Portfolio - Architecture

Page 1

NGOV LYHENG

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio Portfolio

NGOV LYHENG PORTFOLIO 2020-2022 CURRICULUM VITAE 1 BOUTIQUE HOTEL [02/2022 - 07/2022] 2 RENTAL OFFICE [11/2021- 02/2022] 3 URBAN PLANNING [03/2020 - 07/2022] 4 ADDITIONAL WORKS [2021 - 2022]

CURRICULUM VITAE NGOV LYHENG

+855 7077 3927 lyhengcolin070@gmail.com St. 51BT, 12351, Phnom Penh

Nationality: Cambodian / Born: 09 December 2001

Engineering Degree of Architectural Engineering / Fifth Year

A Fifth Year Student of Architectural Engineering interested in positioning of an intern architect where I can enhance my knowledge in Architecture and diversify my career in the field.

I want to establish myself as a valuable asset to the organization which would best utilize my expertise in Technical Environment.

Education

10/2018 - Present

2018-2020

2012-2018

Department of Architectural Engineering

Institute of Technology of Cambodia, Phnom Penh, Cambodia

General English Program Course (GEP)

Australian Centre for Education (ACE), Phnom Penh, Cambodia

Upper Secondary Education

HUN SEN Saang High School, Kandal Province, Cambodia

Achievements

2018 2020

High School Graduation Examination/ Science

Overall Grade: A / Percentile Rank: 99.836

IELTS Test

CEFR Level: B2 / Overall Bandscore: 5.5

Academic Work

Third Year

Semester I

Semester II

Traditional Khmer House Survey

Duration: 3 months

Modern Khmer House Design

Duration: 3 months and 2 weeks

Work Experiences

08-10/2021

Standard Construction & Engineering Co.Ltd. (SCE)

Project: AEON Mall Mean Chey III, Khan Mean Chey, Phnom Penh

08-10/2021

CamED Business School

Volunteering as an Invigilator

Hard Skills

Microsoft Offices

AutoCAD

SketchUp

Lumion

Adobe Photoshop

Adobe Illustrator

Soft Skills

Third Year

Semester I Office Building |ECO-THE TOWER|

Duration: 3 months and 2 weeks

Semester II Boutique Resort

Duration: 3 months and 2 weeks

Time Management

Work Ethics

Flexible and Adaptive

Decision Making

Friendliness and manners

NGOV LYHENG PORTFOLIO 2020-2022

ROKHA SUOR BOUTIQUE

SURROUND YOURSELF WITH THE FINER THINGS IN YOUR LIFE

Tindividualism and creating a thoughtful environment across the Boutique Hotel.

The used of materials for the project are almost sustainable as this might provide customers the most exclusive feeling which truthfully connect to the surrounding nature.

NGOV LYHENG PORTFOLIO 2020-2022
01

SITE INFORMATION

About site:

- Location: Sangkat Romonea, Krong Sen

Monorom, Mondolkiri province

- Area: 6700m2

- Name: Rokha Suor Boutique

- Type: Boutique Hotel

SITE ANALYSIS

The site is surrounded by the resorts, motels, etc. This won’t be a easy competition for our boutique.

SWOT Analysis

Strength

- Perfect for Urbanism to Grow.

- Connect to main road

- Low Density

- Lots of Green space

Sunpath Diagram

Opportunity

- One of biggest area

- Factories growth

- More job opportunity

1.

Rakmey Pich

Mondulkiri

6.

Weakness

- Less public spaces

- Low security service

-Garbage mannagement is bad.

Threatening

- Noise pollution

- More tra c

- Air pollution

Cambodia
Site
Monthly Precipitation Average Humidity Average Temperature 1 2 3 4 5 6 7 8 9 10
Motel 2. Orchid Boutique 3. Long Heng Motel 4. Le Phnom View Motel 5. Les Bambous Resort Chuncheat House Eco-Lodge 7. KNN Resort Mondulkiri 8. Kravan inn 9. Preuksa Sour Motel 10. Senmonorom Resort
02

EVOLUTION OF CONCEPTUAL DESIGN

Master Plan and Lobby

Leaves

Leaf wings turned to path that lead people to each room. And Leaves turned into shape of area in the master plan.

House type

These types of houses are inspired by tropical house as well as indeginous house in Mondolkiri. Add some modern elements to make the houses more interesting.

Vonghean (Kbach Khmer) Bamboo
Floor Plan
Concrete slab Used Materials
03
Front View

Legends: FF

7. Bedroom1

8. Bedroom2

9. Bathroom

Materials Floor
Floor Plan
Used Materials Used
Plans
Front View Front View Roof fiber cement tiles Glass Woods Aluminium
Wood decking 1
Woods Bricks 4 6 7 3 5 2 1 4 6 7 8 9 3 5 2 Aluminium Woods Glass Roof fiber cement tile Concrete wall Woods 04
Glass

Woods

Legends 1. Entrances 2. Women’s restroom 3. Men’s restroom 4. Disables’ restroom 5. Shower’s room(Men) 6. Shower’s room(Women)
Floor Plans
Used Materials
Floor Plan Front View
8 1 4 6 7 9 3 5 2
Front View Roof tiles Woods Woods Woods Glass
Aluminium 1
Woods 1 4 6 3 5 2 Used Materials Bamboo Concrete Woods Ventilation block Roof sheatting 05 Roof fiber cement tile

Rendering Pictures

Lobby House Type A House Type C
06
House Type B

Rendering Pictures

Entrance

Master Plan: Top Isometric

Master Plan: Top View

07

ECO - THE TOWER

LIVE, WORK, CREATE

Type: Rental Office

Site: Phnom Penh, Cambodia

Year: 2021

Thedesign project is like an commercial building which is located in Phnom Penh, Cambodia. The site is surrounded by some high-rise building.

Under the development-era another concrete structure doesn’t cut it. So, this design project becomes an energy e cient, eco-leisure project.

It gather its footfall by the high rise building and a few commercial establishments in close proximity to the site. The absence of another mixed, the project can leads to its exclusivity.

08 NGOV LYHENG PORTFOLIO 2020-2022

SITE INFORMATION

SITE ANALYSIS

About site:

- Location: Chak Angre Ler, Phnom Penh

- Area: 6700m2

- Name: Eco-The Tower

- Type: Rental O

SWOT ANALYSIS

Wind Direction Pattern

- Rainy Season: SW - NE

- Dry Season: NE - SW

Strength

- Surrounded by Public spaces

- Quiet and peaceful environment

- Connect with the main road

Opportunity

- Likely to becomes the biggest part of the city

- Job opportunities

- More high-rise buildings

Sun Path Diagram

- Summer: Day longer than Night

- Winter: Night longer than Day.

Weakness

- Expensive lands

- Lack of natural Landscapes

- Lack of public transportations

Threatening

- Unsecure area

- Pollutions ( Air, water and Land)

09
Cambodia Phnom Penh Chak Angre Ler Site
CLIMATE ANALYSIS General Commissariat of National Police Ministry of Culture and Fine Arts Ministry of Water Resources and Meteorology Chip Mong 271 Mega Mall R&F Properties Electrical Substation Preah Monivong Bridge Urban Village
ce

EVOLUTION OF CONCEPTUAL DESIGN

Step2: One of the arrow has been selected. To get the shape we wanted, we pushed the height of the arrow.

Step3: To get to the specific shape, I chose to cut o the part where I don’t want in my concept which were the egdes of the arrow.

Step1: The recycling logo has been selected as our concept to develop the building. The symbol represents a Mobius loop consisting of three-chasing-arrows in the shape of a triangle having round vertices. Each arrow twists and turns itself, and all three arrows chase each other. The symbol is a consummate representation of recycling.

FACADE DESIGN

Step4: Add a cuboid to make the shape of the building.

Step5: Put a cuboid on the right of the previous shape to get the overall shape we wanted.

10
Inspiration Step 1 Step 2 Final Design

MASTER PLAN LEGENDS

The site spread over 1.7 acres and next to the main road (HUN SEN BLVD). There are high-rise buildings across the street. This building aims to create a space for working, as well as entertaining.

MASTER PLAN LEGENDS

1 3 5 4 4 6 2
1. Entrance 2. Entrance to underground parking 3. Garden 4. Building 5. Exit to underground parking
11
6. Exit

Rendering Pictures and Plans

- Underground level is used for Parking.

- Ground, First and Second floor is used for entertaining (Mall).

- From Third to Ninth floor is used for a working space (o ce).

Perpective
O
O
12
view of Rental
ce during the night Perpective view of Rental
ce during the day
Down Up Slope 12% Slope12% Down Up
Basement Ground Floor First Floor Second Floor 3rd and 4th Floors 5th, 6th, 7th Floors 8th and 9th Floors

URBAN PLANNING

OUR PUBLIC SPACES ARE AS PROFOUND AS WE ALLOW THEM TO BE.

Project: Urban Planning

Site: Sangkat Samraong, Prek Pnov District, Phnom Penh Year: 2022

Samraong

Commune, Preak Phnov District, Cambodia is a commune located outskirts of Phnom Penh. It is the largest district by the land area. The reason we chose this site to study is because we see that the area lacks the need for public services that serve the local people. This scarcity makes life di cult, and on the other hand, connection between city and suburbs is not yet smoothly.

NGOV LYHENG PORTFOLIO 2020-2022
13

SITE INFORMATION

Existing Locations

There are many people living along the river where they live and work there. which make it easy for people to reach.

Site History

supply due to small numbernof schools. there’s less living people in others area.

Existing Data

Road infrastructure has been being developed from dirt to concrete as well as highway.

SWOT Analysis

Existing

Demographic, Occupations, Transportations

Samraong Commune is one of 5 communes of Prek Pnov District with the area of 18.83 square kilometre.

Population Density: In 2008, the population of Samraong Commune was 7,792 and rose up to 18,921 in 2019 with desity of 1,005people /square kilometre and annual growth rate of 8.4%.

Gender

Male: 9,378 people

Percentage: 49.6%

Gender

Male: 9,543 people

Percentage: 50.4%

Strength

- Perfect for Urbanism to Grow.

- Connect to main road

- Low Density

- Lots of Green space

Opportunity

- One of biggest area

- Factories growth

- More job opportunity

There’s lots of vacant land, which iis anticipated for the development of the land for housing, factories and others.

There are housing development projects starting to grow considerably.

Road to vacant land begins to reach out. People most likely to have families business and work as government o cial and others.

Weakness

- Less public spaces

- Low security service

-Garbage mannagement is bad.

Threatening

- Noise pollution

- More tra c

- Air pollution

This Sangkat have been improving a lot since 1992.
Cambodia Phnom Penh Khan Prek Pnov Sangkat Samraong
Roads Public
Green
Households
Services
Areas
Vacant Lands 1992 2000 2012 2021 Police Teacher Doctor Businessmans Carpenter Fisher Vendor Driver Others
65% 25% 5% 5%
14

SITE PROBLEMS

Poor Infrastructure:

Garbage Management:

Garbage management is still not good, causing chaos and losing the beauty of the city.

SOLUTION: PURPOSE

To Garbage Management:

Advertise to people, manage recycle bin, make enough bin and recycling used waste

Only one hospital and two schools exist in the whole area which make it hard for the people to get service out of it.

To Lack of Puclic Equipment

Establish more schools, hospitals and factories to satisfy people’s need.

To Poor Infrastructure

Re-organize roads, plants tree and tra c sign along the roads. Create more public spaces, plan for more public transport systems and upgrade drainage systems to avoid flooding.

13

ADDITIONAL WORKS: To improve rendering

I improved my rendering by taking 3D models across the Internet and started doing it one by one.

14
THANK YOU!

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.