1
Sealab. A thesis on combating outmigration and overfisihing with architecture, In collaboration with Zaven Titizian.
2
Can architecture resuscitate dying outports?
View of Sealab from new Bonavista harbour boardwalk. 3
4
View of Sealab from Bonavista harbour. 5
6
7
8
First and second floor plan showing laboratories and public areas. 9
9 Hanna. A live-work development in Toronto, ON.
Conceptual view of public park and complex from the southeast. 10
How can new development
respect existing & past context? Exploded axonometric view of building approach with structure. 11
Live-work units
12
Public
market
Event space
13
Market & Event Areas
GO Transit
c. 1940 14
First floor and evolution of existing building.
2015
2nd Floor Studios
Liberty Village, Toronto
15
PUBLIC - Lund Hotel. Schematic design presentation for new tourism hub in Lund, BC
Desolation Sound Campbell River
Lund
Strait of Georgia
Powell River Courtenay
16
Can architecture mediate tourism in remote communities?
17
Hotel
Existing hotel c. 1920
Option #1
Option #2
Option #3
18
Marina
Constructing the site model
19
A Chair for Henri Cartier-Bresson. A furniture design-build project in collaboration with Zaven Titizian
View of finished chair. 20
How can a chair frame a moment?
21
A CHAIR FOR THE DECISIVE MOMENT “The [chair] for us is a tool, not a pretty mechanical toy. In the precise functioning of the mechanical object perhaps there is an unconscious compensation for the anxieties and uncertainties of daily endeavor. In any case, people think far too much about techniques and not enough about [sitting].� -Henri Cartier-Bresson, on cameras and seeing The chair is both the photograph and the photographer - the composition and the composer In photography, the chair is ubiquitous. The chair has always framed the moment Thus, the chair becomes part of the story The composition, but not the emphasis Nothing is staged, neither is the chair The photographer must blend in, to seem as if they were some permanent fixture Spontaneity and anonymity are paramount Also attention to proportion Attention to detail No other distractions Only the event expressed A precise organization of forms Simply, pragmatically and functionally reinterpreted Which give that event its proper expression Preserving this moment in time The smallest thing can be a great subject; the little human detail can become a leitmotiv The [chair] has a unique relationship with each individual subject There exists a back-and-forth, a conversation between the subject and the [chair] The resulting idiosyncrasies are brought forth in the subject Providing opportunities for the elusive and decisive moment In short, our chair aims to reinterpret the ubiquituous and reframe the everyday
EXPLODED AXONOM HENRI CARTIER-BRESSON
22
METRIC CHAIR 1:5
Chair process and final product. 23
24
25
PUBLIC - Kingsley Estates Childcare A new childcare facility for Richmond, BC with PUBLIC
Conceptual renderings of childcare 26
Copyright reserved. This de Public Architecture and Com purpose without the written used for construction until i commencement of the Wor datums and levels to identif discrepancies between this bring these items to the atte
ISSUES + REVISIONS NO DATE
14
12
11'-6"
10
37'-2"
8
9'-3 7/8"
6
16'-0"
4
9'-3 1/4"
5 A4.00
2
10'-2"
4'-9 5/8"
5 11 A4.01 A4.01
Laundry IAS-8
6 A8.01
3 A8.01 (at 5' aff)
2 RWL A8.01
7 A8.01
Childrens WC IAS-3
General storage IAS-4
Quiet area IA-4
Open play IA-2
5 A4.04 3 A4.00
Parent stroller storage SS-4
Cubby area IAS-1
Skylight above
S
Hose bib
Art area 1
10 A7.04
3 A4.04
Table Area GA-1
RWL
2 A5.02
Ceiling above
Canopy above
7 A8.02
9 A7.04
3 A8.14
8 A8.02
Line of canopy above
Covered Play GAS-15
G SHEET NOTES
9 A8.02
10 A8.02
Fence (See landscape drawings)
5 A4.03
1 Note: sign to be pos Kitchen GAS-4 notin produce grease lade
Line of canopy above
3 A4.03
(at 9' aff)
Outdoor storage 1 OS-1
1 A4.00
4 A4.03
Video monitor
6 A4.03
F
F
Hose bib
Admin office GAS-7
3 A4.00
6 A8.02
Video monitor above
E
1 A4.03
2 A4.03
17'-9 5/8"
6 A8.01
IT / Data room B-9
11 A8.02
RWL
MW
S
(at 11' aff) Electrical room B-4
4 A4.00
8 A4.02
Kitchen GAS-4
Entrance
4 A4.04
sim
Other activities GA-3
DW
Cubby area GAS-3
RWL
12 A8.02
1 A4.04
2 A4.04
C
7 A4.02
Large motor/nap room GA-5
Ceiling above
RWL Meeting /parent room SS-6
Video monitor Administration office IAS-6
RWL
Ceiling above
Art area 2
11'-6 7/8"
L
Housekeeping pad (see Structural)
Accessible WC SS-9
6 A4.04
Kitchen IAS-2 F
Covered Play
Childrens WC GAS-1
D
Line of cove above
Lobby SS-1
Ceiling above
Quiet area GA-4
Roof hatch above
Staff WC SS-8
Annunciator panel (see Electrical)
B
6'-7 1/8"
Video monitor above
Line of canopy above
Table area IA-1
DW
MW
K
Note: signage to be posted noting "Kitchen use shall not produce grease-laden vapours"
A 6 A4.02
Hose bib
Roof access ladder
Shower
RWL
Ceiling above Ceiling above
1 A5.02
Staff room SS-7
Entrance
Property line
Nap storage GAS-6
General storage GAS-5
Mechanical 23
Video monitor
Janitor SS-11
5 A8.02
4 A8.02
11 A8.01
sim
(at 5' aff) Nap room 1 IA-7
Program stroller FD storage SS-5
D
8'-6 3/8"
10 A8.01
9 A8.01
3 A4.02
2 A5.01
3 A8.02
(at 9' aff)
8 A8.01
RWL
W/D
5 A8.01 Interactive/Nap room 2 IA-8
2 A4.02
1 A4.02
Soffit over
29'-7 3/4"
4 A8.14
Hose bib
5 A4.02
4 A4.02
2 A8.02
10 A4.01
Hose bib
Storage (nap room) IAS-5
Hose bib
13'-1 1/2"
1 A5.01
2 A8.01
1 A8.01
C
1 A4.01
4 A4.01
1 A8.02
00 °
B
3 A4.01
Canopy above
2 Note: sign to be pos B-4 and IT/Data Roo storage permitted in
Bike storage 1 OS-1b
SHEET LEGEND
H
F
E
A
K CP1
PMS3
BRP3
Scupper
L BRP3
BRP2
BRP1
12'-1 1/2"
6'-8 5/8"
23
21
Parapet 4
15'-0"
Parapet 3 30'-0" Parapet 2
14'-0 1/2"
1/8" = 1'-0"
8'-0"
19
15
Interactive/Nap room 2 IA-8 BRP1
Open play IA-2
12'-8 5/8"
21'-11 3/8"
Parapet 3
14'-0 1/2"12'-0 1/2"
Parapet 2
11'-7 1/8"
Parapet 1
9'-7"
BRP1 WT27
South Elevation
2
Main level 0" (Geodetic 2.32m (7' 7"))
C
13
15
11
6
July 11, 2016
Issued for Tender
"Ruff" Texture (BR2)
50% Smooth Texture BR1
BRP2
BRP3
6" = 1'-0"
9
7
5
= air/moisture barrier = adjustable shelving = wall base = brick masonry = brick pattern = acoustic panel ceiling = cementitious soffit panel = cementitious panel trim = carpet = curtain = gypsum board = glass/glazing = insulation = painted metal siding = paint = resilient flooring = resilient wall protection = roller shade (b/w jambs) = roller shade (b/w mullions) = storefront = storefront (operable) = vapour barrier = wood cladding = wood sheathing
3
1
Feb 24, 20
2
March 22,
4
June 3, 20
6
July 11, 20
1
Parapet 5
PMS3
Scupper
215 – 309 W CORDOVA ST VANCOUVER BC V6B 1E5 TEL 604 738 4323 FAX 604 873 4313 WWW.PUBLICDESIGN.CA
19'-10"
BRP3
BRP1
See 13/A3.02
BRP2
PMS2
Parapet 5
PMS1
19'-10" BRP2
PMS3
CP2 CP1
Scupper
BRP3
BRP3
Kingsley Care
BRP3 BRP2
Skylight
Parapet 2
C:\Users\mack\Documents\1517_KEC_mack.rvt
Copyright reserved Public Architecture purpose without th used for constructi commencement of datums and levels discrepancies betw bring these items t
See 11/A3.02
Brick reveal
CP1
Issued for 50% Building Permit review Issued for Building Permit
D
Property line
B
/
19
Acoustic wall
Issued for ADP
May 10, 2016 June 3, 2016
AB AS B BR BRP AP CP1 CP2 CPT CTN GB GL INS PMS PT RF1 RF2 RS1 RS2 SF1 SF2 VB WC WS
Brick Pattern (BRP) Legend
3/16" = 1'-0"
21
1
Main level 0" (Geodetic 2.32(m 7' 7")) BRP1
Feb 24, 2016
March 22, 2016 Issued for Planning Committee
3 4
Material legend (see Architectural spec for full description)
50% "Ruff" Texture (BR2)
5 Smooth Texture (BR1) A4.00
Main level 0" (Geodetic 2.32(m 7' 7"))
1 2
ISSUES + REVISI NO DATE
3
5
7
9
11
10'-0"
1 hour Fire Resistance
DESCRIPTION
15'-2 3/8"
4'-5 3/8"
14'-3 1/2"
2 A4.00
WT1
45min Fire Resistance R
15'-0"
Parapet 3
14'-0 1/2"
10'-0 5/8" U.S. of Ceiling 2
Brick reveal
23
Parapet 3
14'-0 1/2"
U.S. Truss
10'-0 5/8"
U.S. of Ceiling 1
Parapet 4
15'-0"
Parapet 3
14'-0 1/2"
Parapet 2
11'-7 1/8"
Parapet 1
9'-7"
10380 No. 2 Road
Brick reveal
PROJECT CODE
8'-0"
1517 SCALE
1/8" = 1'-0"
Lobby SS-1
Brick reveal Main level 0" (Geodetic 2.32(m 7' 7")) CP1 CP2
18b Hose bib
09a
CP2
CP1
BRP3
BRP1 WT24
WT25
Entry
WT23
East Elevation South
4
CP2
CP1
BRP1
CP1 WT21
WT22
Brick reveal
CP2
CP1 CP2
Brick reveal
3/16" = 1'-0"
Building elevation K
K
L
16
BRP3
BRP1 WT19
WT20
Entry
BRP2
BRP3
CP1 CP2
Main level 0" 2.32m (7' 7"))
CP2
CP1
CP1
BRP1 BRP3 BRP1 CP2 CP1
Hose bib
WT16
WT17
Brick reveal(Geodetic
Rotation line
BRP1 WT26
31a
Brick reveal
WT15
WT13
Floor Pl
East Elevation North
5
SHEET
3/16" = 1'-0"
A1.02
L L
L
14
12
F
10
8
G
G
6
F
4
F
G
2
BRP1
BRP1
Parapet 3
Parapet 1
14'-0 1/2"
Parapet 3
9'-7"
Parapet 1
Parapet 4
15'-0"
Parapet 3
14'-0 1/2"
Parapet 2
11'-7 1/8"
Parapet 4
15'-0"
Parapet 4
15'-0"
Parapet 4
15'-0"
Parapet 3
14'-0 1/2"
Parapet 3
14'-0 1/2"
Parapet 1
9'-7"
14'-0 1/2"
9'-7"
Contiuous 45 minParapet 3 FRR roof assembly 45 min FRR Parapet 1
14'-0 1/2"
Parapet 5
1
Parapet 3
14
9'-7"
Scupper
Scupper U.S. of Ceiling 1
8'-0"
U.S. of Ceiling 1
8'-0" Scupper
Parapet 4
15'-0"
Parapet 2
11'-7 1/8"
U.S. Truss
10'-0 5/8"
Intercom Card reader
Main level
0"
Main level
Kitchen south elevation
6
Kitchen north elevation
7
3/16" = 1'-0"
Main level
3 / A1.04
0"
8
3/16" = 1'-0"
3 / A1.04
Main level
0"
Main level
Lobby Cubby area CP2 CP1 SS-1 IAS-1 Meeting/ parent room north elevation 9
Brick reveal CP1 CP2
BRP1 BRP2
Table area Art area south elevation IA-1 3/16" = 1'-0"
/
33a BRP1
10
3/16" = 1'-0"
/
Electrical room south elevation
0"
Main level WT18
Cubby area GAS-3
11
3/16" = 1'-0"
0"
Main level
Area GA-1 Aministration office north elevation CP2
/
CP1Table
0"
Kingsley Estates Child Care
Other CP1 CP2
activities GA-3 Kitchen south elevation
12
3/16" = 1'-0"
5 / A1.04
3/16" = 1'-0"
Building section
PROJECT CODE
STATUS
1517
Issued for Tender
SCALE
DATE
As indicated
July 11, 2016
Main level (Geodetic 2.32m (7'
SHEET
Setback line
1
Property line
A3.01
3
Parapet 3 sim
sim
2 A7.02
11'-7 1/8"
Other activities GA-3
Large motor/nap room GA-5
Copyright reserved. Public Architecture a purpose without the used for constructio commencement of th datums and levels to discrepancies betwe bring these items to
14'-0 1/2"
ISSUES + REVISIO NO DATE
11'-7 1/8"
6
2'-6"
MW4
Main level
2'-11"
E
0"
(Geodetic 2.32m (7' 7"))
MW6w
MW12
215 – 309 W CORD VANCOUVER BC V6 TEL 604 738 4323 FAX 604 873 4313 WWW.PUBLICDES
Path (varies)
1'-0"
Exposed gable D
E
D
F
F
E
D
F
D
F
D
D
F
D
E
F
E
D
E
D
E
E
F
D
E
F
E
F
D
C
D
F
E
D
F
F
D
E
E
F
E
D
E
F
BB1
2
Kings Care
3" = 1'-0"
MW12
MW6w C
MW20
10"
Property line
D
2'-0"
D
1'-8"
F
7'-11"
4 Millwork detail - MW9b to MW7 corner
MW20
July 11, 201
MW7w
MW9a 1'-11"
9'-0"
eq
Parapet 2
5 A7.02
Contiuous 45 min FRR roof assembly 45 min FRR 14'-0 3/8"
9'-10 1/8"
17'-6" eq
1
U.S. of Ceiling 1
Exterior Elevations
5
1'-0"
U.S. of Ceiling 2
10380 No. 2 Road
C:\Users\mack\Documents\1517_KEC_mack.rvt
/
0"
Open play CP2 CP1 IA-2
CP1 CP2
215 – 309 W CORDOVA ST VANCOUVER BC V6B 1E5 TEL 604 738 4323 FAX 604 873 4313 WWW.PUBLICDESIGN.CA
7/11/2016 4:51:53 PM
12 A7.01
11 A7.01
BB1
10380 No. 2
MW1w
MW20
Parapet 3
14'-0 1/2"
U.S. Truss
10'-0 5/8"
1 Refer to detail fixed shelving, MW3a, etc.). H PROJECT of open CODE cell, co and 1517described i
9'-7"
Parapet 1
staff comm. desk 2'-6"
1'-0" o.c.
MW12
Other activities GA-3
1 Millwork IAS-1 - Elevation 1/2" = 1'-0"
MW1w 1'-0"
U.S. of Ceiling 2
6"
U.S. of Ceiling 1
TD
10"
3'-0"
2'-6"
SHEET NOTES: F
10'-0"
SCALE 2 Provide adequ 1/8" = 1'-0" walls
MW4 MW9a
8'-0"
MW20
2 MW1w & MW6w -Elevation
KEYNOTE LEGEND
1/2" = 1'-0"
1
4 A7.01
Main level 0" (Geodetic 2.32m (7' 7"))
2 4 5
MW7w
Millwork MW1w
2 A7.02
MW20
MW6w
MW1w
MW1w
8 9
1'-6"
27
12 A7.01
11 A7.01
GWB, pt
10'-6" eq
eq
eq
eq
eq
eq
eq
6 Millwork IAS-1 - Plan
Bulletin
A4.00
HPL bac
Adjusta
11
Mail slo
12
Child sa
13 14
Mirror
Toilet pa
15
Paper to
16
Soap dis
17
Grab ba
18
1'-1 1/2"
1'-1 1/2"
Wall bas
Wall pro
10
1/2" = 1'-0"
MW12
Electric
7 SHEET G1S plyw
MW1w
5 Millwork IA-1 - plan
3 Millwork IAS-1 - Axonometric
Mechan
Buildi
6
TD
Toothbr
19
Toilet pa
20
Napkin
21
Change
22
Towel h
MW9a
MW5w
MW5w
MW5w
3'-11"
3'-11"
1/2" = 1'-0" 3'-5"
7/11/2016 4:51:39 PM
13
CP2
WT11
3/16" = 1'-0"
11'-7 1/8"
U.S. Truss
15'-0"
Hose bib CP1
Hose bib
WT12
North Elevation
1
MC3
See A3.01
CP2 CP1 BRP2 WT14
CP2
Parapet 4
U.S. of Ceiling 1
Floor plan sidewalk/ bike path (not in this permit)
CP1
Parapet 4
12'-0"
See A3.01
ISSUES + REVISIONS NO DATE
Outdoor storage 2 OS-2
11'-7 1/8"
Floor Plan
1
D
Brick reveal
Property line
Brick reveal
C
Copyright reserved. This design and drawing is the exclusive property of WMW Public Architecture and Communication Inc. and cannot be used for any purpose without the written consent of the Architect. This drawing is not to be used for construction until issued for that purpose by the Architect. Prior to commencement of the Work the Contractor shall verify all dimensions, datums and levels to identify any errors and omissions; ascertain any discrepancies between this drawing and the full Contract Documents; and, bring these items to the attention of the Architect for clarification.
Property line
G
8 A4.04
June 3, 2016 July 11, 2016
42'-4"
12 A8.01
9 A4.01
8 A4.01
May 10, 2016
4 6
19'-7 3/4"
90 .0
4 A8.01
2 A4.01
Bike parking
7 A4.01
Feb 24, 2016
3
1
5
(at 2' aff)
6 A4.01
1
4'-9 5/8"
1 A4.00
13'-1 1/2"
16
2 A4.00
COLOUR LEGEND
Bunkhouse. A spillover area for guests in Red Bay, ON.
Exterior view of Bunkhouse. 28
How does one build for posterity?
Interior view of Bunkhouse with children. 29
HOWDENVALE
RED BAY
BRUCE PENINSULA
Bruce Peninsula with inset site map. Bunkhouse shown in red. 30
REV 04/19/2015
Construction drawings of the proposed structure with contruction photos. 31
Davenport Diamond CHSR. Studying the impact of transit development in Toronto, ON for THA.
Artist’s impression of new rail viaduct, via Metrolinx. 32
What is the role of heritage in a transient city?
Davenport diamond
Fire insurance plan showing built resources with study boundary, 1913 33
Designated buildings Suggested designations
Fire insurance plan showing built resources with study boundary, 1913 34
Artist’s impression of new rail viaduct via Metrolinx. 35
36
Questions?
phillips.mack@gmail.com
37