Design portfolio

Page 1


contents • Zero energy house competion Entry • Resedential Project ,KSA • Grand Heights Resedential compound • WAY TO HEAVEN SKYSCRAPER • Science city 6th of october • JUMEIRAH BAY MOSQUE • Maspero Triangle Renovation

Goals objectives Three Main Aspects of Design Social Aspects Economic Aspects Spatial Consideration Strategy Research phase Research Implementation Design approach. Design developing Conclusion

• Egyptian embassy in Beirut

Design approach Form generation

• Cairo central library

Economical analysis Sky&datum lines &proportions Urban Setting Historical background

2

5 8 9 10 11 12 13 13 13 14 14 14 14 17 20 20 20 20 20 21 21 22 25 25 25 25 25


Color and pattern study:

• Hall 505 renovation • Fire arms pavilion • Gmaleya District Urban development

Strategies Assets Strentghs Weaknesses opportunities

• 6 th of october • Munifiya governerate • MAADI In dustrial reception • Moon city resedential compound • New heliopolis district • Obour city • Parametric Table • Parametric Sofa • Parametric Stool • Parametric Wardrobe • Marble Wood table • Tv unit • Marshmellow Sofa • Porto matrouh mosque full package • Beirut library working drawings • Sustainable CDC • Arabica Online Prochure • Excellent Way Booklet • Dental Care Clinic • Graduation project report

25 29 30 30 30 31 31 32 32 34 35 36 36 37 37 38 39 40 41 42 42 43 45 52 72 74 76 77 79

3


Architectural Projects

4


Zero energy house competion Entry Organized by University of East of lodon and Ain shams university Rank : Short listed

5


6


7


Resedential Project ,KSA Project by : Zuhair fayez partnership Owner : Government location : Riyadh,KSA

8

Role : Design and rendering


Grand Heights Resedential compound Project by : integrated development group Role : Facade design and rendering Owner : Kwadico location : Zayed city

9


WAY TO HEAVEN SKYSCRAPER Mixed Use sky scraper -New capital

sky scrapers have a unique peoperty that it catches all the sight up to sky .it acts as a Way that can reach the heaven Vision : to design a unique sustanable eco-friendly skyscraper that adapts to the sorrounding enviroment and context a living creature not a static object living creatures do three main activities to survive Eating ,Drinking, breathing In addition to all of these the spatial experience of users is very important so ..an artificial cloud made by vapor splinkers at the entrance lobby in order to make users feel like they are entering a cloud moving up to the heaven Its eats the solar energy like a plant by the photovoltaic skin and solar panels Converting the solar energy into electric energy in order to produce the sufficient power to the building .it drinks the rain water from the cloud by manganin rods which condensate the vapor from the clouds into potable water why manganin ??? cause it has the lowest temperature coefficient so it can resists the change in temperature.

10

and finally breathes the surrounding winds by vertical wind turbine placed on the external columns Converting the Kinetic wind energy into electric energy in order to produce the sufficient power to the building

The seeds of a flower head form interlocking spirals in both clockwise and counterclockwise directions. The number of clockwise spirals differs from the number of counterclockwise spirals, and these two numbers are called the plant's parastichy numbers The Mathematical Lives of Plants The golden angle is about 137.5ยบ. Two radii of a circle C form the golden angle if they divide the circle into two areas A and B so that A/B = B/C. The tower floors rotates by the golden angle 137.4 degrees giving the visual perception of a natural stair way connocting them directlytowards the heaven


Ineternational competition organized by UIA and the biblioteqhue of alexandria

Science city 6th of october

11


JUMEIRAH BAY MOSQUE Project by : Elgabaly architects Owner : Jumeirah devlopments location : Ras el Hekma contribution : implementing the concept sketch and developing the design concept into 3d conceptual model and generation many proposals to choose from. and also solving the internal plan and relations between different spaces and designing the ground floor and first floor plan .

Design concept is a simple application of jumeirah bay main concept wich is derived from broken diamonds and adding the main identifying element of islamic mosque (the dome )

12

Credits of design concept goes for DR.Tamer el gabaly and Arch / Mohamed emad and 3d visualization to Arch Tarek abu zaid


Maspero Triangle Renovation Graduation project • Goals - Fulfilling fairness and equality in terms of civil rights among diverse stakeholders of the project concerning: Ownership, Accessibility, Location and Safety. -Integrating self-sufficient com munity, targeting both maximum feasible investment and adequate housing with strong mutual social networks. - Developing a sustainable self-sufficient community seeking to minimize the negative environmental impact and optimize the use of available resources and recycling of wastes towards zero net energy environment.

safety for children and families. - A dense network of walking and transportation results in short, varied and direct connections that improve access to goods, services and public transport.

• objectives - Creating mutual needs without separating them by making each party need the other through job opportunities. - High quality, unobstructed pedestrian foot paths providing basic mobility for all. - Green parks for inhabitants to ensure

13


• Three Main Aspects of Design • Social Aspects - Enhancing the social fabric of Cairo generally and Maspero residents specifically through functional exchangeability and integrity between diverse social classes. - Offering highly-secured community facing drug dealers problem. - Proposing solutions for existing lack in Livelihood needs of residents like: 1) Basic infrastructure in the areas 2) Daily goods market.

• Economic Aspects - Creating a mutual economic platform for both local community and investors. - Developing economically feasible projects which benefit the country, investors and residents. - Offering a flexible development prototype which can be modified according to market variables and local community desires.

14

• Spatial Consideration - Connectivity: Central urban distribution enhancing the vitality of the centroid of triangle. - Applying the theory of change and transformation upon housing units. - Wider roads for ambulance and fire fighting vehicles.


Maspero public library

Maspero Public library is a cultural extension to the Egyptian museam based in tahrir square a padesterian tunnel is used to link both of them on to the main axis of the projet heading to el rakaaeb museam. These three point will hold the new cultural axis of cairo .the library contains main reading halls and some workshop and seminar rooms ,several lounges and Computer labs A high level resedential units directly on el galaa street to attract another community level to the site serving the bussiness district and new commercial projects in maspero triangle also a community center that serves the middle and low lass people imroving their personal skills and teaching them different subjects the center ontains many workshops and seminar rooms . A transportation hub will include the new metro station and bus terminals also other transportation means like taxis and mini buses surving all the project inhabitants and linking the project with the other parts of cairo . in order to attract investors and large firms and alos surving maspero inhabitants to go to their daily destinations.

15


• Strategy main roads and buildings. • Redistribution of land uses and introducing new functions with respect to the • Avoid detaching the residential zone from the surrounding buildings inside landowners. the triangle. • Maintaining the life style of the in• Focusing on the land as an attraction point for the investors specially with the habitants. • Ensuring for a better quality of life. ones on the Nile front. • Inviting a various wide range of target group visitors and users to the tri• Offering job opportunities to the resiangle. dents within their residential region. • Direct axis from and to the landmarks and internal spaces. • extending the Urban fabric from the surrounding context . • Integrating pedestrian and vehicular routes inside the triangle with minimum intersections. • Taking into consideration Walkability enhancement and the visual perception of the 16


17


18


3-Executive report • Research phase

The research phase started by a repetitive visits to site of Maspero triangle studying the current situation of the inhabitants their homes their daily activities and problems they face . Also studying all conditions of buildings urban spaces and plants roads and lighting posts . Also studying the winning competition proposals and others attempts of local researchers to study the existing condition of the maspero triangle and their proposed solutions

• Research Implementation

All data gathered during the research phase were summed up and was transformed into a detailed digital model illustrating all these information then into a physical model to the scale of 1/500 so that the existing situation can be easily sensed by any one who wants to know more about it.

• Design approach.

Several attempts were made in order to reach the most suitable new masterplan for the project affecting both the programmatic and design concepts . From the programmatic point of view there were many points to deal with and how to make the renovation of the site serve all stakeholders from different point of views and to solve the great conflict between the government and the local inhabitants to fulfill the needs of both of them by enriching the economic feasibility of the project and also providing a suitable living environment for maspero inhabitants . Moving to the design concept which focused on how to exploit all the elements of the site and the neighboring context which led to an urban grid that connects all the different parts and functions of the triangle in a one homogenous unit converting Each element or building into a part of a hall entity. The new master plan grid is an extension

of the urban fabric that offer a total view of the Nile equally to the whole triangle. Direct axis from and to the landmarks and internal spaces. extending the Urban fabric from the surrounding context .Integrating pedestrian and vehicular routes inside the triangle with minimum intersections. Taking into consideration Walkability enhancement and the visual perception of the main roads and buildings.

• Design developing

Creating linear park between the high rise buildings to connect the residential zone with the Nile. An iconic, multi-functional landscape which promotes the health of the river and its adjacent communities acting as a model both nationally and globally. The existence of a transportation hub was an essential solution to the problem of the district . Due to traffic problems, the street needs a new contemporary expression and layering of transportation. The idea of the 3D Street created five iconic “lanterns” by twisting the required program into unique, visible destinations.

• Conclusion

As one of the most important projects in Egypt and one of the most difficult problems that face the Egyptian governments nowadays the selected approaches of the renovation project of maspero triangle were set to fulfill all stakeholders needs and increase the economic feasibility of the project without oppressing local inhabitants.

19


Egyptian embassy in Beirut • Design approach From the famous ancient egyptian myth of isis and osiris the design concept was derived from the relatioship between the ancient egyptian myth and the land of lebanon or the phoenix civilization . When Osiris was grown up he married his sister Isis, And Seth married Nephthys: for he too being a god could marry only a goddess. Osiris became sole ruler of Egypt and reigned on earth as Re had done. But Seth the Evil One, their brother, envied Osiris and hated Isis. Yet he had made his plans, aided by seventy-two of his wicked friends and Aso the evil queen of Ethiopia. Secretly Seth obtained the exact measurements of the body of Osiris, and caused beautiful chest to be made that would fit only him. It was fashioned of the rar-

20


est and most costly woods: cedar brought from Lebanon, and ebony from Punt at the south end of the Red Sea for no wood grows in Egypt except the soft and useless palm. “I will give this chest to whosoever fits it most exactly!” cried Seth. And at once the conspirators began in turn to see if they could win it. “Let me see if I will fit into this marvelous piece of work,” said Osiris, and he laid himself down in the chest while all gathered round breathlessly. Seth and his companions took the chest which held the body of Osiris and cast it into the Nile; and Hapi the Nile-god carried it out into the Great Green Sea where it was tossed for many days until it came to the shore of Phoenicia near the city of Byblos. Here the waves cast it into a tamarisk tree that grew on the shore; and the tree shot out branches and grew leaves and flowers to make a fit resting place for the body of the good god Osiris Presently King Malcander heard of it, and he and his wife, Queen Astarte, came to the seashore to gaze at the tree. By now the branches had grown together and hidden the chest which held the body of Osiris in the trunk itself.

• Form generation

the design concept were derived so that the embassy building represents the ancient chest resting at the shore and the tree branches are growing around creating a marvelous sight of the ancient egyptian god

21


22


23


Cairo central library • Economical analysis

• Urban Setting

the square was a cultural center in cairo but nowadays in changed into one of the most trading centers in cairo and now it is full of Hawkers . the unorganization of the square and and due to the bad human behaviours the first impression of any visitor is not as good as it was in history. so this project main target is to reorganize the square by a way that can reguliate the trading process there in addition to the cultural purpose of the project. and also to make an organized retail shops in the plaza and in the lanscape to acieve awin win sitiuation for both the government that will gain an organized suare

the square lies betwen two different types of urban fabric because it separates the fatimid cairo and the khedevian cairo also the square is one of the main traffic cenetrs in cairo with very haigh traffic denisty because of the governemental and trading shops that exists nowadays there

• Historical background The history of the square had a great impact on choosing the project entrance which is the same as the old opera house to bring back the old historical heritage of the square

• Color and pattern study:

• Sky&datum lines &proportions After several site visits a deep analysis of neigh-

bouring buildings were held taking in considerthe sky line of the neighbouring context is ation the used colors and architectural patterns variable so the average height were taken as each pattern were analysed such that it could 17 meters with taking the building profiles be the initial point of the generation process and setbacks in consedration to allow the the maximum amount of day lighting to reduce the omount of energy needed by the building

24


Applying two of the urban spatial design theories which are the (linkage thoeory) and the (place theory) by linking the opera square visually with outlet of el attaba underground which is the most crowded zone in the site and the place theory by making the perspective of the inner plaza pointing to the statue and the entrance is the same as the old opera house to bring back the historical seritage of the square. analyzing the project program and orientation of zones the the relation between them

the context is very rich with beautiful colors and artistic patterns. which reflects the historical heritage of the square and the deffirent architectural movments that can be be easily noticed there . so that the building can visually interfere with the neighbouring contextthese colors were the main colors of the project also some of these patterns were used in landscape. Spliting the the Knowledge center and the public function zones to result in two masses representing the two different urban and hitorical cultures where the site exists From the philosophical point of view Reading results in an ascending impact in human general knowledge and culture by applying this keyword (Ascending) on the mass in resulted in two separate ascending masses

25


26

OLD LAY OUT

NEW LAY OUT


Sky line study

27


Fire arms pavilion

Gmaleya District Urban development

28

• Strategies


• Strentghs

• Assets

29


• Weaknesses

30

• opportunities


interior Design

31


6 th of october

Resedential apartment in 6 th of OCTOBER district in Engineers oasis with a total area of 171 square meters my design contribution was on both the main bathroom and a room for a teenage boy , simple materials with warm light effects were 32 to add a diifferent feelings and qualities to both rooms. used

both client requirements and aesthetic purposes were taken in consideration


Obour city New heliopolis district

Resedential apartment in Obour district It was required to design a simple comfortable space were simple and strong materials were added to enrich the space giving it special interior qualities on the other side a post modern living room in new heliopolis district is designed using old pieces of furniture giving the space special feeling with the modern forms in ceiling and walls

33


Munifiya governerate

Resedential apartment in Munifiya governerate a small reception with dining room were designed to fulfill client requirements were a calm paceful place were required .simple calcata marble like porcelain were used as a flooring material with 34 paintings on walls while wooden thin coulomns were added

as a wall cladding giving the space rich and natural effect


MAADI In dustrial reception

Moon city resedential compound Resedential apartment in Maadi district The client required an industrial style rennovation to his reception brutal materials with old textures were used to fulfill client requirments giving the space an extra ordinary feeling .. the other project is

a living room for a civil engineer in moon city resedential compund were a large shelving units loaded with heavy 35 equipment models were used


Hall 505 renovation

36


Furniture Design

Parametric Table

37


Parametric Sofa

38


Parametric Stool

39


Parametric Wardrobe

40


Tv unit

Marble Wood table 41


Marshmellow Sofa

42


Working Drawings

43


Porto matrouh mosque full package Project by : Elgabaly architects Owner : Amer group location : Marsah matrouh

PORTO MATROUH PHASE (2) - MOSQUE LIST OF DRAWINGS DRAWING No. 000

DRAWING TITLE LIST OF DRAWINGS

SCALE -----

ARCHITECTURAL PLANS ID 101

MASTER PLAN

1:100

ID 102

GROUND FLOOR PLAN

1:50

ID 103

MEZANYNE FLOOR PLAN

1:50

ID 104

ROOF FLOOR PLAN

1:50

ELEVATIONS ARC 201

ELEVATION 01, ELEVATION 01

1:100

ARC 202

ELEVATION 02, ELEVATION 02

1:100

ARC 203

ELEVATION 03,04

1:100

ARC 301

SECTION A-A

1:50

ARC 302

WALL SECTIONS

1:50

SECTIONS&WALLSECTIONS

DOORS & WINDOWS AR 401

DOORS & WINDOWS DETAILS

AR -L-501

GROUND FLOOR PLAN (LIGHTING)

----

LIGHTING 1:100

AR -L-502

MEZANYNE FLOOR PLAN (LIGHTING)

1:50

AR -L-503

ROOF FLOOR PLAN (LIGHTING)

1:50

DRAINGE AR -DR-601

ROOF DRAINAGE

1:50

AR -DR-602

LAYOUT DRAINAGE

1:100

AR -D-701

WOODEN DETAILS

----

AR -D-702

ELEVATION DETAILS

----

AR -D-703

ARCH DETAILS

1:10

AR -D-704

FLOWER BOX DETAILS

1:20

DETAILS

44


A

W01

01 04

02 04

W01

03 04 ARC 301

AR203

06 04

W01

A

1 3

1 4

7

8

F5

F1

159

lo>K

15 \

yVtM :iVfhî

F4

F1 \ 15

plhL v{hG

159

1 \

A 10

16 \

F 18

plhL luhrdK

F7 \ 11

F3

A 10 1 \ 146

146

159

157

F 18\ 16

159

13 \

F 15

158

1 \

A 10

8 \

F3

F2

1 \

A 10

146

155

F 15\ 13

146

158

1

1

F 2\ 1

plhL sd]HJ

144

F 8\ 2

r'hU

F1

S 1

1

7

1 \

A 10

146

8 \

F3

SHOP

A 10 1 \ 146

j,qdpD

144

yvtM jyddv gb'thG

155

F 2\ 1

2

144

1

2

3

A 10

1 \

146

8

A 10 1 \ 146

1 3

1 \

A 10

F 3\ 8

SHOP

4

146

155

1 \

A 10

146

5

F 2\ 1

8 \

F3

F 2\ 1

144

155

144

15 \

F1

159

6

F 2\ 1

144

SHOP

SHOP

SHOP

SHOP

19

lfkD

laundry

3

20

i 10 i 11

i 12

i9

i8

i6

i5

i4

i2 i3

i1

i7

]1

21 21

SHOP

22

SHOP

23

24

4.619

25

26

4.857

4.816

SHOP

5 5

SHOP

28

29

4.157

4.611

3.370

3.639

4.611

27

lfkD lfkD

30

3.353

3.455

4.151

SHOP

31

2.899

33

SHOP

3.294

4.342

4.197

32

35

36

SHOP

2.605

3.310

SHOP

P

4.608

3.112

3.400

34

SHOP

4.560

37

38

CAFE

4.176

3.749

4.674

3.913

4.074

38

6.976

A 14 1 \ 146

A 14

1 \

146

A 14 1 \ 146

7.796

A 14

1 \

146

F5

10 \

156

A 14

1 \

146

F5

10 \

156

4.322

5.181

Parking

4.978

3.984

4.284

A 14 1 \ 146

1 \

A 14

10 \

F5

146

156

10 \

F5

156

F5

1 \

A 14

10 \

156

146

F 3\ 8

155

HgprhzF

yvtI

A 14 1 \ 146

HB]HvI

10 \

F5

156

SHOP

F 6\ 9

156

F6

9 \

156

F5 \ 10

9 \

F6

156

SHOP

156

F5 \ 10

9 \

F6

156

156

9 \

F6

156

F 6\ 9

156

F 6\ 9

10 \

F5

156

156

52

2 \

F8

144

53

1 \

A1

146

54

53

55

2 \

F8

144

>1

>2

>3

SHOP

56

10

57

146

8 \

F3

155

144

A 10 1 \ 146

1 \

F2

lfkD

>4

1 \

A 10

L0 O +4.60

L0 J +4.70

58

1 \

F2

144

59

1 \

A 10

8 \

F3

146

155

A 10 1 \ 146

LOULY PARK SHOP

L0 O +4.60

L0 J +4.70

60

146

A 10

1 \

146

8 \

F3

62

155

8 \

F3

F2

155

1 \

144

L0 O +4.60

L0 J +4.70

lfkD

1 \

A 10

88.00 m2

146

SHOP 37-38 PAVAROTY CAFE

63

11

64

A 10

1 \

146

L0 J

155

1 \

F2

+1.20

F3

8 \

144

SHOP

L0 J +4.55

L0 O +4.45

65

69

12

O

144

A 10

1 \

146

1 \

A 10

155

F 2\ 1

146

144

8 \

F3

146

144

6

T

74

p4

p3

A 10 1 \ 146

plhL luhrdK

F 2\ 1

67

p2

L0 O +4.60

L0 J +4.70

73

12 2

A 10

1 \

Lobby

72

+4.60

L0 O J +4.70

14

F 9\ 3

15 \ F 159 1

145

12 1

L0 J +4.55

L0 O +4.45

159

L0 J +4.70

+4.70

L0 O +4.60

L0 J

L0 O +4.60

yvtM jyddv gB'thG

F1 \ 15

1

security

L0 O +4.60

L0 J +4.70

12

2

;4

;3

; 1;

Main Kitchen

p6

lo>K

p5

13

Area 160.00 m2

administration

155

p1

CAFE

3

71

12

F 3\ 8

3 2

Lobby

F 2\ 1

PAVAROTY

66

70

lfkD

;4

;3

;2

;1

L0 O +4.60

L0 J +4.70

L0 J +4.55 L0 +4.45

Conference Hall entrance

ROAD - 25

Health Club & Spa Main Entrance 23 m2

1 \

A 10

61

Key Plan

1

3.323

4.180

3.695

-3

F 15\ 13

159

158

11

159

F1

;2

15 \

store

F1 \ 15

L0 J

+4.70

L0 O +4.60

10

store

;3

;4

580 m2

;5

Main RESTAURANT

Elec. ROOM

;1

Receiving Area

staff restaurant

12

4

L0 O J +4.70

+4.60

;7

store

8

Purchasing

;6

pantry

9

12

3

;8

L0 O +4.60

L0 J +4.70

store

; 10

Lobby

;9

7 6

Accounting

12 1

; 11

L0 J +4.55

; 12

L0 O +4.45

; 13

5

; 14

4

3

2

1

Parking

ROAD - 17

ROAD

- 11

ROAD

-2

DISTRIBUTOR

ELECTRICAL

ROAD - 22

Security Room IT Room

‫روسلا‬

M5

M4

M5

M3

M2

M1

Qibla

Direction

TOILETS GENTLEMEN

BASIN

&

&

GENTLEMEN BASIN TOILETS

WOMEN TOILETS & BASIN

Geophysics CONSULTANT

ARC 302 2

ref:

Phase 2

ID 102

drawing number:

PERMIT DRAWING

verified:Sa.MOH.EMAD

drawn:ARC: GIHAD

approved:DR.TAMER

A1

ROAD - 11

ROAD

-9

10.719

11.057

11.715

ARC

010403

date: SEPTEMBER 2016

GROUND FLOOR PLAN

1:50

DR.TAMER ELGABALY

PAPER SIZE:

PROJECT NAME:

ARCHITECTURE

AL-HELAL GROUP

EGYPT - U.A.E - QATAR - K.S.A - SUDAN - ALGERIA

CROWN HOME CONSULTANTS Cairo - EGYPT 19 Fareed St. Heliopolis, P.O.Box : 137 Heliopolis Tel : +202-26901632 / 34 - Fax : +202-26901638 E-mail : cairoinfo@chcint.com

ELECTROMECHANICAL CONSULTANT

ROAD

DRAWING SIZE :

- 10

B A

C A

E02-

AR202

D A

ROAD - 24

ROAD - 20

ROAD - 16

ROAD - 23

ROAD - 19

ROAD - 15

45

ROAD

AR402

3.20

W01 AR402

A F

G A

- 25

AR402

W01

Qibla Direction 04 05 04

3.20

W02 AR402

06 04

ROAD - 12

ROAD - 10

E03-

05 04

ROAD

AR402

3.20

W01

W02

AR401

ARC 302

1

AR402

W02 AR402

W01 AR402

E01AR201

A-A ARC 301

AR402

W02

DR01-

04

AR402

3.20

03 04

_4

AR402

3.20

W01 AR402

02 04

-1

ROAD

ROAD

B A

C A E04AR204

D A

A F G A

01 04

DR01-

AR401


A

W01

01 04

02 04

03 04 ID 301

04

05 04

W01

06 04

W02

W01

A

B A

C A

D A

1 3

1 4

7

8

F5

F1

159

lo>K

15 \

yVtM :iVfhî

F4

F1 \ 15

plhL v{hG

159

1 \

A 10

16 \

F 18

plhL luhrdK

F7 \ 11

F3

A 10 1 \ 146

146

159

157

F 18\ 16

159

13 \

F 15

158

1 \

A 10

8 \

F3

F2

1 \

A 10

146

155

F 15\ 13

146

158

1

F 2\ 1

plhL sd]HJ

1

144

F 8\ 2

r'hU

F1

S 1

1

7

A 10 1 \ 146

1 \

A 10

146

8 \

F3

SHOP

j,qdpD

144

yvtM jyddv gb'thG

155

F 2\ 1

144

1

2

2

1 \

A 10

3

146

8

A 10 1 \ 146

1 3

1 \

A 10

F 3\ 8

SHOP

4

146

155

1 \

A 10

146

5

F 2\ 1

8 \

F3

F 2\ 1

144

155

144

15 \

F1

159

6

F 2\ 1

144

SHOP

SHOP

SHOP

SHOP

19

lfkD

laundry

3

20

i 10 i 11

i 12

i9

i8

i6

i5

i4

i2 i3

i1

i7

]1

21 21

SHOP

22

SHOP

23

24

4.619

25

26

4.857

4.816

SHOP

5 5

SHOP

28

29

4.157

4.611

3.370

3.639

4.611

27

lfkD lfkD

30

3.353

3.455

4.151

SHOP

31

2.899

33

SHOP

3.294

4.342

4.197

32

35

36

SHOP

2.605

3.310

SHOP

P

4.608

3.112

3.400

34

SHOP

4.560

37

38

CAFE

4.176

3.749

4.674

3.913

4.074

38

6.976

A 14 1 \ 146

A 14

1 \

146

A 14 1 \ 146

7.796

A 14

1 \

146

F5

10 \

156

A 14

1 \

146

F5

10 \

156

4.322

5.181

Parking

4.978

3.984

4.284

A 14 1 \ 146

1 \

A 14

10 \

F5

146

156

10 \

F5

156

F5

1 \

A 14

10 \

156

146

F 3\ 8

155

HgprhzF

yvtI

A 14 1 \ 146

HB]HvI

10 \

F5

156

SHOP

F 6\ 9

156

F6

9 \

156

F5 \ 10

9 \

F6

156

SHOP

156

F5 \ 10

9 \

F6

156

156

9 \

F6

156

F 6\ 9

156

F 6\ 9

10 \

F5

156

156

52

2 \

F8

144

53

1 \

A1

146

54

53

55

2 \

F8

144

>1

>2

>3

SHOP

56

10

57

146

8 \

F3

155

144

A 10 1 \ 146

1 \

F2

lfkD

>4

1 \

A 10

L0 O +4.60

L0 J +4.70

58

1 \

F2

144

59

1 \

A 10

8 \

F3

146

155

A 10 1 \ 146

LOULY PARK SHOP

+4.60 L0 O

L0 J +4.70

60

146

A 10

1 \

146

8 \

F3

62

155

8 \

F3

F2

155

1 \

144

Health Club & Spa Main Entrance 23 m2

1 \

A 10

61

L0 O +4.60

L0 J +4.70

lfkD

1 \

A 10

88.00 m2

146

SHOP 37-38 PAVAROTY CAFE

63

11

Key Plan

1

3.323

64

A 10

1 \

146

L0 J

155

1 \

F2

+1.20

F3

8 \

SHOP

L0 J +4.55

L0 O +4.45

69

12

65

O

144

A 10

1 \

146

12

F 3\ 8

1 \

A 10

155

F 2\ 1

146

144

1 \

A 10

12 2

146

144

T

74

p4

p3

6

A 10 1 \ 146

plhL luhrdK

F 2\ 1

67

p2

+4.60 L0 O

L0 J +4.70

73

+4.60

L0 O J +4.70

14

F 9\ 3

15 \ F 159 1

145

12 1

L0 J +4.55

+4.45 L0 O

159

yvtM jyddv gB'thG

F1 \ 15

1

security

+4.60 L0 O

L0 J +4.70

L0 J +4.70

+4.70

+4.60 L0 O

L0 J

+4.60 L0 O

12

2

;4

;3

; 1;

Main Kitchen

p6

lo>K

p5

13

Area 160.00 m2

administration

155

Lobby

72

p1

8 \

F3

CAFE

3

71

3 2

Lobby

F 2\ 1

PAVAROTY

66

70

lfkD

;4

;3

;2

;1

+4.60 L0 O

L0 J +4.70

L0 J +4.55 L0 +4.45

Conference Hall entrance

144

F 15\ 13

159

158

15 \

11

159

F1

;2

store

F1 \ 15

L0 J

+4.70

L0 O +4.60

10

store

;3

;4

580 m2

;5

Main RESTAURANT

Elec. ROOM

;1

Receiving Area

staff restaurant

12

4

L0 O J +4.70

+4.60

;6

pantry

9

store

;7

8

Purchasing

12

3

;8

+4.60 L0 O

L0 J +4.70

store

; 10

Lobby

;9

7 6

Accounting

12 1

; 11

L0 J +4.55

; 12

+4.45 L0 O

; 13

5

; 14

4

3

2

1

ROAD

- 11

ROAD

-2

Security Room IT Room

DISTRIBUTOR

ELECTRICAL

‫روسلا‬

M5

M4

M5

M3

M2

M1

Qibla

Direction

GENTLEMEN TOILETS

BASIN

&

&

GENTLEMEN BASIN TOILETS

WOMEN TOILETS & BASIN

Geophysics CONSULTANT

2

ref:

A1

ROAD - 11

ROAD

-9

10.719

11.057

11.715

ARC

010403

date: SEPTEMBER 2016

MEZANYNE FLOOR PLAN

Phase 2

ID 103

drawing number:

PERMIT DRAWING

verified:Sa.MOH.EMAD

drawn:ARC: GIHAD

approved:DR.TAMER

PROJECT NAME:

PAPER SIZE:

ARCHITECTURE

AL-HELAL GROUP

EGYPT - U.A.E - QATAR - K.S.A - SUDAN - ALGERIA

CROWN HOME CONSULTANTS Cairo - EGYPT 19 Fareed St. Heliopolis, P.O.Box : 137 Heliopolis Tel : +202-26901632 / 34 - Fax : +202-26901638 E-mail : cairoinfo@chcint.com

ROAD - 24

ROAD - 20

ROAD - 16

ROAD - 23

ROAD - 19

ROAD - 15

4.180

3.695

Parking

ROAD - 17

ELECTROMECHANICAL CONSULTANT

ROAD - 25

ROAD - 22

DR.TAMER ELGABALY

1:50

- 10

AR402

W01 AR402

A F

G A

ROAD

DRAWING SIZE :

ROAD

AR402

W02 AR402

06 04

- 25

ARC 302

AR402

05 04

ROAD

W01

ARC 302

1

3.20

AR402

AR402

W01

3.20

W01

04

AR402

A-A ID 301

-3

ROAD - 10

W02 AR402

03 04

_4

AR402

W01 AR402

W02 AR402

02 04

-1

ROAD

ROAD

B A

C A

D A

A F G A

01 04

46

ROAD - 12


A

2

01 04

02 04

8.95

03 04

9.85

ID 301

04

04

8.95

05 04

06 04

9.85

A

1 3

1 4

7

8

F5

lo>K

159

F1 \ 15

plhL v{hG

F1

15 \

yVtM :iVfhî

F4

159

F7 \ 11

1 \

A 10

16 \

F 18

plhL luhrdK

159

157

146

F3

A 10 1 \ 146

F 18\ 16

159

F 15

13 \

158

1 \

A 10

8 \

F3

F2

146

155

F 15\ 13

A 10

1 \

146

158

1

1

F 2\ 1

plhL sd]HJ

144

F 8\ 2

r'hU

F1

S 1

1

7

A 10 1 \ 146

1 \

A 10

146

8 \

F3

SHOP

j,qdpD

144

yvtM jyddv gb'thG

155

F 2\ 1

2

1

144

2

3

A 10

1 \

146

8

4

1 3

1 \

A 10

F 3\ 8

SHOP

A 10 1 \ 146

146

155

A 10

1 \

146

5

F 2\ 1

144

8 \

F3

F 2\ 1

155

144

F1

15 \

159

6

F 2\ 1

144

SHOP

SHOP

SHOP

SHOP

3

19

lfkD

laundry

20

i 10 i 11

i 12

i9

i8

i6

i5

i4

i2 i3

i1

21 21

i7

]1

SHOP

22

SHOP

23

24

25

4.619

26

5 5

4.180

4.857

4.816

SHOP

27

lfkD lfkD

SHOP

28

29

4.157

4.611

3.370

3.639

4.611

3.323

SHOP

30

3.455

4.151

3.353

31

32

4.197

33

SHOP

3.294

4.342

2.899

34

35

36

SHOP

2.605

3.310

SHOP

P

4.608

3.112

3.400

37

SHOP

4.560

38

38

CAFE

4.176

4.074

3.749

4.674

3.913

A 14 1 \ 146

A 14 1 \ 146

A 14

1 \

146

A 14 1 \ 146

7.796

A 14

1 \

146

F5

10 \

156

A 14

1 \

146

F5

10 \

156

4.322

5.181

Parking

4.978

3.984

4.284

6.976

F5

1 \

A 14

10 \

156

146

F5

10 \

156

F5

1 \

A 14

10 \

156

146

F 3\ 8

155

HgprhzF

yvtI

A 14 1 \ 146

HB]HvI

156

SHOP

F5

10 \

F 6\ 9

156

F6

9 \

156

F5 \ 10

9 \

F6

156

SHOP

156

F5 \ 10

156

F6

9 \

156

F6

9 \

156

F 6\ 9

156

F5

F 6\ 9

10 \

156

156

52

F8

2 \

144

53

1 \

A1

146

54

53

55

2 \

F8

144

>1

>2

>3

SHOP

56

10

57

A 10

146

8 \

F3

155

144

A 10 1 \ 146

1 \

F2

lfkD

>4

1 \

+4.60 L0 O

L0 J +4.70

58

F2

1 \

144

59

F3

1 \

A 10

8 \

146

155

+4.60 L0 O

L0 J +4.70

60

LOULY PARK SHOP

A 10 1 \ 146

146

A 10

1 \

146

8 \

F3

62

155

8 \

F3

F2

155

1 \

144

Health Club & Spa Main Entrance 23 m2

1 \

A 10

61

+4.60 L0 O

L0 J +4.70

lfkD

1 \

A 10

88.00 m2

146

SHOP 37-38 PAVAROTY CAFE

63

11

64

A 10

1 \

146

L0 J

155

1 \

F2

+1.20

F3

8 \

144

SHOP

L0 J +4.55

L0 O +4.45

69

12

65

O

144

A 10

1 \

146

12

F 3\ 8

1 \

A 10

155

F 2\ 1

146

144

1 \

A 10

12 2

146

144

T

74

p4

p3

6

A 10 1 \ 146

plhL luhrdK

F 2\ 1

67

p2

+4.60 L0 O

L0 J +4.70

73

+4.60

L0 O J +4.70

14

F 9\ 3

15 \ F 159 1

145

12 1

L0 J +4.55

+4.45 L0 O

159

yvtM jyddv gB'thG

F1 \ 15

1

security

+4.60 L0 O

L0 J +4.70

L0 J +4.70

+4.70

+4.60 L0 O

L0 J

+4.60 L0 O

12

2

;4

;3

; 1;

Main Kitchen

p6

lo>K

p5

13

Area 160.00 m2

administration

155

Lobby

72

p1

8 \

F3

CAFE

3

71

3 2

Lobby

F 2\ 1

PAVAROTY

66

70

lfkD

;4

;3

;2

;1

+4.60 L0 O

L0 J +4.70

L0 J +4.55 L0 +4.45

Conference Hall entrance

F 15\ 13

159

158

11

159

F1

;2

15 \

store

F1 \ 15

L0 J

+4.70

L0 O +4.60

10

store

;3

;4

580 m2

;5

Main RESTAURANT

Elec. ROOM

;1

Receiving Area

staff restaurant

12

4

L0 O J +4.70

+4.60

;6

pantry

9

store

;7

8

Purchasing

12

3

;8

L0 O +4.60

L0 J +4.70

store

; 10

Lobby

;9

7 6

Accounting

12 1

; 11

L0 J +4.55

; 12

+4.45 L0 O

; 13

5

; 14

4

3

2

1

ROAD

- 11

-2

DISTRIBUTOR

ELECTRICAL

ROAD - 22

Security Room IT Room

‫روسلا‬

M5

M4

M5

M3

M2

M1

Direction

GENTLEMEN TOILETS

BASIN

&

&

GENTLEMEN BASIN TOILETS

WOMEN TOILETS & BASIN

Geophysics CONSULTANT

ref:

ROAD - 11

ROAD

-9

10.719

11.057

11.715

ARC

010403

date: SEPTEMBER 2016

ROOF FLOOR PLAN

Phase 2

ID 104

drawing number:

PERMIT DRAWING

verified:Sa.MOH.EMAD

drawn:ARC: GIHAD

approved:DR.TAMER

PROJECT NAME:

A1

DR.TAMER ELGABALY

PAPER SIZE:

ARCHITECTURE

AL-HELAL GROUP

EGYPT - U.A.E - QATAR - K.S.A - SUDAN - ALGERIA

CROWN HOME CONSULTANTS Cairo - EGYPT 19 Fareed St. Heliopolis, P.O.Box : 137 Heliopolis Tel : +202-26901632 / 34 - Fax : +202-26901638 E-mail : cairoinfo@chcint.com

ROAD - 24

ROAD - 20

ROAD - 16

ROAD - 23

ROAD - 19

ROAD - 15

Key Plan

1

3.695

Parking

ROAD

Qibla

ELECTROMECHANICAL CONSULTANT

ROAD - 25

ROAD - 17

1:50

- 10

B A

C A

D A

A F

G A

ROAD

DRAWING SIZE :

ROAD

06 04

- 25

1 ARC 302

05 04

ROAD

9.85

A-A ID 301

-3

ROAD - 10

03 04

_4

9.85

02 04

-1

ROAD

ROAD

B A

C A

D A

A F G A

01 04

ROAD - 12

47

ARC 302


Key Plan 10.719

06 04

L0 J

11.057

11.715

+1.20

L0 J +4.55

1 4

L0 O +4.45

1

1

1

73

2

T L0 J

L0 O +4.60

72

3

1

4

1

74

6

S 1

2

2

L0 J +4.70

Main RESTAURANT

L0 O +4.60

71

4

L0 J +4.55 L0 O +4.45

L0 J +4.55

12 1

lfkD

12 1 3

L0 O +4.45

580 m2

1

70

5

12

3

L0 J +4.55 +4.45

L0

O L0 J +4.70

+4.60 L0 O

69

6 plhL sd]HJ

L0 O J +4.70

yvtM jyddv gb'thG

+4.60

plhL v{hG

F1

11

F3 F7 \ 11

p2

lfkD

64

157

plhL luhrdK

F4

p1

66

7

F2

1 3

12

05 04

12

04

+4.70

03 04

12

02 04

12

01 04

F 9\ 3

yVtM :iVfhî

3

p3

65

L0 J

145

+4.70

L0 O +4.60

67

63

F5

p4

8

F1

15 \

159

13 \

62

158

lo>K

PAVAROTY F1 \ 15

lo>K

p5

F 15

7

CAFE

p6

159

pantry yvtM jyddv gB'thG F1 \ 15

F 18\ 16

159

F 8\ 2

144

F 18 16 \

60

159 F 15\ 13

158

159

61 F 15\ 13

158

F1

SHOP

F1 \ 15

159

15 \

159

L0 J +4.70

59

8

L0 O +4.60

lfkD

10

146

A 10 1 \

146

F 2\ 1

L0 J +4.70

F 2\ 1

F 2\ 1

144

F 3\ 8

144

;1

155

155

A 10 1 \ 146

F3 8 \

F 2\ 1

15 \ F 159 1

plhL luhrdK

88.00 m2

L0 O +4.60

58

F3 8 \

144

Elec. ROOM

SHOP 37-38 PAVAROTY CAFE

SHOP A 10 1 \

155

144

A 10

57

1 \

146

F2 1 \

144

L0 J +4.70 L0 J +4.70

A 10

+4.60 L0 O

L0 O +4.60

1 \

146

;2

F3 8 \

SHOP

155

A 10

56

1 \

146

LOULY PARK SHOP

;3 F2

F 2\ 1

144

1 \

146

3

F3 8 \

A 10 1 \

144

55

A 10 1 \

lfkD

F3 8 \

155

;4

A 10

155

1 \

146

146

A 10

F3

53

54

8 \

1 \

155

;5

146

A 10 1 \

ROAD - 10

SHOP

A 10 1 \

;6

146

146

F2 1 \

F3

144

8 \

A 10 155

1 \

146

;7 A 10 1 \

r'hU

146

SHOP

j,qdpD

F 3\ 8

155

F 2\ 1

SHOP

144

Main Kitchen

A 10 1 \ 146

53

>1

F2 1 \

;8

A 10

144

1 \

146

;9

F3 8 \

SHOP

155

>2

52

; 10

SHOP

A 10 1 \ 146

A 10

F 2\ 1

A 10 1 \

>3

F8

SHOP

144

2 \

144

1 \

L0 J +4.70

146

L0 O +4.60

store

146

Health Club & Spa Main Entrance 23 m2

F8 2 \ A 10 1 \

146

144

F3 8 \

155

5 5

A 10 1 \

146

; 11

lfkD lfkD

Lobby HB]HvI

F 2\ 1

146

F1 15 \

159

21 21

144

SHOP

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

156

store

A1

38

F5

1 \

10 \

F 3\ 8

; 12

store

F5 10 \

A 10 1 \

146

; 13

>4

156

Lobby

155

L0 J +4.70

19

156

F5 \ 10 F5 \ 10

156

Lobby

156

10 \

156

HgprhzF

F 6\ 9

A 14 1 \ 146

F 6\ 9

F5 10 \

9 \ F6

146

F 6\ 9

A 14

SHOP

1 \

SHOP

9 \

F6

1 \

SHOP SHOP

9 \

F6 156 A 14

i5

156

156

F6

SHOP

i4

store

staff restaurant

F5

yvtI

]1

; 14

+4.60 L0 O

F5 10 \

i1 i2 i3

20

9 \

Conference Hall entrance

156

Accounting

156

156

156

156

146

Purchasing SHOP

SHOP

SHOP

CAFE

Receiving Area

i6

SHOP

1

F5 10 \

i7

156

2

F5 10 \

156

i8

A 14 1 \

146

A 14 1 \

i9

146

A 14 1 \ 146 A 14 1 \

5

security

146

A 14 1 \ 146

i 10 i 11

4

3

A 14 1 \ 146

i 12 ;1

7 6

; 1;

;2

8

2

administration

12

Area 160.00 m2

9

13

10

14

11

L0 O J +4.70

+4.60

;3

P

4.816

;3

;4

;4

3 2

1

4.157

4.619 4.151 4.857

laundry

ROAD

4.608

4.197 4.611

_4

3.455 3.294

4.611

4.560

4.180

4.074 3.112

3.695 3.639

4.342 4.284

3.323

3.913 3.353

3.400

3.370

7.796

4.674 6.976

5.181

3.749

ROAD - 23

3.984

4.176

2.605

ROAD - 22

3.310

2.899

4.322

ROAD

-3

ROAD - 24

4.978

Parking

ROAD

- 11 ROAD - 11

ROAD - 19

ROAD - 20

Paint "Recoarzo"

- 10

GRC DRUM MOULDING

ROAD

Paint "Recoarzo"

GRC MOULDED CAP

GRC HEXAGONAL SPIRES

SOLID BRASS CURVED FINAL

ROAD - 17

GRC HEXAGONAL SPIRES

ROAD - 12

GRC MOULDED CAP

ROAD - 25

ROAD - 25

HOLLOW TUBE STEAL

HOLLOW TUBE STEAL

ROAD - 16

ROAD - 15

Parking

ROAD -2

Security Room IT Room

ROAD

-9

ELECTRICAL

& BASIN

& BASIN

Qibla

Direction

GENTLEMEN TOILETS

GENTLEMEN TOILETS BASIN &

TOILETS WOMEN

ROAD

-1

DISTRIBUTOR

M1 M2

M5

‫روسلا‬

M3

M4

M5

D13 AR-D-702

GRC FINISH AS APPROVED SAMPLE

D6 AR-D-702

D7

D1

AR-D-702

D8

AR-D-702

D9

AR-D-703

TOP OF PARAPET

TOP OF PARAPET

+9.85 Roof

+9.85 Roof

+8.55

+8.55

D2

AR-D-702

D11

D10

AR-D-703

AR-D-703

D5

D4

AR-D-702

AR-D-702

D12

D3

AR-D-702

AR-D-702

AR-D-703

Ground Floor 3.20

Ground Floor 3.20

Entrance Level 2.00+

D14 AR-D-704

2.00+ 1

A

ELECTROMECHANICAL CONSULTANT

302

301

GRC MOULDED DADO

Granite

GRC MOULDED CALLIGRAPHY ON LARGE PISHTAQ

GRC

CROWN HOME CONSULTANTS Cairo - EGYPT 19 Fareed St. Heliopolis, P.O.Box : 137 Heliopolis Tel : +202-26901632 / 34 - Fax : +202-26901638 E-mail : cairoinfo@chcint.com

Granite

ELEVATION 01 01 04

GRC MOULDED CAP

02 04

03 04

GRC HEXAGONAL SPIRES Paint "Recoarzo"

04

EGYPT - U.A.E - QATAR - K.S.A - SUDAN - ALGERIA

05 04

AL-HELAL GROUP

06 04

Geophysics CONSULTANT

GRC MOULDED CAP

GRC HEXAGONAL SPIRES

SOLID BRASS CURVED FINAL

Paint "Recoarzo"

GRC DRUM MOULDING

HOLLOW TUBE STEAL

HOLLOW TUBE STEAL

PERMIT DRAWING GRC FINISH AS APPROVED SAMPLE

D6 AR-D-702

D7

D1

AR-D-702

D8

AR-D-702

D9

AR-D-703

TOP OF PARAPET

TOP OF PARAPET

+9.85 Roof

+9.85 Roof

+8.55

+8.55

ARCHITECTURE

ARC

drawing number:

drawn:ARC: GIHAD

ARC 201

verified:Sa.MOH.EMAD ref:

approved:DR.TAMER

010403 date: SEPTEMBER 2016

Phase 2

AR-D-702

D2

AR-D-702

PROJECT NAME:

ELEVATION 01,ELEVATION 01

A1

PAPER SIZE:

D4

AR-D-702

DRAWING SIZE : 1:100

D3

AR-D-702

Ground Floor 3.20

Ground Floor 3.20

Entrance Level 2.00+

D14 AR-D-704

2.00+

Granite

GRC MOULDED DADO

A

1

301

302

GRC MOULDED CALLIGRAPHY ON LARGE PISHTAQ

GRC

Granite

DR.TAMER ELGABALY

ELEVATION 01

Key Plan A

B A

10.719

L0 J

11.057

11.715

+1.20

L0 J +4.55

1 4

+4.45 L0 O

1

1

C A

1

73

2

T L0 J

L0 O +4.60

72

3

2

12

1

4

1

74

6

S 1

+4.70

D A

12

A F

12

G A

2

L0 J +4.70

Main RESTAURANT

+4.60 L0 O

71

4

L0 J +4.55 L0 O +4.45

L0 J +4.55

12 1

lfkD

12

70

5

12

1 3

+4.45 L0 O

580 m2

1

3

L0

L0 J +4.55 +4.45 O

L0 J +4.70

+4.60 L0 O

69

6 plhL sd]HJ

L0 O J +4.70

yvtM jyddv gb'thG

+4.60

plhL v{hG

F1

lfkD

157

12

11

F3 F7 \ 11

plhL luhrdK

F4

p1

66

7

F2

1 3

p2

64

F 9\ 3

yVtM :iVfhî

3

p3

65

L0 J

145

+4.70

+4.60 L0 O

67

63

F5

p4

8

F1

15 \

159

13 \

62

158

lo>K

PAVAROTY F1 \ 15

lo>K

p5

F 15

7

CAFE

p6

159

pantry yvtM jyddv gB'thG F1 \ 15

F 18\ 16

159

F 8\ 2

144

F 18 16 \

60

159 F 15\ 13

158

159

61 F 15\ 13

158

F1

SHOP

F1 \ 15

159

15 \

159

L0 J +4.70

59

8

+4.60 L0 O

lfkD

10

146

A 10 1 \ 146

F 2\ 1

L0 J +4.70

F 2\ 1

F 2\ 1

144

F 3\ 8

144

;1

155

155

A 10 1 \

F3 8 \

F 2\ 1

15 \ F 159 1

plhL luhrdK

88.00 m2

+4.60 L0 O

58

F3 8 \

144

Elec. ROOM

SHOP 37-38 PAVAROTY CAFE

SHOP A 10 1 \

144

146

155 A 10

57

1 \

146

F2 1 \

144

L0 J +4.70 L0 J +4.70

A 10

+4.60 L0 O

+4.60 L0 O

1 \

146

;2

F3 8 \

SHOP

155

A 10

56

1 \

146

LOULY PARK SHOP

;3 F2

F 2\ 1

1 \

144

146

3

F3 8 \

A 10 1 \

144

55

A 10 1 \

lfkD

F3 8 \

155

;4

A 10

155

1 \

146

146

A 10

F3

53

54

8 \

155

1 \

;5

146

A 10 1 \

ROAD - 10

SHOP

;6

146

A 10 1 \ 146

F2 1 \

F3

144

8 \

A 10 155

1 \

146

;7 A 10 1 \

r'hU

146

SHOP

j,qdpD

F 3\ 8

155

F 2\ 1

SHOP

144

A 10 1 \

53

>1

F2 1 \

Main Kitchen

146

;8

A 10

144

1 \

146

;9

F3 8 \

SHOP

155

>2

52

; 10

SHOP

A 10 1 \ 146

A 10

F 2\ 1

A 10 1 \

F8

SHOP

144

2 \

144

>3

1 \

L0 J +4.70

146

+4.60 L0 O

store

146

Health Club & Spa Main Entrance 23 m2

F8 2 \ A 10 1 \ 146

144

F3 8 \

155

5 5

A 10 1 \

146

; 11

lfkD lfkD

Lobby HB]HvI

F 2\ 1

146

F1 15 \

159

21 21

144

SHOP

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

156

store

A1

38

F5 10 \

F 3\ 8

; 12

store

F5 10 \

A 10 1 \

1 \

146

; 13

>4

156

Lobby

155

L0 J +4.70

19

156

F5 \ 10 F5 \ 10

156

Lobby

156

10 \

156

HgprhzF

F 6\ 9

A 14 1 \ 146

F 6\ 9

F5 10 \

1 \

SHOP

9 \ F6

146

F 6\ 9

A 14

SHOP

9 \

F6

1 \

SHOP SHOP

9 \

F6 156 A 14

i5

156

156

F6

SHOP

i4

store

staff restaurant

F5

yvtI

i2 i3 ]1

; 14

+4.60 L0 O

F5 10 \

i1 20

9 \

Conference Hall entrance

156

Accounting

156

156

156

156

146

Purchasing SHOP

SHOP

SHOP

CAFE

Receiving Area

i6

SHOP

F5 10 \

i7

156

2

F5 10 \

i8

156 A 14 1 \

146

A 14 1 \

i9

146

A 14 1 \ 146 A 14 1 \

5

security

146

A 14 1 \ 146

i 10 i 11

4

1

3

A 14 1 \ 146

i 12 ;1

7 6

; 1;

;2

8

2

administration

12

Area 160.00 m2

9

13

10

14

11

L0 O J +4.70

+4.60

;3

P

4.816

;3

;4

;4

3 2

1

4.157

4.619 4.151 4.857

laundry

ROAD

4.608

4.197 4.611

_4

3.455 3.294

4.611

4.560

4.180

4.074 3.112

3.695 3.639

4.342 4.284

3.323

3.913 3.353

3.400

3.310

2.605

4.176

3.984

7.796

4.674 6.976

5.181

4.322

4.978

-3

GRC MOULDED CAP Parking

ROAD

ROAD

- 11

ROAD - 17

ROAD - 11

ROAD - 20

ROAD - 12

Paint "Recoarzo"

ROAD - 19

GRC HEXAGONAL SPIRES

SOLID BRASS CURVED FINAL

ROAD - 24

3.749

GRC HEXAGONAL SPIRES

ROAD - 23

2.899

ROAD - 22

3.370

GRC MOULDED CAP

Paint "Recoarzo"

GRC DRUM MOULDING

ROAD - 10

ROAD - 25

HOLLOW TUBE STEAL

ROAD - 25

ROAD - 16

Parking

ROAD - 15

HOLLOW TUBE STEAL

ROAD -2

Security Room IT Room

ROAD

-9

ELECTRICAL

& BASIN

&

GENTLEMEN TOILETS

BASIN

Qibla

Direction

GENTLEMEN TOILETS BASIN &

TOILETS WOMEN

ROAD

-1

DISTRIBUTOR

M1 M2 M5

‫روسلا‬

M3

M4 M5

GRC FINISH AS APPROVED SAMPLE

D6 AR-D-702

D7

D1

AR-D-702

TOP OF PARAPET

D8

AR-D-702

D9

AR-D-703

TOP OF PARAPET

+9.85 Roof

+9.85 Roof

+8.55

+8.55

AR-D-702

D2

AR-D-702

D11

D10

AR-D-703

AR-D-703

D5

D4

AR-D-702

AR-D-702

D12

D3

AR-D-702

D14

AR-D-704

AR-D-703

Ground Floor 3.20

Ground Floor 3.20

Entrance Level 2.00+

2.00+

Granite

GRC MOULDED DADO

GRC MOULDED CALLIGRAPHY ON LARGE PISHTAQ

GRC

ELECTROMECHANICAL CONSULTANT

Granite

CROWN HOME CONSULTANTS Cairo - EGYPT 19 Fareed St. Heliopolis, P.O.Box : 137 Heliopolis Tel : +202-26901632 / 34 - Fax : +202-26901638 E-mail : cairoinfo@chcint.com

ELEVATION 02

EGYPT - U.A.E - QATAR - K.S.A - SUDAN - ALGERIA

AL-HELAL GROUP G A

GRC MOULDED CAP

A F

D A

GRC HEXAGONAL SPIRES Paint "Recoarzo"

C A

A

B A

GRC HEXAGONAL SPIRES

SOLID BRASS CURVED FINAL

Geophysics CONSULTANT

GRC MOULDED CAP

Paint "Recoarzo"

GRC DRUM MOULDING

HOLLOW TUBE STEAL

HOLLOW TUBE STEAL

PERMIT DRAWING drawn:ARC: GIHAD

GRC FINISH AS APPROVED SAMPLE

D6 AR-D-702

approved:DR.TAMER

D7

D8

AR-D-702

D9

ARC 202 ref:

Phase 2

TOP OF PARAPET

TOP OF PARAPET

+9.85 Roof

+9.85 Roof

+8.55

+8.55

AR-D-702

D2 AR-D-702

PROJECT NAME:ELEVATION 02,ELEVATION 02

A1

PAPER SIZE: D5

D4

AR-D-702

AR-D-702

D14

AR-D-704

DRAWING SIZE :

Ground Floor 3.20

1:100

Ground Floor 3.20

Entrance Level 2.00+

2.00+

Granite

48

ARC

010403 date: SEPTEMBER 2016

D1

AR-D-702

AR-D-703

ARCHITECTURE

drawing number:

verified:Sa.MOH.EMAD

GRC MOULDED DADO

GRC MOULDED CALLIGRAPHY ON LARGE PISHTAQ

GRC

Granite

DR.TAMER ELGABALY

ELEVATION 02


Key Plan 10.719

L0 J

11.057

11.715

+1.20

L0 J +4.55

1 4

L0 O +4.45

12

1

74

6

1

S 1

73

T L0 J

L0 O +4.60

72

3

2

12

1

+4.70

2

4

12

1

1

2

L0 J +4.70

Main RESTAURANT

L0 O +4.60

71

4

L0 J +4.55 L0 O +4.45

L0 J +4.55

12 1

lfkD

12

70

5

12

1 3

L0 O +4.45

580 m2

1

3

L0

L0 J +4.55 +4.45

O L0 J +4.70

+4.60 L0 O

69

6 plhL sd]HJ

L0 O J +4.70

yvtM jyddv gb'thG

+4.60

plhL v{hG

F1

12

p2

lfkD

11

F3 F7 \ 11

64

157

plhL luhrdK

F4

p1

66

7

F2

1 3

F 9\ 3

yVtM :iVfhî

3

p3

65

L0 J

145

+4.70

L0 O +4.60

67

63

F5

p4

8

F1

15 \

159

13 \

62

158

lo>K

PAVAROTY F1 \ 15

lo>K

p5

F 15

7

CAFE

p6

159

pantry yvtM jyddv gB'thG F1 \ 15

F 18\ 16

159

F 8\ 2

144

F 18 16 \

60

159 F 15\ 13

158

159

61 F 15\ 13

158

F1

SHOP

F1 \ 15

159

15 \

159

L0 J +4.70

59

8

L0 O +4.60

lfkD

10

146

A 10 1 \

146

F 2\ 1

L0 J +4.70

F 2\ 1

F 2\ 1

144

F 3\ 8

144

;1

155

155

A 10 1 \ 146

F3 8 \

F 2\ 1

15 \ F 159 1

plhL luhrdK

88.00 m2

L0 O +4.60

58

F3 8 \

144

Elec. ROOM

SHOP 37-38 PAVAROTY CAFE

SHOP A 10 1 \

155

144

A 10

57

1 \

146

F2 1 \

144

L0 J +4.70 L0 J +4.70

A 10

+4.60 L0 O

L0 O +4.60

1 \

146

;2

F3 8 \

SHOP

155

A 10

56

1 \

146

LOULY PARK SHOP

;3 F2

F 2\ 1

144

1 \

146

lfkD

3

F3 8 \

A 10 1 \

144

55

A 10 1 \

F3 8 \

155

;4

A 10

155

1 \

146

146

A 10

F3

53

54

8 \

1 \

155

;5

146

A 10 1 \

ROAD - 10

SHOP

A 10 1 \

;6

146

146

F2 1 \

F3

144

8 \

A 10 155

1 \

146

;7 A 10 1 \

r'hU

146

SHOP

j,qdpD

F 3\ 8

155

F 2\ 1

SHOP

144

Main Kitchen

A 10 1 \ 146

53

>1

F2 1 \

;8

A 10

144

1 \

146

;9

F3 8 \

SHOP

155

>2

52

; 10

SHOP

A 10 1 \ 146

A 10

F 2\ 1

A 10 1 \

>3

F8

SHOP

144

2 \

144

1 \

L0 J +4.70

146

L0 O +4.60

store

146

Health Club & Spa Main Entrance 23 m2

F8 2 \ A 10 1 \

146

144

F3 8 \

155

5 5

A 10 1 \

146

; 11

lfkD lfkD

Lobby HB]HvI

F 2\ 1

146

21 21

144

F1 15 \

SHOP

159

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

156

store

A1

38

F5 10 \

F 3\ 8

; 12

store

F5 10 \

A 10 1 \

1 \

146

; 13

>4

156

Lobby

155

L0 J +4.70

19

156

F5 \ 10 F5 \ 10

156

Lobby

156

10 \

156

HgprhzF

F 6\ 9

A 14 1 \ 146

F 6\ 9

F5 10 \

1 \

SHOP

9 \

F6 9 \

A 14

F6

146

F 6\ 9

A 14

SHOP

9 \

F6 156

1 \

SHOP SHOP

i5

156

156

F6

SHOP

i4

store

staff restaurant

F5

yvtI

]1

; 14

+4.60 L0 O

F5 10 \

i1 i2 i3

20

9 \

Conference Hall entrance

156

Accounting

156

156

156

156

146

Purchasing SHOP

SHOP

SHOP

CAFE

Receiving Area SHOP

i6

F5 10 \

i7

156

2

F5 10 \

156

i8

A 14 1 \

146

A 14 1 \

i9

146

A 14 1 \ 146 A 14 1 \

5

security

146

A 14 1 \ 146

i 10 i 11

4

1

3

A 14 1 \ 146

i 12 ;1

7 6

; 1;

;2

8

2

administration

12

Area 160.00 m2

9

13

10

14

11

L0 O J +4.70

+4.60

;3

P

4.816

;3

;4

;4

3 2

1

4.157

4.619 4.151 4.857

laundry

ROAD

4.608

4.197 4.611

_4

tresta marbel

3.455 3.294

4.611

4.560

4.180

4.074 3.112

3.695 3.639

4.342 4.284

3.323

3.913 3.353

3.400

3.370

7.796

4.674 6.976

5.181

3.749

ROAD - 23

3.984

4.176

2.605

ROAD - 22

3.310

2.899

4.322

ROAD

-3

ROAD - 24

4.978

Parking

ROAD

- 11

ROAD - 19

ROAD - 20

ROAD - 12

ROAD - 17

ROAD - 11

ROAD

3cm Cement mortar

- 10

ROAD - 25

DETAIL 4 1:5

ROAD - 16

ROAD - 15

ROAD - 25

wall

ROAD -2

Security Room IT Room

ROAD

-9

ELECTRICAL

& BASIN

Direction

&

GENTLEMEN TOILETS

GENTLEMEN TOILETS BASIN &

TOILETS WOMEN

ROAD

-1

DISTRIBUTOR

BASIN

Qibla

4

Parking

M1 M2 M3

M5

‫روسلا‬

M4

M5

5

DETAIL 5 1:10

3

DETAIL 3 1:10

D1 1

SOLID BRASS CURVED FINAL

DETAIL 1 1:10

GRC DRUM MOULDING

ELECTROMECHANICAL CONSULTANT

7

CROWN HOME CONSULTANTS Cairo - EGYPT 19 Fareed St. Heliopolis, P.O.Box : 137 Heliopolis Tel : +202-26901632 / 34 - Fax : +202-26901638 E-mail : cairoinfo@chcint.com

DETAIL7 1:10

EGYPT - U.A.E - QATAR - K.S.A - SUDAN - ALGERIA

GRC FINISH AS APPROVED SAMPLE

AL-HELAL GROUP Geophysics CONSULTANT

6

DETAIL6 1:10

PERMIT DRAWING

ARCHITECTURE

ARC

drawing number:

drawn:ARC: GIHAD

AR-D- 702

verified:Sa.MOH.EMAD ref:

approved:DR.TAMER

010403 date: SEPTEMBER 2016

Phase 2

PROJECT NAME: ELEVATION DETAILS

A1

PAPER SIZE: DRAWING SIZE :

DETAIL 1/13 1:25 13

DETAIL 13 1:50

2

D8 8

DETAIL 2 1:10

DETAIL8 1:10

DR.TAMER ELGABALY

Key Plan 10.719

L0 J

11.057

11.715

+1.20

L0 J +4.55

1 4

L0 O +4.45

12

1

74

6

1

S 1

73

T L0 J

L0 O +4.60

72

3

2

12

1

+4.70

2

4

12

1

1

2

L0 J +4.70

Main RESTAURANT

L0 O +4.60

71

4

L0 J +4.55 L0 O +4.45

L0 J +4.55

12 1

lfkD

12

70

5

12

1 3

L0 O +4.45

580 m2

1

3

L0

L0 J +4.55 +4.45

O L0 J +4.70 L0 O +4.60

69

6 plhL sd]HJ

L0 O J +4.70

yvtM jyddv gb'thG

+4.60

plhL v{hG

F1

66

11

F3 F7 \ 11

lfkD

157

plhL luhrdK

F4

p1 12

7

F2

1 3

p2 64

65

F 9\ 3

yVtM :iVfhî

3

p3 L0 J

145

+4.70

L0 O +4.60

67

63

F5

p4

8

F1

15 \

159

13 \

62

158

lo>K

PAVAROTY F1 \ 15

lo>K

p5

F 15

7

CAFE

p6

159

pantry yvtM jyddv gB'thG F1 \ 15

F 18\ 16

159

F 8\ 2

144

F 18 16 \

60

159 F 15\ 13

158

159

61 F 15\ 13

F 2\ 1

L0 J +4.70

F 2\ 1

F 2\ 1

144

F 3\ 8

144

159

15 \

159

;1

155 F3

155

8 \

F 2\ 1

15 \ F 159 1

plhL luhrdK

88.00 m2

L0 O +4.60

58

F3 8 \

144

Elec. ROOM

SHOP 37-38 PAVAROTY CAFE

lfkD

10

146

A 10 1 \ 146

F1 \ 15

L0 O +4.60

SHOP A 10 1 \

158

F1

SHOP L0 J +4.70

59

8

144

A 10 1 \ 146 155 A 10

57

1 \

146

F2 1 \

144

L0 J +4.70 L0 J +4.70

A 10

L0 O +4.60

L0 O +4.60

1 \

146

;2

F3 8 \

SHOP

A 10

155

56

1 \

146

LOULY PARK SHOP

;3 F2

F 2\ 1

1 \

144

146

3

F3 A 10 1 \

8 \

144

55

A 10 1 \

lfkD

F3 8 \

;4

A 10

155

155

1 \

146

146

F3

53

54

8 \

A 10 155

1 \

;5

146

A 10 1 \

ROAD - 10

SHOP

;6

146

A 10 1 \ 146

F2 1 \

F3

144

8 \

A 10 155

1 \

146

;7 A 10 1 \

r'hU

146

SHOP

j,qdpD

F 3\ 8

155

F 2\ 1

SHOP

144

Main Kitchen

A 10 1 \ 146

53

>1

F2 1 \

;8

A 10

144

1 \

146

;9

F3 8 \

SHOP

155

>2

52

; 10

SHOP

A 10 1 \ 146

A 10

F 2\ 1

A 10 1 \

F8

SHOP

144

2 \

144

>3

1 \

L0 J +4.70

146

L0 O +4.60

store

146

Health Club & Spa Main Entrance 23 m2

F8 2 \ A 10 1 \ 146

144

F3 8 \

155

5 5

A 10 1 \

146

; 11

lfkD lfkD

Lobby HB]HvI

F 2\ 1

146

F1 15 \

159

21 21

144

SHOP

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

156

store

A1

38

F5 10 \

F 3\ 8

; 12

store

F5 10 \

A 10 1 \

1 \

146

; 13

>4

156

Lobby

155

L0 J +4.70

19

156

F5 \ 10 F5 \ 10

156

Lobby

156

10 \

156

HgprhzF

F 6\ 9

A 14 1 \ 146

F 6\ 9

F5 10 \

1 \

SHOP

9 \ F6

146

F 6\ 9

A 14

SHOP

9 \

F6

1 \

SHOP SHOP

9 \

F6 156 A 14

i5

156

156

F6

SHOP

i4

store

staff restaurant

F5

yvtI

i2 i3

]1

; 14

L0 O +4.60

F5 10 \

i1

20

9 \

Conference Hall entrance

156

Accounting

156

156

156

156

146

Purchasing SHOP

SHOP

SHOP

CAFE

Receiving Area

i6

SHOP

F5 10 \

i7

156

2

F5 10 \

i8

156 A 14 1 \

146

A 14 1 \

i9

146

A 14 1 \ 146 A 14 1 \

5

security

146

A 14 1 \ 146

i 10 i 11

4

1

3

A 14 1 \ 146

i 12 ;1

7 6

; 1;

;2

8

2

administration

12

Area 160.00 m2

9

13

10

14

11

L0 O J +4.70

+4.60

;3

P

4.816

;3

;4

;4

3 2

1

4.157

4.619 4.151 4.857

laundry

ROAD

4.608

4.197 4.611

_4

3.455 3.294

4.611

4.560

4.180

4.074 3.112

3.695 3.639

4.342 4.284

3.323

3.913 3.353

3.400

3.310

2.605

4.176

3.984

7.796

4.674 6.976

5.181

4.322

4.978

-3

ROAD - 24

3.749

ROAD - 23

2.899

ROAD - 22

3.370

Parking

ROAD

ROAD

- 11

ROAD - 20

ROAD - 19

ROAD - 17

ROAD - 11

ROAD - 12

ROAD - 10

ROAD - 25 ROAD - 16

ROAD - 15

Parking

ROAD - 25

ROAD -2

Security Room IT Room

ROAD

-9

ELECTRICAL

-1

DISTRIBUTOR

& BASIN

&

GENTLEMEN TOILETS

BASIN

Qibla

Direction

GENTLEMEN TOILETS BASIN &

TOILETS WOMEN

ROAD

13

--------

M1 M2

M5

‫روسلا‬

M3

M4

M5

DETAIL DETAIL 1 1

DETAIL DETAIL 22

ELECTROMECHANICAL CONSULTANT CROWN HOME CONSULTANTS Cairo - EGYPT 19 Fareed St. Heliopolis, P.O.Box : 137 Heliopolis Tel : +202-26901632 / 34 - Fax : +202-26901638 E-mail : cairoinfo@chcint.com EGYPT - U.A.E - QATAR - K.S.A - SUDAN - ALGERIA

AL-HELAL GROUP Geophysics CONSULTANT

PERMIT DRAWING

ref:

PROJECT NAME:

PAPER SIZE:

DETAIL DETAIL 3 3

ARC

AR-D-704

verified:Sa.MOH.EMAD approved:DR.TAMER

ARCHITECTURE

drawing number:

drawn:ARC: GIHAD

DRAWING SIZE :

010403

Phase 2

date: SEPTEMBER 2016

FLOWER BOX DETAILS

A1 1:20

DETAIL 4

49

DR.TAMER ELGABALY


Key Plan E 3

10.719

11.057

11.715

ARC 702 L0 J

+1.20

1

L0 J

4

L0 O +4.55 +4.45

12 4

12

74

6

S

T

1 2

73

L0 J +4.70

+4.60 L0 O

72

3

2

1 2

12

L0 J +4.70

4

Main RESTAURANT

+4.60 L0 O

71

L0 J

+4.55 +4.45 L0 O

L0 J +4.55

+4.45 L0 O

580 m2

1

lfkD

12 3

3

5

70

12

1

12 1

1

1

1

1

1

+4.55 L0 J O +4.45 L0 J +4.70 L0 O +4.60

69

6 plhL sd]HJ

L0 J +4.70

+4.60 L0 O

yvtM jyddv gb'thG

plhL v{hG

F1

11

lfkD

3

157

12

3

1

p1

66

7

F2 F3 F7

plhL luhrdK 11 \

p2 65

64

p3 F9

F4

3 \

F5

159

p4

F 15 13 \

62

158

L0 J

+4.70

67

8

F1

15 \

145

L0 O +4.60

63 yVtM :iVfhî

7

p5 lo>K

CAFE

PAVAROTY

p6

pantry F1

159

15 \

159

2 \

60

159 F 15\ 13

158

159

61

144

F 18 16 \

13 \ F 158 15

F1

F 18\ 16

F8

F1

yvtM jyddv gB'thG

15 \

lo>K

A 10

F2 1 \

SHOP 37-38 CAFE PAVAROTY 88.00 m2

L0 J +4.70

lfkD

+4.60 L0 O

58

1 \

F2

A 10 1 \

146

F 3\ 8

159

15 \

159

F1 144

15 \

Elec. ROOM

159

plhL luhrdK

F2

10

146

15 \

+4.60 L0 O

SHOP

1 \

F1

SHOP L0 J +4.70

59

8

1 \

155

;1

144

F3

144

8 \

155

A 10 1 \

155

146

F2

8 3\ F

1 \

57

144

A 10 1 \

F 2\ 1

146

144

L0 J +4.70

+4.60 L0 O

A 10

+4.70 L0 +4.60 J O F3

1 \ 8 \

155

146

;2

A 10

56

SHOP

1 \

146

;3

LOULY PARK SHOP F2

F2 144

1 \

55

lfkD

3

F3 8 \

155

8 \

144

155 1 \

F3

146

A 10

146

A 10 1 \

F3

1 \ A 10 1 \

54

8 \

A 10 1 \

;4

146

;5

146

155

A 10

53

1 \

ROAD - 10

SHOP

;6

146

146

F2

A 10 1 \

1 \

F3

144

A 10

8 \

155

A 10 1 \

146

1 \

146

A 10

;7

1 \

146

SHOP F3

j,qdpD

8 \

155

F 2\ 1

SHOP

144

A 10

r'hU

1 \

53

52

1 \

144

Main Kitchen

;9

; 10 A 10

>3

F8

144

2 \

146

A 10 1 \

L0 J +4.70

146

L0 O +4.60

144

144

F3 8 \

155

lfkD lfkD

5

A 10 1 \

; 11

Lobby HB]HvI

146

F5

146

store

Health Club & Spa Main Entrance 23 m2

F8 2 \

A 10 1 \

;8

155

>2 1 \

F 2\ 1

146

146

F2

>1 F 3\ 8

SHOP SHOP SHOP A 10 1 \

10 \

F1

21

21

144

SHOP

159

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

store

A1

38

10 \

F3

15 \

F5

F 2\ 1

146

8 \

; 12

store

156

A 10 1 \

1 \

146

; 13

>4

156

Lobby

155

L0 J +4.70

156

F5 \ 10 F5

10 \

10 \

156

Lobby

F6

A 14 1 \

146

F6 F6 F5

10 \

156

9 \

A 14

F 6\ 9 1 \

F 6\ 9

146

9 \

9 \

9 \

156

156

Conference Hall entrance

156

156

Accounting

156

156

F6

SHOP

store

staff restaurant

156

HgprhzF SHOP

i3 i4 i5

F6

10 \

yvtI

]1

156

F5

i1 i2

20

; 14

+4.60 L0 O

F5

19

9 \

A 14

SHOP

SHOP

1 \

SHOP SHOP

SHOP

SHOP

156

Purchasing

146

CAFE

Receiving Area

i6

SHOP

F5 10 \

F5

i7

10 \

2

156

156

i8 1 \

146

146

146

A 14 1 \

A 14 1 \

i 10 i 11

A 14 1 \

5

security

146

146

4

146

i 12 ;1

7

;1

;2

12

9

13

14

10 11

L0 J +4.70 L0 O +4.60

P

6

8

;2

administration Area 160.00 m2

;3

4.816

1

3

A 14 1 \ A 14 1 \

A 14

i9

;3

;4

;4

3 2

1

4.157

4.619

4.151 4.857

laundry

ROAD

4.608

4.197 4.611

_4

3.455

3.294

4.611

4.560

4.180

4.074 3.112

3.695 3.639

4.342 4.284

3.323

3.913

3.353 3.400

3.370

7.796

4.674 6.976

5.181

3.749

ROAD - 23

3.984

4.176

2.605

ROAD - 22

3.310

2.899

4.322

ROAD

-3

ROAD - 24

4.978

Parking

ROAD

- 11

ROAD - 19

ROAD - 20

ROAD - 12

ROAD - 17

ROAD - 11

ROAD - 10

ROAD - 25 ROAD - 15

ROAD - 16

Parking

ROAD - 25

ROAD -2

Security Room IT Room

ROAD

-9

ELECTRICAL

& BASIN

& TOILETS BASIN

Qibla

Direction

GENTLEMEN

GENTLEMEN TOILETS

WOMEN TOILETS BASIN &

ROAD

-1

DISTRIBUTOR

M1 M2 M5

‫روسلا‬

M3

M4 M5

E 2

ARC 702

E 4

ARC 702 ARC 702

E1

LAYOUT ELECTROMECHANICAL CONSULTANT CROWN HOME CONSULTANTS Cairo - EGYPT 19 Fareed St. Heliopolis, P.O.Box : 137 Heliopolis Tel : +202-26901632 / 34 - Fax : +202-26901638 E-mail : cairoinfo@chcint.com EGYPT - U.A.E - QATAR - K.S.A - SUDAN - ALGERIA

AL-HELAL GROUP Geophysics CONSULTANT

ELEVATION 1

ELEVATION 3

PERMIT DRAWING

ARCHITECTURE

verified:Sa.MOH.EMAD

AR-D-701

010403

Phase 2

date: SEPTEMBER 2016

ref:

approved:DR.TAMER

PROJECT NAME:

ELEVATION 2

ARC

drawing number:

drawn:ARC: GIHAD

WOODEN DETAILS

A1

PAPER SIZE: DRAWING SIZE :

DR.TAMER ELGABALY

ELEVATION 2

Key Plan

D1/11

A

A

10.719

L0 J

11.057

11.715

+1.20

L0 J +4.55

1 4

L0 O +4.45

12

1

74

6

1

S 1

73

T L0 J

L0 O +4.60

72

3

2

12

1

+4.70

2

4

12

1

1

2

L0 J +4.70

Main RESTAURANT

+4.60 L0 O

71

4

L0 J +4.55 L0 O +4.45

L0 J +4.55

12 1

lfkD

12

70

5

12

1 3

+4.45 L0 O

580 m2

1

3

L0

L0 J +4.55 +4.45

O L0 J +4.70

+4.60 L0 O

69

6 plhL sd]HJ

L0 O J +4.70

yvtM jyddv gb'thG

+4.60

plhL v{hG

F1

lfkD

157

12

11

F3 F7 \ 11

plhL luhrdK

F4

p1

66

7

F2

1 3

p2

64

F 9\ 3

yVtM :iVfhî

3

p3

65

L0 J

145

+4.70

L0 O +4.60

67

63

F5

p4

8

F1

15 \

159

13 \

62

158

lo>K

PAVAROTY F1 \ 15

lo>K

p5

F 15

7

CAFE

p6

159

pantry yvtM jyddv gB'thG F1 \ 15

F 18\ 16

159

F 8\ 2

144

F 18 16 \

60

159 F 15\ 13

158

159

61 F 15\ 13

158

F1

SHOP

F1 \ 15

159

15 \

159

L0 J +4.70

59

8

L0 O +4.60

lfkD

10

146

A 10 1 \

146

F 2\ 1

L0 J +4.70

F 2\ 1

F 2\ 1

144

F 3\ 8

144

;1

155

155

A 10 1 \ 146

F3 8 \

F 2\ 1

15 \ F 159 1

plhL luhrdK

88.00 m2

+4.60 L0 O

58

F3 8 \

144

Elec. ROOM

SHOP 37-38 PAVAROTY CAFE

SHOP A 10 1 \

144

155 A 10

57

1 \

146

F2 1 \

144

L0 J +4.70 L0 J +4.70

A 10

+4.60 L0 O

L0 O +4.60

1 \

146

;2

F3 8 \

SHOP

155

A 10

56

1 \

146

LOULY PARK SHOP

;3 F2

F 2\ 1

1 \

144

146

3

F3 8 \

A 10 1 \

144

55

A 10 1 \

lfkD

F3 8 \

155

;4

A 10

155

1 \

146

146

A 10

F3

53

54

8 \

155

1 \

;5

146

A 10 1 \

ROAD - 10

SHOP

A 10 1 \

;6

146

146

F2 1 \

F3

144

8 \

A 10 155

1 \

146

;7 A 10 1 \

r'hU

146

SHOP

j,qdpD

F 3\ 8

155

F 2\ 1

SHOP

144

Main Kitchen

A 10 1 \ 146

53

>1

F2 1 \

;8

A 10

144

1 \

146

;9

F3 8 \

SHOP

155

>2

52

; 10

SHOP

A 10 1 \ 146

A 10

F 2\ 1

A 10 1 \

F8

SHOP

144

2 \

144

>3

1 \

L0 J +4.70

146

L0 O +4.60

store

146

Health Club & Spa Main Entrance 23 m2

F8 2 \ A 10 1 \

146

144

F3 8 \

155

5 5

A 10 1 \

146

; 11

lfkD lfkD

Lobby HB]HvI

F 2\ 1

146

F1 15 \

159

21 21

144

SHOP

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

156

store

A1

38

F5 10 \

F 3\ 8

; 12

store

F5 10 \

A 10 1 \

1 \

146

; 13

>4

156

Lobby

155

L0 J +4.70

19

156

F5 \ 10 F5 \ 10

156

Lobby

156

10 \

156

HgprhzF

F 6\ 9

A 14 1 \ 146

F 6\ 9

F5 10 \

1 \

SHOP

1 \

SHOP

9 \ F6

146

F 6\ 9

A 14

SHOP

SHOP

9 \

F6 F6

156 A 14

i5

156

156

F6

SHOP

i4

store

staff restaurant

F5

yvtI

]1

; 14

+4.60 L0 O

F5 10 \

i1 i2 i3

20

9 \

9 \

Conference Hall entrance

156

Accounting

156

156

156

156

146

Purchasing SHOP

SHOP

SHOP

CAFE

Receiving Area

i6

SHOP

F5 10 \

i7

156

2

F5 10 \

i8

156 A 14 1 \

146

A 14 1 \

i9

146

A 14 1 \ 146 A 14 1 \

5

security

146

A 14 1 \ 146

i 10 i 11

4

1

3

A 14 1 \ 146

i 12 ;1

7 6

; 1;

;2

8

2

administration

12

Area 160.00 m2

9

13

10

14

11

L0 O J +4.70

+4.60

;3

P

4.816

;3

;4

;4

3 2

1

4.157

4.619 4.151 4.857

laundry

ROAD

4.608

4.197 4.611

_4

3.455 3.294

4.611

4.560

4.180

4.074 3.112

3.695 3.639

4.342 4.284

3.323

3.913 3.353

3.400

3.310

2.605

4.176

3.984

7.796

4.674 6.976

5.181

4.322

4.978

Parking

ROAD

-3

ROAD - 24

3.749

ROAD - 23

2.899

ROAD - 22

3.370

ROAD

- 11

ROAD - 19

ROAD - 20

ROAD - 12

ROAD - 17

ROAD - 11

ROAD - 10

ROAD - 25

ROAD - 25

ROAD - 16

ROAD - 15

Parking

ROAD -2

A

OUT

Security Room IT Room

ROAD

-9

ELECTRICAL

& BASIN

&

GENTLEMEN TOILETS

GENTLEMEN TOILETS BASIN &

TOILETS WOMEN

ROAD

-1

DISTRIBUTOR

Direction

IN

BASIN

Qibla

B

B

M1 M2

M5

‫روسلا‬

M3

M4

M5

SECTION A-A

IN

B

B ELECTROMECHANICAL CONSULTANT CROWN HOME CONSULTANTS Cairo - EGYPT 19 Fareed St. Heliopolis, P.O.Box : 137 Heliopolis Tel : +202-26901632 / 34 - Fax : +202-26901638 E-mail : cairoinfo@chcint.com

OUT

EGYPT - U.A.E - QATAR - K.S.A - SUDAN - ALGERIA

PLAN B-B

AL-HELAL GROUP Geophysics CONSULTANT

DETAIL 1/11

DETAIL 11 1:10

D11

1:2 D1/12

A

SECTION A-A IN

A

OUT

PERMIT DRAWING drawn:ARC: GIHAD

B

B

OUT

A IN

STRUCTURAL OPENING number OPEN. TYPE WIDTH

HEIGHT

2.1

3.4

2

IN

SECTION A-A

HINGED

approved:DR.TAMER

OUT

50

DETAIL 13 1:10

DETAIL 1/13 1:2

PLAN B-B

ARC

010403

AR-401 ref:

Phase 2

date: SEPTEMBER 2016

PROJECT NAME: DOORS & WINDOWS DETAILS

A1

PAPER SIZE: DRAWING SIZE :

PLAN B-B

ARCHITECTURE

drawing number:

verified:Sa.MOH.EMAD

---------

DETAIL 8 1:10

DR.TAMER ELGABALY


Beirut Embassy working drawings

E

D

C

B

A

1

2

1

3D View 6

3D View 7

2

2

3

3

3

3D View 38

4

4

4

3D View 8

5

5

6

6

E

D

C

B

A

Sheet Number

A102

A104 A105 A106 A107 A110 A112 A118

A119 A120 A121 A122

A124

A125

A126 A127 A111 A129 A113 A100 A103

A114

A115

A116

A117 A123

A128

PROJECT

Sheet Name

List of drawings

Basment floor plan Mater Plan Section A-A First floor plan Roof floor plan Elevations 1 Schedules Modified Arch. plan Furniture Plan Flooring pattern Power outlets Interior Elevations Reflected ceiling 1 Reflected ceiling 2 Details Lighting plan Elevations 2 Layout Stair details List of drawings Ground floor plan Curtain wall details 1 Curtain wall details 2 Curtain wall details 3 General Details General Details 2 Original Arch. plan

NORTH & KEY PLAN

ASU FEDA 4th Year Architecture

Rev.

DESCRIPTION

REVISIONS

ISSUE BLOCK

MANGEMENT BLOCK

CHECKED BY:

Sheet Issue Date

11/02/15

11/02/15 11/05/15 11/06/15 11/06/15 11/12/15 11/15/15 12/05/15

12/07/15

12/06/15 12/07/15 12/07/15 12/07/15

12/07/15

12/28/15

12/10/15 12/14/15 12/25/15 12/25/15 12/26/15 12/26/15 12/27/15

12/28/15

12/28/15

12/28/15

12/28/15 12/28/15

DATE

Rev.

North

SEC:

3 Dr Tamer EL Gabaly

Mahmoud Mohamad Kamal

DWG FILE NAME

DWG BY:

SHEET TITLE BLOCK

12/28/2015 5:04:07 AM

List of drawings

DRAWING NAME:

SCALE:

DATE:

A100

DRAWING REFERENCE NO.:

APR.

51


1

2

32

32

15

A111

54

32

1

0.20

76

3

2.40

3

29

20

42

29

24

Meeting room

WC

Room

HOME SECRETARY

8.90

32

Kitchen

29

32

4

42

41

43

15

68

DN

5

32

28

0.13

28

15

Amb. WC

26

28

5'

UP

0.60

56

UP

50

48

WC men

12.40

32

3.51

Entrance lobby

12.38

0.00

74

32

MEDIA Administration

26

26

28

26

59

26

70

28

1.301.24

26

WC WOMEN

A.H.U

2.93

32

77.02

32

56

6

50

4

3.70

3.85

3.69

kitchenette

3.85

17

57

68

68

7

7

4.40

39

28

8.04

7.95

SALONS

8.04

A.H.U

Waiting Salons

68

28 Janitor’s Satelite room room

57

6.00

7.71

15

73

28

WC MEN

4.91 26

WC WOMEN

Kitchnette

32

32.95

13

26

AMB.OFFICE

59

65

57

A.H.U

6

8

8

50

8'

8'

UP

52

1

0.60

kitchen

A128

8.00

10.68

8.00

9

32.23

9

7.98

24.26

52

MULTI PURPOSE HALL

8.00

7.98

UP

50

17

65

2.54

2.51

10

47

10

UP

59

26

26

WC MEN

73

26

26

WC Women

5

2

11

26

26

A.H.U

26

26

Basment ventilation shaft

8.00

57

Handicapped

57

26

13

73

28 28 Janitor’s Satelite room room

8.00

11

N159.81 E216.60

A111

7.82

6.54 BEDRoom

44

Dressing

43

43

COUNTERS

57

26 26

0.94

28

12.38 77.02

7.82

7.84

2

29

30

43

43

10.94

10.87

Chancellary Entrance Lobby

0.60

28

28 28 Janitor’s Satelite room room

0.13

5'

7.84

10.00

3.17

15

2 1.7WC

22

22

34

32

13.64

7.71

5

10.00

9.98

1

9.63

34

32

0.60

Dining

Security room

SALONS

8.90

4

5

9.98

8.24

Basment ventilation shaft

00°

Home Reception

Offices

12.47 0.60

38

38

2.40

6.12

3

4

7.91 10.13

UP

44

135.

RECEPTIONS

32

UP

0.60

9.63

2

10.12

SECURITY

1

7.98

00° 13 5.

E

1 : 200

Graund floor

1.34

E

D

C' C

B

A

1

3

5.63 2.00 2.48

0.86 0.21 4.68 2.48 0.86 0.561.83

4.08

D

C

B

A

2

E

D

C

C'

B

A

6

6

E

D

C

B

A

PROJECT

NORTH & KEY PLAN

ASU FEDA 4th Year Architecture

Rev.

DESCRIPTION

REVISIONS

ISSUE BLOCK

MANGEMENT BLOCK

DATE

Rev.

North

SEC:

3 Dr Tamer EL Gabaly

SHEET TITLE BLOCK

CHECKED BY:

Mahmoud Mohamad Kamal

DWG FILE NAME

DWG BY:

12/28/2015 5:05:11 AM

1 : 200

Mater Plan

DRAWING NAME:

SCALE:

DATE:

A104

DRAWING REFERENCE NO.:

APR.

52

Puplic entrance

6.70 8.07

7.82 7.84 10.00 9.98

35.64


E

1

I

H

G

E

D

C' C

B

A

1

1.79

-3.40

-3.40

-3.40

6.43

Basment 1 : 150

UP

0.51

HVAC and mechanical equipment

15.76

2.54

2.50

2.48

2.50

2

1

3.77

2.73

1

-3.40

-3.40

2.50

Staff room Male

5.75

9.63

11.95

2.50

9.63

2.54

Staff room Female

5.79

2

2.40

2.40

2.50

2

3

1.64

3

2.45

-3.40

4.68

8.90

2.50

9.01

8.90

2.50

Maid's WC

Maid's room

4.15

4

1.32

3

0.92

2.89

4

3

2.50

2.45

7.71

2.50

5.89

2.50

7.71

5

0.13

2.51

5'

2.57

2.50

5'

UP

1.09

0.13

2.09

5

-3.40

2.45

2.49

Water tank

7.65

12.38

2.50

-3.40

12.38

0.77 -3.40

2.50

77.02

2.45

0.90

2.65

Pumps room

4.44

77.02

6

2.50

6

2.45

3.85

2.50

7

1.83

2.86

4

2.50

2.58

UP

7.94

-3.40

3.85

3.75

8.04

8.44

7

4

2.45

2.45

8

0.10

3.26

8'

8'

UP

8.00

8.00

-3.40

-3.40

2.45

2.45

Prayer room

Transformer

1.220.551.40

8

2.50

2.50

9

2.73

1.47 0.67

Generator

9

2.50

2.50

7.98

-3.40

2.45

2.45

7.98

1.58

10

1.69

2.38

10

-3.40

2.50

5

8.00

7.76

8.00

5

2.45

-3.40

11

1.71

11

UP

Garpage disposal

7.94 9.90 9.98

D

C

B

A

2

7.94

3.75 8.00 7.82

6.01

5.30 10.20 6.17 10.30 7.70 5.34 4.57

12.20 8.00 7.56 7.80 2.09 0.23 5.90 11.65

3.75 7.94 8.00 7.82 7.84 10.00 9.98

55.34

55.34

I

H

G

E

D

C

C'

B

A

6

6

E

D

C

B

A

PROJECT

NORTH & KEY PLAN

ASU FEDA 4th Year Architecture

Rev.

DESCRIPTION

REVISIONS

ISSUE BLOCK

MANGEMENT BLOCK

DATE

Rev.

North

SEC:

3 Dr Tamer EL Gabaly

SHEET TITLE BLOCK

CHECKED BY:

Mahmoud Mohamad Kamal

DWG FILE NAME

DWG BY:

12/28/2015 5:04:25 AM

1 : 150

Basment floor plan

DRAWING NAME:

SCALE:

DATE:

A102

DRAWING REFERENCE NO.:

APR.

53


1

1

9.63 3.17

2

4

7.71

5

3

0.13

5'

12.38

0.60

Entrance lobby

0.60

Entrance lobby

3.51

77.02

0.60

6

3.67

3.85

0.60

7

4

0.60

8.04

7.95

0.60

0.60

Waiting Salons

8

8'

2 A113

10.68

8.00

8.00

0.60

kitchen

9

32.27

9

5

7.98

0.60

MULTI PURPOSE HALL

0.60

8.00

0.60

7.98

10

10

0.60

2.54

8.00

Handicapped

8.00

WC Women

WC MEN

11

11

7.82

32.95

1.24

1 A113

8.04

8'

7.82

7.84

2

8.90

Amb. WC

1.30

3.69

3.85

8

7.84

10.00

0.60

AMB.OFFICE

Kitchnette

Entrance lobby

2.93

12.40

77.02

7

10.00

9.98

0.60

0.60

WC WOMEN

4.91 WC MEN

0.60

MEDIA Administration

12.38

6

5

9.98

3

6.54 Meeting room

Room

0.60

HOME SECRETARY

Kitchen

0.94

0.13

5'

4

7.91 10.13

2.40

BEDRoom

Dressing

0.60

10.94

10.87

Chancellary Entrance Lobby

7.71

5

10.12

E

D

8.24

2 1.7WC

6.12 0.60

13.64

0.60

1.34 8.90

4

7.98

E

0.60 Home Reception

12.47

Offices

12.47

Security room

2.40

3

2 D

D

C

0.60

9.63

2

0.860.21 4.68 1.83 0.86 0.56 2.48

C'

B

A

1

Ground Floor plan 1 : 100

3

5.63 2.00 2.48

C

B

A

35.64

1

2

6

6

E

D

C

C'

B

A

E

D

C

B

A

PROJECT

NORTH & KEY PLAN

ASU FEDA 4th Year Architecture

Rev.

DESCRIPTION

REVISIONS

ISSUE BLOCK

MANGEMENT BLOCK

DATE

Rev.

North

SEC:

3 Dr Tamer EL Gabaly

SHEET TITLE BLOCK

CHECKED BY:

Mahmoud Mohamad Kamal

DWG FILE NAME

DWG BY:

12/28/2015 5:04:44 AM

1 : 100

Ground floor plan

DRAWING NAME:

SCALE:

DATE:

A103

DRAWING REFERENCE NO.:

APR.

54

4.08

6.70 8.07

7.82 7.84 10.00 9.98

D


1

2

9

8'

8

3

7

6

4

5'

5

4

5

5

3

2

1

6

6

1 1 : 100

4.00

25.40 Level 8

10

4

4.00

20.60 Level 6

11

3

4.00

4.00

4.80

4.00

1.60

4.00

1.60

4.00

4.00

16.60 Level 5

12.60 Level 4

8.60 Level 3

4.60 Level 2

0.60 Graund floor

-3.40 Basment -5.00 Foundations level

Section A-A

2

24.80 4.00

4.80 4.00

4.00 4.00

E

D

C

B

A

24.80 5.60

4.00 1.60

E

25.40 Level 8

D

20.60 Level 6

16.60 Level 5

12.60 Level 4

8.60 Level 3

4.60 C Level 2

0.60 Graund floor

-3.40 Basment

PROJECT

NORTH & KEY PLAN

DESCRIPTION

REVISIONS

DATE

Rev.

North

SEC:

3 Dr Tamer EL Gabaly

Mahmoud Mohamad Kamal

SHEET TITLE BLOCK

CHECKED BY:

DWG BY:

DWG FILE NAME

MANGEMENT BLOCK

Rev.

ISSUE BLOCK

ASU FEDA 4th Year Architecture

-5.00 Foundations level

B

A

12/28/2015 5:05:24 AM

1 : 100

Section A-A

DRAWING NAME:

SCALE:

DATE:

A105

DRAWING REFERENCE NO.:

APR.

55


56


57


25.40 Level 8

20.60 Level 6

16.60 Level 5

12.60 Level 4

8.60 Level 3

4.60 Level 2

0.60 Graund floor

1

Aclyric painting

AGS - Tempered Glass

VETROTECH - Contraflam - 60

1

White aclyric painting

VETROTECH - Powder Coat VDS Lite - 60 Min

White aclyric painting

10

VETROTECH - Contraflam - 60

Aclyric painting

Mayka stone cladding

11

Northern Elevation 1 : 100

1 : 100

2

2

Mayka stone cladding

White aclyric painting

White aclyric painting

9

3

Mayka stone cladding

VETROTECH - Contraflam - 60

2

8'

8

Aclyric painting

White aclyric painting

Aclyric painting

White aclyric painting

White Marble cladding

Mayka stone cladding

4

7

5

3

3

5'

VETROTECH - Contraflam - 60

VETROTECH - Powder Coat VDS Lite - 60 Min

VETROTECH - Contraflam - 60

6

6

5'

4

A113

1

Clear glazing, tempered

White aclyric painting

5

Aclyric painting

White aclyric painting

7

4

4

8

8'

Aclyric painting

3

5

2

White aclyric painting

White aclyric painting

9

5

10

1

Mayka stone cladding

Mayka stone cladding

11

3.01

1.79

8.00

12.00

6

4.80

4.00

4.00

4.00

4.00

6

4.00

24.80

3.01 9.79 12.00

4.80 4.00

4.00 4.00 4.00 4.00

E

1

25.40 Level 8

20.60 Level 6

16.60 Level 5

4.80

D

C

B

12.60 Level 4

8.60 Level 3

4.60 Level 2

24.80

Southern Elevation

0.60 Graund floor

A

2

25.40 Level 8

20.60 Level 6

16.60 Level 5

12.60 Level 4

8.60 Level 3

4.60 Level 2

0.60 Graund floor

25.40 Level 8

20.60 Level 6

16.60 Level 5

12.60 Level 4

8.60 Level 3

4.60 Level 2

0.60 Graund floor

E

D

C

B

A

PROJECT

NORTH & KEY PLAN

ASU FEDA 4th Year Architecture

Rev.

DESCRIPTION

REVISIONS

ISSUE BLOCK

MANGEMENT BLOCK

DWG FILE NAME

DATE

Rev.

North

SEC:

3 Dr Tamer EL Gabaly

Mahmoud Mohamad Kamal

SHEET TITLE BLOCK

CHECKED BY:

DWG BY:

DRAWING NAME:

12/28/2015 5:05:53 AM

1 : 100

Elevations 1

SCALE:

DATE:

A110

DRAWING REFERENCE NO.:

APR.

58

24.80

2.55

0.99

4.00

1.95

2.05

1.95

2.05

1.95

1.00

4.80 4.00 4.00 4.00 4.00 4.00

3.01 1.79 4.05 0.97 1.91 0.38 1.06 3.63

4.00 4.00 4.00 4.00 4.00

3.10 0.90 1.22 1.98 0.80

24.80


2

3

B

C

D

AHU

E

AHU

F

F

G

G

H

H

I

I

J

J

K

K

AHU

L

L

M

M

8

7

6

2

3

8

7

6

4

E

4

D

5

C

5

B

AIN SHAMS UNIVERSITY DEPARTMENT OF ARCHITECTURE

GENERAL NOTES:

3rd Year Architecture ARC 351 -Working Drawings1

DESCRIPTION Issued for Revision

REVISIONS

DATE 1/10/2014

1. UNLESS OTHERWISE NOTED. ALL DIMENSIONS ARE IN METERS AND ELEVATION LEVELS ARE IN METERS. 2. DO NOT SCALE DRAWINGS DIMENSIONS GIVEN SHALL GOVERN. 3. PRIOR TO COMMENCE WORK CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS ON SITE AND SECURE NECESSARY PERMITS FOR CONSTRUCTION. 4. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND SAMPLES OF ALL MATERIALS AND COLORS TO BE APPROVED BY THE ENGINEER. 5. COORDINATION BETWEEN ARCHITECTURAL DRAWINGS AND ALL OTHER ENGINEERING DRAWINGS WILL BE THE MAIN CONTRACTORS RESPONSIBILITY PRIOR TO WORK COMMENCEMENT. 6. UNLESS OTHERWISE NOTED DOOR JAMBS ARE 200 MM AWAY FROM NEAREST ADJACENT WAIL 7. PAINT COLOR SHALL BE SELECTED BY THE CLIENT 8. INTERNAL WALL FINISH (PLASTER. CERAMIC.. ETC.) WILL TERMINATE 200mm ABOVE SUSPENDED CEILING IF/EL 9. CONTRACTOR WILL PROVIDE SUITABLE SIZE ACCESS PANELS IN CEILING FOR EQUIPMENT MAINTENANCE AS REQUIRED ( REFER TO MECHANICAL. ELECTRICAL AND PLUMBING DRAWINGS) 10. LOCATIONS AND SIZES OF PADS AND ROOF PENETRATIONS SHOWN IN ROOF PLANS WILL BE COORDINATED WITH STRUCTURAL. PLUMBING, ELECTRICAL AND MECHANICAL DRAWINGS. 11. ALL SIZES SHOWN FOR WINDOWS. LOWERS. CURT.AINWALLS &GLAZED DOORS ARE MASONARY OPENINGS. CONTRACTOR SHALL VERIFY All DIMENSIONS ON SITE. 12. DETAILS SHOWN ARE FOR DESIGN INTENT ONLY. CONTRACTOR WILL SUBMIT SHOP DRAWINGS TO BE APPROVED BY THE ENGINEER.

Rev. 1

Cairo - Egypt

SEC:

B.N:

3

0000

Academic Library

PROJECT NAME:

DWG BY:

Dr. Tamer El Gabaly

Mahmood Mohamad Kamal

1 : 100

DATE:

AR - 101

1/10/2014

Ground Floor HVAC SYSTEM

SHEET NAME:

CHECKED BY:

SCALE:

SHEET NUMBER:

59


2

B

0.00

2.20

3.98

1.96

C 4.80

1.22 0.161.00

D

4.19

D

4.58

1.00

4.58

3.15

1.79

E

E

5.20

5.20

5.20

F

F

2.77

5.87

0.16

5.87

G

47.81

G

3.40

3.40

H

H

0.18

0.18

I

I 3.24

3.24

60.95

60.95

J

J

6.06

26.40

42.02 52.17 6.06

K

K

6.26

6.26

L

L

4.24

4.24

M

M

6.60

6.60

6.60

N

13.14

N

6.54

6.54

5.79

6.54

O

O

14.85

3

4.80

15.62

14.85

8.92

5.34

8.92

4

10.21 8.78

C

10.57

2.72

4.64

14.85

5

3.98

15.62

14.85

2.92

0.07 0.26 4.64

4.57

3.09

6

7

8

B

2

3

4

5

6

7

8

5

AIN SHAMS UNIVERSITY DEPARTMENT OF ARCHITECTURE

GENERAL NOTES:

3rd Year Architecture ARC 351 -Working Drawings1

DESCRIPTION Issued for Revision

REVISIONS

DATE 1/10/2014

1. UNLESS OTHERWISE NOTED. ALL DIMENSIONS ARE IN METERS AND ELEVATION LEVELS ARE IN METERS. 2. DO NOT SCALE DRAWINGS DIMENSIONS GIVEN SHALL GOVERN. 3. PRIOR TO COMMENCE WORK CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS ON SITE AND SECURE NECESSARY PERMITS FOR CONSTRUCTION. 4. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND SAMPLES OF ALL MATERIALS AND COLORS TO BE APPROVED BY THE ENGINEER. 5. COORDINATION BETWEEN ARCHITECTURAL DRAWINGS AND ALL OTHER ENGINEERING DRAWINGS WILL BE THE MAIN CONTRACTORS RESPONSIBILITY PRIOR TO WORK COMMENCEMENT. 6. UNLESS OTHERWISE NOTED DOOR JAMBS ARE 200 MM AWAY FROM NEAREST ADJACENT WAIL 7. PAINT COLOR SHALL BE SELECTED BY THE CLIENT 8. INTERNAL WALL FINISH (PLASTER. CERAMIC.. ETC.) WILL TERMINATE 200mm ABOVE SUSPENDED CEILING IF/EL 9. CONTRACTOR WILL PROVIDE SUITABLE SIZE ACCESS PANELS IN CEILING FOR EQUIPMENT MAINTENANCE AS REQUIRED ( REFER TO MECHANICAL. ELECTRICAL AND PLUMBING DRAWINGS) 10. LOCATIONS AND SIZES OF PADS AND ROOF PENETRATIONS SHOWN IN ROOF PLANS WILL BE COORDINATED WITH STRUCTURAL. PLUMBING, ELECTRICAL AND MECHANICAL DRAWINGS. 11. ALL SIZES SHOWN FOR WINDOWS. LOWERS. CURT.AINWALLS &GLAZED DOORS ARE MASONARY OPENINGS. CONTRACTOR SHALL VERIFY All DIMENSIONS ON SITE. 12. DETAILS SHOWN ARE FOR DESIGN INTENT ONLY. CONTRACTOR WILL SUBMIT SHOP DRAWINGS TO BE APPROVED BY THE ENGINEER.

Rev. 1

Cairo - Egypt

SEC:

B.N:

3

0000

Academic Library

PROJECT NAME:

DWG BY:

Dr. Tamer El Gabaly

Mahmood Mohamad Kamal

1 : 100

DATE:

AR - 101

1/10/2014

Ground Floor Ceiling Plan

SHEET NAME:

CHECKED BY:

SCALE:

SHEET NUMBER:

60

15.62

2.86

2.72

2.92

0.10 0.06 2.62 0.16 0.00 5.34

14.85 8.92

5.34 14.85 8.92

0.21 0.12 8.92

39.38

39.38


23.32°

9.34

D

5.36

3.28 1.80

E

5.20

F

1.00 6.15

G

0.60

H

2.19

5.95

I

6.38

J

K

L

M

5.40

4.00

21.40 TOP Level

16.00 F.F.Level 5

12.00 F.F Level 4

3.66

C

2.93 3.29

8.00 F.F Level 3

4.45 F.F.Level mezanyne 2

0.00 zero level

-3.00 F.F L Basment

3.55

4.00

3.55

4.00

0.45

3.00

0.910.35 1.38

0.36 2.93 3.29

3.30 2.10 3.55 4.00

3.18 2.93 3.29 3.00

5.40 4.00 4.00 0.45

4.00

1.90 2.10 1.90 1.96 0.45 3.00

0.14 3.00

24.40

10.74° 7.19

3.29

24.40

21.40 TOP Level

16.00 F.F.Level 5

12.00 F.F Level 4

8.00 F.F Level 3

4.45 F.F.Level mezanyne2

0.45 F.F Ground floor

-3.00 F.F L Basment

AIN SHAMS UNIVERSITY DEPARTMENT OF ARCHITECTURE

GENERAL NOTES:

3rd Year Architecture ARC 351 -Working Drawings1

DESCRIPTION Issued for Revision

REVISIONS

DATE 1/10/2014

1. UNLESS OTHERWISE NOTED. ALL DIMENSIONS ARE IN METERS AND ELEVATION LEVELS ARE IN METERS. 2. DO NOT SCALE DRAWINGS DIMENSIONS GIVEN SHALL GOVERN. 3. PRIOR TO COMMENCE WORK CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS ON SITE AND SECURE NECESSARY PERMITS FOR CONSTRUCTION. 4. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND SAMPLES OF ALL MATERIALS AND COLORS TO BE APPROVED BY THE ENGINEER. 5. COORDINATION BETWEEN ARCHITECTURAL DRAWINGS AND ALL OTHER ENGINEERING DRAWINGS WILL BE THE MAIN CONTRACTORS RESPONSIBILITY PRIOR TO WORK COMMENCEMENT. 6. UNLESS OTHERWISE NOTED DOOR JAMBS ARE 200 MM AWAY FROM NEAREST ADJACENT WAIL 7. PAINT COLOR SHALL BE SELECTED BY THE CLIENT 8. INTERNAL WALL FINISH (PLASTER. CERAMIC.. ETC.) WILL TERMINATE 200mm ABOVE SUSPENDED CEILING IF/EL 9. CONTRACTOR WILL PROVIDE SUITABLE SIZE ACCESS PANELS IN CEILING FOR EQUIPMENT MAINTENANCE AS REQUIRED ( REFER TO MECHANICAL. ELECTRICAL AND PLUMBING DRAWINGS) 10. LOCATIONS AND SIZES OF PADS AND ROOF PENETRATIONS SHOWN IN ROOF PLANS WILL BE COORDINATED WITH STRUCTURAL. PLUMBING, ELECTRICAL AND MECHANICAL DRAWINGS. 11. ALL SIZES SHOWN FOR WINDOWS. LOWERS. CURT.AINWALLS &GLAZED DOORS ARE MASONARY OPENINGS. CONTRACTOR SHALL VERIFY All DIMENSIONS ON SITE. 12. DETAILS SHOWN ARE FOR DESIGN INTENT ONLY. CONTRACTOR WILL SUBMIT SHOP DRAWINGS TO BE APPROVED BY THE ENGINEER.

Rev. 1

Cairo - Egypt

SEC:

B.N:

3

0000

Academic Library

PROJECT NAME:

DWG BY:

DATE:

AR - 101

1/10/2014

Dr. Tamer El Gabaly

Mahmood Mohamad Kamal

CHECKED BY:

1 : 100

Section A-A

SHEET NAME:

SCALE:

SHEET NUMBER:

61


1

E

D

C' C

1

2

23.86

1 : 50

1 2 3

UP

0.60

1.04

interior Power outlets

4

5

6

7

8

9

10

12

1 2 3 4

1.17

11

13

16

0.60

17

18

0.60

5.92

19

21

0.60

22

23

To CCTV control board Button c 2

20

24

25

0.00

To switch board Button s 1

To Telephone panel Button T 1

26

6 24.12

To switch board Button s 2

0.60

To switch board Button s 5

6

3.85

To CCTV control board Button c 1

3.85 3.85

0.60

4

4

7

0.50 0.50

0.47

0.46

0.46

7

5.57

7.94

5

0.40

0.39

6.87

1.33

0.40

To switch board Button s 3

0.60

To switch board Button s 4

6.87

6.87

6.87

7.94 7.94

0.42

0.42

5

8

8

E

D

C' C

6

6

E

D

C

B

A

D

Dimmer switch height 1 m

Double socket wall mounted height 60cm

DATE

Rev.

North

water resistant floor box

Double switch height 1m

DESCRIPTION

REVISIONS

SEC:

3 Dr Tamer EL Gabaly

Mahmoud Mohamad Kamal

1 : 50

12/28/2015 5:07:01 AM

A121

DRAWING REFERENCE NO.:

DATE:

SCALE:

Power outlets

DRAWING NAME:

SHEET TITLE BLOCK

CHECKED BY:

DWG BY:

DWG FILE NAME

MANGEMENT BLOCK

Rev.

ISSUE BLOCK

ASU FEDA 4th Year Architecture

NORTH & KEY PLAN

PROJECT

2

3

12.32

15

0.18 0.66 0.18 0.66 0.18 0.66 0.18 0.66 0.18 0.66 0.18

14

12.32 12.32

3

D

E

D

C

B

A

2

APR.

62

7.82 7.84 0.10 8.05

0.52 1.29 13.99

0.85 3.44 15.60 3.40 0.48

2 D

7.82 7.94 8.10

23.76


E

D

C

B

A

1

E

D

C

C'

2

2

5

5

5'

5'

Ground Floor - reflected 1 ceiling 1 : 50

3

3

6

S

S

4

Gypsum board plain ceiling

3.70

KNAUF gypsum board celing tiles 120*60 cm

Gypsum board plain ceiling

3.60

S

S

6

4

7

7

3.60

S

S

S

S

3.60

3.70

KNAUF gypsum board celing tiles 120*60 cm

3.70

3.70

S

S

S

S

3.60

5

5

E

D

C

C'

6

6

E

D

C

B

A

S

PROJECT

Rev.

Spot light

Linear flurescent lighting

A/C supply diffuser

DESCRIPTION

REVISIONS

SEC:

DATE

Rev.

North

Security camera

A/c return diffuser

Exit sign

Smoke detector

Splinkler

NORTH & KEY PLAN

ASU FEDA 4th Year Architecture

ISSUE BLOCK

MANGEMENT BLOCK

3 Dr Tamer EL Gabaly

SHEET TITLE BLOCK

CHECKED BY:

Mahmoud Mohamad Kamal

DWG FILE NAME

DWG BY:

12/28/2015 5:07:24 AM

As indicated

Reflected ceiling 1

DRAWING NAME:

SCALE:

DATE:

A124

DRAWING REFERENCE NO.:

APR.

63


AIN SHAMS UNIVERSITY DEPARTMENT OF ARCHITECTURE

GENERAL NOTES:

3rd Year Architecture ARC 351 -Working Drawings1

DESCRIPTION Issued for Revision

REVISIONS

DATE 1/10/2014

1. UNLESS OTHERWISE NOTED. ALL DIMENSIONS ARE IN METERS AND ELEVATION LEVELS ARE IN METERS. 2. DO NOT SCALE DRAWINGS DIMENSIONS GIVEN SHALL GOVERN. 3. PRIOR TO COMMENCE WORK CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS ON SITE AND SECURE NECESSARY PERMITS FOR CONSTRUCTION. 4. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND SAMPLES OF ALL MATERIALS AND COLORS TO BE APPROVED BY THE ENGINEER. 5. COORDINATION BETWEEN ARCHITECTURAL DRAWINGS AND ALL OTHER ENGINEERING DRAWINGS WILL BE THE MAIN CONTRACTORS RESPONSIBILITY PRIOR TO WORK COMMENCEMENT. 6. UNLESS OTHERWISE NOTED DOOR JAMBS ARE 200 MM AWAY FROM NEAREST ADJACENT WAIL 7. PAINT COLOR SHALL BE SELECTED BY THE CLIENT 8. INTERNAL WALL FINISH (PLASTER. CERAMIC.. ETC.) WILL TERMINATE 200mm ABOVE SUSPENDED CEILING IF/EL 9. CONTRACTOR WILL PROVIDE SUITABLE SIZE ACCESS PANELS IN CEILING FOR EQUIPMENT MAINTENANCE AS REQUIRED ( REFER TO MECHANICAL. ELECTRICAL AND PLUMBING DRAWINGS) 10. LOCATIONS AND SIZES OF PADS AND ROOF PENETRATIONS SHOWN IN ROOF PLANS WILL BE COORDINATED WITH STRUCTURAL. PLUMBING, ELECTRICAL AND MECHANICAL DRAWINGS. 11. ALL SIZES SHOWN FOR WINDOWS. LOWERS. CURT.AINWALLS &GLAZED DOORS ARE MASONARY OPENINGS. CONTRACTOR SHALL VERIFY All DIMENSIONS ON SITE. 12. DETAILS SHOWN ARE FOR DESIGN INTENT ONLY. CONTRACTOR WILL SUBMIT SHOP DRAWINGS TO BE APPROVED BY THE ENGINEER.

Rev. 1

Cairo - Egypt

SEC:

B.N:

3

0000

Academic Library

PROJECT NAME:

DWG BY:

DATE:

AR - 101

1/10/2014

Dr. Tamer El Gabaly

Mahmood Mohamad Kamal

CHECKED BY:

Varies

Details

SHEET NAME:

SCALE:

SHEET NUMBER:

64


E

D

C

B

A

1

1

E

D

C' C

23.86

1 : 50

2

1.25

0.82

1 2 3

2.70

0.90

1.48

Glass handrail

Security counter

4

5

6

7

8

0.18

1 2 3 4

1.17

0.60

5.06

12.32

0.60

0.00

9.64 9.64

3

Main entrance lobby

1.49

---

0.76

6 24.12

6

0.34

7.05

0.97

0.80

3.85

2.59

1.00

3.61

4.21

Check in counter

0.60

3.85

3.85

To elevators

7.05

Access control gates

0.76

Floor matt

Fountain

1.10

1.57

Reception counter

0.18 0.66 0.18 0.66 0.18 0.66 0.18 0.66 0.18 0.66 0.18

8.23

6.54

12.32 12.32

3

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

0.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.30

Marble cladding mechanical installation

Wall lighting

UP

2.32

interiror modified arch.plan

2

1.00

7

0.39

0.05

7

4

4

0.62 6.93

2.44 1.52 2.68 1.51

Wooden partition

7.94

0.60

Waiting salons

0.60

7.70

MPH foye

6.70

7.77

Waiting salons

0.60

Wooden partition

7.94 7.94

0.62 6.89 0.64 1.24 5.96 0.49 8.08

8

8

7.82 7.84 0.10 8.05

1.08

0.60 7.24 0.45 8.10

5.57 0.87 1.93 2.03 4.41

0.300.30 3.22

2.40 4.96 3.82

7.82 7.94 8.10

23.76

5

5

E

D

C

C'

6

6

E

D

C

B

A

PROJECT

NORTH & KEY PLAN

ASU FEDA 4th Year Architecture

Rev.

DESCRIPTION

REVISIONS

ISSUE BLOCK

MANGEMENT BLOCK

DATE

Rev.

North

SEC:

3 Dr Tamer EL Gabaly

SHEET TITLE BLOCK

CHECKED BY:

Mahmoud Mohamad Kamal

DWG FILE NAME

DWG BY:

12/28/2015 5:06:24 AM

1 : 50

Modified Arch. plan

DRAWING NAME:

SCALE:

DATE:

A118

DRAWING REFERENCE NO.:

APR.

65


E

D

C

B

A

1

2

E

D

C' C

2

1

5'

5'

1 : 50

Level 2 - Reflected ceiling

3

3

6

Gypsum board plain ceiling

Gypsum board plain ceiling

Gypsum board celingS tiles 120*60 cm

S

6

4

4

7

7

S

S

S

S

Gypsum board celing tiles 120*60 cm

S

S

S

S

5

8

8

5

E

D

C' C

6

6

E

D

C

B

A

S

PROJECT

Rev.

Spot light

DESCRIPTION

REVISIONS

SEC:

DATE

Rev.

North

Linear flurescent lighting

A/C supply diffuser

Security camera

A/c return diffuser

Exit sign

Smoke detector

Splinkler

NORTH & KEY PLAN

ASU FEDA 4th Year Architecture

ISSUE BLOCK

MANGEMENT BLOCK

3 Dr Tamer EL Gabaly

SHEET TITLE BLOCK

CHECKED BY:

Mahmoud Mohamad Kamal

DWG FILE NAME

DWG BY:

12/28/2015 5:07:30 AM

As indicated

Reflected ceiling 2

DRAWING NAME:

SCALE:

DATE:

A125

DRAWING REFERENCE NO.:

APR.

66


1

1

1:2

1:5

Floor levels

Steel bolt 15 mm diameter

Wooden skirting 2 cm thick

Plastering material 2 cm

white juton Aclyric painting

brick wall 12 cm

Wall cladding detail

Brick wall 12 cm thickness

Plastering 2 cm thick E

D

C

B

A

2

2

2

3

Marble panels 80*40cm

Steel bolt diameter 12 mm

Stain less steel dowel pin

Stain less steel Bracket

vertical Steel member hat section spacing 45 cm

Vinyl sheets Adhesive material Self leveling concrete 10 cm 2 sheets of DPC 3mm thick Reinforced concrete

3

3

4

50.8mm WIDE

SQUARE END VINYL

EXTRUDED ALUMINUM CONNECTING RAIL ALUMINUM LEVEL BASE FRAME

5

PLAN

B -

Granite Tiles 40x40x2cm

R.C. 10cm Thick.

TEMPERED SPRING STEEL CHAIRS 375x55x5mm

SLEEPERS 7.5x10 cm

SUBFLOOR 2.5x10cm

PARQUET 2cm Thick.

-

A

Cement Mortar 2cm

CEMENT PLASTER 2cm Thick

2007

SECTION A-A

Clean Sand 5cm

6

FASTENER

RIGID VINYL CUSHIONS

EXTRUDED ALUMINUME RAIL

6

GRANITE/PARQUET

R.C. SLAB 10cm

ANGLE 62.5x25x0.5 mm

-

5

CEMENT PLASTER 2cm Thick.

5

ACRYLIC PAINT 3 coats

EXTRUDED VINYLE INSERT

EXTRUDED VINYL INSERT

50.8mm WIDE

SQUARE END VINYL

ALUMINUM LEVEL BASE FRAME EXTRUDED ALUMINUM CONNECTING RAIL SCREED

Floor Matt 1:1

4

FFL

E

D

C

B

A

PROJECT

NORTH & KEY PLAN

ASU FEDA 4th Year Architecture

Rev.

DESCRIPTION

REVISIONS

ISSUE BLOCK

MANGEMENT BLOCK

DATE

Rev.

North

SEC:

3 Dr Tamer EL Gabaly

12/28/2015 5:07:37 AM

As indicated

SHEET TITLE BLOCK

CHECKED BY:

Mahmoud Mohamad Kamal

DWG FILE NAME

DWG BY:

Details

DRAWING NAME:

SCALE:

DATE:

A126

DRAWING REFERENCE NO.:

APR.

67


1

E

D

C

C'

1

2

23.86

1 2 3

UP

4

0.81

5

6

7

8

10

1.78

9

11

12

1 2 3 4

13

14

12.32

16

1.80

15

12.32

17

18

19

3

UP

20

21

2.15

22

23

24

25

26

0.45

00째

45 .0

12.32

135.

1 : 50

interior Furnishing plan

3

6 24.12

6

7.00

4

7

1.83

1.83

1.57

1.75

3.58

3.18

7.94

0.42

7.94

7

3.85

3.85

3.85

3.85

4

2.09

1.65

7.94 7.94

1.61

1.85

1.81

1.85

1.61

0.45

8

8

5

7.82 7.84

E

D

C

B

A

7.84

2

7.84 23.76

5

E

D

C' C

6

6

E

D

C

B

A

PROJECT

NORTH & KEY PLAN

ASU FEDA 4th Year Architecture

Rev.

DESCRIPTION

REVISIONS

ISSUE BLOCK

MANGEMENT BLOCK

DATE

Rev.

North

SEC:

3 Dr Tamer EL Gabaly

SHEET TITLE BLOCK

CHECKED BY:

Mahmoud Mohamad Kamal

DWG FILE NAME

DWG BY:

12/28/2015 5:06:43 AM

1 : 50

Furniture Plan

DRAWING NAME:

SCALE:

DATE:

A119

DRAWING REFERENCE NO.:

APR.

68

1.61 1.76

0.10 8.05

0.91 1.71

12.38 1.68

1.62

1.69

0.91 1.61

0.42

1.02 6.77 5.25 2.59

3.40 12.38 1.76

0째 45 .0

1.61 1.69 0.42

00째 13 5.

7.82 7.94 8.10

0째


E

D

C

B

A

1

2

2

E

D

C

C'

1

23.86

1 : 50

UP

0.60

Carpet stair

interior Floor pattern

0.60

1

2

3

4

3

12.32

Marble tiles 80*40

Floor matt

Vinyl sheets with wooden texture

0.00

6 24.12 3.85

4

7

0.60

7.94

0.60

0.60

Marble tiles 80*40

7.94

0.60

3.85

0.60

12.32

7.94

7

3.85

6

4

12.32

3

5

5

8

8

7.82 7.84 0.10 8.05

7.82 7.94 8.10

23.76

E

D

C

C'

6

6

E

D

C

B

A

PROJECT

Rev.

Vinyl sheets with wooden texture pattern 1

Vinyl sheets with wooden texture pattern 2

Vinyl sheets with wooden texture pattern 3

DESCRIPTION

REVISIONS

SEC:

DATE

Rev.

North

White Marble tiles 80*40

Black Marble tiles 80*40

Carpet stair

Barquet

NORTH & KEY PLAN

ASU FEDA 4th Year Architecture

ISSUE BLOCK

MANGEMENT BLOCK

DWG FILE NAME

3 Dr Tamer EL Gabaly

Mahmoud Mohamad Kamal

SHEET TITLE BLOCK

CHECKED BY:

DWG BY:

12/28/2015 5:06:54 AM

1 : 50

Flooring pattern

DRAWING NAME:

SCALE:

DATE:

A120

DRAWING REFERENCE NO.:

APR.

69


graphic design

70


Sustainable CDC

71


72


Arabica Online Prochure

73


Excellent Way Booklet

74


Dental Care Clinic

Pick me mobile application logo

75


76


Graduation project report

77


Health empire branding

78


79


Thanks