PORTFOLIO
ACADEMIC PROJECTS - MASTER
2021 - now | Politecnico di Milano - Italy M.S | Sustainable Architecture and Landscape Design
THE FLOW OF LINES
remedy from nature
in collaboration with Sara Gharibi, Luidmila Sidorova involved in concept development, technical drawing, 3D representation Year of design: 2021
Project location: Via Malaga, Milan, Italy
Landscape design strategy
In order to solve the connection problem in the focused study area, we believe that it is necessary to have a public realm as an entry open space to welcome people as well as facilitate smart mobibity (cycling, walking to public transportation stops). It should be next to the intersection point, between the arches, the canal and the streets. This will bring higher safety for all the space users.
The to-be-proposed public realm should be impressive in terms of visual design to attract people’s attention.
Bridge
Pedestrian bridge leading to kayak club
Pavilion & Kiosk
Open steel structure with undergound kiosk
Water Treatment
Use of filtration layers to purify the water from the beginning point of pollution
Road Transformation for Smart Mobility
Change of vehicle road and materials to facilitate smart mobility
Open Space with Library
Open platform flowing in-between trees next to public libary for children in the first 2 arches
Playground
Next to the residential area
OpenPlatform
For a better view and connection to the area
Artkademy
Use of movable wall and doors to organize events
Hidden Garden
The only natural part of the area
Minimum intervention with just some walking path in-between the existing trees
Exhibition
Open space for art installation and exhibition for Artkademy
Play Ground
Next to the residential area and far from the main roads to achieve safety
Walking & Cycling Path
Change of materials to create a new convenient way for pedestrians and cyclists along the canal
Green Area for School Children
Protection of the existing trees and improvement of relavant plants to create natural atmosphere for school children
Pavilion concept
AGRID
the infrastructure grid as the symboliztion of historical agricultural fields and canals
in collaboration with Chatzistavropoulou Eirini, Druda Asia, Erturk Ahmet , Levina Claudia | Nannini Federica involved in concept development, technical drawing, 2D & 3D representation
Year of design: 2022
Project location: Porto di Mare, Milan, Italy Softwares used: QGIS, AutoCAD, SketchUp, Photoshop, InDesign
UNDERSTAND THE HISTORY OF PORTO DI MARE
THE ORIGIN OF THE WATER
UNDERSTAND THE HISTORY OF PORTO DI MARE
1907
Pirelli Engineer proposes in Milan a project to expand the commercial power of the declining river network, creating a Port of the Sea that could connect the metropolis to the Adriatic towards Po river. The area of Rogoredo was chosen because it was considered an attractive area, because it was spacious and rural and therefore suitable for conveying all the waters of the Milanese.
1907
Rogoredo Lodi Melegnano Canevano
Pizzighettone
BRESCIA
Fiume Po
CREMONA
Fiume Po
Pirelli Engineer proposes in Milan a project to expand the commercial power of the declining river network, creating a Port of the Sea that could connect the metropolis to the Adriatic towards Po river.
1917
The city of milan says yes to the project, then begin work. 1922
The works were blocked for the rise to power du Mussolini, who decided to close all the ports of Lombardy and in particular wanted to put an immediate end to the excavations. 1930
The area of Rogoredo was chosen because it was considered an attractive area, because it was spacious and rural and therefore suitable for conveying all the waters of the Milanese.
1917 The city of milan says yes to the project, then begin work.
1922 The works were blocked for the rise to power du Mussolini, who decided to close all the ports of Lombardy and in particular wanted to put an immediate end to the excavations.
L'Ing. Baselli del Comune expands the project in view of the construction of a new large canal, the Naviglio Grande, connecting the Naviglio Pavese and the Rogoredo area, from Lake Maggiore to Cremona to reach the Po. 1941
The project was approved but Italy entered the war. The works never left. 1979
Darsena is officially closed with a ceremony after the entry of the last cargo boat. 1991
The subway arrived in Milan and in the area of Rogoredo there was a stop that originally had to be called "Fabio Massimo" but it was preferred to dedicate it to the work never finished, that is "Port of Sea".
1941
The project was approved but Italy entered the war. The works never left.
Canals in 1888
1930 L'Ing. Baselli del Comune expands the project in view of the construction of a new large canal, the Naviglio Grande, connecting the Naviglio Pavese and the Rogoredo area, from Lake Maggiore to Cremona to reach the Po.
1979 Darsena is officially closed with a ceremony after the entry of the last cargo boat.
Fiume Po
1991
The subway arrived in Milan and in the area of Rogoredo there was a stop that originally had to be called "Fabio Massimo" but it was preferred to dedicate it to the work never finished, that is "Port of Sea".
MILANO PAVIA PIACENZA MILANO PROVINCE CREMONA PROVINCEThe historical canals have almost dissappeared in the park of Porto di Mare. But now some traces can be seen in the area, especially the part along the main roads. Our idea is not to receate the whole historical canal system, but to use the infrastructure grid to remind people of the historical canals, and to connect the wetland with the existing canals in the farmland to promote biodiversity in the park. The proposed infrastructure grid would not only follow the historical canal grid in some area, but also the topography as the existing condition. Different sectional configurations would be able to symbolize the concept.
SECTIONAL CONFIGURATION OF INFRASTRUCTURE GRID
IDEA PHASES OF ACTIONS
Piacenza 2030
in collaboration with Wu Hongtai, Yu Luzhu, Zhang Yudi, Zhu Chaoyi involved in concept development, technical drawing, 2D & 3D representation Year of design: 2022 Project location: Piacenza, Italy Softwares used: QGIS, AutoCAD, SketchUp, Photoshop, InDesign
OVERVIEW
The rural landscape of Piacenza is highly diverse thanks to the geographical and settlement characteristics. Our point of view is that the rural landscape can be seen as the public assets of the local community, which are capable of raising new interests as well as facilitating a new sustainable lifestyle and productive processes.
From that perspective, we propose 3 green corridors, which can be considered as park systems, with different characteristics according to the territorial context.
FARM-SCHOOLING CORRIDOR
Urban agriculture
FIELD-CROSSING CORRIDOR
Rural agricultural experience
FOREST SHUTTLE CORRIDOR
Hill hiking - cycling
buffer strips as vegetation coridor
mobillity connection
activation of local potentials
Farmstead evolution The greenhouse
Viewpoint platform evolution
Camping area
ACADEMIC PROJECTS - BACHELOR
2014 - 2019 | Hanoi University of Civil Engineering - Vietnam B.S | Architecture
GREEN FLOW
a new meeting place in Stuttgart
In collaboration with Chu Minh Duc
Concept
Stuttgart is apparently a green city with a significantly large amount of greenery. However, these spaces seem to experience poor quality due to the lack of necessary amenities and then activities. Thus, they might be not regarded as LIVING spaces. Thanks to the special location, the site together with the proposed building can be a junction between the existing residential area and the new one. This leads to our main concept of a GREEN FLOW, which performs as a meeting place and promotes the interconnection among inhabitants of both residential areas, through the site.
In the post-fordian era, human beings are seeking new values such as individuality, vernacular culture and collaboration. At the same time, architecture is changing to adapt itself to people with new characteristics and movements: home office, co-working, and especially SHARING ECONOMY. As an innovative city for young and international workforce, Stuttgart needs to seize the opportunity in the Industry 4.0. Then there is a necessity to redesign housing architecture for the young generations with the new lifestyle as well as new types of work, jobs and market.
re-VILLAGE
one of our contributions to a better Hanoi
in collaboration with Chu Minh Duc, Dao Duy Tung, Nguyen Hai Ninh, Hoang Anh
VISUAL ARTS CENTER
integrating spaces into nature
EXISTING SECTION
EXISTING CONDITIONS FUNCTIONAL DIAGRAM
PRACTICAL PROJECTS
2019 - 2021 | TTA-Partners Construction Architecture JSC - Vietnam Junior architect
field hospital
competition project - in collaboration with Nguyen Diep working on concept generation, modelling and visualizing Year of design: 2020 Outstanding Idea Prize - Field Hospital Concept Design Competition Location: Hanoi, Vietnam Softwares used: AutoCAD, SketchUp, Photoshop, InDesign
Step 1: Production
Step 2: Transportation
Step 3: Installation
Step 4: Completion
NORTHEAST
CAI
RONG
HARBOUR NEW URBAN AREA
planning adjustment project - design team of TTA-Partners working on concept representation, master plan drawing, 3D modelling and visualizing Year of design: 2020 Location: Quang Ninh, Vietnam Softwares used: AutoCAD, MS Excel, SketchUp, Lumion, Photoshop, InDesign
Kindergarten
Primary school
Junior high school
Senior high school
Urban greenery
SITE
Zoning for utilization
Walkability
Transit nodes Greenery connection Ocean orientation Ocean coming into townAN CUU CITY RESIDENCE
recall the identity