Mammoet World 9

Page 1

Mammoet World

9

Mammoet Europe was awarded the contract for the transportation of four heavy components to a power station. A complete generating line consisting of a gas turbine (310 tons), steam turbine (200 tons) and generator (342 tons) was transported from the Mammoet Heavy Lift Terminal to the station’s machinery hall. In addition to this, Mammoet also provided the transport and placement on the foundations of a transformer (236 tons).

Petrochemical page 6

Power page 14

Offshore page 22

Civil page 30

Marine page 34

Transport of an Absorber Stripper by Mammoet Canada. The transport configuration was 6.5 meters wide by 108 meters long and 8.5 meters high with a gross vehicle weight of 730 tons. The total distance travelled was 1,200 kilometers.

Worldwide specialists in heavy lifting and transport


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Mammoet World 9 by Mammoet - Issuu