Lucía Gil Arizón [Portfolio]

Page 1

PORTFOLIO ARQUITECTURA

LUCÍA GIL ARIZÓN

LUCÍA GIL ARIZÓN

Arquitecta

Sevilla, España

luciagilari@gmail.com

+34 644 323 078

SOFTWARE

2D&3D

AutoCAD

SketchUp

Enscape

Twinmotion

Photoshop

Illustrator

Indesign

BIM

Revit Architecture

Revit MEP

Revit Structures

Naviswork

Dynamo

IDIOMAS

Español Nativo

Inglés Fluido (C1)

INTERESES

Estudiante de teatro

Pintura

Retratos digitales

Diseño web

EXPERIENCIA LABORAL & ACADÉMICA

Mar·2018-actualidad

vtrilloarquitectos

Sevilla, España

Oct·2021-actualidad

Departamento nacional

ANZ proyectos

Gestión integral de proyectos de reforma e interiorismo

Página 4

Mar·2018-Oct·2021

Departamento internacional

Arquitectura y diseño de escenografías, museos, exposiciones

Página 13

2022 [Educación]

Máster “BIM Manager para la fase de diseño acorde a la ISO-19650” RF AECO Competence Center

Jun·2015-Sep·2015

Albaba S.L.

Sevilla, España

May·2016-Ene·2018

Aitken Turnbull Architects

Edimburgo, UK

Página 22

2015 [Educación]

Arquitectura

Universidad de Sevilla, España

Página 24

| 2 |

PORTFOLIO ARQUITECTURA

EXPERIENCIA LABORAL

| 3 |

Oct·2021-actualidad

ANZ proyectos Sevilla, España

Arquitectura e interiorismo

Llave en mano

Especialización en reformas de farmacias

COLABORACIÓN EN LOS

SIGUIENTES PROYECTOS:

+Farmacia Chacón (Sanlúcar La Mayor)

+Farmacia González Ponce (Huelva)

+Farmacia Fátima Pereda (Huelva)

+Farmacia Saralegui (Puerto Santa María)

+Farmacia Morell (La Rinconada)

+Farmacia Ana Domínguez Cerrato (Cádiz)

+Reforma vivienda Alejo Fernández (Sevilla)

+Farmacia Rosalía Chacón (Badajoz)

+Farmacia Japón 26 (Sevilla)

+Farmacia Elena Lemus (Badajoz)

+Vivienda Víctor de Dios (Asunción - Sevilla)

+Farmacia La Arboleda - Tomares (Sevilla)

+Farmacia Campos Campos (Coria del Río)

+Farmacia Colchero García (Huelva)

+Clínica dental Calderón-Salado (Pilas)

MIS RESPONSABILIDADES:

• Revisión y mejora de planimetría

• Imágenes 3D + recorridos virtuales 360º

• Desarrollo de mediciones y presupuestos con comparativos costo-cliente

• Elección de materiales

• Elaboración de planimetría de oficios

• Resolución de imprevistos de diseño en obra

• Levantamiento de planos

| 4 |
Inicio

Farmacia Saralegui (Puerto de Santa María) PLANIMETRÍA DE OFICIOS

PROJECT & DESIGN

Proyecto de reforma de Farmacia

Cliente: Ana y Rocío Garcia-Trevijano Saralegui· Ubicación: Plaza Tula Ruiz Golluri 12, El Puerto de Santa María, Cádiz noviembre.2022

info@anz-project.com www.anz-project.com

| 5 |
Fecha: 08·11·2022 Revisión: © Derechos Reservados 2018 LineANZ.S.L. Queda prohibida cualquier reproducción total ALZADO AA' ALZADO CC' ALZADO BB' A' 1 3,3 2,01 3,49 2,85 1,75 3,47 2 0,86 2,84 3,3 3,3 4,18 1,45 3,3 7,25 4,52 5,72 2,53 3,3 5,5 3,3 R4,6 1,06 1,2 3,49 1,2 1,89 Centro de la curva Centro de la curva Centro de la curva 0,56 0,14 R4,08 R4,08 0,52 0,48 0,44 0,39 0,33 0,29 0,35 0,41 0,46 0,5 0,53 0,55 0,22 0,55 0,53 0,5 0,46 0,41 0,35 0,29 0,22 0,52 0,48 0,44 0,39 0,33 0,26 0,19 0,12 0,61 0,58 0,54 0,49 0,43 0,36 0,29 0,21 0,6 0,56 0,52 0,46 0,4 0,33 0,25 0,17 0,6 0,56 0,52 0,46 0,4 0,33 0,25 0,17 0,61 0,58 0,54 0,49 0,43 0,36 0,29 0,21 2 2 Fecha: 08·11·2022 Revisión: © Derechos Reservados 2018 LineANZ.S.L. Queda prohibida cualquier reproducción total ALZADO CC' ALZADO BB' 8,63 8,01 LED detrás de marco LED detrás de arco LED detrás de marco 1,7 0,8 0,7 2,1 1 1,3 1,01 1,7 1,7 0,8 0,8 1 0,8 1,2 1,8 0,6 0,6 0,3 0,5 0,4 LED sobre lamas Enchufe con tapa conmutado Enchufe con tapa conmutado 1,71 1,5 1,5 1,76 1,18 0,91 LED detrás de arco Punto de luz rótulo Detrás de marco Punto de luz rótulo Detrás de marco
5,81 5,85 2,15 projects
4,71
Fecha: 08·11·2022 Revisión: © Derechos Reservados 2018 LineANZ.S.L. Queda prohibida cualquier reproducción total
ALZADO AA' ALZADO CC' ALZADO BB' A' A LAMA CURVA Ver detalles 8,25 8,95 8,6 3 8,2 3,43 3,43 3,43 4,71 R4 R4,5 R4,5 5,85 5,85 4,71 R3,99 3,03 0,13 LAMA CURVA Ver detalles LAMA DIAGONAL Ver detalles LAMA HORIZONTAL PÓRTICO Ver detalles LAMA VERTICAL Ver detalles LAMA HORIZONTAL PÓRTICO Ver detalles LAMA VERTICAL PÓRTICO Ver detalles LAMA CURVA Ver detalles REMATE PUERTA REMATE PUERTA
5.22. Oficios. Fachada. Lamas imitación madera

Farmacia Colchero García (Huelva) PLANIMETRÍA DE OFICIOS

PLANO:

AL-02. ESTADO REFORMADO. CODIFICACIÓN

PLANO:

IN-01. OFICIOS. INSTALACIONES. FONTANERÍA Y SANEAMIENTO

OFICIOS. ACABADOS. SUELOS

Desagüe conectado a red de saneamiento existente

PLANO:

AL-04.1 OFICIOS. ALBAÑILERÍA. PARTICIONES VERTICALES

de

2

SUELO 02. Suelo porcelánico imitación madera en espiga. Treverkmust de Marazzi - pieza espiga SUELO 03. Suelo porcelánico imitación madera en espiga. Treverkmust de Marazzi - pieza rectangular

Perfil de transición 1. Distinto nivel

Perfil de transición 2. Mismo nivel. Negro

SUELO 01. Suelo porcelánico Timeless Pearl Mate de Cifre NOTA. Incluir nivelado de todos los suelos

PLANO: C IN-03.1 OFICIOS. INSTALACIONES. ILUMINACIÓN Proyector en superficie tipo NOX de Beneito

o similar

cilíndrica en superficie (L=25cm aprox)

SUELO 02. Suelo porcelánico imitación madera en espiga. Treverkmust de Marazzi - pieza espiga

SUELO 03. Suelo porcelánico imitación madera en espiga. Treverkmust de Marazzi - pieza rectangular Perfil de transición 1. Distinto nivel

Perfil de transición 2. Mismo nivel. Negro

SUELO 01. Suelo porcelánico Timeless Pearl Mate de Cifre NOTA. Incluir nivelado de todos los suelos

| 6 |
RACK + SAI Reutilización de carpintería existente pA v2 bA pC pD pB
MT01 Office AR01 PL01 PL01 PL01 Macetero + planta artificial Estantería metálica de Esmelux o similar ESTANT.01 ESTANT.01 TAQ.01 TAQ.01 Taquillas Office rebotica Mesa de trabajo rebotica Armario ZAP AR01 MT01 Office x y Carp. metálica. Vidrio Carp. metálica Carp. madera PL02 Reutilización de estantería existente Reutilización de cajonera existente p puerta v ventana b persiana número: existente letra: nuevo color del texto © Derechos Reservados 2016 LineANZ.S.L. concep.S.A. Todos los Derechos Reservados. Queda prohibida cualquier reproducción total o parcial sin autorización expresa de LineANZ.S.L. concep.S.A. 0 1 3m 2 A3 e 1/50 Llave de local húmedo Tubería de AFS Tubería de ACS RACK + SAI
B
B
T
a red
saneamiento existente Conectado a red de abastecimiento existente Desagüe conectado a red de saneamiento existente Termo eléctrico horizontal en falso techo.
Tubería
saneamiento Split T Termo eléctrico horizontal (1 ud.) © Derechos Reservados 2016 LineANZ.S.L. concep.S.A. Todos los Derechos Reservados. Queda prohibida cualquier reproducción total o parcial sin autorización expresa de LineANZ.S.L. concep.S.A. 0 1 3m 2 A3 e 1/50 RACK + SAI M.3,25 M.2,11 TAB.1,15 M.0,44
Conectado
de
de
Alisado de paredes Trasdosado directo Adaptación de rampa Tabiquería de pladur M. TAB. Tabica de pladur Refuerzo de pladur a partir de tubular metálico TAB.1,55 Trasdosado directo Ver plano de acabados Altura libre: 2.20m htabica: 0.60m Altura libre: 2.20m htabica: 0.60m Refuerzo (puerta colgada) Altura libre: 2.10m htabica: 0.70m Alisado de pared h=2.80m © Derechos Reservados 2016 LineANZ.S.L. concep.S.A. Todos los Derechos Reservados. Queda prohibida cualquier reproducción total o parcial sin autorización expresa de LineANZ.S.L. concep.S.A. 0 1 3m 2 A3 e 1/50 1,03 0,85 2,47 1,15 0,54 2,18 1,19 0,88 0,54 2,38 2,55 3,16 1 RACK + SAI
A
Faure
Luminaria
Luminaria cilíndrica colgada (L=25cm aprox) Lineal LED Downlight genérico 30W Luminaria esfera vidrio integrada en carril colgado Lineal LED integrada en carril colgado Proyector integrado en carril colgado Luminaria de emergencia Tira LED de suelo a techo Tira LED * * © Derechos Reservados 2016 LineANZ.S.L. concep.S.A. Todos los Derechos Reservados. Queda prohibida cualquier reproducción total o parcial sin autorización expresa de LineANZ.S.L. concep.S.A. 0 1 3m 2 A3 e 1/50 0,97 0,97 0,80 3,00 2,61 4,00 0,65 0,84 0,84 0,84 1,00 1,00 0,84 0,84 1,06 1,53 0,94 0,87 0,90 0,90 0,65 1,02 0,42 0,42 1,47 0,87 0,69 0,76 1,36 0,84 0,84 1,36 0,84 1,39 1,02 1,48 1,26 2,21 1,68 3,63 1,71 1,40 0,85 0,85 0,05 0,09 0,89 0,83 0,65 1,09 1,09 0,60 1,00 0,57 1,50 1,20 0,70 1,60 1,60 0,51 26,73
SUELO 02 SUELO 01 - AL-08. OFICIOS. ACABADOS. SUELOS Perfil de transición 1 Perfil
transición
SUELO 03 SUELO 03
2,21 3,04 1,22 1,68 2,44 3,7896
RACK + SAI
SUELO 02 SUELO 01
-
Perfil de transición 1
SUELO 03
PLANO:
AL-08.
Perfil de transición 2 SUELO 03
© Derechos Reservados 2016 LineANZ.S.L. concep.S.A. Todos los Derechos Reservados. Queda prohibida cualquier reproducción total o parcial sin autorización expresa de LineANZ.S.L. concep.S.A. 0 1 3m 2 A3 e 1/50 2,21 3,04 1,22 1,68 2,44 3,7896

Farmacia Campos Campos (Coria del Río)

INFOGRAFÍA 3D + VISITA VIRTUAL 360º (SKP+ENSCAPE/TWINMOTION)

| 7 |

Farmacia La Arboleda (Sevilla)

INFOGRAFÍA 3D + VISITA VIRTUAL 360º (SKP+ENSCAPE/TWINMOTION)

| 8 |

Farmacia

Morell (La Rinconada)

PLANIFICACIÓN DE FASES DE OBRA

PROJECT & DESIGN

Proyecto de reforma y ampliación de Farmacia

Cliente: Morell · Ubicación: C/ Virgen de Gracia. 1. 41309. La Rinconada. Sevilla

info@anz-project.com www.anz-project.com

| 9 |
OBRA FARMACIA vending mesa RACK +0.25 +0.00 eb1 eb1 eb1 eb1 eb1 taq1 taq2 taq3 taq4 Gollmann Zwick AG GO.compact An Al: 3,20 3,00 3,40 Máximo número de paquetes: 19.000 24.130 ESTADO REFORMADO OBRA OBRA FARMACIA mesa RACK +0.25 +0.00 eb1 eb1 eb1 eb1 eb1 taq1 taq2 taq3 taq4 taq5 taq6 Gollmann Zwick AG GO.compact An Al: 3,20 3,00 3,40 m Máximo número de paquetes: 19.000 24.130 ESTADO REFORMADO ESTADO ACTUAL project info@anz-project.com www.anz-project.com PROJECT & DESIGN Proyecto de reforma y ampliación de Farmacia Cliente: Morell · Ubicación: C/ Virgen de Gracia. 1. 41309. La Rinconada. Sevilla Septiembre 2022 Fecha: 20·09·2022 © Derechos Reservados 2016 LineANZ.S.L. / concep.S.A. Todos los Derechos Reservados. Queda prohibida cualquier reproducción total o parcial sin autorización expresa de LineANZ.S.L. / concep.S.A. 4.5. Fase 5 0 1 5m A3 e 1/100 ESTADO INICIAL ESTADO FINAL FASE 4. ESTADO INICIAL FASE 4. ESTADO FINAL OBRA FARMACIA vending mesa +0.25 +0.00 eb1 eb1 eb1 eb1 eb1 taq1 taq2 taq3 taq4 TV Gollmann Zwick AG GO.compact L An Al: 3,20 3,00 3,40 Máximo número de paquetes: 19.000 24.130 ESTADO REFORMADO ESTADO ACTUAL OBRA OBRA FARMACIA RACK +0.25 +0.00 eb1 eb1 eb1 eb1 eb1 taq1 taq2 taq3 taq4 taq5 taq6 TV Gollmann Zwick AG GO.compact x An Al: 3,20 3,00 3,40 m Máximo número de paquetes: 19.000 24.130 ESTADO REFORMADO ESTADO ACTUAL project info@anz-project.com www.anz-project.com PROJECT & DESIGN Proyecto de reforma y ampliación de Farmacia Cliente: Morell · Ubicación: C/ Virgen de Gracia. 1. 41309. La Rinconada. Sevilla Septiembre 2022 Fecha: 20·09·2022 © Derechos Reservados 2016 LineANZ.S.L. concep.S.A. Todos los Derechos Reservados. Queda prohibida cualquier reproducción total o parcial sin autorización expresa de LineANZ.S.L. / concep.S.A. 4.5. Fase 4 0 1 5m A3 e 1/100 ESTADO INICIAL ESTADO FINAL FASE 3. ESTADO INICIAL FASE 3. ESTADO FINAL CAJONERA OBRA FARMACIA OBRA ESTADO ACTUAL +0.25 +0.00 El robot se instalará en una Fase posterior. El
instalación de las bandejas. CAJONERA ESTADO REFORMADO ESTADO ACTUAL project
falso techo debe quedar abierto para la futura
Septiembre 2022 Fecha: 20·09·2022 © Derechos Reservados 2016 LineANZ.S.L.
concep.S.A. Todos
LineANZ.S.L.
concep.S.A. 4.2. Fase 1 0 1 5m A3 e 1/100 ESTADO INICIAL ESTADO FINAL +0.25 +0.00 DEMOLICIÓN MURO CAJONERA -SE MONTA ROBOT -SE CIERRA FALSO TECHO BAJO BANDEJA ROBOT OBRA FARMACIA DEMOLICIÓN MURO CERRAMIENTO TEMPORAL ESTADO REFORMADO ESTADO ACTUAL OBRA +0.25 +0.00 Gollmann Zwick AG GO.compact L An Al: 3,20 3,00 3,40 m Máximo número de paquetes: 19.000 24.130 CERRAMIENTO TEMPORAL CAJONERA ESTADO REFORMADO ESTADO ACTUAL ESTADO REFORMADO project info@anz-project.com www.anz-project.com PROJECT & DESIGN Proyecto de reforma y ampliación de Farmacia Cliente: Morell · Ubicación: C/ Virgen de Gracia. 1. 41309. La Rinconada. Sevilla Septiembre 2022 Fecha: 20·09·2022 © Derechos Reservados 2016 LineANZ.S.L. / concep.S.A. Todos los Derechos Reservados. Queda prohibida cualquier reproducción total o parcial sin autorización expresa de LineANZ.S.L. / concep.S.A. 4.3. Fase 2 0 1 5m A3 e 1/100 ESTADO INICIAL ESTADO FINAL FASE 1. ESTADO INICIAL FASE 2. ESTADO INICIAL FASE 1. ESTADO FINAL FASE 2. ESTADO FINAL
/
los Derechos Reservados. Queda prohibida cualquier reproducción total o parcial sin autorización expresa de
/

Farmacia Saralegui (Puerto de Santa María) PLANIFICACIÓN DE FASES DE OBRA

PROJECT & DESIGN

Proyecto de reforma de Farmacia

Cliente: Ana y Rocío Garcia-Trevijano Saralegui· Ubicación: Plaza Tula Ruiz Golluri 12, El Puerto de Santa María, Cádiz

info@anz-project.com www.anz-project.com

PROJECT

Proyecto de reforma de Farmacia

Cliente: Ana y Rocío Garcia-Trevijano Saralegui· Ubicación: Plaza Tula Ruiz Golluri 12, El Puerto de Santa María, Cádiz julio.2022

www.anz-project.com

PROJECT & DESIGN

Proyecto de reforma de Farmacia

Cliente: Ana y Rocío Garcia-Trevijano Saralegui·

Fecha: 18·07·2022 Revisión: © Derechos Reservados 2018 LineANZ.S.L. Queda prohibida

| 10 | FARMACIA ESTADO ACTUAL PARTICIÓN TEMPORAL OBRA ESTADO REFORMADO CAJONERA CAJONERA ESTADO ACTUAL ESTADO REFORMADO ESTADO REFORMADO PARTICIÓN TEMPORAL FARMACIA projects
info@anz-project.com www.anz-project.com
Fecha: 18·07·2022 Revisión: © Derechos Reservados 2018 LineANZ.S.L. Queda prohibida cualquier reproducción total o parcial sin autorización expresa de LineANZ.S.L. 3.4. Fase 4 0 1 5m A3 e 1/100 FASE 4. ESTADO INICIAL FASE 4. ESTADO FINAL FASE 4. ESTADO INICIAL FASE 4. ESTADO FINAL FARMACIA CAJONERA PARTICIÓN TEMPORAL ESTADO REFORMADO OBRA MOVER MOBILIARIO ANTES DE CERRAR CON PARTICIÓN TEMPORAL FARMACIA ESTADO REFORMADO ESTADO REFORMADO PARTICIÓN TEMPORAL CAJONERA projects info@anz-project.com
Ubicación: Plaza Tula Ruiz Golluri 12, El Puerto de Santa María, Cádiz julio.2022
DESIGN
&
Fecha: 18·07·2022 Revisión: © Derechos Reservados 2018 LineANZ.S.L. Queda prohibida cualquier reproducción total o parcial sin autorización expresa de LineANZ.S.L. 3.3. Fase 3 0 1 5m A3 e 1/100 FASE 3. ESTADO INICIAL FASE 3. ESTADO FINAL FASE 3. ESTADO INICIAL FASE 3. ESTADO FINAL FARMACIA OBRA CAJONERA CAJONERA CAJONERA CAJONERA ESTADO REFORMADO FARMACIA projects
julio.2022
cualquier reproducción total o parcial sin autorización expresa de LineANZ.S.L. 3.1. Fase 1 0 1 5m A3 1/100 FASE 1. ESTADO INICIAL FASE 1. ESTADO FINAL FARMACIA CAJONERA CAJONERA OBRA PARTICIÓN TEMPORAL ESTADO REFORMADO CAJONERA ESTADO REFORMADO ESTADO REFORMADO CAJONERA PARTICIÓN TEMPORAL projects info@anz-project.com www.anz-project.com PROJECT & DESIGN Proyecto de reforma de Farmacia Cliente: Ana y Rocío Garcia-Trevijano Saralegui· Ubicación: Plaza Tula Ruiz Golluri 12, El Puerto de Santa María, Cádiz julio.2022 Fecha: 18·07·2022 Revisión: © Derechos Reservados 2018 LineANZ.S.L. Queda prohibida cualquier reproducción total o parcial sin autorización expresa de LineANZ.S.L. 3.3. Fase 2 0 1 5m A3 1/100 FASE 2. ESTADO INICIAL FASE 2. ESTADO FINAL FASE 1. ESTADO INICIAL FASE 2. ESTADO INICIAL FASE 1. ESTADO FINAL FASE 2. ESTADO FINAL

Vivienda Ivo (Tomares) DISEÑO + RECORRIDO VIRTUAL

| 11 | 0 1 5m PLANTA SÓTANO / BASEMENT PLAN 0 1 5m PLANTA BAJA / GROUND FLOOR PLAN 0 1 5m

Clínica dental Calderón-Salado (Pilas) DISEÑO

| 12 |

Mar·2018-Oct·2021

vtrilloarquitectos Sevilla, España

Arquitectura y diseño

Especialización en escenografías, museos, exposiciones

COLABORACIÓN EN LOS

SIGUIENTES PROYECTOS:

+“The Invisible Worlds” - Museo de Historia

Natural de Nueva York (EEUU)

+Iran Mall Art Gallery (Irán)

+Museo arqueológico de Estambul (Turquía)

+Saudi Pavilion Expo 2020 Dubai (EAU)

+Opportunity Pavilion Expo 2020 Dubai (EAU)

+Topkapi Palace (Turquía)

+Pabellón Real Aníbal González, Sevilla (España)

MIS RESPONSABILIDADES:

• Coordinación de diferentes equipos (arquitectura, iluminación, audiovisual, escenografía, gráficas, etc)

• Desarrollo de detalles constructivos

• Detalles de elementos escenográficos y muebles expositivos

• Ordenación de objetos expositivos

• Colaboración en el proceso de diseño

| 13 |
Inicio

COORDINACIÓN DE EQUIPOS

“The Invisible Worlds” - Museo de Historia Natural de Nueva York (EEUU)
| 14 |

COORDINACIÓN DE EQUIPOS

“The Invisible Worlds” - Museo de Historia Natural de Nueva York (EEUU)
| 15 |

DESARROLLO DE DETALLES CONSTRUCTIVOS

“The Invisible Worlds” - Museo de Historia Natural de Nueva York (EEUU)
| 16 |

Saudi Pavilion Expo 2020 Dubai (EAU) PLANIMETRÍA

(ESCENOGRAFÍAS, ILUMINACIÓN, MATERIALES)

The rear of all scenographies must be treated to guarantee that no light leaks through cracks, joints,etc. Buildings must be fully opaque.

The final shape of the scenography must be coordinated with the lighting integrated in it (recesses and protrusions).

SCENOGRAPHY *1

01 AL AHSA OASIS, QARA PASSAGEWAY

02 JABAL AL-MANJOR, ENGRAVINGS

03 RAJAJEEL PILLARS, AL JOUF

04 MADAIN SALEH NABATEAN CONSTRUCTIONS, AL MADINAH

05 OMAR IBN AL-KHATTAB MOSQUE, AL JOUF

06 MASMAK FORT, RIYADH

07 AL-SHINANAH TOWER, QASSIM

08 AL-AAN PALACE, NAJRAN

09 AT-TURAIF, RIYADH

10 NOUR WALI HOUSE

11 GATE OF QAISARIAH SOUQ, AL HOFUF

12 EMARAH PALACE, NAJRAN

13 RIJAL ALMAA, ASIR

14 IBRAHIM PALACE, AL HOFUF

NOTES:

This drawing will be revised and modified if required, according to as-built information, construction codes, technical specifications and facilities calculation by the architectural project.

Check dimensions on site prior to commencement of any works.

HVAC duct system must be redesigned to fit into the final area (limited by a drywall attached to the metallic truss) Ducts should be distributed at the same level and as high as possible.

Ducts running along the top of the escalator and funicular leaving sides free for the upper parts of the scenography. To cover the HVAC ducts with black flexible elastomer if the costs are affordable to improve the acoustic conditions. MEP consultants to confirm access requirements and methodology of access to all devices.

SAUDI PAVILION 2020 BMA Boris Micka Associates Heritage Scenography - PRE-PRODUCTION II GENERAL SECTION I EX.2-320 0 5 10m A1 1:100 A3 1:200 1 A1 1:100 A3 1:200 SECTION VIEW 4 5 6 7 00 GF 25.860 01 MP 31.060 02 CW 36.560 03 MZ 39.960 00 TF 52.860 B2 CL 23.260 B2 FL 20.860 09 05 02 01 12 10 08 13 14 NOTES: This drawing will be revised and modified required, according to as-built information, construction codes, technical specifications and facilities calculation by the architectural project. Check dimensions on site prior to commencement of any works. 01 AL AHSA OASIS, QARA PASSAGEWAY 02 JABAL AL-MANJOR, ENGRAVINGS 03 RAJAJEEL PILLARS, AL JOUF 04 MADAIN SALEH NABATEAN CONSTRUCTIONS, AL MADINAH 05 OMAR IBN AL-KHATTAB MOSQUE, AL JOUF 06 MASMAK FORT, RIYADH 07 AL-SHINANAH TOWER, QASSIM 08 AL-AAN PALACE, NAJRAN 09 AT-TURAIF, RIYADH 10 NOUR WALI HOUSE 11 GATE OF QAISARIAH SOUQ, AL HOFUF 12 EMARAH PALACE, NAJRAN 13 RIJAL ALMAA, ASIR 14 IBRAHIM PALACE, AL HOFUF SCENOGRAPHY SCENOGRAPHY MATERIAL SPECS A. Structure in aluminum profile frames (40x40x2 mm) adhere with polyurethane foam on the perimeter at the back of the blocks. B. Sculpted blocks of high-density extruded polystyrene 20 kg/m3 (self-extinguishing). black tinted fireproof resin finish on the back of the blocks. C. Outer layer in fireproof reinforced polyester resin and glass fibre sheets with natural aggregates of mineral origin. D. Finishing natural stained patina made of natural soil/dirt to replicate the ageing process of the materials according to real buildings. non-visible joints, resin and patina will be applied to ensure seamless finish. * SPECS NOTES: Specialist to propose any suitable material for these basic specs to develop heritage as per design. Additionally, to the corresponding windows and/or window shutters and doors, all openings in the buildings will include a ventilated rear-box in fire-proof MDF finished in matt black paint to allocate the necessary lighting fixtures and/or projection screens. The rear of all scenographies must be treated to guarantee that no light leaks through cracks, joints,etc. Buildings must be fully opaque. The final shape of the scenography must be coordinated with the lighting integrated in (recesses and protrusions). 1 EX.2-330 1 EX.2-331 HVAC duct system must be redesigned to fit into the final area (limited by drywall attached to the metallic truss) Ducts should be distributed at the same level and as high as possible. Ducts running along the top of the escalator and funicular leaving sides free for the upper parts of the scenography. To cover the HVAC ducts with black flexible elastomer if the costs are affordable to improve the acoustic conditions. MEP consultants to confirm access requirements and methodology of access to all devices. 0 5 10m A1 1:100 A3 1:200 4 5 6 7 00 GF 01 MP 31.060 02 CW 36.560 03 MZ 39.960 00 TF 52.860 09 05 02 01 12 10 08 13 14
1 EX.2-331
LIGHTING. FIXTURES FIXED TO METAL PIPES. CROSS SECTION EX.2-500 1 A1 1:50 A3 1:100 SECTION VIEW A1 1:50 A3 1:100 0 2 E 00 GF 25.860 01 MP 31.060 02 CW 36.560 F 03 MZ 39.960 A1 2 A1 1:25 A3 1:50 DETAIL VIEW A2 A1 A2 A1 A2 LIGHTING FIXTURES. FIXED TO METAL PIPES LOCATED AT SIDES AND TOP OF THE ESCALATOR AND FUNICULAR. A1. Lighting fixtures for specific interesting scenography areas. A2. Lighting fixtures for overall lighting base of the larger scenography areas. MEP to confirm access requeriments and methodology of access to all required devices. Colour filtering, dimming and focusing of the lighting fixtures will be carried out under specialized art direct once the lighting equipment and the scenography are fully completed. Lighting stimation by building A1 1:25 A3 1:50 0 1 NOTES: This drawing will be revised and modified required, according to as-built information, construction codes, technical specifications and facilities calculation by the architectural project. Check dimensions on site prior to commencement of any works. Revisions: 2019.11.04 Lighting metal tube support has been raised, and anchored to the ceiling, including an upper electrical tray. Pending to coordinate ceiling hanged lighting support metal tube with HVAC layout. Heritage Scenography - PRE-PRODUCTION LIGHTING. FIXTURES INTEGRATED INTO SCENOGRAPHY. BUILDING A1 1:30 A3 1:60 NOTES: This drawing will be revised according to as-built information, technical specifications architectural project. Check dimensions on site works. MEP to confirm access access to all required devices. Colour filtering, dimming will be carried out under lighting equipment and Additionally, to the corresponding shutters and doors, all lighting fixtures and/or projection ventilated rear-box in fire-proof paint. The final location of backlit revision of the general The final shape of the scenography the lighting integrated in LIGHTING FIXTURES. INTEGRATED INTO THE B1. Hidden lighting fixtures. horizontal protrusions hidden lighting fixtures façade that is relevant. B2. Hidden lighting fixtures. highlight the architectural 1 A1 1:30 A3 1:60 FRONT ELEVATION. BUILDING 4 3 NTS AXONOMETRY. BUILDING 4 B2 B2 B2 B2 B1 B1 B1 B1 B1 B1 B1 B1 B1 B2 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B2 B2 B2 B2 B2 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 NOTES: This drawing will be revised and modified required, according to as-built information, construction codes, technical specifications and facilities calculation by the LIGHTING FIXTURES. INTEGRATED INTO THE SCENOGRAPHY. B1. Hidden lighting fixtures. Flexible linear lighting on all horizontal protrusions or emerging volume bases or hidden lighting fixtures behind every hole of the façade that is relevant. B2. Hidden lighting fixtures. Ground recessed light up to highlight the architectural vertical elements. 1 A1 1:30 A3 1:60 FRONT ELEVATION. BUILDING 3 NTS AXONOMETRY. BUILDING 4 B2 B2 B2 B2 B1 B1 B1 B1 B1 B1 B1 B1 B1 B2 B1 B1 B1 B1 B1 B1 B1 B1 B2 B2 B2 B2 B2 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1
| 17 |

Saudi Pavilion Expo 2020 Dubai (EAU) PLANIMETRÍA (ESCENOGRAFÍAS, ILUMINACIÓN, MATERIALES)

1 A1 1:200 A3 1:400 MIDDLE SECTION 2 A1 1:200 A3 1:400 FRONT VIEW 3 A1 1:200 A3 1:400 SQUARE SECTION 2 3 5 A1 1:200 A3 1:400 PLAN VIEW KALEIDOSCOPE. ORIGINAL PROPOSAL. DIMENSIONS 4 A1 1:200 A3 1:400 TRAPEZOIDAL SECTION 4 6 NTS 3D VIEW 7 NTS 3D VIEW. SQUARE SECTION 8 NTS 3D VIEW. TRAPEZOIDAL SECTION 1 0 10 20m A1 1:200 A3 1:400 10 A1 1:100 A3 1:200 ZOOM 10 9 A1 1:200 A3 1:400 PLAN VIEW. TRUE DIMENSION 9 5.55 10.48 11.44 10.48 11.44 9.63 11.44 11.54 11.54 R14.4000 5.45 5.55 11.44 15.27 15.27 11.44 15.27 15.82 15.82 11.44 5.45 11.44 Current Kaleidoscope that Revit inlcude is longer than this BMA proposal NOTES: This drawing will be revised and modified if required, according to as-built information, construction codes, technical specifications and facilities calculation by the architectural project. Check dimensions on site prior to commencement of any works. 5.5500 1.86 R14.40 R14.40 R14.40 R14.40 R14.40 REV1. 2019.06.17 0.27
| 18 |

Saudi Pavilion Expo 2020 Dubai (EAU) COORDINACIÓN DE EQUIPOS

April 2021 IDENTITY COVERS FOR PROJECTORS. PARTIAL PLAN N 1 A 1:50 A3 1:100 PLAN VIEW. IDENTITY 5 6 7 H H' 0 5m A1 1:50 A3 1:100 C.1 C.2 C.3 C.4 C.5 C.6 C.7 C.8 C.9 3D VIEWS III COVERS FOR PROJECTORS. DETAILS 1m 0.5 A1 1:10 A3 1:20 Notes: The covers base plate exact position will be adjusted on site. Profile dimensions to be confirmed by supplier. COVERS FOR PROJECTORS HEIGHTS (h) C1 1.81m C2 1.37m C3 0.93m C4 1.76m C5 1.54m C6 1.39m C7 1.24m C8 1.83m C9 1.42m 1 A1 1:10 A3 1:20 ELEVATION VIEW A1 1:10 A3 1:20 ELEVATION VIEW 5 A1 1:10 A3 1:20 PLAN VIEW 3 NTS 3D DETAIL NTS 3D VIEW NTS 3D VIEW 4 NTS 3D DETAIL 7 NTS 3D DETAIL NTS 3D DETAIL 3 4 7 9 1 6 h: ADJUSTABLE HEIGHT 1.2m 2.4m 1.776 R 1.605m 1.955m ARC LENGTH R 1.725m 1.881m ARC LENGTH 1.481 0.509 0.100 18mmØ ALUMINUM PIPE 12mmØ GLASS FIBRE ROD 12mmØ THREADED ROD CORNER STRETCH FABRIC FIXED TO FRAME USING VELCRO 18mmØ ALUMINUM PIPE M10 NUT & BOLT PIVOT CHANNEL EASY DRAPE (OR SIMILAR) POWDER COATED 48mmØ ALUMINUM PIPE TELESCOPIC R 1.088m 1.655m ARC LENGTH 1.776 1.481
| 19 |

Opportunity Pavilion Expo 2020 Dubai (EAU)

PLANIMETRÍA (ESCENOGRAFÍAS, ILUMINACIÓN, MATERIALES)

| 20 |

Topkapi Palace (Turquía)

VI.A 1/1 Vietnamese porcelain II-02-V1

JA.A 1/1 Japanese. Theme II-02-V1 JA.B 1/2 Japanese. Arita 17-18th cen. II-02-V1

15J/247 15J/111

15J/247

VI.A JA.A JA.B

JA.A A/A Japanese. Theme PENDING TO ADD A1 1:15 A3 1:30

5

15J/203 15J/509 15J/204 15J/14 15J/131 15J/110 15J/138

15J/110

3 1

15J/14

15J/131

15/682 1/1996 1/2001 15J/213 15J/137 15J/240

15/682 VI.A

JA.B 1/2 Japanese. Arita 17-18th cen. II-02-V1

1/2066

BUILDING 2. KEY PLAN 15/682

15J/111 15J/138 15J/137 15J/240 15/1850 15/2157 15/2434 15/686 2

15J/138 15J/111 15/247

15J/138

Approximate object boundary. More dimensions needed. 15/1850

| 21 |

SHOWCASE II-02-V1 1 A1 1:15 A3 1:30 ELEVATION VIEW 0 A1 1:15 A3 1:30 3 A1 1:15 A3 1:30 ELEVATION VIEW 2 A1 1:15 A3 1:30 ELEVATION VIEW 5 A1 1:15 A3 1:30 ELEVATION VIEW 4 A1 1:15 A3 1:30 PLAN VIEW 0.80 1.75 2.50 0.80 1.75 2.50 0.80 1.75 2.50 0.80 1.75 2.50 2.50 2.50 2.50 2.50
* Possible mismatch between image and dimensions. Object without reference image. 15/686 15/2434 15/2157
ORDENACIÓN DE OBJETOS EXPOSITIVOS

May·2016-Ene·2018

Aitken Turnbull Architects Edimburgo, UK

Arquitectura Residencial

Arquitectura Educacional Arquitectura de la salud Intervención en edificios protegidos

COLABORACIÓN EN LOS SIGUIENTES PROYECTOS:

+Lauder health centre (Lauder)

+Duns primary school (Duns)

+Murieston medical practice (Murieston)

+Craigiebield House Hotel (Penicuik)

+Macmillan Support Centre (Glasgow)

+Life Church (Edinburgh)

+Redevelopment of Murray Royal Hospital

MIS RESPONSABILIDADES:

• Reuniones con clientes y proveedores

• Revisión de Planos de MEP (instalaciones)

• Revisión de Planos de estructuras

• Planning applications

• Preparación de planimetría para Building Warrant Applications

• Familiarización con Building Regulations

• Toma de medidas + levantamientos

| 22 |
Inicio

Redevelopment of Murray Royal Hospital LEVANTAMIENTO + ENCAJE PROPUESTA

PROPOSED CREATION OF FLATS AT FORMER HOSPITAL

MURRAY ROYAL HOSPITAL. PERTH AITKEN TURNBULL ARCHITECTS

THE FORMER MURRAY ROYAL HOSPITAL BUILDING

The former Murray Royal Hospital was originally designed in 1821 by William Burn and opened in 1828 as the Murray Royal Asylum. Situated on a hill to the east of Perth city, the asylum is the earliest surviving asylum building in Scotland and one of the few remaining from this period in the UK. Based on the 1816-18 Wakefield Asylum design, the building is notable for its retention of its H-plan form, with few additions or extensions since 1888. Externally, the building is generally plain in its design, with the exception of the Doric porch to the entrance.

Internally, there is a significant amount of 19th century decorative detail, including a well-detailed former ballroom, former library, timber verandahs and a number of timber fire surrounds. Much of the early 19th century interior room layout and later 19th century decoration survives. There is a central octagonal hall with slender iron columns and decorative wrough iron railings to each floor. There are some rooms with significant decorative plasterwork, including a large former ballroom with stage and fluted timber columns, a library with a decorative plaster ceiling and some of the other rooms with decorative cornicing and canted corners. There are a number of decorative timber fire surrounds surviving, some with overmantels.

Annat Lodge MUIRHALLROAD Mount Pleasant DRIVE Craigend Cottage Murray Royal Hospital Millennium Park (public) DW Shelter Gas Path(um) Path Path Cottage 4 GANNOCHYROAD 32.9m 2 LANGLEY MurrayHouse Birnam
MainBuilding MurrayRoyalHospital N 01 Landscape Plan Scale 1:1000 Ordnance Survey, (c) Crown Copyright 2017. All rights reserved. Licence number 100022432 Site Area 8.83ha project Revision Description By Chk AITKEN TURNBULL ARCHITECTS Bridge Place Galashiels TD1 1SN 01896 752760 enquiries@aitken-turnbull.co.uk www.aitken-turnbull.co.uk Also Dumfries & Edinburgh date scale drawn checked project no. drawing no. size revision drawing status notes: 1. This drawing Copyright reserved and should be used only for the purposes intended its original issue. Do not scale for construction purposes, use only figured dimensions. The Contractor bring to the attention the Architect any discrepancies contained this drawing prior to work commencing. This drawing be read in conjunction with relevant drawings and specifications including those from other Consultants. Any existing dimensions should be checked on site and any discrepancies reported to the Architect. Rivertree Residential Redevelopment of The Former Murray Royal Hospital Muirhall Road, Perth, PH2 7BN Landscape Plan AT2818 L(-1)105 1:1000 A1 Jan 2018 LG DS Planning 0 10 20 30 40 50 m Scale 1:1000 LEGEND: SITE BOUNDARY EXISTING BUILDING EXISTING TREES EXISTING TREE BELT ACCESS ROAD/ TRACK OPEN GRASS/ PARKLAND PROPOSED RESIDENTIAL GARDEN Ground Floor: 02 No 1 Bedroom Flat 17 No 2 Bedroom Flat 04 No 3 Bedroom Flat Total: 02 No 1 Bedroom Flat 43 No 2 Bedroom Flat 5 No 3 Bedroom Flat 01 Ground Floor Plan Scale 1:200 project Revision title AITKEN TURNBULL Bridge Place Galashiels TD1 1SN 01896 752760 enquiries@aitken-turnbull.co.uk www.aitken-turnbull.co.uk Also at Dumfries scale project no. drawing status notes: 1. This drawing intended 2. Do not scale Contractor in this drawing 3. This drawing specifications 4. Any existing reported Proposed Murray Perth PH2 7BH Level as Proposed AT2818 1:200 Planning D 09.01.18 0 2 3 4 5 Scale 1:200 10 m LEGEND: Level 03 Level 02 Level 03 Level 02 Level 01 Level 03 Level 02 Level 01 Level 01 Level 00 03 North West Elevation 01 02 01 South East Elevation 01 South East Elevation 02 05 North East Elevation 02 04 South West Elevation 02 Scale 1:200 Scale 1:200 Scale 1:200 Scale 1:200 Scale 1:200 Level 03 Level 02 Level 01 Level 00 Level 03 Level 02 Level 01 01 North West Elevation 01 Scale 1:200 02 South East Elevation 01 Scale 1:200 03
Villa ElchoVillaChapel
| 23 |

PORTFOLIO ARQUITECTURA

EXPERIENCIA ACADÉMICA

| 24 |

Máster BIM · RF AECO Competence Center

DYNAMO

Proyecto tema libre: “Generación de modelado + planimetría en revit a partir de Dynamo”

| 25 |

Arquitectura · Universidad de Sevilla

PROYECTO FIN DE CARRERA

Residencia de estudiantes en Los Bermejales

| 26 |
| 27 |

Arquitectura · Universidad de Sevilla

INTERVENCIÓN EN EL PATRIMONIO

Escuela de Cocina en el Pósito de Córdoba

| 28 |

Arquitectura · Universidad de Sevilla

INTERVENCIÓN EN EL PATRIMONIO

Casas-taller en San Luis (Sevilla)

| 29 |

Arquitectura · Universidad de Sevilla

PROYECTOS

Vivienda plurifamiliar en Jerez de la Frontera

| 30 |

Arquitectura · Universidad de Sevilla

PROYECTOS

Centro deportivo El Altillo, Jerez de la Frontera

| 31 |

Arquitectura · Universidad de Sevilla

PROYECTOS

Restaurante la Rosaleda, Jerez de la Frontera

| 32 |
GRACIAS Lucía Gil Arizón · luciagilari@gmail.com · +34 644 323 078

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.