Kentish Town Road: concept design and planning stage

3

3150

Pepys Road : concept design, planning, technical and tender stages

2424

Kitchen/Dining

Ground floor extension Tunley Road :details concept&design, planning and technical stages e construction specification West Barnes Lane: concept design and planning stage

4 5

Kingston Road: concept design and planning stage

6

Other Projects: - Albion Road, Margate - High Gable, Cobham - Hamilton Road, Wimbledon - Knepp Castle Estate, Horsham

7

SIDE ELEVATION 1:50 @ A1

Detail J 1400

2m

4m

3m

2050

Detail K

1443

eave storage

1371

SECTION B-B Bedorom 1:50 @ A1

2329

283

Detail A

5m 431 34

Ensuite

Bedroom

Play Room 2424

Living

2286

Bedroom

2276

450 24

WINGS ARE TO BE READ IN CONJUNCTION WITH THE RELEVANT I ON DRAWINGS ANDDetail DETAILS ALONG WITH THE CONSTRUCTION ON AND STRUCTURAL ENGINEERS DETAILS AND CALCULATIONS.

Kitchen/Dining/Day Room

Detail C

SECTION C-C 1:50 @ A1 Mandy Kwok - Sample of Work Portfolio 2020

Mandy Kwok

Architectural Assistant mandykk217@gmail.com 07707736270

Page 1


Bi-folding doors to client specification Bi-folding doors to client specification

Detail Detail E E 1:20 1:20 @ @ A1 A1

Pepys Road, Raynes Park, London RL RL 900*1200 900*1200

BB

Local Authority: Merton WG3 WG3 Planning approval granted, Ref: 19/P2603 , 19/P2703 , 19/P2704 Please click the reference number above to see the planning details on Merton Website

75-100mm Bandage Joint 75-100mm Bandage Joint Code 4 lead verge check over painted timber fascia board with Code 4screen lead verge check over painted timber fascia board with insect insect screen Timber joist to be 120 x 50mm, to be in line with the insulation Timber joist to be 120 x 50mm, to be in line with the insulation Single ply membrane fully adhered to 120mm Kingspan Single ply membrane fully adhered to 120mm Kingspan Thermaroof TR27 LPC/FM Thermaroof TR27 LPC/FM Vapour control layer over 18mm plywood deck Vapour control layer over 18mm plywoodofdeck Firring strips to 1:80 gradient in direction joists Firring strips to 1:80 gradient in direction of joists 18mm Plywood board over joists 18mm Plywood board over joists Flat roof joists to be 50 x 150mm C24 softwood treated timber Flat roof joists to be 50 x 150mm C24 softwood treated timber joists fixed at 400mm centres joists fixed at 400mm centres 12.5mm British Gypsum Gyproc Wallboard 12.5mm British Gypsum Gyproc Wallboard 2 x 150mm timbers to form top plate 2 x 150mm timbers to form top plate Provide 25mm insulation strip to upstand of wall to prevent possible Provide 25mm insulation strip to upstand of wall to prevent possible thermal bridge thermal bridge Slate tiles to match existing hung off 25 x 38mm battens spaced to Slate tiles to match existing hung off 25 x 38mm battens spaced to suit tiles suit tiles 9mm OSB fixed to studwork with Kingspan nilvent breathable 9mm OSB fixed to studwork with Kingspan nilvent breathable membrane over LEGEND LEGEND LEGEND membrane over 150 x 50mm softwood treated C24 timbers @ 400mm centres, 150 x 50mm softwood treated C24 timbers @ 400mm Spot Light Kingspan Kooltherm Spot Light centres, partialSpotfillLight insulation 100mm K112 Framing partial fill insulation 100mm Kingspan Kooltherm K112 Framing Board BoardExisting Spot Light Existing Spot Light Existing Spot Light 32.5mm Kingspan Kooltherm K118 insulated plasterboard ready to 32.5mmskim Kingspan Kooltherm K118 insulated plasterboard ready to receive Spot skim Light under Kitchen Cabinets Spot Light under Kitchen Cabinets Spot Light under Kitchen Cabinets receive

1st F FFL 1st F FFL

flat flat

RL RL 900*1200 900*1200

Pepys Road is a loft and rear extension project. I was actively involved from the start of the project to the construction tender stage. My input to the project included the initial measuring survey, existing drawings and proposed concept designs, liaising with the clients to confirm the design and submitting planning application. WG2 WG2 After receiving the planning permission, I produced the building regulations drawings at technical stage and the tender drawings package including M&E layout, door schedule, windows schedule, bathrooms & kitchen schedule, external work Layout and the schedule of finishes RL RL 900*1200 900*1200

GF FFL GF FFL

LEGEND

WG1 WG1

Spot Light

Existing SVP Existing SVP

Existing Spot Light

Inv = 1029 MH

Spot Light under Kitchen Cabinets R = 108 LV recessed pointing spotlight St

Inv = 1029 MH

R = 108

R = 108

St

St

Wall mounted light

rwell rwell oid oid

RWP

RWP

BIG

RWP

BIG

Detail Detail F F 1:20 1:20 @ @ A1 A1

FRONT FRONT ELEVATION ELEVATION 1:50 1:50 @ @ A1 A1

Inv = 1029 MH

CYL

BIG

boiler co Recessed 1w LED light

boiler

co

boiler

RAD

RAD

co

2D 2D 2D 2D

2D

2D 2D

Light switch

Bedorom 3

2D 2D 2D 2D

HD

HD

SVPa

Bedorom 3

For full main flat roof information see For full main flat roof information see construction details & specification construction details & specification

HD

SVPa

Dimmer light switch

RAD

RAD

TH

TH

TH

RAD

Outdoor floor light Bathroom2D mirror light

D

RAD

CYL

·

SVPa

·

Existing plug sockets to be retained

Bedorom 3

·

Existing plug sockets to be retained

Existing plug sockets to be retained

Bedorom 5

Bedorom 5

Bedorom 5

FD30

RAD

FD30

D D

TR1

TR1

Existing light switch to be retained

RAD

RAD

D D

3

D D

3

SD SD

Proposed Juliet balcony

SD SD

2D

Bedorom 4

3

DD

2D

2D

2DD

Camera

Living

C

·

Existing plug sockets, TV Internet or C phone socket to be retained

Living ·

·

Bedroom 1

Living ·

Existing plug sockets, TV Internet or C phone socket to be retained

For full Ground floor flat roof information RAD roof information RAD For full Ground floor flat see construction details & specification see construction details & specification

WF1 WF1

RAD

·

RWP

1st st F

FFL 1 F FFL

F FFL Lower 2nd Lower 2ndF FFL 2D

2D

2D

FD30

FD30

FD30 FD30

FD30

FD30

RAD

RWP RAD

RAD

Double socket switch high level Double socket switch high level

WF2 WF2

RWP

RAD

RWP

RAD

Wall mounted external light

Lower 1st F FFL Lower 1st F FFL

External Light

SL

CYL

CC

Low level External Light

Brickwork to match the existing Brickwork to match the existing

Strip light

DG3 DG3

Hot water cylinder Consumer Unit (1200mm from ffl)

Electric Under Floor Heating

Double socket switch high level

Detail Detail H H

Spotlight with integrated extractor Spotlight fan with integrated extractor fan

Spotlight with integrated extractor fan

Electric Under Floor Heating

Electric Under Floor Heating

Electric Under Floor Heating

Wet Underfloor Heating

Wet Underfloor Heating

Wet Underfloor Heating

1:20 Co0nstruction details at technical stage (N.T.S) 1:20 @ @ A1 A1

For full Ground floor extension For full Ground floor extension information see construction details & information see construction details & specification specification

Spotlight with integrated extractor fan

Heated towel rail

TR1

Unswitched low level fuse spur Unswitched level fuse spur treated timber Unswitched low level Double up 50 x 150mm C24 low softwood stud tofuse spur Double x 150mm support up the50 rear dormer C24 wall softwood treated timber stud to C C C Camera Camera Camera support the rear dormer wall between new loft Provide code 4 lead flashing extension and Provide code 4 lead flashing between new loft extension and existing construction A A A Alarmconstruction Alarm Alarm existing floor finish to client Carbon Monoxide Detector Carbon Monoxide Detector Carbon Monoxide Detector CD CD spec CD floor finish to client spec Floor Wall joists to be 170 xWall 50mm C24 softwood treated timber joists at mounted external light mounted external light Wall mounted external light Floor joists to beand 170strapped x 50mm C24 the softwood treated 400mm centres with existing joist timber joists at 400mm centres and strapped with the existing joist External Light 100mm mineral External Lightwool 10kg/m3 between External floor Light Provide with joists Provide with 100mm mineral wool 10kg/m3 between floor joists Existing rafters Low level External Light Low level External Light Low level External Light Existing rafters Existing ceiling finish Strip light Strip light Strip light SL SL SL Existing ceiling finish Joists supported at external wall below off 100 x 75m softwood Joists supported at plate, external wall below off 100 75m CYL CYL CYL x Hot water cylinderwall Hot water cylinder water softwood cylinder wall at treated timber strapped to inner leaf ofHot existing treated timber wall plate, to inner leaf of existing wall at 1800mm centers using 30strapped x 5mm galvanized mild steel straps 1800mm centers using 30 x Unit 5mm galvanized mildConsumer steelUnitstraps Consumer Unit (1200mm from ffl) Consumer (1200mm from ffl) (1200mm from ffl)

Existing pendant light to be relocated

RAD

RWP

Existing Radiator

RAD

Heated towel rail

TR1

Slate tiles to match existing hung off 25 x 38mm battens spaced to Thermostat Thermostathung off 25 x 38mm Thermostat TH TH Slate tiles to match existing battens spaced to suit tiles suit tiles detector Smoke detector Smoke detector SD SD studwork 9mm Smoke OSB fixed to with Kingspan SD nilvent breathable 9mm OSB fixed membrane over to studwork with Kingspan nilvent breathable Heat detector Heat detector Heat detector HD HD membrane over HD 150 x 50mm softwood treated C24 timbers @ 400mm centres, B B B Doorbell Doorbell centres, 150 xDoorbell 50mm softwood treated C24 timbers @ 400mm partial fill insulation 100mm Kingspan Kooltherm K112 Framing partial fill insulation 100mm Kingspan Kooltherm K112 Framing Board Intercom Intercom Intercom IN IN IN Board 32.5mm Kingspan Kooltherm K118 insulated plasterboard ready to 32.5mm Kingspan Kooltherm ready to PIR sensor PIR sensor K118 insulated plasterboard PIR sensor receive skim receive skim

Bedroom 1

Existing pendant light to be relocated

RAD

Existing Radiator

RAD

TH

RAD

RAD

Alarm RWP

·

Heated towel rail

TR1

Existing plug sockets, TV Internet or phone socket to be retained

RAD

Carbon Monoxide Detector

Existing pendant light to be relocated

Wall mounted light

RAD

Existing Radiator

RAD

TR1

D2D

Wall mounted light

RAD

Detail G Bedorom Detail G4 1:20 1:20 @ @ A1 A1

SVPa

Ensuite

D2D2DD

RAD

Proposed Juliet balcony

3

BedoromDD 4

DD

WS6 WS6 SVPa

D D 2DD

3

Unswitched low level fuse spur

A

TR1

Bedroom 1 3

Double socket switch high level

CD

SD

FD30

Ensuite

TR1

1172 RAD

Intercom PIR sensor

C

SD

Ensuite

D2D

SD

D

Hall

FD30

Existing SVP

1172 Proposed Juliet balcony

Bedroom 2

D

2 2 3 SVPa

Existing SVP

1172

Bedroom 2

SD

FD30

FD30

D

2 2 3

SD

FD30

RAD

IN B

D

Hall F FFL 2nd 2ndF FFL

FD30

Existing SVP

RAD

FD30

RAD

D

Hall

D

FD30

Existing plug sockets to be retained

SD

Hall

3

SVP

Existing SVP

RAD

FD30

FT = 240

FD30

Heat detector

FD30 D D

D

FD30

FD30

·

R = 153

FD30

IN B

D D

Existing light switch to be retained

D

FD30

SVPa

FD30

B

Hall

3

Play Room

R = 170

FD30

EM GM

Existing plug sockets to be retained

SD

SVP

FD30

RAD

plug socket to be retained

Hall

Smoke detector

Doorbell

·

FD30

IN

R = 153

D D

Existing SVP

D

WC

Play Room

Existing plug sockets to be retained

FD30

B

Play Room R = 170

·

FT = 240

SD

FD30

HD

EM GM SVPa

plug socket to be retained

Heated towel rail Thermostat

SVP

Existing SVP

RAD

2 2 3

IN

TH

R = 153

FD30

FT = 240

Existing Radiator

plug socket to be retained

SD

D D

SVP

3

WC

R = 170

FD30

EM GM SVPa

Existing light switch to be retained

FD30

RAD

Shaver socket

TR1

SVP

3

2

Bedroom 2

Extractor fan

RAD

Slate tiling to2 match the existing 2 D Slate tiling to match the existing D

2D 2D2D2D

3

TV aerial point

Radiator

FD30

3

TR1

Ceiling mounted speaker linked to multimedia socket (speakers to clients spec) WC

Kitchen/Dining/Day Room

SVP

2D 2D2D2D

WS5 WS5

Bath

TR1

2D 2D2D2D

SD

RAD

Telephone point

D

FD30

DS3 SD DS3

Bath

RAD

FF FF Room Kitchen/Dining/Day Room Kitchen/Dining/Day

D

RAD

SD

FF Cat 5 network socket

RAD

ufh

TR1

Double socket switch low level

ufh

TR1

ufh

TR1

D For full flat roof information see For full flat roof information see FD30 construction detailsFD30 & specification construction details & specificationBath

2 or 3 way light switch Single switch fuse spur

TR1

TR1

2/3/4 Gang light switch

2

LV recessed pointing spotlight

Wall mounted light

Pendant light Hanging Pendant light Hanging Pendant light CodeHanging 4 lead verge check over painted timber fascia board with half Code 4uPVC lead verge oversingle painted fasciaover board with round gutter check to fix with plytimber membrane, 120 x half Existing Hanging Pendant light Existing Hanging Pendant ply Hanging Pendant round uPVC gutter fix with single 120 x light 50mm Timber joist ,totimber joist to belightinmembrane, line with Existing theover insulation 50mm Timber joist , timber joist to be in line with Recessed the insulation Recessed 1w LED light Recessed 1w LED light to 120mm Kingspan 1w LED light Single ply membrane fully adhered Single ply membrane fully adhered to 120mm Kingspan Thermaroof TR27 LPC/FM Outdoor floor TR27 light Outdoor floor light Outdoor floor light Thermaroof LPC/FM Vapour control layer over 18mm plywood deck Vapour control layer over 18mm Bathroom mirror light Bathroom mirror lightplywood deck Bathroom mirror light Firring strips to 1:80 gradient in direction of joists over 18mm Firring strips to 1:80 in direction of joists over 18mm playwood board overgradient 50 switch x 150mm C24 softwood treated timber Light switch switch playwood board overat Light 50 x 150mm C24 softwoodLight treated timber Flat roof joists fixed 400mm centres Flat roof joists fixed at 400mm centres DimmerBritish light switch Gypsum Dimmer light switch Wallboard D Dimmer light switch D D 12.5mm Gyproc 12.5mm British Gypsum Gyproc Wallboard Gang light 2/3/4 Gang light switch to take flat roof 2/3/4 Gang light switch Triple2/3/4 joists toswitch act as header plate joists above Triple joists to act as header plate to take flat roof joists above Window to light client as per manufacturers 2 or 3 way switch specification 2 or 3 way light installed switch 2 or 3 way light switch 2 2 2 Window to client specification installed as per manufacturers guidance guidance Single switch fuse spur Single switch fuse spur Single switch fuse spur Double up 50 x 150mm C24 softwood treated timber stud to trim Double upsocket 50 x 150mm C24 softwood treated timber stud to trim Doublefor switch low level Double socket switch low level Double socket switch low level opening window opening for window networkflashing socket 5 network socket Cat 5 network socket code Cat 5 5lead toCatrooflight over single ply membrane code 5 lead flashing to rooflight over single ply membrane point F for full Telephone point Telephone ReferTelephone to Detail specification of rear dormer flatpoint roof build Refer to Detail F for full specification of rear dormer flat roof build up up Ceiling mounted speaker linked toCeiling mounted speaker linked to Ceiling mounted speaker linked to socket (speakers to clients multimedia socket (speakers to clients multimedia socket (speakers to clients Refermultimedia to Detail F/H for full specification of rear dormer wall build up spec) Referspec) to Detail F/H for spec) full specification of rear dormer wall build up TripleTVjoists to act as header plate to take wall and window above, aerial point TV aerial point TV aerial point Triple joists to act as header plate to take wall and window above, and to trim opening for hallway and to trim opening forShaver hallway Shaver socket socket Shaver socket Provide triple joists to trim opening for rooflight Provide triple joists to trim for rooflight Extractor fan Extractor fan Extractoropening fan Provide 32.5mm Kingspan Kooltherm K118 to rooflight reveals Provide 32.5mm Kingspan reveals Radiator Radiator Kooltherm K118 to rooflight Radiator

Hanging Pendant light

CYL Existing Hanging Pendant light

LV recessed pointing spotlight LV recessed pointing spotlight

Wet Underfloor Heating

GF FFL GF FFL

Mechanical & Electrical Layout in tender package (N.T.S)

Lower GF FFL Lower GF FFL

First floorFirst floor First floor Second floor Second floor Second floor Mechanical Mechanical & Electrical &Mechanical Electrical Layout Layout & Electrical LayoutMechanical Mechanical & Electrical &Mechanical Electrical Layout Layout & Electrical Layout 1:100 @ A3 1:100 @ A3 REAR 1:100ELEVATION @ A3 1:100 @ A3 1:100 @ A3 1:100 @ A3 REAR ELEVATION

Layout

Stage:

6m 8m 4m

8m 10m 6m

10m 8m

Project Drawing

Drawing

Drawing

Initial

Date:

mk

mk

Tender Stage:

Tender

Scale:

For full second floor extension information see construction details & specification

07/01/2020 14/02/2020

D

10/03/2020

Shower

Door Second Floor and paving layout - clients amendment Second Floor and- clients paving amendment layout - clients amendment First Floor layout First Floor layout - clients amendment Layout to SE findings & Ground Conditions

Jan 2020 Date:

Layout to SE findings & Ground Conditions

1:1250 @ A3 1:1250 @ A3 Scale: Scale:

Jan 2020 1:1250 @ A3

Client: Client: Address: Address:

Stage: Stage:

Mr & Mrs Eady Mr & Mrs Eady 49 Pepys Road 49 Pepys Road mk

mk Building Regulations Building Regulations

Drawing Drawing

Bedorom

New 100mm diameter foul water drain extended from existing drain, set to minimum 1:80 fall

2121

1616

Hall

St

Kitchen/Dining/Day Room WC

1291

Proposed section at Technical stage (N.T.S) Mandy Kwok - Sample of Work Portfolio 2020

M M M M M

M

Title: Plans , Elevations & detail Title: Plans , Elevations & detail Drawn By: mk Drawn By: mk Oct 2019 Date: Oct 2019 Date: 1:50 @ A1 Scale: 1:50 @ A1 Scale: Dwg No.: 2019-024-21 Rev: D Dwg No.: 2019-024-21 Rev: D

Bedroom

Hall

Ini Ini M

mk 2019-024 2019-024 Dwg No.: Tender Dwg No.: Dwg No.:A 2019-024-27 Rev: A Stage: A Rev: -27 Rev: -27

Project Project

Hall

Bedorom

A B

B 03/03/2020 14/02/2020 C JanDate: 2020 C 03/03/2020 D 10/03/2020

10m 2916

Dwg No.: 2019-024-27 Rev: A 4m 0m 4m m 2m 2m 6m 2m

Project

& Electrical Mechanical Layout Mechanical & Electrical Layout Title: Mechanical Title: Title: Client: MrClient: & Mrs Eady Mr &MKMrs Eady Mr & Mrs EadyLayout& Electrical Revisions Client amendment Revisions Rev Date Notes Pepys Road 49 Pepys Address: Road Pepys Road Rev Date Notes Address: 49Address: Drawn By: 49 Drawn By: Drawn By: mk mk A 07/01/2020 Door mk

Client:

Detail F

1:100 @ A3

Revisions Project

956

1:100 @ A3 1:100 @ A3

1:1250 @ A3 1:100

©Revisions CopyrightRevisions

Rev Date Notes Rev Date Notes Initial Rev Date Initial Notes Whilst due care and attention Whilst is taken dueto care ensure and all attention surveys, is taken to ensure Whilst surveys, care and taken to ensure surveys,drawings, reports, Thealldue copyright in allattention designs,is The drawings, copyright reports, in allall models, designs, Themodels, copyright in all designs, drawings, reports, models, drawings, dimensions and details drawings, provided dimensions are accurate, and details it is the provided drawings, are accurate, dimensions it isbills the ofand details provided are accurate, it is the specifications, quantities, specifications, calculations bills and of any quantities, other calculationsspecifications, and otherbills of quantities,A calculations and any other ClientMK A any13032020 A Client 13032020 amendment amendment 13032020 MK Builders responsibility to check Builders and verify responsibility all dimensions, to check details, and verify allBuilders dimensions, responsibility details, toby check and verify prepared all dimensions, details, documents prepared GBS documents Architectural Limitedby shall GBS remain Architectural Limited documents shallprepared remain by GBS Architectural Limited shall remain levels and sewer invert levels levels on site andprior sewer to ordering invert levels any on site prior to levels ordering andinsewer any invert levels on site prior ordering any vested the Company. vested in thetoCompany. vested in the Company. materials or commencing works. materials Should or commencing any discrepancies works.beShould anymaterials discrepancies or commencing be works. Should any discrepancies be found these should be relayed found to the these Architect shouldimmediately be relayed to forthe Architect found these be relayed to the Architect immediately forany the payment Asimmediately long asshould the for Company hasAs received long as the the payment Company inhas full received of As long as in full theof Company any has received the payment in full of any review. Should these drawings review. be used Should without theseadequate drawingssite be used without review. adequate Should site these drawings be without adequate site fees properly due and owing, fees theused properly Company due grants and owing, a licence thetoCompany the fees grants properly a licence duetoand theowing, the Company grants a licence to the investigations and subsequent investigations issues arise,and liability subsequent will lie solely issues arise,investigations liability willcopy lieand solely subsequent issuestoarise, liability solely Client to and use the documents Client copy for the andpurposes usewill theliedocuments of the for the Client purposes to copy ofand the use the documents for the purposes of the with the Builder.Do not scalewith off this the Builder.Do drawing, work not to scale figured off this drawing, with work theto Builder.Do figured not scale this drawing, to any figured project only (excluding any off extension project only of (excluding thework project). extension of theproject project). only (excluding any extension of the project). dimensions only.This drawing dimensions must be read only.This and checked drawing with mustallbe readdimensions and checked only.This with all drawing must be read and checked with all structural and relevant specialist structural drawings.The and relevant Builder specialist is to drawings.The structural Builder and is to relevant specialist drawings.The Builder is to The Company shall not be liable The Company for any use shall of the notdocuments be liable forfor any useThe of the Company documents shall for not be liable for any use of the documents for comply in all respects with the comply current in all Building respects Regulations with the current and Building comply Regulations in all respects and than withthat theany current Building Regulations and any purpose other for which purpose they other were than prepared that for and which they were any purpose prepared other andthan that for which they were prepared and latest Codes of Practice. latest Codes of Practice. latest Codesbyofthe Practice. provided Company. provided by the Company. provided by the Company.

2465

Scale: 100

1:50 1:50 @ @ A1 A1 Detail G Important Note Important Note Important Note © Copyright © Copyright

1438

SECOND SECOND FLOOR FLOOR JOIST JOIST PLAN PLAN Drawing 1:50 @ @ A1 A1 For full main flat roof 1:50 Title: Mechanical & Electrical Layout information see Ground floor Ground floor Ground floor Drawn By: mk construction details & Mechanical Mechanical & Electrical &Mechanical Electrical Layout Layout & Electrical specification Jan 2020 Date:

SECTION A-A 1:50 @ A1

Page 2


Kentish Town Road, London Local Authority: Camden Planning application submitted, Ref: 2019/6433/P Please click the reference number above to see the planning details on Camden Website Kentish Town Road Project is an on going mixed- use development project proposed for 5x residential units and ground floor commercial shop. Working with the planning consultants, The design team and I proposed 3 concept design options and submitted it for pre-application to Camden council, to design and maximise the potential qualities of the site for the community. I drafted the planning drawings with detailed renovation plans, 3D visualisation and Design & Access Statement. Important Note

© Copyright

Whilst due care and attention is taken to ensure all surveys, drawings, dimensions and details provided are accurate, it is the Builders responsibility to check and verify all dimensions, details, levels and sewer invert levels on site prior to ordering any materials or commencing works. Should any discrepancies be found these should be relayed to the Architect immediately for review. Should these drawings be used without adequate site investigations and subsequent issues arise, liability will lie solely with the Builder.Do not scale off this drawing, work to figured dimensions only.This drawing must be read and checked with all structural and relevant specialist drawings.The Builder is to comply in all respects with the current Building Regulations and latest Codes of Practice.

The Company shall not be liable for any use of the documents for any purpose other than that for which they were prepared and provided by the Company.

E AN

L

209

Ward

207

168 to 172

4

1 to 27

No.195

174 178 176

Bdy

A

CR

211

1 Property boundary

Property boundary

Property boundary

Property boundary

No.199

S

ER

L NG

The copyright in all designs, drawings, reports, models, specifications, bills of quantities, calculations and any other documents prepared by GBS Architectural Limited shall remain vested in the Company. As long as the Company has received the payment in full of any fees properly due and owing, the Company grants a licence to the Client to copy and use the documents for the purposes of the project only (excluding any extension of the project).

205

29 to 36

to

ROAD

193

49

KENT ISH

160 158

195

8

TOWN

197

N YA RD

to 4

GRA FTO

162 164

37

Una House 57 to 64

152 to 156

189

56

195

TCBs

30.1m

LES ROAD

Property boundary

Property boundary

1

PROPOSED REAR ELEVATION VISUALISATION 1:100 PROPOSED SITE PLAN 1:500 @ A1

1:100 0m

TCBs

150

PROPOSED FRONT ELEVATION VISUALISATION 1:100

N

1:500

2m

4m

6m

8m

30.3m

PRINCE OF WA

GROUND LEVEL

10m

0m

10m

20m

30m

40m

50m

EXISTING WINDOW DETAIL PLAN 1:20 @ A1

PROPOSED FRONT WINDOWS 3D View N.T.S @ A1

Property boundary

Property boundary

PROPOSED WINDOW DETAIL PLAN 1:20 @ A1

No.199

EXISTING WINDOW DETAIL ELEVATION 1:20 @ A1

No.195

Revisions Rev

Date

Notes

Initial

colour coated fixed glazed panel Powder coated aluminium double glazed windows in grey colour.

Project

PROPOSED 3D VIEW 1 - FRONT VIEW N.T.S

PROPOSED 3D VIEW 2 - REAR VIEW N.T.S

Address:

Stage:

Drawing sample with front and rear elevations, site plan and 3D visualisations (N.T.S)

Drawing Title:

Client:

97 Kentish town road NW5 2JU Planning

Proposed

Drawn By: MK Date:

AUG 2018

Scale:

VARIES @ A1

Sash window

Dwg No.: 2018-026-504Rev: -

Threshold window cill 75mm

PROPOSED WINDOW DETAIL ELEVATION 1:20 @ A1

2.0 2.1

Existing brickwork

Urban Analysis Site Analysis

197

195

20mm Brick slips 25mm Kingspan Phenolic board 5mm WW1 system adhesive

197A-F

Powder coated aluminium double glazed windows in grey colour.

The site is accessible both from Kentish Town Road and Grafton Yard. There is two way traffic on Kentish Town Road leading to the site.

Colour coated fixed glazed panel GROUND LEVEL

The front of the site on Kentish Town Road is facing east, which means the sunlight would come through in the morning to the south. The rear of the site on Grafton Road is facing west, for sunlight in the afternoon.

PROPOSED FRONT ELEVATION 1:50 @ A1

DETAIL A- WINDOW & BRICK SLIPS JUNCTION DETAIL 1:5 @ A1

1:50 0m

1m

2m

3m

4m

5m

400mm

800mm

1200mm

1600mm

2000mm

1:20

N

0mm

The L-shaped site is approximately 12.7m x 9.4m to the front side and 3.9m x 7.8m to the rear side facing Grafton Yard. The site is facing the busy High Street of Kentish Town Road. The site is surrounded by 3-5 storey mixed use or residential buildings with roof terraces to the rear. There are no large trees around the site.

EXISTING WINDOW DETAIL PLAN 1:20 @ A1

EXISTING WINDOW DETAIL PLAN 1:20 @ A1

ACCESS

PROPOSED FRONT WINDOWS 3D View N.T.S @ A1 PROPOSED WINDOW DETAIL PLAN 1:20 @ A1

ORIENTATION

Project No. 2018-026

GBS Architectural Ltd

Property boundary

NOISE

PROPOSED FRONT WINDOWS 3D View N.T.S @ A1 Property boundary

GREEN/ TREE

No.199

PROPOSED WINDOW DETAIL PLAN 1:20 @ A1

Brick slips renovation detailed plan & section (N.T.S) Property boundary

Mandy Kwok - Sample of Work Portfolio 2020

Property boundary

Design & Access statement sample with initial site study (N.T.S)

7

No.199

Page 3


150 600

Utility

new 100mm diameter foul water drain extended from existing drain, set to minimum 1:80 fall

Local Authority: Wandsworth Detail B Planning approval granted, Ref: 2019/2528 Please click the reference number above to see the planning details on Wandsworth Website 800

Tunley Road is a rear extension project. My contribution to the project consisted of; the initial measuring survey, existing drawings and proposed concept designs, assumed liaising with the clients to confirm planning permission, I produced the building regulations PROPOSED SECTION A-A the design and submitting planning application. After receiving theexisting drawings 1:50@A1 at technical stage. foundation

Bath

Bath

Bath

Bath

PROPOSED DETAIL A 1:20@A1 PROPOSED DETAIL A 1:20@A1

A A

Detail D

3902

Revisions Date

75

158

442

158

442

75

Notes

Initial

658

600

PROPOSED SECTION C-C 1:50@A1 fall

1:50@A1

600mm x 800mm C20toconcrete fill foundation 254UC73 base beam be cast trench into footing with D49 to be a minimum 1000mm ground level TBC wrapping of mesh and abelow minimum of 75mm coverby BCO

Detail E

Client:

Balham SW17 7QJ

Date:

May 2019

Scale:

VARIES @ A1

For full flat roof build up refer to Detail A/D

C

100 x 75mm timber strapped to outer lead of brickwork for to For flat roof build up refer to Detail A/D fix tofull fascia board

C

C

C

Dwg No.: 2019-022-21 Rev: -

Whilst du drawings Builders r levels and materials found the review. S investigat with the B dimensio structural comply in latest Cod

100 x 75mm timberedge strapped to outer Provide cut timber upstand to flatlead roofoftobrickwork channel for to fix to fascia board surface water toward outlet

B

B

B

B

RWP

75mm timber strapped to inner lead of brickwork cut to the flat roof level to be under the single ply membrane

to specification & construction details for full ground floor extension specification

728

175

683

Refer to specification & construction details for full ground floor extension specification

5088

HD

1157

699 201

910

174

600 1521

68

600

FD30

1114

1218

830

cup'd

920

SD

living

62.5mm Kingspan Kooltherm K118 Insulated Plasterboard PROPOSED DETAIL D ready to receive skim and decoration 1:20@A1 PROPOSED DETAIL D 1:20@A1 215mm solid brickwork Steel Beam to be 203UC46,refer to SE steel connection details

Utility

A

to connect to the SVPa via Saniaccess pump Mechanical Extraction @ 30ltrs/sec to Utility

DPC solidfinish brickto wall to be minimum 150mm above external 22mmtofloor client specification ground level 25mm insulation to perimeter of slab to prevent thermal 22mm floor finish to client specification bridge

Mandy Kwok - Sample of Work Portfolio 2020 5m

N

4m

1:20

PROPOSED GROUND FLOOR PLAN 1:50@A1

175mm Ground bearing concrete slab with A393 mesh with 1200 gaugecover Visqueen DPM (dpm linked and taped with dpc) min 30mm 50mm concrete Blinding concrete slab with A393 mesh with 175mm Ground bearing min 30mm cover 150mm hardcore 50mm concrete Blinding 600mm x 600mm C20 concrete trench fill foundation to be a 150mm minimumhardcore of 1000mm below ground level TBC by BCO A

PROPOSED FOUNDATION PLAN

1:50@A1 Proposed Plans at technical stage (N.T.S)

PROPOSED ROOF PLAN 1:50@A1 PROPOSED ROOF PLAN 1:50@A1

65mm screed of slab to prevent thermal 25mm sand/cement insulation to perimeter bridge 70mm Kingspan Kooltherm K103 65mm sand/cement screed 1200 Visqueen DPM K103 (dpm linked and taped with dpc) 70mmgauge Kingspan Kooltherm

A

A

External wall and party wall to be upgraded with 25 x 50mm softwood treated timber batten with 25mm mineral wool insulation between battens and 12mm WBP plywood with 12.5mm moisture board externally

25 x 50mm treated timber batten cavity to face 215mm solidsoftwood brickwork of external wall 25 x 50mm softwood treated timber batten cavity to face 62.5mm Kingspan Kooltherm K118 Insulated Plasterboard of external wall skim and decoration ready to receive 62.5mm Kingspan Kooltherm K118 Insulated DPC to solid brick wall to be minimum 150mmPlasterboard above external ready receive skim and decoration groundtolevel

living

WM

Partitions wall to be filled with 100mm blockwork and 12mm WBP plywood with 12.5mm moisture board

25 x 50mm softwood treated timber batten cavity to face 62.5mm Kingspan Kooltherm K118 Insulated Plasterboard of external wall skim and decoration ready to receive

Steel Beam to be 254UC73, over steel colums 203UC60, refer to SE steel connection details

Partitions wall to be filled with 100mm medium density 7N masonry partition ties to steelwork, refer to SE Specification

680

New obscured glazed door to client specification installed provide Supreme R15A prestressed lintel on the inner leaf and IG L10 Single leaf lintel to the external leaf over with min 150mm bearing each side

B

WC 1465

Steel frame for glass roof to be 152 UC23, refer to SE details

A

Existing staircase to be replaced Existing Party wall to storage to be upgraded with 25 x 50mm softwood treated timber batten with 25mm mineral wool insulation between battens and 15mm sound block plasterboard externally

1272

New pocket doors between living room and kitchen to be FD30 with a minimum of 30 minutes insulation & integrity

St

Existing blockwork partition wall to storage to be upgraded with 15mm sound block plasterboard externally

FD30

1621

2x Steel Beams to be 254UC89,refer to SE details

40mm ply Kingspan Optim-r (vacuum insulated panels) single membrane adhered to 25mm Kingspan thermaroof bridged with/ FM 20.0% flex (t) infill panels where runs of TR27 LPC optim-r panel do not accurately fit dimension of roof 40mm Kingspan Optim-r (vacuum insulated panels) bridged with 20.0% flex (t) infill panels where runscrumb of 3mm vapour check bituminous with 3mm rubber optim-r panel doon nottop, accurately fit dimension of roof protection layer over 18mm plywood decking timbervapour to brickcheck joist Hanger 3mm bituminous with 3mm rubber crumb protection layertoon 18mm plywood decking Flat roof joists betop, 175over x 50mm C24 softwood treated timber to joistcentres, Hangerprovide steel frame to opening for @ brick 400mm roof light with structural engineer specification, fix timber Flat roof joists to be 175 50mm softwood treated firring strips over with minx 1:80 fallC24 toward external wall timber @ 400mm centres, provide steel frame to opening for 12.5mm Gypsumengineer Gyproc Wallboard roof lightBritish with structural specification, fix timber firring strips over with min 1:80 fall toward external wall Masonry Hanger for Solid Joists 12.5mm British Gypsum Gyproc Wallboard 215mm solid brickwork Masonry Hanger for Solid Joists 25 x 50mm softwood treated timber batten cavity to face 215mm solid brickwork of external wall

C

Provide100mm medium density 7N masonry partition ties to steelwork, refer to SE Specification

413

726

Mechanical Extraction @ 15ltrs/sec to WC

A

A

Columns to be 203US60, to be bolted to masonry wall beyond, refer to SE Details & Specification

504

Flat roof joists to be 50 x 175mm C24 softwood treated timber joists fixed at 400mm centres

B

Proposed obscured glazed access door

478

New Steel Columns to be 203UC60, refer to SE steel connection details

Glass roof over

900*5000 Provide cut timber upstand to flatlead roofoftobrickwork channel for to 100 x 75mm timberedge strapped to outer surface water toward outlet fix to fascia board single ply membrane adhered to 25mm Kingspan thermaroof Provide cut timber edge upstand to flat roof to channel TR27 LPC / FM surface water toward outlet

30 x 5mm galavanised mild steel straps across

B

B

B

svpa

1740

Steel Beam to be 254UC73, over steel colums 203UC60, refer to SE steel connection details

C

C

cup'd

fall 3441

New SVPa to connect to existing drainage run

kitchen/ dining

fall

600

Existing solid brick wall to be upgraded with 62.5mm Kingspan Kooltherm K118 insulated plasterboard on Steel Column 203UC60 over 25*50mm timber batten New SVPa to connect to existing drainage run

C

C

Stud partitions to bathrooms. toilet & utility to have 12mm WBP plywood with 12.5mm moisture board internally and 15mm sound block plasterboard externally. 70mm mineral wool min10kg/m3 acoustic insulation slab betwen studs

5553

induction hob with downdraft extraction @ 30ltrs/sec if over hob (60lts/sec if otherwise)

790

Existing foundation to be exposed and checked on site prior to commencement of works for suitability of lower floor. Structural engineer to advice

80

MH Location Assumed

New sliding doors to client specification installed 12mm metal plate over with min 150mm bearing each side

PROPOSED DETAIL C Timber to Brick Joist Hanger 1:20@A1 PROPOSED DETAIL C 100 x 75mm timber strapped to outer lead of brickwork for to 1:20@A1 fix to fascia board

783

116

800

158 215

4060

425

820

251

890

New sliding doors to

fallclient specification, refer

75mm timber strapped to inner lead brickwork to IG theL10 Supreme R15A prestressed lintel onof the inner leafcut and flat roofleaf level to be under the single ply membrane Single lintel to the external leaf over with min 150mm bearing each side Supreme R15A prestressed lintel on the inner leaf and IG L10 Single leaf lintel to the external leaf over with min 150mm bearing each side Timber to Brick Joist Hanger A

200

A

svpa

fall

200

851

Existing manhole to be removed and new sealed Y branch installed, provide pipe work taken to new rodding point located outside of extension to allow access for Thames Water. Exact drainage location to be confirmed

Rain water outlet to soakaway located a minimum of 5 metres from any building or agreed on site with BCO

Drainage Location Assumed

A

New SVPa to Kitchen to connect to existing drainage run

3m

MK

Construction

Impo

Drawn By: MK

RWP

Refer to specification & construction details for full ground floor extension specification

2m

Building Regulations

For full external wall build up refer to Detail D

Rain water outlet to soakaway located a minimum of 5 metres from any building or agreed on site with BCO

1m

Title:

1:20@A1 PROPOSED DETAIL B 1:20@A1

Address: 6 Tunley Road

Stage:

600mm x 800mm C20 concrete trench fill foundation to be a

Drawing

Mr&Mrs. Chubbock

Provide cut timber edge roof D to channel For full external wall buildupstand up refertotoflat Detail surface water toward outlet

Provide pre-stressed concrete lintel over opening in foundation to allow existing drain to pass through, ensure minim 150mm gap, opening location to be checked

New frame to be cast on top of existing foundation if found to be sufficient.If not, Foundation to be replaces with a new strip footing 600mm wide to a minimum depth of 1m. To be agreed with BCO

PROPOSED DETAIL B minimum stage of 1000mm below ground level TBC by BCO Construction details at technical (N.T.S)

Project

fall

New SVPa to WC to connect to existing drainage run

ACO Drain channel DPC to lap under external doors ACO Drain channel 25mm insulation to perimeter of slab to prevent thermal DPC bridgeto lap under external doors

254UC73 base beam to be cast into footing with D49 wrapping mesh and a minimum of 75mm cover

PROPOSED B-Bstage (N.T.S) Proposed Sections SECTION at technical

New inspection chamber 450mm diameter to connect to existing drainage run to allow rodding access

12.5mm British Gypsum Gyproc Wallboard

150mm hardcore

1190

Rev

75

433 433

kitchen/ dining

2254

2254

2712

3008

WC

18mm Timber fascia board with 25 x 50mm timber edge piece to fix single ply membrane, ensure lap with flashing over half round uPVC gutter and provide minimum 75mm 18mm Timber bandage joint fascia board with 25 x 50mm timber edge piece to fix single ply membrane, ensure lap with flashing 100 100mm to outer lead of brickwork overxhalf roundtimber uPVCstrapped gutter and provide minimum 75mmfor bandage joint board to fix to fascia single ply membrane adhered to Kingspan thermaroof 100 x 100mm timber strapped to 25mm outer lead of brickwork for TR27 LPC / FM to fix to fascia board 40mm ply Kingspan Optim-r (vacuum insulated panels) single membrane adhered to 25mm Kingspan thermaroof bridged with/ FM 20.0% flex (t) infill panels where runs of TR27 LPC optim-r panel do not accurately fit dimension of roof 40mm Kingspan Optim-r (vacuum insulated panels) Glass roof window client specification installed bridged with 20.0%to flex (t) infill panels where runsas of per manufacturers guidance optim-r panel do not accurately fit dimension of roof Provide 32.5mm Kingspan Kooltherm K118 to rooflight Glass roof window to client specification installed as per reveals manufacturers guidance 3mm vapour check bituminous with 3mm rubber crumb Provide 32.5mm Kingspan Kooltherm K118 todecking rooflight protection layer on top, over 18mm plywood reveals Steel vapour frame for glassbituminous roof window to3mm be 152UC23, refer to SE 3mm check with rubber crumb design specification protection layer on top, over 18mm plywood decking Flat joists be 175 50mm C24 treated Steelroof frame fortoglass roofx window to besoftwood 152UC23, refer to SE timber @ 400mm centres, provide steel frame to opening for design specification roof light with structural engineer specification, fix timber Flat roof joists to be 175 50mm softwood treated firring strips over with minx 1:80 fallC24 toward external wall timber @ 400mm centres, provide steel frame to opening for For external wall build up referspecification, to Detail D fix timber roof full light with structural engineer firring strips over with min 1:80 fall toward external wall 12.5mm British Gypsum Wallboard For full external wall buildGyproc up refer to Detail D

22mm finishto toperimeter client specification 25mm floor insulation of slab to prevent thermal bridge 65mm sand/cement screed 22mm floor finish to client specification 70mm Kingspan Kooltherm K103 65mm sand/cement screed 175mm Ground bearing concrete slab with A393 mesh with min 30mm cover Kooltherm K103 70mm Kingspan 1200 gauge Visqueen DPM (dpm slab linked and taped withwith dpc) 175mm Ground bearing concrete with A393 mesh min 30mm coverBlinding 50mm concrete 1200 gauge Visqueen DPM (dpm linked and taped with dpc) 150mm hardcore 50mm concrete Blinding

75

Detail C

C

0m

158

3008

1:50

Tunley Road, Balham, London

PROPOSED DETAIL E 1:20@A1 PROPOSED DETAIL E 1:20@A1

600mm x 600mm C20 concrete trench fill foundation to be a minimum of 1000mm below groundPLAN level TBC by BCO PROPOSED RAFTER

1:50@A1

Rev Rev B

S

E

N

Proj

Clien

Page 4

Addr

Stage


West Barnes Lane, New Malden, London Local Authority: Merton Planning permission granted, Ref: 19/P1722 Please click the reference number above to see the planning details on Merton Website The West Barnes Lane project is rear yard development project to create 2x one bedroom flats to the rear of a mixed-use salon and residential building. I was No. 334 actively involved in the feasibility studies, concept design to client’s specification and London Housing Design Guide, Design and Access Statements writing and 3D visualisation for planning application.

B

H 2.74m

No. 336

kitchen/ living/ dinning 21m2

rl 900*1200

rl sk01

glazed window WM

shower 3.7m2

refused

1550

recycling

bedroom 13.1m2 rl 900*1200

Flat c (1B2p) 53.1m2

rl 900*1200 WM

high level FF obscured

st 1m2

Shop Entrance

kitchen/ living/ dinning 24.7m2

Flat B (1B1P Studio) 41.1 m2

refused

FF

bin storage 2.0m2

amenity 13.7m2 st 1.5m2

RB

900

1300

1000

lightwell 1.6m2

D

C

A

A

2x semi-vertical bike rack

up

high level obscured glazed window

bath 4.4m2 900

up Flat Entrance

B

amenity 9.6m2 bedroom 10.5m2

lightwell

Shop

Proposed ground floor plan at concept design stage (N.T.S)

summer sun 62o

No. 338 summer sun 62o

PROPOSED GROUND FLOOR PLAN

winter sun 15o winter sun 15o

N

00

0

D

C

RB

The copyright in all designs, drawings, reports, models, specifications, bills of quantities, calculations and any other documents prepared by GBS Architectural Limited shall remain vested in the Company.

Revisions Rev

Date

Project

Notes

Initial

Client:

Drawing Title:

Koo Anand

Address: 336 West Barnes Lane KT3 6NB

As long as the Company has received the payment in full of any fees properly due and owing, the Company grants a licence to the Client to copy and use the documents for the purposes of the project only (excluding any extension of the project). The Company shall not be liable for any use of the documents for any purpose other than that for which they were prepared and provided by the Company.

Stage:

Planning

Pro

Drawn By: mk Date:

ma

Scale:

1:10

Dwg No.: 201

10m

kitchen/ living/ dinning

render

bedroom 1800

kitchen/ living/ dinning

© Copyright

Whilst due care and attention is taken to ensure all surveys, drawings, dimensions and details provided are accurate, it is the Builders responsibility to check and verify all dimensions, details, levels and sewer invert levels on site prior to ordering any materials or commencing works. Should any discrepancies be found these should be relayed to the Architect immediately for review. Should these drawings be used without adequate site investigations and subsequent issues arise, liability will lie solely with the Builder.Do not scale off this drawing, work to figured dimensions only.This drawing must be read and checked with all structural and relevant specialist drawings.The Builder is to comply in all respects with the current Building Regulations and latest Codes of Practice.

2500

bedroom

8m

2100

6m

2500

4m

2m

Important Note

lightwell

Proposed section with sun study at planning stage (N.T.S) PROPOSED SECTION B- B

7.7 Sustainable Design The proposal will be a sustainable design to provide eco-friendly homes and create a green community for a better health and well being environment. Externally, the proposed well insulated zinc roof will be long lasting and recyclable. The proposed green roof can reduce energy cost by absorbing heat instead of attracting it and providing natural insulation for the flats. As the rear of the application site is located to the south east, the proposal will achieve a good level of daylight and winter natural heat from the sun with the pitched roof design and south facing double glazed windows and double glazed doors, as well, north facing windows will be minimised to reduce heat loss.

Long lasting & recyclable zinc roof

rainwater harvesting drainage system

Potential photovoltaic solar panels

Natural installed green roof

To reduce flood risk in a flood risk zone 2 area, a rainwater harvesting drainage system will be proposed. It will also reduce the water consumption from the residents. Potentially, photovoltaic solar panels will be installed as a renewable energy source.

2m

4m

6m

Internally, Higher than normal wall insulation will be achieved. The proposed flats will also use eco-friendly and sustainable flooring such as reclaimed hardwood or natural fibre carpet. Low energy light fittings and appliances will be use throughout homes to keep the carbon footprint down and provide sustainable low cost living for the residents.

PROPOSED 3D BIRDS EYE VIEW FROM SOUTH 10m N.T.S8m

Important Note South facing

© Copyright

Whilst due care and attention is taken to ensure all surveys, windows/ drawings, dimensions and details provided are accurate, it is the Builders responsibility to check and verify all dimensions, details, glass doors levels and sewer invert levels on site prior to ordering any materials or commencing works. Should any discrepancies be found these should be relayed to the Architect immediately for review. Should these drawings be used without adequate site investigations and subsequent issues arise, liability will lie solely with the Builder.Do not scale off this drawing, work to figured dimensions only.This drawing must be read and checked with all structural and relevant specialist drawings.The Builder is to comply in all respects with the current Building Regulations and latest Codes of Practice.

The copyright in all designs, drawings, reports, models, specifications, bills of quantities, calculations and any other documents prepared by GBS Architectural Limited shall remain vested in the Company.

double glazed

Revisions Rev

Date

Notes

Project Initial

Client:

KT3 6NB

As long as the Company has received the payment in full of any fees properly due and owing, the Company grants a licence to the Client to copy and use the documents for the purposes of the project only (excluding any extension of the project).

PROPOSED 3D BIRDS EYE VIEW FROM SOUTH The Company shall not be liable for any use of the documents for N.T.S any purpose other than that for which they were prepared and provided by the Company.

PROPOSED 3D BIRDS EYE VIEW FROM SOUTH N.T.S

Koo Anand

Address: 336 West Barnes Lane

Stage:

Planning

PR N.

The proposed sustainable eco-friendly homes will provide long term social and environmental benefits to the residents and the community such as, healthy indoor environment, highly-improved air quality, net temperature moderation, significant waste reduction, water conservation and lower carbon footprints.

Project No. 2019-015

GBS Architectural Ltd

Design & Access statement sample - Sustainable Design strategy PROPOSED 3D INTERNAL VIEW FROM FLAT B N.T.S

Mandy Kwok - Sample of Work Portfolio 2020

Natural daylight& winter sun heat 11

PROPOSED 3D INTERNAL VIEW(N.T.S) FROM FLAT B 3D visualisation sample

PR N.

N.T.S

PROPOSED 3D INTERNAL VIEW FROM FLAT C N.T.S

Important No

Page 5

Whilst due care and attention is drawings, dimensions and detai Builders responsibility to check levels and sewer invert levels on


Kingston Road, Wimbledon, London Local Authority: Merton Planning permission granted, Ref: 18/P3059 Please click the reference number above to see the planning details on Merton Website Kingston Road project is a back-land development project for a 0.054 hectare Sui Generis site proposed for Residential units. I was involved in the feasibility studies, concept design, Design and Access Statements writing and 3D visualisation for both pre-application and planning application.

lightwell/void

3854

3004

BEDROOM 1

KITCHEN LIVING/DINING

UNIT 1B GIA=52.1sqm

1050

1450 st

4065

1.5sqm

2200

27.3sqm

2000

2000

13.5sqm

KITCHEN LIVING/DINING

27.3sqm

BATH 2200

BEDROOM 1

UNIT 1C GIA=52.1sqm

KITCHEN LIVING/DINING

30.6sqm

HALL

BATH 2200 4.4sqm

1.5sqm

13.5sqm

2000

4319

3854

3069

UNIT 1A GIA=55.4sqm

1450 st

4065

FD30

3004

7265

lightwell/void

Amenity Space 5.5sqm

1050

1200

1250 st

1.5sqm

13.5sqm

lightwell/void

5.5sqm

4065

BEDROOM 1

lightwell/void

Amenity Space

5.5sqm

3004

lightwell/void

Amenity Space

03DF

lightwell/void

HALL

HALL

4.4sqm

BATH

4.4sqm

lightwell/void A

Proposed Firstplan Floor Proposed first floor at Plan planning stage (N.T.S) 1:100

lightwell/void

lightwell/void

Amenity Space

lightwell/void

Amenity Space

5.2sqm

6.1sqm

UNIT 0A GIA=82.8sqm

KITCHEN LIVING/DINING

KITCHEN LIVING/DINING

27.6sqm

32.2sqm

Amenity Space

5.2sqm

UNIT 0C GIA=81.7sqm

lightwell/void

lightwell/void

Amenity Space

5.2sqm

UNIT 0B GIA=77.3sqm

KITCHEN LIVING/DINING

lightwell/void

Amenity Space

Amenity Space

5.2sqm

UNIT 0D GIA=79.3sqm

5.2sqm

UNIT 0E GIA=79.3sqm

KITCHEN LIVING/DINING

UNIT 0F GIA=82.8sqm

KITCHEN LIVING/DINING

30.3sqm

KITCHEN LIVING/DINING

30.3sqm

32.6 sqm

1900

2.7sqm

FD30

WC

1400 WC

Entrance hall to flat 1B &1C

1900

1400 Entrance hall to flat 1A

1900

1400 WC

2.7sqm

2.7sqm

2.7sqm

03DF FD30

FD30

WC

WC

2.7sqm

2.7sqm

lightwell/void

Entrance hall

Entrance hall

Entrance hall

lightwell/void

lightwell/void

1900

1400

1900

Entrance hall

1400 WC

1900

32.6 sqm

Entrance hall

lightwell/void

lightwell/void

1400

Entrance hall

lightwell/void A

Proposed Ground Floor Plan 1:100

Amenity Space

5.1sqm

FD30

03DF

st

2.0sqm

BEDROOM 1 14.0sqm

11.2sqm

st

14.0sqm

BEDROOM 2

BEDROOM 2

11.2sqm

11.2sqm

BATH

BATH

4.4sqm

4.4sqm

Amenity Space

Proposed 3D Visualisation at planning stage 5.7sqm

5.6sqm

BEDROOM 1

Amenity Space 5.6sqm

3500

11.2sqm

4.4sqm

5.6sqm

HALL

BEDROOM 2 BATH

14.0sqm

HALL

11.2sqm

4.4sqm

BEDROOM 1

14.0sqm

BEDROOM 2

BATH

Amenity Space

st

2.0sqm

BEDROOM 2 11.2sqm

BATH

BATH

4.4sqm

4.4sqm

Amenity Space

Amenity Space

5.6sqm

5.7sqm

A

Mandy Kwok - Sample of Work Portfolio 2020

Amenity Space

st

14.0sqm

HALL

03DF

3500

2.0sqm

BEDROOM 1

HALL

8.9sqm

FD30

2.0sqm

BEDROOM 1

HALL

BEDROOM 2

03DF

st

17.7sqm

Amenity Space

8.9sqm

2.0sqm

BEDROOM 1

HALL

Amenity Space

8.9sqm

FD30

st

2.0sqm

Amenity Space

8.9sqm

4000

8.9sqm

3364

Amenity Space

Amenity Space

Page 6


Other Projects

Im

Whi draw Buil leve mat foun revi inve with dim stru com late

Albion Road, Margate - 3D visualisation at concept design stage Important Note Whilst due care and attention is taken to ensure all surveys, drawings, dimensions and details provided are accurate, it is the Builders responsibility to check and verify all dimensions, details, levels and sewer invert levels on site prior to ordering any materials or commencing works. Should any discrepancies be found these should be relayed to the Architect immediately for review. Should these drawings be used without adequate site investigations and subsequent issues arise, liability will lie solely with the Builder.Do not scale off this drawing, work to figured dimensions only.This drawing must be read and checked with all structural and relevant specialist drawings.The Builder is to comply in all respects with the current Building Regulations and latest Codes of Practice.

Š Copyright The copyright in all designs, drawings, reports, models, specifications, bills of quantities, calculations and any other documents prepared by GBS Architectural Limited shall remain vested in the Company. As long as the Company has received the payment in full of any fees properly due and owing, the Company grants a licence to the Client to copy and use the documents for the purposes of the project only (excluding any extension of the project). The Company shall not be liable for any use of the documents for any purpose other than that for which they were prepared and provided by the Company.

Re

Rev

Pr

Cl

Ad

St

High Gable, Cobham - 3D visualisation at concept design stage

Revisions Rev

Date

Notes

Project Client:

Drawing Mr & Mrs Vasili

Address: High Gable

31 Board High Way Cobham, KT11 2RR

Stage:

Initial

Planning

Title:

Proposed 3D Views

Drawn By: MK Date:

Mar2019

Scale:

NTS @ A1

Dwg No.: 2018-016 -103 Rev: I

Hamilton Road, Wimbledon - 3D visualisation at concept design stage

Knepp Castle Estate, Horsham - Ecolodge rewilding project University year 4 project at London South Bank University - Proposed ecolodge with rewilding architectural strategy to reintroduce the extinct animals

Mandy Kwok - Sample of Work Portfolio 2020

Page 7


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.