Compiled projects (model focused)

Page 1


VELODROME, WA

DETAIL DEVELOPMENT AND SCALE MODEL

DRAWING LIST A02| A03| A04| A05| A06| A07| A08| A09| A10| A11| A12| A13| A14| A15| A16| A17|

GROUND FLOORPLAN ARENA FLOORPLAN PART ELEVATION-NORTH & SOUTH FACADE SECTION A-A REFERENCE SECTION 1:50 (PART 1) SECTION 1:50 (PART 2) DETAIL SECTION-FOOTING DETAIL SECTION-EXTERNAL WALL DETAIL PLAN REFERENCE-EXTERNAL WALL DETAIL SECTION-FLOOR TO WALL DETAIL SECTION- EXTERNAL WALL TO ROOF DETAIL PLAN REFERENCE-EXTERNAL WALL TO ROOF DETAIL SECTION-TRUSS & ROOF CLAD DETAIL PLAN REFERENCE-TRUSS & ROOF CLAD DETAIL SECTION-STADIUM SEATING AREA DETAIL SECTION- SKYLIGHT

ARCT 3030 | CONSTRUCTION LYANA IBRAHIM | 2133052



1

2

4

3

5

6

7

9

8

A

A

B 4

C3

7

B

10

7

5

8

C

C 9

B3

D 2

TO POLETT I ROAD

11

E

CURTAIN WALL ENTRANCE

D

B1 B2 A1

6

1

C3

C1

E

C3

A2

A3 11

A4

F

F 3

9

A4

G 4

H

5 7

C3

G

C4 C2 7

10

H

J

J

1

LY.I

ARCHITECTS

2

4

3

PROECT TITLE:

WA VELODROME DESIGNER:

LYANA IBRAHIM |21363052

DRAWING TITLE:

SCALE:

GROUND FLOOR PLAN

1:500

DRAWING NUMBER:

A02 (1)

DATE:

21 OCTOBER 2016

5 LEGEND 1 2 3 4 5 6

| | | | | |

6

7 | SPECATATOR ACCESS TO ARENA SAFETY ZONE 8 | PARTICIPANT RAMP TO ARENA BLUE BAND 9 | BICYCLE SHOP & REPAIR TRACK 10| BICYCLE STORAGE KIOSK PUBLIC TOILET 11| OFFICES TICKETING & RECEPTION

7

8

9

A | MECHANICAL PLANT ROOMS C | ELECTRICAL PLANT ROOMS A1| CHILLER PLANT ROOM C1| SUB-STATION A2| COOLING TOWERS C2| SWITCHROOM A3| BOILER ROOM C3| DISTRIBUTION BOARDS A4| AHU ROOM C4|CONTROL ROOM/CCTV B | HYDRAUIC PLANT ROOMS B1| PUMP ROOM B2| HOT WATER SYSTEMS B3| STORMWATER TANKS

N


1

2

4

3

5

8

9

A

B

B

1

C

D

D

E

E

F

F

G

G

2

H

H

J

J

1

ARCHITECTS

7

A

C

LY.I

6

2

4

3

PROECT TITLE:

DRAWING TITLE:

5

SCALE:

ARENA FLOORPLAN

1:500

DESIGNER:

DRAWING NUMBER:

DATE:

LYANA IBRAHIM |21363052

A03 (1)

21 OCTOBER 2016

WA VELODROME

6

7

8

LEGEND

9

1 | SEATING AREA-NORTH WING 2 | SEATING AREA- SOUTH WING

N


EXTERIOR DISTRIBUTION BOARD (external lighting)

GUTTER

GUTTER

IRRIGATION SYSTEM

CEILING DIFFUSERS VIA DUCTWORK BETWEEN CEILING

UNDERFLOOR DISPLACEMENT VENTILATION SYSTEM (FLOOR GRILLES @19°C)

INTERIOR DISTRIBUTION BOARDS

FLUORESCENT T5 suspended from trusses above

SWITCH ROOM

STORMWATER TANKS

CCTV & FIRE PROTECTION SERVICES

FIRE TANKS & PUMP RM

AHU UNITS

PLANT DISTRIBUTION BOARD

BOILER ROOM

COOLING TOWERS (Rejects heat from building to outside)

MAINS (sub-station)

ELECTRICAL SERVICES

A03 1

LY.I

ARCHITECTS

CHILLER ROOM

PROECT TITLE:

WA VELODROME

A03 2

MECHANICAL SERVICES

GREYWATER TANK

HOT WATER SYSTEMS

MAINS SEWERAGE SWITCH-OVER DEVICE

A03 3

MAINS WATER

HYDRAULIC SERVICES

DRAWING TITLE:

PLANT ROOM SERVICES DIAGRAM

DESIGNER:

DRAWING NUMBER:

DATE:

LYANA IBRAHIM |21363052

A03(1-3)

21 OCTOBER 2016

N


A04 1

LY.I

PART ELEVATION-NORTH & SOUTH FACADE SCALE 1:50

ARCHITECTS

PROECT TITLE:

WA VELODROME

DRAWING TITLE:

PART ELEVATION-NORTH & SOUTH FACADE

DESIGNER:

DRAWING NUMBER:

DATE:

LYANA IBRAHIM |21363052

A04 (1)

21 OCTOBER 2016


65 600 MM

2

11,420 13,900 MM MM

1

3

A05 1

LY.I

ARCHITECTS

3

4

SECTION A-A REFERENCE SCALE 1:200

PROECT TITLE:

WA VELODROME

DRAWING TITLE:

SECTION REFERENCE A-A

DESIGNER:

DRAWING NUMBER:

DATE:

LYANA IBRAHIM |21363052

A05(1)

21 OCTOBER 2016

LEGEND 1 2 3 4

| | | |

SEATING AREA-NORTH WING SEATING AREA- SOUTH WING TRACK SAFETY SONE


A16 1

A11 1

A09 1 A10 1

A08 1

A06 1

LY.I

ARCHITECTS

DETAILED SECTION A-A SCALE 1:50 PROECT TITLE:

WA VELODROME

DRAWING TITLE:

DETAILED SECTION A-A (PART 1)

DESIGNER:

DRAWING NUMBER:

DATE:

LYANA IBRAHIM |21363052

A06 (1)

21 OCTOBER 2016


A12 1 A14 1

A13 1

A15 1

A17 1

A07 1

LY.I

ARCHITECTS

DETAILED SECTION A-A SCALE 1:50 PROECT TITLE:

WA VELODROME

DRAWING TITLE:

DETAILED SECTION A-A (PART2)

DESIGNER:

DRAWING NUMBER:

DATE:

LYANA IBRAHIM |21363052

A06 (2)

21 OCTOBER 2016


BASE PLATES SET ON LEVELLING NUTS CAST IN PLACE CONCRETE FOUNDATION WITH REBAR REINFORCEMENTS EXTRUDED POLYSTRENE FOAM INSULATION FILTER FABRIC STONE PAD 100 MM Ø PERFORATED DRAIN PIPE

A08 1

LY.I

ARCHITECTS

DETAILED SECTION-FOOTING SCALE 1:10 PROECT TITLE:

WA VELODROME

DRAWING TITLE:

DETAILED SECTION FOOTING

DESIGNER:

DRAWING NUMBER:

DATE:

LYANA IBRAHIM |21363052

A08 (1)

21 OCTOBER 2016


MULTI CHANNEL BRACKETS ATTACHED TO STEEL COLUMNS

STEEL COLUMNS WELDED AT JOINTS & CLADDED WITH GYPSUM BOARD & FINISHED WITH CONCRETE RENDER A10 1

STEEL COLUMNS CLADDED WITH 1MM THIICK GYPSUM BOARD

EUROCLAD STANDING SEAM ZINC PLATES 6000X430X0.7 MM MARINE PLYWOOD 32MM THICK

CONCRETE RENDER ON GYPSUM BOARD

BRADFORD INSULATION 15MM THICK FIRE RESISTANT GYPSUM BOARD 16MM THICK CONCRETE RENDER INTERIOR FINISHING

A09 1

LY.I

DETAILED SECTION-WALL & COLUMNS SCALE 1:10

ARCHITECTS

PROECT TITLE:

WA VELODROME

DRAWING TITLE:

DETAIL SECTION OF WALL & STEEL COLUMNS

DESIGNER:

DRAWING NUMBER:

DATE:

LYANA IBRAHIM |21363052

A09 (1)

21 OCTOBER 2016


STEEL COLUMNS WELDED AT JOINTS & CLADDED WITH GYPSUM BOARD & FINISHED WITH CONCRETE RENDER

CONCRETE RENDER ON GYPSUM BOARD

MULTI CHANNEL BRACKETS ATTACHED TO STEEL COLUMNS

MARINE PLYWOOD 32MM THICK

FASTENER TO PLYWOOD

A10 1

LY.I

ARCHITECTS

CONCEALED CLIP

DETAILED PLAN-WALL & COLUMNS SCALE 1:5 PROECT TITLE:

WA VELODROME

DRAWING TITLE:

DETAILED PLAN-WALL & COLUMNS

DESIGNER:

DRAWING NUMBER:

DATE:

LYANA IBRAHIM |21363052

A10 (1)

21 OCTOBER 2016

EUROCLAD STANDING SEAM ZINC PLATES 6000X430X0.7 MM


EXTERIOR CLADDING- SEE DRAWING A10

DEEP COMPOSITE STEEL DECK FLOOR FLOOR SCREED ANGLE WELDED TO BEAM BELOW

CAST IN PLACE CONCRETE WITH POLISHED FINISH

STEEL BEAM

BRADFORD INSULATION 150MM THICK FIRE RESISTANT GYPSUM BOARD WITH CONCRETE RENDER

LY.I

ARCHITECTS

PROECT TITLE:

WA VELODROME

A11 1

DRAWING TITLE:

DETAIL STAIR TO EXTERIOR WALL SECTION

DESIGNER:

DRAWING NUMBER:

DATE:

LYANA IBRAHIM |21363052

A11 (1)

21 OCTOBER 2016

DETAILED STAIR TO EXT WALL SECTION SCALE 1:5


A10 13

LYSAGHT KLIP-LOK HS EAVES BEAM

75 X 300 X 125 MM DIMOND FASCIA GUTTER OVER FLASHING

GALVANIZED EXTERNAL GUTTER BRACKET

LYSAGHT KLIP-LOK HS OVERHANGING ABOVE GUTTER

GALVANIZED EXTERNAL GUTTER BRACKET

A13 1

DETAILED SECTION OF ROOF TO WALL SCALE 1:5

A12 1

LY.I

ARCHITECTS

PROECT TITLE:

WA VELODROME

DRAWING TITLE:

DETAIL STAIR TO EXTERIOR WALL SECTION

DESIGNER:

DRAWING NUMBER:

DATE:

LYANA IBRAHIM |21363052

A11 (1)

21 OCTOBER 2016

DETAILED PLAN REFERENCE OF ROOF TO WALL SCALE 1:10


LYSAGHT KLIP-LOK HS ROOF CLAD BRADFORD INSULATION BATTS R7.0 STEEL DECKING STEEL PURLIN ‘C’ CHANNEL CLEAT ATTACHING TRUSS TO PURLINS STEEL TRUSS RHS 272 X 272 MM

DETAILED LONG SECTION OF ROOF LAYERS SCALE 1:10

A15 1

ROOF CLAD USES LYSAGHT SMARTSEAM CLIP, HOLDING ALL MATERIALS TOGETHER TO STEEL DECKING STEEL DECKING FASTENED TO PURLINS

A14 1

LY.I

DETAILED SECTION OF ROOF LAYERS SCALE 1:10

ARCHITECTS

PROECT TITLE:

WA VELODROME

DRAWING TITLE:

DETAILED DWGS OF ROOF LAYERS

DESIGNER:

DRAWING NUMBER:

DATE:

LYANA IBRAHIM |21363052

A14(1) & A15(1)

21 OCTOBER 2016


CAST ON SITE CONCRETE WITH POLISHED FINISHING

BEAM SUPPORT

GROUND FLOOR STRUCTURAL WALL

STEEL REINFORCEMENTS

26 MM Ø NOSING BARS

BEAM SUPPORT A16 1

LY.I

DETAILED SECTION OF SEATING AREA SCALE 1:10

ARCHITECTS

PROECT TITLE:

WA VELODROME

GROUND FLOOR LOAD-BEARING WALL

DRAWING TITLE:

DETAILED SECTION OF SEATING AREA

DESIGNER:

DRAWING NUMBER:

DATE:

LYANA IBRAHIM |21363052

A16(1)

21 OCTOBER 2016


25MM INSULATED SAFETY GLASS

EXTRUDED ALUMINIUM EXTERNAL CAPPING

BRACKET CONNECTER

FLASHING ABOVE ROOF CLAD

170X95MM STEEL RHS BASE FOR SKYLIGHT BRACKET

SKYLIGHT RISER BRACKET BOLTED TO PURLINS BELOW

400X170MM STEEL C’CHANNEL PURLINS

‘I’ BEAM AS PURLIN TO HOLD UP THE WEIGHT OF SKYLIGHT

TOP CHORD ROOF TRUSS

A17 1

LY.I

TOP CHORD ROOF TRUSS

DETAILED SECTION OF SKYLIGHT ROOF SCALE 1:5

ARCHITECTS

PROECT TITLE:

WA VELODROME

DRAWING TITLE:

DETAILED SECTION OF SKYLIGHT ROOF

DESIGNER:

DRAWING NUMBER:

DATE:

LYANA IBRAHIM |21363052

A17(1)

21 OCTOBER 2016



"DIMINISHING" -Experiencing effects of climate change L ost of land (especially homes) due to rising sea levels -Ever-changing & inconsistent physical effects, including weather

"

/\

,,

'""'

.,.

' ...

I"!'

I 1f'

,

1

��

Playing with walkway height in order to give a dimishing feel through control and restrciting of space

Proposed Material:�

Particle Board-16mm &1 8mm

Number of shelving decreases as one goes through the e x h i b i t i o n

\����G\ - 0\ IJ.)\Ul,1"\�

: � Exploded (Dismantled) view -main framing & shelves

CONCEPT


,,"'' ,,

"'

]57'1----:-------------,-,,---·I�•-.,,..--------

1&8°

BOUGAINVILLE ISLAND '\\

\\ \\

\\ \\

\\ tt \ \\

FAUltO IS.

so

l

0

41

CHOISEUL ISLAND

Q

\ \

RESEARCH VISUALIZATION- EXISTING CONDITION

A1

'y

n,v,------


u

I\

TONGUE & GROOVE JOINERY Main Frame uses the basic tongue and groove joinery. Thus requiring less nails, glue or other reinforcements

-

MAIN ENTRANCE

LI X

I I I I

, ,

I

I

/

"/

;

,,'

---- --------

.....

........ ..... ,

PLAN DETAIL SCALE 1 : 1 0

',,

\

\ \

� 1 1600

:r- - - - - - - - - - - } . - -- -- --r �--- -- -- 1·: 1 1000

---------------------------

J

1======1--- --1------- ---i: J ::,

1200

\ \

I

_J:I

\

''

I I I I I I

'',

.....

, ........ _ ------------ , '

,,"

""

--

-�- -----------,

.... . ................

....

I

I

I

I L--- \

;

\

I I I :

I I ,

I I I I I

\ \

\

\ \

\

' ,,, .........

\

........

_ ---------- -­ ,' V

..

I

,I

�I

'""

Bracing

---------

..

.I

�,,"" ,

"

I

I

I

,------

• ---------

�I

� I'

""--'-.

\ \ \

18

-·acz/"'-

I

I

\

------'\ ...1

I I I I \ \ \

I

• ---------

X

/

......... ..... .....

', ' SECTION DETAIL Y ',, SCALE 1 :1 \

/;

/

\ y \

y

I \ \ \ \

"00

I

\

\ \

: L

I

',\

" /

,,'

--------

----

• -

---L

--, Top Beam

,000

Bracing ---------.

� Plan-Cullity Galery PLANS I SCALE "1 :50

J<---

-

L-soo_J

-

a,oo _

_

_

_ _______,

Top view�


*REFER TO CATALOGUE PAGE FOR NUMBER/SIZE OF SHELVES FOR EVERY PANEL

POSSIBLE PARKING SPOTS Its regular shape and frame allows it to be dismantled and transported easily

HORIZONTAL BRACING

Jll �

/•I I ' / I / /

/

'

/

I

I I I

,

,

'

/

/ /

0

0

i i I I I i I I I '!

/

I

� Site Plan

Section X �

N OTTO SCALE

,f-

-

-

3400 -

-

---------;

-----

-

F

\

TV

TV

3300 -

F

F

_, 'P: F

F

®

-

--------<

F

F

F

F

F

;-----

- 3200 -

-

L--1200

__j

SECTIONAL DETAIL & ELEVATIONS I SCALE "1 :50

L

1000

__J

------.(

= TV

F

F -F

I

-

©

TV

= =

L soo _J,

I

2400

Elevations �


STOPPED HOUSING JOINT

A Tongue & Groove method commonly used by traditional Japanese woodwork.

.....

I I I

I

I

----

/

'

'

\, \ \

·,

Ensures structural stability & also creates an appealing aesthethic to a design

I \

' ....

---

/

.

I

_..

� Section Detail 1:10

� Joinery Detail 1:5

� lso Detail-Slot in

Ania Wolowska, 'Ban Table'

Constructing Main Framing � Cross Halving Joint is required for the assembly of the main framework

"1) Vertical Beams into base beam. Nail down to secure it

Bracing

2) Place Top Beam above vertical beams, making sure both tongue and grooves fit 3) Horizontal Bracing is the last to be assembled to bring all 3 panels together

Top Beam

I I I

Base Beam ________ 2 Vertical Beam

JOINERY DETAIL

I

SCALE "1 :20


.----------------------------------------------------------· I I I

PARTICLE BOARD SHEET FIXED WITH SHELVINGS AS A BACK PANEL FOR THE TELE VISION(S)

SHELVING CAN BE DESIGNED FURTHER TO BETTER FIT OR BETTER DISPLAY A BOOKLET

...ill

VIEW FROM CULLIT Y GALLER Y MAIN ENTRANCE �

PERSPECTIVES

CUSTOMIZABLE: TOP-MOST SHELVING DETERMINES HEIGHT OF WALKWAY

------------,I I I I I I I I I I


Top Beam

Typical Panel with 8 wooden shelves

(thkness 18mm, x3 each)

(thkness 16mm)

3200

-------->l 200

--------'t-

Base Beam

(thkness 18mm, x1 each) 1200

800

1200

(

(

)

__)

1100 ----------,'-

- 1000 -

--,(--

(.___

1000 -

-----+----

) 1100 -

-1200 -

-

---+------

-1000 _

200

____,,

G)

lo

al 1 60

(2)

lo

al ] 90

@

la

al

@

la

al J 170

--------'t-

-/ -

(._________---1) -

-------->l

Top> Bottom

o

al

J 120

@

la

@

la

al

(2)

lo

al ] 90

G)

lo_______----11.0 I 1 60

Length Varies* 1060, 1160, 1260mm

J 200

J 120

J: 60

(§)

(�________.)

3250

Vertical Beam

J: 60

(thkness 18mm, x12) 2400 _

_ _ _ _ _ _______J

3250

*Diagrammatic plan (number of shelve type per panel)

Bracing

G)x4 E (2)x12 §@x4

(thkness 16mm, x2 each) 1700 ....________________J

=: 18

�@X4

100

------/ 1300 - - -

§

9=:

@x4 -----'\

�--------__J- 18 � 100

CATALOGUE I SCALE� :20

MAIN : SHELVING STRIPS FRAME

G)x.4 (2)x8 , , �@xs �@X-4

�@xo

@xo

r-@x2

@x:2

®x2

r-

G)x 4 (2)X8 �@xo


� SKETCH MODEL

('DIMINISHING' EFFECT ACHIEVED BUT CHANGES HAD TO BE MADE FOR STRUCTURAL PURPOSES)

1 :20 MODEL�

(MOST STRUCTURAL FACTORS SOLVED BUT EFFECT OF 'DIMINISHING' COULD BE FURTHER ENHANCED)

� JOINERY PROTOTYPE

(CONFIRMING DEPTHS AND INTERLOCKING DIMENSIONS & EXPERIMENTING WAYS TO CREATE THE STOPPED HOUSING JOINT)

� WORKING JOINERY?

(TESTING LOAD AND STABILITY OF THE SHORTEST AND WIDEST SHELVING TYPE, SEE CATALOGUE. IT'S SECURED ENOUGH.)

PROCESS MODELS


IDES 2000

VOID SPACE Group 3

Siaw Ning Ting Nur Lyana Ibrahim Fuad Kamsin Hoe Khang Lee


 Wears bright colours with red & blue

 Jumping abilities, Superpower  Lives in the Mushroom Kingdom  Friendly, brave  Aim of game is to rescue Princess Peach


CONCEPT  Classic video game (2D)  Movement along the axis

 Pixels  Squarish  Static

 Color tone  neutral colours


Pixelated Skyscraper by Singapore-based Design Act

“Nomadic” House by Sou Fujimoto


EXPLORATION


LAYOUT


PROCESS: PRODUCTION PT. 1


PROCESS: PRODUCTION PT. 2


PROCESS: ASSEMBLE


VOID


SHADOW & LIGHTING


THANK YOU


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.