NGOV LYHENG
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio
NGOV LYHENG PORTFOLIO 2020-2022 CURRICULUM VITAE 1 BOUTIQUE HOTEL [02/2022 - 07/2022] 2 RENTAL OFFICE [11/2021- 02/2022] 3 URBAN PLANNING [03/2020 - 07/2022] 4 ADDITIONAL WORKS [2021 - 2022]
CURRICULUM VITAE NGOV LYHENG
+855 7077 3927 lyhengcolin070@gmail.com St. 51BT, 12351, Phnom Penh
Nationality: Cambodian / Born: 09 December 2001
Engineering Degree of Architectural Engineering / Fifth Year
A Fifth Year Student of Architectural Engineering interested in positioning of an intern architect where I can enhance my knowledge in Architecture and diversify my career in the field.
I want to establish myself as a valuable asset to the organization which would best utilize my expertise in Technical Environment.
Education
10/2018 - Present
2018-2020
2012-2018
Department of Architectural Engineering
Institute of Technology of Cambodia, Phnom Penh, Cambodia
General English Program Course (GEP)
Australian Centre for Education (ACE), Phnom Penh, Cambodia
Upper Secondary Education
HUN SEN Saang High School, Kandal Province, Cambodia
Achievements
2018 2020
High School Graduation Examination/ Science
Overall Grade: A / Percentile Rank: 99.836
IELTS Test
CEFR Level: B2 / Overall Bandscore: 5.5
Academic Work
Third Year
Semester I
Semester II
Traditional Khmer House Survey
Duration: 3 months
Modern Khmer House Design
Duration: 3 months and 2 weeks
Work Experiences
08-10/2021
Standard Construction & Engineering Co.Ltd. (SCE)
Project: AEON Mall Mean Chey III, Khan Mean Chey, Phnom Penh
08-10/2021
CamED Business School
Volunteering as an Invigilator
Hard Skills
Microsoft Offices
AutoCAD
SketchUp
Lumion
Adobe Photoshop
Adobe Illustrator
Soft Skills
Third Year
Semester I Office Building |ECO-THE TOWER|
Duration: 3 months and 2 weeks
Semester II Boutique Resort
Duration: 3 months and 2 weeks
Time Management
Work Ethics
Flexible and Adaptive
Decision Making
Friendliness and manners
NGOV LYHENG PORTFOLIO 2020-2022
ROKHA SUOR BOUTIQUE
SURROUND YOURSELF WITH THE FINER THINGS IN YOUR LIFE
Tindividualism and creating a thoughtful environment across the Boutique Hotel.
The used of materials for the project are almost sustainable as this might provide customers the most exclusive feeling which truthfully connect to the surrounding nature.
NGOV LYHENG PORTFOLIO 2020-2022
01
SITE INFORMATION
About site:
- Location: Sangkat Romonea, Krong Sen
Monorom, Mondolkiri province
- Area: 6700m2
- Name: Rokha Suor Boutique
- Type: Boutique Hotel
SITE ANALYSIS
The site is surrounded by the resorts, motels, etc. This won’t be a easy competition for our boutique.
SWOT Analysis
Strength
- Perfect for Urbanism to Grow.
- Connect to main road
- Low Density
- Lots of Green space
Sunpath Diagram
Opportunity
- One of biggest area
- Factories growth
- More job opportunity
1.
Rakmey Pich
Mondulkiri
6.
Weakness
- Less public spaces
- Low security service
-Garbage mannagement is bad.
Threatening
- Noise pollution
- More tra c
- Air pollution
Cambodia
Site
Monthly Precipitation Average Humidity Average Temperature 1 2 3 4 5 6 7 8 9 10
Motel
2. Orchid Boutique
3. Long Heng Motel
4. Le Phnom View Motel
5. Les Bambous Resort
Chuncheat House Eco-Lodge
7. KNN Resort Mondulkiri
8. Kravan inn
9. Preuksa Sour Motel
10. Senmonorom Resort
02
EVOLUTION OF CONCEPTUAL DESIGN
Master Plan and Lobby
Leaves
Leaf wings turned to path that lead people to each room. And Leaves turned into shape of area in the master plan.
House type
These types of houses are inspired by tropical house as well as indeginous house in Mondolkiri. Add some modern elements to make the houses more interesting.
Vonghean (Kbach Khmer)
Bamboo
Floor Plan
Concrete slab Used Materials
03
Front View
Legends: FF
7. Bedroom1
8. Bedroom2
9. Bathroom
Materials Floor
Floor Plan
Used Materials Used
Plans
Front View Front View
Roof fiber cement tiles
Glass
Woods
Aluminium
Wood decking 1
Woods Bricks 4
6
7 3
5 2
1
4 6 7 8
9
3
5 2
Aluminium
Woods
Glass
Roof fiber cement tile
Concrete wall
Woods 04
Glass
Woods
Legends
1. Entrances
2. Women’s restroom
3. Men’s restroom
4. Disables’ restroom
5. Shower’s room(Men)
6. Shower’s room(Women)
Floor Plans
Used Materials
Floor Plan
Front View
8 1 4 6 7 9 3 5 2
Front View
Roof tiles Woods Woods Woods
Glass
Aluminium 1
Woods 1 4 6 3
5 2
Used Materials
Bamboo Concrete
Woods
Ventilation block
Roof sheatting
05
Roof fiber cement tile
Rendering Pictures
Lobby
House Type A
House Type C
06
House Type B
Rendering Pictures
Entrance
Master Plan: Top Isometric
Master Plan: Top View
07
ECO - THE TOWER
LIVE, WORK, CREATE
Type: Rental Office
Site: Phnom Penh, Cambodia
Year: 2021
Thedesign project is like an commercial building which is located in Phnom Penh, Cambodia. The site is surrounded by some high-rise building.
Under the development-era another concrete structure doesn’t cut it. So, this design project becomes an energy e cient, eco-leisure project.
It gather its footfall by the high rise building and a few commercial establishments in close proximity to the site. The absence of another mixed, the project can leads to its exclusivity.
08 NGOV LYHENG PORTFOLIO 2020-2022
SITE INFORMATION
SITE ANALYSIS
About site:
- Location: Chak Angre Ler, Phnom Penh
- Area: 6700m2
- Name: Eco-The Tower
- Type: Rental O
SWOT ANALYSIS
Wind Direction Pattern
- Rainy Season: SW - NE
- Dry Season: NE - SW
Strength
- Surrounded by Public spaces
- Quiet and peaceful environment
- Connect with the main road
Opportunity
- Likely to becomes the biggest part of the city
- Job opportunities
- More high-rise buildings
Sun Path Diagram
- Summer: Day longer than Night
- Winter: Night longer than Day.
Weakness
- Expensive lands
- Lack of natural Landscapes
- Lack of public transportations
Threatening
- Unsecure area
- Pollutions ( Air, water and Land)
09
Cambodia Phnom Penh Chak Angre Ler Site
CLIMATE ANALYSIS General Commissariat of National Police Ministry of Culture and Fine Arts Ministry of Water Resources and Meteorology Chip Mong 271 Mega Mall R&F Properties Electrical Substation Preah Monivong Bridge Urban Village
ce
EVOLUTION OF CONCEPTUAL DESIGN
Step2: One of the arrow has been selected. To get the shape we wanted, we pushed the height of the arrow.
Step3: To get to the specific shape, I chose to cut o the part where I don’t want in my concept which were the egdes of the arrow.
Step1: The recycling logo has been selected as our concept to develop the building. The symbol represents a Mobius loop consisting of three-chasing-arrows in the shape of a triangle having round vertices. Each arrow twists and turns itself, and all three arrows chase each other. The symbol is a consummate representation of recycling.
FACADE DESIGN
Step4: Add a cuboid to make the shape of the building.
Step5: Put a cuboid on the right of the previous shape to get the overall shape we wanted.
10
Inspiration Step 1 Step 2 Final Design
MASTER PLAN LEGENDS
The site spread over 1.7 acres and next to the main road (HUN SEN BLVD). There are high-rise buildings across the street. This building aims to create a space for working, as well as entertaining.
MASTER PLAN LEGENDS
1 3 5 4 4 6 2
1. Entrance
2. Entrance to underground parking
3. Garden
4. Building
5. Exit to underground parking
11
6. Exit
Rendering Pictures and Plans
- Underground level is used for Parking.
- Ground, First and Second floor is used for entertaining (Mall).
- From Third to Ninth floor is used for a working space (o ce).
Perpective
O
O
12
view of Rental
ce during the night Perpective view of Rental
ce during the day
Down Up Slope 12% Slope12% Down Up
Basement Ground Floor First Floor Second Floor 3rd and 4th Floors 5th, 6th, 7th Floors 8th and 9th Floors
URBAN PLANNING
OUR PUBLIC SPACES ARE AS PROFOUND AS WE ALLOW THEM TO BE.
Project: Urban Planning
Site: Sangkat Samraong, Prek Pnov District, Phnom Penh Year: 2022
Samraong
Commune, Preak Phnov District, Cambodia is a commune located outskirts of Phnom Penh. It is the largest district by the land area. The reason we chose this site to study is because we see that the area lacks the need for public services that serve the local people. This scarcity makes life di cult, and on the other hand, connection between city and suburbs is not yet smoothly.
NGOV LYHENG PORTFOLIO 2020-2022
13
SITE INFORMATION
Existing Locations
There are many people living along the river where they live and work there. which make it easy for people to reach.
Site History
supply due to small numbernof schools. there’s less living people in others area.
Existing Data
Road infrastructure has been being developed from dirt to concrete as well as highway.
SWOT Analysis
Existing
Demographic, Occupations, Transportations
Samraong Commune is one of 5 communes of Prek Pnov District with the area of 18.83 square kilometre.
Population Density: In 2008, the population of Samraong Commune was 7,792 and rose up to 18,921 in 2019 with desity of 1,005people /square kilometre and annual growth rate of 8.4%.
Gender
Male: 9,378 people
Percentage: 49.6%
Gender
Male: 9,543 people
Percentage: 50.4%
Strength
- Perfect for Urbanism to Grow.
- Connect to main road
- Low Density
- Lots of Green space
Opportunity
- One of biggest area
- Factories growth
- More job opportunity
There’s lots of vacant land, which iis anticipated for the development of the land for housing, factories and others.
There are housing development projects starting to grow considerably.
Road to vacant land begins to reach out. People most likely to have families business and work as government o cial and others.
Weakness
- Less public spaces
- Low security service
-Garbage mannagement is bad.
Threatening
- Noise pollution
- More tra c
- Air pollution
This Sangkat have been improving a lot since 1992.
Cambodia Phnom Penh Khan Prek Pnov Sangkat Samraong
Roads Public
Green
Households
Services
Areas
Vacant Lands 1992 2000 2012 2021 Police Teacher Doctor Businessmans Carpenter Fisher Vendor Driver Others
65% 25% 5% 5%
14
SITE PROBLEMS
Poor Infrastructure:
Garbage Management:
Garbage management is still not good, causing chaos and losing the beauty of the city.
SOLUTION: PURPOSE
To Garbage Management:
Advertise to people, manage recycle bin, make enough bin and recycling used waste
Only one hospital and two schools exist in the whole area which make it hard for the people to get service out of it.
To Lack of Puclic Equipment
Establish more schools, hospitals and factories to satisfy people’s need.
To Poor Infrastructure
Re-organize roads, plants tree and tra c sign along the roads. Create more public spaces, plan for more public transport systems and upgrade drainage systems to avoid flooding.
13
ADDITIONAL WORKS: To improve rendering
I improved my rendering by taking 3D models across the Internet and started doing it one by one.
14
THANK YOU!