Ludmila Parekh Portfolio

Page 1

LUDMILA PAREKH PORTFOLIO


LUDMILA PAREKH

PHONE: +32 47 319 1447 EMAIL: ludmila.andreoli@gmail.com

PROFILE

My professional background includes extensive experience in the development of projects in the execution phase, as well as the design of sustainable architecture projects and the realization of LEED (international standardization of buildings of high environmental quality) certified projects.

I have a MSc in Architecture: Resilient and Sustainable Strategies, graduated from KU Leven Campus Sint Lucas Ghent, BE, and BA in Architect and Urban Designer, graduated from Braz Cubas University (UBC), Faculty of Architecture and Urbanism, SP, Brazil.

Realization of projects from A to Z in construction and renovation: feasibility studies, schematic design, construction development plans, building permit applications, specifications, calls for tenders, planning and awarding of works, and in particular the establishment of the construction documents and administration.

Coordinated a collaborative workshop (FR-PT) and the schematic design of project for a self-sustainable rural village project in

5 Led feasibility studies for residential projects at ILA Architectes

Brazil, liaising with client, architects, engineers & experts. At JNC

Projets et rénovations durables.

International, collaborated on a schematic design of a Boulevard, in the Seraing Valley; Assisted on an urban studies for a Marina Project,

6 Designed residential renovation Project for luxury apartment in a

in Jemeppe; Planned a Master Plan for a residential project in

New York pre-war building and led construction management efforts

Chaumont-Gistoux. + 1 7

through remote team of contractors and tradesmen on site.

1 In my studies , working in rural areas in developing countries

5

endangered by natural disasters and poverty, plus focusing in the reconstruction of the school buildings and the revitalization

Planned, developed drawings and schematics, and manage the construction phase for the rehabilitation project of twelve subway

6

stations in Brooklyn, NY; Led renovation project at Brooklyn

of the school process in rural areas of Nepal, I strived to strength

College, interacting with the client and developing the construction

the participation of teachers, parents and students to result in an

documents; Developed model in Revit, presentations and

3

efficient use of (scarce)recourses in the transformation of the school

2

grounds. The project serves as a pilot project in name of the heritage and rural communities of Nepal. 2

4 In a different context, but still in a rural setting, I analyzed the socio,

at interiors and façades, Warwick N.Y. Hotel façade restoration,

support the sustainable development of the village. The studio:

East and Central Harlem District Health Center building envelope

Future rural villages was based on a real demand articulated by

rehabilitation.

the ‘Association Ouled Merzoug’ who wishes to receive the ‘Green village’ eco-label by the Moroccan government. My group and I

7 Conceptualized and managed various commercial, residential,

developed a master plan of the strategies for food production, land

challenge for me, and also an essential piece of the our plan. 3 In an urban context, explored the inherent structuring capacity of an elevated road, and the potential to further capitalize the Fly over, in Ghent, on its ecological, economic, social and cultural stimulus. Developed an Algae Urban Farm, creating the integration of social sustainability, (eco)infrastructure and landscape urbanism in the development of unused public spaces. 1 Led feasibility studies for sustainability (ex Waste water management) for institutional project at Mihir Thaker Architects. 4

Brook University Medical Center, NY.

examples include Bellevue Hospital Center settlement crack repair

Merzouk, in Morrocco, through research and design proposals to

the fields, including a bridge, for people and goods, was an exciting

Comprehensive Psychiatric Emergency Program Project for Stony

Conducted field investigations for exterior restoration projects,

economic and cultural context of the built village fabric of Ouled

management and mobility. Designing the whole circulation circuit in

construction documents for City Hall Offices Project, and also for the

and social interest projects executing technical viability study,

7

approval from councils (Government / Public), coordination with infrastructure and engineering, aligning with associated projects for the construction, examples include Galeria América Shopping Center, Midas Auto Repair Center, and Accessible Design for multifamily residential projects. Developed and executed architectural, urban planning and landscape design projects for social housing projects, and liaised with various public and governmental organizations; Managed the information integrity and approval coordination process for large scale construction projects; Created, implemented and piloted a new and innovative design for a project management structure.


CITY OF MERCY - SUSTAINABLE VILLAGE

BRAZIL - BIOCONSTRUCTION AND NATURE BASED SOLUTIONS | 2020

1.

Site development – protect or restore habitat : the City of Mercy Project, explores natural resources and population growth in a rural area, making it essential to conserve existing natural areas and restore damaged areas to promote biodiversity.

2.

Walkable project site : the problem of transportation in cities, causes incalculable damage, directly influencing the quality of life of the entire population, such as respiratory problems, burdening the health system. This project promotes the mobility of people

on foot. If the option is to use the bicycle, the streets are safe for the circulation of bicycles, as the circulation of cars within the city for residents or visitors will be prohibited. The use of vehicles will only be allowed for emergencies, such as ambulances or firefighters. The city presents collective spaces for coexistence, such as parks and squares, promoting the quality of urban life. 3.

planning of the team of professionals from all areas, from conception, construction and delivery. Our team seeks synergy with each other, coordinating the disciplines and systems to best serve the objectives of Aliança de Misericórdia, the organization that owns the site, and the community with effective constructive solutions. This will help to reduce the total cost of the project, resulting in greater planning and design, and lower cost and environmental impact.

its inhabitants to value green and productive spaces and to reduce the consumption of industrialized food, thus reducing carbon emissions and improving the eating habitats of its dwellers. 4.

Local food production : green corridors, agroforestry and productive gardens, proposed for City of Mercy project, will teach

Integrative process* : with the current levels of inefficiency in the design process, the enhancement of this phase has great potential in bringing alignment to the sustainable agenda. The City of Mercy project counts on this method, using the vision of the project as a complex system, it requires an interdisciplinary

* Process widely adopted by practitioners of Sustainable Construction. 520

520

527,5

522,5

525 522,5

535

527,5

530

532,5

525

N

CROSS SQUARE

GA

RC IA

ST

RE

AM

BURU RIV

537,5

540

537,5

535

ER

542,5

532,5

532,5

530

527,5 525

522,5 520

LEGEND

520 522,5

542,5

HOUSES

540

537,5

PLANT NURSERY

RAHAMIM SQUARE

525

7 5

535

BANK 532,5

COMMUNITY CENTER

527,5

530

AGROFLOREST

530

527,5

FUTURE MAIN ENTRY

532,5

LINEAR PARK

525

535

530

532,5

525

520

520

HERMITAGE

ENTRY AND EXISTING BUILDINGS

BRIDGES 517,5

PARKING 515

LODGES

515

517,5

RECYCLING PARK 520

SENIOR’S HOUSE HEALTH CENTER EDUCATION

522,5

522,5

AO 1:1000

PILOT PROJECT CENTRAL SQUARE

MASTER PLAN

520

INTERNATIONAL, SOCIAL AND ENVIRONMENTAL - RURAL PROJECTS

535

527,5

522,5

ANPHITHEATER

0 1:3000 (A3)

100

300m

0

50

100

150

200


537,5 535

532,5

530 527,5 525 522,5

52

0

537,5

52

0

535

532,5

52

2,5

532,5

52

5

530 525

52

7,5

527,5

53

0

522,5

53

2,5

520 520

53

5

522,5

525

527,5 537,5

540 530

542,5 532,5

53

0

53

2,5

53

5

535

527,5

542,5

52

5

540

537,5

535

532,5

530

527,5

525

52

2,5

522,5

520

300m

520

52

0

BUILDINGS

100

517,5 520

0

522,5 515 515 517,5

1:3000

+2 ent, R logem Rez + n e e u nomiq +1 té éco per iale, R e évelop nifamil autair n ison u ue à d u m com nomiq o t c n e -é Batim socio mme e Progra logiqu n éco io x e n Con

CIRCULAR ECONOMY SCHEME

(A3)

537,5

535

532,5

530

527,5

525

522,5

52

0

537,5

52

0

535

532,5

52

2,5

532,5

52

5

530 525

52

7,5

527,5

53

0

522,5

53

2,5

520 520

53

5

522,5

525

527,5 537,5

Principal access

540 530

542,5 532,5

535

0

53

2,5

53

5

Secondary Access

53

527,5

542,5

52

5

540

537,5

535

532,5

530

527,5

525

52

2,5

522,5

520

300m 52

0

520

100

517,5 520

0

522,5 515 515 517,5

1:3000

ROUTES

(A3)

Source : LENDAGER GROUP-gronttorvet-spisehus, scheme-adaptation JNC International, 2020

VISION AND OBJECTIVES - SUSTAINABLE STRATEGIES (ESG)

537,5 535

ntion

532,5

nterve

530

527,5 525 522,5

52

0

537,5

52

0

535

532,5

52

2,5

532,5

52

5

530 525

52

7,5

527,5

53

0

522,5 520

53

2,5

cipale e prin ire conda irie se e tertiair ie ir o V tte Place g Parkin Bâti

CLOSED CIRCUIT RECYCLING WATER SYSTEM

520

53

5

522,5

525

527,5 537,5

540 530

542,5 532,5

53

0

53

2,5

53

5

535

527,5

542,5

52

5

540

537,5

535

532,5

Green roof retention

530

Wetland nature reserve

Forest retention

527,5

525

Water collection from public spaces

Collection of water from streets

52

2,5

522,5

Rainwater collection through the roof

520

520

52

0

GREEN CORRIDOR

Overflow

517,5 520

300m

522,5 515 515 517,5

pper

Rainwater filter

Reservoir

Water tank

Treatment Center

100

velo e à dé omiqu -écon io c o s me ique écolog exion n e ri a p re ridor ri acultu e perm one d vatifs ri p s s Jardin d'arbre ment Aligne

0 537,5 535

(A3) 1:3000

Surface runoff treatment

532,5

530

527,5

Gray water

522,5

Potable water

52

0

537,5

Evaporation

525

52

0

535

532,5

52

2,5

532,5

52

5

530 525

Black water

52

7,5

527,5

53

0

522,5

53

2,5

520 520

53

5

522,5

Natural pool, for leisure or sports

525

Primary treatment-Biodigestors 527,5 537,5

Solid / liquid separation

540 530

542,5 532,5

535

53

5

Wastewater treatment WETLANDS

0

53

2,5

Well pump

53

527,5

542,5

52

5

540

Overflow transport

Overflow transport

537,5

535

Reload the well system

530

527,5

Renaturalized river retention bags

52

0

520

517,5 520

BLUE CORRIDOR

522,5 515 515

Recharge

Recharge

Recharge

517,5

Reservoir Agroforestry Recharge

520

Recharge

52

2,5

522,5

Groundwater extraction

525

Recharge

532,5

GROUNDWATER

DEVELOPMENT LAYERS

WATER MANAGEMENT

Source : The Materials Book - Paradigm Shift: Eva Pfannes ©OOZE and Team, 2019, layout-adaptation JNC International, 2020


CHAUTARA - THE TRANSFORMATION OF THE SCHOOL GROUNDS

BA

A

LEARNING OUTDOORS

GM

AT I

RIV

ER

LOOSE PARTS STORAGE

LEARNING OUTDOORS

DECIDUOUS TREES

CL UNDE ASSROOMS RCON STRUC TION

EXIS TIN AGR G SCHOO ICUL TUR L E

CONIFEROUS TREES WATER RECYCLING SYSTEM SPORTS COURT MULTIFUNCTION SPACE AND TOILETS

CHAUTARA

2

RAIN WATER TANKS AND CHANNELS

PLAYGROUND FIRE PIT

EX

IST

IN

G

CL

AS

SR

OO

M

S

EXIS

TIN

GC

L AS

SRO

OM

S

DRY STONE WALL SEATTING

A

INTERNATIONAL, SOCIAL AND ENVIRONMENTAL - RURAL PROJECTS

1

SITE PLAN

0

5

10


NEPAL - IDENTITY AND CONTINUITY WITH LIMITED RESOURCES | 2019

Natural Filter Filters rain water Septic Tank Primary Treatment Anaerobic Baffled Reactor

Digester Recycles Black water Produces Bio gas and fertilizer

Water channels Transport the rain water

It seems to me the right time to introduce sustainable ways of water and waste management while doing the reconstruction

VIEW 1

of schools in the rural areas of Nepal,

The view of the Chautara and the sports court from the existing classrooms

allowing the community to participate in the decision-making process and construction. The school grounds can be the catalyst of the way sanitation is seen in the rural areas.

SCHOOL NEEDS

The school grounds is not only a center for learning, but is a space for the community, people from all ages and backgrounds, to gather and celebrate life.

Children in the villages spend 30 hours per week in school. The school grounds offer hope, and it may be the last opportunity

Water tanks

Phytoremediation Basin Secondary Treatment Filters grey water

to reconnect children with nature and create a future generation that preserves and values the natural world and their heritage.

VIEW 2 Chautara: the transformation of the school grounds project

WATER MANAGEMENT AND RECYCLING PROCESS

The view of the Chautara from the south entrance of the school grounds

is a contribution to the process of transforming the schools grounds into the center of the community, changing the way education is viewed today through a more holistic lens and sustainable strategies. My aim is to create the blueprint for a pilot project in Thadi Khola, that can also be implemented in other schools grounds going through this transformation.

EXISTING CLASSROOM BUILDING

DRY STONE SITTING WALL

CHAUTARA

Designing a Chautara, historically know as a resting place for travellers between one village to another, used in the rural

DECIDUOUS TREE

village as a community gathering space, to be at the heart

TOILETS

of the school, enables to apply sustainable and resilient

EXISTING CLASSROOM BUILDING (UNDER CONSTRUCTION)

CONIFEROUS TREES AND PLAYGROUND

LOOSE PARTS STORAGE

strategies to the outdoor space as part of the reconstruction of Thadi Khola school. It is a process that requires ideation,

EXISTING NURSING SHED

creation, and multiple iterations.

The outdoors space of a school is as important as the classrooms indoors, for the development of children; cocreation with parents, teachers and students is one of the key points for the success of the project; and the urgency of the preservation and rescue of the Chautara is the principal element after a natural disaster for the regeneration process.

SECTION A-A

MULTIFUNCTION SPACE

SPORTS COURT AND BLEACHERS

OUTDOOR LEARNING 0

5

10


FUTURE RURAL VILLAGES - THE PERMACULTURE JOURNEY

MOROCCO - FUTURE RURAL VILLAGES | 2018

REGENERATION OF THE VILLAGE THROUGH PERMACULTURE THE JOURNEY – CONNECTIVITY AND ACCESSIBILITY Research has shown that rural exodus, desertification and abandoned land fields are some of the challenges that Ouled

The “Journey” will help the sustainable development of Ouled Merzouk using resilient design and materials found locally

Merzouk inhabitants are facing these days. The proposal of new

that can be constructed and used by the inhabitants. Creating

activities for the community to increase their income and attract

new jobs, new activities and source of income will diminish the

younger generations to stay and thrive in this rural community

number of young trying to make a better living in the bigger

are been introduced after visits, analyses, and a deeper insight

cities.

into their resources, climate and culture. The revitalization of the eroded soil is the first step of The idea is a participative economy, creating an area for a weekly Souk and a Food Production facility, where the farmers can sell

this project to control the quality of soil, also avoiding the desertification, improving the filtration of the water runoff

their extra produce, where the women can sell their art and

and improving the water retention and the underground water

crafts, where products (e.g. dry fruits, spices, juices etc.) can

recharge.

Tackle the erosion

be made and sold to the local and neighboring communities, and a Farmers’ Association where the population can attend

The second step of the project is making the path accessible

workshops and practical classes on how to make a better use of

with farmers carts, especially where the path is less than two

the soil through permaculture, how to be an entrepreneur or be

meters wide, making the path through the fields accessible for all. The material of the path will be stone.

trained to work at the Food Production, and a place for better management of farmlands.

The third step is to build an arched stone bridge to make the An improvement of the paths around the fields is imperative for the success of this idea.

river crossing and the transportation of the harvested material easier to farmers and non-farmers. The columns made by rammed earth help to support the shading mayde by reed. It

As an improvement of their living standards and work activities, through mobility - connectivity and accessibility – the revitalization of the whole circulation circuit in the fields, starting

is important to remark that the idea of this intervention is the simplest and most resilient alternative, so that it becomes part of the landscape without interfering with the culture of its users or loosing the identity of the village.

from the Food Production building and Souk area, river crossing, passing through the farm lands and points of historical interest, reaching and passing through the Farmers’ Association. The idea of widening the path for the farmers to transport their

Animal

Bicycle

Human

Rickshaw (road)

harvested fruits and vegetables from the fields to the area of the transformation or to the selling points in the Souk or in the Association also includes regular circulation of locals and

INTERNATIONAL, SOCIAL AND ENVIRONMENTAL - RURAL PROJECTS

visitants through the shaded and beautiful landscape they have

MASTER PLAN

around the fields, resting areas, and meeting points.

Carts

POSSIBILITIES OF TRANSPORTING GOOD

JOURNEY AND BRIDGE ELEVATION 0

5

10


RUC UR R GAR M PP UR M U

URBAN REQUALIFICATION AND RENOVATION

P AC À AM NAG R

AÇAD À RUC UR R

SERAING AND JEMEPPE, LIEGE - BE | 2019-2020 ⇔

ELEMENTS DE CONCLUSION

86 .429

83 .335

83 .342

86 .430

83 .336

80 .728 80 .740 80 .740

8080 .768 .850 80 .553 80 .850 80 .558

.745

80 .787

80

80 .759

80 .858

80 .811

86 .452

80 80.782 .866

80 .772

80 .762

80 .567 80 .578

80 .876

80 .784 80 .871

80 .776

80 .561

80 .858

Ru

80 .669

80 .551

80 .653

80 .524 80 .555 80 .815 80 .534 80 .514 80 .505

80 .658 80 .604

e

80 .680 80 80 .658.967 80 .667

8080 .507 .516

80 .578 80 80.574 .556 80 .548

80 .702 80 .703 80 .994 80 .646

80 80 .524.501

Mo

80 .623

80 .465

80 .520 84 .001 C

80 .524

80 .604

80 .549

A

lina

C

P K

80 .579

80 .517 80 .379 80 .357 80 .395

80 .482

80 .464

80 .414

81 80 .052.749 80 .756 81 .053 81 .050 80 .757 80 .751

y

80 80.494 .513 80 .640

80 .457

80 .801

80 .641

80 .611 .616

80 .568

80 .622

78 .484 78 .529

80 .607

R

R

77 .643

77 .564

Mo

85 .805

77 .814 79 .413

lina

79 .414 79 .376

79 .200 .197

79 .349 79 .183

y

79 .239

Rue

79 .240 79 .098

77 .963 79 .099 79 .064

78 .009 78 .809

79 .117

79 .072

78 .934 78 .933 78 .930 78 .269

79 .598

78 .897

78 .857

78 .844

78 78.866 .825

78 .869 78 .851 7878 .83078 .850 78 .764 .735

79 .594

T

B

78 .376 78 .401 78 .41078 78 .538

78 .212 78 .259

N

-3.77-

7

78 .637

78 .518

17

-7.42-

81 .965 78 .786 81 .960

78 .653

82 .011 81 .964

78 .583

78 .574 78 .587

.596

C

79 .001

.658

86 .091

79 .105

79 .125

79 .030

78 .732

78 81 .591 81.796 .588

78 .735

78 .732

78 .788 81 .576

.752 78 78 .76678 81.782 .579

78 .664 78 .710 78 .623

ay

B

98

78 .797

Molin

79 .114 80 .064 79 80.068 .065

Cabine élec.

.670 7878 .587

78 .587 78 .589

78 .67478 .625 78 .69778T .653

79 .210 79 .309 79 .300 81 .576 78 .841

78 .825

.649

78 .655

78 .592 78 .649

PB

78

79 79.296 81 .029 .578 79 .308

78 .876

81 .683

-1 .46-

78 .605

78 .522 78 78.572 .526

78 .689 78 .693 7880 .712 .639 80 .639 78 80.936 .562 80 .057 78

C

ENTRÉE DE VILLE À STRUCTURER

86 .317

85 .751

78 .688

78 .626 78 .535 78 .54978

78 .562

78 .649

78.292 .742 79

79 .103 79 .284

78 .746 78 .582

78 .658

78 .378 78 .411

.00-

78 .036

81 .214

86 85.138 .746

1

78 .522 78 .542

78 .606

78 .616

78 .677 78 .679

78 78 .573.565 78 .607

78 .656

78 .898

78 .659

78 .617 78 .639

78 .051 .049

78 .072 78 .140

78 .290

78 .131

81 .172 81 .02381 .181 81 .040

81 .075 81 .055 81 .074 81 .042

10A

86 .153

3

-3 .22-

78 .572

78 .688

78 .587

-5.00-

78 .617

79 .280 7879 .748 .280

78 .090

-28

78 .015

78 .508 78.662 .511 78

78 .614

GR

-8.09-

18

78 .478

4

78

PB

23

78 .219

78 .132 77 .998

81 .080 81 .059

86 .147 .368

2 86 .765 .151 79 86 .386 82 .155

5

82 .849 79 .349 79 .274 79 .349 82 .847

10

11

.678

78 .485

78 .368

78 .217

83 .424

T

-5 .70-

78.830 .894 78

78 82.807 .187

82 .189 78 82.773 .184

-1.16-

78 .581 78 .512 78 .541

78

T

-1 .36-

B

78 .479 78 .483 78 .612

Rue

1 18,1

2

78 .133

77 .966

78 .218

83 .427

78 .400 78 .400 78 .439 78 .410

78 78.439 .426

24 -1.27- 25

78 .410

78 .300

78 78.130 .174

-5.39-

78 .410

-3.73-

78 .425

78 .156 78 .350

78 .134

-1 .85-

78 .386 78 .402

26

78 .170

78 .183

12

.435

78 .574

78 .509

78 .268 78 .317

78 .275

19

78 .231

78 .068

77 .949

81 .203 81 .126 80 .989

81 .015

80 .027

79 .800

79 .621 79 82.424 .827 79 .551 82 .392

-7.74-

79 .401 82 .826

79 .194 79 .163 79 .301

6

8 9

14

13

78 .450

78 .457

C

78 .483 78 .517 78 .660 78 .471

78 .5587878 .529 .664 78 .389

21 22 20 -1 .79-

7878 .365 .489

T

77 .846

K

86 .329

79 .894 80 .028

79 79.667 .820

.33-

79 .075

15

7982 .388 .411

78 .556

78 .391 78 .513 .408 78 78 .360

78 .062 77 .919

78 .106

78 .081 77 .932 78 .085 77 .938 77 .943

80 .914 80 .932 80 .90780 .934 81 .209 81 .235

P

81 .094 81 .076

81 .025

80 .807 80 .933 80 .911 80.071 .933 81 81 .112 81 .109

83 .963

79 .874

N

PB

78 .959

3

78 .225

78 .152

78 .175 78 .179

C

16

7979 .500 .668

-12

78 .702 78 .846

78 .820 78 .944

83 .333

82 .887

81 .080 .952

80 .965 80 .842

80 .941 80 .92580 .810 80 .782 80 .806

81 .078 81 .059 81 .039

80 .952 81 .112

81 .109

10B

T

-9.01-

79 .440 79 .501

79 .161 79 .203

78 .937 78 .973

78 .764

78 .635 78 .627 78 .770

2 78 .276

82 .892

80 .840 81 .138

81 .051 80 .908

80 .938 80 .916 80 .940

80 .778

80 .555 80 .551

86 .343

80 .354 .135 86 80 .245 80 .135

79 .586 79 .740

79 .633

79 .383

79 .169 79 .084

78 .934

78 .897

78 .497

78 .517

82 .890

83 .393

80 .840

81 .08180

80 .637

80 .590

80 .588

80 .955 .959 81 .032 80 .943 .93980

A

1

79 .180

78 .798

82 .893

80 .559 80 .847 80 .575

80 .592

80 .567 80 .575 80 .557

80 80.440 .460

80 .523

80 .394 80 .541

80 .788

80 80.502 .505 80 .510

83 .961 80 .320 86 .350

78 .922

78 .832

78 .775

78 .407

78 .475

CPAS

80 .763 80 .764 81 .064

80 .920

80 .585 80 .885

80 80.553 .543

80 .607 80 .513 80 .444

80 .391

80 .650 80 .650

80 .472

86 .353

T

78 .450 78 .388

78 .216

78 .391

83 .418

80 .691 80 .989

80 .628

80 .584

80 .512

80 .478

80 .273 80 .398 80 .397

79 .922 80 .076

78 .889 B

78 .282

78 .336 78 .265

78 .267 78 .203

78 .133

78 .286

83 .397

80 .685 80 .624

80.648 .525 80 80 .507 80 .628 80 .483

80 .296

79 .942

78 .736

78 .107

78 .180

78 .148

78 .083 78 .076 78 .096

80 .326

Pui

79 .957

78 .889

77 .931

77 .854 77 .914 77 .839

.909

78 .199 78 .133

78 .129

78.107 .118 78 78 .148

78 .133

78 .168 78 .165

77 .974

80 .482

t Ma

77 .853

77 .757

77 77.866 .916

77 .850 77 .849

78 .206

78.109 .112 78 78 .100

78 .156

78 .201

78 .192

78 .100 77 .913 77 .894

80 .622 80 .465

rie

77 .951 85 .804

85 .796 84 .606

77 .633

77 .88677

77 .966

78 .037

78 .174 78 .110 PB

78 .190

78 .241 78 .233

78 .252

78 .157

78 .135

80 .457

80 .363

79 .752

78 .244 78 .291 P

P

77 .745

78 .232

81 .615 .613

81 .291

81 .289

clôture existante

80 .590

80 .613 80 .465 80 .462

79 .862 79 .719

Rue R

77 .758

81 82.597 .933

Bornes fixes 81 .984 82 .586 82 .944

82 .930 82 .927

91

83 .344

80 .556

5 16,4

79 .919 79 79.838 .861 77 .690

77 .556 77 .542 77 .548

77 .641

77 .669 P 7777 .704 .666 R 77 .669 P

8182 .616 .937

60

CPAS

81 .308

82 .925

82 .930

80 .783

80 .944 80 .642

80 .642 80 .919 80 .637 80 .614

80 .584

80 .560

80 .464 80 .594

80 .456

80 .627

80 .597

80 .560

80 .155

80 .746

80 .704

80 .671 80 .670

80 .597 80 .579

80 .553

80 80.284 .139

84 .007 85 .789

80 .716

81 .009 80 .711 80 .978

80 .621

80 .538

80 .432

81 .014 80 .73580 .741 81 .041

80 .872

80 .578 80 .852 80 .603 80 .605

80 .300

81 .022

81 .048

80 .923

80 .605

80 .517

T

80 .943

80 .627

80 .430 T

80 .478 80 .481

80 .298

67

80 .947

80 .644

80 .629

84 .613

78 .699

78 .585

78 .005 78 .162

81 .983 78 .741

78 .310

-27

.99-

78 .242

85 .266

78 .656 78 .662

77 .996 78 .190

78 .249 78 .105

CV 20

77 .973 78 .134

78 .201 78 .235

28

77 .393 77 .329 77 .305

78 .226 78 .250

78 .203

77 .378

77 .476

78 .431

77 .394 78 .213

78 .270

77 .462 7777 .531 .441

78 .395 77 .542

78 .16578 .235

77 .523 77 .503 77 .502

77 .481

78 .532

79 .745 79 .536

74

79 .219 79 .776

79 .701 79 .715 79 .854

27 78 .483

78 .105

78 .560 78 .869 78 .494 78 .812

78 .256

78 .753

78 .337 78 .316

78 .292

29

78 .731

78 .551

78 .812

69

77 .713

78 .593

78 .341

79 .795

Longeur

-11.0979 .786

75 .580

75 .795 75 .796 75 .914

153

152

151 -4 .11-

-5 .29-

78 .071

154

-4 .53-

78 .045

77 .762

T

CV 3

-2 .75-

X= 230249 .261 Y= 144519 .063 Z= Z radier =

77 .999 78 .148

143

Z radier =

T

-2 .4078 .634

-2 .99-

T C

141

-8 .25-

140

-7 .65-

139

138

-8 .24-

78 .755

78 .204

171

Longeur

arc=15

-3 .30-

136

Longeur

135

.25 - R=391 arc=17 .38

132

133

7878 .550 .417 78 .462

C

Z radier =

T N

.78 - R=888

CV 14 (bascule)

Z radier =

arc=10

.59 - R=911

X= 230240 .562 Y= 144500 .446 Z= 79 79.317 .140 79 .155 79 .278 79 .307 79 .662

PB

Z radier =

79 .667

X= 230658 .905 Y= 144529 .865 Z= Z radier =

88,00

121

arc=14

.95 - R=965

-1 .62-

80 .468

Rue

-4 .79-

-5 .24-

-8 .00-

-10 .35-

-7.93-

-3.82-

-2 .25-

-2 .36-

-6 .61-

.745

-4 .73-

80

78 .797 78 .796 .591 8181 .588

.752 78 78 .76678 81.782 .579

78 .788 81 .576

78 .753

29

78 .731

78 .551

-1 .18-

-0 .42-

-10 .35-

80 .210

Rue 80 .059 80 80.052 .155

-14 .4280 .473 80 .484

83,00

80 .462

80 88 .726 .175

8080 .620 .527 80 .543

88 .225

81 .570

79 .546 79 .464 78 .884

79 .539

78 .777

78 .665

78 .646

7878 .709 .739

78 .506 78 .602 N

78 .527

78 .492

31 -4 .57-

79 .099

-1 .69-

-0 .29-

80 .640

177

78 .915 82 .049 83 .509

176

78 .896

78 .836

78 .608

78 .966 83 .678 81 .435 79 .017

-12

.39-

78 .660 .986 81 81 .280 81 .245

78 .607 79 .024 81 .248 81 .773 .254

78 .924 79 .073

79 .792 78 .065 81 .779

-4 .87-

-3 .52-

34

78 .562 78 .596 78 .637 78 .614

-4 .70-

79 .716

-2 .25-

-2 .36-

79 .633

40

-14

78 .860

78 .495

79 .863 80 .482 80 .571

N

6

-6 .61-

79 .777

78 .582

78 .489

Ruine

-11.09-

.055 7979 .087

78 .952

78 .579

78 .527

.14-

78 .820

78 .865

33

7878 .699 .633 78 .681 .683

78 .556

-5.55-

5

.27-

78 .652

78 .707

78 .811

79 .756

>

41

èg e-

T N 79 .952

80 .056

7

80 .197

79 .910

-Li

80 .213

1

80 .053 80 .039 80 .051 80 .046 80 .039 8680 .826 .041

43

80 .267

86 .859 80 .183 80 .182

80 .463 80 .328

80 .560

-3 .03-

des

Pierres

80 .545

10 10

PB

80 .428

3

-4 .06-

80 .460

-5 .02-

12

-1 .69-

56

80 .597 80 .634 80 .540

80 .547

55

21

84 .546

23

80 .591

Rue des 80 .615

80 .498

23/2

29

m

80 .676

80 .582

14

14

87 .947

16

8087 .405 .393 .955 80 .38487 .061 80 .401 80 .408

80 .394

5 80 .377 80 .354 80 .463

5

80 .495

80 .033 .533 80 .507 87 80 .519 88 .109 80 .513 80 .525 80 .520

80 .608 80.614 .617 80 80 .629 80 .619 80 .636

80 .519 80 .503 80 .608

80 .686

7

7

80 .683 80 .6718087 .686 .011

80 .704

80 .729

80 .743

9

88 .203

10

97

81,40

m

14

.54

16

100

Longeur

arc=53

Longeur

78.055

77.850

Longeur

106 -1 .28- -1103 .69105

-3 .40-

102

arc=27

.20

- R=911

n od ond ti d ff

27

s

80 .481 80 .570

80 .518 80 .551 80 .792 80 .569 87 .110 87 .494 81 .031 80 .575

25

Pierre

80 .502

12

52

80 .945 83 .068

Cabine élec.

54-3 .97-

80 .707 83 .095

80 .505

80 .414

80 .452

3

80 .757 .656 80 .665 80 .675 80 .630

44

80 .64480

80 .458 87 .147 89 .273 80 .583

80 .428

80 .344

80 .473

8

80 .473

80 .311 80 .304 80 .317 80 .505 .280 80 .369 8080 80 .284 .278 89 .235 80 .707 80 .370

45

80 .329

80 .320 80 .295 80 .395

80 .285 80 .921 86 .281

80 .688

-3 .52-

-4 .87-

80 .525

80 .509 80 .431

80 .230

80 .319

6

6

53

80 .641 83 .058 80 .494

46 80 .355

80 .117 80 .214

80 .120 80 .113 80 .105 80 .11580 .175

42

-5 .00-

80 .507 80 .556 80 .534

47 -2.63-

-3 .52-

80.079 .222 80

-0 .29-

80 .512

80 .305 80 .303

80 .125

80 .141

4

<HU Y

84 .530 80 .472

80 .200

80 .173 80 .089

80 .119

8080 .458 80 .365 .358

84

80 80.523 .527 80 .530 83 .672

80 .598

80 .669

88

83 .752

8

80 .270

Rue

-10 .00-

80 .464

-18 .54-

89

80 .475

78 .953 78 .335

-43

78 .695

78 .785

80 80.411 .548 80 .407 80 .417

80 .369

80 .468

14

Rue

86

80 .505

-8 .59-

80 .213 8080 .208 .305 80 .321

80 .392 80 .300 80 .308

80 .372

-18 .30-

-11 .60-

80 .541

96

de la de la Baume Baum e

80 80.393 .399 80 .388

80 .601

80 .694

80 .668

78 .893

.51-

78 .309

78 .408

78 .619

30

80 .098

80 .047 79 .910

80 .244

8086 .243 .830

85

80 .333 82 .980

87

17 80 .644

.76-

80 .237

80 .184 80 .191 80 .191 80 .204

80 .093

80 .329 N

80 .795

-5 .16-

80 .773

-14 .25-

-31 78 .361

78 .462

78 .500

78 78.533 .533

.31-

79 .880

48 79 .959

80 .225

80 .539 T

92

80 .836

80 .826

80 .894

18

80 .075

79 .999

80 .151

80 .259 80 .165 80 .183

79 .977 79 .969 79 .952 80 .034

80 .055

80 86.101 .907 79 .983 79 .968 80 .081

80 .109

80 .287

280,05 1-2

79 86 86.755 .997 .762

79 .929 7980 .918 .016

80 .191 80 .102 80 .116

80 .130

80 .251

PB

79 .868

79 .938 79 .943 86 .863

83

81 .086

-16

- R=927

79 .721

79 .584

79 .764

79 .372

79 .378

79 .575

79 .768

7979 .790 .802

79 .773

80 .191

Rue

79 .906 79 .886

79 .825 79 .922

8080 .164 .074 80 .087

82

80 .225

80 .256

80 .297

79 .871 79 .850 79 .925

79 .951

80 .190

-12 .20-

8280 .691 .704

-5 .38-

90

98 99

.94

79 .911 79 .848

80 .309

13

80 .293

GR

81 .524

78 .173 78 .310

78 .219 78 .384

78 .319 78 .442

78 .551

78 .533

78 .608

-19

.85

82,00

110

21

- R=888 .15 arc=131 .26

22

CV 30

Longeur

arc=76

R=911 .82 -

82,20

.85

Coordonnees trappillon [m] X= 230624 .259 Y= 144525 .743 Z= Z radier =

79.327

77.767

83,80 172

CV 15

24

.32

Coordonnees trappillon [m] X= 230482 .491 Y= 144518 .652 Z= Z radier =

83.372

86.832

23

-32

78,20

.97-

107

mm

.85 - R=911 .85

N

114 82.854

77.155

T

-37 .57Longeur

2%

B

90,00

109

116 .85

-3.77-

-0 .42-

-1 .18-

-14 .42-

de la de la Baume Baum e

-5 .04-

-9 .92-

-10 .00-

19

.15

81,40

N

119

T

Longeur

T

Coordonnees trappillon [m]

79 79.143 .247 79 .150

78 .800 7878 .933 .799

R=888 .80 -

78.764

75.734

T

118

115 B

122

K

78 .989

C

arc=35 .75 - R=888 .15

Longeur arc=68 .46 - R=888 .15

.15

120

82.272

81.652 P

79 .096

P K

T

Longeur

.52-19 .95-

.34 - R=388

24

CV 7 Coordonnees trappillon [m]

Z radier =

111

CV 26

T

86.071

84.051

T

C

arc=11

C

X= 230239 .956 Y= 144514 .831 Z=

arc=81

CV 32 X= 230722 .071 Y= 144514 .998 Z=

82,40 78.200

Coordonnees trappillon [m]

B

Coordonnees trappillon [m]

117

X= 230392 .618 Y= 144529 .918 Z=

T

-21

Longeur

T

Z radier =

78 .826

Z radier =

.15

N

124

T

C

CV 2

Longeur

arc=21

Longeur arc=50 .05 - R=24

arc=50

T

B T

T

T

T

81 .964

78 .735

.710 7878 .623

79 .372

79 .470

-3.82-

4%

23,7

Longeur

25

T

Longeur arc=101 .38 - R=388 .15 B

B

123 82.805

79.975

79 .058

78 78 .898 79 .906 .033

78 .808 78 .843 78 .933

82 .011

78 .670 78 .587

78 .664

78 .699

78 .656 78 .662

Longeur

X= 230671 .176 Y= 144533 .472 Z=

B

B

125

B

X= 230236 .402 Y= 144499 .57 Z=

78 .937 78 .919 78 .901

78 .702

78 .624

78 .732

Coordonnees trappillon [m]

82.552

128

-10 .86-

127 -3.50-

126

arc=2 .27 Longeur R=388 .15

T

CV 1 Coordonnees trappillon [m]

28

175 78 .955

78 78 .640 78 .651 .773

.00

CV 27 Coordonnees trappillon [m]

1,75%

C

137

-2 .25- -0 .35-

.25 .67 - R=391

-22 .83-

170

173

174

-2 .68-

7878 .475 .629 78 .483

7878 .198 .060 78 .093

78 .516 78 .384 78 .375

.05 - R=24

K

78 .438 7878 .572 .428

78 .648

arc=50

83,00

P

-3 .36-

-1.69-

-2 .28-

-2 .43-

e anc

7878 .366 .506 78 .361

T

78 .235 78 .215 78 .356

78 .409

78 .732

N

.23-

pér Es

78 .248

78 .493

78 .070

B

78 .232 78 .104

77 .951 .939 7877 .076

78 .114

78 .575

.658

T

81.692

-15 .21-

81.891

80.341

134 78 .665 78 .807

78 .219 78 .346

142

PB

-1 .79-

-3.18-

78 .105

77 .685 77 .713 77 .821

78 .049 77 .930 77 .947

77 .590 77.725 .568 77

78 .044 78 .089

Longeur

87,50

88,00

K

N

-16

144 78 .119

7777 .828 .950 77 .856 77 .577 77 .310 77 .307 77 .434

77 .775 77 .803

-1 .21-

.29-

77 .098

77 .498

P

T

B

T

77 .919 78 .065

146 78 .146 78 .130 78 .277

77 .503 .530 7777 .636

7777 .676 .797 77 .692

77 .052

PB

88,50

18

131

129

27

B

Coordonnees trappillon [m] X= 230234 .462 Y= 144515 .482 Z=

C

78 .240 78 .012

77 .943 78 .079

77 .920

77 .293

77 .584

77 .075

145 -2.40-

77 .992 7778 .980 .126

77 .227 .225 7777 .357

76 .920 76 .898 77 .031

77 .000

77 .599

162

B

78 .690

78 .313

Entrée Arcelor 77 .937

77 .836 77 .795

77 .489

77 .21277 .236 77 .205

77 .321 77 77.311 .434

77 .478 77 77.463 .592

76 .870

.85

PB

80,00

78 .844 78 .682

78 .458 78 .303 77 .924 77 .768 77 .765

77 .341

T

76 .644 76 .617 76 .758

76 .788

.93 - R=411

-8 .00-

± 1%

.15

20

18

84,00

C

arc=28

80 .131

80 .144

80 .159 80 .228

80 .284

80 .259

-4 .79-

- R=888

81,00

84,70

85,40

2%

T

Longeur

-62 .01-

T

PB

77 .742 77 .772

77 .499 77 .313

161

78 .629

78 .504

155 78 .391

77 .990

77 .76277 .786

77 .534

77 .407

77 .199

-27

76 .324 76 .289 76 .427

76 .457

-2 .71-

76 .750 76 .202

86,40

130

T

T C

2

-2 .30-

77 .278 77 .140 77 .162

ille Vie

76 .855

76 .019 76 .152

76 .014

86,00

B

-1 .62-

150

77 .241 77 .151

76 .845

76 .701

78 .688 76 .031

76 76 .005 .013

-25 .09-

165

6%

F

75 .914

76 .937

76 .549

la

75 .876 75 .859 75 .864

84,00

CV 6

Coordonnees trappillon [m]

4%

75 .563

-0 .45-

76 .093 75 .430 75 .417 75 .550 75 .450

82.416

26 164

-10 .80-

G'

e de Ru

75 .038 75 .186

75 .252

-2 .72-

77 .060

77 .077 76 .930

76 .054 75 .064

75 .070

75 .078

81.336

-27 .66-

163

-16 .07-

149

.12-

76 .496

76 .857 76 .716

74 .803 74 .904 74 .831 74 .876 75 .052

74 .845

-2 .31-

86.268

T

T

Z radier =

82,00

-23 .52-

PB

74 .834 74 .858

-5 .47-

74.808

B

B

160

N

Longeur arc=29 .36 - R=411 .85

Coordonnees trappillon [m] X= 230245 .946 Y= 144518 .16 Z=

168

- R=407 .78 arc=15 .43

-7 .92-

T

G

74 .754

158

-5 .91-

78 .905

23,7

157

-7 .39-

-0 .58-

76 .131

76 .726

T

156

-3 .60-

148 -3

76 .610 76 .466

75 .598

75 .579

74 .782 .791

B

74 .745

70 .402

-0 .59-

75 .696 75 .564 75 .787 75 .813 75 .651 75 .691 75 .818 75 .691 75 .718 75 .683 75 .72075 .711 75 .738

74 .622

74 .488 74 .446

N

-0 .57-

75 .748 75 .619 75 .661 74 .437 74 .407 74 .447 74 .486

70 .785

70 .563

T

159

-17 .38-

N

76 .464 76 .315 76 .327

Longeur

169

CV Non ouvrable T

.299 7676 .164 76 .165

82.081

79.741

76 .082

76 .077 .045 7576 .909 75 .904

70 .863

70 .794

70 .579

X= 230238 .508 Y= 144518 .261 Z= Z radier =

75 .988

166

CV 5

167

Coordonnees trappillon [m] T

P PB K

-7.93-

23,7

4% N

CV 4

75 .734 7575 .530 .653 75 .521

B

70 .141

70 .251

Z radier =

Longeur arc=65 .15 - R=411 .85

T

75 .387

PB

80 .099

80 .306 80 .13980 .152 80 .153 80 .179

80 .573

79 .910 80 .070 .049 8080 .132

80 .320

80 .334

80 .356

E

CV 17 Coordonnees trappillon [m]

K

75 .481 7575 .566 .392

78 .574 78 .587 78 .655

78 .587 78 .589

78 .67478 .625 78 .69778 .653

86 .091

79 .549

79 .652

49

79 .723

80.274 .079 80 .116 80 80 .268 80 .111

80 .127 79 .841 79 .755 79 .804

80 .048 80 .019 80 .116

80 .418

15

80 .626

-24 .62-

T

83.711

82.091

X= 230517 .358 Y= 144542 .093 Z=

P

75 .363

75 .422 75 .378 75 .519

75 .503 75 .609 75 .488 75 .500

81 .965 7881 .786 .960

78 .653

78 .583

78 .592 78 .649

PB

78

-8.2979 .162 79 81.128 .745

79 .148

80 .581

35 79 .282

79 .320

51

79 .672

50 -4 .73-

-16 .07-

2 .150

F

B

Z radier =

75 75.258 .251

75 .268

75 .323 75 .302 75 .439

-24 .18-

79

-5 .58-

80 .392

80 .545 82 .715

80 .731

arc=29

104

G'

CV 11 Coordonnees trappillon [m] X= 230287 .835 Y= 144527 .768 Z=

T

74 .992 74 .993 7575 .089 75 .103 74 .003 .994 75 .093 7575 .011 .021 7575 .005 75 .007 75.006 .011 75 .020 75 .013

75 .002 74 .972 75 .117

95

-5 .43-

80 .594 82 .700

101

82,60

78.180

C

T

75 .272 B

T 75 .194 75 .208 75 .122 75 .133 75 .117 B

75 .050

74 .767

80 .169

94 93

77.500

T

B

N

B

78 .605

78 .522 78 78.572 .526

79 .001

79 .946

80 .245

80 .263 80 .071

80 .147

80 .680

80 .935

5

T

PB 74 .387 T 74 .390 .395 74 .595 74 7474 .527 .535

75 .546 75 .427 75 .455

80 80.703 .699 80 .703

.70-

79 .015

79 .208

T

-12 .61-

79 .332

79 .072

.65-

79 .112 79 .298

79 .136 79 .296

80 .223

80 .125

-5 .04-

Z radier =

Longeur

V

N

74 .660 74 .636 74 .756

75 .377 75 .259 75 .271

75 .154

78 .688

78 .626 78 .535 78 .54978

78 .562

78 .689 78 .693 7880 .712 .639 80 .639

98

79 .405

79 79.297 .429

PB

80 .218 80 .053 80 .082

80 .433 80 .523

80 .802

.13

80 .245

-26

80 .746

79 .093

-18 79 .150 79 .194 79 .106

79 .266

79 .312

79 .823 79 .691 79 .737

79 .915 79 .889 79 .93179 .949 80 .116 80 .182 80 .236

80 .219 80 .161 79 .982 80 .025

80 .029

80 .153

36

79 .141

79 .251

7979 .546 .685 T 79 .588 C 79 .738 79 .738

79 .696

80 .079

80 .158 80 .094 79 .908 79 .962

-5 .24-

X= 230675 .423 Y= 144537 .62 Z= 78.143

75.153

T

N

P

T

74 .833

75 .215 75 .090 75 .127

ence

74 .190 74 .163 74 .197

86 .317

1

10

78 .522 78 .542

78 .606

78 .572

78 .616

78 .649

79 .030

79 .4637979 .438 .584

79 .908 79 .872

81

-5 .29-

-4.21-

T

B

T

T

74 .616

.558 7474 .502 74 .487

74 .644

74.593 .748 74 74 .610

74 .266 74.386 .256 74

75 .038 74 .916 74 .935

Espér

73 .914 73 .959

11

-1.16-

.581 7878 .512 78 .541

78 .508 78.662 .511 78

78 .677 78 .679

79 .105

79 .125

78 .647

78 .975

32

79 .185

79 .178

79 .219 79 .031 79 .010 79 .071

79 .276

79 .091

79 .689

79 .837 79 .855 79 .815 80 .010

-4 .23-

Z radier =

B

T

B

74 .298

74 .308

74 .879 74 .737

74 .756

73 .804 73 .773 73 .823

79 .333

79 .161

79 .466

79 .973

80 .115

N

80 .146

80 .059 80 .071

79 .898

79 .895

79 .777

80 .173

78 .997 78 .949 78 .956 79 .098

79 .262 79 .407

79 .244

79 .732 79 .870 79 .692

79 .892

79 .890

T

80 .043

7979 .823 .978

80 .047 79 .875 79 .762

80 .167

.32

Coordonnees trappillon [m]

X= 230640 .003 Y= 144536 .708 Z= 86.364

B

74 .105 74 .381

74 .462 74 .326 74 .325

73 .993 .951 7473 .097

T

de la Vieille

74 .712 73 .732

73 .882 .884

79 .294

7979 .784 .618

79 .679

79 .731

79 .842

79 .728

79 .986 79 .968 79 .953 80 .064

79 .964 80 .046

80

arc=3 .99

85.474

Passarelle future

74 .304

73 .977

73 .786

B

74.458 .597 74 74 .470

Rue 74 .205

73 .658 73 .593 73.621 .612 73 73 .789

73 .732 73 .739

- R=888

91

CV 28

CV 25 Coordonnees trappillon [m]

CV 16

Coordonnees trappillon [m]

Z radier =

74 .096

74 .186 74 .047 74 .050

73 .760 73 .920

74 .378 74 .241 74 .268

73 .411 73 .553

73 .797 .618 73 .811 73 .823

78 .479 78 .483 78 .612

78 .688

79 .114 80 .064 79 80.068 .065 79 .210

Cabine élec.

79 .551

79 .560 79 .597

79 .746 79 .591

79 .721

79 .708

79 .87379 .884

80 .124

R=1

85.710

83.860

7373 .652 .648 73 .781

74 .037

73 .610 73 .577 73 .727

74 .201 74 .053 74 .078

PB

73 .226

78 .494 78 .812

78 .292

78 .188

78 .257

78 .288 78 .258 78 .252 78 .399

39

78 .336

78 .500 78 .387 78 .426

78 .463 78 .494

78 .772

79 .173 79 .002

78 .844 78 .966

79 .156 79 .073

59

79 .443

79 .342

79 .164

79 .410

79 .391

79 .405

79 79.793 .802 79 .693 79 .691 79 .681

79 .694

79 .673

79 .976

GR

r

Z radier =

X= 230500 .037 Y= 144537 .028 Z=

73 .939 73 .814 73 .821

73 .653

73 .441

73 .915

73 .423 72 .848

73 .923

70 .299

X= 230383 .932 Y= 144534 .254 Z=

73 .643

73 .875 73 .733 73 .744

73 .305 73 .275 73 .434

74 .026 73 .889

73 .875

70 .239

CV 13 Coordonnees trappillon [m]

83.637

73 .730 73 .640 73 .639

73 .628 73 .662 73 .665 73 .911

73 73 .736 .651 73 .693 73 .72473 .731

73 .733 73 .584 73 .585

73 .430

73 .400 73 .556

73 .756

73 .035 73 .036 73 .183

.587

71 .454 71 .442

.44

.22-

79 .350

79 .475

79 .463 79 .360

.19-

79 .503 79 79 .513 .297 79 .356

79 .639

79 .642 79 .582

79 .713

79 .971

80 .026 80 .099

80 .257

Longeu

Z radier =

73 .814

73 .645

73 .625 73 .541

B

73 .885 73 .742

73 .590

73 .625

72 .674 72 .824

72 .54272 72 .395 72 .382 72 .044 71 .751

85.417

73 .049

72 .763 7272 .910 .777

72 .858

73 .630 73 .627

73 .387 T 73 .589 .699 73 .721 73 .643

73 .037 73 .152

73 .719 73 .583

73 .242

72 .695 72 .218 72 .376

71 .858 71 .997

71 .965

71 .249 71 .272

80 .954 80 .954

81 .029 .028

81 .498

22,8

T

73 .179 73 .148 73 .314

73 .055

72 .555

72 .236 71 .883 71 .780 71 .755

71 .568 71 .713

71 .736

80 .802

81 .256 81 .256

ble

B

73 .574 73 .437 73 .437

73 .167

72 .786 72 .965

73 .556 73 .418 73 .437

72 .950 72 .258

71 .897

71 .590

71 .112 71 .248

71 .256

17

78 80.936 .562 80 .057

79 79.296 81 .029 .578 79 .308

79 .484

7979 .758 .613 79 .644 79 .61579 79.617 .773

79 .741 79 .674

79 .797 79 .756 79 .765

80 .018 80 .058 80 .171

80 .348 80 .340

80 .403

X= 230357 .983 Y= 144534 .047 Z=

7272 .804 .916 72 .789

71 .926 71 .927 71 .928 72 .059 72 .794

73 .712 .041

73 .431 73 .419

73 .023

72 .945

72 .794 72 .711 72 .698 72 .832

73 .076

72 .736

72 .394

72 .004

71 .634

71 .337

71 .104

PB

+/- 6,00 varia

CV 12 Coordonnees trappillon [m]

73 .012

72 .552 P K

72 .679 72 .772

72 .727 72 .734 72 .873

73 .052 73 .059 73 .193

73 .419 73 .278 73 .286

72 .957

72 .851

73 .209 73 .076

72 .113 71 .993 71 .768 71 .628

71 .290 .384 71 .317 71 .201 71 .217 71 .201

E

73 .092 73 .089 73 .081 73 .225 73 .080 73 .221 73 .075 73 .079 73 .228 73 .235 73 .084 73 .256 73 .07773 .116 73 .115

73 .002

72 .880

72 .608

72 .447 72 .454 72 .586

72 .145 72 .283

72 .833 72 .722 72 .505 72 .377

71 .280

GR

81 .498

81 .847

82 .048

82 .414

arc=29

G

72 .885 72 .860 72 .848

72 .693 72 .657 72 .655

72 .153 71 .867 71 .859 72 .005

71 .542 71 .517 71 .668

71 .209 71 .190 71 .346

T

71 .169 B 71 .279 N 71 .211 T 71 .222 T

B

71 .328 71 .130

70 .827

79 .523

79 .524 79 .365

79 .459

79 .736

79 .613 79 .522 79 .573

79 .668 79 .586

79 .813

79 .799

80 .111

80 .275

80 .417

80 .409

80 .360

Longeur

RT

72 .502

72 .302

71 .881

71 .304

71 .121

70 .672 70 .795

81 .554

82 .056

82 .092

VE

72 .550

K

72 .119 72 .128 72 .264

72 .362 72 .363 72 .515

73 .153

72 .569

B T P

72 .387

72 .141 72 .111 72 .113

71 .275

70 .910 70 .855 71 71.015 70 .002 .919 70 .931 71 .134

70 .902

70 .656

81 .927 82 .213

71 .972

72 .391

72 .679

72 .474 72 .466 72 .618

72 .974 72 .906 72 .789

PB

72 .429 72 .383

71 71.692 .827

72 .416 72 .280 72 .288 72 .693 72 .586 72 .590

73 .078 72 .961 72 .951

73 .107 73 .119 73 .260

73 .034 72 .991

72 .849

72 .535 72 .589

72 .153

71 .917

71 .833 71 .811 71 .808

71 .756 71 .711 71 .719

71 .595

71 .311 71 .319

71 .164 71 .164 71 .150

71 .071 70 .884

81 .363 81 .376

82 .263

82 .546 82 .616

E

N

72 .447

71 .860 71 .598

71 .616 71 .456

71 .014

70 .489

PB

79 .444

7979 .679 .536 79 .563

79 .694

79 .878 79 .878

80 .270

80 .398

80 .546

80 .721

80 .676

80 .963 80 .963 82 .270

82 .536

80,20

AX

73 .109

73 .021

73 73.143 .027 73 .020

T

72 .388

71 .549 71 .510

70 .826

70 .890

70 .169 70 .298

-12 .20-

4% -0 .45-

-3 .36-

-1.69-

-2 .43-

-2 .40-

nce

72 .238

71 .935

GR

N

70 .787

70 .739 70 .551

70 .149

78 .41078 .435 78 .538

78 .637

78 .614

GR

78 .742 79 .292

79 .103 79 .284

85 .266

78 .607

78 .926 78 .903

79 .210

79 .291

7979 .219 .371

61

79 .413

79 .518

79 .455 79 .471 79 .440 79 .816 79 .601

79 .650

79 .903

79 .862

79 .814

79 .918

79 .644

79 .821

79 .89579 79 .892

80 .012 79 .849

79 .827

82 .276 79 79.840 .829

.955

80 .025

80 .168 83 .367 83 .379 80 .088 86 .821

80 .068

80 .062

80 .090

80 .156

80 .240

80 .306

16Rue des Trois Mêlées

80 .487

82 .227 79 .667

79 .713 79 .884

80 .345

80 .020

80 .102 80 .021

80 .136 80 .201

80 .386 80 .260 80 .248

80 80.412 .445 80 .319

80 .423 80 .486

80 .608

Pui 78 .397

78 .462

4

78 .800

78 .888

78 .969

78 .931

79 .234

79 .451 79 .268

-5.49-

79 .488 .487 79.493 .492 79

79 .502 79 .384 79 .517 79 .415

79 .335

79 .353 79 .503 79 .522

79 .683 82 .567

88 86 .986 80 .237

80 .317

80 .481

84 .239 80 .322 .303 80 .412 80 .301 87

80 .483

84 .986 87 .307 80 .420 80 .435

80 .585

80 .582

79 .489 7979 .480 .656

79 .661

PB

GR

8080 .714 .593

-9 .92-

ére

N

73 .069

71 .951

71 .839

71 .617

T

72 .319

72 .188 71 .653

T

73 .213

73 .103

N

71 .769

71 .858 71 .718 71 .433

71 .413 71 .115

71 .027

70 .604 70 .788 70 .821 70 .719

T

12

78 .376 78 .401

78 .574

78 .565 78 .573 78 .607

78 .656

78 .898

79 .309 79 .300 81 .576 78 .841

81 .983

.99-

27 78 .483

inay

Esp

N

73 .153 73 .026 73 .030 73 .167 73 .058 73 .059

73 .203 73 .065 73 .078

73 .169

72 .714

72 .528 T

71 .403

71 .372 71 .090

70 .822 70 .825 70 70 .982.819 .803 7070 .798

B

82 .002

82 .270

78.182

77.332 82 .523

72 .706 73 .114 T

73 .187

73 .208

73 .213

73 .211 72 .796 GR

81 .610

78 .077

71 .398

81 .214

Mol

ille

Z radier =

81 .172 81 .02381 .181 81 .040

81 .07581 .074 81 .05581 .042

78 .691

78 .565

78 .641

78 .735

-5 .07-

78 .776

78 .867

78 .755 78 .887

79 .143 79 .167

79 .440 79 .240 79 79.428 .246 79 .250

79 .519 79 .518 79 .469

PB

79 .513

79 .507 79 .416 79 .452

10 10

14 14 80 .657 80 .481 80 .461

88 80.670 .011 .582 80 .542

82 .581 82 80 84 80 .584 80 .787 .184 .777 .635 80 .790

80 .799

Mêlées Rue des Trois

37

78 .639 78 .787

78 .772

78 .854

D

Vie 72 .398

22

81 .601

78 .095 78 .842

71 .408

82 .328

Coordonnees trappillon [m] X= 230675 .229 Y= 144538 .577 Z=

T

71 .657

71 .443

T

70 .035

V

80 .673 80 .779

78 .662

78 .877

1,45

la

78,20

B

81 .633

K

P

80 .793 80 .633

80 .819 80 .719

78 .562

78 .584 78 .694

78 .797

78 .988

78 .958

79 .197

79 .445 79 .246 79 .215

60 79 .543

81 .436

78 .604 78 .913 78 .750

78 .868

79 .055 78 .928

79 .149

79 .306

-17

7979 .467 .336 79 .346

79 .452 79 .292 79 .289

79 .228 79 .443 79 .246 79 .242

79 .530

79 .394

79 .410 79 .424

79 .343

79 .447

79 .656

80 .800 80 .800

84 .157 81 80.564 .894 80 .858

80 .900

80 .820

80 .885 80 .831 80 .761

80 .871

81 .136 81 .335 81 .552

80 .551

84 .186 88 .657 80 .594 81 .012

83 84 .216 .065 80 .956 80 .942

80 .905

80 .928

81 .506

81 .975

81 .723

71 .313

71 .397 71 .540

P

7171 .445 .452 71 .459 B

81 .080 81 .059

T

C

78 .995 78 .842 78 .795

79 .186 79 .173

.97

79 .509 79 .302

79 .321

79 .431 79 .284 79 .292

79 .302 79 .282 79 .294 7979 .290 .439

79 .349

81 .905

Mari

78 .612

78 .495 78 .552

38

T

78 .952 78 .975

78 .938

78 .981

79 .032

-10 7979 .377 .506 79 .398

79 .398 7979 .512 .379

79 .526

.38

de

71 .739 71 .751

71 .260 71 .291 7171 .288 71.400 .291 71 .218

79 .464

79 .451 79 .444 79 .652 79 .575

79 .380 79 .382 79 .501

R=48 .68 -

Rue 71 .679

71 .310 71 .108 71 .020 71 .012

81 .203 81 .126 80 .989

81 .015

78 .677

78 .995 79 .128

79 .936

arc=4 R=22

58

79 .564

79 .596

79 .222

79 .207

79 .277

GR

80 .925 81 .087

81 .177 81 .973

82 .058

82 .191

Puit

78 .518

78 .535 78 .594

78 .749

78 .931 78 .940 78 .944 78 .971

79 .928

79 .975

Longeur

79 .590 79 .086 79.053 .038 79

79 .266 79 .090 79 .126

79 .275

79 .231

79 .410 79 .331 79 .360

79 .436

80 .954 80 .954

81 .066

81 .256

81 .432 82 .046

82 .099

71 .619

70 .630

78 .866

78 .986 78 .846 78 .890

79 .127 79 .032 79 .089

7979 .272 .178 79 .246

81 .113 81 .113

81 .376 81 .376

81.690 .690 81

82 .076 82 .139

71 .419 71 .310 71 .303

71 .131

71 .534 7171 .421 .424

70 .968

78 .858

78 .852

7878 .665 .789 78 .730

78 .951

7878 .950 .862 78 .906

79 .054

79 .323 79 .232 79 .283 79 .304

86 .990

Entrée de garages

Limite d'intervention

82,00 81 .999 81 .999

82 .121 82 .186

82 .364

Rue

78 .623

78 .664

79 .028

79 .985

79 .973

57 79 .828

79 80 .447 .977 79 81 .575 .105

12

.722 7878 .730 78 .554 78 .612 78 .682

78 78 .859.762 78 .815

78 .892

78 .966

79 .237

79 .351

Pylone 82.736

76.726

82 .360

71 .991 71 .876 71 .869

K

81 .094 81 .076

78 .250

78 .562

79 .952

79 .475

80 .456 79 .986 78 .644

7878 .742 .638 78 .685

8678 .819 .930

79 .195 79 .252

8787 .464 .111

Z radier =

CV Non ouvrable

CV 29

78 .563

78 .793 78 .623

9

-10 .78-

79 .635 79 .580

79 .632

79 .560

7878 .603 .505 78 .553

86 78.518 .914

78 .997

86 79 79.100 .792 .098

108

86 .884 84 79 .437 .260 .241

71 .524

70 .500 70 .313

78 .605

78 .585

78 .645 78 .746

104104

106

Bornes amovibles

87 .481

CV 33 Coordonnees trappillon [m] X= 230786 .252 Y= 144564 .351 Z=

77,40

71 .979

80 .91480 .932 80 .907 80 .934 81 .209 81 .235

P

81 .078 81 .059 81 .039 81 .025

10A

85 .751

Rue

8678 .496 .634 .625

.00

106

Police

78 .659

ay

.17 - R=24

T

78 .787

A

arc=51

B

Rue e

78 .480

78 .467 78 .687 78 .520 78 .917

78 .873

82 .726 83 .223

79 .930

Longeur arc=10 .98 R=22 79 .845

79 .463

0

Longeur

T

B T

81,00

5

7878 .452 .548 78 .509

78.044

77.334

B

T

82.910

81.530

78 .410

10

76

64 63

7979 .456 .595

78 .602

Coordonnees trappillon [m] X= 230667 .622 Y= 144491 .929 Z=

84,00 77,60 B

T

Z radier = 71 71.242 .260 71 .256

78 .525 78 .389

78 .595 78 .467

78 .685

7979 .685 .827

79 .626 79 .741 79 .597

7979 .587 .725 79 .600

-1 .83- -0 .55-

79 .532

79 .599 79 .468 79 .485

81.900

76.500

79.763

78.113

83.052

80.802

83.034

81.264

B

X= 230206 .566 Y= 144539 .031 Z=

71.069 .077 71

71 .229

81 .080 .952

80 .965 80 .842

83 .963

86 .147 .368

86 .153 86 85.138 .746

78 .430

78 .643 78 .686

83 .673 83 .208

79 .975

79 .997

79 .700

79 .653 79 .649 79 .788

79 .651

67 180 179 -5 .44-

79 .496 7979 .646 .501

79 .492 79 79.628 .463

arc=16

Z radier =

Z radier =

Coordonnees trappillon [m]

70 .873 70 .888 70 .880

83 .705

7979 .825 .964

78 .775

79 .680

79 .631

66

t Ma

82 .726

79 .968

75

79 .804

77

-7 .00-

7979 .715 .573 79 .582

79 .647

79 .689

.490 .628 79 .4987979

Coordonnees trappillon [m] X= 230615 .58 Y= 144571 .853 Z=

CV 18 Coordonnees trappillon [m] X= 230513 .077 Y= 144566 .621 Z= Z radier =

Z radier =

Coordonnees trappillon [m] X= 230217 .263 Y= 144539 .439 Z=

CV 8

70 .793

70 .708 70 .602 70 .599 70 .461

70 .588 70 .478 70 .463

.25

7979 .693 .55079 .549

11

-17 .90-

T

Longeur arc=51 .17 - R=24 .00

79 .543

78 .638

18,2

79,00

Z radier =

T

B

X= 230220 .572 Y= 144542 .885 Z=

CV 9

69 .902

70 .022

80 .840 81 .138

81 .051 80 .908

80 .938 80 .916 80 .940 80 80.941 .810 80 .925 80 .782 80 .806

80 .955 .959 80 .943 .93980 81 .032

80 .911 80 .933 81 .071 81 .112 81 .109

81 .112

86 .329

80 .027

2

3

78 .560 78 .869 78 .256

78 .316

78 .629

79 .963 79 .965

79 .789 79 .936

79 .780

79 .739

79 .641

178 -0 .7973 72

79 .704

79 .579

78 .458

78 .396 78 .402

62

79 .484

CV 31

.85 - R=911 arc=111 .82

CV 24

108

B

Longeur arc=93 .78 - R=911 .85 C

Coordonnees trappillon [m]

Arcelor

69.721 .820 69 69 .735

69 .684

B T

70 .636

79 .794 79 .643

79 .848

71

arc=4 Longeur R=7

-10 .64-

79 .574

78 .319

78 .350

78 .429

rie

78 .324

79 .702 79 .786

-4.9379 .631

78 .313

78 .263

79 .475 79 .610

K

CV 10 PB

.945 6969 .948 70 .064

70 .705

T

86 .765 .151 79 86 .155 82 .386

-3 .22-

78 .201 78 .235

78 .083 78 .230

78 .337

78 .441 78 .293

9

79 .732

7979 .842 .692

79 .656

70

9

78 .349

78 .239

65 78 .284 78 .217 78 .186

78 .584

P

68 .730 6868 .721 68 .757 .747

69 .923 69 .843 69 .839 69 .967

70 .029

79 79.715 .854

-7.2379 .795

7979 .887 .742

79 .690

78 .039

78 .186

78 .030 77 78 .995.099

78 .281

78 .291 78 .395 78 .335

Longeur

112

T

79 .669

68 .845

68 .921 68 .956 69 .040

71 .410 71 .112

77 .942

68 .896

P

K 68 .783 68 .814 68 .792 68 .811

69 .148 69 .115

79 .701

79 .800

79 .778

79 .761 79 .644

77 .914

78 .215

78 .443

-1 .20-

Longeur

88,00

79 .703 7979 .702 .731 79 .564 79 .100 7979 .223 .106

79 .317

PI

68 .842

69 .087

74

79 .776

79 .795

78 .170

77 .809

77 .842

78 .014

78 .140 78 .047 78 .097

86 .187 .557 78 87 .995

79 .406

68 .569

6868 .481 .573 68 .476

68 .695 68 .696

68 .639 68 .617

68 .713

68 .922

78 .532

79 .745 79 .536 79 .219

78 .593

78 .341 78 .099 77 .790

77 .830 77 .740 77 .748 77 .712

77 .957

78 .242

88 .002 78 86.433 .614

68 .527

68 .020 68 .003 68 .094 B T 68 .055 68 .084 68 .098

68 .375

78 .509

78 .518

-8.09-

18 78 .587

-5.00-

78 .617

78 .825

4

77 .973 78 .134

78 .213

78 .105

78 .812

69

77 .746

.973 87 7777 .862 .982 86 .357

98

100

77 .209

77 .203

78 .16578 .235

77 .523 77 .503 77 .502

77 .713

7777 .781 .673 77 .712

78 .102

96

96

78 .621

68 .384

67 .965

68 .138 68 .292

GR

77 .915 77 .515 7777 .572 .473 77 .481

87 .328 87 77 77 .889 .735 .741

9494

83,80

78 .214

67 .744

67 .781

8777 .317 .574 77 .570

92

82,20

.85

107

84.365

81.075

102102

67 .528 .533

67 .571

R=911 .82 -

78,20

CV 23 Coordonnees trappillon [m]

Z radier =

.739 6767 .630 67 .635

.456 6767 .460 67 .529

arc=76

81.562

74.152

113

79 .306 79.357 .306 7979 .386

67 .181

67 .448

67 .460

67 .571

Longeur

172

Z radier =

16,4

22 79.327

77.767

CV 22 X= 230587 .875 Y= 144593 .291 Z=

.97-

A

Z radier =

77.876

76.916

-32

inay

Z radier =

78 .439

78 .478

79 .280 7879 .748 .280

78 .876

B

- R=888 .15 arc=131 .26

CV 30 X= 230624 .259 Y= 144525 .743 Z=

Coordonnees trappillon [m] X= 230566 .918 Y= 144599 .21 Z= 80.042

72.392

23

T

Longeur arc=9 .72 - R=911 .85

-6 .38-

79 .667

86.832

83.372

B

114

78 .410

PB

23

78 .617 78 .639 78 .746

Molin

Z radier =

.85 - R=911 .85

7

78 .741

Coordonnees trappillon [m]

Coordonnees trappillon [m] X= 230482 .491 Y= 144518 .652 Z=

X= 230616 .034 Y= 144586 .325 Z= arc=53

78 .485

81 .683

5

82 .849 79 .349 79 .274 79 .349 82 .847

78 .585

-27 78 .242

-5 .15-

Longeur

T

78 .582

78 .658

78 .378 78 .411

78 .005 78 .162

-2 .54-

120

N

78 .226

78 .203

78 78.352 .212

D

Z radier =

CV 15

24

.32

T

77 .943

28

78 .395 77 .542

-4 .73-

.95 - R=965

B

78 .368

78 .290

.00-

80 .590

80 .840

81 .08180

80 .637

80 .588

80 .778 80 .807 80 .933 80 .952

81 .109

79 .894 80 .028

79 .800

79 .621 79 .424 82 .827 79 82.551 .392

-7.74-

79 .401 82 .826

79 .194 79 .163 79 .301

6 -5 .70-

77 .996 78 .190

78 .270

77 .462 7777 .531 .441

78 .089

arc=14

78 .400 78 .400

78 78.439 .426

24 -1.27- 25

78 .410

78 .300

78 .130 78 .174

78 .072 78 .140

-5.39-

78 .410

-3.73-

78 .425

78 .156 78 .350

78 .134

78 .051 .049 78 .090

78 .219

-28 78 .036

8 9

78 .894 78 .830 78 82.807 .187 82 .189 78 82.773 .184

78 .389

21 22 20 -1 .79-

78 .365 78 .489

26

78 .170

78 .183

2

78 .133

14

13

78 .391 78 .408 78 .513 78 .360

78 .450

78 .268 78 .317

78 .457

78 .212 78 .259 78 .386 78 .402

77 .949

78 .483 78 .517 78 .660 78 .471

78 .558 7878 .529 .664

78 .276 78 .275

19

78 .231

78 .068

78 .131

80 .763 80 .764 81 .064

80 .920

80 .575

80 .592 80 .567 80 .575

80 .557

80 .440 80 .460

80 .523

80 .788

79 .874

N

15

7982 .388 .411

78 .556

78 .138

78 .431

77 .394

77 .415 77 .397 77 .481

-2 .95-

-2 .68-

Longeur

78 .225

C

78 .015

78 .249 78 .105

77 .476

77 .464

-0 .67-

X= 230548 .827 Y= 144594 .667 Z=

-37 .57-

121

CV 19

Coordonnees trappillon [m]

116 .85

77 .894 77 .974

T

78 77.062 .919

78 .106

77 .943

78 .132 77 .998

78 .310

77 .378

78 .014

.59 - R=911

78 .286

78 .100 77 .913

78 .152

78 78 .175 .179

78 .218

78 .217

C

79 79.667 .820

.33-

79 .075

78 .959

3

78 .135

clôture existante

83 .344

82 .887

80 .691 80 .989

80 .628

80 .585 80 .885

80 80 .559.847

80 .607 80 .513 80 .444

80 .394 80 .541

80 .650 80 .650

86 .343

10B

T

-9.01-

16

7979 .500 .668

-12 PB

82 .892

80 .685 80 .624

80 .584 80 .553 80 .543

80 .482

80 .391 80 .326

80 .555 80 80.502 .505 80 .551 80 .510

83 .961 80 .320 86 .350

80 .135 86.245 .354 80 80 .135

79 .586 79 .740

79 .440 79 .501

79 .161 79 .203

78 .937 78 .973

78 78.702 .846

7878 .820 .944

82 .893

.393 77 .329 7777 .305

77 .357

77 .371

87 .307

de la Glacière Rue Rue de la Glacière

arc=10

GR

80 .801

80 .622

80 .556

80 .512

80 .478

80 .273 80 .398 80 .397

80 .472

1 79 .594

79 .633

79 .383

79 .169 79 .084

78 .934

78 .897

78 .764

78 .635 78 .627 78 .770

82 .890

83 .393

83 .397

83 .427

83 .424

80 .783

80 .641

80 .611 .616

80 .568

80 .525 8080 .648 .507 80 .628 80 .483

80 .622 80 .465 80 .457

80 .296

79 .942

78 .922

78 .832

78 .775

78 .798

83 .333

CPAS

14

16

Rue du Dépot

-13 .33-

Longeur

10

81,40

.85

21

Coordonnees trappillon [m]

CV 21 T

122

K

78 78.866 .825

78 .869 78 .851 7878 .83078 78.850 .764 .735

78 .517

.596

Longeur

90,00

109

B

.15

P

N

78 .844

79 .180

82,00

80 .746

80 .704

80 .670 80 .944 80 .642

80 .642 80 .919 80 .637 80 .614

80 .584

80 .560

80 .464 80 .594

80 .590

PLACE DES QUATRE GRANDS

FAÇADE À STRUCTURER

86 .353

T

78 .497

2

77 .393

119 115

.52-19 .95-

.34 - R=388

T

79 .598

79 .922 80 .076

78 .889 B

78 .407

78 .475

78 .133

C

arc=11

82.272

81.652

82.854

81.494

Rue

79 .117

79 .072

78 .934 78 .933 78 .930 78 .897

78 .857 78 .736

78 .450 78 .388

78 .081 77 .932 78 .085

- R=911

79 .239

78 .809

78 .269

Pui

79 .957

79 .349 79 .183

79 .240 79 .098 79 .099 79 .064

78 .009

78 .282

78 .336 78 .265

78 .216

77 .966

.20

79 .414

79 .200 .197

77 .963

78 .267 78 .203

77 .938

arc=27

79 .413

79 .376 78 .889

77 .931

78 .107

83 .418

102

-3 .40-

105

77 .814

77 .854 77 .914 77 .839

78 .148

78 .083 78 .076 78 .096

.613 8080 .465

t Ma

77 .853

77 .757

78 .180

78 .199 78 .133

78 .129

78 .118 78 .107 78 .148

78 .133

78 .168 78 .165

78 .391

97

.54

100

Longeur

106 -1 .28- -1103 .69-

110

T

Longeur arc=68 .46 - R=888 .15

-21

Longeur

24

CV 7 Coordonnees trappillon [m] X= 230239 .956 Y= 144514 .831 Z=

81,40

81 .009 80 .711 80 .978 80 .671

80 .627

80 .597

80 .560

85 .805

77 .866 77 .916

.909

77 .846

78.764

75.734

80 .872

80 .621

80 .597 80 .579

80 .553

80 .494 80.640 .513 80

80 .457

80 .607

rie

77 .951 85 .804

8584 .796 .606

77 .633

77 .850 77 .849

78 .206

78 .112 7878 .109 .100

78 .156

78 .201

78 .192

80 .462

80 .363

77 .643

77 .88677

77 .966

78 .037

78 .174 78 .110 PB

78 .190

78 .241 78 .233

78 .252

78 .157

78

124

123

C

Z radier =

111

R

77 .564

R

79 .752

78 .244 78 .291 P

P

77 .745

78 .232

81 .615 .613

81 .291

81 .289

-1 .36-

B T

T

T

T

T

Z radier =

82,40 78.200

77.850

78.055

77.155

B

C

Longeur arc=101 .38 - R=388 .15 B

B

B

C

R

77 .758

81 82.597 .933

Bornes fixes 81 .984 82 .586 82 .944

82 .930 82 .927

Rue

Z radier =

78.091

76.551

T

125

T

CV 2

79 .662

X= 230658 .905 Y= 144529 .865 Z=

81 .053 81 .050 80 .757 80 .751

.649

126

arc=2 .27 Longeur R=388 .15

C

N

Z radier =

88,00

81 .052 80 .749 80 .756

80 .605 80 .538

80 .432

81 .014 80 .741 80 .735 81 .041

78

132

T

T

2%

P

P

81 .616 82 .937

60

CPAS

81 .308

PLACE À AMÉNAGER

80 .716 81 .022

80 .578 80 .852 80 .603

80 .395

80 .456

77 .669 7777 .704 .666 R 77 .669

29

82 .925

82 .930

-1 .85-

.25 - R=391 arc=17 .38

82.805

79.975

Coordonnees trappillon [m]

PB

X= 230564 .023 Y= 144608 .493 Z=

N

80 .702 80 .703 80 .994

81 .048

80 .923

80 .605

80 .517 80 .379 80 .357

80 .414

80 .155

79 .862 79 .719 .556 7777 .542 77 .548

77 .641

27

.678

Coordonnees trappillon [m] T

118

80 .482

80 .464

80 .284 80 .139

79 .919 79 79.838 .861

25

87 .947

16

78

Longeur

135

CV 1

Z radier =

78 .989

CV 20

P K

C

arc=35 .75 - R=888 .15

C

80 .300

78 .529

77 .690

23/2

y

-2 .25- -0 .35-

Coordonnees trappillon [m] X= 230236 .402 Y= 144499 .57 Z=

X= 230240 .562 Y= 144500 .446 Z= 79 .096

T

T

Longeur

80 .658

80 .947

80 .644 80 .943

80 .627 80 .604

80 .579

78 .484

23

s

lina

-3 .30-

.25 .67 - R=391

Z radier =

Z radier =

CV 26 Coordonnees trappillon [m]

B

86.071

84.051

K

80 .481 T

P

80 .298

67

21

Pierre

Mo

arc=15

Z radier =

80 .669 80 .653

80 .680 80 .658 80 .967 80 .667

80 .646

80 .623

80 .465

80 .549 80 .517

.007 8584 .789

55

84 .546

56

Rue

-8 .24-

Longeur

171

-5 .0280 .634 80 .540 80 .591

80 .615

14

80 .524

80 .478

-3.11-

-7 .65-

81 .606

52

80 .945 83 .068

80 .707 83 .095

80 .675

80 .597 80 .505 80 .547

80 .502 80 .481 80 .570

80 .676

14

B

140 78 .755

80 .630

Cabine élec.

54-3 .97-

80 .757 .656 80 .665

44

80 .64480

y

-8 .25-

-22 .83-

28

- R=927

-4 .06-

80 .460

80 .498

80 .518 80 .551 80 .792 80 .569 87 .110 87 .494 81 .031 80 .575

12

12

5 21,6

139

T C

141

79 .058

.94

45 80 .473

Rue des

80 .414

80 .452

80 .458 87 .147 89 .273 80 .583

10

80 .688

-3 .52-

80 .545

80 .509 80 .431

PB

80 .428

10

-2.07-

-2 .99-

175

79 79.317 79 .155 .140 79 .278 79 .307

arc=21

-3 .03-

80 .473

80 .311

80 .304 80 .317 80 .505 80 .280 80 .369 8080 .284 .278 89 .235 80 .707 80 .370

53

80 .641 83 .058

80 .560

80 .525

80 .463 80 .328 80 .355

8

80 .320 80 .295 80 .395

80 .285 80 .921 86 .281

5

9

C

142

-1 .79-

170

-2 .28-

173

174

78 .955

78.901 .937 78 .919 78

78 .702

117

X= 230392 .618 Y= 144529 .918 Z=

78 78 .898 79 .906 .033

78 .808 78 .843 78 .933

98 99

.15

80 .507 80 .556 80 .534

80 .494

46

80 .329

80 .230

80 .319

6

6

5

7

7

80 .683 80 .67180 .686 87 .011

80 .743

Longeur

X= 230671 .176 Y= 144533 .472 Z= Longeur arc=50 .05 - R=24

.15

CV 14 (bascule)

78 .624

79 79.143 .247 79 .150

R=888 .80 -

80 .305

47 -2.63-

80 .244

Pierres

80 .117 80 .214

86 .859 80 .183 80 .182

3

3

80 .627

80 .604

8080 .507 .516

80 80 .524.501

80 .430 C

91

.68

78 .634 7878 .475 .629 78 .483

7878 .550 .417 78 .462

78 .640 7878 .651 .773

arc=81

CV 32

CV 27 Coordonnees trappillon [m]

1,75% .78 - R=888

78 .438 7878 .572 .428

78 .800 7878 .933 .799

Longeur

80 .267

80 .428

80 .581

80 .570

80 .551

80 .524 80 .555 80 .815 80 .534 80 .514 80 .505

80 .608 80 .594 80 .578 80 .574 80 .556 80 .548

80 .520

T

8087 .405 .393 .955 80 .38487 .061 80 .401 80 .408

80 .686

80 .608 80 .617 80 .614 80 .629 80 .619 80 .636

80 .578

80 .579

80 .870

80 .561

80 .554

80 .841 80 .633 80 .605 80 .816

80 .654

80 .644 80 .674 80 .637

84 .001

80 80.411 .548 80 .407 80 .417

80 .495

80 .533 80 .507 .033 80 .519 87 80 .513 88 .109 80 .525 80 .520

80 .567

80 .876

80 .784 80 .871

80 80.770 .860

80 .709 80 .838

80 .733 80 .713

80 .686 80 .649

80 .629

84 .613

80 .704

80 .729

80 .768 80 .850 80 80 .850.553 80 .558 80 .858

80 .782 80 .866

80 .772

80 .858

80 .394

80 .377 80 .354 80 .463

80 .519 80 .503 80 .608

83 .342

83 .336

80 .759

80 .811 80 .762

Coordonnees trappillon [m] X= 230722 .071 Y= 144514 .998 Z=

K

arc=50

Coordonnees trappillon [m]

78 .648

.00

P

Longeur

T

78 .235 78 .215 78 .356

78 .409

78 .826

.05 - R=24

83 .335

86 .452

N

N

T

N

78 .114

arc=50

83,00

86 .429 78 .811

T

T

B

T

78 .044

78 .575

Longeur

87,50

88,00

K

80 .582

78 .652

78 .707

80 .776

80 .225

des

80 .125

80 .120 80 .113 80 .105 80 .175 80 .115

80 .141

4

1

8086 .243 .830

8080 .620 .527 80 .543

88 .203

arc=7

7878 .366 .506 78 .361

7878 .198 78 .093 .060

78 .516 78 78 .384 .375

P

78 .556

80 .761

80 .303

80 .222 80 .079 80 .119

80 .306 80 .13980 .152 80 .153 80 .179 80 .191

79.969 .977 79 79 .952 80 .034

80 .053 80 .039 80 .051 80 .046 80 .039 8680 .826 .041

80 .237

80 .184 80 .191 80 .191 80 .204

80 .344

80 80 .213 .208 80 .305 80 .321

80 .369

80 .726 88 .175

88 .225 80 .270

R=10

78 .493

78 .070

78 .232 78 .104

77 .951 77 .939 78 .076

88,50

18

131

78 .681 .683

80 .458 80 80 .358.365

84

80 80.523 .527 80 .530 83 .672

80 .598

80 .669

88

83 .752

8

80 .475

Longeur

78 .248

77 77 .685.713 77 .821

78 .049 77 .930 77 .947

77 .590 77 .568 77 .725

.85

25

T

78 .562

78 .637

7878 .699 .633

lina

.93 - R=411

B

B

F

143

-3.18-

78 .105

e anc

7777 .828 .950 77 .856 77 .577 77 .310 .307 7777 .434

77 .775 77 .803

20

18

84,00

C

arc=28

82.552

129

.23-

pér Es

77 .098

78 .204

144 78 .119

146 78 .146 78 78.130 .277

77 .503 .530 7777 .636

7777 .676 .797 77 .692

77 .052

77 .498

85,40

2%

T

Longeur

-62 .01-

78 .495

78 .614

Mo

130

T

6%

81.692

-3.50-

78 .924 78 .860

79 .792 78 .065 81 .779

79 .073

e

86,00

165

B

Z radier =

-15 .21-

128

-10 .86-

127

133

-16

.29-

77 .920 77 .919 78 .065

145 -2.40-

77 .992 7778 .980 .126

77 .584

77 .075

78 .219 78 .346

77 .999 78 .148

77 .943 78 .079 77 .836 77 .795

77 .489

77 .212 77 .236 .205 7777 77 .227 .225 77 .357 77 .293

77 .321 77 .311 77 .434

77 .478 77 .463 77 .592

76 .920 76 .898 77 .031

77 .000

78 .089

-25 .09-

84,00

CV 6

Coordonnees trappillon [m] X= 230249 .261 Y= 144519 .063 Z=

27

137

79 .024 81 .248 81 .773 .254

Ru

82.416

26 164

-10 .80-

C

136

G'

78 .012

77 .937

-27

76 .644 76 .617 76 .758

76 .870

77 .599

163

-2 .75-

134

76 .457

76 .788

81.336

-27 .66-

-2 .31-

162

138

86,40

T

Z radier =

82,00

T

81.891

80.341

-1 .21-

76 .750

76 .324 76 .289 76 .427

-5 .47-

B

T

Z radier =

78 .665 78 .807

-2 .71-

76 .019 76 .152

76 .202

160

161

C

86.268

T

B

X= 230245 .946 Y= 144518 .16 Z=

168

- R=407 .78 arc=15 .43

N

T

CV 3 Coordonnees trappillon [m] X= 230234 .462 Y= 144515 .482 Z=

T

74.808

B

Longeur arc=29 .36 - R=411 .85

Coordonnees trappillon [m] 82.081

79.741 Longeur

T

B

PB

80,00

78 .844 78 .682 78 .690

78 .313

78 .608

78 .607

78 .660 .986 81 81 .280 81 .245

5

42

-5 .00-

1 18,1

158

-5 .91-

78 .905

78 .629

78 .458 78 .303

78 .240

80 .075

79 .999

80 .151

80 .059 80 80.052 .155

80 .464

78 .836 78 .966 83 .678 81 .435

D

157

-7 .39-

78 .504

155

78 .391

77 .765

77 .341

77 .199

80 .101 86 .907 79 .983 7980 .968 .081

80 .109

80 .130

80 80.259 .165 80 .183

80 .093

80 .462

-18 .54-

1,45

156

78 .045

77 .990

77 .924 77 .768 77 .499 77 .313

77 .162

ille Vie

76 .855

-4.21-

-4 .53-

78 .071

154

77 .762 77 .772

77 .742

77 .278 77 .140

76 .845

76 .701

78 .688 76 .031

76 .005 76 .013 76 .014

23,7

-5 .29-

77 .76277 .786

77 .534

77 .407

153

152

151 -4 .11-

-2 .30-

76 .937

76 .549

la

75 .795 75 .796 75 .914

75 .914

G

75 .580

-0 .58-

e de Ru

75 .563

75 .876

150

77 .241 77 .151

77 .077 76 .930

76 .093 75 .430 75 .417 75 .550 75 .450

75 .859 75 .864

-2 .72-

77 .060

76 .054 75 .064 75 .038 75 .186

75 .252

-0 .59-

149

.12-

76 .496

76 .857 76 .716

74 .876 75 .052

75 .070

75 .078

-0 .57-

148 -3

76.466 .610 76 76 .131

74 .803 74 .904 74 .831

74 .845

-7 .92-

159

-17 .38-

N

76 .464 76 .315 76 .327

75 .598

76 .726

PB

74 .834 74 .858

-4 .23-

Z radier =

169

CV Non ouvrable T

.299 7676 .164 76 .165

75 .422 .378 7575 .519 75 .481 7575 .566 .392 75 .503 75 .609 75 .488 75 .500 75 .696 75 .564 75 .787 75 .813 75 .651 75 .691 75 .818 75 .69175 .683 75 .718 75 .72075 .711 75 .738

74 .754

-3 .60-

X= 230238 .508 Y= 144518 .261 Z=

76 .082

76 .077

75 .323 75 .302 75 .439

75 .748 75 .619 75 .661

T

-23 .52-

T

75 .988

.045 7576 .909 75 .904

75 .546 75 .427 75 .455

75 .579

74 .782 .791

B

74 .745

166

CV 5

167

Coordonnees trappillon [m] B

P PB K

75 .002 74.117 .972 75 75 .377 75 .259 75 .271

74 .622

74 .488

79 .868 79 .951

79 .938 79 .943 86 .863 80 .055

280,05 1-2

79 86 86.755 .997 .762

8080 .191 .102 80 .116

Rue

79 .906 79 .886

79 .850 79 .925

79 .825 79 .922

79 .929 79 .918 80 .016

83 80 .251

80 .287

80 .392 80 .300 80 .308

80 .473 80 .484

83,00

89

78 .896

33

-5.55-

84 .530 80 .472

80 .573

79 .848

8080 .164 .074 80 .087

82

80 .225

PB

79 .871

79 .755 79 .804 79 .911

79 .910 80 .070 .049 8080 .132

80 .190 80 .210

80 .256

80 .372

-18 .30-

14

86

80 .505

-8 .59-

40

80 .728

80 .099

80 .079 80 .274 80 .116 80 .268 80 .111 80 .147

80 .127 79 .841

80 .048 80 .019 80 .116

80 .131

80 .297

80 .393 80 .399 80 .388

-11 .60-

80 .541

176

78 .596

-4 .70-

79 .716

80 .787

80 .245

80.071 .263 80 80 .125

80 .153

80 .144

.32

N

CV 4

75 .734 7575 .530 .653 75 .521

75 .363 75 .215 75 .090 75 .127

75 .154

74 .437 74 .407 74 .447 74 .486

74 .446

80 .223

79 .986 79 .968 79 .953 80 .064

81

-5 .29-

80 .173

13

80 .293

GR

85

80 .333 82 .980

80 .601

96

E

Longeur arc=65 .15 - R=411 .85

T

75 .387

74 .660 74 .636 74 .756

75.916 .038 74 74 .935

74 .190 74 .163 74 .197

-24 .62-

K

74 .266 74 .256 74 .386

74 .879 74 .737 74 .756

74 .712

73 .923 73 .914 73 .959

PB

80 .218 80 .053 80 .082

80 .029

80 .167

80 .309 80 .259

80 .329

87

80 .694

80 .668

80 .644

78 .915 82 .049 83 .509

79 .017

34

80 .197

80 .213

43

80 .512

80 .025 79 .895

79 .777

80

80 .124

80 .159 80 .228

80 .356

N

17

.76-

177

.39-

80 .571

79 .584

.27-

-14

80 .056

80 .200

80 .173

80 .539 T

80 .795

-5 .16-

80 .773

-14 .25-

-16

31 -4 .57-

79 .099

-12

79 .863 80 .482

79 .633

N

6 41

T N 79 .952

79 .910

80 .098

80 .089

80 .047 79 .910

79 .976 79 .964 80 .046

80 .026 80 .099

GR

80 .169

80 .626

92

80 .836

5

P

75 .268 74 .767 74.458 .597 74 74 .470

74 .205

73 .773 73 .823

Z radier =

75 75.258 .251

74 .378 74 .241 74 .268

73 .804

73 .732

F

75 75 .089 75 .103 74 .003 .994 75 .093 75 .011 75 .021 7575 .005 75 .007 .006 75 .011 75 .020 75 .013

73 .993 .951 7473 .097

74 .201 74 .053 74 .078

73 .875

73 .658 73 .593 73.621 .612 73 73 .789

G'

74 74 .993.992

73 .915

73 .884

79 .884 79 .873 79 .971

80 .018 80 .058

-24 .1880 .284 80 .320

80 .334

80 .418

15

80 .545 82 .715

8280 .691 .704

80 .894

18

78 .582

78 .489

78 .865

-8.2979 .162 79 81.128 .745

80 .640

80 .581

79 .208

T

-12 .61-

79 .764

86 .430

80 .111

80 .171 80 .257

79

-5 .58-

80 .392

80 .594 82 .700

80 .826

81 .086

78 .492

78 .975

32

79 .148

80 .746

79 .178

79 .777

79 .756

7

80 .718

80 .275

80 .348 80 .340

95

-5 .43-

93

-5 .38-

90

.70-

79 .015

79 .185

79 .098

79 .721

79 .672

79 .880

48 79 .959

80 .417

80 .409

80 .360

94 80 .680

80 .935

19

80 .245

-26

78 .820

30

78 .903 79 .173 79 .002

78 .844 78 .966

78 .949 78 .956

79 .332

79 .372

79 .378 79 .372

79 .575

79 .768

7979 .790 .802

79 .773

80 .182 80 .236

80 .219

80 .270

80 .398

80 .433

80 80 .699 80.703 .703

± 1%

.15

22,8

G X= 230517 .358 Y= 144542 .093 Z=

74 .026 73 .889

73 .625

71 .513

- R=888

78 .785

78 .772 78 .926

78 .969

78 .931 78 .854

78 .997

36 35 79 .282

79 .320

51

80 80.740 .740

80 .546

80 .721

80 .523

80 .802

80 .731

.150

81,00

84,70

78 .755 78 .887

79 .073

79 .072

.65-

79 79.112 .298

79 .136 79 .296

79 .470

79 .549

79 .652

PB

79 .946

80 .158 80 .094 79 .908

80 .161 79 .982

16Rue des Trois Mêlées

80 .487

80 .608

.13

arc=3 .99

RT

73 .760 73 .920

73 .885 73 .742 73 .756

CV 17

GARE JEMEPPE-SURMEUSE

79 .405

50

49

79 .723

.823 7979 .691 79 .737

79 .915 79 .889 79 .93179 .949 80 .116

79 .898 79 .908 79 .872

R=1

VE

73 .719 73 .583 73 .590

T

83.711

82.091

Coordonnees trappillon [m]

73 .242

- R=888

91

arc=29

104

C

B

Z radier =

.44

101

82,60

78.180

77.500

T

CV 11 Coordonnees trappillon [m] X= 230287 .835 Y= 144527 .768 Z=

78 .888

78 .772

78 .988

78 .958

79 .093

-18 79 .150 79 .194 79 .106

79 .266

79 .312 79 .297 79 .429

79 .762

r

E Z radier =

Longeur

T

B

T 75 .194 75 .208 75 75 .122.133

75 .117

4

78 .800 78 .867

78 .868

79 .055 78 .928

79 .141

79 .251

7979 .546 .685 T 79 .588 C 79 .738 79 .738

79 .696

80 .079

80 .146

80 .059 80 .071 80 .047 79 .875

79 .728

80 .403

78.143

75.153

T

B

N

75 .272

T

75 .050

ble

AX

arc=29

T

B

T

B

B

70 .398 70 .575

82 .414

Longeur

Z radier =

B

T

V

PB 74 .387 T 74 74 .390 .395 74 .595 74 74.527 .535

8080 .714 .593 80 .582

80 .802

80 80.954 .954

81 .029 .028

81.256 .256 81

81 .498

82 .092

Coordonnees trappillon [m] X= 230675 .423 Y= 144537 .62 Z=

X= 230640 .003 Y= 144536 .708 Z= 86.364

85.474

B

N

P

N

73 .556 73 .418

GR

81 .498 81 .633 81 .847

82 .048

82 .546 82 .616

CV 28

CV 25 Coordonnees trappillon [m]

CV 16

Coordonnees trappillon [m]

Z radier =

Passarelle future

T

T

74 .616

74 .558 74 .502 74 .487

T

74 .833

74 .748 74 .593 74 .610

74 .308

37

78 .877

78 .995 78 .842 78 .795

79 .186

79 .219 79 .031 79 .010 79 .071

79 .276

79 .091

79 .689

79 .837 79 .81579 .855 80 .010

80 .043

7979 .823 .978

79 .842

79 .721

79 .708

7878 .709 .739

79 .4637979 .438 .584

79 .732 7979 .870 .692

79 .973

80 .115

N

79 79.793 .802 79 79 .693.681 79 .691

79 .694

79 .673

79 .962

80 .676

80 .963 80 .963

81 .554

82 .056

82 .536

80,20

85.710

83.860

X= 230500 .037 Y= 144537 .028 Z=

B

74 .298

74 .644

73 .437

81 .436

81 .363 81 .376

81 .927 82 .213

X= 230383 .932 Y= 144534 .254 Z= Z radier =

74 .105 74 .381

74 .462 74 .326 74 .325

80 .673

Mêlées Rue des Trois

81 .136 81 .335 81 .552 81 .723

82 .002

82 .270

82 .270

82 .263

Coordonnees trappillon [m]

83.637

74 .304

73 .977

73 .786

80 .793 80 .633

81 .506

81 .975

82 .191

82 .328

78.182

77.332 82 .523

Z radier =

73 .814

.730 7373 .640 73 .639

73 .643

74 .096

74 .186 74 .047 74 .050

79 .161

79 .466

7979 .784 .618

79 .892

79 .890

79 .731

T

79 .639

79 .642 79 .582

78 .646

78 .527

79 .551

79 .560 79 .597

79 .746

79 .679 79 .694

79 .741 79 .674 79 .713

79 .173

79 .156

79 .333 79 .244

79 .410

79 .391

79 .758 79 .613 79 .644 79 .61579 79.617 .773

79 .668 79 .586

79 .756 .797 79 79 .765

79 .149

79 .262 79 .407

79 .294

79 .210

79 .234

79 .503 79 79 .513 .297

79 .405

79 .736

79 .613 79 .522 79 .573

79 .644

79 .813

79 .814 79 .799

79 .878

79 .918

80 .240

80 .306

Longeu

Z radier =

CV 13

85.417

73 .049

73 .652 .648 7373 .781

74 .037

73 .441 73 .400 73 .556 73 .610 73 .577 73 .727

70 .812

81 .905

80 .871

CV Non ouvrable

CV 29 Coordonnees trappillon [m] X= 230675 .229 Y= 144538 .577 Z=

T

X= 230357 .983 Y= 144534 .047 Z=

7272 .804 .916 72 .789

72 .794

72 .763 7272 .910 .777

73 .645

73 .939 73 .814 73 .821

73 .653

73 .305

80 .819 80 .719

81 .177 81 .973

82 .058

81,00 78,20

B

CV 12 Coordonnees trappillon [m]

73 .012

72 .552

73 .875 73 .733 73 .744

80 .779

80 .928

82 .046

82 .099

82 .364

B T

.739 7171 .751

72 .319

72 .188

73 .911

73 73 .736 .651 73 .693 73 .731

73 .733 73 .584 73 .585

73 .430

73 .275 73 .434

80 .885 80 .831 80 .761

81 .087 81 .432

82.910

81.530

71 .679

71 .657

T

71 .692 71 .827

73 .541

73 .721

80 .905

80 .925 82 .076

82 .139

Z radier = 71 71.242 .260 71 .256

71 .419 71 .310 71 .303

71 .313

71 71.397 .540

P

K 71 .443 71 .445 71.459 .452 71 B

71 .653

71 .926 71 .927 71 .928 72 .059

72 .858

T

GR

81 .999 81 .999

82 .121 82 .186

X= 230206 .566 Y= 144539 .031 Z=

71 .077 71 .069

71 .229

71 .310

71 .260 71 .291 71 .288 71 .291 71 .400 71 .218

71 .619

P K

B

73 .148 73 .314

79 .032 79 .936

58

0

.38

81 .690 81 .690 82 .360

Coordonnees trappillon [m]

70 .873 70 .888 70 .880

70.602 .708 70 70 .599 70 .461

70 .588 70 .478 70 .463

71 71.108 .020 71 .012

72 .119 72 .128 72 .264

73 .387

73 .179

73 .055 73 .037 73 .152

79 .523

79 .524 79 .365

7979 .679 .536 79 .563

79 .903

79 .862

79 .878

80 .012 79 .849

79 .827 79 .821

79 .89579 79 .892

80 .068

80 .062

80 .090

80 .156

79 .539

78 .777

78 .665

78 .506

N

78 .695

79 .459 79 .484

79 .591

82 79 .227 .667

79 .713 79 .884 82 .276 79 79.840 .829

.955

80 .025

80 .168 83 .367 83 .379 80 .088 86 .821

80 .345

80 .020

80 .102 80 .021

80 .136 80 .201

80 80.386 .260 80 .248

80 .412 80 .445 80 .319

80 .423

.97

59

79 .443

79 .342

79 .143 79 .167 79 .164

79 .197

79 .215

79 .250

79 .291

79 .219 79 .371

PB

79 .415

79 .444

79 .518

79 .455 79 .471 79 .440 79 .816 79 .601

79 .650

79 .683 82 .567

88 86 .986 80 .237

80 .317

80 .481

84 .239 80 .322 .303 80 .412 80 .301 87

80 .435

80 .585

80 .486

79 .489 7979 .480 .656

79 .661

PB

80 .483

84 .986 87 .307 80 .420

80 .657 80 .481 80 .461

GR

80 .799

18,2

R=48 .68 -

CV 8

70 .793

70 .022

71 71.534 .421 71 .424

T

73 .167

72 .786 72 .965

+/- 6,00 varia

B T

70 .636 70 .705

71 .131

71 .972

72 .772

B

73 .574 73 .437 73 .437

73 .419 73 .2

73 .023

72 .945

72 .794

V

80 .820

arc=4 R=22

79 .350

79 .475

79 .463 79 .360

79 .306

.19-

-17

7979 .467 .336 79 .346

61

79 .502 79 .384 79 .517

79 .413

79 .353 79 .503 79 .522 79 .513

79 .507 79 79 .416.452

10 10

14 14

E

70 .029

71 .524

71 .991 71 .876 71 .869

72 72.416 .280 72 .288

73 .431 73 .419

72 .789

P

80 .542

82 .581 82 80 84 80 80 .584 .787 .184 .777 .635 80 .790

80 80 .800 .800

.157 8184 .564 80 .894 80 .858

80 .900

88 80.670 .011 .582

80 .551

84 .186 88 80 .657 .594 81 .012

83 84.216 .065 80 .956 80 .942

81 .256

.22-

-10 7979 .377 .506 79 .398

79 .380 79 .382 79 .501

79 .452 79 .292 79 .289

79 .228 79 .443 79 .246 79 .242 7979 .445 .246 79 .440 79 .240 79 .428 79 .246

79 .451 79 .268

-5.49-

79 .488 .487 79 .492 79 .493

79 .356

PB

79 .447

79 .656

80 .954 80 .954

81 .066

81 .113 81 .113

81 .376 81 .376

Longeur

7979 .456 .595 79 .463 79 .635 79 .580 79 .464

79 .398 7979 .512 .379

79 .526

60 79 .519 79 .518 79 .469

79 .343

79 .410 79 79 .331.360

79 .436

Limite d'intervention

82,00

71 .979

72 .398

22

86 .990

Entrée de garages

82.736

76.726

77,40 T

.14-

78 .647

78 .735

-5 .07-

78 .776

79 .828

79 .599 79 .48579 .468

79 .451 79 .444 79 .652 79 .575

79 .530

79 .394 79 .543

Z radier = T

B

79 .464 78 .884

-43

78 .602

78 .562

78 .584 78 .694

78 .797

79 .509 79 .302

79 .321

.431 7979 .284 79 .292

79 .335 79 .349

Pylone

X= 230786 .252 Y= 144564 .351 Z=

B

81.264

-10 .78-

63

80 79 .977 .447 81 79 .105 .575

79 .596

79 .222

79 .207

79 .275

79 .277

79 .323 79 .232 79 .283 79 .304

T

T

83.034

79 .302 79 .282 79 .294 7979 .290 .439

79 .351

8787 .464 .111

CV 33

B

Coordonnees trappillon [m]

Z radier =

Bornes amovibles

87 .481

77,60 B

Coordonnees trappillon [m] X= 230217 .263 Y= 144539 .439 Z=

.945 6969 .948 70 .064

79 .231

7979 .272 .178 79 .246

84,00 83.052

80.802

CV 9

69 .902

69 .820 69 .721 69 .735

69 .684

69 .923 69 .843 69.967 .839 69

79 .564

79 .590 79 .086 79.053 .038 79

79 .266 79 .090 79 .126

79 .127 79 .032 79 .089

79 .237 86 .884 84 79 .437 .260 .241

Z radier =

68 .921 68.040 .956 69

81 .570

79 .546

78 .527

78 .408

T

78 .604 78 .913 78 .750

7979 .490 .628 79 .498

78 .951

7878 .950 .862 78 .906

79 .054

79 .195

78.113

CV 10 Coordonnees trappillon [m] X= 230220 .572 Y= 144542 .885 Z=

P

K 68 .783 68 .814 68 .792 68 .811 68 .845

69 .148 69 .115

79 .475

80 .456 79 .986

arc=16

Z radier = 68 .896

PI

68 .842

69 .087

79 .055 79 .087

78 .952

78 .579

Mol

79 .532

79 .492 79 79.628 .463

78 .866

78.846 .986 78 78 .890

78 78 .859.762 78 .815

78 .892

79 .410 79 .424

79.763

79 .252

68.721 .730 68 68 .757 68 .747

68 .476

68 .695 68 .696

68 .639 68 .617

68 .713

68 .922

78 .953 78 .335

78 .309

78 .462

78 .500

78 78.533 .533 78 .551

.3178 .619

38

78 .952

C

78 .975

78 .938

78 .981

78 .662

79 .484

8678 .819 .930

78 .966

X= 230513 .077 Y= 144566 .621 Z=

86 79 79.100 .792 .098

108

68 .569

6868 .481 .573

68 .084 68 .098

78 .893

.51-

78 .219 78 .384

78 .319 78 .442

78 .533

78 .608

-19 78 .607

78 .641

78 .677 T

78 .944 78 .971 78 .995 79 .128

GARE ROUTIÈRE

81 .524

-31 78 .361

78 .257

78 .288 78 .258 78 .252 78 .399

39

78 .336

78 .500 78 .387 78 .426

78 .463 78 .494

78 .612

78 .495 78 .552

78 .535 78 .594

78 .749

78 .931 78 .940

79 .928

79 .975

57

-1 .20-

79 .496 7979 .646 .501

-17 .90-

12

78 .858

78 .852

7878 .665 .789 78 .730

86 .518 78 .914

78 .997

106

Coordonnees trappillon [m]

68 .527

68 .020 68 .003 68 .094 B T 68 .055

68 .375

Pui 78 .397

78 .462

78 .565

78 .518

79 .028

79 .985

79 .973

78 .639 78 .787

79 .632

79 .560

.722 7878 .730 .554 78 .6127878 .682

7878 .742 .638 78 .685

81.900

76.500

106

67 .965

68 .138 68 .292

GR

Rue

78 .623

78 .664

78 .562

79 .952

64 79 .689

78 .605

78 .644

Longeur

Z radier =

CV 18

68 .384

67 .781

D

11

78 .638

78 .584

7878 .603 .505 78 .553

78 .645

Coordonnees trappillon [m] X= 230615 .58 Y= 144571 .853 Z=

67 .571

Mari

Puit

78 .563

78 .793 78 .623

9

Longeur arc=10 .98 R=22 79 .845

79 .475 79 .610

T

78 .602 78 .585

86 .496 78 .625 .634

78 .746

104104

CV 24

B

67 .744

67 .571

Rue e

78 .480

78 .467 78 .687 78 .520 78 .917

78 .873

82 .726 83 .223

79 .930

-1 .83- -0 .55-5 .15-

79 .543

62

7878 .452 .548 78 .509

79,00 67 .528 .533

67 .739 67 .630 67 .635

67 .456 .460 6767 .529

78 .410

10

76

-2 .54-

-6 .38-

7878 .396 .402

78 .350

78 .429

-2 .95-

-4 .73-

7979 .587 .725 79 .600

78 .525 78 .389

78 .595 78 .467

78 .685

79 .685 79 .827

79 .626 79 .741 79 .597

67 180 179 -5 .44-

79 .647

78 .173 78 .310

78 .430

78 .643 78 .686

83 .673 83 .208

79 .975

79 .997

79 .700

79 .653 79 .649 79 .788

79 .651 79 .631

66

7979 .693 .55079 .549

79 .579

78 .458

78 .291 78 .395 78 .335

88 .002 78 86.433 .614

78 .621

102102

78 .089

T

67 .181

67 .448

67 .460

83 .705

7979 .825 .964

78 .775

79 .680

7979 .715 .573 79 .582

79 .704

78 .319

78 .188

rie

82 .726

79 .968

75

79 .804

77

-7 .00-

-0 .67-

78 .014

de la Glacière Rue Rue de la Glacière

-13 .33-

81.075

B

.25

arc=4 Longeur R=7

-10 .64-

79 .574

78 .313

78 .263

t Ma

79 .963 79 .965

79 .789 79 .936

79 .780

79 .739

79 .641

178 -0 .7973 72

79 .848

71

9

78 .349

78 .239

65 78 .284 78 .217 78 .186

C

.68

79 .794 79 .643

-4.9379 .631

78 .099 78 .030 77 .995

78 .281

78 .443

Rue

arc=7

Z radier =

9

79 .732

79 .842 79 .692 79 .702

79 .656

70

78 .186

78 .215

100

84.365

79 .795

79 .887 79 .742

79 .690

78 .039

R=10

77 .942

78 .140 78 .047 78 .097

86 .187 .557 78 87 .995

CV 23 Coordonnees trappillon [m] X= 230616 .034 Y= 144586 .325 Z=

78 .441 78 .293 78 .324

79 .644

77 .914

78 .014

78 .242

74.152

78 .629

79 .761

77 .809

77 .842

77 .957

98

81.562 78 .214

Z radier =

-7.23-

79 .778

78 .170

77 .830 77 .740 77 .748 77 .712

77 .973 87 77.862 .982 86 .357

96

96

CV 22 Coordonnees trappillon [m] X= 230587 .875 Y= 144593 .291 Z=

79 .800

78 .099 77 .790

77 .746

7777 .781 .673 77 .712

78 .102

77.876

76.916

ENTRÉE DE LA VILLE

78 .691

78 .083 78 .230

-3.11-

78 78.352 .212 77 .915

77 .515 7777 .572 .473

87 77 77 .889 .735 .741

Z radier =

-7.42-

77 .415 77 .397 77 .481

8777 .317 .574 77 .570

87 .328

Coordonnees trappillon [m] X= 230566 .918 Y= 144599 .21 Z= 80.042

72.392

-1 .46-

77 .464

9494

CV 21

Z radier =

Ruine

77 .357

77 .371

87 .307

92

5 21,6

Rue du Dépot

78.091

76.551

-2.07-

Z radier =

77 .943

78 .138 77 .393

Coordonnees trappillon [m] X= 230564 .023 Y= 144608 .493 Z=

CV 19 Coordonnees trappillon [m] X= 230548 .827 Y= 144594 .667 Z=

Axes structurants et affirmation du potentiel

80 .570

80 .554

80 .841 80 .633 80 80 .605.816 80 .608

80 .594

80 .581 80 .627

80 .770 80 .860

80 .709 80 .838

80 .733 80 .713

80 .654

80 .644 80 .674 80 .637

80 .579

80 .870

80 .761

80 .718

80 .686 80 .649

81 .606

GR

Longeur arc=9 .72 - R=911 .85

113

81.494

79 .306 79.357 .306 7979 .386

Longeur

88,00

79 .703 7979 .702 .731 79 .564 79 .100 7979 .223 .106

112

79 .317

.85 - R=911 arc=111 .82

CV 31 Coordonnees trappillon [m] X= 230667 .622 Y= 144491 .929 Z= Z radier =

78.044

Longeur

77.334

arc=51

.17 - R=24

.00

79 .406

108

Longeur arc=93 .78 - R=911 .85 T C

79 .669

B T

P K

Longeur arc=51 .17 - R=24 .00

m

Q

BOULEVARD - SERESIAN VALLEY

mm

DIAGNOSTIC - MARINA JEMEPPE

PROJECT

ROLE

m

Il s’avère nécessaire de structurer les deux fronts du projet en Il est nécessaire de souligner l’importance d’un aménagement accord avec les qualités de cet espace de transition et de créer paysager de ce front fortement verdurisé qui puisse contribuer BLOCK STRATEG les conditions pour qu’il puisse jouer URBAN un rôle de charnière entre à protégerES le développement immobilier des nuisances sonores les différentes facettes du territoire. de la route.

Aménager des parcours urbains de qualité Légende

PRO ECT

Périmètre d'expropriation Gare / Place existante Commerce/ HORECA existant

Part of a global development plan, a mobility plan and a green zone

P o ect phase

development plan, the urban Boulevard, facilitates mobility from

Bou eva d n Vecto wo ks a new softwa e des gn too fo me when

east to west in the Seresian valley and the communication between

edes gned the extens ve schemat c phase of the 10m

25m

Pen hou e L’entrée du site depuis la N617 devra renforcer l’effet d’entrée transition entre le tissu industriel et urbain. A cet effet nous proposons le réaménagement des quais Apa men qui Nethe longent le site de l’autre côté de la N617. La réaffectation de la voie the c eat o of theRelation ma àna wà structurer/perméabiliser g ve d ect access to the ands ceux-ci en quais d’amarrage pour bateaux de plus grande taille, Espace public structurant potentiel voire de la navette fluviale Liégeoise, supportée par la volonté Ge many and F ance and beyond to the No th Cente and South of et services complémentaires d’installer infrastructures Apaà l’actimen Quai d'ammarage de bateaux de croisière potentiel vité portuaire dans le site, amènera à l'accentuation de cet effet Eu ope Rehab tat ng th s ndust a a ea b ng ng new fe wo k and de porte en cadrant ce passage au fil de la N617 mais également Vitrine ville à valoriser et structurer du point de vue de la mobilité fluviale. Se e

Jemeppe s a so pa t of the 800 hecta es maste p an de deve ville et opment marquer la Connexion existante

50m

sta ted wo k ng at JNC p epa e a sect ons of the Bou eva d to

different neighborhoods. A new urban dynamic will be generated,

coo d nate the wo k w th the engenee ng company nvo ved n the

along the districts crossed, by the creation of economic activities,

p o ect

Entrée de ville à aménager et valoriser ente ta nment and tou sm to th s dese ted ndust a po t a ea

offices, housing, green spaces and living areas.

Le front du projet sur la rue Nihar est la continuité naturelle de l’axe créé par la rue de la station. Il se croise avec la rue Wettinck, autre axe commercial. Ce front devra être aménagé de façon à accueillir les flux qui se croisent et à confirmer le caractère commercial et d'animation urbaine du tissu dans lequel il s’insère. Un grand espace public pourrait se trouver au croisement des rues et ainsi continuer la séquence formée par la place des Quatre Grands et la gare routière. Une telle approche permet la création d’une porte d’entrée sur le site de la darse, ainsi que d'une percée visuelle focalisant sur le port de plaisance qui contribue à la perméabilité de la trame urbaine.

Comme e Re au an JNC International • Seraing • Port de Plaisance de Jemeppe • Analyse, Enjeux et Scénarii •23/06/2020 • 49/72

CHALLENGE

H br d Bu

d ng

Sys em

CHALLENGE To make th s p o ect happen we need to conv nce the comm ss on that Having to coordenated the Boulevard PROF L F F access with the Master Plan,

t wou d mpo tant to att act nvesto s to p omote the equa ficat on

where there were residential blocs and commercial and service

of th s ndust a po t The COV D 19 ockdown mposs b tate the v s t

buildings, taking in consideration the topography. Besides all the

and nte v ew w th nhab tants n the ocat on

PROFIL F-F

existing water and sewage were planned to be reused, therefore

ROLE

roundabouts, sidewalk, parking and treepits could not be on the way of the service points.

p LIMITE DE LOT

pub public m

m

é

Ana yses phase to study and map the a ea ana yse the c cu at on t affic of peop e ca s and boats pa k ng pub c t anspo tat on

privé

tou sm

Poros

em p

ae

y

ve Meuse bes des egu at ons and secto s p an P epa e

the feas b ty stud es fo the t ansfo mat on of the dese ted a ea go

mât d'éclairage h. de feu: 8 m

unde t ansfo mat on Be e a qua

M croc

and n u a on n bu d ng

ma e

m

T1 2%

%

T2 2%

TROTTOIR/ PISTE CYCLABLE

STATIONNEMENT

3

2,5

T2 T3 NOUES

4,2

2% VOIRIE

4,25

0,9

0,6

PISTE CYCLABLE SUGGÉRÉE

ng + ee

Bu e

Pa

Ca

an Pede

B e

an Pede

B e

ng + ee

2%

2% TROTTOIR/ PISTE CYCLABLE

STATIONNEMENT

2,5

3

23,7

TYPICAL SECTION

Pa

T1

%

T3

4,25

Bu e

% %

2% VOIRIE

%

Ca

%

Bu e

Niv. exist: +/- 83,90

Niv. : +/-83,10

Ca

N

ng + ee

bordure ciselée de 35 x 20 cm

Pa

N

bordure de 20 x 10 cm

Bloc en béton 100 x 20 x 50 cm

- bande de contrebutage en béton (100 x 25 x 17cm) - fondation en béton maigre

m

an

m

bordure de 20 x 10 cm

m

m

B e

m

Pede

INDUSTRIAL ZONE, RESIDENTIAL FOREST, MARINA - URBAN PROJECTS

é

LIMITE DE LOT

p privé

G ound floo

ATMOSPHERE

m

0

0.5

1

2m

CONFORTABLE AND SAFE CIRCULATIONS

S

ree

Tree P an a

on

n d d ub n A qu on n u n o d d n po u d po du po n d


49.50

50.50

50.00

51.00

11 %

25

5

50 m

42.27

40.85

RD

RD

JNC International • The Globe Village, 993 Chaussée d’Alsemberg Bt 4, B-1180 Bruxelles • Boissonet • 18/02/2020 • 14/34

3

Pente 16%

de Huy

42.27

r eu re 1è de res Arb •

res

44.76

43.67

B B

Vé Ha gé t a u te tio ur n b • 4 -5 as s Arb m e: 3è res me de g r a 2è m nd eu e et r

nd gr a

eu

nd

gr a

re 1è

50 m

de

25

5

50 m

+/-43.45

+/-41.80

0

5

25

0

5

25

50 m

50 m

47.10

47.00

46.50 46.00

45.00

44.28

44.78

44.72 43.76

25

5

0

44.20

43.69

50 m

44.76

42.97 43.67

41.61 42.27

+/-42.10

+/-42.80

+/-43.45

+/-41.80

0

5

25

50 m

» Contexte bâti

» Vues

A . E S Q U I S S E D ’A M É N A G E M E N T (5)

• 18/02/2020 • 14/34

A 50 m

25

5

0

AG 48.47

48.33

25

5

25

50 m

50 m 48.47

25

5

5

48.68

48.68

44.28

48.33

50 m

44.78

44.20

42.77

44.76

42.97

43.67

42.36

0

5

25

50 m

0

45.50

45.00

NO43.67 RD

25

5

50 m

B

44.78

44.28

44.72

44.20

44.76

» Vues

0

5

25

50 m

0

5

25

50 m

ÉN

• 18/02/2020 • 14/34

25

5

50 m

NO

RD

0

0

5

25

5

25

50 m

B B

50 m

A A

RD

JNC International • The Globe Village, 993 Chaussée d’Alsemberg Bt 4, B-1180 Bruxelles • Boissonet • 18/02/2020 • 26/34 JNC International • The Globe Village, 993 Chaussée d’Alsemberg Bt 4, B-1180 Bruxelles • Boissonet • 18/02/2020 • 26/34

50 m

4 2 /3

VEGETATION

SECTIONS

020 8/0

RD

2 /2

JNC International • The Globe Village, 993 Chaussée d’Alsemberg Bt 4, B-1180 Bruxelles • Boissonet • 18/02/2020• 19/34

A

JNC International • The Globe Village, 993 Chaussée d’Alsemberg Bt 4, B-1180 Bruxelles • Boissonet • 18/02/2020 • 26/34

mb

•2

er g

2 /3

4

Bt

4, B

-11 8

0B

rux

elle

s•

Bo

is s

on

et

•1

B

020 2 /2

e, 9

is s

93

on

et

Ch

•1

au s

8/0

sée

A

d ’A

ACCESS

SITE PLAN •2

25

NO

NO

SCENARIOS

r

r

et

me

de

res Pente 16%

0

Arb

41.06

40.77

44.78

44.20

43.69

A A

lse

CONSTRUCTED

5

Pente 16%

eu

nd

gr a me

» Vues

50 m 25 JNC International • The Globe Village, 993 Chaussée d’Alsemberg Bt 4, B-1180 Bruxelles • Boissonet • 18/02/2020 • 14/34

5

• E SQ UI SS E

0

JNC International • The Globe Village, 993 Chaussée d’Alsemberg Bt 4, B-1180 Bruxelles • Boissonet • 18/02/2020 • 18/34

Bo

VEGETATION

rux 0B -11 8 ,B

•T

he

Glo

be

elle

V il

SCHEMES

s•

lag

CONSTRUCTED

nal

INDUSTRIAL ZONE, RESIDENTIAL FOREST, MARINA - URBAN PROJECTS

45.90

» Scénario III Les coulisses végétales

50 m

44.72

43.76

43.69

42.27

D’

NO NO

e +/-41 .80

25

46.00

41.61

46.88

AM

0

43.67

41.61

40.77

Bas toitur

Pente 12%

m -5 r4

teu

:H

Pente 12%

Pente 16%

Arb Pente 12%

fossé

Chaussée

50 m

Pente 12%

sse

ba

on ati gé t

50.50

50.00

49.50

T

EN

au

50.50

50.00

51.00

49.50

Pente 12%

51.00

11 %

So

nte

50.50

50.00

49.50

50.00

50.50

51.00 49.50

50.50

50.00

51.00

%

11

nte Pe

leil

Pe

Hiv er So leil l'è te

Pente 16%

Pe nte

Constructed

EM

Pente 12%

Pe nte

Vegetation 49.50

50.50

50.00

51.00

11 %

te l'è

le i

Pente 16%

50.50

51.00

11 %

er

Hiv

er Hiv

So

50.50

51.00

49.50

50.50

50.00

51.00

Hiv er

l'è te

leil

So

te l'è eil 50.50

51.00

11 %

Pe nte 49.50

l l'

49.50 49.50

50.00

50.50

51.00

r

ète

49.50

50.00

50.50

51.00

ète

Pe

51.00

50.50

50.00

49.50 50.50

50.00

51.00

49.50 49.50

49.50

50.00

50.50

51.00

Hiv er

Sol

Orientation N-E

50.00

So lei

50.00

te l'è leil

So

er

l l'

Hiv e

lei

Views

e l'è t lei l

So

So

Site inclination 9-16%

50.00

Hiv er r Hiv e

Hiv 49.50

50.50

50.00

51.00

l l'è te

So lei l'è te

leil

So

er Hiv er

l l' è te

• 49.50

50.50

50.00

51.00 50.50

50.00

51.00

49.50

49.50

50.00

50.50

51.00

50.50

51.00

Hiv 49.50

50.00

50.50

+/-43.84

49.00

0

0

45.00

RD

iche +/-42 .10 Faîte +/-42 .80

5

NO

44.76

0

+/-43 .45

0

Faîte

50

0

40.85

Faîte +/-45.90

Corniche

51.00

Faîte Faîte Bas toiture

+/-42.30

49.50

+/-42.10

+/-42.80

Faîte +/-43.30

Corniche

50.00

+/-51.20

+/-42.30

Faîte +/-43.30

Corniche

50.50

Faîte

+/-43.45

+/-41.80

40.85

+/-42.30

+/-43.84

Faîte

+/-42.30

51.00

nte

res Arb

de res

Arb •

49.50

50.00

51.00

49.50

de

re

de

res

Arb •

Vé Ha gé t a u te tio ur n b • 4 -5 as Arb m 3è res me de g r a 2è m nd eu r

gr a

m 2è

on ati

gé t

Vé •

Corniche

Faîte

Bas toiture

Faîte +/-43.30

+/-42.10

+/-42.80

Corniche

Faîte Faîte Bas toiture

43.15

42.97

Faîte +/-45.90

Corniche

Pente 13%

du Piroi

Faîte +/-43.30

Corniche

+/-43.84

Faîte +/-45.90

Corniche

ète

+/-47.50

+/-42.30

Faîte

Faîte +/-43.30

+/-51.20

48.47

Corniche

+/-43.84

Faîte

9% Pente

43.00

Chemin

Pente 9%

43.50

48.68

+/-43.50

Faîte +/-45.90

Piroi

47.50

+/-47.50

Pente 13%

du Chemin

48.00

49.00

48.33

47.17

de Huy

40.06

+/-43.65

+/-40.85

Faîte

Corniche

9%

43.00

48.50

Pente 13%

+/-42.30

Faîte +/-43.30

Corniche

l l'

+/-51.20

Pente 9%

Pente

43.50

49.00

49.09

48.00

47.50

Pente 13%

Faîte

0

47.5

53.00

54.00

43.15

9%

Piroi

48.00

52.50

52.00

51.50

42.77

39.46

39.44 39.27

Corniche Corniche

45.50

43.35

42.96 42.28

Pente

in du Chem

48.50

+/-42.30

+/-43.30

42.36

43.00

53.00

54.00

49.00

Faîte

Corniche

42.33

42.07

Pente 9%

43.50

+/-42.30

+/-43.30

52.50

52.00

51.50

Pente 13%

43.52

42.09

42.03

42.12

47.50

Faîte

Corniche

+/-43.84

+/-45.90

Corniche

Faîte

9% Pente

Pente 9%

9%

53.00

54.00

er

48.00

Pente 13%

+/-51.20

+/-43.84

Pente 9%

Pente

52.50

+/-51.20

+/-43.84

Faîte

Faîte +/-45.90

Corniche

lei

48.50

9%

Faîte

+/-42.30

Faîte +/-43.30

Corniche

Faîte +/-45.90

Corniche

53.00

54.00

+/-51.20

+/-43.84

Faîte

Faîte +/-45.90

Corniche

Hiv

54.00

53.00

49.00

Pente

Pente 9%

i du Piro

43.00

+/-43.84

+/-45.90

Corniche

Faîte

52.50

43.00

So

52.50

52.00

51.50

53.00

54.00

52.50

Chemin

43.50

+/-51.20

+/-42.30

+/-43.30

45.25

44.53

44.23

43.29

42.69

44.76

45.50

45.25

43.69

42.97

42.77

43.00

0

Faîte

Faîte

+/-47.50

Faîte

44.28

44.72

43.76

42.77

51.23

49.00

49.09

46.00

46.88

44.53

43.15

43.76

43.35 43.15

42.96 42.28

52.00

43.50

54.00

53.00

47.5

i

Corniche

Corniche

+/-43.65

Faîte

46.79

46.88

46.23

44.98

43.71

41.97

44.78

44.20

43.69

43.67

fossé

41.06

ée de Huy

40.77

43.15

42.97

40.06

39.44

+/-43.50

41.29

fossé

42.71

42.50

41.65

41.82

41.57 41.00 40.80

Chauss

42.77

42.36

42.27

49.74

49.50 49.74

49.50

48.96

47.10

47.00

46.50

42.33

42.07

51.50

48.00

52.50

48.00

43.00

+/-42.30

Faîte +/-43.30

Corniche

+/-42.30

Faîte +/-43.30

Corniche

43.50

42.12

48.50

52.00

48.50

43.50

90

+/-43.84

+/-45.90

43.00

44.20

42.97

42.36

Faîte +/-45.

Corniche

43.50

44.72

43.76 43.69

43.15

Faîte

+/-51.20

Corn

65

+/-47.

he +/-42.3

Faîte

4 he +/-43.8

Faîte

44.78

44.28

Faîte +/-43.3

Cornic

50

+/-43.

0

RD

40.06

39.44 39.27

he +/-43.

Cornic

85

47.5

NO

48.47 48.33

45.50 45.00

41.88 40.60 40.50

39.27

Faîte

43.00

42.08

41.81

43.00 42.71

+/-43.50

48.68 48.47

45.00

43.35

42.96 42.28

52.50

49.74

44.28 44.72

43.35

42.96 42.28

42.33

42.07

45.00

43.76

43.52

42.09

42.03

42.12

39.63

38.90

+/-40.85

44.00

42.96

42.00

42.82 42.99

40.22

25

40.06

Faîte

Corniche

+/-43.65

+/-40.85

49.00

47.10

46.00

45.50

45.25

43.52

42.36

49.74

49.50 49.09

48.33

47.17

47.00

46.50

46.88

44.53

44.23

42.09

42.33

42.07

52.00

49.50

39.63

39.30

38.90

38.76 38.50

39.46

38.90

Faîte

47.50

48.68

43.67

42.36

43.17

43.32

43.50

39.93

46.34

44.00

43.78

43.50

43.15

43.65

44.00

43.75

45.31

44.50

45.11

43.82

44.41 43.75

tant

39.46

39.44 39.27

Corniche Corniche

50.00 49.40 48.96

47.50

46.79

46.34

46.23

44.98

43.29

42.03 42.12

51.50

51.00

50.00 49.40 48.96

40.77

Chaussée

CHAUMONT-GISTOUX, BE | 2020

45.50

45.25

44.53

44.23

43.29

42.69

41.61

40.85

39.06

38.48

38.36

39.63

39.30

che +/-40.

48.00

40.22

48.00

49.74

49.00

39.45

39.06

du Piroi

42.77

48.50

48.47 48.33

44.78

44.76

fossé

41.06

48.50

42.33

42.07

48.68

44.20

43.35

42.96 42.28

49.00

42.12

44.53

43.52

53.00

42.09

42.03

41.97

+/-42.10

+/-42.80

+/-43.45

+/-41.80

54.00

41.29

Faîte Faîte

Bas toiture

52.5049.00

41.65

41.82

41.57

Corniche

+/-47.50

52.00

41.00 40.80 fossé

Faîte

43.29

51.50

40.50

+/-43.50

Chemin

41.88 40.60

Faîte

+/-43.84

41.81

43.00 42.71

44.23

+/-43.65

+/-40.85

Faîte +/-43.30

42.00

42.82 42.99

Corniche

42.69

49.00

44.28

44.72

43.69

44.53

43.52

+/-41.80

42.36

0

43.32

43.50

39.93

42.71

Faîte +/-45.90

43.75

Corniche

38.36

+/-42.30

39.44 39.27

38.20

42.50 42.08

+/-42.30

43.00

43.17

49.09

47.10

46.00

45.00

42.97

42.27

40.85

Faîte +/-43.30

42.96

43.15

43.65

44.00

43.15

44.50

exis

39.45

45.66

45.00

44.65

44.87

44.55

44.44

48.50

40.50

40.22

46.88

46.23

44.98

43.71

41.97

fossé

41.06

39.46

38.48

38.76

47.26

45.50

45.23

45.40

45.00

Mur

49.00

41.29

fossé

42.71

42.50

41.65

41.82

41.57

41.00

40.80

40.60

39.93

39.45

41.81

43.00

42.71

48.47

43.35

42.96 42.28

0

Bas toitur

46.00

41.61

46.88 45.25

Corniche

38.76 38.50

43.82

44.41

43.75

42.07

fossé

39.46 40.06

Corniche

40.22

41.29 41.06

40.77

46.23

39.63

39.30

38.90

0

39.45

39.06 38.67

38.48

he +/-42.3

38.45

42.07

+/-42.10

+/-42.80

+/-43.45

42.27

45.50

45.25

43.76

42.77

Faîte

46.79

46.34

43.52

42.09

42.03

47.10

44.23

43.29

46.50

4

44.98

43.71

38.83

38.68

fossé

47.17

47.00

46.50

46.88

44.53

49.50 49.74

49.50

48.96

47.50

46.79

RD

38.80

Corniche

2

+/-51.20

44.50

44.00

iche +/-42 .10 Faîte +/-42 .80

+/-43 .45

39.30

39.63

39.30

38.90

38.76 38.50

42.69

41.61

50.25

» Vues 45.11

44.19

38.67

39.06

5

38.67

38.48

43.71

41.97

fossé

50.50

46.00

46.15

44.27

38.83

+/-46.25

41.88 40.50 40.22

38.45

38.36

41.29

42.71

42.50

41.65

41.82 41.57

41.00 40.80

40.60

39.93

39.45

0

38.20

53.78

53.50 53.00 52.98

43.00

42.08

38.83

+/-46.25

54.00 53.71

52.67

50.50

48.50

44.00

42.96

42.00 41.81

43.00 42.71

45.31

44.50

44.00

43.78

43.50

43.82 43.17

42.82 42.99

45.66

45.00

45.11

43.15

43.32

43.50

51.23

50.25

49.00

48.00

47.26

45.50

45.23

44.65 44.87

43.65

44.00

43.75

nt

53.78

53.50

53.00 52.98

52.50

52.00

51.50

51.00

49.02 47.10

46.14

46.00

45.40

44.41 43.75

ista

25

54.00

53.71

52.67

47.35

47.00

46.50

45.11

54.04

52.63

50.61

49.02 47.10

46.14

46.57

42.88

39.68

38.45

Corniche

53.84

51.76

47.50

46.15

44.50

44.44

5

54.04

52.63

50.61

46.57

45.00

53.79

51.23

49.09

47.35

43.00

42.00

42.82

42.99

48.68

JNC International • The Globe Village, 993 Chaussée d’Alsemberg Bt 4, B-1180 Bruxelles • Boissonet • 18/02/2020 • 14/34

43.35

42.96 42.28

42.33

50.00

51.23

50.00 49.09

49.40

48.00

47.26

46.34

43.52

42.09

42.03

47.10

44.23

43.29

46.50

42.12

41.65

41.82 41.57

46.34

41.00 40.80

41.88 40.60 40.50

+/-46.25

41.81

43.00 42.71

00

42.69 41.97

46.23

44.98

47.

42.71

42.50

0

47.17

43.71

46.79

43.00

42.08

42.99

48.50

0

45.66

44.00

43.50

42.96

42.00

42.82

45.31

44.50

44.00

43.78

43.17

43.32

43.50

39.93

43.50 Corniche

49.00

47.5

45.00

RD

43.82 43.15

43.65

44.00

43.75

Faîte

44.55

43.78

45.11

45.11

44.41 43.75

44.00

44.65

44.44

44.50

44.44

44.50

45.40 44.87

44.65

44.87

44.55

45.50

45.23

NO

45.40

45.00

45.66 45.31

Faîte

50

Corniche Faîte

Bas toiture

42.09 42.33

44.76

41.65

fossé

45.25

44.23

+/-47.50

51.23

50.25

53.00 52.98 52.50

50.50 50.25

49.02

48.0

46.14

46.00

45.11 44.19

41.06

40.85

rg Bt 4, B-1180 Bruxelles • Boissonet

0

52.00

51.50

50.61

51.00

46.50

47.26

46.15 44.27

39.66

Corn

65

+/-47.

Faîte

43.29

00

42.69

41.97

46.23

44.98

47.

42.71

90

42.94

42.88

39.68

45.00

Faîte

+/-43.50

41.61

e +/-41 .80

he +/-43.8

42.24

45.50

Cornic 50

+/-43.

40.85

40.06

Faîte

41.65

40.77

0 40.50

46.23

40.22

39.63 39.46

39.44

+/-43.65

+/-40.85

42.03 42.12

41.29 41.06

40.77

fossé

41.29

+/-42.65

53.33

52.75

50.00

49.02

47.77

47.00

46.50

44.00

42.96

42.08

38.83

38.20

50 m

25

53.84

51.76

49.09

46.62 42.94

Mu

52.78

52.46

50.79

50.00

48.00

47.50

5

53.79

51.23

50.00

47.43

46.27

52.75

50.79

49.02

47.77

44.19

38.68

52.14

51.00

50.50

49.00

50.00 49.09

49.40

48.50

48.00

0

47.17

43.71

46.79

43.00

42.50

41.82 41.57

fossé

44.78

44.00

43.50

41.81

46.34

41.00 40.80

40.50

43.67

39.45

39.30

39.27

Corniche Corniche

42.69 41.97

Faîte +/-45.

52.67

49.40 48.96

0

47.10

NO

41.84

+/-42.65

40.60 +/-41.8

42.82

43.00

40.60

39.06

38.90

38.76

42.71

45.31

44.50

44.00

42.00

47.50

47.17

45.66

45.00

42.96

47.26

47.5

45.50

43.78

43.82

41.88

44.98

38.67

42.27

38.36

43.69 43.50 42.71

38.48

38.50

41.82

41.57

42.36

43.71 38.45

38.20

42.50

0

53.78

53.50

52.63

49.09

0

48.5

47.35

47.00

42.14

+/-45.20

Corn

41.81 41.00

fossé

42.07

38.83

38.68

43.00

49.00

0

45.23

44.65

43.17

0

51.23

51.23

50.50 50.25

49.02

48.0

46.14

46.00

45.11

43.32

53.33

50.00

48.00

44.27

38.80

52.00

51.50

49.50

48.50

47.43

43.17

43.32

43.50

49.74

49.00

47.10

46.00

50.00

51.50

50.61

48.96

0

47.10 44.76

46.50

44.87

44.2043.15

43.65

42.08

43.75

49.40

48.5

47.35

47.00 44.20

47.26 45.11

44.28

44.41

42.99

50.5

54.00 53.71

51.76

49.0 47.77

47.50 47.43

46.57

Faîte

39.27

he +/-43.

Faîte

Cornic

43.00

+/-45.20

45.23

42.82

he +/-42.1 0 Faîte +/-42.8 40.80 0

+/-45.20

52.68

52.50

48.53

48.15

46.62

43.78

43.50

43.82

43.15

43.65

44.00

43.75

41.88

38.67

45.11

44.41

43.75

nt

52.98

51.23

49.50 49.09

48.33

47.17

47.00

46.50

46.34

44.00

52.00

51.00

48.33

44.78

44.28 44.72

43.76 43.69

43.67

45.40

44.72

44.00

39.93

Faîte +/-43.3

53.84

43.50

Faîte

46.00

45.11

45.00

51.00

53.79

51.23

50.00 49.02

49.02

48.15

46.62

46.15

44.19

50.61 52.75

54.04

46.57

43.50

+/-46.25

42.96

53.00

49.35

48.52

44.65

44.50

ista

53.78

53.50 53.00 52.50

52.00

51.50

51.00

50.00 49.40 48.96

47.50

46.79

45.31

44.50

44.87

44.55

r ex

47.26

45.66

45.00

45.40

44.44

38.45

45.50

45.23

45.11

44.19

45.00

54.00 53.71

52.67

50.50

48.50

46.00

46.15 44.27

50.25

49.00

48.00

50.25

53.00 52.98

52.50

0

48.47 47.77

45.00

42.27

45.00

43.76 43.75

42.97

42.77

50.79

50.00

49.00

48.50

48.00

44.27

41.61 Corniche

42.96 42.28

42.33

48.00

47.50

45.50 45.25

42.97

42.77

42.36

46.00

45.50

44.50

43.35

52.67

49.09

43.35 43.15

42.96 42.28

42.33

46.00

46.88

44.53

43.52

42.09

42.03

42.07

46.15

44.53

44.55

44.44

53.33

52.46

51.00

50.50

49.50 48.53

47.10

48.52

46.27

41.88

44.00 38.80

fossé

41.29 41.06

43.82 40.85 43.17

54.03

50.72

49.43

48.10

46.27

54.04

52.63

50.61

49.02 47.10

46.14

0

53.78

53.50

52.63

49.0

52.78

52.46

51.00

50.50

49.00

42.88

39.68

52.82

51.66 51.07

49.38

44.53

53.84

51.76

49.09

47.35

47.00

46.50 46.57

50.5

54.00

53.71

50.00

48.33

46.50

47.10

44.23

0

46.50

42.12

47.10

47.00

46.79

46.34 46.23

44.98

47.43

43.29

42.69 41.97

41.61

46.88

45.00

51.00

54.04

48.68

48.68

40.85

40.06

Cornic

52.78

51.50

50.72

49.35

48.10

44.53

+/-43.84

51.66

49.43

47.35 0

43.42

41.65 43.78

41.82

41.57

40.77

45.90

42.24 42.94

47.50

46.62

Mu

53.79

51.23

50.00

» Vues

51.50

44.76

53.84

49.00

49.00

48.47

47.17

45.66

45.31

47.17

47.0

42.71

42.50

fossé

41.29 41.06

40.77

46.23

45.66

45.31 43.15

49.74

49.09

43.42

42.24

52.75

50.79

49.02

47.77

42.94

39.68

38.68

53.33

50.00

48.00

42.88

38.80

52.78

52.46

51.00

50.50

49.00

47.43

46.27

42.24

52.14

51.50

49.50

48.50

52.50

44.20

53.79

51.76

49.02

50.00

49.50

48.50

47.50

47.50 43.71

46.79

43.00

41.65

41.57

fossé

45.25

+/-42.10

+/-42.80

43.52

+/-41.80

48.96

48.00

44.50 44.00

43.50

42.00

46.57 41.82

41.81

46.34

41.00 40.80

41.88 40.60 40.50

Faîte

+/-43.45

42.09

42.03 42.12

47.43

47.00 46.50

43.42

41.84

42.14

52.00

48.15

43.42

41.84

52.68

52.50

48.52

52.00

44.78

44.28

43.67

52.75

49.74

49.50

49.09 49.02

49.40

48.50

53.00 52.98

48.47

47.10

44.72

43.76

53.33

52.46

51.23

50.50

49.00

52.67

48.33

47.17

45.00

43.69

50.61

52.7842.97

42.77

42.36

42.27

51.23

50.25

49.00

49.02

47.26

47.50

46.00

45.50

45.25

43.35

43.15

42.96 42.28

42.09

42.33

42.07

51.00

46.88

44.53

43.52

51.23

42.03

42.12

50.50

50.79

50.00

53.00 52.98

52.50 52.00

51.50

48.96

47.10

53.50

49.74

48.68

46.50

46.34

44.23

43.29

51.00

41.97

50.25

53.50

46.23

44.98

51.50

42.69

52.14

54.00

53.71 41.6153.78

52.67

50.00 49.50

48.00

44.00

42.96

42.08

42.71

40.06

Corniche

48.53

45.00

43.78

43.82 43.17

42.82

43.00

42.99

40.22

Faîte

Bas toiture

42.69

41.97

53.70

47.11

rg Bt 4, B-1180 Bruxelles • Boissonet

53.78

53.71

51.23

50.00

49.50

49.09

49.00

47.00

46.79

45.31

52.00

43.71

42.71

42.50

54.04

50.50

40.85

48.50

47.35

+/-42.10

+/-42.80

45.50

45.23

48.15

45.11

43.15

43.65

43.32

43.50

39.93

44.19

44.23

+/-47.50

43.29

51.50

52.14

51.07

49.38

45.00

44.5

41.06

39.44

Faîte +/-45.90

52.00

42.19 40.74

44.65

41.81 41.00 45.11

fossé

Faîte

+/-43.50

+/-41.80 44.65

44.87

43.75

39.63

39.46

39.44

+/-43.65

+/-40.85 Faîte

44.50

44.00

52.00

52.68

52.50

45.90

45.50

44.00

42.39

46.14

Bas toiture

5

Village, 993 Chaussée d’Alsembe

Corniche

53.00

43.99

43.64

46.50

+/-51.20

47.43

53.50

52.82

46.00 45.44

47.00 46.62

39.46

52.50

54.03

45.70

47.50 47.43

46.27

Faîte

0

47.5

46.50

47.77

42.25

53.70

.90 +/-45

42.24

.84 che +/-43

Corni

47.00

48.15

54.00

Faîte

47.11

+/-42.30

54.50

49.09

85

he +/-40.

53.00 52.98 38.36

54.81

48.00 47.25

+/-43.30

53.00

54.00

48.50

47.50

Faîte

52.50

49.00

46.80 46.89

48.00

38.76 38.50

Cornic

52.67

54.82

0

39.93

+/-43.4

Bas toiture 45.11 45.40

44.41

46.62

44.00

43.75

39.45

39.30

39.27

Corniche

Corniche

Corniche

Faîte

47.26 +/-43.45

+/-47.50

46.27 44.50

44.27

39.06

38.90

38.76

38.50

39.68

42.71

42.08

Cornic

42.71 Faîte

+/-47.50

Faîte

+/-43.50

44.55

45.31

44.98 38.67

38.48

39.66 38.36

42.00

39.63

JNC International • The Globe

53.78 38.20

53.50

52.63 54.57

53.5

54.09

» Scénario II Les coulées vertes

+/-51.20

54.00

50.00

54.98

53.13

47.92 49.06

+/-43.50

42.99

+/-43.65

46.14

45.00

45.66

42.94

42.88

38.45

38.20

42.50

43.15

40.22

38.90

52.65

50.53 47.55

53.71

51.76

52.58

50.29 49.01

49.02

42.82

44.87

40.50

43.00

39.44

Faîte

42.24

43.71

38.83

38.68

43.00

45.00

39.45

51.07

52.00

49.33

49.00

48.50

RD

39.27

39.30

38.67 38.48

51.23 49.29 49.58

49.50 48.53

NO

+/-40.85

Faîte

43.42

41.84 42.14

38.80

+/-46.25

42.00

40.60

43.6540.22

» Contexte bâti

Corniche

44.27

38.36

47.10

46.00

Faîte

46.15

44.44

41.06

44.50 44.00

43.50

40.80

41.88

Faîte

42.39

39.66

40.74

44.00

45.50

40.06

47.00

46.50

48.52

+/-43.65

Corniche

47.26

45.66

44.00

43.00

42.00

41.65

fossé

41.29 51.00

41.06

de Huy 52.63

40.77

52.50

44.00

42.96

51.50

41.82

41.57

51.76

fossé

ssée Chau 49.40

49.09

50.61

47.50

39.44 39.27 46.57

+/-40.85

41.81 41.00

40.80

41.88 40.60 40.50

52.00

42.08

53.84

42.82

51.23

42.71 50.72

49.00

53.00 52.98

45.50

43.50

43.17

53.79

43.32

43.00

42.99

50.00

39.93

47.77 49.35

47.43

46.62

43.15

43.65

52.75

43.50

50.79

49.02

40.22

48.10

38.90

38.76

39.68 42.19

45.00

+/-42.65

42.96

40.06

39.06 38.45

54.04

49.32

49.35

48.52

43.0

46.27

38.50

44.53

43.7551.66

nt

49.02

48.00

44.19

45.50

+/-45.20

Corn

43.78

45.23

43.32

43.50

47.35

38.48

0

44.00

+/-42.65

+/-45.20

Faîte

44.65

43.17

ista

39.4548.50

39.63

43.78

43.82

50.61 53.33

52.46

51.00

50.50

49.50 49.00

45.11 52.68

52.50 52.82 44.41

52.78

44.00

43.75

r ex

39.46

53.78

53.00 52.98

52.50

52.00

51.50

51.00

50.50

50.25

48.96

41.84

r ex

53.50

47.25

S C ÉN A RI I (2) 44.65

44.87

52.14

44.50

51.50

44.44

50.00

43.99 38.20

43.64 42.88

45.11

43.15

39.63

39.46

38.83

38.68

25

he +/-46.

Cornic

80

Corn

45.23 Faîte

46.00

43.82

0

42.99

44.41

39.45

44.00

39.30

38.36

38.80

53.84

+/-41.

46.00

42.14

+/-45.20

53.50

53.00 52.00

44.55

44.5

41.06

+/-45.20

Faîte

46.50

39.06

43.75

38.90

42.24 42.94

42.19 40.74

Faîte

45.40

49.09

52.68

52.50 45.00

Mu

39.06 49.43 39.30

48.15

38.67

» Trâme arborée 45.11

39.93

44.50

38.67

Corniche

43.42

41.84

42.39 +/-46.25

Corniche

46.14

54.00

49.06

47.50

45.50

43.99

42.39

42.19 41.06

39.66

53.50

52.67

49.40

48.50

44.50

54.03

53.70

53.00

51.07

48.53

47.10

48.52

49.00

48.00

45.00

45.11

54.00

53.50

50.72

49.38 49.35

48.10

38.45

47.10

54.04

54.00

53.71

52.63

50.61

52.63

49.02

45.23

54.03

51.66

49.43

42.08

38.48

38.76

46.50

47.00

46.15

54.50

54.09

54.00 53.70

49.09

49.38

47.43

47.00

47.35 45.90 38.83

45.00

38.68

51.76

49.09

53.78

53.50 52.67

46.00

54.81 54.50

44.19

51.07

47.11

46.50

45.50 38.80

54.04

51.23

50.00

54.00 53.71 47.35

52.82

47.25

46.00 45.70

44.53

53.79

Village, 993 Chaussée d’Alsembe 54.00

54.04

47.77

47.00

46.50 46.14

54.81 54.09

49.06

47.50

47.43 39.68

47.00

45.90

45.44

44.00

52.75

53.84 50.79

49.02

51.76

48.00

47.50

52.63

47.92 49.06

46.80

47.11

45.00

44.50 43.99

49.00

48.50

47.43

54.82 46.57

0

46.89

46.50

45.50

42.25

43.64

43.32

45.4043.50

43.75

43.75 38.45

47.25

46.00 45.70 45.44

47.77

51.76 54.57

46.62

53.5

47.50

39.66

47.77

42.25

49.50

48.53

48.15

50.00

54.98

53.13 54.82

44.27

47.92

46.80

46.89

42.24

42.24

47.00

46.14

44.00

47.55

47.55

+/-42.65

48.00

47.50

Corniche

44.44

38.83

+/-45.20

Corn

48.50

48.00

47.50

45.11

43.75

44.55

38.80

+/-46.25

Faîte

48.50

52.46

50.00

53.84

51.23

46.27

54.57

50.53 53.50

50.50

53.79

49.35

48.52

51.23 52.65

50.00

54.98

53.13

53.33

JNC International • The Globe

52.58

52.65

42.94

42.88 50.53

53.84

52.78

51.00

50.72

52.75

51.07

50.29 49.01

52.58

42.24

52.14

51.50

51.07

49.43

43.42 49.33

41.84

53.79 52.00

49.32 49.29 44.53 49.58

51.07

50.29 49.01

42.14

52.50 52.82

48.10

0

49.29

42.39

42.19 49.33 41.06

49.02

52.68

51.66

53.33

45.00

44.5

44.00

49.32

49.58

+/-45.20

Faîte

53.00

52.14

51.50

49.50

48.50

42.14

44.55

39.66

54.50

» Contexte bâti

54.03

53.50

49.38

52.46

45.90

45.50

43.99

43.64

43.65

43.67

46.00

45.70 45.44

50.79

49.02

40.74

44.87

44.41

46.50

50.79

42.25

50.00

45.40

44.76

42.71

42.27

42.24

50.50

49.00

54.00

52.00

54.82

47.92

46.80

42.25

38.50

53.33 53.70

52.68

52.50

48.15

54.81

Corniche

52.75

53.00

48.52

44.53

54.57

53.50

54.09

Corniche

54.50

54.03

52.82

50.72

48.53

54.98

53.13

38.20

52.78

52.46

52.78

47.43

47.00

49.50

44.78

44.50

45.00 41.61

Faîte

he +/-42. 10 Faîte +/-42. 80

45

Bas toiture

.30 +/-43

Cornic 53.79

Faîte +/-43.

.50 +/-47

50.00

.30 che +/-42

1

39.44

52.75

.65 +/-43

Faîte

.50 +/-43

Faîte

46.15

0

44.55

47.25

51.00

50.00

49.00

44.20

54.82

0

+/-42.65

52.65

54.57

53.5

54.00

53.70

51.66

49.35

52.58

50.53

54.98

53.13

+/-45.20

Corn

51.07

50.29

49.01

46.89

42.24

+/-45.20

Corniche

50 m

42.39

+/-45.20

Faîte

49.29

38.36

54.81

47.11

50.50

49.50

45.0

44.44

42.77

52.14

51.50

44.28

46.15

43.67

25

54.50

49.43

48.10

43.99

42.19 41.06

40.74

Faîte

50 m

25

5

0

49.32

39.06

5

54.82

51.07

45.00

52.65

54.09

51.00

44.72

43.69

Corniche

Faîte

49.43

.85 +/-40

51.50

» Scénario I Les clairières

Corniche Corniche

50.79 38.36

46.57

42.27

45.00

44.19

38.50

Corni

53.33 39.27

52.46

38.20

43.67

43.76

38.20

52.78

38.90

38.76 38.50

51.00

50.50

42.77

42.36

45.50 45.25

43.35

fossé

41.29

40.85

40.06

47.43

42.97

42.33

44.76

54.57

0

49.38

49.58

49.33

47.55

38.68

42.77

49.06

47.50

46.89

42.27

» Pente de terrain (9 à 16%, Différence 13,5m)

15° 40° 65°

38.80

47.92

46.80

52.00

48.47

48.33 47.43

44.76

42.36

Corniche

39.46

48.47 48.33

44.78

44.20

42.97

42.33

42.07

48.68

44.72 43.76 43.69

44.27

46.57 44.53

38.68

38.67

38.48

51.50

.25 +/-46

+/-43.84

.20 +/-51

Corniche

50.72

46.88

40.77

40.85

48.68

49.00

44.28

45.00

46.00

43.15

42.96 39.68 42.28

39.63

39.30

52.14

38.45

42.09

42.03

42.07

46.23

42.96 42.28

46.50

42.12

41.61

41.06

fossé

40.50

43.52

+/-41.80

39.66

RD

39.06

52.00 38.68

51.66

42.03 42.12 44.19

41.06

39.68

46.34

40.80

41.88 40.60

40.22

40.06

Corniche

+/-42.10 Faîte +/-42.80

Bas toiture

40.77

40.22

42.69 41.97

fossé

41.29

49.00

49.09

48.15

45.50 45.25

43.35

43.15

Faîte +/-43.45

+/-47.50

42.09

NO

38.83

38.80

51.07

41.97

41.57

49.74

49.50

48.96

47.10

46.00 46.88

44.53

46.62

43.52

47.55

52.50

49.74

49.50

50.00 49.09

49.40

48.50

47.17

47.00

46.50 46.34 46.23

47.10 44.23

43.29

41.65

41.82

41.81 41.00

39.63

44.23

+/-43.65

Faîte

+/-43.50

43.29

+/-45.90

Faîte

» Contexte arboré

52.50

52.82

48.10

fossé

39.66

Faîte

41.65

41.82 41.57

41.00 40.80

40.50

39.45

52.68

41.81

.00

41.88

53.00

+/-40.85

42.50

43.17

42.00

42.82

43.00 42.71

39.93

39.45

39.46

39.44 39.27

Corniche Corniche

42.71 44.27

42.69

42.00

40.60

39.93

53.50

46.62 5

39.30

38.90

38.76

38.36

43.15

43.65

42.71

42.08

42.99

+/-42.6

39.06

38.48

38.20

49.00

48.00

47.50

46.79

45.66

45.31

47.00

46.79

43.00

47.17 44.98

43.71

43.50

42.96

51.23

50.25

49.02

47.26

47.50

46.27

44.00

43.78

43.32

43.50

42.88

38.67

38.45

38.68

42.50

44.41

44.00

43.75

43.75

44.98

43.71

38.83

38.80

43.00

42.08

Corniche

43

42.71

54.03

Corn

44.00

43.50 +/-46.25

42.96

43.17

Faîte

42.99

54.00

43.78

50 m

43.15

42.82

54.50

53.70

25

5

43.32

43.50

43.75

54.81

49.38

0

39.66

54.09

44.00 44.65

» Voiries 43.82

44.41

44.00

43.75

Faîte

44.50

42.94

45.11 42.88 Corniche

.65 +/-42

43.65

39.68

45.11 42.24

44.87

38.50

Corn

44.50

42.14

44.44

0

+/-45.2

Corniche

+/-43.84

44.55

44.44

44.50

44.00

44.65

45.11

43.82

42.94

50 m

42.36

» Contexte arboré

52.68 51.50

43.00

41.84

42.14

45.40

.20 +/-45

Faîte

0

Faîte +/-45.90

.00

.00

53

54

Corniche

52.50

54.82

0

45.0

00

40.74

.20 +/-45

Faîte

+/-41.80

43.

+/-42.10

+/-42.80

+/-43.45

48.15 45.50

45.23

45.00

42.24

51.00 50.50

0

Bas toiture

43.5

Faîte

Faîte

+/-47.50

.90 +/-45

Faîte

+/-43.50

+/-45.2 46.27 Faîte

50.61

48.96

47.10

48.00

46.14

45.11

44.87

41.84

44.50

45.31

+/-51.20

52.00

» Bâti

54.57

Faîte

39.68 39.66

45.00

44.19

54.98

53.13 53 .5

45.50

45.23

52.00

51.50

49.40

48.50

47.35

47.00

46.50

47.26

43.42

46.15

45.40

42.19 41.06

44.55

48.52

47.77

47.50

46.00

42.39

45.00

45.6640.74

0

49.09

0

48.00

46.57

44.19

Faîte

Faîte

Corniche

+/-43.65

+/-40.85

42.19 41.06

15° 40° 65°

44.27

+/-43.84

39.27

Corniche

Corniche

38.36

+/-42.30

44.27

38.20

Faîte +/-43.30

+/-42.65

Corniche

Corn

52.65

42.39

+/-42.65

40.06

39.44

49.0

48.50

44.53

.00

46.27

42.94

+/-45.20

Corn

39.46

38.90

38.76

44

47.43

42.24

41.84

42.14

42.88

Faîte

39.63

39.30

38.67

38.48

.50

43.99

48.52

48.15

43.42

46.62

42.19 41.06

40.74

+/-45.20

Faîte

Corniche

38.45

38.50

52.58

40.85

39.06

38.68

+/-46.25

47.10 43.64

44.53

44.00

42.39

46.14

43.42

.00

+/-51.20

40.22

38.83

38.80

Corniche

48.10

43.99

43.64

44.53

46.50

46.00

43

Faîte

42.88

+/-45.20

0

43.00

44.76

47.35

48.52

47.00

.0

43.50

44.20

46.15

50.00 48.53

25

5

15° 40° 65°

+/-41.80

52.00

44

44.78

44.28

44.72

43.76

43.69

43.67

42.27

40.77

50.25

0

43.69

52.58

51.50

48.47

48.33

44.50

43.99

43.64

48.68

47.10

46.00

45.00

43.35

42.97

42.77

42.36

41.61

41.06

43.50

.00

42.33

42.07

43.15

42.96 42.28

42.09

42.03

42.12

feasibility and maximum density for the lot. Faîte

fossé

40.50

53.78

53.00 52.98

52.50

+/-41.80

Corn

44.20

43.76

43.35

43.15

42.97

51.07

50.29 49.01

43.50

43

fossé

41.29

49.00

47.50

47.17

43.52

43.29

42.69

41.97

46.57

41.65

41.82

41.57

40.80

41.88

40.60

39.93

39.45

49.29

0

49.09

48.00

41.81

41.00

42.71

45.50

45.25

44.53

44.23

42.71

42.50

42.08

42.00

42.82

43.00

42.99

46.88

46.23

44.98

43.71

43.00

43.17

43.32

43.50

47.00

46.50

46.34

44.00

43.50

42.96

43.15

43.65

43.75

46.79

45.31

44.50

44.00

43.82

44.41

44.00

43.75

43.78

45.11

46.62

44.50

45.66

45.00

44.65

44.87

44.55

44.44

49.74

49.50

48.96

47.43

47.26

45.50

45.23

45.11

45.40

45.00

54.00

53.50 52.67

Faîte +/-42.80 Faîte +/-43.45

+/-47.50 Bas toiture

45.90

45.50

44.00

Faîte

48.47 48.33

44.78

44.76

49.32

49.33

47.5

49.40

48.50

46.14

46.00

46.15

46.27

44.19

50.50

54.04

49.3553.71 52.63

48.53

40.85

42.07

+/-42.10

46.00

48.68

44.20

45.44

45.00

49.00

44.72

42.33

42.12

Corniche

+/-43.65

Faîte

46.00 45.70

44.50

44.72

44.53

49.74

49.50

Corniche

+/-43.50

46.50

42.25

44.5

44.00

49.09

44.28

39.44 39.27

0

0

53.50

43.67

42.36

JNC International • The Globe Village, 993 Chaussée d’Alsemberg Bt 4, B-1180 Bruxelles • Boissonet • 18/02/2020 • 14/34

40.06

38.90

44.76

» Vues

54.81

47.43

47.00 42.24

42.77

53.5

54.09

47.11

42.97

42.33

42.07

49.06

47.50

47.25

43.64

39.46

38.67

+/-40.85

42.09

42.03 42.12

54.98

53.13

47.92

46.80 46.89

44.76

0

39.63

39.30

47.55 48.47

48.33

44.78

40.85

45.70

+/-43.45

50.53

53.00

51.23

53.84

51.76

+/-42.10

+/-42.80

50.00

49.40

39.06

48.68

44.20

43.69

41.61

41.06

40.77

ssée

Chau

52.65

49.01

50.53

49.00

44.72 43.76

de Huy

fossé

40.50

40.22

52.58

50.29

49.33

49.74 49.09

44.28

45.00

43.35 43.15

42.96 42.28

fossé 41.29

40.80

41.88 40.60

39.93

41.57

51.23

49.50

48.96

47.10

45.50

45.25

43.52

41.65

41.82

41.81 41.00

46.88

44.53 44.23

43.29

42.69

41.97

42.00

42.82

43.00 42.71

49.58

52.00

51.00 50.50

50.00 49.40

48.50

46.00

46.34

46.23

44.98

43.71

42.71

42.08

42.99

39.45

38.83

43.17

43.32

43.50

51.07

50.25

43.00

42.50

44.00

43.75

40.74

42.27

48.00

46.50

46.57

44.27

50.72

51.00

53.79

49.43 51.23

48.96

+/-42.10 47.10 Faîte +/-42.80

43.76

43.69

stant

Faîte

43.67

42.27

48.50

42.94

42.88

39.68

39.66

52.50 52.00

51.50

53.33

80

Bas toiture

49.00

46.62

42.24

+/-42.65

80

50.61 52.75

52.46

50.00

48.10

49.02

49.02

Faîte

+/-47.50

52.00

41.84

42.14

+/-45.20

Corn

42.94

52.78

+/-41.

49.35 50.79

50.00

49.00

Faîte

40.06

48.50

47.50

Corniche 47.17

45.00

42.96 42.28

43.65 43.75

r exi

49.29

51.50

50.61

49.00

47.50 47.17

44.00

43.50

42.96

47.00

46.79

45.31

44.50

44.00

43.78

49.32

46.50

45.00

43.15

53.78

53.50 53.00 52.98 52.50

48.00

47.26

45.66

45.50

45.23

44.65 45.11

43.82

Mu

54.00 53.71

52.67

49.02 47.10

46.14

46.00

44.87

44.41

45.44

44.78

46.00

45.50

45.25

43.35

42.36

42.09

49.09

47.35

47.00

45.40

44.50

43.64

46.50

46.88

44.53

+/-41.80

42.97

42.77

44.76

41.61

51.50

43.00

.50

+/-45.20

43.42

42.24

41.84

42.14

Faîte +/-42.

45

Bas toiture

52.14

51.00

50.50

+/-43.84

52.00

51.50

48.53

Faîte

+/-43.50

Faîte +/-45.90

52.50

49.50

44

Corniche

43.50

43

40.74

Faîte

Faîte

42.39

42.19 41.06

40.74

+/-45.20

+/-51.20

49.38

52.68

50.72

.00

49.35

49.43

designer; prepared all calculations for C •together S C Éwith N Aa landscape RII Faîte

Faîte

53.00

45.90

50

45

48.10

45.90

45.00

40.06

Corniche

42.33

42.07

43.15

42.96 42.28

42.09

42.03 42.12

47.00

46.79

43.52

46.23

Bas toiture

43.52

43.29

42.69 41.97

44.20

44.28

49.58

53.00 52.98

51.66

42.71

42.50

41.61

44.72 43.76 43.69

54.04

52.63

44.20

» Pente de terrain (9 à 16%, Différence 13,5m)

43.67

53.84

51.76

46.50

45.11

Faîte

44.76

53.79

51.23

47.77

47.50

46.15

44.55

43.67

» Contexte arboré 52.14

53.50 52.82

52.67

+/-43.84

51.07

Faîte +/-43.

53.50

52.82

45.

51.66

51.07

49.38

45.50

54.03

46. .50 00 +/-47 45.70 Faîte

45.44

49.43

47.43

46.00 45.70 45.44

0

54.00

53.70

49.09

.50 +/-43

Faîte

0

47.00

42.25

10

Faîte +/-45.90

.85 +/-40

Corniche

47.5

47.11

46.50

47.77

42.24

50.72

+/-42.

Corniche

49.06

47.50

47.25

21 dec

44 47.50 .5 0

43.00

45 48.00 .0 0

51.23

50.00

43.50

47.92

46.80

38.36

53.78

53.50

53.00 52.98

52.50

52.00

51.50

51.00 50.50 50.25

49.00

+/-51.20

21 mars-sep 46.89

54.00

53.71

52.67

49.02

47.10

Faîte

.50 48.50

54.04

52.63

50.61

47.35

47.50

53.84

51.76

49.09

48.15

47.77

47.00

+/-51.20

45

53.79

51.23

50.00

49.02

48.00

47.50

48.00

45.44

52.75

50.79

50.00

49.00

48.50

47.43

46.27

Faîte

53.33

52.46

51.00

50.50

49.50

48.53

48.15

43.42

48.50

52.78

51.50

50.72

48.52

49.35

48.52

44.53

44.00

53.78

+/-40.85 Faîte

40.85

53.50

.30 +/-42

.65 +/-43 46.5

Corniche

39.46

39.44

+/-43.65

49.00

48.00 47.26

Faîte +/-43.45 46.34

44.98

43.71

44.23

43.00

42.00

0

52.00

54.03

53.71

40.06

52.63

.30 +/-43

54.50

0

54.00

54.00

Faîte

51.66

51.07

49.43

48.10

44.50

43.99

43.64

42.39 42.19 41.06

51.66

Corniche

45.90

45.50

44.53

0

48.00

49.38

46.00

45.70

45.44

0

.0

49.00

0

48.10

46.50

42.25

.5

45.00

44

0

53.0

54.81

Corniche

54.09

42.25

.50

42.24

39.46

47.43

47.0

39.27

54.82

54.04

39.63

39.30

39.27

Corniche

38.36

52.50

54.50 40.22

52.82

39.06

38.90

Corniche

+/-47.50 44.00

43.50

42.96

41.65 fossé

41.29 41.06

42.03

40.77

40.50

40.22

42.00

38.67

38.76

41.65

44.23

45.31

44.50 44.00

Faîte

43.29

41.82 41.57

fossé

40.60

44.78 44.28

45.00

48.00

46.57

45.00

42.97

42.77

» Conte xte bâti 45.66

45.00 +/-43.65

43.78

43.82 43.17

42.08

38.48

50.25

49.02

47.10

39.44 39.27 45.50

45.23

Corniche 44.65

45.11 +/-43.50

43.15

41.81 41.00

40.80

41.88

38.50

39.46

46.14

46.00

44.87

Faîte

42.82

43.00

42.71

48.33

46.00 45.50

45.25

43.35

43.15

42.96 42.28

48.50

46.62

Corniche

44.20

53.33

52.75

50.00

49.02

49.00

42.36

42.27

45.50

2145.00 dec

45.25

fossé

41.29

41.06

40.77

53.70

39.44 47.11

54.57

53.50

54.09

38.45

38.20

41.57

fossé

52.68

54.81

53.84

51.76

47

47.00

42.24

44

43.99

54.0

39.30

38.83

+/-46.25

39.30

47.00

+/-40.85

43.65

43.32

43.50

39.93

42.07

48.47

48.33

44.53

43.52

42.09

42.33

42.12

46.88

46.23

47.10 21 juin

44.23

43.29

46.50 42.03

41.97

40.85

51.23

50.50

46.50

45.11 45.40

Corniche

44.41

42.69

43.75

42.69

21 mars-sep 46.00

40.77

46.23

52.00

48.68

48.68

46.50 46.34

42.71

42.50

41.61

46.88

41.06

fossé

53.00 52.98

40.50 52.50

44.00

43.75

41.97

45.66

45.31

44.98

47.00

46.79

43.00

42.08

42.00

40.80

43.71

43.50

42.96

fossé

41.29

41.00

53.78

41.65

41.82 41.57

46.34

54.00

53.50 41.88

40.60

51.50

51.00

49.00

49.00

48.47

43.67

44.00

43.78

43.82 43.17

41.81

43.00

53.71 42.71

40.22

48.10

38.36

49.74

49.50 49.74

49.50 49.09

44.72

42.97

42.77

52.78

50.79

50.00 49.50

46.27

21 dec

50.00

51.23

50.00 49.09

48.96

47.10

44.78

44.28

52.14

42.27

50.50

44.19

38.20

50.25

53.00 52.98 52.50

52.00

51.00 50.50 50.25

49.40

48.50

47.17

48.47 48.33

44.76

43.69

42.36

52.00

51.00

21 juin

38.76

48.68

44.20

51.50

44.27

38.45

49.00

44.78

44.28

44.72

43.69

43.67

52.68

48.53

40.85

45.00

43.35 43.15

42.96 42.28

52.46

38.50

51.50 50.61

49.00

48.00

47.50 47.00

46.79

48.47

45.50

45.25

43.15

42.97

52.50

42.94

38.48

53.78

53.50 52.67

48.47 48.33

44.78

44.76

47.17

44.00 44.65

45.11

43.15

42.82 54.04

42.99

52.67

39.93

54.00 53.71

52.63

49.74

48.68

47.26

44.50

44.87

43.32

43.50

52.63

53.00

42.88

38.68

+/-46.25

50.50

54.04

51.23

49.00

49.02

44.20

47.50

45.50 45.00

42.27

45.40

43.65

53.84

50.61

38.90

38.76

44.50

39.45

42.77

45.23

42.36

45.11

41.61

44.41

43.75

39.63

46.15

38.36 44.55 44.44

41.82

42.07

fossé

41.29 41.06

53.79

51.23 51.76

38.50

42.71

45.00

47.26

41.65

41.82

41.57

44.00

43.75

52.75

39.45

47.35

49.40 48.96 44.28

44.72

43.76

43.69

48.68

47.10

46.00

46.88

44.53

43.76

42.77

43.76

43.52

42.33

42.07

53.50

» Pente de terrain (9 à 16%, Différence 13,5m)

41.81 41.00

40.80

40.60 40.50 53.00

52.46

39.06

38.67 38.48

46.57

38.20

42.99

Corniche

42.82

.00

41.88

53.50

39.93

54.82

42.71

54.03

54.57

.50

39.63

Project phase: developed the concept and the schematic phase 43.64

53.00

0 52.5

48.00

47.55

52.00

48.50

38.20 45.90

54.98

53.13

50.53

51.50

49.00

50.29

49.01

53.00

45.70

48.53

38.76

21 juin

54.00

38.50 49.02

38.90 50.00 49.38

52.65

48.50

52.14

52.58

53

43

42.99

54.00

53.70

+/-42.10

+/-42.80

44.98 47.77

38.45

38.68

43.00

42.50

43.32

43.50

43.75

54.98

53.13

Faîte

49.02

+/-41.80

47.50

51.00

50.50

50.00

49.50 49.09

49.09

47.10

45.00

48.00

42.97

40.85

44.50

53.33

44.44

50.79

Corniche

50.00

43.71

42.08 38.68

54.50 52.65

53.79

39.45

49.06

47.50

51.07 47.25

51.07

49.58

49.33

46 .00 49.00

52.68

52.50

52.00

.00

.00

53.00

46.89

49.32

38.48

49.00

47.43

Corn

49.35

53.50

52.82

46.80 51.23

38.67

38.45

52.50

47.11

54.03

53.70

49.43

47.43

47.

38.6800

46.50 49.50

.25 iche +/-46

52.00

0 47.5

47.25

42.25

51.50

48.00 47.50

54

53

53.00

48.50

46.80 46.89

.00

54.00

44.27

38.80

54.81 52.58

50.53

39.06

49.29

42.24

54.50

47.55

50.79

38.83

47.11

50.00

54.82

0

54.81

49.06

51.07

54.09

50.29

49.01

53.33

52.75

47.92

54.57

53.5

54.09 47.92

45

54.00

49.00

47.55

47.25

50.50 38.80

54.98

53.13

50.53

45.90

.50

51.00

15° 40° 65°

0

50.29

49.01

52.50

52.00

49.33

52.65

51.50

46.00

45

46.89

50.72

49.38

52.58

.5

51.07

+/-46.25

Corniche

42.96

51.76

48.96

45.50 45.25

43.35 43.15

42.96 42.28

42.33

40.77

44.55 52.78

45.31 +/-43.45

49.09

39.68

43.17

41.81 41.00

45.00

40.22

45.66

52.14

50.00

48.00

43.50

42.94

42.88

44.19

49.33

52.78

52.46

39.63

51.00

50.50

49.50

49.00 Bas toiture

48.53

48.15

38.83

47.43

46.62

42.24

+/-42.65

39.66

52.00

51.50

Faîte

+/-47.50

Faîte

fossé

40.50

39.45

40.06

49.35

+/-43.50

48.50

44.00 38.80

42.14

+/-45.20

Corn

43.15

44.00

43.75

52.68

52.50

39.46

39.44

Faîte

+/-43.65

Corniche

+/-40.85

48.52

46.27

41.84

+/-45.20

Faîte

44.41

44.44

49.32

49.58

52.1449.06

47.50

42.19 41.06

40.74

Faîte

43.82

44.50

43.65

» Conte xte arbor é

47.92

52.00

51.50

46.80

.20 +/-51

49.29 49.58

45.70 45.44

52.50

21 dec

47

49.32

39.66

52.68

21 juin 21 mars-sep

45.11

0

54.82

0

49.29

39.68

47.55

52.82

51.66

51.07

46.50

42.25

53.00

» Orientation (Nord-Est) Faîte

47.43

47.00

42.24

53.5

50

0

48.00

ROLE

.5

47.11

48.

00

47 47.25

44.87

45.0

.5

44.19 53.00

50.72

39.27

Corniche

40.80

41.88 40.60

39.93

53.50

39.30

51.66

39.68 38.90

44.50

49.43

48.10

46.15

42.82

42.71

54.03

52.82

39.06

38.67

51.07

38.76

39.66

49.38

38.50

44.00 43.78

46.88

43.52

46.00 42.09

42.03

42.12

47.10

48.50

46.00

47.35

44.53

46.14 43.29

42.69 41.97

0

47.17

46.50 46.34 46.23

44.23

46.50 42.71

42.50 42.08

42.00

49.40

48.50 48.00

47.50

47.00

46.79

40° 65°

44.98 47.00

43.71

43.00

42.96

42.03 42.12

54.03

+/-42.10

+/-42.80

45.00

44.53

+/-41.80

40.85

+/-41.80

43.35

42.96 42.28

42.36

+/-43.45

Bas toiture

42.09

+/-42.10 Faîte +/-42.80

Bas toiture

42.27

52.82

50.72

42.14

38.80

Corniche

50.25

49.00

49.0

47.26

44.00

43.50 43.82

43.00

42.99

44.27 54.00

38.48

45.00 38.36

44.53

43.42

43.78

45.11

43.32

54.00 53.70

41.61 51.66

49.35

44.44

51.23

Faîte

Faîte

+/-47.50

43.29

41.97

42.00

54.50

41.65

39.68

53.84

52.00

51.23

50.00

49.02

49.02

47.77

45.31

47.5015°

44.50

44.00

44.65

47.43

43.15 43.17

54.50

53.70

38.45

47.43

38.20

45.00

44.50

44.00

44.87

43.65

45.66

45.00

45.11 45.40

44.41

46.57

43.50

49.02

48.00 45.50

45.23

48.15

44.00

43.75

47.10

49.00

48.50

21 dec

46.00

47.10

46.15

46.62 43.75

54.81

45.50

38.68

47.00

45.90

45.50

43.99

54.57

53

54.00

52.50

49.06

47.50

54.98

53.13

50.53

0

42.88

54.09

38.83

38.80

47.11

46.50

46.00 45.70 45.44

43.64

42.39

44.55

49.00

48.50 48.

46.80

54.03

47.25

Corniche

44.65

54.82

+/-42.65 Corn 49.06

47.50

45.23

+/-46.25

42.25

+/-45.20

Faîte

47.92

46.80

46.89

42.24

45.11

45.40

44.19

54.50

54.00

50.53 47.55

46.00

50 m

25

5

0

46.15

52.50

0

52.00

51.5

49.01

54.81

53.70

46.57

44.27

52.65

52.00

52.58

50.29

51.50

.00

0 49.0

49.33

53.00 52.98

51.50

50.61

50.00

47.35 49.50

21 juin 21 mars-sep 46.14

48.52

44.50

54.81 54.09

fossé

51.07

49.43

43.42

42.24

Faîte

+/-43.50

Faîte

Corniche

+/-43.65

+/-40.85

Corniche

42.69

49.38

39.66

52.50

50.79

50.50

47.77

47.00

48.53 46.50

48.10

46.27

44.55

44.44

42.94

54.57

51.00

53.50 53.79

52.67

47.50

49.35

49.43

44.19

43.42

42.24

41.84 42.14

53.13 53.50

53.78

53.71

53.33

52.63

52.75

52.46

49.09

46.57

44.53

44.27

45.00

42.19 54.98 41.06

54.00

51.00

46.62

47.35

0

44.00

42.39

52.65

40.74

54.82

41.82 41.29

41.06

21 mars-sep

51.50

54.04

50.61

52.78

51.76 50.00

49.02

47.43

46.27

44.5

52.58

50.29

+/-45.20

52.14

51.50 49.00

48.50

48.00

48.15

45.90

45.00

43.99

43.64

51.07

39.68 49.01

Faîte

e +/-41 .80

51.23

52.00

53.13

41.57

44.53

44.00

41.84

44.23

39.27

Corniche

42.71

38.36

42.50

47.43

+/-42.65

52.50

52.00

53.84

Bas toitur

52.50

» Orientation (Nord-Est)

49.38

46.00

45.50

42.94

42.88

49.29

49.33

39.66

52.68

50.79

50.72

45.70 45.44

43.42

42.24

49.32

49.58

46.14

43.00

+/-43.84

51.07

42.88

+/-42.65

Corn

54.82

+/-45.90

49.29

49.58

+/-45.20

54.57

47.77

42.25

41.84

+/-42.65

53.00

+/-43 .45

53.79

53.50

49.50 51.66

48.53

51.07

48.52

Cornic

+/-42.30

+/-43.30

49.32

42.14

Corniche

Faîte

.00

53

54

.50

54.98

Faîte

+/-45.20

Faîte

52

52.00

51.50

52.65

Corn

49.35

47.43

42.14

+/-45.20

Faîte

53.33

52.75

52.82

46.50

43.50

Faîte

Corniche

.00

42.94

E in• two D density I A G zones: N O Smedium T I Cand high density The site was split

42.24

42.39 42.19 41.06

40.74

+/-45.20

Faîte

47.00

46.50

51.00

Faîte

52.78

52.46

50.50

49.43

48.10

47.11

47.00

47.50

50.72

54.03

50.00

0

47.25

44.53

52.14

50

+/-47.

+/-45.20

Corn

0

43.67

48.15

54.00

Faîte

40.06

39.44

38.20

43.00

42.08

50.53

49.06

47.43

du Piro

42.77

42.36

42.27

46.62

51.50

Faîte

53.70

42.96

54.57

53.50

48.15

Chemin

42.97

42.33

42.07

40.85

+/-41.80

52.00

54.50

50

+/-43. 49.09

Faîte

49.06

15° 40° 65°

44.50

44.00

Cornic

54.81

54.09

51.66

49.00

48.33

47.17

47.00

46.50

43.52

44.78 44.28 44.72

43.69

43.67

+/-47.50

46.00

45.25

39.46

38.90

49.74

49.09

47.50

46.79

47.10

44.23

42.09

42.33

42.77

42.36

42.27

Faîte +/-43.45

Faîte

45.50

40.85

39.63

39.30

38.67

38.48

54.98

43.99

42.39

42.19 41.06

40.74

+/-45.20

53.00 52.98

40.22

39.06

38.45

38.76

43.17

48.52

53.78 Faîte

53.50

52.67

0

+/-51.20

43

42.24

41.84

Bas toiture

47.50

43.99

43.64

5

he +/-40.8

iche +/-42 .10 Faîte +/-42 .80

he +/-43.6

Faîte +/-43.3

Faîte

.50

40.74

+/-42.10 Faîte +/-42.80

Faîte +/-43.45

+/-47.50

48.00

43.00

43

52.58

42.09

42.03

42.12

41.61

40.77

47.43

+/-43.65

Faîte

+/-43.50

Faîte

fossé

41.29

41.06

fossé

40.50

Corniche

parking with access to all buildings in a minimum distance. +/-40.85

41.65

41.82

41.57

40.80

41.88

40.60

40.22

40.06

46.27

39.44 39.27

Corniche

Corniche

44.76

39.63 39.46

38.90

38.76 38.50

41.81

41.00

42.71

38.48

38.36

44.20

43.69

0

Corn

5

52.68

52.50

47.5

43.50

42.82

43.00

42.99

39.93

39.06

38.67

38.45

+/-46.25

41.97

42.00

43.32

43.50

43.75

39.45

38.83

38.68

Corniche

44.72

43.35 43.15

46.80 46.89

45.00

53.00

he +/-42.3 Cornic

42.08

44.00

43.75

39.68

39.66

43.42

38.20

42.19 41.06

42.96 42.28

49.38

48.00

44.44

0

39.30

42.39

51.07

44.78 44.28

45.00

43.76

43.52

43.29

42.69

48.50

45.25 44.53

44.23

42.71

42.50

49.00

44.98

43.71

43.00

53.00

.0

38.80

49.32

49.58

42.96

43.17

45.90

45.50

39.27

53.50

54.82 52.82

Cornic

51.07

45.70 45.44

54.03

54.57

43.64

54.00 53.71

52.63

39.44

54.00

53.70

50.53

47.92

38.36 46.00

48.50

54.50

53.5

53.13

45.90

44.50

54.04

40.06

51.76

54.81

50.00

54.98

54.00

44.00

43.78

43.50

43.15

43.65

47.0047.5547.43

46.50

42.25

52.50

44.41

49.02

47.11

42.24

52.00

44.50

49.00

49.01

54.09

52.65

50.29

49.33

38.90

54.82

38.76

52.58

51.50

44.00

44.65

45.11

43.82

44.55

45.50

53.00

48.52

44.87

45.00

46.88

54.57

0

51.07

38.50

47.25

53.5

53.13

49.32

49.58

49.06

47.50

52.65

45.00

39.46

51.23

54.98

54.00

45.40 44.19

44.53

46.00

46.34 46.23

52.50

Corn

46.50 45.31

44.50

Having a slope entrance to the site and to make an underground 44

47.10

47.00

46.79

45.66

45.50

45.23

45.00

43.99

43.64

48.33

47.17

46.15

45.11

48.68

47.50

46.00

46.57

44.27

49.00

38.67

38.48 49.29

46.80

46.89

45.50

44.98

43.71

38.83

38.68

00

42.03

42.07

42.97

42.33

42.07

41.61

de Huy

49.74

49.50

49.50

48.96

48.00 47.26

46.34

46.23

44.98

46.50

42.12

41.61

46.88

41.06

40.77

46.23

0

47.17

43.29

42.69

41.97

fossé

41.29

fossé

47.

42.71

42.50

41.65

41.82

41.57

40.80

41.88

40.60

40.50

52.58

41.81

47.00

45.70

39.63

39.30

52.65

50.29

49.01

50.53

38.20

43.82

43.15

41.81

46.34

41.00

42.71

43.71

46.79

43.00

42.08

42.00

42.82

43.00

42.99

+/-46.25

44.00

43.50

42.96

43.17

43.32

43.50

39.45

0

+/-43.50

40.77

40.06

Corniche

+/-43.65

+/-40.85

Faîte

e Chaussé

50.00 49.09

49.40

48.50

0

45.31

44.50

44.00

43.82

43.15

43.65

45.66

45.00

43.78

45.11

44.41

44.00

43.75

39.93

43.50

51.07

50.29

44.50

43.75

38.80

45.11

47.50

47.11

46.50

40.77 46.00

15° 40° 65°

39.06 52.58

38.45 49.33

47.92

49.50

0 47.5

42.94

42.88

48.53

49.50 49.09

48.47 47.26

42.24

41.84

+/-42.65

49.74

49.40 48.96

48.00

46.14

+/-45.20

Faîte

49.00

47.10

46.50

38.68

47.55

21 dec

48.00

48.10

51.23

50.00

49.02

47.35

47.00

48.50

46.27

42.14

+/-45.20

53.00 52.98

52.50

52.00

51.50

51.00 50.50 50.25

48.50

43.00

43.42

Cornic

53.78

53.50 52.67

49.00

43.50

40.74

Faîte

0

54.00 53.71

E • DIAGNOSTIC

5 50.00 he +/-46.2

54.04

52.63

49.35 50.61

47.50 47.43

.5

53.84

51.76

47.77

46.62 42.19 41.06

53.79

51.23

49.09

48.00

51.07

49.58

50.50

53.33

52.75

50.00 49.02

49.00

48.50

48.15

42.39

44

52.78

52.46

50.79

50.00 49.50

52.00

.00

50.79

49.29

21 mars-sep

52.14

51.00

50.50

49.00

47.5

45.50

45.23

44.65

44.87

44.55

44.44

45.31

44.00

48.33

47.10

45.00

43.76

43.35

43.15

42.96 42.28

42.09

42.03 42.12

fossé

41.06

fossé

40.50

39.63

39.46

39.44

39.27

Corniche

Corniche

50.00

51.23

50.50 50.25

49.02

48.0

46.14

46.00

45.40

45.00

45.66

39.68

44.00

43.78

48.47

47.50

47.00

45.50

45.25

43.52 43.29

42.69

41.97

46.88

44.53

44.23

42.71

42.50

41.57

41.29

40.80

40.60

41.65

41.82

41.81

41.00

42.71

38.90

38.76

38.50

38.36

50.25

51.50

50.61

51.00

46.50

45.11

47.25

42.25

45.44

40.22

49.32

52.00

51.50

53.00 52.98

52.50

48.68

52.00

49.40 48.96

0

47.10

47.26

46.15 44.27

44.19

47.50

fossé 42.24

40.50

38.83

38.80

52.50

49.43

48.52

49.00

52.68

50.72

48.53

48.10

44.53

44.00

51.50

53.00

52.82

51.66

49.35

49.43

45.00

44.50

45

50.72

53.50

49.38

51.07

49.38

45.90

45.50

43.99

43.64

51.50

47.43

47.00

46.00 45.70 45.44

42.94

42.88

45.50

44.50

53.00

47.50

47.11

46.50

42.25

45.90

.50

42.24

+/-42.65

45.00

54.00

49.06

47.50

47.25

42.24

45

41.84 42.14

+/-45.20

Corn

+/-51.20

46.80 46.89

46.00

45.70 45.44

46.89

40.80

41.88 40.60

39.93

21 dec 53.84

39.45

41.00 46.80

21 mars-sep 53.79

47.92

43.00

42.71

21 juin

53.33

52.75

52.67

49.09

0

48.5

47.35

53.78

53.50

52.63

49.0 47.77

47.00

46.57

Faîte

45.23

49.01

43.32

43.50

42.99

52.78

52.46

+/-45.20

53.71

51.76

49.02

49.02

47.50 47.43

46.62

Faîte

46.50

42.25

49.33

47.55

52.14

21 juin

41.06

40.74

Faîte

46.00

39.06

+/-46.25

50.5

54.00

51.23

50.00

49.00

48.50

48.15

46.27

43.00

42.08

42.00

42.82

43.00

42.99

40.22

38.67

38.45

38.48

Corniche

51.23

50.79

49.50 48.53

47.10

48.52

43.42

38.50

49.29

49.58

43.65

42.82

52.00

51.00

51.00

53.79

54.04

49.35

48.10

44.53

48.00

49.32

44.41

51.50

52.75

50.00

47.35 0

39.66

44.00

43.75

15° 40° 65°

54.03

50.61 53.33

50.50

49.43

45.00

44.5

38.83

38.80

39.30

52.78

52.46

51.00

49.00

46.00

46.34

46.23

44.98

43.71

43.50

42.96

43.32

43.50

43.75

41.88

51.50

52.14

51.50

45.90

45.50

43.99

43.64

42.39 42.19

53.00

48.53

A . E S Q U I S S E D ’A M É N A G E M E N T (5) A . E S Q U I S S E D ’A M É N A G E M E N T (5) stant

39.45

52.00

52.68

52.50

49.09

48.00

44.00

43.78

43.82 43.17

49.50

48.96

47.17

45.31

44.50

44.00

45.11

43.15

43.65

51.23

49.74

49.40

48.50

46.50

45.00

44.65 44.87

44.41

44.00

43.75

46.79

45.66

45.50

45.23

45.11 45.40

44.50

r exi

53.00 52.98

52.50

52.00

51.50

51.00

50.50

50.00

47.26

46.15

44.55

53.78

53.50

52.67

50.25

49.00

47.10

46.00

46.57

45.00

Mu

54.00

53.71

52.63

50.61

49.02

47.35

47.00

44.19

38.68

53.50

53.84

44.00

52.50

48.00

42.24

44.50

44.44

47.50

44.27

52.50

54.03

52.82

50.72

51.76

47.77

46.14

42.94

42.88

38.20

54.00 53.70

51.66

54.04

51.23

50.00

49.09

48.00

46.62 42.24

41.84

53.79

50.79

49.02

49.00 48.50

46.50

42.14

39.66

53.00 52.98

54.50

49.38

45.70 45.44

47.00

46.50

45.11

» Conte xte arbor é » Orientation (Nord-Est)

52.82

51.66

51.07

54.00

53.70

20

48.50

54.50

+/-42.65

53.33

52.75

53.84

50.00

49.50

46.27

53.78

53.50 52.67

54.81

49.09

51.07

46.50

47.50

52.00

54.81 54.09

52.78

52.46

44.44

52.63 54.82

0

52.00

Corniche

43.75

+/-51.

54.82

+/-45.20

43.42

54.57

53.5

47.43

47.00

46.14

52.14

50.50

39.93

50.00

54.98

53.13

49.06

53.00

47.25

47.11

51.50

54.57

53.50

53.13

44.55

50.29

49.01

47.50

46.00

44.87

Faîte

53.00

49.00

CHALLENGE

54.98

54.00

52.50

52.00

51.50

52.65

Faîte

47.92

46.80 46.89

47.77

42.25

45.40

48.00

52.58

50.53

15° 40° 65°

49.02

42.24

48.50

51.07

50.29 49.01

with the developer.

39.68

52.50

+/-45.20

Corn

48.00

54.03

52.82

50.72

49.35

42.14

+/-46.25

» Contexte bâti

52.00

51.50

51.00

39.68

44.65

45.00

52.68

52.50

44.53

44.00

42.19 41.06

40.74

Faîte

54.00 53.71

Différ ence 13,5m) » Pente de terrain (9 à 16%, » Conte xte bâti

46.15

39.66

53.00

C

46.57

44.19

49.00

49.29

47.92

+/-42.30

49.32

49.58

49.33

47.43 47.55

+/-43.30

0

47.00

50 m

25

44.27

53.5

21 dec

53.79

51.76 52.65

54.09

42.88

0

21 mars-sep

52.75

52.58

50.53

5

52.68

50.72

49.35

49.43

48.15

53.84

47.55

47.43

53.50

52.82

51.66

51.07

49.38

43.99

42.39

51.23

48.50

46.27

54.03

53.00

45.90

45.50

43.64

51.07

44.76

0

.65 +/-42

52.46

49.33

44.20

Faîte

.5

47.11

Corniche

47 47.25

+/-42.10 Faîte +/-42.80

54.00

46.00 45.70

50.79

49.00

48.53

44.72

43.69

43.67

42.27

46.62

+/-43.84

47.50

Corniche

+/-41.80

54.50

53.70

47.43

47.00

47.43

44.78

44.28

45.00

43.35

42.77

42.36

41.61

40.85

Faîte +/-43.45

Bas toiture

54.82

54.81

0

47.11

46.50

54.04

48.15

39.44

54.57

53.50

54.09

47.5 47.25

42.25

53.33

49.29

42.97

42.33

42.07

43.15

42.96 42.28

42.09

42.03

42.12

54.98

53.13 50.53

49.06

47.50

46.89

42.24

49.32

+/-47.50

Faîte

+/-43.50

Faîte

49.01

47.92

46.80

49.58

+/-45.90

00

46.80 46.89

43.29

42.69

41.97

52.65

48.53

49.50

fossé

41.29

41.06

52.58

50.29

49.33

47.55

50.00

49.74

43.76

+/-43.65

Corniche

+/-40.85

Corniche

38.36

51.07

48.52

50.50

51.23

40.77

40.50

40.06

39.27

38.20

42.94

49.29

48.10

48.33

45.50

45.25

44.53

43.52

42.71

42.50

41.57

fossé

40.60

40.22

39.46

38.90

38.76

38.50

43.42

54.0021 juin 54.03

53.70

49.32

52.78

48.68

44.23

43.00

42.08

48.52

41.65

41.82

41.81

41.00

40.80

41.88

Corniche

48.

49.06

50 m

49.58

49.09

49.35

47.10

Faîte

54.09

47.92

46.88

44.98

43.71

43.50

42.96

43.17

42.00

42.82

43.00

42.99

42.71

.20 +/-45

25

5

52.14

46.00

46.34

46.23

44.00

43.78

45.11

43.15

43.65

43.32

43.50

43.75

39.93

54.50

0

49.00

43.00

0

48.50

47.55

45.31

44.50

44.65

44.41

44.00

43.75

39.63

39.30

» Orientation (Nord -Est) project 54.81

Corniche

Diffé rence 13,5m) » Pente de terrain (9 à 16%,

45.00

48.47

43.82

44.50

39.45

39.06

38.67

38.45

38.48

.00

49.0

0

42.27

40.85

45.44

49.00

47.17

44.00

45.40

44.87

44.55

44.44

38.83

42.14

Corn

54.82

.5

+/-42.10

+/-42.80

+/-41.80

» Contexte arboré

21 dec

53.00 52.98

52.50

52.00

51.50

51.00

49.50

48.96

47.50 47.00

46.79

46.50

45.11

48.10

45.00

44.53

43

Faîte

54.57

53

Faîte

+/-43.45

50.50

50.00

47.26

45.66

45.50

45.23

44.19

39.68

42.24

Bas toiture

50.25

49.40

48.50 48.00

46.14

39.66

43.50

.00

.00

53

54

.50

54.98

53.13 50.53

52.67

49.00

47.10

49.43 46.00

0

+/-46.25

41.84

Faîte

+/-47.50

51.00

50.72

53.50

52.63

50.61

49.02

47.35

47.00

46.50

.5

+/-51.20

52

50.29

53.78

53.71

51.76

49.09

47.77

47.50

theEprocess • D ofI Aco-creation G N O of S the TI

densify the area and to keep the surface as permeable as possible. 49.01

54.00 51.23

50.00

49.02

48.00

45.00

Corniche

42.39

42.19 41.06

40.74

.20 +/-45

Faîte

Corniche

+/-43.65

Faîte

+/-43.50

54.04

50.00

49.00

46.15

Faîte

52.00

51.50

52.65

Faîte

51.50

53.79 53.84

48.50

46.57

38.68

41.61

41.06 40.77

40.50 40.22

40.06

39.44

39.27

+/-40.85

21 mars-sep

53.33

52.75

52.46

49.50

48.15

38.80

fossé

44.76

fossé

41.29

40.80

41.88 40.60

15° 40° 65°

44.20

39.46

38.90

+/-42.65

39.66

44.78

44.28 44.72

43.76 43.69

43.67

44.50

51.66

48.53

48.52

.0

41.00

42.71

45.00

43.35

42.97

42.77

42.36

39.63

39.30

38.67

38.76

21 juin

52.00

analyses were very important in

52.58

38.45

38.48

52.68

52.82

46.27

42.88

0

44

41.57

43.00

42.99

39.93

42.33

42.07

43.15

42.96 42.28

42.09

42.03 42.12

54.03

52.50

50.50

49.38

49.35

49.43

44.53

42.94

42.14

44.27

44

43.99

44.53

43.52 43.29

42.69 41.97

47.10

45.50 45.25

42.71

42.50

41.65

41.82

39.45

39.06

38.68

53.00

50.79

+/-42.65

Corn

51.07

49.33

52.78

51.07

51.00

50.72

43.50

Faîte

43.00

42.08

41.81

46.00

46.88

46.23

44.98

43.71

44.23 42.96

42.00

42.82

48.47 48.33

46.50 46.34

44.00

43.50 43.82 43.17

43.32

43.50

48.68

47.00

46.79

45.31

44.50 44.00 43.78

45.11

43.15

43.65

43.75

38.83

38.80

+/-46.25

53.50

and schemes, the following

49.32

49.29

54.00

53.70

52.14

+/-45.20

43.64

45.66

45.00

44.65 44.87

44.41

44.00

43.75

+/-45.20

Corn

49.00

21 dec

54.50

51.50

51.66

51.07

43.42

42.24

45.23 45.11 45.40

44.50

44.44

+/-42.30

52.00

45.00

44.00

49.09

47.50 47.17

+/-45.20

Faîte

49.74

49.50

48.96

48.00 47.26

45.50

Faîte +/-43.30

52.50

43.99

41.84

49.40

48.50 46.14

46.00

42.39

42.19 41.06

40.74

Faîte

50.00

49.00

46.50

46.15

Corniche

47.43

52.68

46.62

0

21 dec

51.23

50.25

49.02 47.10

21 juin

54.82

0

47.43

49.58

54.09

54.00

53.00

53.00

48.10

.0

51.00 50.50 47.35

45.00

44.55

54.00 53.70

51.66

44.53

44.00

51.50

50.61 47.77

47.00

44.19

+/-43.84

53.50

52.82

49.38

45.90

43.64

42.19 41.06

48.00

47.50

44.27

39.68

39.66

54.50

49.43

48.10

43.99

43.64

Faîte +/-45.90

54.03

53.70

44.50

E • DIAGNOSTIC

Corn

54.82

51.07

49.38

45.00

53.00 52.98 52.50

52.00

46.57

Corniche

48.00

00

45.90

45.50

45.44

.00

.50

45

52.67

45.90

45.50

44.50

53.50

52.63

49.02

47.43

45.44

53.78

49.09

42.94

+/-51.20

54.50

54.00

47.43

46.00

45

+/-45.20

50.00

49.00

48.50

Faîte

48.50 49.06

47.

45.70

46

45.70

number of properties available and high demand. The idea was to

43.00

.00

0

54.81

46.50

45.44

51.76

49.50 48.53

42.88

» Orientatio n (Nord -Est)

.5

In order to develop the scenarios

property caractheristics, was suffering real state pressure from low

46.89

.00

53

53.00

54.00

52.50

52.00

51.50

.5

49.00

54.82

50.53

46.50

42.25

54.00 53.71

15° 40° 65°

54.57

47

42.24

42.39

0

54

0 54.98

53.50 53.13

47.50

47.00

42.25

40.74

50.53

43.50

52.50

52.00

0 51.5

48.0 52.65

54.09

0

54.04 51.23

46.62

42.24

+/-42.65

21 mars-sep

53.79 53.84

42.14

+/-45.20

Faîte

54.57

53.50

54.81

46.00

50.79

50.00

46.50

42.25

45.70

52.75

54.57

53

53.13

50 48. 52.58

47.5

42.24

50.50

47.43

47.00

53.33

48.15

Corniche

54.09

51.07

50.29 49.01

47.25

50.72

47.11

52.78

52.46

51.00

47.50

47.25

52.14

51.50

46.27

Corniche

49.06

49.29

52.00 51.66

21 mars-sep

49.32

49.33

52.68

52.50

48.52

38.36

54.98

53.50 53.00

46.89

21 juin

54.03

52.82

43.42

41.84

+/-45.20

54.98

53.13

49.06

53.50 54.00 53.70

48.10

44.53

38.20

52.65

54.81

49.58

47.50

47.55

Faîte

47.92

47.50

52.58

47.92

46.80

Located just before the entrance of the village, the site, with a rural

42.19 41.06

40.74

Faîte

52.65

54.09

46.80

49.35

38.50

47.11

47.55

49.43

43.99

42.39

Corniche

46.89

.5

52.50

48.00

51.07

50.29

50.53

42.24

53

48.50

49.32

49.58

47.25

53.13

45.90

45.50

52.58

47.92

54.50

49.38

46.00

E • DIAGNOSTIC

STUDIES

51.07

50.29 49.01

47.55

54.82

51.07

44.50

47.11

50.29

47.43

47.00

46.50

42.25

44.00

46.80

49.01

52.00

49.00

47.11

42.24

43.64

46.89

49.33

51.50

47.25

50.53

54.57

53.50

45.00

47.92

49.29

49.06

47.50

45.70

47.55

49.29 49.58

49.33

54.98

53.13

54.81

47.92

46.80

46.89

49.01

49.32

15° 40° 65°

52.65

54.09

49.29

21 dec

52.58

50.29

50.53

45.44

49.33

» Pente de terrain (9 à 16%, Différence 13,5m)

21 juin 21 mars-sep

51.07

49.01

47.55

49.00

PROJECT

49.29

49.33

RESIDENTIAL MASTER PLAN

» Orientation (Nord-Est)

49.32

49.58

SECTION


REHABILITATION OF 12 SUBWAY STATIONS

BROOKLYN, NY | 2011

9th Avenue 50th Street 55th Street 71st Street

Fort Hamilton Parkway

62nd Street Station

79th Street 18th Avenue 20th Avenue

Bay Parkway

North Mezzanine (closed to Public)

South Mezzanine - FULL TIME

Rehabilitate Street Stairs

Remove stairs and walls

Remove Vestibule

Reconfiguration of Control Area

Rehab Floor Slab

Remove Exterior Walls

New Platform Stairs

9TH AVENUE STATION

Maintain EDR and Comm Rooms

25th Avenue

EXISTING NORTH MEZZANINE

Bay 50th Street

EXISTING SOUTH MEZZANINE

West End BMT Four Stations, Line Structure, CCR Risk Assessment Workshop

PROJECT The scope of this project was to renovate and rehabilitate twelve stations,

North Mezzanine - UNMANNED

FORT HAMILTON PARKWAY STATION

to repair 9,7 kilometers of the steel and concrete viaduct, including spatial

Free transfer

reorganization to improve circulation, give visual coherency to the West

HEET, Railings, gates

South Mezzanine - FULL TIME New Walls and Entrance additional Station Rooms

Fire Standpipe System

End Line of the NYC subway, historical preservation, compliance with the

Open Balconies to Platform

Platform and Street Stairs

Americans with Disabilities Act (ADA) providing accessibility upgrades,

Maintain EDR

integration of public art, and modernization of building systems.

Communications System

CHALLENGE NORTH MEZZANINE CONFIGURATION

SOUTH MEZZANINE CONFIGURATION

Having to conduct field investigations, plan the construction and changes in a way so as to keep all stations active at all times creating perpetual access to the ticket booths, turnstiles, platforms and street. To provide a better accessibility in these hundred years old structure stations

BAY PARKWAY STATION

through the upgrade of all platforms to reduce the gap between the train and the platform.

REHABILITATION, EXTENSION AND RESTORATION - CITY PROJECTS

ROLE Project phase: I coordinated the extensive station renovations at Fort

PLATFORM PLAN

Hamilton Parkway; the stairs and canopies renovation for all the stations; and I was responsible for the working sequences schemes for the principal stations: Ft Hamilton, 62nd Street, 9th Avenue and Bay Parkway, the latter two are listed on the National Register of Historical Places.

Relocate Agent to North Mezzanine to Maximize Work

Construction phase: managed the construction administration, represented

Area at South Mezzanine

the firm in meetings, received and approved project submittals and shopdrawings.

NORTH MEZZANINE WORK RESTRICTIONS AND SEQUENCE

SOUTH MEZZANINE


INTERIOR FIT-OUT INTERIOR FIT-OUT 100% 100% CONSTRUCTION CONSTRUCTION DOCUMENTS DOCUMENTS 100% CONSTRUCTION DOCUMENTS STONY BROOK UNIVERSITY STONY BROOK HOSPITAL UNIVERSITY HOSPITAL

CPEP | STONY BROOK UNIVERSITY MEDICAL CENTER EXTENSION

FEBRUARY FEBRUARY 22, 22, 2010 2010 STONY STONYBROOK, BROOK,NEW NEWYORK YORK

PROJECT

EXIT 3 SEE SEEA-104 A-104FOR FOREXTENT EXTENTOF OFWORK WORK 43 PERSONS EXITING CPEP ININEXTERIOR EXTERIORSHELL SHELLAND ANDSITE SITE 340 PERSONS CAPACITY CONTRACT. CONTRACT. @ EXIT

COMPREHENSIVE COMPREHENSIVE PSYCHIATRICPSYCHIATRIC EMERGENCYEMERGENCY PROGRAM PROGRAM

was an extension of the

4-020 4-020

4-023 4-023

4-022

FEFE

4-021A

4-039 4-039

FAFA

4-045 4-045

122 sf

4-030 4-030

AA

REFUGE REFUGEAREA AREA

REFUGE AREA FAFA

PYXI S

PYXI S

121121 sf sf

FEFE

118 sf

120120 sf sf

4-028

4-029 students to and medical

8' 8' - 0" - 0"

22 3' 3' - 8- 1/4" 8 1/4" EXIST EXIST . . A321 A321

22

STST STL STL BASE BASE

APPLICABLE APPLICABLECODES CODES

LEVEL LEVEL4 4 0"0"

BUILDING BUILDINGCODE CODE1'OF NEW NEW YORK YORKSTATE, STATE, 1' -OF 8" - 8" 8' 8' - 0" - 0" 8' 8' - 0" - 0" 2007 3'2007 3' - 8- 1/4" 8 1/4" EXIST EXIST . . FIRE FIRECODE CODEOF OFNEW NEWYORK YORKSTATE, STATE,2007 2007

8' - 0"

EXIST2 A321

3' - 8 1/4" .

T.O. METAL DECK 11' - 4" 22 ED EDMAIN MAIN ENTRANCE ENTRANCE ELEVATION A303 A303 33 5 = 1'-0" SCALE SCALE1/8" 1/8"= =1'-0" 1'-0" SCALE 51/8" A321 A321

A.

ST STL BASE

STST STL STL BASE BASE

LEVEL LEVEL4 4 0"0"

LEVEL LEVEL4 4 0"0"

BUILDING CODE 1'OF YORK STATE, 2007 - 8" NEW 8' - 0" 8' - 0" 3' - 8 1/4" . FIRE CODE OF NEW YORK STATE, 2007

22

A303 A303

7 33 A303 A303 A303

5

0' - 4" TYP

A321 METAL METAL PANELS PANELS

T.O. T.O.METAL METALDECK DECK LEVEL 4 LEVEL 4 14' 14'- 0" -40" 7 LEVEL A303 0"0" 0"B O FASCIA B BOOFASCIA FASCIA 10' 10'- 8" - 8" 10' - 8"

The CPEP’s exterior

1'-0"

5

77 A303 A303

LEVEL 4 0"

1" 1" INSUL INSUL SPANDREL SPANDREL GLGL 2 ELEVATION ELEVATION ED MAIN ENTRANCE A303 55 3 1" 1" INSUL INSUL GL GL SCALE SCALE SCALE 1/8" 1/8"=1/8" =1'-0" 1'-0" = 1'-0"

2

A

LEVEL LEVEL4 4 0"0"

REVISION NO.

HONED HONED FACE FACE CMU CMU

1' - 8" PROPOSED PROPOSED CPEP CPEP EXISTING EXISTING

T.O. PARAPET EMERGENCY EMERGENCY DEPARTMENT - 0" DEPARTMENT T.O. METAL DECK LEVEL 4 KEYPLAN 14' - 0" KEYPLAN 0"

OPP OPP 2 2 A303 HND HNDA303 HONED HONED FACE FACE CMU CMU

3 A303

DATE:

3 A303

PROPOSED PROPOSED CPEP CPEP

KEYPLAN

5

ELEVATION 1/8" = 1'-0"

N PROPOSED CPEP

2 OPP HND A303

1" INSULSCALE GL

7 A303

METAL PANELS

LEVEL 4 0"

N

EXISTING EMERGENCY DEPARTMENT

HONED FACE CMU

1" INSUL SPANDREL GL

E.E. 6.1. 6.1.

LEVEL 4 0"

VALVE CABINET

FA

FIRE FIREALARM ALARMPULL PULLSTATION STATION

FIRE ALARM PULL ST

FIRE EXTINGUISHER

DF DF

DRINKING DRINKINGFOUNTAIN FOUNTAIN

DF

DRINKING FOUNTAIN

AREA AREA

PERSONS PERSONS

AREA

LEVEL 4

SMOKE ZONE A

(9,245 (9,245SF SF/100 /100GSF GSFPER PERPERSON) PERSON)= =9393PERSONS PERSONS

9,245 9,245SF SF

REQUIRED REQUIREDREFUGE REFUGE

2,790 2,790SF SF

AVAILABLE AVAILABLEREFUGE REFUGE

4,700 4,700SF>2,790 SF>2,790SF SF

9393PERSONS PERSONSXX3030SF/PERSON SF/PERSON= =2,790 2,790SF SF

REVISION REVISION NO. NO.

EXISTING EMERGENCY DEPARTMENT

CHAPTER CHAPTER6 6- TYPES - TYPESOF OFCONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTIONCLASSIFICATION CLASSIFICATION

HONED FACE CMU

EXIT

FE

9,245 SF

(9,245 S

REQUIRED REFUGE

2,790 SF

93 PER

AVAILABLE REFUGE

4,700 SF>2,790 SF

9393PERSONS PERSONSTOTAL TOTAL

DATE:

PROPOSED CPEP

CODE COMPLIANCE -OPP LEVEL 5 PLAN 2 HND A303 1/16" = 1'-0"

2

DESCRIPTION

KEYPLAN

2 A303

1" INSUL SPANDREL GL

NN

ELEVATION EXISTING EXISTING METAL 4 PANELS EMERGENCY EMERGENCY SCALE 1/8" = 1'-0" DEPARTMENT DEPARTMENT ST STL BASE

2 A303

A

1"T.O. INSULPARAPET GL 17' - PANELS 0" METAL T.O. METAL DECK LEVEL 4 14' - 0" 0"B O FASCIA 10' - 8"

7 A303

17' ST STL BASE

LEVEL 4 0"

T.O. PARAPET 17' - 0" T.O. METAL DECK 14' - 0" BO FASCIA METAL COPING 10' - 8"

NN

METAL COPING

A303 HND HNDA303

METAL COPING

EXIT STAIR

FIRE FIREEXTINGUISHER EXTINGUISHERCABINET CABINET

SMOKE SMOKEZONE ZONEAA

DATE: DATE:

2 HOURS HORIZONTAL SHAFT T.O. PARAPET 17' - 0" ENCLOSURE FOR PIPING T.O. METAL DECK 14' - 0" KEYPLAN KEYPLAN

1' - 8"

A321 METAL METAL PANELS PANELS

DESCRIPTION

A

DESCRIPTION DESCRIPTION

EXIT SIGN

EXIT EXITSTAIR STAIR

E. 6.1.

DESCRIPTION DESCRIPTION

DATE: DATE:

REVISION NO.

CHAPTER 6 - TYPES OF CONSTRUCTION CONSTRUCTION CLASSIFICATION

DE

EAST EASTHANOVER HANOVERNJ NJ07936 07936

ST STL BASE CORRIDOR CORRIDORDOORS DOORS 4.4. CORRIDOR DOORS NYSBC NYSBC- TABLE - TABLE601, 601,2006 2006 TYPE TYPEIAIACONSTRUCTION CONSTRUCTION NYSBC - TABLE 601, 2006 TYPE IA CONSTRUCTION ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION ED MAIN ENTRANCE ELEVATION ELEVATION NO NOFIRE FIREPROTECTION PROTECTIONRATING RATINGREQUIRED. REQUIRED. NO FIRE PROTECTION RATING REQUIRED. NYSBC NYSBC - SECTION - SECTION 407.3.1 407.3.1 NYSBC - SECTION 407.3.1 1414 14 NFPA NFPA101 101 TABLE TABLE18.1.6.2 18.1.6.2 TYPE TYPEI I NFPA 101 TABLE 18.1.6.2 TYPE I 44 2 55 3 4 5 SCALE SCALE1/8" 1/8"= =1'-0" 1'-0"SCALE 1/8" = 1'-0"33 SCALE SCALE 1/8" 1/8" =1'-0" 1'-0" =NO 1'-0" 1/8" = 1'-0"POSITIVE SCALE 1/8" = 1'-0" NO1SELF-CLOSING NOR AUTOMATIC CLOSING DEVICES, POSITIVE 5 5 22 13SCALE 11=1/8" 1SELF-CLOSING 1SELF-CLOSING 7 NOR 6 AUTOMATIC 5 SCALEDEVICES, 3 2 NO NOR AUTOMATICCLOSING CLOSING DEVICES, POSITIVE 1994/1995 SUPPLEMENT NYSBC NYSBCSEISMIC SEISMICSITE SITECLASSIFICATION CLASSIFICATIONTABLE TABLE1615.1.5 1615.1.5 CC NYSBC SEISMIC SITE CLASSIFICATION TABLE 1615.1.5 C 4 4 4 LATCHING LATCHINGISISREQUIRED. REQUIRED. LATCHING IS REQUIRED. NATIONAL NATIONALELECTRICAL ELECTRICALCODE CODE- NFPA - NFPA7070- 1996 - 1996AND AND1999 1999 NATIONAL ELECTRICAL CODE - NFPA 70 - 1996 AND 1999 A345 A345 A345 49 49West West37th 37thStreet Street 88 4 4ENERGY CONSERVATION 11 8 4 1 GALVANIZED STEEL GALVANIZED STEEL GALVANIZED STEEL ENERGY ENERGYCONSERVATION CONSERVATIONCONSTRUCTION CONSTRUCTIONCODE CODEOF OFNEW NEWYORK YORKSTATE, STATE,2007 2007 CONSTRUCTION CODE OF NEW YORK 2000 STATE, 200718.3.6.3 6.2. 6.2. NORDISTANCE DISTANCESEPARATION SEPARATION 6.2. DISTANCE SEPARATION 2000- NFPA - NFPA 18.3.6.3 2000 - NFPA 18.3.6.3UNLESS NO NOSELF-CLOSING SELF-CLOSINGNOR NORAUTOMATIC AUTOMATICCLOSING CLOSING DEVICES, DEVICES, UNLESSININREQUIRED REQUIREDEXITS, EXITS,SMOKE SMOKE NO SELF-CLOSING AUTOMATIC CLOSING DEVICES, UNLESS IN2'-3" REQUIRED SMOKE 2'-4EXITS, 2'-4 3/4" 3/4" 2'-4 3/4" 2'-3" 2'-3" STST STL STL SCREEN SCREEN ON ON ST STL SCREEN ON SCREEN SUPPORT SCREEN SUPPORT SCREEN SUPPORT Sixth SixthFloor Floor A302 A302 A302 A302 A303 A303 A302 A302 A303 NEW NEWYORK YORKSTATE STATEHOSPITAL HOSPITAL CODE, CODE, NYCRR NYCRRPART PART712, 712,REVISED REVISED1998 1998 NEW YORK STATE HOSPITAL CODE, NYCRR PART 712, REVISED 1998 GALVANIZED GALVANIZED STL STL STRUCT STRUCT GALVANIZED STL STRUCT BARRIERS, BARRIERS,HAZARDOUS HAZARDOUSAREAS, AREAS,VERTICAL VERTICALOPENING OPENINGENCLOSURES, ENCLOSURES,POSITIVE POSITIVELATCHING LATCHING BARRIERS, HAZARDOUS AREAS, VERTICAL OPENING ENCLOSURES, POSITIVE LATCHING New NewYork, York,NY NY10018 10018 AIA AIAGUIDELINES GUIDELINESFOR FORDESIGN DESIGNAND ANDCONSTRUCTION CONSTRUCTIONOF OFHOSPITALS HOSPITALSAND ANDHEALTH HEALTHCARE CAREFACILITIES FACILITIES- 1996-1997 - 1996-1997 AIA GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITALS AND HEALTH CARE FACILITIES - 1996-1997 REQUIRED REQUIREDEXCEPT EXCEPTTO TOTOILETS, TOILETS,BATHROOMS. BATHROOMS. REQUIRED EXCEPT TO TOILETS, NYSBC NYSBC- TABLE -BATHROOMS. TABLE602 602 EXTERIOR EXTERIORSEPARATION SEPARATIONOF OFLESS LESSTHAN THAN5’-0”, NYSBC 5’-0”,1 1HR HR - TABLE RATED RATED 602 EXTERIOR EXTERIORWALLS WALLSREQUIRED. REQUIRED. EXTERIOR SEPARATION OF LESS T.T.212.239.0220 212.239.0220 THAN 5’-0”, 1 HR NFPA NFPA101 101LIFE LIFESAFETY SAFETYCODE CODE- 2000 - 2000 NFPA 101 LIFE SAFETY CODE - 2000 49 49 WEST WEST 37th 37th STREET STREET 49 WEST 37th STREET EXTERIOR EXTERIORSEPARATION SEPARATIONOF OFLESS LESSTHAN THAN5’-0” 5’-0”OR ORMORE, MORE,BUT BUTLESS LESSTHAN THAN10”-0”, 10”-0”,1 1HR HRRATED RATEDEXTERIOR EXTERIORWALLS WALLS EXTERIOR SEPARATION OF LESS THAN 5’-0” OR MO 2 266 22 22 2 6 2 2 1 F.F.212.563.5621 212.563.5621 13 13 CARE11 11 55 333 3 22 13 1 1 11 11 7 5 3 3 2 1 NEW NEW YORK, YORK, NYNY 10018 10018 NEW YORK, NY 10018 NFPA NFPA99, 99,HEATH HEATHCARE CAREFACILITIES FACILITIES- 1999 - 1999 NFPA 99, HEATH FACILITIES - 1999 77 A303 KEYPLAN KEYPLAN KEYPLAN METAL METAL COPING COPING METAL COPING NN A303 A303 A251 A251 - (SMOKE A303 A303 A251 A251 A303 A251 A303 A251 4.5. 4.5. SUBDIVISION SUBDIVISIONOF OFA303 BUILDING BUILDINGSPACES SPACES - (SMOKE COMPARTMENTS-ZONES) COMPARTMENTS-ZONES) 4.5. SUBDIVISION OF A303 BUILDING SPACES - (SMOKE COMPARTMENTS-ZONES) t. 212.239.0220 t. 212.239.0220 t. 212.239.0220 REQUIRED. REQUIRED. REQUIRED. www.urbahn.com www.urbahn.com AMERICAN AMERICANNATIONAL NATIONALSTANDARD STANDARDACCESSIBLE ACCESSIBLEAND ANDUSABLE USABLEBUILDINGS BUILDINGSAND ANDFACILITIES FACILITIESICC/ANSI ICC/ANSI AMERICAN NATIONAL STANDARD ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES ICC/ANSI f. 212.563.5621 f. 212.563.5621 f. 212.563.5621 SMOKE SMOKEBARRIER(ZONES) BARRIER(ZONES) SMOKE BARRIER(ZONES) EXTERIOR EXTERIORSEPARATION SEPARATIONOF OF10’-0” 10’-0”OR ORMORE, MORE,BUT BUTLESS LESS THAN THAN30’-0”, 30’-0”,1 1HR HRRATED RATEDEXTERIOR EXTERIORWALLS WALLS EXTERIOR SEPARATION OF 10’-0” OR MORE, BUT L PROPOSED PROPOSED 88 4A117.1 4 11 8 4 1 A117.1 A117.1- 1996 - 1996AND AND2003 2003 - 1996 AND 2003 T.O. T.O.PARAPET PARAPET T.O. PARAPET CPEP CPEP STST STL STL SCREEN SCREEN ON ON ST STL SCREEN ON REQUIRED. REQUIRED. REQUIRED. 60 60 PARK PARK PLACE, PLACE, SUITE SUITE 302302 60 PARK PLACE, SUITE 302 OF TWO A302 A302 A302 A302 A303 A302 A302 A303 NYSBC- SECTION - SECTION407.4, 407.4,SEC. SEC.709 709 SMOKE SMOKEBARRIERS BARRIERSTO TOBE BEMINIMUM MINIMUM1 1HR. NYSBC HR.FIRE FIRE - SECTION RATED. RATED.PROVIDE PROVIDE 407.4, SEC. MINIMUM MINIMUM 709 OF OFTWO TWO SMOKE BARRIERS TO BE MINIMUM 1 HR. FIRE RATED. PROVIDE MINIMUM 17' 17' - 0" 17'- 0" - 0"AMERICANS AMERICANSWITH WITHDISABILITIES DISABILITIES ACT ACT ACCESSIBILITY ACCESSIBILITY GUIDELINES GUIDELINES AMERICANS WITHA303 DISABILITIES ACT GUIDELINESNYSBC GALVANIZED GALVANIZED STL STL STRUCT STRUCT GALVANIZED STLACCESSIBILITY STRUCT EXISTING EXISTING EXISTING NEWARK, NEWARK, NJNJ 07102 07102 NEWARK, NJ 07102 EXTERIOR EXTERIOR SEPARATION SEPARATION OF30’-0” 30’-0”OR ORMORE, MORE, NO NORATED RATEDEXTERIOR EXTERIORWALLS WALLSREQUIRED. REQUIRED. EXTERIOR SEPARATION NO RA EMERGENCY EMERGENCY EMERGENCY STAINLESS STEEL SCREEN STAINLESS STEEL SCREEN OF 30’-0” OR MORE, STAINLESS STEEL SCREEN OF COMPARTMENTS COMPARTMENTSPER PERSTORY STORYWITH WITHAN ANOCCUPANCY OCCUPANCY> >5050PERSONS PERSONS COMPARTMENTS PER STORY WITH AN OCCUPANCY > 50 PERSONS T.O. T.O.METAL METAL DECK DECK T.O. METAL DECK t. 973.639.0194 t. 973.639.0194 t. 973.639.0194 STATE STATE UNIVERSITY UNIVERSITYCONSTRUCTION CONSTRUCTIONFUND FUND- JAN. - JAN.2003 2003 STATE UNIVERSITY CONSTRUCTION FUND - JAN. 2003 DEPARTMENT DEPARTMENT DEPARTMENT f. 973.639.0077 f. 973.639.0077 f. 973.639.0077 14' 14' - 0" 14'- 0" - 0" MEP MEPENGINEERS: ENGINEERS: F.F. CHAPTER CHAPTER7 7- FIRE - FIRERESISTANCE RESISTANCERATED RATED CONSTRUCTION CONSTRUCTION F. CHAPTER 7 - FIRE RESISTANCE RATED CONSTRUCTION 66 6 49 49 WEST WEST 37th 37th STREET STREET 49 WEST 37th STREET 22 2 2 2 2 3 3 1 1 2 2 2 3 1 2000 2000NFPANFPA-18.3.7, 18.3.7,18.3.7.1 18.3.7.1THROUGH THROUGH 18.3.7.5 2000 NFPA18.3.7.1 THROUGH SMOKE SMOKECOMPARTMENT COMPARTMENTTO TOBE BEMAX.22,500 MAX.22,500 SQ SQFTFT18.3.7, - AUTOMATIC - AUTOMATIC SPRINKLERS SPRINKLERS AND ANDAUTOMATIC AUTOMATIC SMOKE COMPARTMENT TO BE MAX.22,500 SQ FT - AUTOMATIC AND AUTOMATIC A321 A321 18.3.7.5 A321 LOWER LOWERROOF ROOF LOWER ROOF NEW NEW YORK, YORK, NYNY 10018 10018 18.3.7.5 NEW SPRINKLERS YORK, NY 10018 B.B. T.O. CHAPTER CHAPTER 3 3 USE USE AND AND OCCUPANCY OCCUPANCY CLASSIFICATION CLASSIFICATION B. CHAPTER 3 USE AND OCCUPANCY CLASSIFICATION METAL METAL COPING COPING METAL COPING A303 A303 A303 A303 A251 A251 A303 A303 A251 A251 A303 A303 A251 A303 A251 STRUCTURAL STRUCTURAL ENGINEERS: ENGINEERS: STRUCTURAL ENGINEERS: t. 212.239.0220 t. 212.239.0220 t. 212.239.0220 T.O. METAL DECK T.O.METAL METALDECK DECK Lizardos LizardosEngineering EngineeringAssociates Associates FIRE FIREDETECTION DETECTIONREQUIRED. REQUIRED. FIRE DETECTION REQUIRED. f. 212.563.5621 f. 212.563.5621 f. 212.563.5621 7.1. 7.1. FIRE FIRERESISTANCE RESISTANCE RATINGS RATINGS FOR FOR BUILDING ELEMENTS ELEMENTS 7.1. FIRE RESISTANCE RATINGS FOR BUILDING ELEMENTS 11' 11' - 4" 11'- 4" - 4" 2" 2" EXP.JT. EXP.JT. 2" EXP.JT. YSRAEL YSRAEL A.A. SEINUK, SEINUK, PCPC YSRAEL A. SEINUK, PC BUILDING 200 200Old OldCountry CountryRoad Road 88 ONE ONE WOODBRIDGE WOODBRIDGE CENTER CENTER SUITE SUITE 510 510 8 ONE WOODBRIDGE CENTER SUITE 510 PARAPET PARAPET PARAPET MAXIMUM MAXIMUMTRAVEL TRAVELNYSBC NYSBC407.4, 407.4, NFPA NFPA18.3.7.1 18.3.7.1(4)(4) METAL MAX MAXTRAVEL TRAVELFROM FROMANY ANYPOINT POINTTO TOAN AN MAXIMUM ACCESS ACCESS DOOR TRAVEL DOOR IN IN NYSBC THE THE SMOKE SMOKE 407.4, BARRIER NFPA BARRIER 18.3.7.1 ISIS200’. 200’. (4) MAX TRAVEL FROM ANYNYSBC POINT-TO AN ACCESS DOOR IN THE60SMOKE BARRIER IS 200’. 3.1. 3.1.B BT.O. CONSTRUCTION CONSTRUCTIONCLASSIFICATION CLASSIFICATIONCOMPLIANCE COMPLIANCE 3.1. B T.O. CONSTRUCTION CLASSIFICATION COMPLIANCE OT.O. OCANOPY CANOPY O CANOPY TYPE TYPE1A1A TYPE 1A NYSBC TABLE - TABLE 601 601 NYSBC - TABLE 601 Mineola, Mineola,NY NY11501 11501 METAL PANELS PANELS METAL PANELS WOODBRIDGE, WOODBRIDGE, NJNJ 07095 07095 60 60 WOODBRIDGE, NJ 07095 A321 A321 A321 PARK PARK PLACE, PLACE, SUITE SUITE 302302 PARK PLACE, SUITE 302 17' 17'- 0" - 0" 17' - 0"

11

STST STL STL BASE BASE

ELEVATION ELEVATION MECHANICAL MECHANICALCODE CODEOF OFNEW NEWYORK YORKSTATE, STATE,2007 2007 SCALE SCALE 1/8" 1/8"= =1'-0" 1'-0" NATIONAL NATIONAL STANDARD STANDARDPLUMBING PLUMBINGCODE CODE- 1993 - 1993WITH WITH1994/1995 1994/1995SUPPLEMENT SUPPLEMENT

22

ELEVATION ELEVATION 1 SCALE SCALE1/8" 1/8"= =1'-0" 1'-0"

4.4. 4.4.

1' - 8"

CODE CODECOMPLIANCE COMPLIANCE-OPP -LEVEL LEVEL55PLAN PLAN OPP 2 2 METAL PANELS

1" 1" INSUL INSUL SPANDREL SPANDREL GLGL 2 A303 T.O. PARAPET PARAPET T.O. PARAPET 1"T.O. 1" INSUL INSUL GL GL

more pleasant.

METAL PANELS ELEVATION ELEVATIONMETAL PANELS ELEVATION METAL METAL PANELS 4 4PANELS 2 SCALE1/8" 1/8"= =1'-0" 1'-0"SCALE 1/8" = ST STL BASESCALE

APPLICABLE CODES

LEVEL 4 0"

T.O. T.O.PARAPET PARAPET T.O. PARAPET 17' 17'- 0" - 0" 17' - 0" T.O. T.O.METAL METALDECK DECK 14' 14'- 0" - 0" COPING B BO O FASCIA FASCIA BMETAL O FASCIA METAL METAL COPING COPING 10' 10'- 8" - 8" 10' - 8"

22 areas make the spaces 1/16" 1/16" 1'-0" 17' 17'- 0" - 0" 17' - 0" ==1'-0"

77 A303 A303

T.O. T.O.METAL METALDECK T.O. DECK METAL DECK LEVEL LEVEL 4 LEVEL 4 14' 14'- 0" -40" 14' - 0" 0"0" 0"

7 33 A303 A303 A303

ceilings in the main adult

0' - 4" TYP

T.O. T.O.PARAPET PARAPET 17' 17'- 0" - 0"

LEVEL LEVEL4 4 0"0" B BOOFASCIA FASCIA 1'10' - 10' 8"- 8" 8' - 0" - 8"

1' - 8"

22

A303 A303

AA

REVISION NO.

METAL COPING 2 HOUR RATED FLOOR CONSTRUCTION 1' - 8" OVER EXISTING PARKING STRUCTURE

The skylights and faceted

A303

1' 1' - 8" - 8"

REVISION REVISION NO. NO.

METAL COPING METAL METAL COPING COPING

DATE: DATE:

EXISTING BUILDING

EXIT EXITSIGN SIGN

FE FE

LEVEL LEVEL4 4

area and child treatment

METAL METAL COPING COPING

METAL PANELS METAL COPING METAL PANELS METAL METAL PANELS PANELS T.O.PARAPET PARAPET T.O. PARAPET ST STL BASET.O. 17' 17'- 0" - 0" 17' - 0" 2" STEXP.JT. ST STL STL BASE BASE

CODE COMPLIANCE NOTES

ELEVATION ELEVATION 1 SCALE SCALE1/8" 1/8"= =1'-0" 1'-0"

LEVEL LEVEL4 4 0"0"

0' - 4" TYP.

5 T.O. 5PARAPET 17' A321 - 0" A321 T.O. METAL DECK LEVEL 47 7 14' - 0" A303 A303 0" LOWER ROOF

METAL METAL PANELS PANELS

2' - 0" 2' - 0" TYP. TYP.

A.A.

EXISTING BUILDING

A321

CODE COMPLIANCE - LEVEL 4 PLAN

1

2

EXITSHAFT 1 2T.O. 2HOURS HOURS HORIZONTAL HORIZONTAL SHAFT T.O. PARAPET PARAPET T.O. PARAPET 17' - 0" - 0" 17' -FOR 0"FORPIPING 2" EXP.JT.17' 50 PERSONS EXITING ENCLOSURE ENCLOSURE PIPING T.O. T.O.METAL METALDECK T.O. DECK METAL DECK 170 PERSONS CAPACITY7 14' 14'- 0" - 0" 14' -METAL 0" COPING

1' 1' - 8" -28"

77 A303 A303

2 2 A303 A303 A303

22

1/16" = 1'-0" CODE COMPLIANCE – LEVEL 4 PLAN

STST STL STL BASE BASE

METAL METAL PANELS PANELS

T.O. T.O.PARAPET PARAPET 17' 17'- 0" - 0"

METAL METAL COPING COPING 2 2HOUR HOUR RATED RATEDFLOOR FLOORCONSTRUCTION CONSTRUCTION 1' 1' - 8" - 8" OVER OVEREXISTING EXISTINGPARKING PARKING STRUCTURE STRUCTURE 1' - 8"

METAL COPING

DESCRIPTION DESCRIPTION

2

A

program.

2' - 0" TYP

8' 8' - 0" - 0"

C AA

TYP.

2' - 0" 2' - 0" TYP. TYP.

1' 1' - 8" - 8"

CODE CODECOMPLIANCE COMPLIANCENOTES NOTES

T.O. T.O.METAL METALDECK DECK 11' 11'- 4" - 4" ELEVATION ELEVATION 11 SCALE SCALE1/8" 1/8"= =1'-0" 1'-0"

T.O. T.O.PARAPET PARAPET 17' 17'- 0" - 0" T.O. T.O.METAL METALDECK DECK LEVEL LEVEL 4 14' 14'- 0" -40" 0"0"

STST STL STL BASE BASE 2" 2" EXP.JT. EXP.JT.

2' - 0"

0' - 4" 0' - 4" TYP. TYP.

METAL METAL PANELS PANELS

1/16" 1/16"COMPLICANCE ==1'-0" 1'-0" CODE PLAN CODE CODE COMPLIANCE COMPLIANCE –– LEVEL LEVEL 44 PLAN PLAN T.O. T.O.PARAPET PARAPET 17' 17'- 0" - 0" T.O. T.O.METAL METALDECK DECK LEVEL LEVEL 4 14' 14'- 0" -40" 0"0" LOWER LOWERROOF ROOF

LOWER ROOF T.O. METAL DECK 11' - 4"

1' 1' - 8" - 8"

METAL METAL PANELS PANELS METAL METAL COPING COPING

2' - 0"

CODE CODECOMPLIANCE COMPLIANCE- -LEVEL LEVEL44PLAN PLAN

A321 A321

EXISTING BUILDING

1' 1' - 8" - 8"

A303 B A303

METAL COPING COPING BMETAL BO OFASCIA FASCIA 1'- -8" 10' 10' -8"8" 4

A303 A303

EXISTING EXISTING BUILDING BUILDING

22

44

A303 A303

2' - 0" 2'TYP - 0" TYP

1' 1' - 8" - 8"

EXISTING EXISTINGBUILDING BUILDING METAL COPING

77

4 A303

REVISION REVISION NO. NO.

TRAVEL PATH AND D

EXIT EXIT

25' COMMON PATH OF TRAVEL < 75' MAX.

4-033

FA

AA

2' - 0" TYP

2" 2" EXP.JT. EXP.JT.

LOWER LOWERROOF ROOF T.O. T.O.METAL METALDECK DECK 11' 11'- 4" - 4"

0' - 4" TYP.

EXIT EXIT1 1 T.O. T.O.PARAPET PARAPET T.O. PARAPET 17' 17'- 0" - 0" 17' - 0" 5050PERSONS PERSONSEXITING EXITING T.O. T.O.METAL METALDECK DECK T.O. METAL DECK 170 170 PERSONS PERSONSCAPACITY CAPACITY METAL 14' 14'-METAL 0" -METAL 0" COPING 14' - 0"COPING COPING 77

A

FA FA

4-034

the University’s education

2

0' - 4" 0'TYP - 4" TYP

22

METAL METAL COPING COPING

22

1' - 4" 1'TYP - 4" 0' - 4" 0'TYP - 4"TYP TYP

1' - 8" 1' 1' - 8" - 8"

CC

2' - 0" 2'TYP - 0" TYP

0' - 4" 0' - 4" TYP. TYP.

AA

BB

C AA

METAL METAL COPING COPING

EXISTING EXISTING BUILDING BUILDING

44 A303 A303

T.O. T.O.PARAPET PARAPET 17' 17'- 0" - 0" T.O. T.O.METAL METALDECK DECK METAL METAL 14' 14' - 0" - COPING 0"COPING

11

METAL COPING

METAL METAL COPING COPING 1' 1' - 8" - 8"

B

134 sf

1' - 4" 1'TYP - 4" TYP

METAL METAL COPING COPING

A

A

25' 25'COMMON COMMONPATH PATHOF OF TRAVEL TRAVEL< <75' 75'MAX. MAX.

4-031

0' - 4" 0'TYP - 4" TYP

22

DI 0' MA 0

L VE

SMOKE PARTITION -

TEXT

TRAVEL TRAVELPATH PATHAND ANDDISTANCE DISTANCE

VALVE VALVECABINET CABINET

MOTHER BABY UNIT LEVEL 5

4-035

44'

integrate the CPEP into4-032

0' - 4" 0'TYP - 4" TYP

CC

MOTHER MOTHERBABY BABY

social work, patients,TRA104' < 2

125 sf

FAFA

TYP.

BB

0' - 4" 0'TYP - 4" TYP

134134 sf sf

4-036

FE

4-027

DOOR TO ROOF EQUIP.

120 sf

4-031 4-031

0' - 4" 0'TYP - 4" TYP

AA

DOOR DOORTO TOROOF ROOF FA EQUIP. EQUIP.

= CE provides space for nursing, A N X. ST

4-032 4-032 125125 sf sf

4-055

4-037

safety standards, it LEVEL55 UNIT UNIT 4-026 4-056 LEVEL

4-034 4-034

4-033 4-033

4-029 4-029 118118 sf sf

4-036 4-036

34'

4-039A

4-024A

4-035 4-035

AA

SMOKE SMOKEPARTITION PARTITION- 0- 0HOURS HOURS

TEXT TEXT

100% 100% CONSTRUCTION CONSTRUCTION DOCUMENTS DOCUMENTS 100% CONSTRUCTION regulations and NYS Office AUGUST AUGUST 13, 2009 2009 AUGUST 13, 2009 of Mental Health rigorous13,

A

4-037 4-037

4-056 4-056

4-028 4-028

EXISTING EXISTING FIRE BARRIER - 1 HO EMERGENCY EMERGENCY DEPARTMENT DEPARTMENT FIRE AND SMOKE BA

FIRE FIREAND ANDSMOKE SMOKEBARRIER BARRIER- 1- 1HOUR HOUR

REFUGE AREA

4-038

4-055A (NYS) sustainable design

121 sf

= = 44' CECE 44' AN AN X.X. ISITSTMM AA DD ' ' L L 0 0 EE AVAV 2020 TRTR10140'4<' <

PROP PRO CC FIRE AND SMOKE BA

FIRE FIREAND ANDSMOKE SMOKEBARRIER BARRIER- 2- 2HOURS HOURS

A

22'

to meet New York State’s

PYXI S

NUMBER OF PERSONS FROM EXISTING BUI COORDINATION WITH HOSPITAL) ADDED TO ADDITION AT EXIT #3

FIRE FIREBARRIER BARRIER- 1- 1HOUR HOUR

4-054

95 '

EMERGENCY DEPARTMENT 4-026 4-026 LEVEL 4 4-027 4-027

4-055 4-055

95 ' 95 '

EMERGENCY EMERGENCY DEPARTMENT DEPARTMENT LEVEL44 LEVEL

4-024A 4-024A

XXX

EXTERIOR SHELLEXTERIOR & SITE SHELL & SITE

34' 34'

4-039A 4-039A 120 sf

NUMBER NUMBEROF OFPERSONS PERSONSFROM FROMEXISTING EXISTINGBUILDING BUILDING(TO (TOBE BEESTABLISHED ESTABLISHEDININ COORDINATION COORDINATIONWITH WITHHOSPITAL) HOSPITAL)ADDED ADDEDTO TOPERSONS PERSONSEXITING EXITINGFROM FROMPROPOSED PROPOSED ADDITION ADDITIONAT ATEXIT EXIT#3#3

KEYPLAN KEYPLAN

SBUH PROJECT # DODO289

4-039

FE 4-030 The extension is designed 4-053

4-025 4-038 4-038

4-055A 4-055A

6,000 4-045 patients FA per year.

4-020

4-023 REFUGE REFUGEAREA AREA

AA

22' 22'

4-054 4-054

120120 sf sf

4-021B

E= NC TA X. DIS MA E L 2 0 0' AV TR 158' <

E= NCE = TANC X. DISTAMAX. EL DIS 0' MA AVEL 200' TRAV 8' < 20 TR 11558' <

4-053 4-053

4-040

provides 4-050 emergency SBUH SBUHPROJECT PROJECT ##DODO289 DODO289 30' 4-051 4-044 psychiatric services for 26'

4-021 26' 26'

122122 sf sf

4-025 4-025

122 sf

30' 30'

4-051 4-051

4-044 4-044

4-022 4-022 4-021B 4-021B

141 sf

0' - 4" TYP

4-050 4-050

FE (CPEP). This new facility4-041 4-043

4-008

4-006

4-041 4-041

4-040 4-040

XXX XXX

4-042

1' - 4" 0' - 4"TYP TYP

4-043 4-043

4-021 4-021 4-021A 4-021A

Emergency Program 47'

1' - 4" TYP

122122 sf sf

TRAVEL DISTANCE = 162'<200' MAX.

0' - 4" TYP

141141 sf sf

4-009

Comprehensive Psychiatric

FE

FE FE

4-008 4-008

A

4-042 4-042

63'

University to 4-011 create a 4-011A

4-007

4-005

1' - 4" 0' - 4"TYP TYP

47' 47'

FE FE 4-006 4-006

4-011 4-011

1' - 4" TYP

TRAVELDISTANCE DISTANCE= =162'<200' 162'<200'MAX. MAX. AA TRAVEL

63' 63'

FA 4-011A 4-011A

4-009 4-009

0' - 4" 0'TYP - 4" TYP 0' - 4" TYP

4-007 4-007

4-005 4-005

1' - 4" 0' - 4" 1'TYP - 4" 0'TYP - 4"TYP TYP 0' - 4" TYP

FA FA

DF

1' - 4" 1'TYP - 4" TYP

DF DF

DESCRIPTIO DESCRIPTI

Le Le projet projet consistait consistait en en une une exte exte l'Université l'Université pour pour créer créer un un Pro Pr complet complet d'urgence d'urgence psychiatrique psychiatrique Cette Cette nouvelle nouvelle installation installation fou fou FIRE FIRESAFETY SAFETYNOTE NOTE FIRE SAFETY NOTE services services psychiatriques psychiatriques d'urgence d'urgenc 000 000 patients patients par par an.
 an.
 L'extension L'extension aa été été conçue conçue pour pour répo rép FIRE FIRESAFETY SAFETYLEGEND LEGEND SAFETY LEGEND normes normes de de l’Etat l’EtatFIREde de New New York York matière matière de de développement développement durab durab 49 49West West 37th 37thStreet Streetde 49 W normes normes de sécurité sécurité très très rigoure rigour Sixth SixthFloor Floor Bureau Bureau de de la la Santé Santé Mentale Mentale du duSixth NY N New NewYork, York, NY NY10018 10018 New T. T.212.239.0220 212.239.0220 T. 21 extension extension aa permis permis d'intégrer d'intégrer le leF.CP C F. F.212.563.5621 212.563.5621 21 DOCUMENTS www.urbahn.com www.urbahn.com le le cursus cursus de de l'université l'université en enwww oo espace espace pour pour les les soins soins infirm infirm MEP MEPENGINEERS: ENGINEERS: MEP éducateurs éducateurs sociaux, sociaux, les les patient patien Lizardos LizardosEngineering EngineeringAssociates Associates Lizar étudiants étudiants en en médecine.
 médecine.
 200 200Old Old Country CountryRoad Road 200 O Mineola, Mineola,NY NY11501 11501 Mine Les Les verrières verrières et et les les faceted faceted ceiling ceiling les les espaces espaces plus plus agréables agréables dans dans de de soin soin pour pour adultes adultes et et dans dans les les URBAHN URBAHNARCHITECTS ARCHITECTS soins soins pédiatriques.
 pédiatriques.
 49 49W W37TH 37THSTREET STREET NEW NEWYORK, YORK,NY NY10018 10018 Les Les matériaux matériaux extérieurs extérieurs du du CPEP CPEP son son nouvel nouvel auvent auvent contribuent contribuent YSRAEL YSRAELA. A.SEINUK, SEINUK,PC PC STRUCTURAL STRUCTURALENGINEERS: ENGINEERS: STRU ONE ONEWOODBRIDGE WOODBRIDGECENTER CENTERSUITE SUITE510 510 WOODBRIDGE, WOODBRIDGE, NJ NJ 07095 07095 cette cette extension extension àà l'hôpital l'hôpital existan exista LIZARDOS LIZARDOS ENGINEERING ENGINEERINGASSOCIATES ASSOCIATES MEP MEPENGINEERS: ENGINEERS: MEP que que sa sa nouvelle nouvelle structure structure métalliq métalliq 200 200OLD OLDCOUNTRY COUNTRYROAD ROAD MINEOLA, MINEOLA,NY NY11501 11501 toit toit réalisé réalisé en en acier acier inoxydable inoxydable la la m m BET BETCONSULTANTS CONSULTANTS CIVIL CIVILENGINEERS: ENGINEERS: CIVIL évidence. évidence. 3636ROUTE ROUTE10 10

SEE A-104 FOR EXTENT OF WORK IN EXTERIOR SHELL AND SITE CONTRACT.

The scope of this project

REFUGE AREA

REVISION REVISIONNO. NO.

PROJET

REFUGE REFUGEAREA AREA

FEBRUARY 22, 2010 STONY BROOK, NEW YORK

PROJET

EXIT EXIT3 3 4343PERSONS PERSONSEXITING EXITINGCPEP CPEP 340 340PERSONS PERSONSCAPACITY CAPACITY@@EXIT EXIT

STONY BROOK, NY | 2010

EXIST

materials and sidewalk canopy help to marry

ED EDMAIN MAIN ENTRANCE ELEVATION MECHANICAL3CODE OF ENTRANCE NEW YORK STATE, 2007 3 SCALE SCALE 1/8" 1/8"= =1'-0" 1'-0" 13 13 11 11 7 WITH 66 SCALE 1/8" = 1'-0" NATIONAL STANDARD PLUMBING CODE - 71993

Le Le défi défi était était de de mener mener àà bien bien cette cette extension extension tout tout en en screen planifiant planifiant p faceted stainless-steel rooftop equipment highlights the new addition. expansions expansions futures, futures, de de séparer séparer les le aadduulltteess ddeess ppaattiieennttss ppééddiiaa CHALLENGE d'accroître d'accroître la la flexibilité flexibilité opérationn opérationn The challenge was to sustain current operations réduire réduire la la durée durée du du séjour séjour des des pat pa while planning for future growth, to segregate autre autre défi défi consistait consistait en en la la modélisa modélis adult and pediatric patients, to increase STONY STONYBRO BR développement développement de de la la structure structure m UNIVERSITY UNIVERSITYHO Hm operational flexibility and to reduce patient length sur sur le le toit toit de de cette cette extension extension dans dans COMPREHE COMPREHE of stay. An additional challenge was to design and PSYCHIAT PSYCHIAT masquer masquer les les équipements équipements qui s’y s’y trt develop a model of the metallic structure on the qui

1"T.O. INSUL GL - TYP PARAPET

17' - 0"

3 3

2 EQ 2 EQ SPSP

CORRIDOR CORRIDORWALLS WALLSSHALL SHALL BE BE-CONSTRUCTED CONSTRUCTED NYSBC - AS TABLE ASSMOKE SMOKE 1016.1 O CANOPY 1" 1" INSUL INSUL GLGL TYP -B TYP PARTITIONS PARTITIONS(0(0HR. HR.WITH WITH SPRINKLER SPRINKLER SYSTEM) 10' - GL 7 GL 1/4" 1" 1" INSUL INSUL SPANDREL SPANDREL -NYSBC TYP - SYSTEM) TYP - SECTION 407.3

METAL METAL PANELS PANELS

7

INSUL GLGL - TYP - TYP 4.3. 4.3.1"1"INSUL CORRIDOR CORRIDOR WALLS. WALLS.CONT.: CONT.:

4.3.

STST STL STL BASE BASE - TYP - TYP

2000 2000NFPA NFPA101 10118.3.6 18.3.6- CORRIDOR - CORRIDORSEPARATION SEPARATION 2 EQ 2 EQ SPSP

EAST EASTELEVATION ELEVATION SCALE SCALE1/8" 1/8"= =1'-0" 1'-0"

EAST ELEVATION EAST ELEVATION EAST ELEVATION 2000 2000NFPA NFPA101 10118.3.6.2 18.3.6.2- CORRIDOR - CORRIDORWALL WALLCONSTRUCTION CONSTRUCTION

5.3. 5.3. SKEWED SKEWED . SP . 2 EQ

1"EAST INSUL ELEVATION SPANDREL GL - TYP

SCALE 1/8" = 1'-0"

CORRIDOR WALLS. CONT.:

1" INSUL GL - TYP

ST STL BASE - TYP

CORRIDORS CORRIDORSTO TOCONFORM CONFORMTO TO18.3.6.2 18.3.6.2 2000 EXCEPT EXCEPT NFPA SPACES 101 SPACES 18.3.6MAY MAY - CORRIDOR BE BEUNLIMITED UNLIMITED SEPARATION AND AND OPEN OPENTO TOTHE THECORRIDOR CORRIDOR IFIF THEY THEY ARENON NONSLEEPING, SLEEPING,NON NONTREATMENT, TREATMENT,OR ORNON NON SKEWED METAL METAL PANELS PANELS 1" 1" INSUL INSUL GL GL - TYP - TYPARE SKEWED . . 1" 1" INSUL INSUL SPANDREL SPANDREL GL GL - TYP - TYP HAZARDOUS HAZARDOUSAREAS AREASAND AND THERE THERE ISISAUTOMATIC AUTOMATIC FIRE FIREDETECTION DETECTIONAND ANDSPRINKLERS. SPRINKLERS.2 EQ SP 7

EAST ELEVATION SCALE 1/8" = 1'-0"

EAST ELEVATION

WAITING WAITINGAREAS AREASMAY MAYBE BEOPEN OPENTO TOTHE THECORRIDOR CORRIDORIFIFTHEY THEYARE ARELESS LESSTHAN THAN600 600SF SF AGGREGATE AGGREGATEININEACH EACHSMOKE SMOKECOMPARTMENT. COMPARTMENT.ININAALIMITED LIMITEDCARE CAREFACILITYFACILITY-AAMULTIMULTIPURPOSE PURPOSETHERAPEUTIC THERAPEUTICSPACE SPACEMAY MAYBE BEPERMITTED. PERMITTED.

0 0HR. HR.(WITH (WITHSPRINKLER SPRINKLERSYSTEM) SYSTEM)WALLS WALLS 2000SHALL NFPA SHALL101 FORM FORM 18.3.6.2 AABARRIER BARRIER - CORRIDOR TO TOLIMIT LIMIT WALL CONSTRUCTION TRANSFER TRANSFEROF OFSMOKE SMOKE

10'-4 1/4"

10'-4 1/4" 10'-4 1/4"

6"

3'-0"

WALL SECTION 1 THE CORRIDOR WAITING AREAS MAY BE OPEN TO WALL SECTION 1 WALL SECTION 1 IF THEY ARE LESS THAN 600 SF

AGGREGATE IN EACH SMOKE COMPARTMENT. IN A LIMITED CARE FACILITY- A MULTIWALL WALLSECTION SECTION 11 SCALE SCALE1/2" 1/2"= =1'-0" 1'-0" PURPOSE THERAPEUTIC SPACE MAY BE PERMITTED.

0 HR. (WITH SPRINKLER SYSTEM) WALLS SHALL FORM A BARRIER TO LIMIT TRANSFER OF SMOKE

PROJECT PROJECT MANAGER: MANAGER: DODO289 MEL MEL AMINOFF AMINOFF DODO289 DRAWN DRAWN BY: BY:

.

SKEWED

CHECKED CHECKED BY: BY:

DRAWING DRAWING NO. NO. PAREKH LUDMILA LUDMILA PAREKH

A201 A201

MA MA / KN / KN / RA / RA

UAUA PROJ PROJ NO. NO. DATE: SCALE: SCALE: DATE: 0801-00 0801-00 1/8" 1/8" = 1'-0" = 1'-0" 08/13/2009 08/13/2009 SHEET SHEET 200 1 1OFOF200

WALL SECTION 1

SBUH SBUH PROJECT PROJECT ## 100% 100% CONSTRUCTION CONSTRUCTION DOCUMENTS DOCUMENTS

DODO289 DODO289

1

WALL SECTION DRAWING DRAWING NO. NO. SCALE 1/2" = 1'-0"

A201 A201

SHEET SHEET 100% 100% CONSTRUCTION CONSTRUCTION DOCUMENTS DOCUMENTS

200 1 1OFOF200

FIN. FL.FL. FIN.

A311 A311 PROJECT MANAGER:

DODO289MEL AMINOFF

DRAWN BY:

DRAWING NO. LUDMILA PAREKH

CHAPTER CHAPTER8 8- INTERIOR - INTERIORFINISHES FINISHES CHECKED BY: INTERIOR INTERIORFINISHES FINISHES UA PROJ NO. SCALE:

A201

MA / KN / RA

DATE: 08/13/2009 1 OF 200

0801-00 1/8" = 1'-0" SHEET INTERIOR INTERIORFINISH FINISHREQUIREMENTS REQUIREMENTS NYSBC NYSBCTABLE TABLE803.4 803.4 SBUH PROJECT # 100% CONSTRUCTION DOCUMENTS DODO289 2000 2000- NFPA - NFPA 101 101SECTION 10.2, 10.2,18.3.2 18.3.2 WALL WALL SECTION

22

WALL 2 2 WALL SECTION WALLSECTION SECTION 2

SCALE SCALE1/2" 1/2"= =1'-0" 1'-0"

DRAWING NO.

A201

INTERIOR INTERIORFLOOR FLOORFINISHES FINISHES SHEET

1 OF 200

2000 2000NFPA NFPA18.3.3 18.3.3INTERIOR INTERIORFLOOR FLOORFINISHES FINISHES 100% CONSTRUCTION DOCUMENTS 10.2.8 10.2.8SPRINKLERS SPRINKLERS

1'-0"

MEP ENGINEERS:

2 HRS LIZARDOS ENGINEER 200 OLD COUNTRY RO 2 HRS DRAWING DRAWINGTITLE: TITLE: MINEOLA, NY 11501 1" INSUL. GL. U.O.N.MIN AND NOT LESS THAN THE RATING OF EXI 1 -HR CIVIL ENGINEERS: BET CONSULTANTS 2 HRS 36 ROUTE 10 3'-11 1/4"

3'-11 1/4" 3'-11 1/4"

FIN. FIN. FL. FLFL. FL

G.G. 8.1. 8.1.

6'-0 3/4"

6'-0 3/4" 6'-0 3/4"

CORRIDORS TO CONFORM TO 18.3.6.2 EXCEPT SPACES MAY BE UNLIMITED AND OPEN TO THE CORRIDOR IFGLTHEY 1" INSUL - TYP ARE NON SLEEPING, NON TREATMENT, OR NON 1" INSUL SPANDREL GL - TYP HAZARDOUS AREAS AND THERE IS AUTOMATIC FIRE DETECTION AND SPRINKLERS.

METAL PANELS

14'-0"

NAT BARRANCO

PRINCIPAL IN CHARGE:

1'-9"

3'-0" 3'-0"

6" 6"

1' - 4" TYP

2' - 0" TYP

NAT NAT BARRANCO BARRANCO

3

DÉFI

2.5°

DÉFI

0' - 4" TYP 1' - 4" TYP

2' - 0" 0' - 4"TYP TYP

2' - 0" 2'TYP - 0" 0' - 4" 0'TYP - 4"TYP TYP 1' - 4" 1'TYP - 4" TYP

PRINCIPAL PRINCIPAL ININ CHARGE: CHARGE:

PROJECT PROJECT MANAGER: MANAGER: MEL MEL AMINOFF AMINOFF PROJECT MANAGER: 7.9. 7.9. CORRIDOR CORRIDORWALLS WALLS (SMOKE (SMOKE PARTITION) PARTITION) MEL AMINOFF OPEN OPEN PARKING PARKINGSTRUCTURE STRUCTUREBELOW BELOWOCCUPANCY OCCUPANCYGROUP GROUPI, I,FIRE FIRESEPARATION SEPARATION 5.3. OPEN PARKINGBUILDING STRUCTURE BUILDINGBELOW OCCUPANCY GROUP I, FIRE SEPARATION BUILDING METAL METAL FASCIA FASCIA METAL FASCIA DRAWN DRAWN BY: BY: DRAWN BY: LUDMILA LUDMILA PAREKH PAREKH NYSBC NYSBCSECTION SECTION710, 710,716.5.5, 716.5.5, 407.3 407.3 LUDMILA1PAREKH CORRIDOR WALLS SHALL BE CONSTRUCTED AS SMOKE ELEVATIONS ELEVATIONS 1/ 1 ELEVATIONS METAL PANELS 1" INSUL GL - TYP SKEWED PER NYSBC NYSBC 508.7, 508.7,507.1 507.1 2 2HR HRMIN MIN FIRE FIRE SEPARATION SEPARATION PER TABLE TABLE NYSBC 302.3.2, 302.3.2, 508.7, BETWEEN BETWEEN 507.1 S-2(OPEN S-2(OPEN PARKING 2 HR MIN FIRE SEPARATION PER TABLE 302.3.2, S-2(OPEN MA MA KN / PARKING KN / RA / RA MA / PARKING KN / RA CHECKED CHECKED BY: BY: CHECKEDBETWEEN BY: . SINGLE SINGLE PATIENT PATIENT HOLDING HOLDING ROOM ROOM SINGLE PATIENT HOLDING ROOM PARTITIONS (0EGRESS HR.CORRIDOR WITH SPRINKLER 2000 2000NFPA NFPA18.3.6.2 18.3.6.2 ADULT ADULT MILIEU MILIEU EGRESS CORRIDOR EGRESS CORRIDOR CORRIDOR CORRIDOR CORRIDOR 1" INSUL SPANDREL GL - SYSTEM) TYP STRUCTURE) STRUCTURE)BELOW BELOWAND ANDI-2I-2OCCUPANCY OCCUPANCY ABOVE. ABOVE. UAUAPROJ STRUCTURE) BELOW AND I-2 OCCUPANCYSCALE: ABOVE. UA PROJ NO. DATE: PROJ NO. NO. DATE: SCALE: SCALE: DATE: A-414 A-414 A-414 0801-00 0801-00 1/8" 1/8" = 1'-0" = 1'-0" 1/8" = 1'-0" 08/13/2009 08/13/2009 08/13/2009 MEANS MEANSOF OFEGRESS EGRESSBETWEEN BETWEENI-2I-2AND ANDS-2, S-2,REQUIRES REQUIRESAA2 2HR HRFIRE FIRERESISTANCE RESISTANCE MEANS OF EGRESS BETWEEN I-2 AND S-2, REQUIRES A 2 0801-00 HR FIRE RESISTANCE PRINCIPAL PRINCIPAL ININ CHARGE: CHARGE: NAT NAT BARRANCO BARRANCO PRINCIPAL IN CHARGE: NAT BARRANCO 6 6 RATING. RATING. RATING. SBUH SBUH PROJECT PROJECT ## SBUH PROJECT #

INTERIOR J'ai J'ai mené mené ce ce projet projet en en INTERIOR alignant alignantFIF architectural avec avec les les autres autres cc ROLE architectural I coordinated this impliqués, project, aligning the métier métier impliqués, en enarchitecture développant développant CODE CODECOMPLI COMPLl with the other professionals involved, developed NOTES NOTES dans dans Revit-BIM, Revit-BIM, en en détermin détermi the model in Revit, determined types, room la nouveaux nouveaux types typeswall de de murs, murs, la dispos dispo lay-outs, elevations, wall sections and prepared salles, salles, les les élévations, élévations, les les coupes coupes m m drawings for client presentations and construction en en préparant préparant les les plans plans desti dest submissions. présentations présentations faites faites au au client, client, no no WALL SECTION 2 les les plans plans d’exécution. d’exécution. CANOPY

EAST HANOVER NJ 07

ALUM. CURTAIN WALL

ROLE

6 A302

- TYP 4.2.ST STL BASE CORRIDOR WALLS

NYSBC NYSBC- TABLE - TABLE1016.1 1016.1

2' - 0" 2'TYP - 0" TYP

1'-0" 1'-0"

5 A302

EMERGEN EMERGE PROGRA PROGRA

2 HRS. (PER CANNON COMPLIANCE LEGEND NOTE STRUCTURAL ENGINE MIN OF 1 ½ HRS YSRAEL A. SEINUK, P ONE WOODBRIDGE 0 HR. (IF ROOF CONSTRUCTION IS 20’-0” OR MOREC WOODBRIDGE, NJ 070

1 HR. FIRE RESISTANCE RATING, DOORASSEMBLIE

1" INSUL. TEMPERED FROSTED GL. 7.9. CORRIDOR WALLS (SMOKE PARTITION) PROJECT PROJECT TITLE: TITLE: SECTION 710, 716.5.5, 407.3 PROJECT TITLE: FIRE FIRERESISTANCE RESISTANCERATING RATINGNOT NOTREQUIRED REQUIRED NYSBC FIRE RESISTANCE RATING NOT REQUIRED ST.ST. STL. BASE ST. STL. BASE STL. BASE CONTINUITY CONTINUITYTO TODECK, DECK,SEALED SEALEDWINDOWS, WINDOWS, 2000 SMOKE SMOKE NFPAAND 18.3.6.2 AND DRAFT DRAFTADULT CONTROL CONTROL DOORS. DOORS. CONTINUITY TOPRINCIPAL DECK, SEALED WINDOWS, MILIEU STONY STONY BROOK BROOK STON PRINCIPAL ININCHARGE: CHARGE:SMOKE (716.5.5) (716.5.5)EXCEPTION: EXCEPTION:SMOKE SMOKEDAMPERS DAMPERSARE ARE NOT NOT REQUIRED REQUIRED WHERE WHERE THE THE OPENINGS OPENINGS IN IN DUCTS DUCTS ARE ARE LIMITED LIMITED (716.5.5) TO TO EXCEPTION: SMOKE DAMPERS ARE NOT R UNIVERSITY UNIVERSITYHOSPITAL HOSPITAL UNIVERSI AASINGLE SINGLESMOKE SMOKECOMPARTMENT COMPARTMENTAND ANDTHE THEDUCTS DUCTSARE ARECONSTRUCTED CONSTRUCTED OF OFSTEEL STEEL A SINGLE SMOKE COMPARTMENT AND THE DUCTS 6 PROJECT PROJECT MANAGER: MANAGER: SIDEWALK SIDEWALK SIDEWALK COMPREHENSIVE COMPREHENSIVE COMPR 1" 1" INSUL. INSUL. TEMPERED TEMPERED FROSTED FROSTED GL.GL.

FIN. FL. FL

G. 8.1.

6'-0"

1" INSUL SPANDREL GL - TYP

I-2/STORAGE/OPEN I-2/STORAGE/OPENPARKING PARKINGSTRUCTURE) STRUCTURE)- 2HRS. - 2HRS.

17' 17'- 0" - 0"

B BOOCANOPY CANOPY 10' 10'- 7- 71/4" 1/4" NYSBC NYSBC- SECTION - SECTION407.3 407.3 EAST EAST ELEVATION ELEVATION INSUL INSUL SPANDREL SPANDREL GLGL - TYP - TYP 7 71" 1" SCALE SCALE1/8" 1/8"= =1'-0" 1'-0"

302.3.2

MET.WALL PANEL

ROOF DRAIN 3 HRS (PER CANNON COMPLIANCE LEGEND NOTES 1 TABLE 601A312 REQUIRES MIN OF 2 HRS

A311

PSYCHIATRIC PSYCHIATRIC FIN. FL.

8"

1"T.O. 1" INSUL INSUL GL GL - TYP - TYP T.O. PARAPET PARAPET

1'-9" 1'-9"

5.2. 5.2.

REQUIRED SEPARATION OF OCCUPANCIES

REFERENCE TABLE 602 DISTANCE SEPARATIONS.

equipment.

CHAPTER 8 - INTERIOR FINISHES EMERGENCY EMERGENCY INTERIOR FINISHES PROGRAM PROGRAM

VERTICAL VERTICALEXITS EXITS&&EXIT EXITPASSAGEWAYS PASSAGEWAYS-INTERIOR CLASS - CLASSAA(CLASS FINISH (CLASSREQUIREMENTS BBIFIFSPRINKLERED) SPRINKLERED) EXTERIOR EXTERIOR SHELL SHELL & SITE EXIT EXITACCESS ACCESSCORRIDORS CORRIDORSAND ANDOTHER OTHER EXITWAYSNYSBC EXITWAYSTABLE CLASS CLASS 803.4 A& ASITE (CLASS (CLASSBBIFIFSPRINKLERED) SPRINKLERED) ROOM ROOMAND ANDENCLOSED ENCLOSEDSPACES SPACES- CLASS - CLASS A 2000 A(CLASS (CLASS - NFPA BWALL B101 IFIFSPRINKLERED) 10.2, SPRINKLERED) 18.3.2 SECTION DRAWING DRAWING TITLE: TITLE: 2

SCALE 1/2" = 1'-0"

VERTICAL VERTICALEXITS EXITS&&EXIT EXITPASSAGEWAYS, PASSAGEWAYS,EXIT INTERIOR EXITNYSBC NYSBC FLOOR 804, 804,804.5, FINISHES 804.5,805.5.1 805.5.1 WALL WALL SECTIONS SECTIONS11 ACCESS ACCESSCORRIDORS CORRIDORS&&NON NONSEPARATED SEPARATED ROOMS ROOMS 2000 NFPA 18.3.3 INTERIOR FLOOR FINISHES 10.2.8 SPRINKLERS 8/20/2009 2:48:52 PM 8/20/2009 2:48:52 PM

66 A302 A302

J

6 A302

RAINSCREEN

B O CANOPY 10' - 7 1/4"NYSBC I-2/S-2 I-2/S-2(OPEN (OPENPARKING PARKINGSTRUCTURE) STRUCTURE) - 2- 2HRS. HRS. - TABLE

STST STL STL BASE BASE - TYP - TYP 4.2. 4.2. CORRIDOR CORRIDOR WALLS WALLS

77

A302 A302

5.1. 5.1.

GALVANIZED STEEL SCREEN SUPPORT

rooftop of this extension to hide the mechanical

PRINCIPAL PRINCIPAL ININ CHARGE: CHARGE:

NAT NAT BARRANCO BARRANCO

-28.rvt -28.rvt

55 A302 A302

D.D.

EPDM ROOFING

0 HRS

49 49 WEST WEST 37th 37th STREET STREET

ROLE

4.1.

SLOPE

T/O MET. DECK T/OT/O MET. MEMET. MEDECK DECK

6'-0" 6'-0"

REQUIRED REQUIREDSEPARATION SEPARATIONOF OFOCCUPANCIES OCCUPANCIES

1" 1" INSUL INSUL SPANDREL SPANDREL GLGL - TYP - TYP

A302 A302

17'METAL - 0" PANEL

RAINSCREEN RAINSCREEN

TABLE - TABLE302.3.2 302.3.2

5

A302

C.T.O. PARAPET CHAPTER 4 - FIRE SEPARATIONS

17' 17' - METAL 0" - 0" PANEL METAL PANEL

J

A.1 A.1

A302 A302

5 A312

8" 8"

T.O. T.O.PARAPET PARAPET C.C. CHAPTER CHAPTER4 4- FIRE - FIRESEPARATIONS SEPARATIONS

B BOOCANOPY CANOPY 10' 10'- 7- 71/4" 1/4" NYSBC NYSBC-

88 A302 A302

RAINSCREEN FIRE FIRESEPARATIONS SEPARATIONSARE ARENOT NOTREQUIRED REQUIRED NYSBC BETWEEN BETWEEN 302.3.1USES, USES,EXCEPT EXCEPTAS ASREQUIRED REQUIRED BY BYOTHER OTHERPROVISIONS PROVISIONS 33 77 44 88

A251 A251

7.5. 7.5.

SLOPE SLOPE

8/20/2009 11:01:45 AM

JJ

M

CIVIL ENGINEERS:

SLOPE SLOPEBET CONSULTANTS FLOOR FLOORCONSTRUCTION CONSTRUCTION 36 ROUTE 10 EAST HANOVER NJ 07936 INCLUDING INCLUDINGSUPPORTING SUPPORTING BEAMS BEAMSAND ANDJOISTS JOISTS PROJECT TITLE:

SLOPE NEW NEW YORK, YORK, NYNY 10018 10018 MET.WALL MET.WALL PANEL PANEL 7.5. FLOOR CONSTRUCTION t. 212.239.0220 t. 212.239.0220 f. 212.563.5621 f. 212.563.5621 ROOF ROOF DRAIN DRAIN 3 3HRS HRS(PER (PER CANNON CANNONCOMPLIANCE COMPLIANCE LEGEND LEGEND NOTES) NOTES)SUPPORTING BEAMS AND JOISTS T/O MET. ME DECK INCLUDING C. CHAPTER 4 - FIRE SEPARATIONS, CONT.: 1 1 TABLE TABLE601 601 REQUIRES REQUIRESMIN MINOF OF2 2HRS HRS A312 A312 60 60 PARK PARK PLACE, PLACE, SUITE SUITE 302302 1 HR. AND AUTO. FIRE-EXTINGUISHING SYSTEM SUBDIVISION SUBDIVISION OFBUILDING BUILDINGSPACES SPACES- (SMOKE - (SMOKECOMPARTMENTS-ZONES) COMPARTMENTS-ZONES) 4.7. SUBDIVISIONSTONY OF BUILDING SPACES - (SMOKE COMPARTMENTS-ZONES) BM-TYP. BM-TYP. BM-TYP. NEWARK, NEWARK, NJNJ 07102 07102 STONY BROOK BROOK STONY BROOK H OF G A.1 7.6. 7.6. ROOF ROOF CONSTRUCTION CONSTRUCTION 7.6. ROOF CONSTRUCTION 2" 2" E.J.E.J. 2" E.J. EXIST. EXIST. EXIST. t. 973.639.0194 t. 973.639.0194 ROOF DRAIN ROOF DRAIN ROOF DRAIN SPRAY-ON SPRAY-ON FIRE FIRE PROOFING PROOFING SPRAY-ON FIRE PROOFING INDEPENDENT INDEPENDENT EGRESS EGRESS INDEPENDENT EGRESS CANOPY CANOPY CANOPY 1 HR. AND AUTO. FIRE-EXTINGUISHING SYSTEM UNIVERSITY UNIVERSITY HOSPITAL HOSPITAL UNIVERSITY HOSPITAL f. 973.639.0077 f. 973.639.0077 INCLUDING INCLUDINGSUPPORTING SUPPORTINGBEAMS BEAMS INCLUDING SUPPORTING BEAMS SPRAY-ON SPRAY-ON FIREFIREPROOFING PROOFING SPRAY-ON FIRE- PROOFING 3 7 8 2HRS EXIST EXIST DECK DECK AND AND BEAMS BEAMS 2HRS EXISTWITHOUT DECK AND BEAMS NYSBC NYSBC1407.4.2 407.4.2 AAMEANS MEANS4OF OFEGRESS EGRESS FROM FROMEACH EACHSMOKE SMOKE NYSBC COMPARTMENT COMPARTMENT 407.4.2 WITHOUT HAVING HAVINGTO TORETURN RETURNTHROUGH THROUGHTHE THE A MEANS OF EGRESS FROM EACH SMOKE COMPARTMENT WITHOUT HAVING TO RETURN THROUGH THE HR. 2HRS COMPREHENSIVE COMPREHENSIVE COMPREHENSIVE TABLE TABLE3402.1.1 3402.1.1 2 2HRS. HRS.(PER (PERCANNON CANNONCOMPLIANCE COMPLIANCELEGEND LEGEND TABLE NOTES) NOTES) 3402.1.1 TABLE TABLE601 601REQUIRES REQUIRESAA A251 A302 A302 A302 STRUCTURAL STRUCTURAL ENGINEERS: ENGINEERS: SMOKE SMOKECOMPARTMENT COMPARTMENTOF OFEGRESS EGRESSORIGINATION'S ORIGINATION'SREQUIRED. REQUIRED. SMOKE COMPARTMENT OF EGRESS ORIGINATION'S REQUIRED. MIN MINOF OF1 1½½HRS HRS PSYCHIATRIC PSYCHIATRIC PSYCHIATRIC SPRAY-ON FIRE SPRAY-ON FIRE SPRAY-ON FIRE YSRAEL YSRAEL A. A. SEINUK, SEINUK, PCPC PROJECT PROJECT TITLE: PROJECT TITLE: STST STL STL SCREEN SCREEN ON ON ST STL SCREEN ON TITLE: PROOFING TYP PROOFING TYP PROOFING TYP ONE ONE WOODBRIDGE WOODBRIDGE CENTER CENTER SUITE SUITE 510 510 0 0HR. HR.(IF(IFROOF ROOFCONSTRUCTION CONSTRUCTIONISIS20’-0” 20’-0” OR ORMORE MORE ABOVE ABOVE FLOOR) FLOOR) GALVANIZED GALVANIZED STL STL GALVANIZED STL EMERGENCY EMERGENCY EMERGENCY 4" 4" DIADIA HOLE HOLE @@ CENTER CENTER OFOF 4" DIA HOLE @ CENTER OF WOODBRIDGE, WOODBRIDGE, NJNJ 07095 07095 CHAPTER CHAPTER5 5- GENERAL - GENERALBUILDING BUILDINGHEIGHTS HEIGHTSAND ANDAREAS AREAS D. CHAPTER 5 - GENERAL BUILDING HEIGHTS AND AREAS STRUCT STRUCT STRUCT W27x94 W27x94 FOR FOR 3" 3" ROOF ROOF DRAIN DRAIN W27x94 FOR 3" ROOF DRAIN 7.7. 7.7. FIRE FIREBARRIERS BARRIERS 7.7. FIRE BARRIERS PROGRAM PROGRAM PROGRAM STONY STONYBROOK BROOK STONY BROOK H G A.1 6" 6" 6" FIRE SEPARATIONS ARE NOTAREAS REQUIRED BETWEEN USES, EXCEPT AS REQUIRED ALLOWABLE ALLOWABLE HEIGHT HEIGHTAND ANDBUILDING BUILDING AREAS 5.1. ALLOWABLE HEIGHT AND BUILDING AREAS UNIVERSITY UNIVERSITY HOSPITAL HOSPITAL NYSBC NYSBCSECTION SECTION706 706 UNIVERSITY HOSPITAL NYSBC SECTION 706 MEP MEP ENGINEERS: ENGINEERS: BY OTHER PROVISIONS 3 7 4 8 SHAFT SHAFT ENCLOSURES ENCLOSURES 706.3.1, 706.3.1, 707.4 707.4 2 2 HRS HRS SHAFT ENCLOSURES LIZARDOS LIZARDOS ENGINEERING ENGINEERING ASSOCIATES ASSOCIATES 706.3.1, 707.4 EXTERIOR EXTERIOR SHELL SHELL & & SITE SITE EXTERIOR SHELL & SITE CANOPY NYSBC NYSBC- TABLE - TABLE503 503 NYSBC - TABLE 503 OCCUPANCY STORIES STORIESAND ANDAREA AREA UNLIMITED UNLIMITED-WITHOUT -WITHOUT MODIFICATIONS MODIFICATIONS OCCUPANCY GROUP GROUPI-2, I-2, STORIES AND AREA UNLIMITED -WITHOUT MODIFICATIONS OCCUPANCY GROUP I-2, CANOPY 4 4 4 COMPREHENSIVE COMPREHENSIVE COMPREHENSIVE A251 A302 A302 A302 200 200 OLD OLD COUNTRY COUNTRY ROAD ROAD N.I.C N.I.C N.I.C EXIT EXITENCLOSURES ENCLOSURES 706.3.2, 706.3.2, 1019.1 1019.1 2 2HRS HRS EXIT ENCLOSURES 706.3.2, 1019.1 MINEOLA, MINEOLA, NYNY 11501 11501 CONSTRUCTION CONSTRUCTIONTYPE TYPE1A1A CONSTRUCTION TYPE 1A PSYCHIATRIC PSYCHIATRIC PSYCHIATRIC METAL METAL COPING COPING METAL COPING STST STL STL SCREEN SCREEN ON ON ST STL SCREEN ON DUCT - NIC DUCT - NIC - NIC DRAWING DRAWING TITLE: TITLE: DRAWING TITLE: 1" 1" INSUL. INSUL. GL. -1 U.O.N. - HR U.O.N. EXIT EXITPASSAGEWAYS PASSAGEWAYS 706.3.3, 706.3.3, 1020.1 1020.1 1GL.DUCT HR MIN MINAND ANDNOT NOTLESS LESSTHAN THANTHE THERATING RATING EXIT OF OF PASSAGEWAYS EXIT EXITENCLOSURES ENCLOSURES 706.3.3, THEY THEY 1020.1 ARE ARECONNECTED CONNECTEDTO TO GALVANIZED GALVANIZED STL STL GALVANIZED STLON COL. -TYP. COL. -TYP. COL. -TYP. EMERGENCY EMERGENCY EMERGENCY CIVIL CIVIL ENGINEERS: ENGINEERS: BUILDINGS BUILDINGS ON ONTHE THESAME SAMELOT LOT 5.2. BUILDINGS THE SAME LOT STRUCT STRUCT STRUCT SUSP. CL'G (8'-6" AFF) - NIC SUSP. CL'G (8'-6" AFF) - NIC SUSP. CL'G (8'-6" AFF) - NIC BET BET CONSULTANTS CONSULTANTS SUSP CL'G (8'-6" AFF) - NIC SUSP CL'G (8'-6" AFF) - NIC SUSP CL'G (8'-6" AFF) - NIC SUSP. CL'G SUSP. CL'G SUSP. CL'G HORIZONTAL HORIZONTAL EXITS EXITS 706.3.4, 706.3.4, 1021.1 1021.1 2 2 HRS HRS HORIZONTAL EXITS 706.3.4, 1021.1 PROGRAM PROGRAM PROGRAM 36 36 ROUTE ROUTE 10 10 NYSBC NYSBC 503.1.3 503.1.3 BUILDINGS BUILDINGSON ONTHE THESAME SAMELOT LOTSHALL SHALL NYSBC BE BEREGULATED REGULATED 503.1.3BUILDING AS ASSEPARATE SEPARATEBUILDINGS BUILDINGSOR ORSHALL SHALLBE BE BUILDINGS ON THE SAME LOT SHALL BE REGULATED AS SEPARATE BUILDINGS OR SHALL BE BUILDING BUILDING EAST EAST HANOVER HANOVER NJNJ 07936 07936 COL. BEYOND METAL METAL FASCIA FASCIA METAL FASCIA COL. COL. BEYOND BEYOND CONSIDERED CONSIDEREDAS ASPORTIONS PORTIONSOF OFONE ONEBUILDING, BUILDING,ELEVATIONS IFELEVATIONS IFTHE THEHEIGHT HEIGHTAND AND AGGREGATEAREA AREASATISFY SATISFYTHE THE CONSIDERED AS PORTIONS OF ONEUSE BUILDING, IF THE HEIGHT AND INCIDENTAL INCIDENTAL USETABLE TABLEELEVATIONS 302.1.1 302.1.1 INCIDENTAL USE TABLE 302.1.1 11AGGREGATE 1 AGGREGATE AREA SATISFY THE N.I.C. LIMITATIONS LIMITATIONSOF OFTABLE TABLE503. 503. LIMITATIONS OF TABLE 503. EXTERIOR EXTERIORN.I.C. SHELL SHELL&&SITE SITE EXTERIOR N.I.C. SHELL & SITE I-2/S-2 (OPEN PARKING STRUCTURE) - 2 HRS. N.I.C N.I.C N.I.C 7.8. 7.8. SMOKE SMOKEBARRIERS BARRIERS 7.8. SMOKE BARRIERS ALUM. ALUM. CURTAIN CURTAIN WALL WALL 2 2 2 SPRAY-ON FIRE PROOFING SPRAY-ON FIRE PROOFING SPRAY-ON FIRE PROOFING I-2/STORAGE/OPEN PARKING STRUCTURE) 2HRS. N.I.C N.I.C 407.3.1. N.I.C NYSBC NYSBC SECTION SECTION 709 709 1 1 HR. HR. FIRE FIRE RESISTANCE RESISTANCE RATING, RATING, DOORASSEMBLIES DOORASSEMBLIES NYSBC SECTION PER PER 709 407.3.1. METAL METAL COPING COPING METAL COPING DRAWING DRAWING TITLE: TITLE: DRAWING TITLE: MET. DECK T/OT/O MET. DECK

4 HRS. (PER CANNON COMPLIANCE NOTES) PROJECT PROJECT TITLE: TITLE: TABLE 601 REQUIRES A MINIMUM OF 3 HRS. 3 HRS. (SUPPORTING ROOF ONLY)

7.4. NON-BEARING WALLS AND PARTITIONS REFERENCE REFERENCETABLE TABLE602 602DISTANCE DISTANCESEPARATIONS. SEPARATIONS. EXTERIOR

C:\Revit Local Files\CPEP A LOCAL.rvt C:\Revit Local Files\CPEP A LOCAL.rvt 8/20/2009 11:01:45 AM

66 A302 A302

GG

4.7. 4.7.

MET.WALL PANEL

SCREEN SUPPORT SCREEN SUPPORT

LIZARDOS ENGINEERING ASSOCIATES

200 OLD COUNTRY ROAD NON-BEARING NON-BEARINGWALLS WALLS AND ANDPARTITIONS PARTITIONS MINEOLA, NY 11501 EPDM ROOFING EXTERIOR EXTERIOR

8'-6"

55 A302 A302

3.4.METAL PANEL NON SEPARATED USES

A302 A302

A312

14'-0" 14'-0"

HH

A302 A302

EXISTING BLDG.

1" INSUL SPANDREL GL - TYP CIVIL CIVIL ENGINEERS: ENGINEERS: BET BET CONSULTANTS CONSULTANTS 3636 ROUTE ROUTE 1010 EAST EAST HANOVER HANOVER NJNJ 07936 07936 PROJECT PROJECT TITLE: TITLE:

7.4. 7.4.

3 EQ SP

11'-4"

MM

A251 A251

MET.WALL PANEL MET.WALL PANEL

5 5 A312 A312

HAZARDOUS AREA PROTECTION - 2000 - NFPA 101 TABLE C.C.18.3.2.1CHAPTER CHAPTER4 4- FIRE - FIRESEPARATIONS, SEPARATIONS,CONT.: CONT.:

1 1HR. ANDAUTO. AUTO.FIRE-EXTINGUISHING FIRE-EXTINGUISHING STORAGE SYSTEM SYSTEM ROOMS OVER SQ FT M 100 A.1 HHR. H AND GG A.1 1 1HR. HR.AND ANDAUTO. AUTO.FIRE-EXTINGUISHING FIRE-EXTINGUISHING SOILED SYSTEM SYSTEM LINEN ROOMS 33 77 44 1 1HR. HR. BOILER AND FUEL-FIRED HEATER ROOMS

LIZARDOS LIZARDOS ENGINEERING ENGINEERING ASSOCIATES ASSOCIATES 200 200 OLD OLD COUNTRY COUNTRY ROAD ROAD METAL PANELS MINEOLA, MINEOLA, NYNY 11501 11501 EPDM ROOFING ROOFING 1" INSUL GL - TYPEPDM

HONED FACE CMU

1" 1" INSUL INSUL SPANDREL SPANDREL GLGL - TYP - TYP

NORTH ELEVATION SCALE 1/8" = 1'-0"

NEWARK, NJ 07102 t. 973.639.0194 f. 973.639.0077

1'-2"

3.4. 3.4. NON NONSEPARATED SEPARATEDUSES USES METAL METAL PANEL PANEL

6

SKEWED 1" 1" INSUL INSUL GLGL - TYP - TYP

8/20/2009 11:01:45 AM 8/20/2009 11:01:45 AM

JJ

3.3.

A312 A312

1 HR. OR AUTO. FIRE-EXTINGUISHING SYSTEM 3 EQ 3 EQ SPSP 4' - 6" 8' - 0" 6' - 4" METAL PANELS 1 HR. OR AUTO.. FIRE-EXTINGUISHINGEXISTING SYSTEM EXISTING BLDG. BLDG.

METAL METAL PANELS PANELS

C:\Revit Local Files\CPEP A LOCAL.rvt C:\Revit Local Files\CPEP A LOCAL.rvt C:\Revit Local Files\CPEP A LOCAL.rvt 8/20/2009 11:01:45 AM C:\Revit Local Files\CPEP A LOCAL.rvt 8/20/2009 11:01:45 AM 8'-0"

STORAGE STORAGEROOMS ROOMSOVER OVER 100SQ SQFTFT MM100 SOILED SOILEDLINEN LINENROOMS ROOMS BOILER BOILERAND ANDFUEL-FIRED FUEL-FIREDHEATER HEATERROOMS ROOMS

4.1. 4.1.

6

NEWARK, NEWARK, NJNJ 07102 07102 t. 973.639.0194 t. 973.639.0194 f. 973.639.0077 f. 973.639.0077 7

8'-6" 8'-6"

BOILER BOILERAND ANDFURNACE FURNACEROOMS ROOMS

HAZARDOUS HAZARDOUSAREA AREAPROTECTION PROTECTION- 2000 - 2000- NFPA - NFPA101 101TABLE TABLE18.3.2.1 18.3.2.1

NYSBC NYSBC302.3.1 302.3.1

AREAS - TABLE 302.1.1

NORTH ELEVATION

77

MEP MEP ENGINEERS: ENGINEERS: MEP ENGINEERS: 7.2. 7.2. STRUCTURAL STRUCTURALFRAME FRAME 7.2. STRUCTURAL FRAME ST STL BASE - TYP 66 A321 A321 A3216 - (SMOKE COMPARTMENTS-ZONES) 1-2 INSTITUTIONAL SUBDIVISION SUBDIVISION OF OFBUILDING BUILDINGSPACES SPACES - (SMOKE - (SMOKECOMPARTMENTS-ZONES) COMPARTMENTS-ZONES) 4.6. SUBDIVISION OF BUILDING SPACES A321 A321 4 4HRS. HRS.(PER (PERCANNON CANNONCOMPLIANCE COMPLIANCENOTES) NOTES) INCLUDING INCLUDINGCOLUMNS, COLUMNS, GIRDERS GIRDERS INCLUDING COLUMNS, GIRDERS LIZARDOS LIZARDOS ENGINEERING ENGINEERING ASSOCIATES ASSOCIATES A321 LIZARDOS ENGINEERING ASSOCIATES 88 9AREA 9COUNTRY 8 9 COUNTRY REFUGE REFUGE AREA AREA CARE (HOSPITAL) REFUGE STRUCTURAL STRUCTURAL ENGINEERS: ENGINEERS: STRUCTURAL ENGINEERS: 200 200 OLD OLD COUNTRY ROAD ROAD 200 OLD ROAD HEALTH METAL METAL PANELS PANELS METAL PANELS TABLE TABLE601 601REQUIRES REQUIRESAAMINIMUM MINIMUMOF OF3 3HRS. HRS. MINEOLA, MINEOLA, NYNY 11501 11501 MINEOLA, NY 11501 3 EQ 3 EQ SP SP 3 EQ SP 2" 2" EXP.JT. EXP.JT. 2" EXP.JT. 4' 6" 8' 0" 6' 4" METAL PANELS HONED FACE CMU YSRAEL YSRAEL A.SMOKE A. SEINUK, SEINUK, YSRAEL SEINUK, PCBARRIER PER HOUSED PATIENT. SKEWED 1" 1" INSUL INSUL GLGL - TYP - TYP 1" INSUL GL -SMOKE TYP PCPC NYSBC NYSBC 407.4.1 407.4.1 > >NET NET30* 30*SQ/ SQ/FT FTPER PERPATIENT PATIENTON ONEACH EACH NYSBC SIDE SIDE 407.4.1 OF OF BARRIER BARRIER PER PERHOUSED HOUSEDPATIENT. PATIENT. > NET 30* SQ/ FT PER PATIENT ON EACH SIDE OFA.SMOKE TRUSSES TRUSSES 3 3HRS. HRS.(SUPPORTING (SUPPORTINGROOF ROOFONLY) ONLY) TRUSSES 88 . ONE ONE WOODBRIDGE WOODBRIDGE CENTER CENTER SUITE SUITE 510 510 8 ONE WOODBRIDGE CENTER SUITE 510 1" 1" INSUL INSUL SPANDREL SPANDREL GLGL - TYP - TYP 1" INSUL SPANDREL GL - TYP METAL METAL PANELS PANELS METAL PANELS WOODBRIDGE, WOODBRIDGE, NJNJ 07095 07095 WOODBRIDGE, NJ 07095 A321 A321 A321 CIVIL CIVIL ENGINEERS: ENGINEERS: CIVIL ENGINEERS: EPDM EPDM ROOFING ROOFING > >6*6*NET NETSQ. SQ.FTFTPER PERPATIENT PATIENTON ONEACH EACHSIDE SIDE OF OF SMOKE SMOKE BARRIER BARRIERPER PER NON NONHOUSED HOUSEDPATIENT PATIENT > 6* NET SQ. FT PER PATIENT ON EACH SIDE OF SMOKE BARRIER PER NON HOUSED PATIENT BET BET CONSULTANTS CONSULTANTS BET CONSULTANTS 3636 ROUTE ROUTE 1010 36 ROUTE 10 PARTITIONS 7.3. NON-BEARING NON-BEARINGWALLS WALLS AND AND PARTITIONS 7.3. NON-BEARING WALLS AND PARTITIONS (15* (15*NET NETSQ SQFT FTPER PERNFPA) NFPA) (15* NET SQ FT7.3. PER NFPA) 1" INSUL GL - TYP 77 7 EAST EAST HANOVER HANOVER NJNJ 07936 07936 EAST HANOVER NJ 07936 1'-8" 1'-8" 1'-8" 1 HR. OR AUTO. FIRE-EXTINGUISHING SYSTEM MEP MEP ENGINEERS: ENGINEERS: MEP ENGINEERS: (*(*AGGREGATE AGGREGATEAREA AREA OF OFCORRIDORS, CORRIDORS,PATIENT PATIENT &&TREATMENT TREATMENTROOMS, ROOMS, LOUNGES) LOUNGES) (* AGGREGATE AREA3 OFINTERIOR CORRIDORS, PATIENT & TREATMENT ROOMS, LOUNGES) ST STL BASE - TYP INTERIOR INTERIOR 0 0HRS HRS GALVANIZED A321 A321 A321 3 3 STEEL GALVANIZED STEEL

11'-4" 11'-4"

STST STL STL BASE BASE - TYP - TYP

NORTH NORTHELEVATION ELEVATION SCALE SCALE1/8" 1/8"= =1'-0" 1'-0"

RAINSCREEN RAINSCREEN

B O CANOPY INCIDENTAL USE 10' - 7 1/4" NORTH ELEVATION

3.2.

HONED HONED FACE FACE CMU CMU

SCALE 1/8" = 1'-0" STORAGE 1 1HR. HR.OR ORAUTO. AUTO.FIRE-EXTINGUISHING FIRE-EXTINGUISHING SYSTEM SYSTEMROOMS OVER 100 SQ FT WASTE AND LINEN COLLECTIONS LEVEL 4 0" ROOMS OVER 100 SQ FT 1 1HR. HR.OR ORAUTO. AUTO.FIRE-EXTINGUISHING FIRE-EXTINGUISHING SYSTEM SYSTEM - 6" - 6" 8' 8' - 0" - 0" 6' 6' - 4" - 4" METAL METAL PANELS PANELS HONED HONED FACE FACE CMU CMU SKEWED SKEWED 4' 4' . FIRE-EXTINGUISHING . FIRE-EXTINGUISHING 1 1HR. HR.OR ORAUTO. AUTO. SYSTEM SYSTEM BOILER AND FURNACE ROOMS

1" 1" INSUL INSUL GLGL - TYP - TYP

WASTE WASTE AND ANDLINEN LINENCOLLECTIONS COLLECTIONS LEVEL LEVEL 44 0"0" ROOMS ROOMSOVER OVER100 100SQ SQFTFT

66

8' 8' - 0" - 0"

1" INSUL GL - TYP

4.6. 4.6.

1'-2" 1'-2"

NORTH NORTHELEVATION ELEVATION SCALE SCALE1/8" 1/8"= =1'-0" 1'-0"

ROOF LEVELLOWER 4 2000 - DECK NFPA 101 6.1.5 0"T.O. METAL 11' 6' 6' - -4" - 4" 4" METAL METAL PANELS PANELS

8'-0" 8'-0"

REHABILITATION, EXTENSION AND RESTORATION - CITY PROJECTS

- 6" - 6" SKEWED SKEWED 4' 4' . .

B BOOCANOPY CANOPY 3.2. 3.2. 10' INCIDENTAL INCIDENTAL USE USEAREAS AREAS- TABLE - TABLE302.1.1 302.1.1 10'- 7- 71/4" 1/4"

3.3. 3.3.

GROUP: NYSBC - SECTION 308

1-2 1-2INSTITUTIONAL INSTITUTIONAL HEALTH HEALTHCARE CARE(HOSPITAL) (HOSPITAL)

STST STL STL BASE BASE - TYP - TYP

NORTH ELEVATION NORTH NORTH ELEVATION ELEVATION STORAGE STORAGE ROOMS ROOMSOVER OVER100 100SQ SQFTFT 66

10' - 7 1/4" T.O. METAL DECK OCCUPANCY/USE 14' - 0"

1" 1" INSUL INSUL GLGL - TYP - TYP

NYSBC NYSBC- SECTION - SECTION308 308

LOWER LOWER ROOF ROOF LEVEL LEVEL 44 2000 2000- DECK NFPA - DECK NFPA101 1016.1.5 6.1.5 T.O. T.O.METAL METAL 0"0" 11' 11'- 4" - 4"

° 80

10' 10'- 7- 71/4" 1/4" T.O. T.O.METAL METAL DECK DECK OCCUPANCY/USE OCCUPANCY/USE GROUP: GROUP: 14' 14'- 0" - 0"

° 80° 80

1' - 4" 1'TYP - 4" TYP

0' - 4" 0'TYP - 4" TYP

2.5° 2.5°

the addition to the existing hospital, while its

DRAWN DRAWNBY: BY:

PSYC EMER PRO

CHECKED CHECKEDBY: BY: VERTICAL EXITS & EXIT PASSAGEWAYS - CLASS A UA UAPROJ PROJ NO. NO SCALE: SCALE: AND OTHER EXTERIOR EXIT ACCESS CORRIDORS EXITWAYS 0801-0 0801 As Asindicated indicated ROOM AND ENCLOSED SPACES - CLASS A (CLASS DRAWING TITLE:

VERTICAL EXITS & EXIT PASSAGEWAYS, EXITSBUH NYSB SBU ACCESS CORRIDORS & NON SEPARATEDWALL ROOMSS

DOD DO

DRA DRA

PRINCIPAL IN CHARG


GFCI

FE55

PASSAGE 005X PASSAGE 005X

FE51

COPY RM 2 006J

FE55

FE51

A311

DN

PROJECT

PASSAGE 005X

A311

0' - 6"

SCALE: 1/4" = 1'-0"

5D

8' 0' - 6"

5D

8' 4

4

4 4

4 4

4

4

5D

A806

UP

Partial Cellar 1/4" = 1'-0"

OFFICE 3 006G

5D

4

5D

SMALL CONFERENCE SMALL ROOM CONFERENCE 006F ROOM 006F

5D

4

4

4

4

2

FE57

2

FE57

FE51

FE51

OPEN OFFICE 6 WEST OPEN OFFICE 6 006E WEST

FE53

FE53

006E

FE58

2

4

2

FE59

FE55

2

FE58

GFCI

GFCI

4

FE59

4

PASSAGE 005X PASSAGE 005X

0' 1' 2'

4'

0' 1' 2' 4' SCALE: 1/4" = 1'-0"

2 A806 2

A806

0' 1' 2'

4'

0' 1' 2' 4' SCALE: 1/4" = 1'-0"

4

4

4

4

2D

4 4

4 4

4

4

4

4

4 4

4 4

4

4

3D

3D

3D

FE59

3D

4

4

4

2

4

4

4

FE61

OFFICE FE582 006I OFFICE 006I

FE61 FE61

FE58

3D

2

FE55

FE55

FE60

FE51

ELEVATOR 3D MACH. ROOM ELEVATOR 005Z KITCHENETTE MACH. ROOM 3D 006C MECH. RM. 005Z 005Y MECH. RM. 3D FE55 005Y

FE61

FE58

FE59 A311

3D

A806

0' 1' 2'

2

4'

2D

N UP

1 A806

UP

2D

Partial Cellar Furniture & Power Plan - Room 1006 1/4" = 1'-0"

0' 1' 2'

8'

A311 1

4'

A311

Partial Cellar Furniture & Power Plan - Room 005 1/4" = 1'-0"

2D

2D

2D

2D

UP

FE57

FE57

East Wing existing conditions

0' 1' 2'

COPY RM 1 COPY RM 005C 1 005C

4'

8'

OFFICE 005B OFFICE 005B

SCALE: 1/4" = 1'-0"

FE57

FE61

FE61 FE61 FE61

5

FE54

A311 5

FE54

4

4

4

4 2

4

4

A311

3D FE58

FE58

2

FE58

3D

2

4

4

4

4

3D

4 4

4 4

3D

4

4

FE61 FE61

FE58

3D

FE59

2D

3D

3D

4

2D

2D

2D

4

TV MONITOR TYP TV MONITOR TYP

4

4

4

2

2

3D

3D

2

A806

Partial Cellar Furniture & Power Plan - Room 005 1/4" = 1'-0"Cellar Furniture & Power Plan - Room 005 Partial

0' 1' 2'

4'

0' 1' 2' 4' SCALE: 1/4" = 1'-0"

1/4" = 1'-0"

A806

1

0' 1' 2'

4'

8'

A311 1

0' 1' 2' 4' SCALE: 1/4" = 1'-0"

8'

A311

SCALE: 1/4" = 1'-0"

SCALE: 1/4" = 1'-0"

REHABILITATION, EXTENSION AND RESTORATION - CITY PROJECTS

A806 2

Partial Cellar Furniture & Power Plan - Room 005 1/4" = 1'-0"Cellar Furniture & Power Plan - Room 005 Partial 1/4" = 1'-0"

2

A806

8'

8'

1/4" = 1'-0"

4'

8'

SCALE: 1/4" = 1'-0"

West Wing

PROJECT

original brownstone piers, timber beams and brick vaults, and to

CITY HALL OFFICES BASEMENT RENOVATION

The project had two phases: (1) included the Situation room

excavate and create an access floor to conceal systems infrastructure

DESIGNED BY:

FE61

A311FE61 FE51

FE51

FE51 FE59

FE51

KITCHENETTE 006C

DRAWING TITLE:

3D

FE58

FE55

DRAWING TITLE:

2

4

4

4

4

FE51

4

UP TV UPMONITOR TYP = 1'-0" 1/4"

DN

ELEVATOR MACH. ROOM 005Z

DRAWN BY:

3D

LP MECH. RM.

SEAL: BY: 005Y DRAWN CHECKED BY: LP RS SEAL: CHECKED BY: RS DRAWING NUMBER:

3D

SCALE:

005X

1/4" = 1'-0" 03.02.09

DATE:

03.02.09

4

DRAWING NUMBER:

52

3D

A311

134

OF

NUMBER DESCRIPTION: SHEET NUMBER: REVISIONS:

0' 1' 2'

DATE:

FE57

A311

COPY RM 1 COPY RM 005C 1 005C

DATE:

DCAS SIGNATURE

DATE

DCAS SIGNATURE

DATE

4'

8'

SCALE: 1/4" = 1'-0"OFFICE SIGNATURE MAYOR'S

2D DATE

2D

MAYOR'S OFFICE SIGNATURE

2D DATE

2D

DDC SIGNATURE

DATE

DDC SIGNATURE

DATE

FE57

1

A311

1/4" = PASSAGE 1'-0"

SCALE: DATE:

52 134 OF Partial Cellar Furniture & Power Plan - Room NUMBER 006 DESCRIPTION:

2

LOUNGE

A311 4 006B

GFCI

2

SHEET NUMBER: REVISIONS:

4

4

DN

3D

UP

N

OFFICE 005B OFFICE 005B

2D

2D

FE57

OFFICE 005B

COPY RM 1 005C

DIVISION OF STRUCTURES OPEN OFFICE 5 BUREAU OF ARCHITECTURE & 005AOF STRUCTURES DIVISION ENGINEERING OPEN OFFICE 5 BUREAU OF ARCHITECTURE & 005A ENGINEERING

FE54

CITYHALL2 4 4 CITYHALL2 PROJECT NAME: 4 Hall4 Renovation of City PROJECT NAME: Renovation of City Hall

4 2

FE61

2

FE58

FE58

A311 5

A311

CAPITAL PROJECT NUMBER:

4

FE61 FE61

OPEN OFFICE 5 005A

5

FE54

CAPITAL PROJECT NUMBER:

FE61

4

4

FE54

FE59

FOR THE:

4

4

FE59

4

DRAWING TITLE:

3D

FE58

2

3D

FE58

3D

2

5

3D2

A311

3D

DRAWING TITLE:

2

4

4

3D

4 4

4 4

3D

4

4

FE61 FE61

FE58

3D

3D

4

2D

2D

4

4

4

4

3D

OFFICE 2 005D OFFICE 2 005D

3D

3D

4

LP

DRAWN BY:BY: CHECKED

LP RS

SCALE:

4

4

3D

1/4" = 1'-0"

SCALE: DATE:

1/4" = 1'-0" 03.02.09

DATE:

03.02.09

4

4

2

2

3D

3D

OFFICE 2 005D

A806

2

3D

2

MONITOR TYP

4

2D

DRAWN BY:

CHECKED BY: RS DRAWING NUMBER: TV MONITOR DRAWING NUMBER: TYP TV

3D

2D

2D

N

4

TV MONITOR TYP

4

2

UBAHN lay-out to the City Hall basement plans. AC units and hung ceilings to increase natural lighting by 50%, and West Wing of the City Hall Basement, and (2) was to renovate the adding low profile surface-mounted lighting complements and work-spaces and conference rooms located in the East Wing. The CITY HALL, NEW YORK CITY, NY / CLIENT: NYC Department of AdministraDve Services ARCHITECTS ROLE scope of this project was to upgrade the office space for 26 staff

central (ducted) air conditioning system. It followed principles of

within the 19th century City Hall basement, respecting the historic

sustainable design, keeping at least 75% of the existing fabric in place

I coordinated the second phase of this project aligning the architecture

building while adding data cabling infrastructure to facilitate the

and the footprint of the new sub-cellar is within the existing building,

project with the other professionals involved, to develop the model in

communication needs. The principal idea was to expose the structure

minimizing construction waste and the need for new materials, and site

Revit and prepare drawings for client presentations and construction

by peeling away layers of finish to the bare bones, revealing the

disturbance.

submissions.

4

2D

2

52 OF SHEET NUMBER:

52

1 OF

134

A311 1 DCAS SIGNATURE A311 DCAS SIGNATURE

2

APRIL/ 2009

1/4" = 1'-0"

0' 1' 2'

2D

134

Partial Cellar Furniture & Power Plan - Room 005SIGNATURE MAYOR'S OFFICE

N

4

DATE

DATE

DATE

DATE

DDC SIGNATURE

DATE

4' SIGNATURE8' DDC

DATE

1

A311

N

SHEET NUMBER:

3D

MAYOR'S OFFICE SIGNATURE

integrity of the building plan to give it a modern look and a functional

within it. The design encompassed removal of the existing window

N

PROJECT COMPLETION:

renovations to ascertain the original architectural and structural

(awarded in 2010 as the Best Government AV Project), located in the

ENTRANCE HALLWAY 006A

FE60

5

4

2

3D

A806

Partial Cellar Furniture & Power Plan - Room 005 0' 1' 2'

RESULTS OF PHASE 1 - WESTone WING Results of phase –

A311

OFFICE FE58 006I OFFICE 006I

and prepare drawings for client pres construction submissions PARTIAL CELLAR PLAN - FURNITURE AND POWER PLAN - RM 006 Partial Cellar Furniture and Power conditions Plan – Room 006 East Wing existing Partial Cellar Furniture and Power Plan – Room 006 Conducting a forensic analyses on construction and renovations to ascerta architectural and structural integrity o CHALLENGE plan to give it a modern look and a fun to the City Hall basement plans. Conducting a forensic analyses on 200 years of construction and 2D

2

3

FE61

FE56

A311

3D

FE51

CITYHALL2 COPY RM FE57 PROJECT NAME: FE61 2 Renovation COPY RM of City Hall PROJECT NAME: 006J 2 Renovation of City Hall

FOR THE:

OFFICE 006I

OFFICE 2 005D

2

4

2

A806 2

4

FE59

006H

4 4 DIVISION OF STRUCTURES FE58 BUREAU OF ARCHITECTURE & DIVISION OF STRUCTURES ENGINEERING FE58 BUREAU OF ARCHITECTURE & OPEN OFFICE 6 ENGINEERING FE61 CAPITAL PROJECT NUMBER: WEST FE57006E FE61 CITYHALL2 CAPITAL PROJECT NUMBER:

FE59

3D

OFFICE 2 005D OFFICE 2 005D

4

FOR THE:

3D

FE59

FE51 FE53 FE54 FE55 FE56 FE57 4 4 FE58 4 4 FE59 OPEN OFFICE 6FE60 EAST OPEN OFFICE 6FE61 006H EAST 4

FOR THE: FE56

FE58

3D2

FE58

FE59

COPY RM 2 006J

LOUNGE 006B LOUNGE 006B 4

COPY RM 1 005C

OPEN OFFICE 5 005A OPEN OFFICE 5 005A

3D

FE54

FE57

FE61

4

4

006J

DN

A806

4

8'

SCALE: 1/4" = 1'-0"

2

N

3D

FE59

FE51

1

4

3D

OFFICE 2 005D

8'

8'

4

FE53

4

2

Partial Cellar Furniture & Power Plan - Room 006 3D Partial Cellar Furniture & Power Plan - Room 006 2

TV MONITOR TYP TV = 1'-0" 1/4" MONITOR TYP = 1'-0" 1/4"

4

FE56

LOUNGE A311 4 006B

2

GFCI

2

4

GFCI

3D

4

FE61 PASSAGE 005X PASSAGE 005X

3D

PASSAGE 005X

4

5D

5D 3D

5D 3D

OFFICE 005B

OPEN OFFICE 5 FE58 005A

GFCI

3D

FE58

OPEN OFFICE 6 EAST 006H

FE61

8'

A806

conditions

KITCHENETTE 006C KITCHENETTE 006C

3D2 FE51

5D

FE60

FE54

2D

FE60

FE59

ENTRANCE HALLWAY 006A

4

3D

FE58

COPY RM 1 005C

3D

5D 3D

SMALL CONFERENCE ROOM FE51 006F

ENTRANCE HALLWAY ENTRANCE 006A HALLWAY 006A

4

4

3D

FE54

P 212 239 0220 F 212 563 DATE: 5621 DESCRIPTION: 0' - 6" 4 4

NUMBER

5D

5D

FE54

REVISIONS: URBAHN NEW YORK, ARCHITECTS NY 10018 P 212 23937TH 0220 STREET F 212 563 DATE: 5621 49 WEST NUMBER DESCRIPTION: REVISIONS: NEW YORK, 4 4 NY 10018

5D

4

2D

A311FE61 FE59

4

2

Partial Cellar Furniture and Power Plan – Room 006

PREVIOUS CONDITIONS East Wing existing

3 FE57 A311 3 FE58 A311

5D

DN

FE51 FILING CABIN FE53 FILING CONFERENC FE51 CABIN FE54 CONFERENC BUILT IN COU FE53 FE55 BUILT BUILT IN IN COU KITC FE54 3D FE56 BUILT BUILT IN IN KITC MAIL FE55 FE57 BUILT LARGEINCOPIE FE56 MAIL 5D FE58 FE58 PRINTER FE57 LARGELARGE COPIE 3D KEYNOTE LEGEND FE58 FE59 PRINTER FAXCONFERENC MACHINE FE58 3D ROOM FE60 WATER COOL FE59 FAX MACHINE FILING 006DGA FE61 WATER RECYCLE 5D CABINETS TO BE BY OWNER - TYP FE60 COOL CONFERENCE TABLES TO BE CUSTOM DESIGNED AS PART OF CONT 3D FE61 RECYCLE GA BUILT IN COUNTERTOP FE51 3D BUILT IN KITCHEN CABINETS 5DFE51 BUILT IN MAILBOX CUBBIES LARGE COPIER 3D PRINTER 3D FAX MACHINE 5D COOLER 3 WATER A311 3D 2 FE59 GARBAGE RECYCLE BIN 3

URBAHN ARCHITECTS

Associate Architect 49 WEST 37TH STREET

5D

2

A311

3D

Associate Architect

5D

4

5D

5 FE61 A311FE61 5

FE54

SCALE: 1/4" = 1'-0"

SCALE: 1/4" = 1'-0"

4

FE51

FE51

006E

0' 1' 2' 4' SCALE: 1/4" = 1'-0"

8'

4

OPEN OFFICE 6 WEST OPEN OFFICE 6 006E WEST

3D

FE59

3D

MECH. RM. 005Y 4

FE61

3D

FE58

FE51 FE59

4

UP

FE53 5D

DN

A806 1

4

3D

FE54

FE51

2

4

2D

3D

3D

FE51 FE53 FE51 FE54 FE53 FE55 FE54 FE56 FE55 FE57 FE56 FE58 FE57 FE59 FE58 FE60 FE59 FE61 FE60

FE51

FE56

ELEVATOR MACH. ROOM 005Z

OFFICE 2 005D OFFICE 2 005D

4

8'

Partial Cellar Furniture & Power SCALE: Plan -1/4" Room = 1'-0" 005 1/4" = 1'-0"Cellar Furniture & Power Plan - Room 005 Partial 1/4" = 1'-0"

4

DN

Partial Cellar Furniture & Power Plan - Room 006 1/4" = 1'-0"Cellar Furniture & Power Plan - Room 006 Partial 1/4" = 1'-0"

4

FE56

LOUNGE 006B LOUNGE FE59 006B

4

3D

FE58

2D

SMALL 2D5D CONFERENCE SMALL ROOM CONFERENCE FE51 006F ROOM 006F 5DFE51 OFFICE 005B OFFICE FE53 005B

4 4 OFFICE 5 005A OFFICE 5 005A OPEN OFFICE 6 WEST FE57006E FE61 FE61 4 4 COPY RM FE57 FE61 4 4 2 COPY RM 006J 2 006J

4 2

FE61

DN

2D

FE61

1 1

4

4

2D

A806

4

5D FE58

4

OPEN OFFICE 6 EAST OPEN OFFICE 6 006H EAST 006H

4

FE61 FE61

2D

A806 1

4

5D

FE58

MECH. RM. 005Y MECH. RM. 005Y

4

OPEN FE58

FE55

ELEVATOR MACH. ROOM ELEVATOR 005Z MACH. ROOM 005Z

8'

OPEN FE58

FE61

KITCHENETTE 006C KITCHENETTE 006C

4

4 4

5D

FE53

GFCI

City Hall Plaza

CITY HALL PLAZA City Hall Plaza

4

FE61 FE59

4

4 4

0' - 6"

2D

5D

COPY RM 1 COPY RM 4005C 1 005C SMALL CONFERENCE ROOM 006F

GFCI

FE61 FE61

FE60

4'

5D

FE60

A311

3D

3D

FE54

FE54 5D

Plan5D- Room 006

SCALE:5D1/4" = 1'-0"

ENTRANCE HALLWAY ENTRANCE 006A HALLWAY 006A

FE58 FE61

5D

0' 1' 2'5D

5D

4

East Wing existing conditions

UP

1

5D

5D

LARGE CONFERENCE LARGE ROOM CONFERENCE 006D ROOM 006D Furniture & Power

Architects & Planners LLP

5D

KEYNOTE LEGEND

5D

GFCI

4'

0' 1' 2' 4' SCALE: 1/4" = 1'-0"

BEYER BLINDER BELLE

Architects & Planners LLP 41 East 11th Street BEYER BLINDER BELLE 4 New York, &NY 10003 LLP Architects Planners Tel:East 212.777.7800 41 11th Street A311 Fax: 212.475.7424 New York, NY 10003 Tel: 212.777.7800 Fax: 212.475.7424

Architects & Planners LLP

GFCI

0' 1' 2'

OFFICE 3 006G OFFICE 3 006G

SEAL:

DN

CHALLENGE

1/4" = 1'-0"

SEAL:

A311

LARGE CONFERENCE LARGE ROOM KEYNOTE LEGEND CONFERENCE FILING 006D 5D CABINETS TO BE BY OWNER - TYP ROOM CONFERENCE TABLES TO BE CUSTOM DESIGNED AS PART OF CONTRACT FILING 006D 5D CABINETS TO BE BY OWNER - TYP BUILT IN COUNTERTOP CONFERENCE TABLES TO BE CUSTOM DESIGNED AS PART OF CONTRACT BUILT IN IN COUNTERTOP KITCHEN CABINETS BUILT 5D IN MAILBOX CUBBIES BUILT BUILT IN KITCHEN CABINETS LARGE COPIER OFFICE 3 5D IN MAILBOX CUBBIES5D BUILT 006G PRINTER LARGELARGE COPIER FAX MACHINE CONFERENCE PRINTER 5D ROOM WATER COOLER FAX MACHINE 2 006D RECYCLE GARBAGE BIN 5D COOLER 5D WATER 4 4 2 RECYCLE GARBAGE BIN

2

OFFICE 3 006G OFFICE 3 006G

GFCI

A806

5D

0' - 6" 0' - 6"

A311 2

DN

DN

Partial Cellar Furniture & Power Plan - Room 006 1/4" = 1'-0"Cellar Furniture & Power Plan - Room 006 Partial

FE51

2

CHALLENGE PROJECT

MECH. RM. 005Y

A311 2

LOUNGE

A311 4 006B

GFCI

GFCI

4

DN

DN

ELEVATOR MACH. ROOM 005Z

2

1

OFFICE 006I

FE56

DN

A806 1

FE57

FE61

KITCHENETTE 006C

FE51

ROLE

MECH. RM. 005Y MECH. RM. 005Y

FE61

FE51

FE51 FE59

4

2

FE61

ROLE

CITY HALL OFFICES BASEMENT RENOVATION

FE56

LOUNGE 006B LOUNGE 006B

GFCI

GFCI

space for 26 staff within the 19th cen basement, respecting the historic b NEW YORK, NY | 2009 adding data cabling infrastructure to communication needs. The principal idea was to expose the peeling away layers of finish to the revealing the original brownstone piers, and brick vaults, and to excavate a The project two phases: (1) included access floorhad to conceal systems infrast room (awarded in 2010 as the Best G it. Project), located in the West Wing of The design encompassed removal of Basement, and (2) was to renovate the window AC units and hung ceilings and conference located in the Ea natural lighting rooms by 50%, and addin The scope of thislighting project complements was to upgr surface-mounted space for staff within the 19th cen (ducted) air26 conditioning system. respectingof the historic de b Itbasement, followed principles sustainable Cellar Floor adding cabling infrastructure at least data 75%Cellar of the existing fabric into Floor Partial Furniture Partial Furniture Power Plan communication needs. footprint of &&the new Power Plan sub-cellar is withi The principal idea was to expose the building, minimizing construction waste peeling away A806 layers of finish to the for new materials, and site disturbance. A806 revealing the original brownstone piers, and brick vaults, and to excavate a access floor to conceal systems infras it. Conducting a forensic analyses on The design and encompassed o construction renovationsremoval to ascerta window AC and unitsstructural and hung ceilings architectural integrity o City Hallplan Plaza natural lighting by 50%, and addin to give it a modern look and a fun surface-mounted lightingplans. complement to the City Hall basement (ducted) air conditioning system. It followed principles of sustainable de Cellar Floor at least 75%Cellar ofFloor the existing fabric in Partial Furniture Furniture & Power Plan footprint of Partial the new & Power Plan sub-cellar is withi I coordinated the second phase of building, minimizing construction waste aligning the architecture project wi for new materials, and site disturbance. A806 professionals involved, to develop the m FE58

FE60

FE61

FE56

FE55

ELEVATOR MACH. ROOM ELEVATOR 005Z MACH. ROOM 005Z

ENTRANCE HALLWAY 006A

OFFICE FE58 006I OFFICE 006I

GFCI

COPY RM FE57 2 COPY RM 006J 2 006J

FE61

GFCI

City Hall Plaza

KITCHENETTE 006C KITCHENETTE 006C

FE59

4

2

FE57006E

FE61 FE61

FE61

FE61 FE59

4

2

N

SCALE: 1/4" = 1'-0"

PROJECT SIZE:

PO

450 M² 25 MILLION I coordinated the second phase 0 of aligning the architecture project wi professionals involved, to develop the m

and prepare drawings for client pres construction submissions


RESTORATION - ENVELOPMENT OF THE HISTORIC BUILDINGS

NEW YORK, NY 2007-2009

CENTRAL HARLEM HEALTH CENTER - ACESSIBILITY DESIGN

ELEVATION

9TH AVENUE STATION

BAY PARKWAY STATION

WINDOW SCHEDULE

REHABILITATION, EXTENSION AND RESTORATION - CITY PROJECTS

PLAN


STUDIES - POCKET PARKS, NYC "NATURE IN THE CITY MUST BE CULTIVATED, LIKE A GARDEN, RATHER THAN IGNORED OR SUBDUED” - THE GRANITE GARDEN (Anne Whiston Spirn)


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.