unlike any other experciane this Abdullah Ghalib Architects , we didn›t goes deep in the architecture details , we just started the urban design journey which was a good point to our experiance...

Summer Training Diary 2016/5/29 - 2016/7/29 Salem Ahmed Malibary 1207189 - Architecture Second Summer Training Abdullah Ghalib Architects


Salem Ahmed Malibary Email : malibary.s@gmail.com mobile : 0582355088 Instigram : @SMalibary Second Summer Trianing 2015/6/7 - 2015/8/6 Abdullah Ghalib Architecture Studio Design Saudi Arabia - Jeddah - Sari Tele. 0505673520 C


Summer Training Diary

Salem Ahmed Malibary 1207189 - Architecture


Content

01 05 46

Introduction 02 About The Office 03 Entertainment & Retail Waterfront Project The Diaries 06 Case Studies 12 Site Regulations 36 Site Analysis 40 Design Criteria 42 Standards 44 Concept

Introduction -About The Office -Entertainment & Retail Waterfront Project

Conclusion 47 Annexes 48 Refrances

H


Choosing The Training Place The optional relied on that in Jeddah will be engineering office in order earned some experience, especially in : How staff deal with each other How founder deal with employees How engineering office dealing with other enterprises What is Market requirements and how to deal with the client Also knowing the right time to complete the engineering work Found that the Office of Architecture Abdulallah ghalib (SCALE) is one of the best offices, and i started with the trainees to work on urban design for an enterainment and retail site and it was really and new and exciting experience to us... , which in turn increased my knowledge of this field and developed some skills such as : sense of the urban and how the customer gonna feel of the space, reducing the cost as much as possible with the same efficiency, and how to attract the users to the site and how to take the advantages of site..

2

3


About the Office Line ( Abdulallah Ghalib Architects ) is a multi-disciplinary firm based in Jeddah providing services in Architecture, and Interior Design and construction . At the moment of the summer training they had two project which we had to focus on them , first is a vertical hospital , second is the project which my summer training was on it mostly which is the urban design for enterainment and retail on the north of abhur The Founder Arch. Abdulallah Ghalib

The Supervisors in The Training Arch. Abdulallah Ghalib

Trainees Partner Ahemd Zainy

4

5


About the Project Entertainment & Retail Project During the training period we have trained to the most prominent project in the office (The Entertainment & Retail Waterfront Project ) A multi-use waterfront project located in north abhor, the site has an area of 83,512.92m². The project targets mainly residents of North Abhor District and the neighbouring facilities as it is the only public space located on the sea in North Abhor, thus making the success of the project high due to it being an attraction point from a commercial and leisure perspectives All of the work has been done with other trainees which we used to work as a group on the project and we started it from the very beginning , by researching and analysing and designing , this group work was a new experience for us which gonna help us in the senior year which we needed

6

7


The Diaries -Case Studies -Site Regulations / Architecture Program -Site Analysis / Response -Design Criteria -Standards -Concept

8


Case Studies At the beginning of the summer training we started to research about the urban design and how we can start to design it , since we don›t have any idea of how urban design work and what should we do to design a good urban design.... so the research started with serveral points which we started to search about : - Location - Master Plan and Areas - Attraction Points - Area and Distribution - Orientation

10

11


LE CAUDAN WATERFRONT

12

13


1-LE CAUDAN WATERFRONT

1-LE CAUDAN WATERFRONT

Le Caudan Waterfront is a commercial development in Port Louis, the capital city of Mauritius.It includes:

Gallery

- Shops - Banking facilities - Casinos - Cinemas - Restaurants - Marina - Five star hotel (Le Labourdonnais)

14

15


1-LE CAUDAN WATERFRONT

1-LE CAUDAN WATERFRONT

Master Plan

Attraction Points Total Area 67,500 m2 Museum 650m2

Attraction points are distributed around the project in a way that takes you on a tour, the open areas get bigger as you’re getting near the ocean.

Market 14,500 m2 Hotel 2,400 m2 Resturant / Coffee 5,500 m2 Parking 14,000 m2 Public Spaces/Corridors 30,450m2

16

Key : Highway Main Roads Attraction Points Vehicle Parking

17


1-LE CAUDAN WATERFRONT

1-LE CAUDAN WATERFRONT

Area & Distribution

Orientation Positive: Ease of access between parking and marina. Negative: Massive area for parking located on the waterfront that has a great view.

Key :

View priority to open spaces and restaurants, good views between open spaces, most of the amenities overlook the ocean.

Key : Highway

Buildings

Main Roads

Views

Buildings

18

Vehicle Parking

19


THE ORACLE READING

20

21


2- THE ORACLE READING The Oracle is a large indoor shopping and leisure mall, located on the banks of the River Kennet.

2- THE ORACLE READING Gallery

Area: The site has an estimate total area of 56,000m². Year of opening: 1999

22

23


2- THE ORACLE READING

2- THE ORACLE READING

Master Plan

Attraction Points Total Area 56,000 m2 Cinema 1750m2 Mall and retail shops 32,500 m2

Main attraction points are the River Kennet,and the bride between phase | and |||. Acceptable walking distance on the river banks inside the project.

Resturants 13,800 m2 Open Space 8,100 m2

Key : Highway Main Roads Attraction Points

24

View Direction

25


2- THE ORACLE READING

2- THE ORACLE READING

Area & Distribution

Orientation Main entrances are from Minster St. There are two bridges that go over the river linking the project.

The open space and sitting area around the river have great views and interaction between people, while the bridge that goes over Minster St. gives people an idea of what is going outside.

Key : Highway

Buildings

Main Roads

Views

Entry

26

Circulation

27


PORT VELL

28

29


3- PORT VELL Area: 100,000m²

3- PORT VELL Gallery

It was built as part of an urban renewal program prior to the 1992 Barcelona Olympics. Before this, it was a run-down area of empty warehouses, railroad yards, and factories. 16 million people visit the complex each year.

30

31


3- PORT VELL

3- PORT VELL

Master Plan

Attraction Points Total Area 100,000 m2 Educational Center 4,500m2

The boardwalk (Rambla De Mar) works as An attraction feature for pedestrians walking-by inviting them into the area.

Aquarium 12,000 m2 Shopping Center 15,000 m2 Open Space 32,000 m2 Corridors 36,500 m2

Key : Main road Pedestrian access Attraction points (Rambla De Mar)

32

33


3- PORT VELL

3- PORT VELL

Accessibility

Orientation The boardwalk (Rambla De Mar) and park act as attraction to invite pedestrians to visit the aquarium and retail center.

The green area is located at the back where noise is low suitable for picnics, while the boardwalk and buildings have a view advantage.

The services access are hidden behind the buildings away from visitors eyes.

Key : Main road

Green Area

Pedestrian access

Views

Services access

34

Retail center / Aquarium

35


SANTA MONICA PIER

36

37


4- SANTA MONICA PIER The Santa Monica Pier is a large double-jointed pier.

4- SANTA MONICA PIER Gallery

Area: The pier has an estimate total area of 36,000m². Year of construction: Long narrow pier to the north – 1909. Wide short pier to the south – 1916. Main material of construction: Concrete.

38

39


4- SANTA MONICA PIER

4- SANTA MONICA PIER

Master Plan

Attraction Points Total Area 100,000 m2

Attractions Points:

Leisure & Theme Park 7150m²

1) Santa Monica Looff Hippodrome 2) Pacific Park 3) Bubba Gump’s Shrimp co.

Commercial & Restaurants 3800m² Open space 10750m² Aquarium Entrance 500m²

40

Key :

Main road

Trapeze School 1400m²

View direction

Parking & Vehicles 11600m²

Engagement people on the beach

41


4- SANTA MONICA PIER

4- SANTA MONICA PIER

Vehicle Entry & Circulation

Orientation The main access to the pier is through the intersection of Ocean Ave. with Colorado Ave. Main parking is located on the pier itself, also, there is an adjacent parking to the north.

Main road Vehicle access

Main view is towards the Pacific Ocean, the long part of the pier has a great view with no obstacles. At the end of pier the anglers wharf provides an excellent view to Santa Catalina Island.

Key : Main road Views

Vehicle entry

42

Vehicle parking

43


Site Regulations

44

FAR

0.6

Site Regulation

2/%30

Area of Parking (Public)

5000

Area of Parking (Private)

3600

Area of Corridors and Services

25,053

Area of Commercial

25,050

Area of Public Spaces

24,810

Total Area

83,513 45


Site Analysis/Response At this piont we start to do the site analysis and respose to them to achieve the best result to the project , and we started to analysis with those points : - Landmarks - Landuse - Solid and Void - Building Heights - Accessibility - Sun Analysis - Context of Surrounding

46

47


1- Landmarks

2- Land Use Key :

Key : King Abdulaziz Airport

Location Seafront

King Adbullah Stadium Residential

Jeddah Tower

Religion Green and open area

Location

Local commercial road Commercial road

48

49


3- Solid & Void

4- Building Heights

-The area where the site is located is mostly undeveloped and new -The area consists of private owned villas and resorts (high percentage of open space) -Neighbouring buildings have a linear configuration in response to their site

-High buildings are located furthest from the sea, while low rise buildings are in front and close from the sea to maximize the view -Building heights range mostly between (4-1 story building)

50

51


5- Accessibility

6- Sun Analysis

The site is accessible from Prince Abdullah Alfaisal St.

-Few existing buildings to the south and west to provide shading -Low rise area, no shading on site -Vegetation is very low -South elevations should be shaded -Locate open space to the North and East to be shaded

King Abdulaziz Rd. Al-Madinah Rd.

52

Camel Square

Prince Abdullah Alfaisal St.

53


Accessibility Design Response

Views / Circulation Design Response -Secondary entrance for ease of access to East side of the site

-Attraction points distributed along the axis of the site

-Service entrances located on the side can be used also for access to sea for small boats and jet skis

-Differentiate between main and secondary attraction points for visual sequence

Key :

Key : Main Entrance Secondary Entrance Services

54

Main Attraction

Secondary Attraction

55


Sun Design Response

Wind Design Response -Open space to the East and North of buildings -Shade provided in the afternoon

Key :

-Wind enters site with ease -Wind travels through linked open spaces

Key : Open space

Open space

Buildings

Buildings

Boardwalk/marina

Wind direction

Shaded area

56

57


Views

58

Context

59


Sun Design Response Key : Gathering area Attraction point Entrance Open space Marina area Buildings Boat/Jet ski access

60

61


Design Criteria

62

Location Advantages :

Design Criteria :

-1Located on the sea

Use of view and orientation

-2The only public space in North Abhor

Serves the community in the area

-3Linear shape site

Walking and health

-4Attraction Point

New idea as an attraction point in Jeddah

63


Design Criteria Cinemas -Projection rooms need 1m of space behind the projector and at the operating side, 2.80m high, ventilation, noise insulation to the auditorium side. Projection rooms may be combined for several auditoriums. -Film widths of 16mm, 35mm and 70mm. The centre of the projected beam should not deviate more than °5 horizontally or vertically from the centre of the screen, or it should be deflected via a deflection mirror. -The angle from the middle of the last row of seats to the outer edge of the picture should be at most °38 for Cinemascope. -The lower edge of the projection screen should be at least 1.20m above the floor. -The auditorium should have no outside light other than emergency lighting. Walls and ceiling are made from non reflective materials and in not too bright colours.

64

65


Yachts, Marinas & Harbours

Yachts, Marinas & Harbours -Mooring spaces for sailing and motor boats have to be planned carefully to make optimum use of the water area available. For reference, allocate 5-4 sailing boats or 6 motorboats per hectare of water area. -centre-boards require a depth of 1250mm whereas fixed-keel boats need 5000-4000 mm. -The direction of the prevailing wind and waves is an important consideration in determining the position of the harbour entrance and also influences the design of the breakwaters, which protect the interior of the harbour from waves.

66

-The harbour should have a turning area, with a diameter of 60-35m, behind the entrance. -Each boat needs a berth appropriate to its use (e.g. training, weekend, holiday etc.), The options include water berths, land berths or hall/indoor berths and the areas required for boats and associated facilities are: water berths 160-90 m2; land berths 200-100m² (this gives a total area per boat of approximately 360-200m²). -In addition, at least one family car parking space should be planned for every berth.

67


Design Criteria After the pre-design research , we started to make the concept of the site , and we started to define the zones since we have very varieties on the zones and we ended up with those main zones : - Go Kart - Gatehering Areas - Shopping Center - Cinema - Resturant and we made attraction points that makes , people notice the site and comes to it - Entrance Gate - Water Tower - Water Park - Open Theatre with activities like firework and concert

* the prossess took more than the half of the summer training course and we started it with sketches , then importing them to the digital with Revit and CAD , and we ended them by finalizing them with rendering them on Revit and photoshop

68

69


The First Concept Those the ideas of the first concept and zonning

70

The ideas of the open theatre

The ideas of go kart

71


The First Concept The last result of the first concept as massing ,sections and 3d views Go Kart Section

GF – Parking 1st Floor – Drop off Gate

Open mall & Cinema

Go Kart Water Park

Gathering Areas

1st Gathering Area Section

Watch Tower Restaurants

Open Theatre Panoramic boardwalk Plaza

Open Mall and Cinema Section Jet-ski Renting Shack

72

73


The First Concept Gathering Area: -Entry to go kart - Go kart viewing gallery - Beginning of open mall - Green view and sitting area

3rd Gathering Area and Watch Tower Section

Water Park and Restaurants Section

74

75


The First Concept Go Kart Bridge:

Watching Tower:

-Overlooks the go kart track

-Entry from 3rd gathering area at the end of the open mall

-Has stops with sitting area -Supported with columns

-Overlooks the project and Jeddah city -Has view to the near land marks -About 50m tall

76

77


The Final Concept After reviewing the first concept with the eng.ghalib we took the comment and started to make the last concept

78

Redefining the zone of the Go Kart

79


The Final Concept Redefining the zone of Water park and resurants

80

This is the last massing , we started to get 3d views and rendering it , since the design was accepted by the eng.Ghalib

81


The Final Concept After the massing we started to design the elevations and start to feel the place

82

83


The Final Concept The first old render which we just canceled since its lake of life and interests

84

With many trys and tests we come with a result which was accepted

85


The Final Concept The water park entrance and the watch tower entrance

86

The Shopping area

87


The Final Concept The Entrance Gate

88

The Resturant / Waterpark

89


The Final Concept

Conclusion

The final master plan

-Annexes -Refrances

Sectoin for the whole Site

90

91


Annexes

Annexes Supervisor report

a Digital Copy of the diary

8 of Student Weekly Notes 92

93


Refrances

Annexes

Annexes

Standard from Neufert

Data from Internet & Line′s Servers 94

Images from Line's Servers & Internet & Noun

Colors from Adobe Kuler


Salem Ahmed Malibary Email : malibary.s@gmail.com mobile : 0582355088 Instigram : @Mr.y8w


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.