N° 09
AÑO FISCAL 2017 Oficina General de Planeamiento y Presupuesto – OGPP Oficina de Presupuesto - OP
Lunes 30.JUL.2017
A NIVEL DE SECTOR Cuadro N° 1. Evolución Semanal de la Ejecución Presupuestal Ranking Sectorial Ranking 26 29 29 28 30 29 29 28 29 29 29
FECHA Al 31.ENE Al 28.FEB Al 31.MAR Al 30.ABR Al 31.MAY Al 30.JUN Al 02.JUL Al 09.JUL Al 16.JUL Al 23.JUL Al 30.JUL
PIA
PIM
10,795,361,929 10,795,361,929 10,795,361,929 10,795,361,929 10,795,361,929 10,795,361,929 10,795,361,929 10,795,361,929 10,795,361,929 10,795,361,929 10,795,361,929
CERTIFICADO
11,361,910,136 12,009,232,606 11,733,708,270 11,828,495,711 11,878,694,543 11,879,522,197 11,879,522,197 11,879,522,197 11,919,371,690 11,919,371,690 11,919,371,690
3,515,525,038 4,770,752,320 5,261,512,099 5,950,581,568 6,726,981,991 6,890,384,133 6,890,384,133 8,602,399,855 8,920,332,675 9,076,999,511 9,095,600,951
COMPROMISO ANUAL 2,060,343,799 2,830,592,039 3,396,080,488 4,174,121,633 4,591,321,510 4,945,739,047 4,945,739,047 4,991,046,706 5,257,366,895 6,048,829,064 7,077,383,635
COMPROMISO MENSUAL 344,622,916 662,714,417 1,170,014,282 2,088,945,710 2,584,275,124 3,182,244,168 3,182,244,168 3,265,919,965 3,418,627,613 3,593,484,111 3,757,247,408
DEVENGADO 326,167,685 621,797,490 1,119,456,339 2,022,177,484 2,489,427,786 3,084,951,276 3,084,951,276 3,166,293,966 3,313,115,024 3,492,254,258 3,652,302,527
GIRADO 244,107,230 537,863,040 1,067,044,939 1,825,956,931 2,403,394,018 3,059,750,730 3,059,750,730 3,147,303,000 3,207,730,376 3,460,972,875 3,559,479,000
% Certificado 30.9% 39.7% 44.8% 50.3% 56.6% 58.0% 58.0% 72.4% 74.8% 76.2% 76.3%
% Devengado 2.9% 5.2% 9.5% 17.1% 21.0% 26.0% 26.0% 26.7% 27.8% 29.3% 30.6%
Durante el periodo del 24 al 30 de julio la ejecución devengada se incrementó en S/ 160’048,269 acumulando una ejecución sectorial de S/ 3,652’302,527 que representa el 30.6% del Presupuesto Institucional Modificado-PIM. El PIM a la fecha es de S/ 11,919’371,690, que representa un incremento del 10.4% (S/ 1,124’009,761) respecto al Presupuesto Institucional de Apertura-PIA.
Cuadro N° 2. Ranking Sectorial – Gobierno Nacional ACUMULADO AL 23.JUL.2017 SECTOR ENERGIA Y MINAS MVCS RELACIONES EXTERIORES C. NACIONAL DE LA MAGISTRATURA PODER JUDICIAL DEFENSA INTERIOR FUERO MILITAR POLICIAL MINISTERIO PUBLICO JURADO NACIONAL DE ELECCIONES CONTRALORIA GENERAL CONGRESO DE LA REPUBLICA DEFENSORIA DEL PUEBLO ECONOMIA Y FINANZAS SALUD MUJER Y POBLACIONES VULNERABLES RENIEC CULTURA DESARROLLO E INCLUSION SOCIAL COMERCIO EXTERIOR Y TURISMO ONPE EDUCACION TRABAJO Y PROMOCION DEL EMPLEO JUSTICIA PRESIDENCIA CONSEJO MINISTROS AMBIENTAL PRODUCCION TRIBUNAL CONSTITUCIONAL TRANSPORTES Y COMUNICACIONES AGRICULTURA TOTAL - GOBIERNO NACIONAL
PIA
R.
586,400,054 6,496,129,953 756,955,610 33,915,178 2,073,968,818 7,136,931,981 9,973,627,489 22,740,800 1,647,171,381 40,184,000 538,212,210 616,674,888 59,764,968 25,880,457,969 8,258,663,696 437,549,070 324,852,658 504,573,472 4,306,651,000 589,756,008 43,933,828 16,379,171,034 371,136,099 1,914,906,174 1,861,129,133 615,117,471 756,878,090 57,027,000 10,795,361,929 2,033,597,490 105,113,439,451
1 2 3 4 5 6 8 11 7 9 10 12 13 14 15 16 17 18 20 19 21 23 22 24 25 26 28 27 29 30
PIM
ACUMULADO AL 30.JUL.2017
1,320,866,458 3,956,335,031 456,765,483 25,162,321 1,191,314,939 4,121,200,391 5,400,362,703 11,214,790 878,887,337 32,102,564 279,209,067 345,880,783 31,197,195 12,673,419,091 3,882,908,172 201,141,543 186,065,916 239,049,385 1,815,521,837 255,014,860 34,442,617 5,575,116,223 195,250,437 839,729,216 865,833,098 244,660,511 291,070,092 18,961,613 3,492,254,258 855,867,677
% Cert. 86.3% 112.9 90.8% 80.4% 85.9% 95.7% 89.3% 95.7% 95.2% 76.9% 93.8% 78.1% 91.2% 83.3% 80.7% 87.5% 87.8% 80.8% 83.9% 68.7% 81.1% 65.2% 61.8% 66.3% 65.1% 63.5% 64.7% 58.7% 76.2% 66.9%
% Dev. 75.9% 60.1% 56.5% 53.6% 53.1% 52.8% 50.9% 49.1% 51.0% 50.9% 50.6% 48.9% 48.6% 48.3% 47.5% 46.5% 45.9% 42.7% 41.3% 42.0% 40.3% 39.0% 39.7% 36.8% 35.8% 35.4% 31.0% 31.2% 29.3% 28.5%
49,716,805,608
81.9%
45.2%
Certificación
Devengado
1,740,683,633 6,577,855,077 808,301,609 46,974,537 2,244,138,466 7,803,490,304 10,599,562,382 22,846,205 1,724,618,559 63,123,537 552,172,528 708,032,308 64,198,436 26,230,183,330 8,181,884,232 432,318,269 405,158,756 559,503,897 4,392,664,036 606,552,467 85,563,427 14,287,069,106 491,713,770 2,284,588,087 2,419,934,063 690,767,898 939,786,725 60,758,629 11,919,371,690 2,998,577,849
1,501,373,427 7,424,629,165 733,854,970 37,766,689 1,926,650,612 7,468,742,005 9,461,374,123 21,875,129 1,641,595,439 48,551,680 518,063,615 553,185,812 58,520,859 21,850,910,958 6,599,147,227 378,089,777 355,552,118 452,296,967 3,687,509,532 416,677,184 69,428,770 9,316,545,520 303,963,813 1,514,975,828 1,574,626,400 438,696,685 608,143,770 35,637,471 9,076,999,511 2,007,042,790
109,942,393,812
90,082,427,846
R.
PIM
Certificación
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
1,740,757,619 6,577,855,077 808,301,609 46,974,537 2,244,138,466 7,803,771,595 10,599,562,382 22,846,205 1,724,618,559 63,123,537 552,172,528 708,032,308 64,198,436 26,230,183,330 8,183,938,836 432,318,269 405,158,756 559,503,897 4,405,409,536 606,552,467 85,563,427 14,221,120,801 491,713,770 2,284,588,087 2,422,993,594 705,790,898 939,786,725 60,758,629 11,919,371,690 2,998,577,849
1,520,140,711 5,458,027,935 735,793,205 38,170,928 1,928,636,669 7,482,631,019 9,480,367,648 21,914,124 1,648,716,358 48,625,065 519,917,037 553,798,242 58,975,905 21,572,060,159 6,569,816,682 379,983,953 356,227,230 465,697,288 3,711,658,973 421,648,076 69,598,313 9,430,139,950 364,863,887 1,540,496,951 1,583,471,304 445,175,185 617,750,357 35,707,519 9,095,600,951 2,022,998,457
109,909,683,419
88,178,610,081
1,325,244,640 4,030,088,797 459,130,436 25,599,413 1,199,767,964 4,148,914,483 5,483,348,683 11,800,810 886,804,139 32,406,718 281,497,524 347,529,920 31,346,612 12,769,894,540 3,942,827,911 206,900,641 189,273,553 247,021,979 1,920,211,132 258,354,690 36,212,997 5,711,028,517 196,157,786 847,401,217 883,885,559 250,170,830 300,660,992 19,127,034 3,652,302,527 875,954,224
% Cert. 87.3% 83.0% 91.0% 81.3% 85.9% 95.9% 89.4% 95.9% 95.6% 77.0% 94.2% 78.2% 91.9% 82.2% 80.3% 87.9% 87.9% 83.2% 84.3% 69.5% 81.3% 66.3% 74.2% 67.4% 65.4% 63.1% 65.7% 58.8% 76.3% 67.5%
% Dev. 76.1% 61.3% 56.8% 54.5% 53.5% 53.2% 51.7% 51.7% 51.4% 51.3% 51.0% 49.1% 48.8% 48.7% 48.2% 47.9% 46.7% 44.2% 43.6% 42.6% 42.3% 40.2% 39.9% 37.1% 36.5% 35.4% 32.0% 31.5% 30.6% 29.2%
50,570,866,268
80.2%
46.0%
Devengado
Al 30 de julio el Sector Transportes y Comunicaciones viene ocupando la posición 29° en el Ranking de la ejecución sectorial, manteniendo la misma posición respecto a la semana anterior. Asimismo el nivel de certificación presupuestal en el Sector es de 76.3% cuyo monto en términos absolutos es de S/ 9,095’600,951.
OGPP - OP
Página 1 de 5
Cuadro N° 3. Ranking de Ejecución por Pliegos ACUMULADO AL 23.JUL.2017 PLIEGO 202: SUTRAN 214: AUT. PORTUARIA NAC. 036: M. DE TRANSP. Y COMUNICAC. TOTAL
PIA
ACUMULADO AL 30.JUL.2017
54,384,000 12,647,108
1 2
54,384,000 46,970,752
50,140,224 33,804,149
25,238,089 16,310,319
% Cert. 92.2% 72.0%
10,728,330,821
3
11,818,016,938
8,993,055,138
3,450,705,849
76.1%
29.2%
11,919,371,690
9,076,999,511
3,492,254,257
76.2%
29.3%
R.
PIM
10,795,361,929
Certificación
Devengado
% Dev. 46.4% 34.7%
1 2
54,384,000 46,970,752
50,232,094 33,957,308
25,744,822 16,953,375
% Cert. 92.4% 72.3%
3
11,818,016,938
9,011,411,549
3,609,604,330
76.3%
30.5%
11,919,371,690
9,095,600,951
3,652,302,527
76.3%
30.6%
R.
PIM
Certificación
Devengado
% Dev. 47.3% 36.1%
Al 30 de julio, el seguimiento de la ejecución presupuestaria respecto al PIM, arroja los siguientes resultados, los pliegos con mayores niveles de ejecución son: SUTRAN (con el 47.3%), la APN (con el 36.1%) y el MTC (con el 30.5%). Asimismo, a nivel de Certificación Presupuestal, el Pliego que presenta el mayor nivel es SUTRAN (92.4% del PIM) mientras que el Pliego APN presenta el menor nivel (72.3%).
Cuadro N° 4. Ejecución Presupuestaria a nivel de Genérica de Gastos ACUMULADO AL 23.JUL.2017 Categoria / Genérica GASTO CORRIENTE Personal y Obligaciones Sociales Pensiones y Otras Prestaciones Sociales
PIA 2,552,512,574 139,492,129
ACUMULADO AL 30.JUL.2017
1,147,324,762 61,227,006
% Cert. 83.6% 94.9%
% Dev. 37.9% 48.4%
PIM
Certificado
Devengado
3,025,266,389 126,378,001
2,529,448,881 119,923,852
1,194,875,480 61,241,459
% Cert. 84.2% 94.9%
% Dev. 39.5% 48.5%
PIM
Certificado
Devengado
3,025,223,889 126,378,001
2,547,561,214 119,923,852
80,935,626
84,026,982
77,516,446
45,674,201
92.3%
54.4%
84,026,982
77,516,446
45,683,199
92.3%
54.4%
2,229,943,312
2,693,734,463
2,246,125,862
979,013,132
83.4%
36.3%
2,694,113,104
2,263,035,603
1,024,547,792
84.0%
38.0%
Donaciones y Transferencias
52,162,905
79,676,726
52,128,932
46,293,100
65.4%
58.1%
79,552,119
53,328,932
46,506,645
67.0%
58.5%
Otros Gastos
49,978,602
41,450,217
33,753,789
15,117,323
81.4%
36.5%
41,153,683
33,756,381
16,896,385
82.0%
41.1%
8,242,849,355
8,894,105,301
6,547,550,631
2,344,929,496
73.6%
26.4%
8,894,147,801
6,548,039,737
2,457,427,048
73.6%
27.6%
Donaciones y Transferencias
0
215,746,250
49,443,841
0
22.9%
0.0%
215,746,250
49,443,841
0
22.9%
0.0%
Otros Gastos
0
1,647,373
1,647,373
1,384,019
100.0%
84.0%
1,647,373
1,647,373
1,647,373
100.0%
100.0%
8,242,849,355
8,676,711,678
6,496,459,417
2,343,545,477
74.9%
27.0%
8,676,754,178
6,496,948,523
2,455,779,675
74.9%
28.3%
10,795,361,929
11,919,371,690
9,076,999,512
3,492,254,258
76.2%
29.3%
11,919,371,690
9,095,600,951
3,652,302,528
76.3%
30.6%
Bienes y Servicios
GASTO DE CAPITAL
Adquisición de Activos No Financieros TOTAL SECTOR
La ejecución devengada de los gastos corrientes se incrementó en S/ 47’550,718, mientras que en gastos de capital fue de S/ 112’497,552. La Genérica de Gasto con mayor nivel de ejecución en términos absolutos es Adquisición de Activos No Financieros (S/ 2,455’779,675) en la que se ha ejecutado el 28.3% del PIM mientras la que presenta el menor nivel es Donaciones y Transferencias en gastos de capital (0.0% del PIM).
Cuadro N° 5. Ejecución Presupuestaria a nivel de Fuente de Financiamiento ACUMULADO AL 23.JUL.2017 Fuente de Financiamiento Recursos Ordinarios Recursos Directamente Recaudados R. por Operaciones Oficiales de Crédito Donaciones y Transferencias Recursos Determinados TOTAL SECTOR
PIA 8,486,771,716 476,970,276 1,831,619,937 0 0 10,795,361,929
PIM
Certificado
Devengado
8,412,011,960 1,002,681,418 2,444,941,687 27,766,373 31,970,252 11,919,371,690
6,734,846,623 792,938,151 1,512,533,996 15,824,588 20,856,153 9,076,999,511
2,654,813,506 404,221,416 411,939,361 15,076,040 6,203,934 3,492,254,257
ACUMULADO AL 30.JUL.2017 % Cert. 80.1% 79.1% 61.9% 57.0% 65.2% 76.2%
% Dev. 31.6% 40.3% 16.8% 54.3% 19.4% 29.3%
PIM
Certificado
Devengado
8,412,011,960 1,002,681,418 2,444,941,687 27,766,373 31,970,252 11,919,371,690
6,751,090,037 794,891,923 1,512,583,457 15,824,588 21,210,947 9,095,600,952
2,766,893,935 447,227,682 416,182,068 15,339,394 6,659,448 3,652,302,527
% Cert. 80.3% 79.3% 61.9% 57.0% 66.3% 76.3%
% Dev. 32.9% 44.6% 17.0% 55.2% 20.8% 30.6%
Destaca en términos absolutos la ejecución de los Recursos Ordinarios (S/ 2,766’893,935), mientras que la fuente Recursos Determinados presenta la menor ejecución con S/ 6’659,448.
Cuadro N° 6. Ejecución Presupuestaria a nivel de Categorías Presupuestales ACUMULADO AL 23.JUL.2017 Categoria Presupuestal
PIA
Programas Presupuestales 0047: ACCESO Y USO ADEC. DE LOS SERV. PUBLICOS DE TELECOM. E INFOR. ASOC. 0138: REDUC. DEL COSTO, TIEMPO E INSEGURIDAD EN EL SIST. DE TRANSP. Acciones Centrales Asignaciones Presupuestarias Que No Resultan en Productos TOTAL SECTOR
ACUMULADO AL 30.JUL.2017
PIM
Certificado
Devengado
10,426,468,214
10,523,477,316
8,171,024,450
3,204,735,958
% Cert. 77.6%
% Dev. 30.5%
PIM
Certificado
Devengado 3,361,233,963
% Cert. 77.7%
% Dev. 31.9%
10,523,604,923
8,178,331,941
185,994,307
316,571,425
173,504,535
107,926,560
54.8%
34.1%
316,571,425
173,563,393
149,585,395
54.8%
47.3%
10,240,473,907
10,206,905,891
7,997,519,915
3,096,809,398
78.4%
30.3%
243,946,777
271,999,757
209,398,499
100,342,546
77.0%
36.9%
10,207,033,498
8,004,768,548
3,211,648,568
78.4%
31.5%
271,872,150
210,285,963
102,394,015
77.3%
124,946,938
1,123,894,617
696,576,561
187,175,754
62.0%
37.7%
16.7%
1,123,894,617
706,983,046
188,674,550
62.9%
10,795,361,929
11,919,371,690
9,076,999,510
3,492,254,258
76.2%
16.8%
29.3%
11,919,371,690
9,095,600,950
3,652,302,528
76.3%
30.6%
A nivel de Categorías Presupuestales, se tiene que los “Programas Presupuestales” y las “Asignaciones Presupuestarias Que No Resultan en Productos” lideran los mayores niveles de ejecución devengada en términos absolutos con S/ 3,361’233,963 y S/ 188’674,550 respectivamente. Asimismo, la Categoría “Acciones Centrales” presenta el menor nivel de ejecución (S/ 102’394,015).
OGPP - OP
Página 2 de 5
Cuadro N° 7. Ranking de Inversiones – Gobierno Nacional ACUMULADO AL 23.JUL.2017 SECTOR
PIA
CONSEJO NACIONAL DE LA MAGISTRATURA DEFENSA ECONOMIA Y FINANZAS MINISTERIO PUBLICO TRANSPORTES Y COMUNICACIONES EDUCACION VIVIENDA CONSTR. Y SANEAMIENTO PRESIDENCIA CONSEJO MINISTROS AGRICULTURA CULTURA AMBIENTAL CONTRALORIA GENERAL PRODUCCION COMERCIO EXTERIOR Y TURISMO INTERIOR MUJER Y POBLACIONES VULNERABLES ENERGIA Y MINAS SALUD PODER JUDICIAL RELACIONES EXTERIORES TRIBUNAL CONSTITUCIONAL JUSTICIA JURADO NACIONAL DE ELECCIONES TRABAJO Y PROMOCION DEL EMPLEO CONGRESO DE LA REPUBLICA DESARROLLO E INCLUSION SOCIAL FUERO MILITAR POLICIAL OF. NAC. DE PROCESOS ELECTORALES TOTAL
5,500,000 490,491,886 213,593,569 20,000,000 8,204,655,171 1,941,960,305 1,619,029,735 3,690,000 696,473,205 71,710,427 159,056,537 23,200,000 182,163,379 114,698,133 337,422,293 2,791,140 308,558,637 828,745,375 67,514,901 0 23,000,000 475,861,354 0 48,851,235 14,976,404 2,726,476 0 15,856,670,162
ACUMULADO AL 30.JUL.2017
R.
PIM
Certificación
Devengado
1 2 3 4 5 6 9 7 8 13 10 18 11 12 14 17 15 16 19 20 21 22 23 24 25 26 27 28
15,754,715 765,448,452 249,625,699 31,590,754 8,624,820,258 1,823,436,780 1,186,155,680 4,079,791 986,950,640 85,026,329 176,660,426 29,972,747 289,947,394 106,086,082 460,743,201 1,954,332 253,062,898 398,016,198 88,669,261 18,542,537 24,573,723 497,149,887 2,468,766 50,128,745 22,376,404 30,194,053 2,726,476 568,064 16,226,730,292
8,479,242 655,889,069 155,050,776 26,446,111 6,464,841,147 1,338,507,119 1,139,559,526 1,511,932 784,636,640 38,866,741 64,899,931 18,269,039 152,908,449 62,022,981 202,022,143 644,299 107,054,412 276,816,242 20,360,206 13,767,436 4,094,887 209,825,087 157,622 2,941,992 0 0 2,726,476 475,771 11,752,775,276
7,152,664 326,710,547 79,784,515 10,000,474 2,339,085,273 491,365,009 255,285,391 960,632 218,976,197 13,394,233 32,073,568 3,113,673 46,303,634 16,814,846 60,979,549 219,488 30,751,589 45,025,053 6,298,914 1,263,417 696,058 14,033,970 37,000 643,294 0 0 0 0 4,000,968,988
% Cert. 53.8% 85.7% 62.1% 83.7% 75.0% 73.4% 96.1% 37.1% 79.5% 45.7% 36.7% 61.0% 52.7% 58.5% 43.8% 33.0% 42.3% 69.5% 23.0% 74.2% 16.7% 42.2% 6.4% 5.9% 0.0% 0.0% 100.0% 83.8% 72.4%
% Dev. 45.4% 42.7% 32.0% 31.7% 27.1% 26.9% 21.5% 23.5% 22.2% 15.8% 18.2% 10.4% 16.0% 15.9% 13.2% 11.2% 12.2% 11.3% 7.1% 6.8% 2.8% 2.8% 1.5% 1.3% 0.0% 0.0% 0.0% 0.0% 24.7%
R.
PIM
Certificación
Devengado
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
15,754,715 765,448,452 249,625,699 31,590,754 8,624,820,258 1,827,892,479 1,189,664,559 4,079,791 986,905,409 85,026,329 176,660,426 29,972,747 289,947,394 106,086,082 460,751,701 1,954,332 253,062,898 398,016,198 88,669,261 18,542,537 24,573,723 497,149,887 2,468,766 50,128,745 22,376,404 30,194,053 2,726,476 568,064 16,234,658,139
8,479,242 659,547,705 156,814,257 31,132,715 6,465,244,257 1,349,264,090 1,159,791,995 1,522,425 790,635,640 49,469,907 65,841,221 19,426,284 158,060,939 63,936,169 205,772,569 682,699 107,798,437 277,477,975 19,748,560 13,767,436 4,094,887 210,818,331 157,622 2,941,992 0 0 2,726,476 475,771 11,825,629,601
7,155,164 334,791,784 86,210,063 10,000,474 2,451,050,554 508,943,186 310,412,101 980,932 227,569,959 18,290,263 32,707,954 5,171,843 49,711,632 17,162,521 61,679,267 260,014 32,886,907 49,600,647 6,569,363 1,300,367 748,430 14,416,009 37,000 654,294 0 0 0 0 4,228,310,728
% Cert. 53.8% 86.2% 62.8% 98.6% 75.0% 73.8% 97.5% 37.3% 80.1% 58.2% 37.3% 64.8% 54.5% 60.3% 44.7% 34.9% 42.6% 69.7% 22.3% 74.2% 16.7% 42.4% 6.4% 5.9% 0.0% 0.0% 100.0% 83.8% 72.8%
% Dev. 45.4% 43.7% 34.5% 31.7% 28.4% 27.8% 26.1% 24.0% 23.1% 21.5% 18.5% 17.3% 17.1% 16.2% 13.4% 13.3% 13.0% 12.5% 7.4% 7.0% 3.0% 2.9% 1.5% 1.3% 0.0% 0.0% 0.0% 0.0% 26.0%
A nivel del Ranking de Inversiones del Gobierno Nacional, al 30 de Julio, el Sector viene ocupando la posición Nº 5, manteniendo la misma posición respecto a la semana anterior. Ranking 4 7 8 5 6 5 5 6 5 5 5
FECHA Al 31.ENE Al 28.FEB Al 31.MAR Al 30.ABR Al 31.MAY Al 30.JUN Al 02.JUL Al 09.JUL Al 16.JUL Al 23.JUL Al 30.JUL
PIM
CERTIFICADO
8,737,610,320 8,701,131,872 8,174,604,025 8,520,978,002 8,584,828,265 8,584,828,265 8,584,828,265 8,584,828,265 8,624,820,258 8,624,820,258 8,624,820,258
DEVENGADO
2,855,406,293 3,551,026,978 3,819,885,242 4,380,710,898 4,941,039,443 4,960,842,598 4,960,842,598 6,008,165,077 6,298,900,083 6,464,841,147 6,465,244,257
203,732,538 379,724,986 720,739,899 1,429,783,678 1,724,949,988 2,101,269,162 2,101,269,162 2,137,338,695 2,231,987,425 2,339,085,273 2,451,050,554
% Certificado 32.7% 40.8% 46.7% 51.4% 57.6% 57.8% 57.8% 70.0% 73.0% 75.0% 75.0%
% Devengado 2.3% 4.4% 8.8% 16.8% 20.1% 24.5% 24.5% 24.9% 25.9% 27.1% 28.4%
Se observa que el nivel de ejecución devengada es de 28.4% y la certificación de 75.0% respecto al PIM. En este periodo la ejecución se incrementó en S/ 111’965,281 llegando al monto acumulado de S/ 2,451’050,554.
Cuadro N° 08. Ranking de Ejecución de Proyectos por Pliegos y Unidades Ejecutoras (Presupuesto de Inversión) ACUMULADO AL 23.JUL.2017 PLIEGO / UE 036: M. DE TRANSP. Y COMUNICAC. UE 001: MTC-ADM. GENERAL UE 007: MTC- PRO VIAS NACIONAL UE 010: MTC- PROVIAS DESCENT. UE 011: FITEL UE 012: MTC - AATE UE 013: P.E.JUEGOS PANAM. 2019 202: SUTRAN 214: AUTOR. PORTUARIA NACIONAL TOTAL
PIA 8,204,655,171
PIM
Certificación
Devengado
% Cert.
% Dev.
R.
PIM
Certificación
Devengado
% Cert.
% Dev.
3
8,621,778,656
6,463,800,428
2,338,137,211
75.0%
27.1%
3
8,621,778,656
6,464,203,538
2,450,102,492
75.0%
28.4%
490,570,314
106,875,826
86,537,936
21.8%
17.6%
490,570,314
106,916,790
86,784,470
21.8%
17.7%
4,777,297,333
4,425,480,817
1,566,203,177
92.6%
32.8%
4,777,297,333
4,424,784,726
1,629,788,054
92.6%
34.1%
191,122,948
124,290,301
25,004,159
65.0%
13.1%
191,122,948
124,966,592
25,958,684
65.4%
13.6%
229,723,118
129,723,118
85,541,292
56.5%
37.2%
229,723,118
129,723,118
125,390,785
56.5%
54.6%
2,487,684,509
1,307,411,028
572,236,248
52.6%
23.0%
2,487,684,509
1,307,752,972
579,327,276
52.6%
23.3%
445,380,434
370,019,339
2,614,399
83.1%
0.6%
445,380,434
370,059,339
2,853,223
83.1%
0.6%
1
25,000
25,000
25,000
100.0%
100.0%
1
25,000
25,000
25,000
100.0%
100.0%
2
3,016,602
1,015,719
923,062
33.7%
30.6%
2
3,016,602
1,015,719
923,062
33.7%
30.6%
8,624,820,258
6,464,841,147
2,339,085,273
75.0%
27.1%
8,624,820,258
6,465,244,257
2,451,050,554
75.0%
28.4%
346,473,782 4,786,334,437 313,416,794 100,000,000 2,658,430,158 8,204,655,171
ACUMULADO AL 30.JUL.2017
R.
Asimismo a nivel de Inversiones, el pliego SUTRAN tiene el mayor nivel de ejecución (100% del PIM) seguido por los pliegos APN (30.6%) y el MTC (con el 28.4%). A nivel de Unidades Ejecutoras, es la UE 011. FITEL la que presenta el mayor nivel de ejecución (54.6% del PIM) y la que presenta el menor nivel es la UE 013: P.E.JUEGOS PANAM. 2019 (0.6% del PIM).
OGPP - OP
Página 3 de 5
Cuadro N° 09. Seguimiento de la Ejecución de la Cartera Priorizada de Proyectos ACUMULADO AL 23.JUL.2017 Unidad Ejecutora / Proyecto
PIA
UE 001: MTC-ADM. GENERAL Aeropuerto Chinchero Concesiones en Telecomunicaciones UE 007: MTC- PRO VIAS NACIONAL Autopista Puno - Juliaca Carretera Bellavista - Mazán - Salvador - El Estrecho Carretera Camaná - Dv. Quilca - Matarani - Ilo - Tacna Carretera Dv. Negromayo - Occoruro - Pallpata - Dv. Yauri Carretera Huánuco Conococha Carretera Juanjui - Tocache Carretera Lima - Canta - La Viuda - Unish Carretera Mazamari - Pangoa - Cubantía Carretera Puerto Bermúdez - San Alejandro Concesiones Viales Integración Víal Tacna - La Paz Red Víal departamental Moquegua - Arequipa UE 012: MTC - AATE Concesiones Ferroviarias Construcción de la Línea 2 Mejoramiento de la Línea 1 UE 013: P.E.JUEGOS PANAM. 2019 Servicio Alta Competencia, Callao Villa deportiva La Videna, San Luis Villa Panamericana, Villa El Salvador TOTAL CARTERA PRIORIZADA
211,578,000 211,578,000 2,825,201,141 173,931,642 240,846,479 103,815,654 111,767,097 100,000,000 191,399,485 104,824,338 378,854,366 1,118,548,330 256,400,356 44,813,394 2,655,832,535 166,634,072 2,184,519,038 304,679,425 5,692,611,676
PIM
Certificado
Devengado
359,674,532 239,163,419 120,511,113 2,933,293,818 121,015,371 240,905,812 106,178,961 111,767,097 94,027,164 141,211,736 144,321,651 109,896,153 378,905,695 1,119,150,812 256,944,237 108,969,129 2,473,902,602 188,441,968 2,012,508,427 272,952,207 294,860,352 91,262,475 107,555,821 96,042,056 6,061,731,304
53,122,409 53,122,409 2,757,934,041 119,047,967 220,202,448 106,084,748 111,767,096 2,795,657 141,209,986 102,510,949 105,635,797 378,905,692 1,103,860,339 256,944,233 108,969,129 1,301,773,168 188,441,968 950,474,018 162,857,182 285,697,553 82,233,719 107,505,821 95,958,013 4,398,527,171
51,142,631 51,142,631 1,134,477,849 66,093,186 2,700,541 41,401,463 63,145,902 1,898,747 129,778,030 26,477,168 22,710,208 186,622,735 445,002,646 142,068,721 6,578,502 571,130,070 125,943,160 441,375,451 3,811,459 1,015,479 12,000 396,800 606,679 1,757,766,029
ACUMULADO AL 30.JUL.2017 % Cert. 14.8% 0.0% 44.1% 94.0% 98.4% 91.4% 99.9% 100.0% 3.0% 100.0% 71.0% 96.1% 100.0% 98.6% 100.0% 100.0% 52.6% 100.0% 47.2% 59.7% 96.9% 90.1% 100.0% 99.9% 72.6%
% Dev. 14.2% 0.0% 42.4% 38.7% 54.6% 1.1% 39.0% 56.5% 2.0% 91.9% 18.3% 20.7% 49.3% 39.8% 55.3% 6.0% 23.1% 66.8% 21.9% 1.4% 0.3% 0.0% 0.4% 0.6% 29.0%
PIM
Certificado
Devengado
359,674,532 239,163,419 120,511,113 2,933,293,818 121,015,371 240,905,812 106,178,961 111,767,097 94,027,164 141,211,736 144,321,651 109,896,153 378,905,695 1,119,150,812 256,944,237 108,969,129 2,473,902,602 188,441,968 2,012,508,427 272,952,207 294,860,352 91,262,475 107,555,821 96,042,056 6,061,731,304
53,122,409 53,122,409 2,736,320,669 119,054,998 220,202,448 106,178,960 111,767,096 2,795,657 141,211,736 102,510,949 105,634,797 378,905,693 1,082,237,522 256,944,236 108,876,577 1,301,840,650 188,441,968 950,541,500 162,857,182 285,697,553 82,233,719 107,505,821 95,958,013 4,376,981,281
51,142,631 51,142,631 1,170,894,494 66,093,186 3,199,940 41,414,338 69,065,135 1,898,747 129,778,030 31,136,737 22,727,322 199,575,621 446,911,718 152,491,392 6,602,328 578,221,098 125,943,160 448,408,979 3,868,959 1,095,479 24,000 456,800 614,679 1,801,353,702
% Cert. 14.8% 0.0% 44.1% 93.3% 98.4% 91.4% 100.0% 100.0% 3.0% 100.0% 71.0% 96.1% 100.0% 96.7% 100.0% 99.9% 52.6% 100.0% 47.2% 59.7% 96.9% 90.1% 100.0% 99.9% 72.2%
% Dev. 14.2% 0.0% 42.4% 39.9% 54.6% 1.3% 39.0% 61.8% 2.0% 91.9% 21.6% 20.7% 52.7% 39.9% 59.3% 6.1% 23.4% 66.8% 22.3% 1.4% 0.4% 0.0% 0.4% 0.6% 29.7%
La cartera Priorizada del Sector 36.TRANSPORTES Y COMUNICACIONES está conformada por 20 proyectos. Al 30 de julio presenta un nivel de ejecución del 29.7% y la certificación está en el 72.2% del PIM. A nivel de Unidades Ejecutoras es la UE 007: MTC- PRO VIAS NACIONAL quien presenta el mayor nivel de ejecución (39.9% del PIM), mientras que la UE 013: P.E.JUEGOS PANAM. 2019 presenta el menor nivel (0.4%). Destaca el monto de ejecución de los proyectos Concesiones Viales y Construcción de la Línea 2 con S/ 446’911,718 y S/ 448’408,979 respectivamente, mientras que el proyecto Aeropuerto Chinchero, por problemas con el concesionario aún no presenta ejecución.
A NIVEL DE PLIEGO Cuadro N° 10. Ranking por Unidades Ejecutoras del Pliego MTC (Total General) ACUMULADO AL 23.JUL.2017 UNIDAD EJECUTORA UE 011: FITEL UE 007: MTC- PRO VIAS NACIONAL UE 001: MTC-ADM. GENERAL UE 012: MTC - AATE UE 010: MTC- PROVIAS DESCENT. UE 013: P.E.JUEGOS PANAM. 2019 TOTAL PLIEGO
PIA
R.
PIM
Certificación
Devengado
ACUMULADO AL 30.JUL.2017 % Cert.
% Dev.
R.
PIM
Certificación
Devengado
% Cert.
% Dev.
177,730,739
2
307,453,857
166,399,569
103,700,583 54.1%
33.7%
1
307,453,857
166,428,366
145,334,314
54.1%
47.3%
6,478,981,671
1
6,635,968,637
6,165,867,461
2,258,609,836 92.9%
34.0%
2
6,635,968,637
6,169,252,827
2,362,230,828
93.0%
35.6%
813,726,902
3
1,110,371,670
534,815,804
334,569,256 48.2%
30.1%
3
1,106,371,670
536,164,533
336,828,070
48.5%
30.4%
2,831,655,475
4
2,660,909,826
1,447,464,052
657,430,186 54.4%
24.7%
4
2,660,909,826
1,448,453,845
665,512,141
54.4%
25.0%
426,236,034
5
318,505,390
185,534,207
57,709,544
58.3%
18.1%
5
322,505,390
187,922,822
59,677,254
58.3%
18.5%
6
784,807,558
492,974,045
38,686,444
62.8%
4.9%
6
784,807,558
503,189,154
40,021,722
64.1%
5.1%
11,818,016,938
8,993,055,138
3,450,705,849 76.1%
29.2%
11,818,016,938
9,011,411,547
3,609,604,329
76.3%
30.5%
10,728,330,821
A nivel Total General (Actividades y Proyectos), se tiene que al 30 de Julio, la UE 011 FITEL es la que presenta un mayor nivel de ejecución devengada con el 47.3% del PIM, seguido por la UE 007 PVN (35.6%), la UE 001 MTC – ADM.GENERAL (30.4%), la UE 012 AATE (25.0%), la UE 010. PROVIAS DESCENTRALIZADO (18.5%) y la UE 013: PE.JUEGOS PANAM.2019, que presenta el menor nivel de ejecución (5.1% del PIM).
A NIVEL DE UE 001. MTC – ADM. GENERAL Cuadro N° 11. Principales Certificaciones de Crédito Presupuestario CERTIFICADO SERVICIOS DE TERCEROS ADQUISICIÓN DE MÁSTIL TELESCÓPICO PARA ANTENA SERVICIOS DE MANTENIMIENTO, ACONDICIONAMIENTO Y REPARACIONES CONSULTORIAS , ASESORIAS PASAJES Y VIÁTICOS OTROS (CAJA CHICA, MATERIALES, REBAJAS, ETC). TOTAL
OGPP - OP
MONTO 497,260 265,500 139,631 115,800 54,650 275,888 1,348,729
Página 4 de 5
Cuadro N° 12. Ranking por Oficinas de la UE 001. Ministerio de Transportes y Comunicaciones – Adm.General ACUMULADO AL 23.JUL.2017 DEPENDENCIAS
PIA
R.
PIM
Certificación
Devengado
ACUMULADO AL 30.JUL.2017 % Cert.
% Dev.
R.
PIM
Certificación Devengado
% Cert.
% Dev.
SECRETARIA GENERAL - SG
2,738,306
1
3,056,542
2,681,297
1,696,609 87.7%
55.5%
1
3,056,542
2,682,451
1,714,674 87.8%
56.1%
OFICINA DE ADMINISTRACION - OA
4,448,533
2
5,411,233
4,954,357
2,963,279 91.6%
54.8%
2
5,411,233
5,038,786
3,009,823 93.1%
55.6%
OFICINA DE IMAGEN INSTITUCIONAL - OII
1,516,618
4
2,770,265
2,112,140
1,472,492 76.2%
53.2%
3
2,770,265
2,112,140
1,513,792 76.2%
54.6%
664,901
3
961,706
630,989
523,484 65.6%
54.4%
4
961,706
632,249
523,484 65.7%
54.4%
3,180,361
6
7,925,732
5,008,448
4,067,825 63.2%
51.3%
5
7,925,732
5,008,448
4,247,466 63.2%
53.6%
139,514,703
5
145,440,404
134,223,125
76,424,706 92.3%
52.5%
6
145,440,404
134,273,866
76,594,168 92.3%
52.7%
26,117,591
7
31,179,345
29,459,979
15,585,621 94.5%
50.0%
7
31,329,345
29,702,671
15,796,515 94.8%
50.4%
ORGANO DE CONTROL INSTITUCIONAL - OCI
2,426,693
8
2,986,693
2,849,643
1,346,330 95.4%
45.1%
8
2,986,693
2,850,703
1,412,180 95.4%
47.3%
D.V. DE COMUNICACIONES - VMC
1,644,033
9
4,188,624
2,980,474
1,878,528 71.2%
44.8%
9
4,188,624
3,034,524
1,896,816 72.4%
45.3%
OFICINA DE FINANZAS - OF
2,229,760
10
3,032,953
2,499,832
1,330,751 82.4%
43.9%
10
3,032,953
2,523,832
1,330,751 83.2%
43.9%
62,096,736
12
86,457,316
45,067,345
37,578,383 52.1%
43.5%
11
86,457,316
45,115,941
37,924,633 52.2%
43.9%
DIRECCION GENERAL DE CONCESIONES EN COMUNICACIONES - DGCC
7,126,716
11
209,798,890
97,681,474
91,435,800 46.6%
43.6%
12
209,798,890
97,711,535
91,456,063 46.6%
43.6%
PROCURADURIA PUBLICA -PP
2,653,890
13
4,213,718
3,613,624
1,669,909 85.8%
39.6%
13
4,213,718
3,615,469
1,814,154 85.8%
43.1%
DIRECCION GENERAL DE AUTORIZACIONES EN TELECOMUNICACIONES - DGAT
7,278,941
14
9,679,541
6,198,319
3,736,791 64.0%
38.6%
14
9,679,541
6,198,319
3,828,722 64.0%
39.6%
OFICINA GENERAL DE ASESORIA JURIDICA - OGAJ
2,394,467
15
4,103,751
3,642,363
1,562,447 88.8%
38.1%
15
4,103,751
3,721,363
1,618,947 90.7%
39.5%
DIRECCION GENERAL DE CAMINOS Y FERROCARRILES - DGCF
27,165,407
16
38,421,729
32,946,363
13,240,706 85.7%
34.5%
16
38,421,729
33,080,991
13,477,460 86.1%
35.1%
DIR. GRAL. DE CONTROL Y SUPERV. DE COMUNIC. - DGCSC
31,692,746
17
5,969,033
3,541,914
1,941,393 59.3%
32.5%
17
5,969,033
3,541,914
1,953,342 59.3%
32.7%
OFICINA DE PATRIMONIO - O.PAT
8,390,406
18
19,834,989
19,485,539
6,178,599 98.2%
31.1%
18
19,834,989
19,493,663
6,246,763 98.3%
31.5%
DESPACHO MINISTERIAL - DM
1,836,000
19
7,507,716
3,878,857
2,311,114 51.7%
30.8%
19
7,507,716
3,888,918
2,349,214 51.8%
31.3%
D.V. DE TRANSPORTES - VMT
5,454,834
20
3,181,574
2,011,898
943,322 63.2%
29.6%
20
3,181,574
2,014,786
946,365 63.3%
29.7%
15,863,093
21
34,601,101
13,895,605
10,240,242 40.2%
29.6%
21
34,601,101
13,925,691
10,279,805 40.2%
29.7%
3,399,174
22
5,514,728
4,534,427
1,503,881 82.2%
27.3%
22
5,514,728
4,543,190
1,524,040 82.4%
27.6%
39,258,455
23
35,817,579
24,552,872
8,695,205 68.5%
24.3%
23
31,942,186
24,563,447
8,710,105 76.9%
27.3%
CONSEJO CONSULTIVO DE RADIO Y TELEV.- CONCORTV
1,398,400
24
1,398,400
991,110
327,808 70.9%
23.4%
24
1,398,400
991,426
353,578 70.9%
25.3%
DIR. GNRAL. DE REG. ASUNTOS INTERN. DE COMUNIC. - DGRAIC
5,969,033
25
34,803,873
23,709,677
7,587,863 68.1%
21.8%
25
34,803,873
23,975,742
7,645,547 68.9%
22.0%
OFICINA DE TECNOLOGIA DE INFORMACION - OTI
21,373,327
26
21,108,793
17,209,621
3,950,139 81.5%
18.7%
26
20,958,793
17,218,658
4,140,708 82.2%
19.8%
CONSEJO NACIONAL DE SEGURIDAD VIAL - CNSV
6,930,389
27
6,930,389
2,451,751
1,277,544 35.4%
18.4%
27
6,930,389
2,451,751
1,329,581 35.4%
19.2%
73,498,451
28
42,248,620
12,006,133
5,330,768 28.4%
12.6%
28
42,124,013
12,066,313
5,344,268 28.6%
12.7%
305,464,938
29
331,614,433
30,428,337
27,765,370
9.2%
8.4%
29
331,614,433
30,527,640
27,934,417
9.2%
30
212,000
7,920
7,920
3.7%
3.7%
30
212,000
7,920
7,920
3.7%
3.7%
1,110,371,670
535,255,434
334,574,829
48.2%
30.1%
1,106,371,670
536,514,347
336,925,300
48.5%
30.5%
COMISION DE INVESTIGACION DE ACCIDENTES DE AVIACION - CIAA DIRECCION GENERAL DE ASUNTOS SOCIO-AMBIENTALES - DGASA OFICINA DE PERSONAL - OPER OFICINA DE ABASTECIMIENTO - O.ABAST.
DIRECCION GENERAL DE AERONAUTICA CIVIL - DGAC
DIRECCION GENERAL DE TRANSPORTE TERRESTRE - DGTT OFICINA DE ATENCION AL CIUDADANO Y GESTION DOCUMENTAL - OACGD DIRECCION GENERAL DE TRANSPORTE ACUATICO - DGTA
OFICINA GENERAL DE PLANEAMIENTO Y PRESUPUESTO - OGPP DIRECCION GENERAL DE CONCESIONES EN TRANSPORTES - DGCET OFICINA DE DEFENSA NACIONAL - ODN TOTAL UE001.MTC - ADM.GENERAL
813,726,902
8.4%
Fuente : BD SIAF - MPP al 30.07.17
Las Unidades Orgánicas con niveles de ejecución superiores al 50% respecto al Presupuesto Institucional Modificado-PIM son: la Secretaria General – SG (56.1%), la Oficina de Administración – OA (55.6%), la Oficina de Imagen Institucional – OII (54.6%), la Comisión de Investigación de Accidentes de Aviación – CIAA (54.4%), Dirección General de Asuntos Socio-Ambientales – DGASA (53.6%), la Oficina de Personal (52.5%) y la Oficina de Abastecimiento (50.4%), mientras que las unidades orgánicas con menores niveles de ejecución respecto al PIM son: la Oficina de Defensa Nacional (3.7%), la Dirección General de Concesiones en Transportes – DGCET (8.4%), la Oficina General de Planeamiento y Presupuesto – OGPP (12.7%) y el Consejo Nacional de Seguridad Vial - CNSV (19.2%). Las Unidades Orgánicas en general y principalmente aquellas que cuentan con mayor crédito presupuestario, deben efectuar las medidas que sean necesarias para dinamizar la ejecución presupuestaria y contribuir a la ejecución del 100% de los recursos asignados a la UE 001. MTC – Administración General, al cierre del ejercicio.
OGPP - OP
Página 5 de 5