POR TFO L I O
L u c a s Jo h n s t o n
2021
ABOUT ME My desire to pursue architecture was sparked by the summer I spent with my uncles renovating my grandparents house. Having a grandfather in a wheel chair meant there were many adjustments that were made to improve his quality of life. It was the rewarding feeling of seeing something I helped build have such a meaningful impact on someone that lead me to pursue architecture as a career.
PROFESSIONAL GOALS As a professional I seek to improve the lives of people through well thought out and meaningful design. I plan to develop my technical and leadership skills to someday lead projects alongside other passionate designers.
i
CONTENTS 01 - 12
Mixed Methods Peace Academy
13 - 16
Biblio Bench
17 - 24
Uplift
25 - 28
Planned Parenthood Highland Park
29 - 32
NICU Expansion Providence Holy Cross
33 - 36
UCLA Hampshire
ii
Mixed Methods Peace Academy Senior Design Thesis | 2019
San Luis Obispo, CA | Fifth Year The Peace Academy is a summer learning program in San Luis Obispo looking to someday open a school that focuses on implementing nature into education and fostering more personalized learning methods. This program seeks to help children become active members in their society as well as act as global citizens. Its emphasis on implementing nature into learning is based on the positive impact it has on peoples focus, stress levels, and health. Classes are often taught outdoors, and various outdoor activities are part of the curriculum The idea of mixed methods is based on the principle of learning through problem solving. Using different subjects to investigate a topic encourages trial and error as well as iterative learning so children take the time to gain and improve their skills .
Program & Process The project is located on what was a 340 acre private residence with large agricultural space. The users planned to open a small k-12 school eventually. While these site plans show a developed master plan, this project focus’s on the Kindergarten through second grade space as this is likely what would be the first space to be built in a phased project. For this reason the space will be built on the building pad existing for the current residence while initial admin space will be located near the existing barn to take advantage of existing utilities. As the school grows it would expand deeper into the site providing more privacy and open space for older students.
Existing Site Main Road Parcel Perimeter Plant Agriculture Animal Agriculture Dairy & Housing Natural Vegetation Existing Building
San Luis Obispo
3
Site Program Studies Grade 6-8 Student Community Center Grade K-2 7414 SF
Grade K-2 Grade 3-5
Visual and Performing Arts
Technology and Innovation
Language and Culture
Grade K-2 7414 SF
Language and Culture 21953 SF
Health and Wellness 6838 SF
High School Classes
Ecology and Nature 18637 SF
Health and Wellness 8550 SF
Ecology and Nature
8507 SF
Grade 3-5 12265 SF
Grade 6-8 13801 SF
Health and Wellness Visual and Performing Arts
Student Community Center
Technology and Innovation Ecology and Nature
Language and Culture
Visual and Performing Arts 23464 SF
Technology and Innovation 12622 SF
Student Community Center 12100 SF
8507 SF 6838 SF
Grade 3-5 10197 SF
Grade 6-8 High School Classes
8595 SF
High School Classes
Overall Site Plan
4
K-2 MIXING CHAMBER
COMMUNITY/EVENT SPACE
3-5 MIXING CHAMBER
Lower Campus Site Plan
5
Design Progression
The merging into one building creates easier circulation between students and teachers. The combination of these buildings allows students to mix with other ages of children to help create community amongst all grades.
Overall Site Model
Outdoor Learning Space
6
Design Development Conventional Learning
Systems Section 7
Mixed Methods Learning
Schematic Program Diagram
PV panels & clerestory
Indoor/outdoor learning space
Focused learning space & home room
8
Private upper courtyard
SOLAR PANELS PRODUCE EXCESS ENERGY WHILE SHADING REDUCES THE NEED FOR ACTIVE SYSTEMS MIXING CHAMBER MADE FOR TO BLEND OUTDOOR AND INDOOR LEARNING
Atrium section model
FOCUSED ON EARLY ENGINEERING AND TECHNOLOGY
2ND
RESOURCES FOR LIFE SCIENCES AND MATHEMATICS
Outdoor deck and side entrance 9
ATRIUM SPACE HELPS BRING NATURE INTO THE HEART OF THE SPACE
1ST WATER COLLECTION DISPERSED TO LOWER SITE K HISTORY AND CULTURAL STUDIES
SOLAR AND POWER MANAGEMENT
10
Mixed Methods Vellum Show Piece “PEGS”
“Pegs” was submitted to the 2019 furniture competition in San Luis Obispo. This interactive and fun piece of furniture was designed to align with the concept and ultimate goals of “Mixed Methods Peace Academy”. The design is based off of a classic toy, a hammer and peg board. All the cylinders are hollowed out and weighted to balance with a corresponding member. As you push down one member, another piece will pop up using a system of custom balances below the table.
11
12
Biblio Bench
Design Build Studio | 2018-2019
Cal Poly, San Luis Obispo | Fourth Year Biblio Bench is a design build project in which myself and two others spent thirteen weeks planning, building, and installing a nineteen foot long seating area in front of Cal Poly’s Kennedy Library. Smaller, temporary installments were fairly common throughout the Architecture Department, however, we believed the entrance to the library was a valuable spot for this type of project, and we pushed to build outside of our department. The Library Board of Directors chose an engraved quote as they believed it would inspire students as they left or entered the library and gave them some creative input in the project. The bench is completely friction fit to its concrete base and should not leave any lasting marks on the site if removed. The seating material is composite decking that is recycled and manufactured in California. The Biblio Bench offers two tables to work or eat at, as well as a reclined area to rest facing away from the sun. The bench stays shaded until roughly 1 PM and is a great place for people to relax, have a conversation, and enjoy a break in the day.
In order to securely mount this project, dimensions of the concrete base were taken at every connection point and each member was welded to fit accordingly. The entire frame is galvanized in order to prevent rusting and Bituthene strips were added under the bench to prevent scratching. We met with the Library Board of Directors as well as Facilities Management to submit construction documents to apply for a permit. We received a conditional six month permit in 2019, which we were able to extend and the bench is still standing today.
15
16
Uplift
Permanent Supportive Housing | 2017
Los Angeles, CA | Third Year Uplift is a permanent supportive housing building for the chronically homeless in Skid Row, Los Angeles with street level commercial spaces. The design drivers for this project were self sustainability, security, and community for its residents. The program offers users secure housing as well as many community spaces for residents to recover, connect and grow, all while learning valuable skills. This project was a two person effort in which I played the role of digital and physical model maker while my parter primarily focused on render post production and general graphic design. Research, design and presentations were all collaborative efforts. AIA Integration Awards - Honorable Mention
water
energy
2.
4.
comfort
net-zero water through rainwater collection and grey-water re-use
health & happiness
net-positive energy through PV solar energy collection
mechanical systems in truss gap minimize noise and space constraints on residential units
3.
urban farming & community gardens supply private kitchens and public market
solar energy collection
rooftop community garden
4.
passive daylighting south-facing glazing admits winter sun, overhang rejects summer sun
outdoor circulation
residential units radiant floor heating
residential units
laundry & tech. room
passive ventilation from south-west
common room community kitchen
light wells
2.
1.
4.
community courtyard
light wells
public market
rainwater collection
office
restaurant
residential lobby
underground parking
north-south section
19
10’
20’
40’
80’
Building Program
residential
structure commercial
site
circulation
The program strikes a balance between helping its residents re-acclimate from being homeless while also keeping the living and community spaces secure in Skid Row. Community spaces are designed for people to socialize and learn valuable skills, while a community garden, with an emphasis on herbs and spices, is used to help supply a tea shop on the street level. A portion of these proceeds would circulate back into the supportive housing and continue to help people get back on their feet.
20
Private upper courtyard
Grand stairwell
Street level market space
21
parapet flashing counter flashing rigid insulation
cant roof membrane
T/Slab (Roof) 72’-0”
aluminum sill + flashing
T/Slab (Sixth Floor) 62’-0”
tergo + connectors
gypsum board
T/Slab (Fifth Floor) 52’-0”
equitone fiber cement panels
The two main structural design elements driving this project are the large trusses on the ground floor and diagonal bracing members along the exterior of the building. The trusses elevate the building, giving it a stronger sense of security while also being inviting to people on the first floor to experience the commercial space. The high ceilings and light wells integrated into the courtyard space on the upper floor create a more naturally lit and inviting space. The cross framing supports the building’s primary circulation visually encouraging residents to take the stairwell and will improve their health over time.
glass railing
T/Slab (Fourth Floor) 42’-0” mullion vented air space 1”
girt system batt insulation cold form steel T/Slab (Third Floor) 32’-0”
woolrock insulation
drop ceiling subframe water barrier
drop ceiling tie back
welded steel flange
corrugated metal deck
T/Slab (Second Floor) 22’-0”
weep flashing wood veneer
#3 rebar
counterbalance spring
track
roller
hinge 1” dual pane window mullion
T/Slab (First Floor) 0’-0”
22
Section Model Street Front
Full Building Model
23
Light Well
Site Model
Private Upper Courtyard
24
Planned Parenthood Highland Park, CA | 2020
Boulder Associates Architects | Designer I A 3,390 tenant improvement from two retail stores to a womens health clinic. Planned Parenthood in Highland Park offers healthcare and sex education to an up and coming neighborhood. My roles in this project: • Primary drafter throughout SD, DD, and CD phases • Coordinating and compiling drawings from the consultants • Primary contact with the City of Los Angeles Building Department. In charge of submitting and coordinating comment responses • Conducting field reports through out Construction Administration • Managing document distribution during CA while answering relevant RFI’s and Submittals.
5.
ELECTRICA BE MOUN AFF TO BO LIGHT, THE MOUNTED BOX) UNO 7. J‐BOXES SH BOXES WI FOR DETA
6.
4x4x3/4" FIRE RATED PLYWOOD BACKERBOARD 3'‐0" AFF TO BOTTOM, TYP. ALL WALLS THIS ROOM LOCK GATE
12' - 9 1/4"
4 7/8"
10' - 0"
4 7/8"
10' - 0"
4 7/8"
9' - 0"
8' - 8"
7 3/4"
6' - 7 1/2"
4 7/8"
8' - 9 1/2"
208 EP
CR +44"
FILL GAP BETWEEN BUILDINGS W/PRE‐COMPRESSED SEIMISC SEAL. COLOR TO MATCH EXTERIOR PAINT
SS1
WH
+44"+44"
25
9' - 1 3/8"
4 7/8"
10' - 0"
4 7/8"
10' - 0"
FLOOR 1
1/4" = 1'‐0"
CR +44"
6' - 3"
4 7/8" 4' - 0"
9' - 0"
6' - 6 3/4"
8' - 1 1/2"
+44"
8' - 0" 7 1/4"
+26"+26" DR PB
25
122 +44" CR
5" PB +44" GFI +44" +44" 021
A6.10
9
A
A6.10 13A
4' - 4 1/4"
6' - 3 1/2"
12
012
17A
4 7/8"
D
TV +60" +60"
016
2 A2.11
13A
STAFF TOILET 120
6' - 8"
4 7/8"
11
4A
A6.10 10
S2
6' - 11 1/2"
1A
STAFF BREAK 122
3' - 10 3/4"
19' - 1 3/8"
+26"+26" DR DR
8' - 2"
3' - 0 1/8"
4 7/8"
+60"+60" TV
13A
+44" GFI
4 7/8"
+3"
A6.10
+44"+44"
(N) PAD. RE: PLUMBING AND STRUCTURAL DETAIL SX.XX
4
11' - 11 1/2"
GFI L1 +44"
MANAGER'S OFFICE 119
A6.10
3
13A
6' - 10"
4 7/8"
EXAM 7 14 118
013
1
9' - 1"
EXAM 6 117
WH
A6.10
5
WAITING 101
024
8' - 8 3/4"
JANITOR 116
2
GFI GFI +44" +56"
ALL WALLS THIS ROOM
RECEPTION 102
13A
120
8' - 2"
15
GFI
13A
8' - 10"
116
5' - 4" 4 7/8"
13
119
12 13
024 13A
A6.10
118
A2.20
100
024
+44"
13A
NEW MECHANICAL UNITS
27
015
1A
13A
4' - 4 3/4"
(E) GATE TO REMAIN. DOOR TO BE ELECTRIFIED
A2.10
117
S3
4 7/8"
5' - 3 1/8"
4 7/8" 2' - 1 1/8" CR +44"
EW
126B
CORRIDOR 127
15
3' - 2 7/8"
AP
115
5' - 10 1/2"
102
4A
CR +44"
1' - 6 5/8"
4 7/8"
RECEIVING 115
+44" +44" GFI
4 7/8"
11 A2.20
A6.10
015 EM
15
CLEAN/DIRTY 126 014
3' - 11"
7
013
4 7/8"
EQ 17SIM
11' - 0"
16
4' - 0"
A6.10
S4
A6.10
CLEAN
22SIM
A6.10
4A
DIRTY
3"
A SIM 23
1A
101
CORRIDOR 108
EP
+44" GFI +44"
5" 13A
6 A2.20
6
14
126A
A6.10
EXAM 5 114
009
+44" GFI +44"
3F
4' - 0"
PATIENT TOILET 125
EP
009
3' - 1 7/8"
+44"+44"
10' - 0"
114
24
013
EM 20
GFI +44"
8' - 2"
8 1/2" A6.10
19
21
+44" PB AP
18
L1
PATIENT TOILET 124
13A
125
EQ
B
+21"+21"
4 7/8"
TEAM 123
6' - 11"
GFI +44"
L1
A6.10
7 1/4" 124
22
A6.10
1
6' - 11"
13A
008B
A6.10
10' - 10 3/8"
7 1/4" 17
015
8' - 10 7/8"
1 A2.20
15' - 4 7/8"
8
CORRIDOR 109
17A
23
CORRIDOR 110
105
6' - 2"
+44"+44"
10' - 0"
A6.10
106
A6.10
A
EXAM 4 113
103
4 A7.11
4 7/8"
107
13A
+44"EM
4 7/8"
3' - 11 1/4"
113
5 3/8"
L1
11' - 0"
4 7/8"
4 7/8"
PUBLIC TOILET 103
VITALS
13A
11' - 0"
(E) OPENING TO BE FILLED WITH 0Ba WALL
TALK 104
104
4' - 8 1/2"
112
6 A7.10
TALK 105
111A
EXAM 3 112
2' - 5 7/8"
+44"+44"
10' - 0"
15
CAPPED PLUMBING FOR FUTURE EXAM CASEWORK
4 7/8"
4 7/8" 4' - 1"
WASTE HOLDING 111A
4' - 11 3/4"
+44"+44"
EXAM 1 106
6' - 8 3/4"
10' - 7 1/2"
111B
(E) OPENING TO BE FILLED WITH 0Ba WALL
+44"+44"
S1
EXAM 2 107
9' - 0"
4 7/8" 4' - 0"
IT 111B
207
W
EP LOCK DOOR
Some major project challenges included: • Reviewing and complying with the Office of Historic Resources requirements. This included special approval for exterior light fixtures, signage, sight lines, and a glazing film on the interior of the building. • Filing for a “Request for Modification of building ordinances” as we could not update the site to have a proper accessible path from the accessible parking space to the building entrance without substantially shrinking the exterior of the building.
28
Render by Kassie Hammerschmidt, Boulder Associates
NICU Expansion
Providence Holy Cross | 2020
Boulder Associates Architects | Designer I Providence Holy Cross Medical Center requested a 6,200 sf expansion to their existing NICU space as well as a renovation to the nurse station and administration space of the well baby suite. This project will help reduce overloading on NICU staff, modernize an outdated space, and provide much needed storage space. My roles in this project: • Primary drafter throughout SD, DD, and CD phases • Coordinating and compiling drawings from the consultants and • Outlining items needed for OSHPD submittal and coordinating with Consultants to respond to OSHPD comments • Recording and distributing meeting minutes for design review and consultant meetings
Major project challenges included: • Project staff often could not properly observe infants from the central work station, and became uncomfortable sitting next to the NICU bays with a rolling chair and laptop. To solve this issue we created touch down stations between multiple NICU bays, as shown to the right, which allow nurses to comfortably observe patients closely and have a more functional work space. • During the Construction Documents phase the client decided they wanted to be able to open the Well Baby Suite renovation prior to the NICU expansion. This lead to us create a phased construction plan. As this project crosses over a corridor, we had to redesign our egress path and design temporary egress door and partition details.
31
1' - 3 1/2"
4 7/8"
8' - 8"
2' - 1 1/2"
19 A7.20
4' - 0"
2' - 9"
2' - 9"
CB
057
26A
+60"
V V MA O +60" EM EM
+32"
EP
EM EM
13D 13D
VENT
13D
15D
15B HAM0009
NICU BAY 13 1804C
CL SPC0526
WST0083
GLV0036
5
9 A8.20
14
DSP0825 THM0038
SPC0526
13D
6 10
4' - 0"
2
NICU BAY TYPE A - BAYS 3, 4, 13, 14, 15, 16
4 7/8"
1/2" = 1'-0"
1' - 10"
26A
2' - 2"
BRK0927
4' - 11" 3' - 6"
055
V
V MA O
V
V MA O EM EM
INC0009
+32"+32"+32"
4 A2.20
O MA V
V
O MA V
V
EM EM
7' - 0"
+60" 1' - 8" CB
LOW AIR RETURN
WINDOW SHADE CONTROLS
MON0357 +60"
9
13B
Nurse Touch Down Station
1/2" = 1'-0"
2' - 0"
WN STATION 15B
A2.20
13B
NICU BAY TYPE B - BAYS 1, 17 & 18
A2.10B A2.20
14
15D
13D
15B
15D
REFER TO PLAN FOR LOCATION OF END GLASS
055 LOW AIR RETURN
2' - 0"
BRK0927
A2.20
SS1
13D
NURSE TOUCH DOWN 1' - 9"
26A
2' - 2"
A2.10A A2.20
4' - 11"
4 7/8"
1
6"
15B
15D 15D
14
13D
F
9' - 11 1/2"
DSP0825 THM0038
15D
9 A8.20
GLV0036
CL
15B 4' - 0" TYP.
4 7/8"
NICU BAY 17 1804G G
8
+42"
HAM0009 0 3-1 52
15B
A2.20
DIS0008
15B
WST0083
MON0357 +60"
CB
INC0009
+60" 1' - 8"
4 Sim 19 A7.20 A2.20
V
V MA O
O MA V
V
V
V MA O
+32"+32"+32" O MA V
V
15B SS1
3' - 6"
TYP.
3' - 10"
+42"
0 3-1 52
VENT INC0009
15B
2' - 6 7/8"
1' - 10"
EP
8' - 1 3/4"
IVS0012 15B INF0012
EM EM
15D
INC0009
1
057
O MA V V
IVS0012 INF0012
TYP.
15D
+32" +32" +32"
SS
TYP.
A2.20
26A
HDW0016
4' - 6"
4 7/8"
13
5' - 5"
A2.20
BRK0927 MON0357
V V MA+60" O
SCN053
EM EM
3' - 9"
CB +60"
EP
+32" +32"
055
6' - 11"
IVS0012
+32"
13D 2"
4 7/8"
2' - 9"
DIS0008
EM EM
4' - 10"
12
057
O MA V V
2' - 0"
+42"
V V MA O +60"
4 7/8"
6' - 5"
- / ---
+60"
15D
1' - 0"
13D
26A
6' - 0" 2' - 9"
MON
15D
CB
4' - 10"
15D
15D
2' - 2"
15B
2' - 6"
1' - 0 1/2"
4 7/8"
4' - 0" TYP
12 A8.20
10 A8.20
THM0038
15D
13D
1' - 2"
8' - 3"
GLV0036 DSP0825
13D
12' - 0"
11 A7.11
1' - 0"
19 A7.20
+42"
11 A8.20
3' - 6"
DIS0008
4 7/8"
8
+42"
1' - 0"
+42"
8' - 0 1/2" TYP.
3' - 10"
NICU BAY 14 1804D
CL
1' - 3 1/2"
SS
WST0083
A2.20
0 3-1 52
15B
13D
14
HAM0009
5
BRK0927 MON0357
SS1 CAP
VENT
INF0012
055
A2.20
EM EM
INC0009
12 A7.11
12
O MA V V
+32" +32"
IVS0012
SPC0526
1' - 0"
055 BRK0927 MON0357
ON
9 A8.20
F
1' - 0 1/2"
4 7/8"
ON
12 A7.11
LOW AIR RETURN
32
Render by Kassie Hammerschmidt, Boulder Associates
UCLA MOB UCLA, Hampshire | 2020
Boulder Associates Architects | Designer I UCLA Health is developing a 16,263 sf tenant improvement to an existing two story Chase bank where a new healthcare facility will provide a primary care office as well as a GI procedure suite. One of the driving design fores in this project was the users request for an intimate space that also feels high end. This request was met by selecting warmer toned materials, using playful lighting, and creating variety in the ceiling plane. My roles in this project: • Assistant drafter throughout SD, DD, and CD phases • Primary contact with the City of Thousand Oaks Building department through plan check process • Assisting in the coordination the bidding process by compiling and sending out sets to contractors, responding to Bid RFI’s, and issuing the For Construction Set • Performing document management & distribution during construction administration • Responding to relevant RFI’s, Submittals and consultant and user responses
FLOOR PLAN GENERAL NOTES 1.
2
3
4
5
6
7
A
+84" SC
BAY 1 104
2 1/2" 11' - 6 1/4"
DS SE
+48"
4 7/8"
6' - 6"
4 7/8"
8' - 3 1/4"
4 1/8"
4 7/8"
24" 60"
OUTLET W/ GROUND FAULT CIRCUIT INTERRUPT PROTECTION EMERGENCY OUTLET USB OUTLET
SYMBOLS
4 7/8"
48" 10' - 7 5/8"
36" TYP.
PHONE OUTLET
FLOOR PHONE OUTLET
DATA/PHONE OUTLET
FLOOR DATA/PHONE OUTLET
SYMBOLS SPECIAL PURPOSE OUTLET DESIGNATIONS R
7 1/4"
60"
RECESSED OUTLET (TYPE PER SYMBOL)
SPECIAL PURPOSE OUTLET LEGEND
RECESSED OUTLET (TYPE PER OTHER DESIGNATION)
TV
TV OUTLET
CR
CARD READER
DO
DOOR OPENER BUTTON
DR
DOOR RELEASE BUTTON
KP
KEYPAD INTERCOM
4' - 9 5/8"
SECURITY CAMERA
48"
JUNCTION OUTLET LEGEND
PUSH SIDE DOOR CLEARANCE. ADDITIONAL 12" CLEAR AREA AT DOORS W/ CLOSER & LATCH.
36" TYP.
SYMBOLS JUNCTION BOX OUTLET
P
JUNCTION BOX OUTLET FOR POWER
W
JUNCTION BOX OUTLET FOR FURNITURE WHIPS
C
JUNCTION BOX OUTLET FOR COMMUNICATION/DATA
J J J
MHO
MAGNETIC HOLD OPEN
FIRE ALARM STROBE
PUSH SIDE DOOR CLEARANCE. ADDITIONAL 4" CLEAR AREA AT DOORS W/ CLOSER & LATCH.
36" TYP.
U
GENERATOR ALARM PANEL
SYMBOLS
DOME LIGHT WALL MOUNTED, PLAN VIEW
PUSH SIDE DOOR CLEARANCE. ADDITIONAL 4" CLEAR AREA AT DOORS W/ CLOSER & LATCH.
36" TYP.
WALL MOUNTED, ELEVATION
BS
BATH STATION
CB
CODE BLUE
48"
CC
PATIENT CALL CORD
NCM
NURSE CALL MASTER
DS
DUTY STATION
SE
CEILING MOUNTED, PLAN VIEW
STAFF EMERGENCY
PS
PROJECT
PATIENT STATION
UCLA H
MEDICAL GAS LEGEND N
NITROGEN
O
OXYGEN
V
VACUUM
100B CR
WG
+44"
ADDRESS
248 HAMPSH WESTLAKE V
WASTE ANESTHESIA GAS DISPOSAL
IA
COMPRESSED AIR
COMPRESSED AIR - WALL
5
10' - 9"
9' - 11 1/4"
7 1/4"
4' - 6"
4 7/8"
8' - 8 5/8"
4 7/8"
8' - 8 5/8"
16
252
SE
5' - 0"
1C
3' - 7 7/8"
4 7/8" 7' - 5 7/8"
11' - 6"
+48"
+48"
WAITING 202
18 A6.11
11' - 4 5/8"
11' - 6" 4 7/8"
4 7/8"
60" 48"
4 7/8"
5' - 0" 1
4 7/8"
60"
4 7/8" 4' - 6" 9' - 3 1/4"
+42" 7 1/4"
PUSH SIDE DOOR CLEARANCE. ADDITIONAL 12" CLEAR AREA AT DOORS W/ CLOSER & LATCH.
+66"
1/4" = 1'-0"
A2.
DESCRIPTIO
LOW
DUPLEX OUTLET
DUPLEX FLOOR OUTLET
QUAD OUTLET
QUAD FLOOR OUTLET
R
RECESSED OUTLET (TYPE PER SYMBOL OR OTHER DESIGNATION)
D
DEDICATED OUTLET 208 VOLT OUTLET
GFI
OUTLET W/ GROUND FAULT CIRCUIT INTERRUPT PROTECTION
EM
EMERGENCY OUTLET USB OUTLET
SYMBOLS
DATA OUTLET
FLOOR DATA OUTLET
PHONE OUTLET
FLOOR PHONE OUTLET
DATA/PHONE OUTLET
FLOOR DATA/PHONE OUTLET
RECESSED OUTLET (TYPE PER SYMBOL)
SPECIAL PURPOSE OUTLET LEGEND SYMBOLS
SPECIAL PURPOSE OUTLET
60"
18"
RECESSED OUTLET (TYPE PER OTHER DESIGNATION) TV OUTLET
CR
CARD READER
DO
DOOR OPENER BUTTON
DR
DOOR RELEASE BUTTON
KP
KEYPAD INTERCOM SECURITY CAMERA
JUNCTION OUTLET LEGEND SYMBOLS
JUNCTION BOX OUTLET
JUNCTION FLOOR OUTLET
DESIGNATIONS
J
P
JUNCTION BOX OUTLET FOR POWER
W
JUNCTION BOX OUTLET FOR FURNITURE WHIPS
C
JUNCTION BOX OUTLET FOR COMMUNICATION/DATA
MISCELLANEOUS ELECTRICAL LEGEND MHO
44"
36" TYP.
PUSH SIDE DOOR CLEARANCE. ADDITIONAL 4" CLEAR AREA AT DOORS W/ CLOSER & LATCH.
EP
GP
4"
24" MIN
MAGNETIC HOLD OPEN
36" TYP. 48"
ELEVATOR / STAIR B 200B
©Boulder Associate
ELECTRICAL PANEL GENERATOR ALARM PANEL
FACP
FIRE ALARM CONTROL PANEL
FAAP
FIRE ALARM ANNUNCIATOR PANEL
SYMBOLS
DESIGNATION
48"
1' - 0"
UP
PUSH SIDE DOOR CLEARANCE. ADDITIONAL 4" CLEAR AREA AT DOORS W/ CLOSER & LATCH.
H
HUMIDISTAT
T
THERMOSTAT
NURSE CALL LEGEND SYMBOLS
DOME LIGHT WALL MOUNTED, PLAN VIEW
DESIGNATIONS BS
BATH STATION
CB
CODE BLUE
CC
PATIENT CALL CORD
NCM
NURSE CALL MASTER
DS
DUTY STATION
SE
STAFF EMERGENCY
PS
PATIENT STATION
WALL MOUNTED, ELEVATION CEILING MOUNTED, PLAN VIEW
MEDICAL GAS LEGEND N
NITROGEN
O
OXYGEN
V
VACUUM
IA
WASTE ANESTHESIA GAS DISPOSAL COMPRESSED AIR ZONE VALVE BOX
PROJECT NORTH
TRUE NORTH
Boulder Assoc Architecture + 300 Spectrum Irvine, Californ 949.727.9000 www.bouldera
MECHANICAL CONTROLS LEGEND
WG
A1.10 A2.12
SHEET NUMBER REVISIONS
REV
BRACED PARTITION
A6.11
CORRIDOR 201
HIGH
SOUND PARTITION
J
PULL SIDE DOOR CLEARANCE
F
FLOOR 1 FLOOR 22
PRIORITY
SOUND PARTITION
J
FRONT APPROACH - INTERIOR SLIDING DOORS
CR +44"
3' - 10" 3' - 10"
FLOO
DATE
09/14/2020
LIGHT SWITCH
7 7/8"
004
1/A7.10 LOW
FIRE ALARM STROBE
050
002
36" TYP.
SIDE APPROACH - INTERIOR DOORS
4' - 3 99/128"
3
1/A7.10
0Fa
SOUND PARTITION
I
12"
260 CR +44" 8' - 10 3/4"
0Ba
FURRING PARTITION
SEE PARTITION TYPES, SHEET A7.10 HIGHEST PRIORITY PARTITIONS ARE LISTED FIRST IN THE LEGEND. SUBSEQUENT PARTITIONS DECREASE IN PRIORITY . HIGHER PRIORITY WALLS TAKES PRECEDENCE, SEE WALL PRIORITY DETAILS.
SC
12
A6.11
004
226B CR +44" 253
5' - 6 1/8"
7 7/8"
6' - 2"
004
2
18"
13
207B
+66"
A6.11
002
+22"
20
DRPB
050
2' - 2"
+42"
RECEPTION 203
FD
9' - 0" V.I.F.
1' - 0"
004
DRPB
5' - 6 1/4"
4 7/8" 1C
BRACED PARTITION
SOUND PARTITION
R
PULL SIDE DOOR CLEARANCE
7' - 0 1/8"
053
36" TYP.
PUSH SIDE DOOR CLEARANCE. ADDITIONAL 12" CLEAR AREA AT DOORS W/ CLOSER & LATCH.
(E) ELEVATOR MACHINE 260
002
19
SS-1
4 7/8"
S-4
1/A7.10
MASONRY PARTITION
TV
STAFF TOILET 208
5
1/A7.10
0Bb
1 HOUR FIRE BARRIER
24"
12"
DRAWN BY SHEET TITLE
0Ac
BRACED PARTITION
DESCRIPTION
204292.00
KH
SOUND PARTITION
1 HOUR FIRE BARRIER / SHAFTWALL
U
PULL SIDE DOOR CLEARANCE
7 1/4"
13' - 11 1/4" 4A
GRAPHIC
208
A6.11
1/A7.10
DATA OUTLET LEGEND
11
7 1/4"
D +108" SC
PBDR PBDR
+66" 053A
7
1/A7.10
PROJECT NUMBER
DESIGNATIONS
A2.21
14
A6.11
009 +42"
002
001
13' - 4 1/2"
GI WAITING 226
U
+48"
DS SE DS W
4 7/8"
4
21
+22"
232
6' - 10 3/8"
EM +42"
4 7/8" 11' - 0 3/4" 4 7/8" 4' - 6" 7' - 8" 4 7/8" 2 3/8" 1' - 2 7/8"
7 1/4"
7 1/4"
7 1/4"
002
JANITOR 232 GFI
4 7/8"
8' - 6"
004
12"
8 1/4"
4' - 1 3/4"
3' - 5 7/8"
9"
2' - 3 1/4"
234 CR CR +44"+44"
4 7/8"
7 7/8" 4' - 4 1/8"
4' - 2"
8' - 6 1/4"
SC +108"
RECEPTION 227 A6.11
A6.11
FD
7 1/4"
016A
001
002
MAP-1
7 1/4" 4 7/8" 4' - 3 1/4"
3' - 0"
MED GAS 233 233
053A
004
BS
CS1
+66"
5' - 6 1/4"
4' - 6" 4 7/8"
FS
7' - 7 3/8"
36"
7' - 0 3/4"
7 1/4"
STAFF BREAK 207
9' - 5 3/4"
053
3' - 0"
+42" 8' - 0"
046
4 7/8"
SC +84" 4' - 7 1/2"
5 1/8" 4 7/8" 2' - 4" 4 7/8"
STAIR A 200A
4 7/8"
PATIENT TOILET 228
FD 4' - 0"
4 7/8"
7' - 8 1/2"
226A CR +44"
6' - 8" FD
FS
3' - 0"
7 1/8" 4 7/8"
8' - 0"
A6.11
1/A7.10 HIGH
1/A7.10
DESIGNATIONS
207A 6 3/4"DS 6' - 10 7/8"
7 1/4"
FD
EVS 206 SS-1
CR +44"
+66"
045
202
228
7 1/4"
006
9' - 7 5/8"
1' - 6"
1' - 8 5/8"
4 7/8"
PS SE
206
PATIENT TOILET 205
FD
2' - 5 7/8"4 7/8"
+44" CR
17A
6
2 A2.20
MGA
VAC PUMP / AIR COMPRESSOR 234
4 7/8"
1' - 0"
4' - 1 251/256"
EMEMEM
PS SE
8' - 0 1/8"
1' - 0"
21' - 3 5/8"
EMEMEM
A6.11
002
25
1 A4.10
005
23
8
22
+44" CR
11' - 1"
25
+44" CR
11
10 A2.21
1Aa
UPGRADED-1 HR FIRE BARRIER 1Ra SOUND PARTITION
0Ab
PRIORITY
EXISTING PARTITION GRAPHICS LEGEND
208v 12"
FRONT APPROACH - INTERIOR DOORS
4 7/8" 3' - 0"
1Sa
1 HR FIRE BARRIER
R
4 7/8"
CORRIDOR 213
1 HR FIRE BARRIER / SHAFT
DETAIL
DESIGNATIONS INDICATES HEIGHT IN INCHES AFF TO OUTLET CENTERLINE. +##" DEFAULT HEIGHT = 18" AFF TO CENTERLINE UNLESS TAGGED OTHERWISE. TYPICAL FOR ALL OUTLETS
PULL SIDE DOOR CLEARANCE
004
12' - 2"
TYPE
SYMBOLS
T-SHAPED TURNING SPACE 60"
"
002
EP
4 7/8"
205
003
7' - 9 3/4"
SUB-STATION 229A
A6.11
005
SOILED 217 217
004
13
002
004
-6
002
A6.11
219
212 9' - 4 5/8"
2'
5' - 0"
HOTELING 219
A6.11
1 A2.20
A6.11
R
12
004
4 7/8"
A6.11
7 1/4" 7 1/4"
NCM 9 1/2"
7 1/4"
7 1/4"
4 7/8"
004
002
ADMIN 212
9
1' - 1"
10' - 4"
200A CR +44"
7 1/4"
7' - 6"
PRE-OP 230
60" WHEELCHAIR TURNING CIRCLE
CORRIDOR 209
050
DESCRIPTION
POWER OUTLET LEGEND
FRONT APPROACH - EXTERIOR DOORS
050
10
CR +44"
6' - 9"
CORRIDOR 247
261
7 1/4"
002
VITALS 210
12' - 2 3/4"
4 7/8"
6"
ROOF STAIR 261
8 1/2"
BS
35
EXAM 216
002
004
4 7/8"
A6.11
ACCESSIBILITY CLEARANCES
004 004
CORRIDOR 204
050
4 7/8"
17
002
10"
4 7/8"
PRE-OP 231
A6.11
+42"
34
CORRIDOR 229
7' - 11 7/8"
15
004
4' - 10 1/2"
7 1/4" 9 1/4"
4 7/8"
050 002
4 7/8"
EXAM 215
W
245
5 1/2"
AP
7 1/4"
6' - 9"
FD
PATIENT TOILET 245
NURSE OFFICE 244
17A
6' - 1"
4' - 4 3/8"
CC
CONST DOCUM
SHUT OFF VALVE
FURRING PARTITION
4' - 3 3/4"
216
11' - 6"
PB
4 7/8" 2' - 8 3/8"
7 1/4"
DS
7 1/4"
+42"
NCM
S VO 4 7/8" 9' - 9 5/8" 4 7/8"
4' - 3 1/2"
8 1/4"
9' - 0"
DS SE
EP 002
244 4' - 5 5/8" 6' - 5 1/4"
D
008
MA STATION 214
14
004
7 5/8"
004
9"
4 7/8"
MED GAS ALARM PANEL
GRAPHIC
1. 2.
4A
EP
6' - 0"
AP
002
7 1/4"
9' - 0"
CC
002
10 5/8"
9"
5.
220
CORRIDOR 225
215
004
A6.11
6' - 8"
+22" 004
A6.11
221
4 7/8"
2' - 0"
002
1' - 6 1/4" 4 7/8"
011
B
2' - 9 3/8"
CC
222 17A
A6.11
BS
PB
OV S SECC
+42"
002
050
4 7/8"
2 A2.20
043
A6.11
24
CC
4 7/8"
CC 223
2 A4.10
246
030
030
30"
29
004
19' - 1 3/4"
S VO
A6.11
MA STATION 004 243
+42" +42" NEMA
OV S SECC
4A
28
002
DS SE
DS SE
CC
CR +44"
4 7/8"
S VO
4 7/8" 7' - 6"
EW-1
004
27
RECOVERY 235
SOILED STORAGE 246
030
HW-1
002
7' - 6"
012 EM
032 029
1C
5 5/8"
CORRIDOR 239
26
EM
008
002
A6.11
013 EM
+42" EM
1' - 2 1/2" 2' - 8 3/8" 6"
OV S SECC
017 050
11 3/4"
RECOVERY 236
+48"
11' - 6"
+48"
- 1 SE 5/8" 7'DS
1' - 7"
211
16
BOOSTER PUMPS ON 4" HOUSEKEEPING PAD, SEE PLUMBING, ELECTRICAL & STRUCTURAL
4 7/8"
+44"DO
3.
EXAM 220
5' - 0"
A2.21
EP
8' - 0"
2' - 9 3/8"
RECOVERY 237
EXAM 221
4.
40" 0" 7/8"
15 18
CORRIDOR 249
EXAM 222
HW-1
4 7/8"
2.
GFI +42"
+42" GFI
IA EM
VV EM +48"
SS
DO +44"
4 1/4" 4 3/4"
EXAM 223 CLEAN 211
EW-1 1 A2.21 9' - 11 1/2"
8 4 1/4" 3' - 11 1/2"
4 7/8"
6' - 0"
248
004
7 1/4" 4' - 4 1/8"
3 A4.10
+42" GFI SOV
CR +44"
DS
8' - 8 5/8" 3' - 5 5/8" 4 7/8"
SE
SOV
238
4' - 0 3/8"
FS
GI PROCEDURE 252
+48"
250
S-3
249
4
+44" DO CB
CR +44"
S-2
11' - 9 5/8"
D W
240
CLEAN STORAGE 238
8
5' - 9 3/8"
EM
7
11 5/8"
BOOSTER PUMP 1' - 0" 248
3
EM
+22" +22"
4 7/8"
016B
A2.21
7
4' - 9 1/2"
9' - 10"
2 5
6 A2.21
+42" GFI
+48" EM
+42"
4A
009
4 7/8"
EQ
8' - 9 5/8"
30
W
7' - 9 5/8"
A6.11
EM
S-4
KITCHENETTE 240 UNISTRUT AT THIS WALL FOR FUTURE STORAGE
6' - 0"
1C
9
4 7/8"
8' - 6 1/2"
2' - 0"
4 7/8"
028A FD
SCOPE PROCESSING 251
EM
2' - 5 1/2"
S-2
GI PROCEDURE 250
EM EM +48" 17' - 11 3/8"
4' - 3 1/2"
10' - 10"
14' - 0"
002
EM
+48"
+42" GFI
32
VV
4 7/8"
028A A6.11
241
5' - 0 5/8" EQ
4' - 4 1/2"
W
GFI
DO CB +44"
HOTELING 241 33
SS
7' - 9"
004
31
002
004
3' - 8"
EM
W
GFI
13' - 7"
+48"
4 7/8"
EQ
033
033
EM
050
+48" EMEM
EM
+80" +80"
EM
+80"
002
004
PLUMBING CHASE LOCATED BEHIND DRAWERS. COORDINATE DRAWER DEPTH WITH PLUMBING DRAWINGS.
6
7 1/8" 4 7/8"
14' - 0"
36"
6 5/8"
DS SE
13' - 5 3/8"
3' - 0"
7 1/4"
24"
4
4 7/8"
MED GAS AREA ALARM PANEL
NEW PARTITION GRAPHICS LEGEND
DIMENSIONS ARE TO FACE OF INTERIOR GYPSUM BOARD, TILE BACKER BOARD, FACE OF EXTERIOR WALL MATERIALS, STRUCTURAL GRIDS AND CENTERLINES WHERE INDICATED. ALL GYPSUM WALLBOARD TO BE 5/8" UNO TYPE 'X' EXCEPT AT THE FOLLOWING LOCATIONS: A. AT RESTROOMS WITHOUT A SHOWER (TCNA COM2 AREAS), PROVIDE 5/8” UNO MOISTURE AND MOLD RESISTANT GYPSUM BOARD COMPLYING WITH ASTM C1396 FOR WALLS AND BEHIND TILE. B. AT WET AREAS INCLUDING BUT NOT LIMITED TO SHOWERS, STERILE PROCESSING ROOMS, JANITOR CLOSETS, SAUNAS, AND SWIMMING POOLS (TCNA COM3/4 AREAS), PROVIDE: 1. AT TILE AND WALL PROTECTION LOCATIONS: PROVIDE 5/8” UNO COATED GLASS-MAT FACED WATER-RESISTANT GYPSUM WALLBOARD COMPLYING WITH ASTM C1178 OR 5/8” UNO CEMENT BACKER BOARD COMPLYING WITH ASTM C1325 2. AT PAINTED GYPSUM BOARD LOCATIONS (INCLUDING CEILINGS): PROVIDE 5/8” UNO TYPE ‘X’ MOISTURE AND MOLD RESISTANT GYPSUM BOARD COMPLYING WITH ASTM C1396 PROVIDE RATED ENCLOSURES OR PUTTY PACKS AROUND ALL OUTLETS, BOXES, CABINETS, PIPING, DUCTWORK, ETC., THAT ARE RECESSED IN FIRE-RATED WALLS. ENCLOSE TO PROVIDE SAME RATING AS THE WALL WHERE IT IS LOCATED. SEE SHEET A7.11. DOORS SHALL BE LOCATED 4" FROM ADJACENT PERPENDICULAR WALL TO THE INSIDE EDGE OF THE DOOR FRAME, UNO. SEE DOOR DETAILS ON THE A8 SHEETS. J-BOXES SHOWN BACK-TO-BACK MAY BE ADJUSTED TO OFFSET THE BOXES WITH APPROVAL FROM THE ARCHITECT. SEE SHEET A7.11 FOR DETAILS RELATED TO RECESSED BOXES.
48"
3 11' - 4 7/8"
7 1/4"
2
COMPRESSED AIR - CEILING
AAP-1 MAP-1 SOV
FLOOR PLAN GENERAL NOTES 1.
1
E
TRUE NORTH
1/4" = 1'-0"
8' - 3 1/4"
A1.10 A2.11
FLOOR 1
+42"
1
PROJECT NORTH
4 7/8"
9/14/2020 1:07:35 PM
FIRE ALARM ANNUNCIATOR PANEL
ZONE VALVE BOX
A THIS LINE IS 1 INCH LONG WHEN PRINTED TO FULL SCALE
FIRE ALARM CONTROL PANEL
FAAP
DESIGNATIONS
A8.20
EQ
BIM 360://204292.00 UCLA Hampshire/204292.00 - UCLA Hampshire - A19.rvt
FACP
NURSE CALL LEGEND
A
4' - 3 1/2"
9/14/2020 1:07:40 PM
©Boulder Associa
ELECTRICAL PANEL
EP
GP
4"
24" MIN
A
35
Boulder Ass Architecture 300 Spectrum Irvine, Califo 949.727.900 www.boulde
MISCELLANEOUS ELECTRICAL LEGEND
18"
44"
UP
FLOOR 1
C
JUNCTION FLOOR OUTLET
DESIGNATIONS
F
B
FLOOR DATA OUTLET
DATA OUTLET
PUSH SIDE DOOR CLEARANCE. ADDITIONAL 12" CLEAR AREA AT DOORS W/ CLOSER & LATCH.
7 1/4" 5' - 7"
60"
+48" SE
ELEVATOR / STAIRS B 100B
10
4 7/8"
208 VOLT OUTLET
GFI
EM
SIDE APPROACH - INTERIOR DOORS
3' - 10"
1' - 0"
CR
6' - 6"
12"
I
4 7/8"
4 7/8"
FIRE-RATED ¾” PLYWOOD INSTALLED SCREWED TO STUDS: 6”-8’6” AFF ALL WALLS THIS ROOM
+44"
4 7/8"
4 7/8" 5' - 0" 7' - 0 5/8" 4' - 5 3/8"
053
12 A7.11
12 A7.11
2' - 3 1/8"
36"
PULL SIDE DOOR CLEARANCE 3' - 10"
156
053A
DEDICATED OUTLET
U
8' - 11 3/4"
CR +44"
D
SC
15' - 5 1/2"
155B
QUAD FLOOR OUTLET
RECESSED OUTLET (TYPE PER SYMBOL OR OTHER DESIGNATION)
208v
8' - 7"
4 7/8"
DUPLEX FLOOR OUTLET
R
DATA OUTLET LEGEND
D
MPOE 156
DUPLEX OUTLET QUAD OUTLET
DESIGNATIONS INDICATES HEIGHT IN INCHES AFF TO OUTLET CENTERLINE. +##" DEFAULT HEIGHT = 18" AFF TO CENTERLINE UNLESS TAGGED OTHERWISE. TYPICAL FOR ALL OUTLETS
8"
D
101A CR
3' - 6 1/8"
+66" +66"
010
+44" 4 7/8"
DS SE
DS SE 3' - 6" 4 7/8"
4 7/8" 5' - 0"
LOW
SYMBOLS
18"
120V NEMA 5-20R
U
T-SHAPED TURNING SPACE 60"
48"
EP +84" SC
EP
+66" +66"
BAY 2 105
BRACED PARTITION
24"
12"
DESCRIP
HIGH
SOUND PARTITION
"
12"
REVISIONS
REV
SOUND PARTITION
FRONT APPROACH - INTERIOR SLIDING DOORS
RE: ELEC PLAN FOR ROOM LAYOUT
155A
023
8' - 2 5/8"
054
TELECOMM 155
ASSI EQPT
DATE
PRIORITY
LIGHT SWITCH
S-2
050
1/A7.10 LOW
SEE PARTITION TYPES, SHEET A7.10 HIGHEST PRIORITY PARTITIONS ARE LISTED FIRST IN THE LEGEND. SUBSEQUENT PARTITIONS DECREASE IN PRIORITY . HIGHER PRIORITY WALLS TAKES PRECEDENCE, SEE WALL PRIORITY DETAILS.
PULL SIDE DOOR CLEARANCE
004
002
EP 12' - 0 1/2"
7 1/8"
WAITING 101
100A
3 3/8"
+48"
DS SE
ADMIN 153
27
1/A7.10
0Fa
SOUND PARTITION
R
J
17 SIM A7.11
0Ba
FURRING PARTITION
SOUND PARTITION
PULL SIDE DOOR CLEARANCE
DS SE
002
002
CONFERENCE (6) 150
BRACED PARTITION
09/14/2020
MASONRY PARTITION
+84" SC
3' - 11 3/4"
1' - 11"
26
7' - 8 1/8"
2' - 10 5/8"
4 7/8"
BAY 3 106
20B
2 3/4"
E
6' - 8"
BS A6.10
EXAM/PROCEDURE 13 151
AP
25
4 7/8" 4' - 1 1/2" SS-1
1/A7.10
DESIGNATIONS
150 004
002 FD
CR +44"
19
STAIRS A 100A
11' - 6"
4' - 5 3/8" 4 7/8" 9' - 10 1/4"
COUNTER LENGTH
6 7/8" 4 7/8"
4 7/8" 1
5' - 6" 29
151
153
004
A6.10
4 7/8" 5' - 0 3/4"
CC
28
A8.20
4 7/8"
EVS 149
149
A6.10
1/A7.10
0Bb
1 HOUR FIRE BARRIER
FRONT APPROACH - INTERIOR DOORS
004
EP
SUB-STATION 154A
17 A2.20 4 7/8" 4' - 10 1/8"
8' - 0 1/2"
004 002
9' - 10 1/8"
148
CORRIDOR 154
DRAWN BY
0Ac
BRACED PARTITION
DESCRIPTION
PROJECT NUMBE
204292.00
KH
SOUND PARTITION
1 HOUR FIRE BARRIER / SHAFTWALL
PULL SIDE DOOR CLEARANCE
002
26
10' - 2"
CR +44"
PATIENT TOILET 152
24
CR +44"
4 7/8"
152
103B
1' - 0"
8' - 3 3/8"
4 3/8"
DRPB
13
DS SE
DS SE +48" 4 7/8" 3' - 2"
050
25 A6.10
-6
2'
12"
HOTELING 148
WATER HEATER ALARM PANEL
C
GRAPHIC
FRONT APPROACH - EXTERIOR DOORS
002
1/A7.10
POWER OUTLET LEGEND
60" WHEELCHAIR TURNING CIRCLE
EXAM 10 140
004
7 1/4"
A6.10
004
101B
4 A2.20
+48"
DS +22"
4 7/8" 7' - 11" 4 7/8"
4 7/8" 2 3/8"
17 SIM A7.11
002
5' - 5 5/8"
004
002
STORAGE 146
4 7/8"
BS
006
004
002
004
PRIORITY
1/A7.10
1/A7.10
0Ab
FURRING PARTITION
R
6"
A6.10
003
8' - 11 7/8"
7' - 5 5/8"
4 7/8" 4 7/8" 3' - 9 1/4"
BLOOD DRAW CORRIDOR 103
24
1 A2.20
+44" CR
4' - 6"
1 A2.20
8' - 0"
002
DETAIL
1/A7.10 HIGH
1Sa 1Aa
UPGRADED-1 HR FIRE BARRIER 1Ra SOUND PARTITION
EXISTING PARTITION GRAPHICS LEGEND
1. 2.
+48"
17 SIM A7.11
EXTENT OF SHAFT ABOVE
VITALS 145
A6.10
12 A7.11
TYPE
1 HR FIRE BARRIER
1' - 11"
4 7/8"
5
6
EP 17A
+42"
6' - 7 5/8"
4 7/8"
4 7/8"
2' - 10 7/8" 4 7/8"
CR +44" 8' - 9 5/8" 2 3/8" 4 7/8"
108 CR +44"
004 3' - 6 1/8"
2
CC
EXAM 11 141
4 7/8"
7' - 6 7/8"
107 002
4 7/8" 3' - 11 3/4"
002
4
+66"
SC +84" 3' - 10"
002
C
037
3
1 A4.10
SOILED 109
19
1C
6' - 8"
11' - 6" 4 7/8"
051
4A
PATIENT TOILET 108
FD 4A
004
004 109
1C
7 1/8" 3' - 7 1/8"
SOILED 139
5' - 8 1/4" 4 7/8"
140
CC
146
050
A6.10
1' - 6"
022
+42" +42"
CORRIDOR 144
4 7/8"
004
3' - 8"
BLOOD DRAW LAB S-2 8 107
A6.10
EW-1 HW-1 9
125 FD 8' - 0"
002
001
17 SIM A7.11
5' - 0"
24
CORRIDOR 144
002
RECEPTION 102
4' - 10 1/4"
D
26
EXAM 12 142
A6.10
101C
102
4 7/8" 2 3/8"
+42"
6' - 5 3/8"
10
4 7/8"
7
009
34
DRESSING 113
+42" 5' - 5 1/2" 002
+42" +42"
+42"
009
A6.10
33
2' - 0"
1' - 11 1/4" 4 7/8"
+42"
009
32
112
PATIENT TOILET 125 7 1/4"
4 7/8"
141
004
SC +84" 4' - 0"
4' - 0"
10' - 4"
4A
A6.10
1' - 11"
004
4 7/8"
CLEAN 112
PATIENT TOILET 124
8' - 0"
004
041
31
17 SIM A7.11
11' - 6 3/8"
4' - 8 1/4"
004
2 A2.20
113
17' - 2"
1' - 11 1/4"
S-2 1C
30
+42" 7' - 10 5/8"
A
4' - 0 3/4" A6.10
4 7/8"
+42"
14' - 10 1/2"
A
X-RAY 114
X01
6' - 11 3/8"
061
4 7/8"
002
020
1C
CR +44"
4 7/8"
4 7/8"
8 5/8" 3' - 0"
7 1/4"
DS
9' - 8"
6' - 9 1/4"
CR +44"
X09 18' - 6 5/8"
12' - 5 7/8"
4' - 7 3/4"
X04
SUB-WAIT 111
114
BS
8' - 5"
X06
CORRIDOR 110
23
S-2
5C 4A
FD 3' - 11 1/4"
22
17 SIM A7.11
008
A6.10
5C
+42" GFI
124 6' - 10 3/8"
4 7/8" 4 1/4"
X02
X07
BIM 360://204292.00 UCLA Hampshire/204292.00 - UCLA Hampshire - A19.rvt
004 2' - 6 3/8"
003
002 004 4 7/8" 3' - 0"
EM +42"
EM
139
10' - 5"
CC
AP
+42"
21
P.O.C. 132
4 7/8"
142
17A
W
2 A4.10
1' - 6"
4A
EW-1 HW-1
002
13
006
X05
D
132 1C
10' - 5"
19
+44" 11' - 10 1/2" CR
6' - 11 3/4"
GFI +42"
004
VITALS 115
050
004 4 7/8"
CORRIDOR 143
4 7/8"
A6.10
11' - 2 5/8"
+42" +42" 11' - 6"
EXAM 1 116
DS SE
002
+48"
DS SE
+48"
DS SE
+48"
11' - 1 3/4"
EXAM 2 117
17 SIM A7.11 2' - 10 1/2"
A6.10
4' - 4 7/8" OH 18
004
U
3 5/8" 1 1/4"
2' - 2 3/8"
CC
002
U
4 7/8"
116
12
EXAM 3 118
+22"
4 7/8"
9' - 3"
CC
5.
DESCRIPTION 1 HR FIRE BARRIER / SHAFT
138
3 A2.20
004
6' - 5 1/4"
4 7/8"
117
CC
CC
BS
9' - 3"
118
12 A7.11
+48"
137
17 A6.10
4.
GRAPHIC
ACCESSIBILITY CLEARANCES
002
20
EXAM 9 138
CC
4' - 5 5/8"
PB
MA STATION 131
002
5' - 1 1/2"
CORRIDOR 123
17 SIM A7.11
7 1/4"
4 7/8" 1' - 7"
17A
10' - 0 1/4"
12 A7.11
136
+22"
9' - 7 3/4"
10' - 2"
004 002
DRPB
119
4 7/8"
16
NCM
7' - 0 3/4"
7 1/4"
EXAM 8 137
CC
004
1 1/4" 5' - 0"
4 7/8" 2' - 11 1/4"
A6.10
CORRIDOR 133
002
122
10' - 5"
EXAM 7 136
134 CR +44"
18
3 5/8"
SOILED 119 6"
A6.10
A6.10
121
4' - 9 7/8"
11
4 7/8"
3.
002
15
DRPB
035
10' - 5"
+42" +42"
EP 7' - 9 3/8"
10' - 2"
6' - 10 1/32"
2' - 9 7/8"
3' - 10 1/8" 4 7/8"
A6.10
14
4' - 5 1/8"
CC
4 7/8"
CLEAN 134
129
4 7/8"
4 7/8" 2' - 2 1/8"
120
002 A6.10
004
004
1' - 6"
10A
12 A7.11
16' - 10"
HOTELING 128
10' - 3 1/2"
10' - 3 1/2"
+48"
CC
050
MANAGER'S OFFICE 129
050
3 A4.10
DS SE
DS SE
11' - 6"
CC
4' - 10 1/8"
12 A7.11
002
044
EXAM 6 122
4 7/8"
004 002
4 7/8"
ATS-EQ
8' - 5"
10 A7.11
128
EXAM 5 121
DS SE
+48"
8' - 1 1/2"
ATS-CR
4 7/8"
004 002
ATS 127
044
044
EXAM 4 120
C
ATS-LS
EP
004
BREAKER
RE: ELEC PLAN FOR ROOM LAYOUT
X-RAY RE: ELEC
1Ad3
16' - 10" RACEWAY FOR POWER AT WINDOWS
4 7/8"
WIREWAY W/ BREAKERS
RE: ELEC PLAN FOR ROOM LAYOUT
+48"
3' - 4 1/2" 4 7/8" 3' - 1 5/8"
157B
+44" CR
4 7/8"
9
4 1/4"
EP
ELECTRICAL 157 MAIN SWITCHBOARD RE: ELEC
A8.20
7' - 2 5/8"
135
EP
3' - 6 3/8" 6 1/8"
EP
6' - 0 5/8"
+44" CR
4 1/8"
4 7/8"
11
+44" CR A7.11
157
4 7/8"
21' - 6 5/8"
B
NEW PARTITION GRAPHICS LEGEND
DIMENSIONS ARE TO FACE OF INTERIOR GYPSUM BOARD, TILE BACKER BOARD, FACE OF EXTERIOR WALL MATERIALS, STRUCTURAL GRIDS AND CENTERLINES WHERE INDICATED. ALL GYPSUM WALLBOARD TO BE 5/8" UNO TYPE 'X' EXCEPT AT THE FOLLOWING LOCATIONS: A. AT RESTROOMS WITHOUT A SHOWER (TCNA COM2 AREAS), PROVIDE 5/8” UNO MOISTURE AND MOLD RESISTANT GYPSUM BOARD COMPLYING WITH ASTM C1396 FOR WALLS AND BEHIND TILE. B. AT WET AREAS INCLUDING BUT NOT LIMITED TO SHOWERS, STERILE PROCESSING ROOMS, JANITOR CLOSETS, SAUNAS, AND SWIMMING POOLS (TCNA COM3/4 AREAS), PROVIDE: 1. AT TILE AND WALL PROTECTION LOCATIONS: PROVIDE 5/8” UNO COATED GLASS-MAT FACED WATER-RESISTANT GYPSUM WALLBOARD COMPLYING WITH ASTM C1178 OR 5/8” UNO CEMENT BACKER BOARD COMPLYING WITH ASTM C1325 2. AT PAINTED GYPSUM BOARD LOCATIONS (INCLUDING CEILINGS): PROVIDE 5/8” UNO TYPE ‘X’ MOISTURE AND MOLD RESISTANT GYPSUM BOARD COMPLYING WITH ASTM C1396 PROVIDE RATED ENCLOSURES OR PUTTY PACKS AROUND ALL OUTLETS, BOXES, CABINETS, PIPING, DUCTWORK, ETC., THAT ARE RECESSED IN FIRE-RATED WALLS. ENCLOSE TO PROVIDE SAME RATING AS THE WALL WHERE IT IS LOCATED. SEE SHEET A7.11. DOORS SHALL BE LOCATED 4" FROM ADJACENT PERPENDICULAR WALL TO THE INSIDE EDGE OF THE DOOR FRAME, UNO. SEE DOOR DETAILS ON THE A8 SHEETS. J-BOXES SHOWN BACK-TO-BACK MAY BE ADJUSTED TO OFFSET THE BOXES WITH APPROVAL FROM THE ARCHITECT. SEE SHEET A7.11 FOR DETAILS RELATED TO RECESSED BOXES.
2.
8
36"
1
A A
COMPRESSED AIR - WALL COMPRESSED AIR - CEILING
AAP-1
MED GAS AREA ALARM PANEL
MAP-1
MED GAS ALARM PANEL
PROJECT
UCLA HA
ADDRESS
248 HAMPSHIR WESTLAKE VIL
CONSTR DOCUM
Some major project challenges included: • During the permitting process we were notified that although a new emergency generator was built and approved, there would need to be a separate permit for the enclosure surrounding the generator. We were able to prove that this generator would not impact the TI space and were able to start construction of the interior while the enclosure was still under review. • At the beginning of the Construction Administration phase, the client requested a complete redesign of our proposed stairwell. We were able to argue for an additional service fee and had to rush to design and coordinate with the contractor on a custom staircase in order to ensure we would create a major impact to the critical path.
Render by Kassie Hammerschmidt, Boulder Associates
36
tha nk you. (626) 353 - 9571 lucasljohnston@yahoo.com issuu.com/lucas.johnston