Who we are... - Skateboarders & BMXers - Professional Skatepark Designers - Professional Skatepark Builders
v1.2
PAGE 2
Skatepark Construction
Iain Young
27 years skating v1.2
PAGE 2
Design Crew Trevor Johnson
Shaun Scarfe
17 years skating
31 years riding Skatepark Construction
Design Crew Iain Young - Director / Designer & Construction Manager Iain is a skateboarder with 27 years of experience. Iain has worked in the construction industry for most of his working life. He has been building skateparks and obstacles since his passion in skateboarding began. With his experience and skill sets, Iain is able to operate and manage the on site construction to ensure that the end results are of the highest quality and meet the specification of the final design, with creative & innovative facilities as our hallmark.
Shaun Scarfe - Director / Designer Shaun is a BMXer with 31 years experience. Shaun has been running Four One Four Skateparks Ltd 12 years building permanent indoor and outdoor skateparks. Four One Four have provided equipment for some of the most successful Events & Skatepark facilities in the UK & Europe. These include The London 2012 Olympic Opening Ceremony, Adrenaline Alley Skatepark, Europe's first Resi Vert Ramp, NEC Cycle Show, Urban Games, NASS, Cologne Masters and the BMX Freestyle World Championships.
Trevor Johnson - Designer Trevor has been skating for 17 years. In this time he has gained reputable sponsors and travelled the globe skating some of the best spots and parks in the world. Trevor has worked in the skatepark construction industry for over 10 years and with a keen eye for detail he has been able to apply his experience to design and build some of the most successful parks in the UK and Europe.
v1.2
PAGE 2
Skatepark Construction
Build Crew
v1.2
PAGE 2
Skatepark Construction
Our Skateparks - Our passion translates into the parks we build - It is in every step from the design to the finish - We feel that this shows...
v1.2
PAGE 2
Skatepark Construction
Examples of Previous Works
v1.2
PAGE 2
Skatepark Construction
INVERNESS SKATEPARK - 3D Concept v1.2
Concept Images
PAGE 4
Skatepark Construction
INVERNESS SKATEPARK - 3D Concept v1.2
Concept Images
PAGE 5
Skatepark Construction
Newtown Skatepark
INVERNESS SKATEPARK Projects managed by Iain Young v1.2
Project Images
PAGE 9
Skatepark Construction
Newport Skatepark
Newport Skatepark
Newtown Skatepark
Newtown Skatepark
Example of previous work Projects managed by Iain Young v1.2
Project Images
PAGE 9
Skatepark Construction
Shrewsbury Skatepark
Shrewsbury Skatepark
Shrewsbury Skatepark
Shrewsbury Skatepark
Example of previous work Projects managed by Iain Young v1.2
Project Images
PAGE 10
Skatepark Construction
Bay 66 Nike London
Bay 66 Nike London
Bay 66 Nike London
Example of previous work Projects managed by Iain Young v1.2
Project Images
PAGE 12
Skatepark Construction
Dudhope Skatepark
North Berwick Skatepark
Dudhope Skatepark
Bay 66 Nike London
Example of previous work Projects managed by Iain Young v1.2
Project Images
PAGE 11
Skatepark Construction
Example of previous work Projects managed by Iain Young v1.2
Project Images
PAGE 11
Skatepark Construction
Skatepark Concepts
v1.2
PAGE 2
Skatepark Construction
SKATEPARK CONCEPT - Transition Park v1.2
PAGE 2
Skatepark Construction
SKATEPARK CONCEPT - Transition Park v1.2
PAGE 2
Skatepark Construction
SKATEPARK CONCEPT - Transition Park v1.2
Concept Images
PAGE 6
Skatepark Construction
SKATEPARK CONCEPT - Plaza Park v1.2
Concept Images
PAGE 7
Skatepark Construction
SKATEPARK CONCEPT - Plaza Park v1.2
Concept Images
PAGE 8
Skatepark Construction
SKATEPARK CONCEPT - Extensions & Elevations v1.2
Concept Images
PAGE 8
Skatepark Construction
SKATEPARK CONCEPT - Flow Street Section v1.2
Concept Images
PAGE 8
Skatepark Construction
Design - Identify the needs and requirements of the facility - Understanding budget and achieving realistic goals - We have an affinity to the clients & users vision - Continual design development through user & client liaisons - Design a facility to further user progression & skills development
v1.2
Concept Images
PAGE 8
Skatepark Construction
Consultation - Continual design group involvement through every stage
- Actualisation of design groups visualisation
- Truly bespoke design process inline with user group feedback
v1.2
Concept Images
PAGE 8
Skatepark Construction
Integration of Facility - Consideration of the surrounding areas and history of the site - Integrated design space uses Topography for maximum use of materials & the available space - Design & use of Landform & Architechture for improved Aesthetics
- Social benefits of completed facility
v1.2
Concept Images
PAGE 8
Skatepark Construction
Professionalism - All staff have formal qualifications in their fields with continual development training programs within Concreate Skateparks - Quality Management H&S Systems - ISO 9001, ISO 18001, ISO 14001 Assured - Full Liability and Design Indemnity insurance cover - High level 3D render models & full construction drawings
v1.2
Concept Images
PAGE 8
Skatepark Construction
Company Structure - Management Management Tree
- Implementation How design vision is achieved with by intelligent management
- Protocol / Program of works Procedures in place to see the designers vision is maintained throughout, with clear communication channels & procedure.
- Timeline Realistic Program of works is crated then implemented to ensure timely delivery of the project. v1.2
Concept Images
PAGE 8
Skatepark Construction
Construction
- Methods, techniques & importance of H&S
Bespoke Tools & Techniques - H&S compliance - COSSH & RAMS
- Groundworks
Efficient Unit - Implemented to strict protocol and design standards
- Fabrication & Shuttering
Techniques - Why is it so important to get right - Double checks
- Steel Installation
Standards - Tie-ing of Steelwork - Correct Placement - Movement & Expansion
- Concreting
Standards - intelligent planning of Concrete pours - How & why we lay our concrete
- Landscaping v1.2
Concept Images
PAGE 8
Skatepark Construction
Shuttering
v1.2
Concept Images
PAGE 8
Skatepark Construction
Mesh & Rebar
v1.2
Concept Images
PAGE 8
Skatepark Construction
Previous Clients & Events LONDON 2012 OLYMPICS Opening Ceremonies - LOCOG
ADRENALINE ALLEY SKATEPARK -
BMX FREESTYLE WORLDS - Spielbetrieb
VODAFONE - First Chance
RELENTLESS NASS - Sports Vision
HTC ONE - Selfridges Skatepark
3 DEGREES - Red Bull
XSITE SKATEPARK - Gelder Group
NEC CYCLE SHOW - Upper Street Events
FELT BICYCLES TM - Xtra Distribution
NIKE 6.0 SNOW SHACK - Urb Orbis
BRAUN SPINE RAMP - Kjerag / Spielbetrieb
NIKE 6.0 FASHION SHOW - Urb Orbis
V FESTIVAL - Kjerag / Spielbetrieb
GAMESTARS LIVE - London Event Co.
BOARDMASTERS - Sports Vision
SPRITE URBAN GAMES - Board-X
BMX MASTERS COLOGNE - Spielbetrieb
SPRITE URBAN GAMES - Haymarket Exhibitions
SPRITE SUMMER SESSIONS - Urb Orbis
KING of STREET - Board -X
CENTRAL SKATEARK - Two Distribution
NASS - ASE Ltd
TENT EXHIBITION - Farm Designs
WINDFEST & WIGHT AIR - Red Bull
CANON BOWL FREESTYLE CH -
TRIX MUSIC CHANNEL - BSKYB
MOUNT HAWKE SKATEPARK -
GOLD COAST - Red Bull
DIGITAL SWITCH OVER - BSKYB
RELENTLESS TV Commercial - Sports Vision
NIA ATHLETICS HIGH JUMP - Fast Track
LINTON PARISH COUNCIL - Skatepark Maintenance
BUG JAM - Santa Pod Raceway
NEC BIKE SHOW - Haymarket Exhibitions
FIFE COUNCIL - Design & Consultation with 'Skint Skateparks'
SPRITE PARKOUR COURSE - Urb Orbis
BOTTESFORD COUNCIL - Skatepark Maintenance
SHROPSHIRE COUNCIL - Shrewsbury Skate Ramp
BURN ENERGY / LOTUS F1 - Junk Yard project
DUNDEE CITY COUNCIL - Dudhope Skatepark Updates
BAY 66 Skatepark / NIKE SB - Urb-Orbis
v1.2
Previous Clients
PAGE 14
Skatepark Construction
Concrete Works
v1.2
Concept Images
PAGE 8
Skatepark Construction
Concrete Finishing
v1.2
Concept Images
PAGE 8
Skatepark Construction
Typical Construction Concreate Skateparks - TYPICAL CONSTRUCTION - BS EN 14974:2006
Grass Bunding 100mm Seeded Top Soil
150mm reinforced concrete Hand Finished P380 - P450 grade (specialist mix tested 60-70KNmm2 )
Sealed Construction Joint to BS69120
150mm reinforced power floated concrete
Compacted MOT Type 1 or similar fill
12mm Bent Rebar 1200mm Long
Sub-Soil 6F2 / 6F5 to engineer Spcification
Teram Geo textile between SubBase layers
A252 Reinforcing Mesh Tied at 200m centres
Sub-Base 6F2 / 6F5 or similar Recycled Fill
v1.2
CONSTRUCTION
20mm Smooth Steel Bar 600mm through join
PAGE 17
Skatepark Construction
Assurances - Warranty - Indemnity on Design - 15 Year on Concrete & Reinforcement - Exclusions - High level 3D render models & full construction drawings
v1.2
Concept Images
PAGE 8
Skatepark Construction
Assurances
v1.2
Concept Images
PAGE 8
Skatepark Construction