MAGDALENA LACH MArch Thesis, AA School
PORTFOLIO 2018
MAGDALENA LACH PORTFOLIO 2018
Loughbrough Junction, PRP
London Road, Wembley, PRP
Holz 100 Hotel & SPA, Studio EL
Helsinki Central Library, Studio EL
2
Contents 1. Talent Environment, Birmingham MArch Thesis AA School of Architecture
2. Loughborough Junction, London Concept Design, Design Development Teamwork: PRP, London
3. Redbridge Scape Framework Sites, London Planning Application, Working Drawings Teamwork: PRP, London
4. Bollo Lane, Ealing, London Planning Application, Working Drawings Teamwork: PRP, London
5. Holz 100 Hotel, Piwniczna Zdrรณj, Obidza, Poland Private work Teamwork: Studio EL, Wroclaw
6. London Road, Wembley Concept Design towards Planning Teamwork: PRP, London
7. Helsinki Central Library Competition Entry Teamwork: Studio EL, Wroclaw
3
1. Talent Environment, Birmingham M.Arch Thesis Housing and Urbanism Programme, AA School of Architecture Individual work. Tutors: Lawrence Barth and Anna Shapiro Knowledge and cultural city models are becoming the strategies for the urban transformations of cities. However, these models often do not clarify how we might gain long-term values through that processes and how these models might support the emergence of liveable environments that would retain and attract new talents. Today, there is a trend that people start to look again at the idea of the living in the city centre. However, this is getting more and more unaffordable in London because of the high developmental pressure. What Birmingham can offer differently is an opportunity for the affordable living just in the city centre rich with resources. The Big City Plan distinguishes Digbeth as an area with a significant creative vocation into which the city living will expand. The existing creative industries start to make the area the trendiest place for affordable working environment. Moreover, the proximity to the city centre and the network of local businesses make it possible to think of this area as particularly attractive for living environment. However, there is a risk that the market-driven approaches might eliminate the local values. The main goal of the thesis was to go beyond the vision of the Big City Plan. Define how housing and creative industry might work together in order to promote values, diversity and rich intensification within Digbeth. How architecture as urbanism can drive change and create new living opportunities in the central city environment.
1. Minimal intervention of the facade, White Building, Hackney Wick, London 4
2. The network of synergies between local creative industries and housing. The integration of Digbeth district with the city centre. 5
3. Digbeth urban structure in 20 years time defined by the Big City
Aston University Campus ThinkTank Muzeum
Planned Curzon HS2 Station
Fazeley Studios Bullring Shopping Centre
Custard Factory
4. Network of existing creative businesses in Digbeth. 6
5. Location of Digbeth in relation to the city centre.
6. The relationship between housing and cultural institution within industrial fabric.
7. Diagram of the explored typologies and their differentiated orintation.
8. Diagram illustrates the micro mobility system that permeates through differentiated spaces.
9. Differentiation and hierarchy in the mobility system. 7
10. The orientation and spatial relationships between explored housing typologies.
8
11. Double L typology and the richness of communal facilities on the ground level.
12. L - shaped building with the external gallery oriented towards the sun.
13. The courtyard type building with the internal gallery acting as a collective space.
9
14. The walking route acts as an interface between residents and local artists enhancing the creative value of the area. 10
15. The axonometric projection illustrating the nature of spaces on the ground level. 11
2. Loughbrough Junction, London Concept design , Design development PRP, London Design elaborated by a team of 4 people. 3D model, section and plans by author.
Client: Peabody Housing Association, Lambeth Council This project includes the re-development of the Higgs Industrial estate site the other side of Coldharbour Lane from Loughborough Junction station. The proposal went on show for local people and businesses at the start of March 2018. It includes about 130 homes and commercial space in a mixed development. According to the Peabody housing association, the plans will also include improvements to the public realm with open access to railway arches and a courtyard for residents. The new scheme has fewer homes and buildings would range in height from five to eight storeys. It also has more than 3,500 square metres of office and light industrial units.
Existing condition.
Taller element
1. Architectural Context Anlysis - Materiality. 12
Stepping of the tower
Concept for the tower
4. Street view from Coldharbour Lane.
View toward the City of London
2 Typical 1B2P flat layout.
Stepping of the building mass
Exploration of the top of the tower
3. Typical 3B5P flat layout.
Bay study
Two elements
5. Elevation Bay Study. 13
B
A
A
C
3
1 6121
4
The contractor is responsible for checking dimensions, tolerances and references. Any discrepancy to be verified with the Architect before proceeding with the works. Where an item is covered by drawings to different scales the larger scale drawing is to be worked to.
2
4
6121
440
6121
6123 440
8 440
1
Do not scale drawing. Figured dimensions to be worked to in all cases.
6121
CDM REGULATIONS 2015. All current drawings and specifications for the project must be read in conjunction with the Designer's Hazard and Environment Assessment Record
1 6121
All intellectual property rights reserved.
8 6121
EXTERNAL Line of front fascia of balcony. Refer to Sheet 6151
Top of Fusion Roof 61272
Top of Fusion Roof 61272
BALCONY
1650
1650
1650
EXTERNAL
Line of balustrade to balcony. Refer to Sheet 6151
2.01
Top of Fusion Roof 61272
0mm
Top of Fusion Roof 61272
500mm
1000mm
1500mm
2.66
2.66
30
3. Redbridge Scape Framework Sites, London
Note:
2.07
30
PRP, London
332.5
Planning Application, Working Drawings Package
Levels as Civil Engineer's drawings. All foundations as S/E details. Shown indicatively only. Roof insulation shown indicatively only. Refer to supplier's insulation scheme for thicknesses.
•
WALL TYPE 5.1
• •
30
200
150
150
150
2.54
2.66
2.01
2.54
INTERNAL
50
EXTERNAL
Design elaborated by a team of 3 people. CGIs elaborated by team. 3D model, diagrams, 2D drawings and details done by author.
BALCONY
347.5
Dwelling
2410
2500
2410
Dwelling
2500
2410
Dwelling
2500
WALL TYPE 1.1/ 4.1
Client: Willmott Partnership Homes and LB Redbridge Wall Type 5.1 junction with Brick Wall Extension
1
Brick Column Type 1
2
This project includes five sites of varying scales across the London Borough of Redbridge. It aims to produce high quality affordable family housing within difficult infill sites whilst enhancing the immediate environment through the public realm. I took part in the design of these sites from the initial viability stage and I have been involved in the production of the information for the planning applications through to the completion of RIBA work stage 4. 1 : 10
3
1 : 10
Communal Stair Core
3 6151
2 6112
Second Floor FFL 58300
350
6111
590
The contractor is responsible for checking dimensions, tolerances and reference EXTERNAL Any discrepancy to be verified with the Architect before proceeding with the work Where an item is covered by drawings to different scales the larger scale drawin is to be worked to.
150
150
590
590
350 150
3
Second Floor FFL 58300
350
Second Floor FFL 58300
For window jamb detail refer to Drawing 2 on Sheet 6161
Do not drawing. Figured dimensions to be worked to in all cases. Line of front fascia of scale balcony. Refer to Sheet 6151 CDM REGULATIONS 2015. All current drawings and specifications for the
2.66
1010085
2.66
80
2.02
30 347.5
WALL TYPE 1.1/ 4.1
8450
For window jamb detail refer to Drawing 1 on Sheet 6161
2.22
81 x 32 sw frame
332.5
81
75
50
81
2.10
32
1
INTERNAL
12.5mm plasterboard
12.5
32x12mm planted stop (screw fixed when door is fire resising)
22 12
10
3
19 3
44
2.22
3
INTERNAL
9
3mm skim
300
12.5mm plasterboard
WALL TYPE PW 1.1 15
The contractor is responsible for checking dimensions, tolerances and references. The contractor is r Any discrepancy to be verified with the Architect before proceeding with the works. Any discrepancy to Where an item is covered by drawings to different scales the larger scale drawing Where an item is is to be worked to. is to be worked to.
65
65
3mm skim
Communal Stair Core
460
460
65
1 : 10
Do not scale draw
CDM REGULATIONS 2015. All current drawings and specifications for the CDM REGULATIO project must be read in conjunction with the Designer's Hazard and Environment project must be re Assessment Record Assessment Reco
Frame width
150 65
Do not scale drawing. Figured dimensions to be worked to in all cases.
3. 50mm brick wall junction with cladding, Window and 5 50mm brick wall junction with cladding, Window and Wall Type 1.1 6 partition wall
350
350
2. Internal door plan detail.
150
460 65
15
12.5 3
6111
First Floor FFL 55300
65 350
Dwelling Hallway
Refer to GA's for SO
6111
150
BALCONY
15mm dabs
19
7
First Floor FFL 55300
INTERNAL
Dwelling - Hab Room / Hallway
7 First Floor FFL 55300
85
All intellectual property rights reserved.
100
6 6151
WALL TYPE 5.1
3
2.02
44
12.5
2
Dwelling - Hab Room
2.11
44 x 19 architrave
19
1 6151
50
WALL TYPE 1.1/ 4.1
44 x 19 architrave
2
Intumescent seal if door is FD rated
50
32 19
2 19
2500
Door width
Dwelling
EXTERNAL
3
WALL TYPE 1.1/ 4.1
Frame width
2410
FFL to FFL 3000 2410
Dwelling
2500
FFL to FFL 3000 2410
Dwelling
2500
FFL to FFL 3000
50
Timber stud packer
Refer to GA's for SO
2.01
2.01
50
Plywood packer. Note When FD rated, all gaps to be filled with intumescent material
project must be read in conjunction with the Designer's Hazard and Environment Assessment Record
All intellectual property rights reserved. Line of balustrade to balcony. Refer to Sheet 6151
80
1 6151
All intellectual prop
50 mm Brick Wall junction with Wall Recess and Window
7
1 : 10
Door set as per manufacturers details (TBC)
Jamb Detail A - Wall Type IW1
Electrical and Mechanical Key:
1:2
Electrical an
Double Switched Socket Outlet (DSSO) USB
Doubl USB
DSSO withUSB
DSSO
750
2755
EQ
EQ
Flat Type 3 M & E
1 : 50
1 : 50
1 : 50
1 : 50
750
100
750
750
Heat D
Carbo
15 3 12.5
Pelme S
Shaver Socket
Shave
Bulkhead light fitting
Bulkhe
Consumer Unit
Consu
FL
700
TR
Non Switched fused spur for towel 1100 rail (high level) 2300
Non S
FL
Non switched fused spur1100for though floor lift
Non s
700
1300 700
2300
700
1300
TR
Storage
5 amp single gang light switch ø 1500
2.1 m²
5 amp 2
5 amp single gang 2way light switch
Date 09/01/17
Scale @ A1 1 : 20 1371.4
1 : 50
450
450
5 amp
1371.4
5 amp two gang light switch
5 amp
n
n
3007.5
750
1737.8
1737.8 EQ
800
8021
Checked SM
Planning / Bui Date Clear 05/12/17 Scale @ A1>300mm 1:2 activity zones
clea
required by AD Part M4(2) EQ
Twin Bedroom
Twin Bedroom
14.9 m²
14.9 m²
750
4) Dra Consu ER's. Design 5) For bathro
REV -
600
Planning / Building Control Key: clear opening width >850mm >150mm
7
Dwn Ck 3) Dra
3007.5
600
Drawn >300mmML
EQ
NOTE 1) Ref setting 2) ALL
MAS SM Specia
Kilburn Square WD's
Building Control
EQ
7
n
5 amp
NOTES: 1) Refer to Kitchen Drawings for requirements and setting out of ALL electrical items. 2) ALL kitchen requirements to be confirmed by First Issue and M&E Consultant. Specialist Designer Rev 3)Date Drawing Description for setting out purposes/principles only. 4) Drawing MUST be read in conjunction with M&E Consultant's drawings and specifications AND Client ER's. Any discrepancies are to be brough to attnetion of Design Team prior to installation on site. 5) For setting out Plan of shaver sockets/lights in all 1 Internal Door Details - Sheet bathrooms refer to bathroom drawings.
300
800
Smoke
H
CO
2
Checked SM
Flat Type 3 Planning / Building Control Flat Type 3 Planning / Building Control
EQ
EQ
EQ 750
Carbon Dioxide Detector
3 AA6275C-6000
EQ
EQ
Doorb S
5 amp multi-gang light switch (n=number of gangs)
EQ
EQ
1:2
750
Heat Detector
EQ
EQ
EQ
3 AA6275C-6000
Jamb Detail C - Wall Type PW2
1:2
H
1100 1100
ø 1500
EQ
EQ EQ
Jamb Detail B - Wall Type IW2
Smoke Detector
S
2.1 m²
EQ EQ
S
6 AA6275C-6000
1 : 50
300
400
EQ
Doorb
15.0 m²
Pelmet light
prp-co.uk London 020 7653 1200
EQ 400
14
DB
Double Bedroom
Doorbell Chime
1150.8
Drawn CP
1 : 20
4. Typical 2B4P fat layout.
750 Doorbell (external)
750
CL of BED
1200
Storage
950.1
Height Rod 4
4
Video/
DB
750
Flat Type 3 M & E
VA
750
Flat Type 3 Furniture
Therm
Video/Audio entry phone
S
For Construction
EQ
For external details refer to external 6 works drawings AA6275C-6000
D01
T
VA
Dwn Ckd
H499-PRP-Z1-J-XX-HR-4200 REV B Communal Hallway
1200
350 EQ
Double Bedroom
750
EQ
EQ EQ
2
1150.8
Flat Entrance Door
EQ
6101 950.1
750
2755
CL of BED
S
6101
Wall m
Thermostat
CO
300 EQ
EQ
EQ
EQ
Flat Type 3 Furniture
1 : 20
EQ
7 AA6275C-6000
14 AA6275C-6000
H
EQ EQ
Ceiling
600
n
For external details refer to external D01 works drawings
Height Rod 3
Description
S
1
EQ
EQ
CO
350
EQ
1250
2000
1250
EQ
1300
EQ
1300
EQ
H
EQ
EQ
EQ 1835 300
(ensure 100mm to left of window jamb in Kielder Close)
(ensure 100mm to left of window jamb in Kielder Close)
S 14 AA6275C-6000
EQ
1. Section through elevation.
750
1645.5
1800
1645.5
450
350
50
50 450 EQ
450 EQ
EQ EQ
(ensure 100mm to left of window jamb in Kielder Close)
1835 2000
12.5 3
EQ
EQ
EQ
14 AA6275C-6000
13.4 m²
2
19
(ensure 100mm to left of window jamb in Kielder Close)
12.5 9 50
90
90 x 32 sw frame
44 1 11
EQ
CO
750
Height Rods Sheet 1
VA
Dwelling Hallway
7 AA6275C-6000
Teleph
Wall mounted External Light
Twin Bedroom
15.0 m²
4 AA6275C-6000
T
44 x 19 architrave
D06
EQ
Ground Floor FFL 52300
EQ
TR
32
D02
EQ
Not sw level)
Telephone point
T
Drawing Number Changed. MA Detail references added. ML/SM EQ First Issue
14 AA6275C-6000
EQ
2
19
8 6101
EQ
VA
3
1 : 20
D06 D02
14 AA6275C-6000
EQ
Fused FA
600
Block J, Marlyon Road, Redbridge
7 AA6275C-6000
9mm Ply packer
T
32x12mm planted stop (screw fixed when door is fire resising)
D03
EQ
EQ
Rev Date
AA6275C-6000
7 AA6275C-6000
14 AA6275C-6000
90
Dwelling - Kitchen / Bathroom
D05
05.05.17 27.04.17
12.5mm plasterboard 4
FA
door is FD rated
Height Rod 2
Fused
2787
Not switched fused spur for future security alarm (high level)
600
B A -
3mmEQskim
EQ
FA
Ceiling Pendant Light
EQ
2
Intumescent Ground Floor FFL 52300seal if
EQ
EQ
TR
2
D03
EQ
2830
600
13.4 m²
50
FA
1 : 20
D04
D05
19
D04 3
44 x 19 architrave
EQ
100
2
8 6101
Height Rod 1
2787
3 AA6275C-6000
EQ
EQ
32
2
19
2
5
1
EQ
50
Note - 9mm ply on bathroom/ wc/ kitchen side of wall
3
Door width
For external details refer to external works drawings
1800 EQ
450
100
84
Frame width
For external details refer to external works drawings
3 AA6275C-6000
EQ
2410
Timber stud packer
Refer to GA's for SO
Ground Floor FFL 52300
EQ
EQ
EQ
Plywood packer. Note When FD rated, all gaps to be filled with intumescent material
EQ
Ground Floor FFL 52300
2830
Twin Bedroom
2500
Dwelling
6101
350
EQ
EQ
FFL to FFL 3000 2410
2500
FFL to FFL 3000 2410
2500
Dwelling
EQ
USB
Dwelling
TV an
Fused Switch Spur Fused Spur
USB
FFL to FFL 3000
170
425
TV and DAB Radio Outlet
prp-co.uk London 020 7653 1200
*applies to all doors to habitable rooms in project
is tothe beArchitect worked to. Any discrepancy to be verified with before proceeding with the works. Where an item is covered by drawings to different scales the larger scale drawing Do not scale drawing. Figured dimensions to be worked to in all cases. is to be worked to. CDM REGULATIONS 2015. All current drawings and specifications for the Do not scale drawing. Figured dimensions to be be read worked to in all cases. project must in conjunction with the Designer's Hazard and Environment Assessment Record CDM REGULATIONS 2015. All current drawings and specifications for the Note -
347.5
377.5
1 : 100 WALL TYPE 1.2/ 2.2/ 3.2/ 4.2
For House Block internal wall to floor junctions and internal wall to head junctions (Fusion Floor Type 2.1) -
loor junctions and sion Floor Type 2.1) -
• •
2.02
board 28 layer ard is at FFL level as series 4200 - 4205) acoustic sealant sterboard to extend
• •
2.02
•
5.10
5.04
85
5.05
FFL + 3.0 m above FFL below
2.07
FLOOR TYPE 1.2/ 1.3/ 1.4/ 1.5/ 2.1
5.03
A
For external details refer to external works drawings
80
2.02
Note - coursing block as required
2.01 2.16
Void varies
2.02
Soldier Course Brick Type 22.20
Facing brick rated F2/S2 - SE to 50 confirm suitability for below ground use
2.10
Note - coursing block as required
Soldier Course Brick Type 1
2.16
Facing brick rated F2/S2 - SE to confirm suitability for below ground use
2.20
2.04 2.28
1.02
2.28
2.05
2.01
1.01
2.30
2.30
2.39
2.28 2.67
2.67
2.05
2.65
5.06
85
2.05
2.68 2.65
2.68
2.13
2.64
EW1.2 2.13
5.10
EW2.1
W11
EW2.1
EW2.1
W11 225
W11
450
225
2560
2560
W01
EW2.1
Flue
2560
2560
2560
450
225
Flue
EW5.1
W01
EW2.1
EW2.1
EW5.1
W11
ED2
W11
450
225
Flue
W01
EW2.1
W11 225
•
EW2.1
W11
225
• All membranes shown are indicative only, refer to EW1.2 manufacturer's details for full membrane references and lapping details. All membranes shown areRefer indicative only, refer • to S/E spec for to blockwork density and manufacturer's details for windpost full membrane requirements. EW2.1 EW2.1 references and lapping details. • All footings, piles and pile caps EW2.1 are shown EW2.1 • Refer to S/E spec for blockwork density andRefer to S/E drawings for details. indicatively only. windpost requirements. • For wall type locations refer to GA/ Elevation All footings, piles and W11 pile drawings caps are for shown W11• each block. W11 W11 indicatively only. Refer to S/E drawings forrefer details. • For actual FFLs to height rod drawings for 450 225 • For225 wall type locations refer to GA/ Elevation 450 each specific block/ house. 225 225 drawings for each• block. Height of batten behind lintels dependant on lintel Flue • For actual FFLs refer to height for Flue size, rod referdrawings to manufacturers literature each specific block/ house. • Height of batten behind lintels dependant on lintel Keynote Text size, refer to manufacturers literature W01 2.01 colours EW2.1Facing Brickwork; Refer to elevations/ GAs for brick W01 EW2.1 2.02 Wall ties to SE details + setting out 2.04 Weep hole and cavity tray EW5.1 EW5.1 W11 2.07 Proprietary cavity closer to suit cavity size, installed to W11 manufacturers instructions. To provide 30mins fire resistance if + 80mm Cavity cavity is not closed by timber frame min 38mm thick or steel min Keynote 0.5mm thick.Text 1.01 Periscope ventilator to underside 2.10 Timber batten of beam and block floor void. For vent locations for each block refer to 2.13 3mm skim BWIC drawings 2.14 Galvanized fixing strap as required by window manufacturer 1.02 RC lintels over airbrick to SE design where floor beam 2.16leaf Cavity tray above lintel. bears on inner 2.17blockwork Brick Type 1 banding 1.03 Below ground to SE details detail. Brick laid on end and to be installed with a fall of approximately 1 to 2 degrees. Bricklayer to ensure 2.01 Facing Brickwork; Refer to elevations/ GAs for brick that all brick banding still aligns with adjacent coursing. colours 2.18 Cladding rail and bracket to cladding manufacturer's instructions 2.02 Wall ties to SE details + setting out Horizontal 2.04 Weep hole2.19 and cavity tray timber battens or 'Top Hat' to cladding manufacturer's instructions and capacity TBC by FBS 2.05 Open perpend weep holes at 900mm max crs to drain 2.20wall Frame lintel to SE spec. base of cavity 2.22 Fire in cavity to be Rockwool SP 'Firestop slab' cavity 2.06 60mm Kingspan K108Stops insulation barrier or similar approved to provide 60min fire resistance for Note 2.07 Proprietary cavityboth closer to suitand cavity size, installed to integrity insulation criteria. Along compartment wall line, allow for manufacturers instructions. To provide 30mins • fire Fire stop (mineral wool) above Flexible acoustic sealant underlay, between battens resistance 2.28 if cavity is not intumescent/ closed by timber frame min • Fire stop (mineral wool) below Perforated profile to act as bird and insect mesh. Perforations as underlay, above line of party wall 38mm thick2.29 or steel min 0.5mm thick. to seal fire compartment line per cladding manufacturers literature to ensure ventilation 2.11 Mastic air seal. Colour to match windows 6.01 Refer to diagrams 1 and 2 requirement is maintained 2.14 Galvanized fixing strap as required by window 6.17 6.13 2.30 Pistol brick above lintel 6.05 manufacturer Dashed line to indicate highest level of gutter (in 2.46 Timber packer, as required 2.23 Precast concrete kerbstone with 1:60 min fall away background) 2.64 15mm Gyproc Wallboard from window/door 6.06 2.65 15mm Gyproc Fireline 2.68 2.39 Open perpend weepholes @900mm centres to drain6.02 6.16 2.67 Compressible seal, to manufacturers recomendation, colour: To underlfoor void 6.15 6.15 2.67 6.03 match frame 2.40 S/Steel edge shutter angle drilled and plugged to 6.16 6.14 2.68 PU expanding foam in void blockwork below as deemed necessary with by 2.02 Contractor 2.69 on site. Ensure packed level withlaid on end 2.17 Brick Typeshutter 1 banding detail. Brick plastic shims where required. to inside 6.15 5.01 Skirting boardS/steel shownmesh inidcatively only 2.07 6.14 by S/E. edge to prevent cracking. Size of steel tbc 79.9 5.03 Flexible acoustic sealant below plasterboard with resiliant flanking 2.24 2.24 2.22 2.43 30mm thick upstand rigid skirting insulation stripof below 6.06 5.01 Skirting board inidcatively 2.02 6.20 6.19 2.02 5.04shown Softwood or MDFonly window board, to project 30mm beyond face of 5.03 Flexible acousticplaster sealantfinish belowand plasterboard with each jamb. 6mm pencil round to 50mm beyond 2.01 resiliant flanking exposed strip below skirting arises. 2.10 7.01 Linear slot 5.05 drainage channel system suppported by Yelofon FS50 flanking angle installed at perimeter and turned Slope 5° concrete haunchunder skirting board 2.16 6.12 The contractor is responsible for checking dimensions, tolerances and references. Any discrepancy to be verified with the Architect before proceeding with the works. Note: 2.01 8.01 uPVC cill with straps where required, installedor mastic, colour to matchWhere an item is covered by drawings to different scales the larger scale drawing 2.20 5.06support Continuous internal flexible caulking is to be worked to. in accordance with manufacturers adjacent 2.07 • Allinstructions. external wall dimensions are taken from Do not scale drawing. Figured dimensions to be worked to in all cases. Including end pieces. Colour internal to match windows. finish flexible face, i.e.caulking edge of brickwork. CDM REGULATIONS 2015. All current drawings and specifications for the 5.10 Continuous or mastic to all frame
2.14
All footings indicative only. Strictly to SE deisgn.
2560
EW2.1
EW2.2
General Notes:
5.10
2.14
All footings indicative only. Strictly to SE deisgn.
EW5.1
W11
ED2
W11
ED2
unction Detail - Brick + 80mm Cavity
Floor Junction Detail - Brick + Windows + 50mm Cavity Floor Junction Detail - Brick + Windows 3 Typical 4 Typical 1 : 10 1 : 10 ick + 50mm Cavity + Vent Typical Ground Floor Detail - Brick + 80mm Cavity Typical Ground Floor Detail - Brick + 80mm Cavity + Vent 3 4 1 : 10 1 : 10 5. Front elevation.
25.00
°
2.16 6.06
2.20
Facing brick rated F2/S2 -
2.28 SE to confirm suitability for
2.04
below ground use 2.28 Note - Rafter and bottom chord dims tbc 2.05 by truss 5.06 manufacturer
2.30
6.09
6.03
97
2.16 2.20
2.02
Refer to diagrams 1 and 2
2.07
Facing brick rated F2/S2 SE to confirm suitability for below ground use
6.03 2.28
2.39 6.10
2.28
2.04 2.30 2.67
2.05
1.03
6.07
2.10
6.02 6.05
Note - coursing block as required
2.06
2.25
80
2.65 2.64
2.01 6.07
50
6.08
2.13
2.25 All footings indicative only. Strictly to SE deisgn. 2.07
Facing brick rated F2/S2 - SE to confirm suitability for below ground use
2.28
2.04
perimeters, colour to match frame Assessment Record • Dimensions for setting out of doors and All intellectual property rights reserved. 8.01 uPVC cill with support whereopening required, installed in windowsstraps are structural sizes. accordance with manufacturers instructions. Including end pieces. • All internal dimensions to structure/ inside Colour to match windows.
2.28
2.10
5.06
2.29
Note - Rafter and2.19 bottom chord dims tbc by truss manufacturer 2.18
6.11
5.10
2.10
-
First Issue
Rev Date
Description
2.02 2.01
D
05.05.17
•
prp-co.uk London 020 7653 1200
High performance DPM, guage to meet NHBC requirements. All joints to be taped and lapped as per manufacturer's instructions Visqeen (or similar approved) protect and drain membrane with granular backfill
General Notes:
6.18
Dwn Ckd
Note Refer to dwg 6111 detail 4 for typical window head detail
2.10
•
All membranes shown are indicative only, refer to manufacturer's details for full membrane references and lapping details. Refer to S/E spec for blockwork density and windpost requirements. All footings, piles and pile caps are shown indicatively only. Refer to S/E drawings for details. For wall type locations refer to GA/ Elevation drawings for each block. For actual FFLs refer to height rod drawings for each specific block/ house. Height of batten behind lintels dependant on lintel size, refer to manufacturers literature
•
8. Typical Eaves Detail - Houses Front Elevation at Outlet Blue dimensions denote key setting
out dimensions for flats layouts. All REV D H499-PRP-ZZ-X-XX-DE-6111 blue dimensions are structure to
•
11.• Street view towards green amenity space. •
structure. H499-PRP-ZZ-X-XX-DE-6101 For Comments REV C
For Comments
Date 16/12/16
Roof membrane; IKO Ultra PrevENt T-O waterproof membrane. All layers strictly in accordance with manufacturers requirements and recommendations contained within the specification
each unit.1 Fusion Ground Floor Details - Sheet
•
Hatched area denotes kitchen
Drawn CP
Checked SM
Breather membrane
6.11
Dwn Ckd
XXX
Drawn ML
EPDM Seal - installed to manufacturer's instructions
Redbridge Sites WDs • Refer to Unit Type Plans for-allSheet private 1 Fusion Floor Junction Details
7. Typical Floor Junction Detail - Brick + Banding + Cladding
Block E, Marlyon Road, Redbrid Elevations
Visqueen (or similar) high performance DPC installed to manufacturer's recommendations
entrance door types AND door types within
6. Typical Ground Floor Detail - Door Threshold + 80mm Cavity
Description
1 : 100
Visqueen (or similar) Gas membrane system - products as specified by manufacturer, joints to be lapped and sealed with DPC in accordance with manufacturer's instructions
6.09
• For joining of wall types refer to standard Redbridge Sites WDs details. GAs for setting out purposes only.
332.5 WALL TYPE 5.1
Rev Date
Vapour Control Layer, installed to manufacturer's instructions
2.10
Drawing Number Changed. MA
Location of SVPs/ SSs and AAVs shown
05.04.17 20.02.17
Elevation BB
Waterproofing Key:
6.08
C 25.04.2017 Notes added. General amendments. CL/SM Note - Rafter and bottom for coordination purposes only.6.06 Refer to 05.05.17 Drawing Number Changed. MA B 17.03.2017 Fire stops clarified. General minor amendments. CP/SM 6.14 chord dims tbc by truss Note M&E Consultant's drawings manufacturer 17.03.2017 Structural topping extended below fusionAmended wall panel, A 24.02.2017 to membranes WPH comments, as clouded for confirmation Refer to dwg amended to suit. Perforated stormwater pipe with ofgranular routes.back fill First Issue 6111 detail 4 and geotextile layer added to perimeter details. CP/SM for typical Rev Date A window 24.02.2017 as cloudedDescription head detail Amended to WPH comments, • Movement joint sizes to SE spec.
B A
H499-PRP-Z1-E-XX-EL-4100
C B
6.14
All footings indicative only. Strictly to SE deisgn.
2.10 2.14
50
6.11 6.06
-
Drawing number changed. CP/SM Window type W01 and W04 changed for window type W14 as clouded to meet requirements of planning co ML/SM DPC line added to elevations. ML/SM Extracts and movement joints added. Issued for cons ML/SM First Issue
2.01
face of plasterboard.
6.08
05.05.17 26.04.17
For Construction
project must be read in conjunction with the Designer's Hazard and Environment
2.30
2.05 1.03
All intellectual property rights reserved.
min 150mm
2.02
2.68 Note - Rafter and bottom chord dims tbc by truss manufacturer
6.09
2.07
10
30
2.02
80
6.09
24
82.5
2.10
6.10
6.12
2.39
5.06 6.11
80
D C
Do not scale drawing. Figured dimensions to be worked to in all cases. CDM REGULATIONS 2015. All current drawings and specifications for the project must be read in conjunction with the Designer's Hazard and Environment Assessment Record
°
7.01 to diagrams 1 and 2 Refer Note Red dashed line inidcates cavity barrier (50mm wire reinforced mineral wool blanket) cut to seal eaves space, nailed to rafter
82
For external details refer to external works drawings
6.06
The contractor is responsible for checking dimensions, tolerances and references. Any discrepancy to be verified with the Architect before proceeding with the works. Where an item is covered by drawings to different scales the larger scale drawing is to be worked to.
40.0 0
2.01
6.15
6.14
min 150mm
6.04 2.02 6.12
80
2.06
6.08
6.06
2.22
30.00°
97.5
2.02
8.01 6.01
82
210
2.10
Note Along compartment wall line, allow for • Fire stop (mineral wool) above For external details refer battens to underlay, between works drawings • external Fire stop (mineral wool) below underlay, above line of party wall to seal fire compartment line
°
Refer to diagrams 1 and 2 6.01
2.11
40.0 0
6.05
8m
6.16
6.14
526
6.02
6.03
5.05 85
2.17
2.23
1:60 Fall
2.07
97
80
360
97
6m
6.04
FFL FLOOR TYPE 1.2/ 1.3/ 1.4/ 1.5/ 2.1
4m
For external details refer to external works drawings
Note - coursing block as required
FLOOR TYPE 1.1
2m
Note Red dashed line inidcates cavity 2.22barrier (50mm wire reinforced mineral wool blanket) cut to seal eaves space, nailed to rafter
2.40 2.11
Note - coursing block as required
2.69
Refer to diagrams 1 and 2
FFL + 3.0 m above FFL below
6.13
Note: Threshold detail 85 below ground relates to all finishes above 6.16 (Cladding and Brick)
6.02
5.04
5.05
360
6.12
85
2.07 2.67
6.17
highest level of gutter (in background)
2.46 6.06
2.14 2.68
97
8.01 6.06
FFL
Void varies
2.11
FLOOR TYPE 1.2/ 1.3/ 1.4/ 1.5/ 2.1
Along compartment wall line, allow for • Fire stop (mineral wool) above underlay, between battens • Fire stop (mineral wool) below underlay, above line of party wall to seal fire compartment 82.5line
Cellecta not required in houses as per note above
Note: Threshold detail below ground relates to all finishes above (Cladding 85 and Brick)
5.04
FFL + 3.0 m above 2.40 FFL below
50 Note -
5.05
0m
2.46
82.5 2.43
and Brick)
97
Cellecta not required in houses as per note above 2.14
30
Note: Threshold detail below ground relates to all
Ventilated void as S/E details
5.01
2.28 finishes above (Cladding
85
5.10
5.10
10. Street view towards houses along Marlyon Road.
526
2.02
•
EW1.2
97
2.14
ve
bove w
Note: Window reveals to be 85mm from outside edge of brickwork. When window is within or adjacent to an inset brick panel (50mm cavity) the 85mm reveal is to be measured from furtherst edge of brickwork
25
Omit Cellecta screed board 28 layer Ensure top of OSB board is at FFL level as per height rod dwgs (series 4200 - 4205) Flexible intumescent/ acoustic sealant between OSB and plasterboard to extend under skirting board
• 2.01
WALL TYPE 1.2/ 2.2/ 3.2/ 4.2
Note Along compartment wall line, allow for Omit Cellecta screed board 28 layer • Fire stop (mineral wool) above Ensure top of OSB board is at FFLunderlay, level asbetween battens Note: Window reveals to be per height rod dwgs (series 4200 -Fire 4205) • stop (mineral wool)85mm below from outside edge of underlay, above line ofbrickwork. party wall When window is Flexible intumescent/ acoustic sealant to seal fire compartment linewithin or adjacent to an inset between OSB and plasterboard to extend under skirting board brick panel (50mm cavity) 6.01 Refer to diagrams 1 and 2 the 85mm reveal is to be 2.14 measured from furtherst 6.05 edge of brickwork Dashed line to indicate
• •
FLOOR TYPE 1.1
• •
Note: Window reveals to be 85mm from outside edge of brickwork. When window is within or adjacent to an inset brick panel (50mm cavity) the 85mm reveal is to be measured from furtherst edge of brickwork
377.5
377.5 For House Block internal wall to floor junctions and EW1.2, 2.2, (Fusion 3.2, 4.2,Floor 5.1, 5.2 internal wall to head junctions Type 2.1) -
377.5 WALL TYPE 1.2/ 2.2/ 3.2/ 4.2
Ventilated void as S/E details
WALL TYPE 1.1/ 2.1/ 3.1/ 4.1
8 layer at FFL level as 200 - 4205) c sealant ard to extend
Details are for Flat Block internal wall to floor junctions and internal wall to head junctions (Fusion Floor Types 1.2, 1.3, 1.4, 1.5) only
Details are for Flat Block internal wall to floor junctions and internal wall to head junctions (Fusion Floor Types 1.2, 1.3, 1.4, 1.5) only 377.5 For House Block internal wall to2.2, floor junctions EW1.2, 3.2, 4.2, 5.1,and 5.2 internal wall to head junctions (Fusion Floor Type 2.1) -
347.5
5.1, 5.2and ctions oor Type 2.1) -
Note -
Note -
1 : 100
Void varies
Elevation AA
floor junctions n Floor Types
1
Visqeen (or similar approved) protect and drain membrane General Notes: with granular backfill
1.03
EW2.2
2
97
2.64
EW1.2
2560
1.03
2560
5.06
F
Seal - installed to manufacturer's instructions Visqueen (or similar) high EPDM performance DPC installed to manufacturer's recommendations Breather membrane EPDM Seal - installed to manufacturer's instructions Roof membrane; IKO Ultra PrevENt T-O waterproof Breather membrane membrane. All layers strictly in accordance with manufacturers requirements and recommendations Roof membrane; IKO Ultracontained PrevENt within T-O waterproof Soldier Course the specification Soldier Course membrane. All layers strictly in accordance with Brick Type 2 Brick Type 1 manufacturers requirements and recommendations High performance DPM, guage to meet NHBC contained within the specification requirements. All joints to be taped and lapped as per manufacturer's instructions High performance DPM, guage to meet NHBC similar approved) requirements. All joints to Visqeen be taped(or and lapped as per protect and drain membrane manufacturer's instructionswith granular backfill
2.02
2.06
5.06
2.22
25
For external details refer to external works drawings 80
2.04 2.39
2.28
2.07
D
2.07
2.28
2.28
8.01
C
2.22
2.10
2.06
Facing brick rated F2/S2 - SE to confirm suitability for below ground use
25
For external details refer to external works drawings
Soldier Course Brick Type 1
1.01
5.03
DPC min 150mm above FGL
FFL
B
150
2.01
5.01
Visqueen (or similar) Gas membrane system - products Vapour Control Layer, installed to manufacturer's as specified by manufacturer, joints to be lapped and instructions sealed with DPC in accordance with manufacturer's Visqueen (or similar) Gas instructions membrane system - products as specified by manufacturer, joints to be lapped and Visqueen similar) high performance DPC installed sealed with DPC in accordance with(or manufacturer's to manufacturer's instructions E recommendations
8.01 DPC min 150mm above FGL
FFL
2.67 2.04
150
5.03 2.22 DPC min 150mm above FGL
5.04
FFL + 3.0 m above FFL below
Void varies
5.05
2.67
2.04
Vapour Control Layer, installed to manufacturer's instructions
85
FLOOR TYPE 1.2/ 1.3/ 1.4/ 1.5/ 2.1
5.01
Note - coursing block as required
Waterproofing Key: Waterproofing Key:
2.68
2.46
2595.5
Cellecta not required in houses as per note above
2.10
2.28
ove
2.01
2.14
Cellecta not required in houses as per note above
2.68 2.04
1 : 100
2.02
80
2.46 5.01
Elevation DD
WALL TYPE 1.2/ 2.2/ 3.2/ 4.2
Omit Cellecta screed board 28 layer Ensure top of OSB board is at FFL level as per height rod dwgs (series 4200 - 4205) Flexible intumescent/ acoustic sealant between OSB and plasterboard to extend under skirting board
5.10
2.02
n ove
All intellectual property rights reserved. 377.5
For House Block internal wall to floor junctions and internal wall to head junctions (Fusion Floor Type 2.1) -
WALL TYPE 1.1/ 2.1/ 3.1/ 4.1
Omit Cellecta screed board 28 layer Ensure top of OSB board is at FFL level as per height rod dwgs (series 4200 - 4205) Flexible intumescent/ acoustic sealant between OSB and plasterboard to extend under skirting board 80 2.14
•
WALL TYPE 1.2/ 2.2/ 3.2/ 4.2 Details are for Flat Block internal wall to floor junctions and internal wall to head junctions (Fusion Floor Types 1.2, 1.3, 1.4, 1.5) only
2582
wall to floor junctions s (Fusion Floor Types
project must be read in conjunction with the Designer's and Environment rights reserved. All intellectual property Hazard Assessment Record
377.5
Note -
377.5
1.2/ 2.2/ 3.2/ 4.2 Details are for Flat Block WALL internalTYPE wall to floor junctions and internal wall to head junctions (Fusion Floor Types 1.2, 1.3, 1.4, 1.5) only
Elevation CC
3.1/ 4.1
Checked SM Date x06/02/17 Scale @ A1 As service zone (25mm 50mm battens indicated
and 12.5mm plasterboard) in addition
Drawn CP
Checked SM
Denotes location of movement joints. Movement prp-co.uk joint sizes to SE spec.
unction Detail - Inset Brick Panels + Banding Floor Junction Detail - Brick + Windows + Banding Typical Floor Junction Detail - Brick + Banding + Cladding 7 Typical cal Eaves Detail - Blocks A, B, C & D Eaves Detail - Block E and G Rear Elevation 8 Typical Eaves Detail - Block E and G Front Elevation 1 : 10 1 : 10 ndow Cill + 50mm Cavity Typical Ground Floor Detail Door Typical Ground Floor Detail Cill + 80mm Cavity 2 - Typical 3 - Window 1 : 10 Threshold + 80mm Cavity 1 : 10
7
A
1 : 10
8
B 7692
337.5
665
30
EW1.1
787.5
890
787.5
1810
W12
EW1.1
EW1.2
EW1.1
W12
2 6161
rwp
C
D
7647
1810
665
235
665
EW1.1
4
prp-co.uk London 020 7653 1200
38690
1 : 10
7647
1810
787.5
890
787.5
1810
W12
EW2.1
EW2.2
EW2.1
W12
665
235
665
EW1.1
Date 06/02/17 to party Scale A1 As wall@ type. indicated
1 : 10 020 7653 1200 E
787.5
890
787.5
1810
W12
EW1.1
EW1.2
EW1.1
W12
665
235
665
EW1.1
7692
1810
787.5
890
787.5
1810
W12
EW2.1
EW2.2
EW2.1
W12
665
235
665
EW1.1
7 6163
3 6161
rwp
rwp
rwp
2.02 2.07
F
7647
1810
Keynote Text Facing Brickwork; Refer to elevations/ GAs for brick colours Wall ties to SE details + setting out Proprietary cavity closer to suit cavity size, installed to manufacturers instructions. To provide 30mins fire resistance if cavity is not closed by timber frame min 38mm thick or steel min 0.5mm thick. Timber batten Facing Brickwork, stacked soldier course; Refer to elevations/ GAs for brick colours Mastic seal Marley Eternit Edgemere fibre cement slates, laid and fixed strictly in accordance with the manufacturers recommendations Breathable roofing underlay - Tyvek Supro Plus osa draped over rafter, installed to manufacturers instrcutions Proprietary over fascia ventilator - Glidevale FV100 Ventilator osa Proprietary rafter tray ventilator - Glidevale RV Rafter Ventilator osa 50 x 25mm treated sw battens , complying with BS5534 and set out to gauge in accordance with tile size and lap as manufacturers recommendations Rafter and bottom chord, to truss manufacturers design and spec WBP 25mm painted fascia board fixed to treated sw noggin fixed between rafters 37.5 x 156mm wallplate, factory fitted 100 x 50mm wallplate, site fixed uPVC gutter, square profile Holding down straps to subcontractors design 300mm Rockwall insulation between and over joists PPC aluminium profile coping 50 x 38mm treated sw battens 18mm WBP ply Structural timber studwork or HRS post, in line with each rafter to form support for parapet - size tbc by truss manufacturer/ SE/ Fusion 10mm cement particle board uPVC 100mm RWP. Colour TBC. Bracketed back to ext wall finish using standard pipe clip uPVC hopper head. Colour TBC Alumasc Harmer two way outlet 4TW and chute. Water proofing system to be dressed into outlet, all to be installed as manufacturer's details
2.01
London Typical Eaves Detail - Block E and G Front Elevation at Outlet
1810
787.5
890
787.5
1810
W12
EW1.1
EW1.2
EW1.1
W12
2 6161
rwp
665
2.10 2.24
337.5
EW1.1
3 6161
6 6163
rwp
2.25 6.01
30
2
6.02 PW1.1
337.5
ED2
EW5.1
1135
552.5
W01
EW1.2
EW2.1
W11
910
890
787.5
1810
235
ED2
EW5.1
1135
552.5
W01
EW2.2
910
890
6.04
EW2.1 Slope
5°
787.5
6.05 6342.5
92
142.5
1911 900
125.5 72
65
142.5
92
900
6.06
92
IW2.2
6.07
Store 2.0 m²
IW1.1
IW1.1
147.5 451.1
7 6163
72
72
147.5
900
451.1
Lobby 5.6 m²
Bathroom 2.6 m²
Bathroom 2.6 m²
1 6161
6.19
W11
1810
1048.5
IW2.2
Store 2.0 m²
92
IW1.1
Lobby 5.6 m²
Bathroom 2.6 m²
rwp
Canopy above 665
1911
IW1.1
73
NOTE Wall construction shown indicatively - diagrams indicate locations of required EW2.1 W01 EW2.2 Canopy above firestopping, to be applied to all EW5.1 ED2 wall build-ups
rwp
EW1.1
665
235
Canopy above 665
ED2
EW5.1
1135
552.5
W01
EW1.2
EW2.1
W11
910
890
787.5
1810
EW1.1
665
235
665
1135
552.5
910
890
787.5
rwp
rwp
W11
30
418.2
EW1.1
665
92
IW1.1
2.24
6.20
30.00°
Canopy above 665
900 125.5 72
IW2.2
Store 2.0 m²
92
900
1048.5
73
65
65
125.5 72
Lobby 5.6 m²
Bathroom 2.6 m²
Living / Dining / Kitchen 29.1 m²
IW1.1
IW2.1
900
92
142.5
1911 900
92
142.5
900
92
72
72
147.5
900
rwp
EW1.1
105
92
6.12 30
30.00°
900
73
2.02
IW1.1
Living / Dining / Kitchen 29.1 m²
IW1.1
IW2.1
IW1.1
6.15
6.06
1 6161
2.02
1048.5
6.15 IW2.2
Store 2.0 m²
6.14
Lobby 5.6 m²
6.14
min 150mm
rwp
451.1
min 150mm
6 6163
1911
6.16
Bathroom 2.6 m²
92
6.16
125.5 72
IW1.1
2.24
6.03
PW1.1 IW2.1
65
6.03
IW1.1
1 418.2
900
6.02
IW2.2
Living / Dining / Kitchen 29.1 m²
IW1.1
PW1.1
72
900 65
1048.5
Dashed line to indicate highest level of gutter (in background) 73 92
IW1.1
Lobby 5.6 m²
6.15
6.06
6.06
Store 2.0 m²
6.16 6.14
IW2.1
1911
6.15
125.5 72
6.03
41.4 m²
EW1.2
Refer to diagrams 1 and 2
92
41.7 m²
6.13
Living / Dining / Kitchen 29.1 m²
IW1.1
PW1.1
92
142.5 92
6.17
451.1 147.5
900
73
6.05
97
1048.5
6.16
6.02
97
6037.5
6402.5
Dashed line to indicate highest level of gutter (in background)
6342.5
6.06
IW2.1
41.5 m²
41.7 m²
900
Living / Dining / Kitchen 29.1 m²
IW1.1
EW1.2
Plot 2 (Lower) House Type 2 - 2B4P
Plot 5 (Lower) House Type 2 - 2B4P
147.5
6.01
Plot 4 (Lower) House Type 2 - 2B4P
900
41.4 m²
6.13
Plot 3 (Lower) House Type 2 - 2B4P
451.1
Plot 1 (Lower) House Type 2 - 2B4P 6.17
Refer to diagrams 1 and 2
6.14
Note Along compartment wall line, allow for • Fire stop (mineral wool) above underlay, between battens • Fire stop (mineral wool) below underlay, above line of party wall to seal fire compartment line
105
Note Along compartment wall line, allow for • Fire stop (mineral wool) above underlay, between battens • Fire stop (mineral wool) below underlay, above line of party wall to seal fire compartment line
EW1.1
Canopy above
Diagram 1 1810
665
235
665
ED2
EW5.1
1135
552.5
W01
EW1.2
EW2.1
W11
910
890
787.5
1810
EW1.1
665
6.08 6.09 6.10 6.11 6.12 6.13 6.14 6.15 6.16
337.5
6.09
6.09
6.08
6.08 Note - Rafter and bottom chord dims tbc by truss manufacturer
6.06
6.14
6.11
Ground Floor 80
9. Ground floor level. 2.10
1 : 50
6.17 6.18
38690
97
97
2.01
Note - Rafter and bottom chord dims tbc by truss manufacturer
6.06
6.14
6.11
6.19 6.20
2.01 80
12. Street view towards blocks of flats on Marlyon Road.
2.07
2.10 6.18 D C B A
2.10
2.10
-
05.05.17 27.04.17 05.04.17 20.02.17
Drawing number changed. CP/SM Notes amended + windows amended as clouded. CL/ SM Detail references added. ML/SM Extracts and movement joints added. Issued for construction. ML/SM First Issue
Rev Date
Description
Block E, Marlyon Road, Redbridge Ground Floor Plan 2.10
2.10
B A Dwn Ckd
15
05.05.17 Drawing Number Changed. MA 24.02.2017 Amended to WPH comments, as clouded First Issue
Rev Date
Description
Redbridge Sites WDs
Dwn Ckd
4. Bollo Lane, Ealing, London Planning Application, Working Drawings Package PRP, London Design elaborated by a team of 8 people. CGIs and 3D model elaborated by team. Elevation studiesnd details by author. Client: Pocket living Bollo Lane features 84 ‚Pocket’ homes, 28 private sale apartments, and flexible office space. Stepping in form, from three, eight and 14-storeys, the building celebrates the interface between different contexts - traditional low-rise residential; industrial warehouses; and the taller Chiswick Park structures. Creating local employment opportunities and offering middle-income ‘city makers’ homes discounted to at least 20% below open market rates, the scheme also provides generous communal terraces and internal lounges, promoting social interaction. Designed for innovative volumetric modular construction, a central boiler and low maintenance materials ensure both longevity and low service charges.
Site boundary Proposed building
1
2
3
39 4
5
6
3
2
1
1
1
1600
1600
1585
1600
1587
7
8
34527.5 477.5
6492.5
777.5
2812.5
1360
1800 2240
477.5
6492.5
1360
WA01
1227.5
2035
WA06
6557.5 1902.5
1360
WA02
1227.5
WA01
2035
5550
1902.5
WA02
1360
1227.5
6792.5
2035
WA01
1907.5
1360
WA02
1560
3037.5
2035
WA01
3955.9
665
WA02
RWP 140mm
Wall Types Key 365
777.5
Core
2035
1601
1 552.5 Plot No. 3. 6 1B1P WCA
WA01
Plot No. 3. 5 1B1P
Plot No. 3. 3 2B3P WCA
Plot No. 3. 4 1B1P
WA01
I
1580
6492.5
1115 1360
6492.5
1580
refer to drawing no. 1800 for details 2
WA02 WA04
1
1340
RWP 140mm
1360
2035
A
Dry Riser
1800
15515
1360 552.5
365
RWP 140mm
I
1285
RWP 140mm
3375
1350 937.5
Plot No. 3. 14 1B1P
I
WA04
1442.5
2035
1790
WA01
1677.5
Plot No. 3. 13 1B1P
I
1360
WA03 1790
1360
5550
WA01 947.5
1360
1952.5
6792.5
365
1
1
1606
1603
1360
WA01
I
WA03
1360
18787.5
1565
1227.5
41840
WA02
Plot No. 3. 9 1B1P
WA01 1280
6192.5 665
Meter Cupbd
1360
WA01
Corridor 44.3 m² Plot No. 3. 8 1B1P
2035
1606
1902.5
Meter Cupbd
RWP 140mm
RWP 140mm
22060
WA02
WA02
2 1603
2035
6525
1125 1457.5
WA04
Staircase 15.3 m²
2035
UP
Riser 1.1 m²
Level
1340
Riser 2.7 m²
F
2035 6492.5
1606
F H
WA04
Staircase 17.6 m²
re fe r to
Lobby 7.6 m²
1 1583
Riser 2.1 m²
1565
RWP 140mm
WA01 WA01 Plot No. 3. 11 1B1P
1902.5
1360
3
6525
UP F
1227.5
G
lan dsc
ap e
Riser 3.2 m²
I
WA02
I
Plot No. 3. 12 1B1P
I
1567.5
1902.5
6525
Plot No. 3. 10 1B1P
Meter Cupbd
1 1583
dra win g
26212.5
4490
WA01
2035
1360
RWP 140mm
RWP 140mm
1360
F
Meter Cupbd
1
1
1584
1584
6492.5
1227.5
3
2035 1112.5
RWP 140mm
WA02
WA01 3595 477.5
1360
WA06 2240
6492.5
1360 1800
WA01 2240
1360
477.5
2035 1227.5
H
477.5
1603
WA02
3585
6492.5
477.5
15740
1
1
1587
1585
0m
1. Site location plan. 16
0m
25m
50m
75m
4m
6m
8m
2. Third floor GA plan.
NOTE: All drawing to be read in conjunction with PRP's Outline Architectural Specification Rev D and NET's Stage 3 Tender Issue 4. CDM REGULATIONS 2015. All current drawings and specifications for the project must be read in conjunction with the Designer's Hazard and Environment Assessment Record. All intellectual property rights reserved.
Designed with reference to the surveys, information and reports listed: Xxxxxxxxxxxxxx Xxxxxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx.
100m Rev Date A
NOTE: All drawing to be read in conjunction with outline architectural specification. CDM REGULATIONS 2015. All current drawings and specifications for the project must be read in conjunction with the Designer's Hazard and Environment Assessment Record. All intellectual property rights reserved.
2m
Designed with reference to the surveys, information and reports listed: Xxxxxxxxxxxxxx Xxxxxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx.
B
Description
Dwn
Ckd
21/02/20 Tender Issue. Draft for comments. mc/a fl 17 da 07/04/20 Amended to incorporate changes following comments fl mc 17 forom client from February and March 2017
Drawn
ADA
Checked
FL
Date
12/07/16
Scale @ A3
1 : 1250
Bollo Lane Site Location Plan
AA5858-1500 REV B
Rev Date
Description
D
21/02/2017 Tender Issue. Draft for comments.
E
07/04/2017 Amended to incorporate changes following comments forom client from February and March 2017 25/09/2017 Drawings amended to reflect recent changes.
F
Dwn Ckd
Drawn
mc/ad fl a fl mc
Checked
fl
bsc
Plot no. on level
For window and door references refer to Window and Door Types drawing no.1803
2817.5
1902.5 2035
WA02
2035
3.5
NOTE:
Riser 2.2 m²
Meter Cupbd
1360
WA01
RWP 140mm
1360
W ay e ho p
Plot No. 3. 2 1B1P
Plot No. 3. 1 1B2P
G
Plot numbering KEY
1 1601
6492.5
WA01
WA02
RWP 140mm
2
6557.5
WA05
rwp - from balconies
Firefighting lift
Meter Cupbd
Plot No. 3. 7 1B1P
St an
I
I
E
Riser 1.8 m²
I
J
E
I
Meter Cupbd
6525
1360
1800
665 1360
Corridor 42.5 m²
F
1902.5
6492.5
2035
D
I
Meter Cupbd
WA01
F
La ne
1227.5
llo
I
Riser 1.1 m²
WA01
D03
Bo
IW1 IW2 IW3 IW4 IW5 IW6 External walls EW1 EW2 EW3
2357.5
1902.5
rwp - from balconies
B C
Finishes/Partitions
C01 C02 Party Walls PW1 PW3 PW4 PW5 PW6
Author FL
Date
12/07/16
Scale @ A1
As indicated
Bollo Lane Third Floor Level GA Plan
AA5858-1523 REV F
11
2.5 11
77
1
2.5
7.5 77
7.5
01.02.02
Level 9 FFL: 41660
01.01.01 01.04.03
01.04.03
01.04.03
01.04.09 01.05.02
515
515
02
01.02.07
3000
435
01.05.02
05
01.03.03
435
07
01.04.02
01.05.02
01.02.05
250
250
Level 8 38360
01.03.02
Level 8 38360
01.05.01
515
515
01.02.01
1800
01
01.02.07
01.02.07
01.01.01
01
130
515 2.5 11
79
435
03.01.01
75
66
2.5 21
5 2.5 11
Detail - B 1
Detail - B 5 435
5
Balustrade detail
Detail - B
Balustrade detail
2.5
01.02.07
01.03.02 01.02.07
115
01.02.10
425
475
03.01.01
01.02.01 11
75
11
2.5
77
01.01.01
7.5
77
2.5
01.02.05
03.01.01 475
115
01.02.05
150
100
3450
150
Level 7 34910
100
200
Level 7 34910
200
FFL to u/s ceiling
2775
2500
FFL to u/s slab
2508
FFL to u/s SO
SO 2525
C360
0 13
66
Detail - B 1
Detail - B 1
C370
C365
2.5
425
15 ceiling board
Note - U/S of ceiling is 8mm below U/S of SO
C375
435
185 terrace build up 280
2.5
01.02.05
200 slab
79
78
03.01.01
insulation 10 waterproofing
C385
TOS 38185
130
01.02.05
35 module roof finish
2.5 11
C380
7. Street view from Bollo Lane.
75
01.03.03
7.5
01.02.02
01.02.01
01.04.03
01.02.01
C355
01.02.07
Pod module
17
2500
01.03.02
C330 5
200
01.02.07
515
03.01.01
Detail - B 2
Detail - B 5
Detail - B 2
66
5 11
21
2.5
5
79
.5 12
2.5 10
NOTE: Specification below is to be read in conjunction with Outline Architectural Specification Revision D. Please refer to this document and NET's Stage 3 Tender Document for full specification.
1 : 20
100
Section Window Brick 115
01.02.05
5
Section Window Brick1
01.03.02
200
Level 7 34910
Detail - B
Detail - B 6
2.5
66
4. Details
150
150
66
01.02.07
150
01.02.10
03.01.01
1 : 20
475
C320
2508
SO 2525
92 .5
03.01.01
Detail - B 2
2.5
2.5
C325 7
115 01.02.07
2.5
150
150
78
Balustrade detail
425
79
01.01.01
01.02.08
115 03.01.01
FFL to u/s ceiling
5
01.02.05
Level 6 31835
01.05.01
10
130
Detail - B 1
2.
2500
11
FFL to u/s SO
5
75
150
66
66
0
435
13
Level 6 31835
01.02.07
5
200
435
515 2.5
435
78
2.5
01.02.08
435
225 Note - U/S of ceiling is 8mm below U/S of SO
C335
15 ceiling board
10
78
01.02.08 66
01.03.02
Level 8 38360
35 module roof finish
475 C340
5
150
66
01.04.02
01.03.03
01.05.02
250
01.02.01
01.01.01
01.04.09
01.02.05
C345
3000
435
Level 7 FFL: 35210
01.02.05
75
515 01.02.07
150
Note - SO 17 mm below FFL
01.05.02
C350
2500
01.01.01 01.04.03
Detail - B 1
C315
Pod module
01.02.01
Keynote Legend
01.03.03
75
Number
17
Level 6 FFL: 32210
C305
10
C300
78
0
2.5
5
79
Note - U/S of ceiling is 8mm below U/S of SO
435
66
150
C295
Detail - B 2
1
2.5
15 ceiling board
01.02.08
200
01.02.10
01.01.01
Level 6 31835
66
01.03.02
150
150
5
225
475
35 module roof finish
01.02.08 66
01.01.01
01.02.01
01.03.02
115
01.02.01
5
01.01.01
01.02.07 03.01.01
Detail - B 2
Detail - B 6 66
5 11
C290
2.5
10
NOTE: Specification below is to be read in conjunction with Outline Architectural Specification Revision D. Please refer to this document and NET's Stage 3 Tender Document for full specification.
01.03.03
Section Window Brick
01.02.02
01.02.10
2.5
01.01.01
815
01.02.05
2500
01.02.07
01.02.01
75
C310
150
Note - SO 17 mm below FFL
01.01.01
1
01.02.05
2
FFL to u/s ceiling
2500
FFL to u/s SO
2508
SO 2525
C280
3000
1 : 20
C285
3
Keynote Legend
01.03.02
Number 01.01.01
01.02.01
66
01.03.02
01.02.01
5
C275
Pod module
Detail - B 3
C265
5 47
5 2.5 11
35 module roof finish
225
2.5 11
Detail - B 3
C255 66
5 11
47
Note - U/S of ceiling is 8mm below U/S of SO
5
2.5
15 ceiling board
C260
01.02.05
01.02.07
01.06.01
5
475
66
01.03.02
5 47
66
75
Level 5 FFL: 29210
01.03.03
01.01.01
150
Note - SO 17 mm below FFL 17
C270
01.02.02
01.02.10
01.01.01
815
01.02.10
01.02.08
Detail - B 7
01.02.10 75
B1
C250
66
01.03.02
5
01.03.02
le drawing. Figured dimensions to be worked to in all cases.
2500
2508
3000
35 module roof finish
B3
01.04.09
B7
B4
3. Elevation section.
B6
66
Detail - B 8
11
Detail - B 4
8 815
01.05.02 01.06.01
2.5
B C D
Description
07/04/2017 Amended to incorporate changes following comments forom client from February and March 2017 23/06/2017 Material changes to reflect latest outline architectural specification. 19/09/2017 Specification amended to reflect Outline Architectural Specification Revision D.
01.02.08
Detail - B 7
Aluminum Cill installed between window frame and GRC window cill (feature bands), Colour: 9011 (semi gloss) to match colour of window frame. All aluminium cills to have stop ends. Aluminum Window Cill, Colour: 9011 (semi gloss) to match colour of window frame. All aluminium cills to have stop ends. Window/Glazing to commercial area and sides of entracne areas. Manufacturer: Schueco, Range: FW50+SG capped façade product, Frame Colour: RAL 9011 internal and external. Performance as per Performance Specification by NET.
01.02.10 75
66
5
01.03.02
Dwn Ckd fl
mc
fl fl
bsc sm
Drawn
MC
Checked
FL
Date
6. Axonometric details.
Scale @ A0
08/02/17
Bollo Lane Elevation Bay Studies, Brick
As indicated
AA5858-1701 REV D
01.04.02
B3 B5
01.06.01
B4
Terrace Decking. Thermwood, 25x138mm composite decking to manufacturers details and specification. 10mm gaps between boards. Ref. to landscape drawings for more details. Aluminium profile - powder coated, Colour: Black RAL9011( Semi Gloss ) Aluminium profile - powder coated, Colour: White RAL9010 Louvred Steel Screen - Galvanised and Painted. Colour Black RAL 9011 (Semi Gloss). Refer to drawings for more details Structure to SE details
01.01.01
The contractor is responsible references. Any discrepancy with the works. Where an item larger scale drawing is to be w Do not scale drawing. Figured
CDM REGULATIONS 2015. A project must be read in conjun Environment Assessment Re
All intellectual property rights
Please note, all information development process (RIBA Any work not issued as “Co construction. Any construc elements produced using in “Construction” status is at
CDM REGULATIONS 2015. All current drawings and specifications for the project must be read in conjunction with the Designer's Hazard and Environment Assessment Record
Do not scale drawing. Figured dimensions to be worked to in all cases.
All intellectual property rights reserved.
6.1 11 2.5 11
Axonometric View
9. Front of the building. Commercial podium.
01.03.02
Panels above glazed screens, Aluminium Profile Powder Coated, Colouer:Black RAL 9011(semi gloss) - to match window frames Terrace Balustrade, Structural glass balustrade, standard square base shoe TL-6011 profile c/w pre drilled holes at 300mm c/c to allow fixing to concrete structutre with M12x156 hilti expansion anchor, 21.5 toughened & laminated clear glass panels (opaque in areas to comply with Planning Condition 6) fixed into channel with dry glazed system, rubber fitted between edge glass and top of channel, balustrade height 1120mm from FFL. Manufacturer Elite Architectural Systems.
01.04.09
Terrace Decking. Thermwood, 25x138mm composite decking to manufacturers details and specification. 10mm gaps between boards. Ref. to landscape drawings for more details. Aluminium profile - powder coated, Colour: Black RAL9011( Semi Gloss ) Aluminium profile - powder coated, Colour: White RAL9010 Louvred Steel Screen - Galvanised and Painted. Colour Black RAL 9011 (Semi Gloss). Refer to drawings for more details Structure to SE details
01.05.01 01.05.02 01.06.01 03.01.01
NOTE: All drawing to be read in conjunction with outline architectural specification. The contractor is responsible for checking dimensions, tolerances and references. Any discrepancy to be verified with the Architect before proceeding with the works. Where an item is covered by drawings to different scales the larger scale drawing is to be worked to.
5
Detail - B
Aluminum Cill installed between window frame and GRC window cill (feature bands), Colour: 9011 (semi gloss) to match colour of window frame. All aluminium cills to have stop ends. Aluminum Window Cill, Colour: 9011 (semi gloss) to match colour of window frame. All aluminium cills to have stop ends. Window/Glazing to commercial area and sides of entracne areas. Manufacturer: Schueco, Range: FW50+SG capped façade product, Frame Colour: RAL 9011 internal and external. Performance as per Performance Specification by NET.
Terrace Balustrade, Top Fixed Balustrade c/w posts. Mild steel galvanised and powdercoated SHS 100x5mm unprights fixed to concrete surface with M12 chemical anchor fixings through 250x25x12mm baseplate, posts complete with glass lugs/discs and fixings to support 17.5mm toughened & laminated clar glass panels (opaque in areas to comply with Planning Condition 6), posts powdercoated to RAL 7047, 1800mm high from FFL. Manufacturer Elite Architectural Systems.
B7
66
Description / Specification Facing Brick - Castor. The Bespoke Brick co. Mortar colour grey. Performance as per Performance Specification by NET. Residential casement windows, Schueco AWS70HI, Inward opening, Colour: Black RAL 9011(semi gloss) externally and White RAL9016 (30% gloss) internally. Performance as per Performance Specification by NET. Residential terrace door, Schueco AWS70HI, Outward opening, Colour: Black RAL 9011(semi gloss) externally and White RAL9016 (30% gloss) internally. Performance as per Performance Specification by NET. Panel above Window, Material:Aluminium Profile Powder Coated Colour:Black RAL 9011(semi gloss). Where MVHR outlets, these face downwards. Refer to window shedule and details for their position GRC Window Cill (feature band), Manufacturer: GRC UK, Colour Arctic White, Thickness: 30mm, Finish: Hydrophobic Coat, all cills to be provided in a single piece. Pofiles as per drawings 1701,1702. Sample of each profile to be provided for approval & sign off by client.
01.04.03 B6
B8
Detail - B 8 prp-co.uk London 020 7653 1200
01.03.03
B2
Panels above glazed screens, Aluminium Profile Powder Coated, Colouer:Black RAL 9011(semi gloss) - to match window frames Terrace Balustrade, Structural glass balustrade, standard square base shoe TL-6011 profile c/w pre drilled holes at 300mm c/c to allow fixing to concrete structutre with M12x156 hilti expansion anchor, 21.5 toughened & laminated clear glass panels (opaque in areas to comply with Planning Condition 6) fixed into channel with dry glazed system, rubber fitted between edge glass and top of channel, balustrade height 1120mm from FFL. Manufacturer Elite Architectural Systems. Terrace Balustrade, Top Fixed Balustrade c/w posts. Mild steel galvanised and powdercoated SHS 100x5mm unprights fixed to concrete surface with M12 chemical anchor fixings through 250x25x12mm baseplate, posts complete with glass lugs/discs and fixings to support 17.5mm toughened & laminated clar glass panels (opaque in areas to comply with Planning Condition 6), posts powdercoated to RAL 7047, 1800mm high from FFL. Manufacturer Elite Architectural Systems.
01.03.02
B1
Note: Pigeon protection system required on the flat surfaces of parapets
01.03.02
Rev Date
Axonometric View
11
6.1
03.01.01
B8
5. Axonometric view illustrating details location.
5
01.01.01
B7
Axonometric View
01.05.01
01.02.07
01.06.01
8
B8
1 : 25
CDM REGULATIONS 2015. All current drawings and specifications for the project must be read in conjunction with the Designer's Hazard and Environment Assessment Record
01.06.01
B5
B6
8. Residential entrance.
Description / Specification Facing Brick - Castor. The Bespoke Brick co. Mortar colour grey. Performance as per Performance Specification by NET. Residential casement windows, Schueco AWS70HI, Inward opening, Colour: Black RAL 9011(semi gloss) externally and White RAL9016 (30% gloss) internally. Performance as per Performance Specification by NET. Residential terrace door, Schueco AWS70HI, Outward opening, Colour: Black RAL 9011(semi gloss) externally and White RAL9016 (30% gloss) internally. Performance as per Performance Specification by NET. Panel above Window, Material:Aluminium Profile Powder Coated Colour:Black RAL 9011(semi gloss). Where MVHR outlets, these face downwards. Refer to window shedule and details for their position GRC Window Cill (feature band), Manufacturer: GRC UK, Colour Arctic White, Thickness: 30mm, Finish: Hydrophobic Coat, all cills to be provided in a single piece. Pofiles as per drawings 1701,1702. Sample of each profile to be provided for approval & sign off by client.
815
225 15 ceiling board
8 815
01.04.03 B5
75
Note - SO 17 mm below FFL
17
4203 - Height Rod 3 (B)
All intellectual property rights reserved.
5
B3
B4
Detail - B 4
ctor is responsible for checking dimensions, tolerances and . Any discrepancy to be verified with the Architect before g with the works. Where an item is covered by drawings to cales the larger scale drawing is to be worked to.
01.01.01
C225
C220
2
66
01.06.01
475
Level 4 FFL: 26210
01.04.02
01.02.10
B2
Pod module C230
01.06.01
B2
C235
5
815
66
5
150
815
66
01.01.01
01.03.03
B1
815
C240
01.02.10
FFL to u/s SO
01.03.02
SO 2525
C245
FFL to u/s ceiling
01.03.02
drawing to be read in conjunction with outline architectural on.
al
38660
225
5
75
435
66
0 13
C390
675
Level 8 FFL: 38660
2.5
942
78
515
Terrace
Note: Pigeon protection system required on the flat surfaces of parapets
Detail - B
17
5. Holz 100 Hotel in Piwniczna Zdrรณj, Obidza, Poland Private work Studio EL, Wroclaw Design elaborated by a team of 3 people. Drawings and sketches done by author. 3D model and CGIs done by team. The hotel will be located on the northern periphery of Piwniczna Zdrรณj, in the beutiful hilly landscape of Pieniny mountains. The main idea is reflected in the centric layout of the building. The main lobby with a spacious hall on one hand directs guests to all rooms and on the other hand becomes a heart of the building. The scheme has been designed and is being delivered using sustainable and environmentally friendly wood construction - Thoma Holz 100 solid wood panel technique.
Traditional wooden houses in the area.
1.Site photograph. 18
Two elements
Extension of the base
Maximise views towards mountains
Pow. Użytkowa Poziom -1
Pow. Użytkowa Poziom -1 Area
Number
4 1020
10''
A'
36 00
8
38 00
B'
18 00
50 00
6
5
10
38 00
7
10
1
50 22
P0.24 Pom. Masazu
1020
C'
38 00
70 00
10'
7900
D'
P0.23 Pom. Masazu
P0.19 Pom. Mag
P0.48 Zbiornik ppoż
38 00
P0.25 Hydroterapia
poj. czynna - 210m3
P0.31 Relaksarium
P0.22 Pom. Masazu
270
5 m² 2 m² 43 m² 3 m² 3 m² 6 m² 11 m² 3 m² 7 m² 17 m² 17 m² 27 m² 29 m² 7 m² 11 m² 12 m² 6 15 m² 24 m²
Area 5 m² 5 m² 5 m² 97 m² 8 m² 40 m² 4 m² 8 8 m² 19 m² 41 m² 11 m² 1 m² 3 m² 3 m² 2 m² 3 m² 3 m² 15 m² 8 m² 1 m² 4 m² 22 m² 71 m² 13 m² 9 m² 3 m² 3 m² 54 m² 9 m² 964 m²
11
I' 12
4 A'
B'
10'
C'
P0.30 Sauna Parowa
D'
38 00
E'
38 00
P1.01 Sypialnia
38 00
P1.05 Przedsionek
P0.01 Hall
P0.35 Sala Ćwiczeń
IT P0.40 Winda
P0.45 Mag
25854
EL
MC
EL
22/04/17
MC
EL
26/03/17
MC
EL
F
Dodana zamknięta klatka schodowa, dodane pomieszczenia techniczne i IT zmiana układu przyłącza, pomieszczenień na poziomie -1, zmiana P1.36 układu pomieszczeń strefy wejściowej, Mag dodatnie wyrzutni i komiun, powiększenie relaksarium; zmainy w podjeździe na parking
17/03/17
MC
E D C
Oddanie koncepcji Dodana strefa mokra sauny Zmiany na poziomie 1; Zmiana przebiegu galerii; dodanie słupów hallu głównym; zmiana i redukcja okien połaciowych; P1.28 usunięcieP1.31 okien w elewacji szczytowej; zmianaPrzedsionek łazienek na poziomie +1. Przedsionek
22/02/17 14/02/17 23/01/17
MC MC ML
EL EL EL
Zmiany na poziomie -1:zamiana sauny f. 16/01/17 z relaksarium; zmiany grubości ścian w P1.32technologi Thoma; zmiany okien P1.29 A Zmiany na poziomie -1; zmiany w SPA i 08/01/17 Łazienka Łazienka kuchni Rev Opis Data
MC
EL
G UP
EL
P0.16 Pom. Socjalne P0.44 Separator Tłuszczu
MC
10/04/17
H
P0.38 Winda
3
3 1800
DORA METAL
2
P0.09 Mag. warzyw
DORA METAL
DORA METAL
P0.03 Jadalnia
DORA METAL
DORA METAL DORA METAL
narysowane
DORA METAL
DORA METAL
DORA METAL
DORA METAL
DORA METAL
DORA METAL
DORA METAL
J
3800
I
3800
A
P1.15 Łazienka
Void EL
P1.25 Przedsionek
10/07/16 P1.30 Sypialnia
1 3800
38 00
P1.14 Sypialnia
P1.12 Łazienka
P1.13 Salon
data stworzenia
MC
45.0 0°
DORA METAL
DORA METAL
DORA METAL
H
DORA METAL
1
3 1020
P1.11 Przedsionek
P1.26 ML EL Łazienka Dr by
P1.20 WC
P1.22 Przedsionek
P1.23 Łazienka
P1.17 Salon
P1.19 Łazienka
App by
sprawdzone
EL
DORA METAL
P0.07 i prod. Mag. chłodniczy suchych
DORA METAL
DORA METAL
P0.54 Korytarz
7000
DORA METAL
P0.05 Kuchnia
uv
DORA METAL
DORA METAL
DORA METAL
DORA METAL
7000
DORA METAL
P0.08 Obieranie i dez. jaj
P0.53 Maszynownia
38 00
P1.10 Sypialnia
EL
B
DORA METAL
P0.04 Rozdzielnia kelnerska
2
P0.02 Przedsionek
DORA METAL
DORA METAL
P0.06 Zmywalnia
DORA METAL
DORA METAL
1800
P0.36 Bar
P0.10 Korytarz
P1.08 Przedsionek
EL
07/05/17
I
P0.47 Schody
28/06/2017 MC
Zmiana układu pom. na poziomie -1; połączenie korytarzy gospodarczych; dodanie szachtów elektrycznych Zmaina układu pomieszczeń technicznych i magazynowych, dodane pom. mag/tech w czesci SPA Zmainy w klatce schodowej; zmiany w galeri na poziomie +1; przesunięcie windy Zmiany z zagospodarowaniu; zmiany na poziomie -1; dodany zbiornik wodny; dodanyP1.37 pokój dostosowany do potrzeb osoby niepełnospawnej; zmiany w klatce Klatka schodowa schodowej
J
P0.34 Sauna Finska
P0.29 SPA -4.20
P0.42 Szatnie
P1.34 Usuniecie klatki schodowej w holu, na Recepcja / Sklepik proźbę klienta
3800
B
3800
C
3800
D
3800
E
P1.27 Studio EL Sypialnia23 al. Wiśniowa Polska 53-137 Wrocław Polska
P1.24 Sypialnia
P1.21 Sypialnia
T +48 601 703 436 E edward.lach@studioel.p http://www.studioel.pl/
3800
F
STUDIO
16700
P0.46 Pom Porządkowe
P0.15 WC
P0.50 Przyłącza telekom.
P1.09 Łazienka
4 K
P0.41 WC
G'
38 00
P1.07 Sypialnia
P1.06 Łazienka
P1.38 Hol
3 1020
P0.39 Korytarz
P0.13 WC P0.49 Pom. IT / Ochrony
+0.00 =837.5 n.p.m.
P0.33 Sauna Aromatyczna
P0.11 WC
P0.12 WC
P0.14 Szatnie
P0.26 Szatnia
0 04 24
4
38 00
P1.04 Sypialnia
P1.02 Przedsionek P0.52 P0.51 Mag Biel Czystej Mag Biel Brudnej
F'
H
P1.03 Łazienka G'
P0.43 Pom. Rozdzielni głównej
1 1020
9
F'
P0.28 Szatnia
1020
10''
9° 2.4 11
P0.18 Maszynownia SPA
P0.17 Pom. Hipoksji
5
38 00
P0.21 Pom. Mag / Tech P0.20 Recepcja
114 m² 4 m² 80 m² 6 m² 34 m² 6 m² 8 m²
Name Szatnia WC Szatnia SPA Sauna Parowa Relaksarium Przedsionek Sauna Aromatyczna Sauna Finska Sala Ćwiczeń Bar Pom. Tech Winda Korytarz Winda 7 WC Szatnie Pom. Rozdzielni głównej Separator Tłuszczu Mag Pom Porządkowe Schody Zbiornik ppoż Pom. IT / Ochrony Przyłącza telekom. Mag Biel Brudnej Mag Biel Czystej Maszynownia Korytarz
E'
9' 9
P0.08 P0.09 P0.10 P0.11 P0.12 P0.13 P0.14 P0.15 P0.16 P0.17 P0.18 P0.19 P0.20 P0.21 P0.22 P0.23 P0.24 P0.25
Hall Przedsionek Jadalnia Rozdzielnia kelnerska Kuchnia Zmywalnia Mag. chłodniczy i prod. suchych Obieranie i dez. jaj Mag. warzyw Korytarz WC WC WC Szatnie WC Pom. Socjalne Pom. Hipoksji Maszynownia SPA Pom. Mag Recepcja Pom. Mag / Tech Pom. Masazu Pom. Masazu Pom. Masazu Hydroterapia
70 00
P0.01 P0.02 P0.03 P0.04 P0.05 P0.06 P0.07
37 10
38 00
18 00
I' 11
P0.26 P0.27 P0.28 P0.29 P0.30 P0.31 P0.32 P0.33 P0.34 P0.35 P0.36 P0.37 P0.38 P0.39 P0.40 P0.41 P0.42 P0.43 P0.44 P0.45 P0.46 P0.47 P0.48 P0.49 P0.50 P0.51 P0.52 P0.53 P0.54
36 00
Name
Level -1
50 00
Number
12
G
3800
3800
3800
klient
3800
P1.18 Sypialnia
24316
3800
3800
3800
3800
Ośrodkek Przyrodo – Leczniczy MADRA Sp. z o.o
3. Groundfloor plan.
2. Basement plan.
J
projekt
I
A BUDOWA
B PRZYRODO C OŚRODKA LECZNICZEGO I ODNOWY BIOLOGICZNEJ; 6 33-350 PIWNICZNA-ZDRÓJ, OBIDZA 1
D
2
E
F
G
2 1020
1020
rysunek
Poziom -1
1020
miejsce na dysku
7
data wydruku
1020
C:\Users\Madzi\Documents\Piwniczna_EL_BUD_HT_Madzi.rvt
Poziom 0
Poziom -1
1 : 100
1 : 100
numer projektu
EL_AA_HT_001 numer rysunku
1001
skala
1 : 100 rev
@A1
powód
K
Rysunek czytać razem z resztą rysunków. Wszystkie wymary należy sprawdzić i potwierdzić na terenie budowy przed rozpoczęciem prac w terenie. Wszelkie niedokładności należy zgłosić. Ten rysunek jest kopią i prawa autorskie należą do Studia EL.
Top wooden element widening
4. Bird’s eye view from South-West.
Concept for the hotel building
Topographycal character of the site.
5. Perspective of the main entrance.
Simple form of the building
Solid and glass elements
Separation of two hotel wings
Central main hall
Basement of the holel hidden in topo
6. Perspective of the South - East Elevation. 19
6. London Road, Wembley Concept design towards Planning PRP, London Design elaborated by a team of 3 people. CGIs elaborated by team. 3D model, diagrams, sketches, 2D drawings done by author. Client: Brent Housing Management This project includes the re-development proposals for the Wembley Youth Centre and former Dennis Jackson Centre on London Road, Wembley which features 150 affordable homes. The proposals will provide new purpose built rented residential accommodation for local people; a mix of low cost rented, supported and temporary accommodation. The proposed development includes the re-provision of a community facility. I took part in the design of this project from the initial viability stage and I have been involved in the resident consultations. The work now is moving on to RIBA Work Stage 3 with the intention of submitting a detailed planning application.
Block A - Respecting existing context
Grid
1. Street view from the end of London Road towards houses of Block B. 20
Grid on the elevation
Vertical elements
N
2. Site plan - level 1.
B
C
Block B - Vertical divisions
Grid on elevation and vertical divisions
3. Street view from London Road towards Block B.
Block C - Vertical divisions
Vertical grouping.
4. Street view from London Road towards Block C
Grid on elevation. Community centre at ground level distinguished.
Two characters of development
London Road Edge
A
C
A
B
Playing Fields Edge
5. Street view from the end of London Road towards Block A and houses of Block B. 21
7. Helsinki Central Library International Competition Entry Studio EL, Wroclaw Design elaborated by a team of 4 people. CGIs and 3D model elaborated by team. 2D drawings by author. The main idea for the design of the library was the modular facade which is made of the boxes of various depth. They were designed in such a way to provide additional space for individual work or meetings. Not only do they diversify the space of the library, but they also provide views to the surrounding park and act as a thermal insulation as well as sun rays filtration system. The building is made of steel construction. The structure of the building enables maximum flexibility of the interior. Atrium acts as the most esternal layer of the library, made of glass wall. It acts as a buffer zone between outside and inside and by this protects the interior of the building from overcooling and overheating.
1. Section and ventilation diagrams.
2. Location of the library. 22
Winter season
Intermediate season
Summer season
3. Main level of the colection area.
4. Longitudinal section.
5. Location of the the Central Library and the surrounding context.
6. Interior space of the collection area. 23