Detail B Hall
Content
Page GF FFL
2
Kentish Town Road: concept design and planning stage
3
3150
Pepys Road : concept design, planning, technical and tender stages
2424
Kitchen/Dining
Ground floor extension Tunley Road :details concept&design, planning and technical stages e construction specification West Barnes Lane: concept design and planning stage
4 5
Kingston Road: concept design and planning stage
6
Other Projects: - Albion Road, Margate - High Gable, Cobham - Hamilton Road, Wimbledon - Knepp Castle Estate, Horsham
7
SIDE ELEVATION 1:50 @ A1
Detail J 1400
2m
4m
3m
2050
Detail K
1443
eave storage
1371
SECTION B-B Bedorom 1:50 @ A1
2329
283
Detail A
5m 431 34
Ensuite
Bedroom
Play Room 2424
Living
2286
Bedroom
2276
450 24
WINGS ARE TO BE READ IN CONJUNCTION WITH THE RELEVANT I ON DRAWINGS ANDDetail DETAILS ALONG WITH THE CONSTRUCTION ON AND STRUCTURAL ENGINEERS DETAILS AND CALCULATIONS.
Kitchen/Dining/Day Room
Detail C
SECTION C-C 1:50 @ A1 Mandy Kwok - Sample of Work Portfolio 2020
Mandy Kwok
Architectural Assistant mandykk217@gmail.com 07707736270
Page 1
Bi-folding doors to client specification Bi-folding doors to client specification
Detail Detail E E 1:20 1:20 @ @ A1 A1
Pepys Road, Raynes Park, London RL RL 900*1200 900*1200
BB
Local Authority: Merton WG3 WG3 Planning approval granted, Ref: 19/P2603 , 19/P2703 , 19/P2704 Please click the reference number above to see the planning details on Merton Website
75-100mm Bandage Joint 75-100mm Bandage Joint Code 4 lead verge check over painted timber fascia board with Code 4screen lead verge check over painted timber fascia board with insect insect screen Timber joist to be 120 x 50mm, to be in line with the insulation Timber joist to be 120 x 50mm, to be in line with the insulation Single ply membrane fully adhered to 120mm Kingspan Single ply membrane fully adhered to 120mm Kingspan Thermaroof TR27 LPC/FM Thermaroof TR27 LPC/FM Vapour control layer over 18mm plywood deck Vapour control layer over 18mm plywoodofdeck Firring strips to 1:80 gradient in direction joists Firring strips to 1:80 gradient in direction of joists 18mm Plywood board over joists 18mm Plywood board over joists Flat roof joists to be 50 x 150mm C24 softwood treated timber Flat roof joists to be 50 x 150mm C24 softwood treated timber joists fixed at 400mm centres joists fixed at 400mm centres 12.5mm British Gypsum Gyproc Wallboard 12.5mm British Gypsum Gyproc Wallboard 2 x 150mm timbers to form top plate 2 x 150mm timbers to form top plate Provide 25mm insulation strip to upstand of wall to prevent possible Provide 25mm insulation strip to upstand of wall to prevent possible thermal bridge thermal bridge Slate tiles to match existing hung off 25 x 38mm battens spaced to Slate tiles to match existing hung off 25 x 38mm battens spaced to suit tiles suit tiles 9mm OSB fixed to studwork with Kingspan nilvent breathable 9mm OSB fixed to studwork with Kingspan nilvent breathable membrane over LEGEND LEGEND LEGEND membrane over 150 x 50mm softwood treated C24 timbers @ 400mm centres, 150 x 50mm softwood treated C24 timbers @ 400mm Spot Light Kingspan Kooltherm Spot Light centres, partialSpotfillLight insulation 100mm K112 Framing partial fill insulation 100mm Kingspan Kooltherm K112 Framing Board BoardExisting Spot Light Existing Spot Light Existing Spot Light 32.5mm Kingspan Kooltherm K118 insulated plasterboard ready to 32.5mmskim Kingspan Kooltherm K118 insulated plasterboard ready to receive Spot skim Light under Kitchen Cabinets Spot Light under Kitchen Cabinets Spot Light under Kitchen Cabinets receive
1st F FFL 1st F FFL
flat flat
RL RL 900*1200 900*1200
Pepys Road is a loft and rear extension project. I was actively involved from the start of the project to the construction tender stage. My input to the project included the initial measuring survey, existing drawings and proposed concept designs, liaising with the clients to confirm the design and submitting planning application. WG2 WG2 After receiving the planning permission, I produced the building regulations drawings at technical stage and the tender drawings package including M&E layout, door schedule, windows schedule, bathrooms & kitchen schedule, external work Layout and the schedule of finishes RL RL 900*1200 900*1200
GF FFL GF FFL
LEGEND
WG1 WG1
Spot Light
Existing SVP Existing SVP
Existing Spot Light
Inv = 1029 MH
Spot Light under Kitchen Cabinets R = 108 LV recessed pointing spotlight St
Inv = 1029 MH
R = 108
R = 108
St
St
Wall mounted light
rwell rwell oid oid
RWP
RWP
BIG
RWP
BIG
Detail Detail F F 1:20 1:20 @ @ A1 A1
FRONT FRONT ELEVATION ELEVATION 1:50 1:50 @ @ A1 A1
Inv = 1029 MH
CYL
BIG
boiler co Recessed 1w LED light
boiler
co
boiler
RAD
RAD
co
2D 2D 2D 2D
2D
2D 2D
Light switch
Bedorom 3
2D 2D 2D 2D
HD
HD
SVPa
Bedorom 3
For full main flat roof information see For full main flat roof information see construction details & specification construction details & specification
HD
SVPa
Dimmer light switch
RAD
RAD
TH
TH
TH
RAD
Outdoor floor light Bathroom2D mirror light
D
RAD
CYL
·
SVPa
·
Existing plug sockets to be retained
Bedorom 3
·
Existing plug sockets to be retained
Existing plug sockets to be retained
Bedorom 5
Bedorom 5
Bedorom 5
FD30
RAD
FD30
D D
TR1
TR1
Existing light switch to be retained
RAD
RAD
D D
3
D D
3
SD SD
Proposed Juliet balcony
SD SD
2D
Bedorom 4
3
DD
2D
2D
2DD
Camera
Living
C
·
Existing plug sockets, TV Internet or C phone socket to be retained
Living ·
·
Bedroom 1
Living ·
Existing plug sockets, TV Internet or C phone socket to be retained
For full Ground floor flat roof information RAD roof information RAD For full Ground floor flat see construction details & specification see construction details & specification
WF1 WF1
RAD
·
RWP
1st st F
FFL 1 F FFL
F FFL Lower 2nd Lower 2ndF FFL 2D
2D
2D
FD30
FD30
FD30 FD30
FD30
FD30
RAD
RWP RAD
RAD
Double socket switch high level Double socket switch high level
WF2 WF2
RWP
RAD
RWP
RAD
Wall mounted external light
Lower 1st F FFL Lower 1st F FFL
External Light
SL
CYL
CC
Low level External Light
Brickwork to match the existing Brickwork to match the existing
Strip light
DG3 DG3
Hot water cylinder Consumer Unit (1200mm from ffl)
Electric Under Floor Heating
Double socket switch high level
Detail Detail H H
Spotlight with integrated extractor Spotlight fan with integrated extractor fan
Spotlight with integrated extractor fan
Electric Under Floor Heating
Electric Under Floor Heating
Electric Under Floor Heating
Wet Underfloor Heating
Wet Underfloor Heating
Wet Underfloor Heating
1:20 Co0nstruction details at technical stage (N.T.S) 1:20 @ @ A1 A1
For full Ground floor extension For full Ground floor extension information see construction details & information see construction details & specification specification
Spotlight with integrated extractor fan
Heated towel rail
TR1
Unswitched low level fuse spur Unswitched level fuse spur treated timber Unswitched low level Double up 50 x 150mm C24 low softwood stud tofuse spur Double x 150mm support up the50 rear dormer C24 wall softwood treated timber stud to C C C Camera Camera Camera support the rear dormer wall between new loft Provide code 4 lead flashing extension and Provide code 4 lead flashing between new loft extension and existing construction A A A Alarmconstruction Alarm Alarm existing floor finish to client Carbon Monoxide Detector Carbon Monoxide Detector Carbon Monoxide Detector CD CD spec CD floor finish to client spec Floor Wall joists to be 170 xWall 50mm C24 softwood treated timber joists at mounted external light mounted external light Wall mounted external light Floor joists to beand 170strapped x 50mm C24 the softwood treated 400mm centres with existing joist timber joists at 400mm centres and strapped with the existing joist External Light 100mm mineral External Lightwool 10kg/m3 between External floor Light Provide with joists Provide with 100mm mineral wool 10kg/m3 between floor joists Existing rafters Low level External Light Low level External Light Low level External Light Existing rafters Existing ceiling finish Strip light Strip light Strip light SL SL SL Existing ceiling finish Joists supported at external wall below off 100 x 75m softwood Joists supported at plate, external wall below off 100 75m CYL CYL CYL x Hot water cylinderwall Hot water cylinder water softwood cylinder wall at treated timber strapped to inner leaf ofHot existing treated timber wall plate, to inner leaf of existing wall at 1800mm centers using 30strapped x 5mm galvanized mild steel straps 1800mm centers using 30 x Unit 5mm galvanized mildConsumer steelUnitstraps Consumer Unit (1200mm from ffl) Consumer (1200mm from ffl) (1200mm from ffl)
Existing pendant light to be relocated
RAD
RWP
Existing Radiator
RAD
Heated towel rail
TR1
Slate tiles to match existing hung off 25 x 38mm battens spaced to Thermostat Thermostathung off 25 x 38mm Thermostat TH TH Slate tiles to match existing battens spaced to suit tiles suit tiles detector Smoke detector Smoke detector SD SD studwork 9mm Smoke OSB fixed to with Kingspan SD nilvent breathable 9mm OSB fixed membrane over to studwork with Kingspan nilvent breathable Heat detector Heat detector Heat detector HD HD membrane over HD 150 x 50mm softwood treated C24 timbers @ 400mm centres, B B B Doorbell Doorbell centres, 150 xDoorbell 50mm softwood treated C24 timbers @ 400mm partial fill insulation 100mm Kingspan Kooltherm K112 Framing partial fill insulation 100mm Kingspan Kooltherm K112 Framing Board Intercom Intercom Intercom IN IN IN Board 32.5mm Kingspan Kooltherm K118 insulated plasterboard ready to 32.5mm Kingspan Kooltherm ready to PIR sensor PIR sensor K118 insulated plasterboard PIR sensor receive skim receive skim
Bedroom 1
Existing pendant light to be relocated
RAD
Existing Radiator
RAD
TH
RAD
RAD
Alarm RWP
·
Heated towel rail
TR1
Existing plug sockets, TV Internet or phone socket to be retained
RAD
Carbon Monoxide Detector
Existing pendant light to be relocated
Wall mounted light
RAD
Existing Radiator
RAD
TR1
D2D
Wall mounted light
RAD
Detail G Bedorom Detail G4 1:20 1:20 @ @ A1 A1
SVPa
Ensuite
D2D2DD
RAD
Proposed Juliet balcony
3
BedoromDD 4
DD
WS6 WS6 SVPa
D D 2DD
3
Unswitched low level fuse spur
A
TR1
Bedroom 1 3
Double socket switch high level
CD
SD
FD30
Ensuite
TR1
1172 RAD
Intercom PIR sensor
C
SD
Ensuite
D2D
SD
D
Hall
FD30
Existing SVP
1172 Proposed Juliet balcony
Bedroom 2
D
2 2 3 SVPa
Existing SVP
1172
Bedroom 2
SD
FD30
FD30
D
2 2 3
SD
FD30
RAD
IN B
D
Hall F FFL 2nd 2ndF FFL
FD30
Existing SVP
RAD
FD30
RAD
D
Hall
D
FD30
Existing plug sockets to be retained
SD
Hall
3
SVP
Existing SVP
RAD
FD30
FT = 240
FD30
Heat detector
FD30 D D
D
FD30
FD30
·
R = 153
FD30
IN B
D D
Existing light switch to be retained
D
FD30
SVPa
FD30
B
Hall
3
Play Room
R = 170
FD30
EM GM
Existing plug sockets to be retained
SD
SVP
FD30
RAD
plug socket to be retained
Hall
Smoke detector
Doorbell
·
FD30
IN
R = 153
D D
Existing SVP
D
WC
Play Room
Existing plug sockets to be retained
FD30
B
Play Room R = 170
·
FT = 240
SD
FD30
HD
EM GM SVPa
plug socket to be retained
Heated towel rail Thermostat
SVP
Existing SVP
RAD
2 2 3
IN
TH
R = 153
FD30
FT = 240
Existing Radiator
plug socket to be retained
SD
D D
SVP
3
WC
R = 170
FD30
EM GM SVPa
Existing light switch to be retained
FD30
RAD
Shaver socket
TR1
SVP
3
2
Bedroom 2
Extractor fan
RAD
Slate tiling to2 match the existing 2 D Slate tiling to match the existing D
2D 2D2D2D
3
TV aerial point
Radiator
FD30
3
TR1
Ceiling mounted speaker linked to multimedia socket (speakers to clients spec) WC
Kitchen/Dining/Day Room
SVP
2D 2D2D2D
WS5 WS5
Bath
TR1
2D 2D2D2D
SD
RAD
Telephone point
D
FD30
DS3 SD DS3
Bath
RAD
FF FF Room Kitchen/Dining/Day Room Kitchen/Dining/Day
D
RAD
SD
FF Cat 5 network socket
RAD
ufh
TR1
Double socket switch low level
ufh
TR1
ufh
TR1
D For full flat roof information see For full flat roof information see FD30 construction detailsFD30 & specification construction details & specificationBath
2 or 3 way light switch Single switch fuse spur
TR1
TR1
2/3/4 Gang light switch
2
LV recessed pointing spotlight
Wall mounted light
Pendant light Hanging Pendant light Hanging Pendant light CodeHanging 4 lead verge check over painted timber fascia board with half Code 4uPVC lead verge oversingle painted fasciaover board with round gutter check to fix with plytimber membrane, 120 x half Existing Hanging Pendant light Existing Hanging Pendant ply Hanging Pendant round uPVC gutter fix with single 120 x light 50mm Timber joist ,totimber joist to belightinmembrane, line with Existing theover insulation 50mm Timber joist , timber joist to be in line with Recessed the insulation Recessed 1w LED light Recessed 1w LED light to 120mm Kingspan 1w LED light Single ply membrane fully adhered Single ply membrane fully adhered to 120mm Kingspan Thermaroof TR27 LPC/FM Outdoor floor TR27 light Outdoor floor light Outdoor floor light Thermaroof LPC/FM Vapour control layer over 18mm plywood deck Vapour control layer over 18mm Bathroom mirror light Bathroom mirror lightplywood deck Bathroom mirror light Firring strips to 1:80 gradient in direction of joists over 18mm Firring strips to 1:80 in direction of joists over 18mm playwood board overgradient 50 switch x 150mm C24 softwood treated timber Light switch switch playwood board overat Light 50 x 150mm C24 softwoodLight treated timber Flat roof joists fixed 400mm centres Flat roof joists fixed at 400mm centres DimmerBritish light switch Gypsum Dimmer light switch Wallboard D Dimmer light switch D D 12.5mm Gyproc 12.5mm British Gypsum Gyproc Wallboard Gang light 2/3/4 Gang light switch to take flat roof 2/3/4 Gang light switch Triple2/3/4 joists toswitch act as header plate joists above Triple joists to act as header plate to take flat roof joists above Window to light client as per manufacturers 2 or 3 way switch specification 2 or 3 way light installed switch 2 or 3 way light switch 2 2 2 Window to client specification installed as per manufacturers guidance guidance Single switch fuse spur Single switch fuse spur Single switch fuse spur Double up 50 x 150mm C24 softwood treated timber stud to trim Double upsocket 50 x 150mm C24 softwood treated timber stud to trim Doublefor switch low level Double socket switch low level Double socket switch low level opening window opening for window networkflashing socket 5 network socket Cat 5 network socket code Cat 5 5lead toCatrooflight over single ply membrane code 5 lead flashing to rooflight over single ply membrane point F for full Telephone point Telephone ReferTelephone to Detail specification of rear dormer flatpoint roof build Refer to Detail F for full specification of rear dormer flat roof build up up Ceiling mounted speaker linked toCeiling mounted speaker linked to Ceiling mounted speaker linked to socket (speakers to clients multimedia socket (speakers to clients multimedia socket (speakers to clients Refermultimedia to Detail F/H for full specification of rear dormer wall build up spec) Referspec) to Detail F/H for spec) full specification of rear dormer wall build up TripleTVjoists to act as header plate to take wall and window above, aerial point TV aerial point TV aerial point Triple joists to act as header plate to take wall and window above, and to trim opening for hallway and to trim opening forShaver hallway Shaver socket socket Shaver socket Provide triple joists to trim opening for rooflight Provide triple joists to trim for rooflight Extractor fan Extractor fan Extractoropening fan Provide 32.5mm Kingspan Kooltherm K118 to rooflight reveals Provide 32.5mm Kingspan reveals Radiator Radiator Kooltherm K118 to rooflight Radiator
Hanging Pendant light
CYL Existing Hanging Pendant light
LV recessed pointing spotlight LV recessed pointing spotlight
Wet Underfloor Heating
GF FFL GF FFL
Mechanical & Electrical Layout in tender package (N.T.S)
Lower GF FFL Lower GF FFL
First floorFirst floor First floor Second floor Second floor Second floor Mechanical Mechanical & Electrical &Mechanical Electrical Layout Layout & Electrical LayoutMechanical Mechanical & Electrical &Mechanical Electrical Layout Layout & Electrical Layout 1:100 @ A3 1:100 @ A3 REAR 1:100ELEVATION @ A3 1:100 @ A3 1:100 @ A3 1:100 @ A3 REAR ELEVATION
Layout
Stage:
6m 8m 4m
8m 10m 6m
10m 8m
Project Drawing
Drawing
Drawing
Initial
Date:
mk
mk
Tender Stage:
Tender
Scale:
For full second floor extension information see construction details & specification
07/01/2020 14/02/2020
D
10/03/2020
Shower
Door Second Floor and paving layout - clients amendment Second Floor and- clients paving amendment layout - clients amendment First Floor layout First Floor layout - clients amendment Layout to SE findings & Ground Conditions
Jan 2020 Date:
Layout to SE findings & Ground Conditions
1:1250 @ A3 1:1250 @ A3 Scale: Scale:
Jan 2020 1:1250 @ A3
Client: Client: Address: Address:
Stage: Stage:
Mr & Mrs Eady Mr & Mrs Eady 49 Pepys Road 49 Pepys Road mk
mk Building Regulations Building Regulations
Drawing Drawing
Bedorom
New 100mm diameter foul water drain extended from existing drain, set to minimum 1:80 fall
2121
1616
Hall
St
Kitchen/Dining/Day Room WC
1291
Proposed section at Technical stage (N.T.S) Mandy Kwok - Sample of Work Portfolio 2020
M M M M M
M
Title: Plans , Elevations & detail Title: Plans , Elevations & detail Drawn By: mk Drawn By: mk Oct 2019 Date: Oct 2019 Date: 1:50 @ A1 Scale: 1:50 @ A1 Scale: Dwg No.: 2019-024-21 Rev: D Dwg No.: 2019-024-21 Rev: D
Bedroom
Hall
Ini Ini M
mk 2019-024 2019-024 Dwg No.: Tender Dwg No.: Dwg No.:A 2019-024-27 Rev: A Stage: A Rev: -27 Rev: -27
Project Project
Hall
Bedorom
A B
B 03/03/2020 14/02/2020 C JanDate: 2020 C 03/03/2020 D 10/03/2020
10m 2916
Dwg No.: 2019-024-27 Rev: A 4m 0m 4m m 2m 2m 6m 2m
Project
& Electrical Mechanical Layout Mechanical & Electrical Layout Title: Mechanical Title: Title: Client: MrClient: & Mrs Eady Mr &MKMrs Eady Mr & Mrs EadyLayout& Electrical Revisions Client amendment Revisions Rev Date Notes Pepys Road 49 Pepys Address: Road Pepys Road Rev Date Notes Address: 49Address: Drawn By: 49 Drawn By: Drawn By: mk mk A 07/01/2020 Door mk
Client:
Detail F
1:100 @ A3
Revisions Project
956
1:100 @ A3 1:100 @ A3
1:1250 @ A3 1:100
©Revisions CopyrightRevisions
Rev Date Notes Rev Date Notes Initial Rev Date Initial Notes Whilst due care and attention Whilst is taken dueto care ensure and all attention surveys, is taken to ensure Whilst surveys, care and taken to ensure surveys,drawings, reports, Thealldue copyright in allattention designs,is The drawings, copyright reports, in allall models, designs, Themodels, copyright in all designs, drawings, reports, models, drawings, dimensions and details drawings, provided dimensions are accurate, and details it is the provided drawings, are accurate, dimensions it isbills the ofand details provided are accurate, it is the specifications, quantities, specifications, calculations bills and of any quantities, other calculationsspecifications, and otherbills of quantities,A calculations and any other ClientMK A any13032020 A Client 13032020 amendment amendment 13032020 MK Builders responsibility to check Builders and verify responsibility all dimensions, to check details, and verify allBuilders dimensions, responsibility details, toby check and verify prepared all dimensions, details, documents prepared GBS documents Architectural Limitedby shall GBS remain Architectural Limited documents shallprepared remain by GBS Architectural Limited shall remain levels and sewer invert levels levels on site andprior sewer to ordering invert levels any on site prior to levels ordering andinsewer any invert levels on site prior ordering any vested the Company. vested in thetoCompany. vested in the Company. materials or commencing works. materials Should or commencing any discrepancies works.beShould anymaterials discrepancies or commencing be works. Should any discrepancies be found these should be relayed found to the these Architect shouldimmediately be relayed to forthe Architect found these be relayed to the Architect immediately forany the payment Asimmediately long asshould the for Company hasAs received long as the the payment Company inhas full received of As long as in full theof Company any has received the payment in full of any review. Should these drawings review. be used Should without theseadequate drawingssite be used without review. adequate Should site these drawings be without adequate site fees properly due and owing, fees theused properly Company due grants and owing, a licence thetoCompany the fees grants properly a licence duetoand theowing, the Company grants a licence to the investigations and subsequent investigations issues arise,and liability subsequent will lie solely issues arise,investigations liability willcopy lieand solely subsequent issuestoarise, liability solely Client to and use the documents Client copy for the andpurposes usewill theliedocuments of the for the Client purposes to copy ofand the use the documents for the purposes of the with the Builder.Do not scalewith off this the Builder.Do drawing, work not to scale figured off this drawing, with work theto Builder.Do figured not scale this drawing, to any figured project only (excluding any off extension project only of (excluding thework project). extension of theproject project). only (excluding any extension of the project). dimensions only.This drawing dimensions must be read only.This and checked drawing with mustallbe readdimensions and checked only.This with all drawing must be read and checked with all structural and relevant specialist structural drawings.The and relevant Builder specialist is to drawings.The structural Builder and is to relevant specialist drawings.The Builder is to The Company shall not be liable The Company for any use shall of the notdocuments be liable forfor any useThe of the Company documents shall for not be liable for any use of the documents for comply in all respects with the comply current in all Building respects Regulations with the current and Building comply Regulations in all respects and than withthat theany current Building Regulations and any purpose other for which purpose they other were than prepared that for and which they were any purpose prepared other andthan that for which they were prepared and latest Codes of Practice. latest Codes of Practice. latest Codesbyofthe Practice. provided Company. provided by the Company. provided by the Company.
2465
Scale: 100
1:50 1:50 @ @ A1 A1 Detail G Important Note Important Note Important Note © Copyright © Copyright
1438
SECOND SECOND FLOOR FLOOR JOIST JOIST PLAN PLAN Drawing 1:50 @ @ A1 A1 For full main flat roof 1:50 Title: Mechanical & Electrical Layout information see Ground floor Ground floor Ground floor Drawn By: mk construction details & Mechanical Mechanical & Electrical &Mechanical Electrical Layout Layout & Electrical specification Jan 2020 Date:
SECTION A-A 1:50 @ A1
Page 2
Kentish Town Road, London Local Authority: Camden Planning application submitted, Ref: 2019/6433/P Please click the reference number above to see the planning details on Camden Website Kentish Town Road Project is an on going mixed- use development project proposed for 5x residential units and ground floor commercial shop. Working with the planning consultants, The design team and I proposed 3 concept design options and submitted it for pre-application to Camden council, to design and maximise the potential qualities of the site for the community. I drafted the planning drawings with detailed renovation plans, 3D visualisation and Design & Access Statement. Important Note
© Copyright
Whilst due care and attention is taken to ensure all surveys, drawings, dimensions and details provided are accurate, it is the Builders responsibility to check and verify all dimensions, details, levels and sewer invert levels on site prior to ordering any materials or commencing works. Should any discrepancies be found these should be relayed to the Architect immediately for review. Should these drawings be used without adequate site investigations and subsequent issues arise, liability will lie solely with the Builder.Do not scale off this drawing, work to figured dimensions only.This drawing must be read and checked with all structural and relevant specialist drawings.The Builder is to comply in all respects with the current Building Regulations and latest Codes of Practice.
The Company shall not be liable for any use of the documents for any purpose other than that for which they were prepared and provided by the Company.
E AN
L
209
Ward
207
168 to 172
4
1 to 27
No.195
174 178 176
Bdy
A
CR
211
1 Property boundary
Property boundary
Property boundary
Property boundary
No.199
S
ER
L NG
The copyright in all designs, drawings, reports, models, specifications, bills of quantities, calculations and any other documents prepared by GBS Architectural Limited shall remain vested in the Company. As long as the Company has received the payment in full of any fees properly due and owing, the Company grants a licence to the Client to copy and use the documents for the purposes of the project only (excluding any extension of the project).
205
29 to 36
to
ROAD
193
49
KENT ISH
160 158
195
8
TOWN
197
N YA RD
to 4
GRA FTO
162 164
37
Una House 57 to 64
152 to 156
189
56
195
TCBs
30.1m
LES ROAD
Property boundary
Property boundary
1
PROPOSED REAR ELEVATION VISUALISATION 1:100 PROPOSED SITE PLAN 1:500 @ A1
1:100 0m
TCBs
150
PROPOSED FRONT ELEVATION VISUALISATION 1:100
N
1:500
2m
4m
6m
8m
30.3m
PRINCE OF WA
GROUND LEVEL
10m
0m
10m
20m
30m
40m
50m
EXISTING WINDOW DETAIL PLAN 1:20 @ A1
PROPOSED FRONT WINDOWS 3D View N.T.S @ A1
Property boundary
Property boundary
PROPOSED WINDOW DETAIL PLAN 1:20 @ A1
No.199
EXISTING WINDOW DETAIL ELEVATION 1:20 @ A1
No.195
Revisions Rev
Date
Notes
Initial
colour coated fixed glazed panel Powder coated aluminium double glazed windows in grey colour.
Project
PROPOSED 3D VIEW 1 - FRONT VIEW N.T.S
PROPOSED 3D VIEW 2 - REAR VIEW N.T.S
Address:
Stage:
Drawing sample with front and rear elevations, site plan and 3D visualisations (N.T.S)
Drawing Title:
Client:
97 Kentish town road NW5 2JU Planning
Proposed
Drawn By: MK Date:
AUG 2018
Scale:
VARIES @ A1
Sash window
Dwg No.: 2018-026-504Rev: -
Threshold window cill 75mm
PROPOSED WINDOW DETAIL ELEVATION 1:20 @ A1
2.0 2.1
Existing brickwork
Urban Analysis Site Analysis
197
195
20mm Brick slips 25mm Kingspan Phenolic board 5mm WW1 system adhesive
197A-F
Powder coated aluminium double glazed windows in grey colour.
The site is accessible both from Kentish Town Road and Grafton Yard. There is two way traffic on Kentish Town Road leading to the site.
Colour coated fixed glazed panel GROUND LEVEL
The front of the site on Kentish Town Road is facing east, which means the sunlight would come through in the morning to the south. The rear of the site on Grafton Road is facing west, for sunlight in the afternoon.
PROPOSED FRONT ELEVATION 1:50 @ A1
DETAIL A- WINDOW & BRICK SLIPS JUNCTION DETAIL 1:5 @ A1
1:50 0m
1m
2m
3m
4m
5m
400mm
800mm
1200mm
1600mm
2000mm
1:20
N
0mm
The L-shaped site is approximately 12.7m x 9.4m to the front side and 3.9m x 7.8m to the rear side facing Grafton Yard. The site is facing the busy High Street of Kentish Town Road. The site is surrounded by 3-5 storey mixed use or residential buildings with roof terraces to the rear. There are no large trees around the site.
EXISTING WINDOW DETAIL PLAN 1:20 @ A1
EXISTING WINDOW DETAIL PLAN 1:20 @ A1
ACCESS
PROPOSED FRONT WINDOWS 3D View N.T.S @ A1 PROPOSED WINDOW DETAIL PLAN 1:20 @ A1
ORIENTATION
Project No. 2018-026
GBS Architectural Ltd
Property boundary
NOISE
PROPOSED FRONT WINDOWS 3D View N.T.S @ A1 Property boundary
GREEN/ TREE
No.199
PROPOSED WINDOW DETAIL PLAN 1:20 @ A1
Brick slips renovation detailed plan & section (N.T.S) Property boundary
Mandy Kwok - Sample of Work Portfolio 2020
Property boundary
Design & Access statement sample with initial site study (N.T.S)
7
No.199
Page 3
150 600
Utility
new 100mm diameter foul water drain extended from existing drain, set to minimum 1:80 fall
Local Authority: Wandsworth Detail B Planning approval granted, Ref: 2019/2528 Please click the reference number above to see the planning details on Wandsworth Website 800
Tunley Road is a rear extension project. My contribution to the project consisted of; the initial measuring survey, existing drawings and proposed concept designs, assumed liaising with the clients to confirm planning permission, I produced the building regulations PROPOSED SECTION A-A the design and submitting planning application. After receiving theexisting drawings 1:50@A1 at technical stage. foundation
Bath
Bath
Bath
Bath
PROPOSED DETAIL A 1:20@A1 PROPOSED DETAIL A 1:20@A1
A A
Detail D
3902
Revisions Date
75
158
442
158
442
75
Notes
Initial
658
600
PROPOSED SECTION C-C 1:50@A1 fall
1:50@A1
600mm x 800mm C20toconcrete fill foundation 254UC73 base beam be cast trench into footing with D49 to be a minimum 1000mm ground level TBC wrapping of mesh and abelow minimum of 75mm coverby BCO
Detail E
Client:
Balham SW17 7QJ
Date:
May 2019
Scale:
VARIES @ A1
For full flat roof build up refer to Detail A/D
C
100 x 75mm timber strapped to outer lead of brickwork for to For flat roof build up refer to Detail A/D fix tofull fascia board
C
C
C
Dwg No.: 2019-022-21 Rev: -
Whilst du drawings Builders r levels and materials found the review. S investigat with the B dimensio structural comply in latest Cod
100 x 75mm timberedge strapped to outer Provide cut timber upstand to flatlead roofoftobrickwork channel for to fix to fascia board surface water toward outlet
B
B
B
B
RWP
75mm timber strapped to inner lead of brickwork cut to the flat roof level to be under the single ply membrane
to specification & construction details for full ground floor extension specification
728
175
683
Refer to specification & construction details for full ground floor extension specification
5088
HD
1157
699 201
910
174
600 1521
68
600
FD30
1114
1218
830
cup'd
920
SD
living
62.5mm Kingspan Kooltherm K118 Insulated Plasterboard PROPOSED DETAIL D ready to receive skim and decoration 1:20@A1 PROPOSED DETAIL D 1:20@A1 215mm solid brickwork Steel Beam to be 203UC46,refer to SE steel connection details
Utility
A
to connect to the SVPa via Saniaccess pump Mechanical Extraction @ 30ltrs/sec to Utility
DPC solidfinish brickto wall to be minimum 150mm above external 22mmtofloor client specification ground level 25mm insulation to perimeter of slab to prevent thermal 22mm floor finish to client specification bridge
Mandy Kwok - Sample of Work Portfolio 2020 5m
N
4m
1:20
PROPOSED GROUND FLOOR PLAN 1:50@A1
175mm Ground bearing concrete slab with A393 mesh with 1200 gaugecover Visqueen DPM (dpm linked and taped with dpc) min 30mm 50mm concrete Blinding concrete slab with A393 mesh with 175mm Ground bearing min 30mm cover 150mm hardcore 50mm concrete Blinding 600mm x 600mm C20 concrete trench fill foundation to be a 150mm minimumhardcore of 1000mm below ground level TBC by BCO A
PROPOSED FOUNDATION PLAN
1:50@A1 Proposed Plans at technical stage (N.T.S)
PROPOSED ROOF PLAN 1:50@A1 PROPOSED ROOF PLAN 1:50@A1
65mm screed of slab to prevent thermal 25mm sand/cement insulation to perimeter bridge 70mm Kingspan Kooltherm K103 65mm sand/cement screed 1200 Visqueen DPM K103 (dpm linked and taped with dpc) 70mmgauge Kingspan Kooltherm
A
A
External wall and party wall to be upgraded with 25 x 50mm softwood treated timber batten with 25mm mineral wool insulation between battens and 12mm WBP plywood with 12.5mm moisture board externally
25 x 50mm treated timber batten cavity to face 215mm solidsoftwood brickwork of external wall 25 x 50mm softwood treated timber batten cavity to face 62.5mm Kingspan Kooltherm K118 Insulated Plasterboard of external wall skim and decoration ready to receive 62.5mm Kingspan Kooltherm K118 Insulated DPC to solid brick wall to be minimum 150mmPlasterboard above external ready receive skim and decoration groundtolevel
living
WM
Partitions wall to be filled with 100mm blockwork and 12mm WBP plywood with 12.5mm moisture board
25 x 50mm softwood treated timber batten cavity to face 62.5mm Kingspan Kooltherm K118 Insulated Plasterboard of external wall skim and decoration ready to receive
Steel Beam to be 254UC73, over steel colums 203UC60, refer to SE steel connection details
Partitions wall to be filled with 100mm medium density 7N masonry partition ties to steelwork, refer to SE Specification
680
New obscured glazed door to client specification installed provide Supreme R15A prestressed lintel on the inner leaf and IG L10 Single leaf lintel to the external leaf over with min 150mm bearing each side
B
WC 1465
Steel frame for glass roof to be 152 UC23, refer to SE details
A
Existing staircase to be replaced Existing Party wall to storage to be upgraded with 25 x 50mm softwood treated timber batten with 25mm mineral wool insulation between battens and 15mm sound block plasterboard externally
1272
New pocket doors between living room and kitchen to be FD30 with a minimum of 30 minutes insulation & integrity
St
Existing blockwork partition wall to storage to be upgraded with 15mm sound block plasterboard externally
FD30
1621
2x Steel Beams to be 254UC89,refer to SE details
40mm ply Kingspan Optim-r (vacuum insulated panels) single membrane adhered to 25mm Kingspan thermaroof bridged with/ FM 20.0% flex (t) infill panels where runs of TR27 LPC optim-r panel do not accurately fit dimension of roof 40mm Kingspan Optim-r (vacuum insulated panels) bridged with 20.0% flex (t) infill panels where runscrumb of 3mm vapour check bituminous with 3mm rubber optim-r panel doon nottop, accurately fit dimension of roof protection layer over 18mm plywood decking timbervapour to brickcheck joist Hanger 3mm bituminous with 3mm rubber crumb protection layertoon 18mm plywood decking Flat roof joists betop, 175over x 50mm C24 softwood treated timber to joistcentres, Hangerprovide steel frame to opening for @ brick 400mm roof light with structural engineer specification, fix timber Flat roof joists to be 175 50mm softwood treated firring strips over with minx 1:80 fallC24 toward external wall timber @ 400mm centres, provide steel frame to opening for 12.5mm Gypsumengineer Gyproc Wallboard roof lightBritish with structural specification, fix timber firring strips over with min 1:80 fall toward external wall Masonry Hanger for Solid Joists 12.5mm British Gypsum Gyproc Wallboard 215mm solid brickwork Masonry Hanger for Solid Joists 25 x 50mm softwood treated timber batten cavity to face 215mm solid brickwork of external wall
C
Provide100mm medium density 7N masonry partition ties to steelwork, refer to SE Specification
413
726
Mechanical Extraction @ 15ltrs/sec to WC
A
A
Columns to be 203US60, to be bolted to masonry wall beyond, refer to SE Details & Specification
504
Flat roof joists to be 50 x 175mm C24 softwood treated timber joists fixed at 400mm centres
B
Proposed obscured glazed access door
478
New Steel Columns to be 203UC60, refer to SE steel connection details
Glass roof over
900*5000 Provide cut timber upstand to flatlead roofoftobrickwork channel for to 100 x 75mm timberedge strapped to outer surface water toward outlet fix to fascia board single ply membrane adhered to 25mm Kingspan thermaroof Provide cut timber edge upstand to flat roof to channel TR27 LPC / FM surface water toward outlet
30 x 5mm galavanised mild steel straps across
B
B
B
svpa
1740
Steel Beam to be 254UC73, over steel colums 203UC60, refer to SE steel connection details
C
C
cup'd
fall 3441
New SVPa to connect to existing drainage run
kitchen/ dining
fall
600
Existing solid brick wall to be upgraded with 62.5mm Kingspan Kooltherm K118 insulated plasterboard on Steel Column 203UC60 over 25*50mm timber batten New SVPa to connect to existing drainage run
C
C
Stud partitions to bathrooms. toilet & utility to have 12mm WBP plywood with 12.5mm moisture board internally and 15mm sound block plasterboard externally. 70mm mineral wool min10kg/m3 acoustic insulation slab betwen studs
5553
induction hob with downdraft extraction @ 30ltrs/sec if over hob (60lts/sec if otherwise)
790
Existing foundation to be exposed and checked on site prior to commencement of works for suitability of lower floor. Structural engineer to advice
80
MH Location Assumed
New sliding doors to client specification installed 12mm metal plate over with min 150mm bearing each side
PROPOSED DETAIL C Timber to Brick Joist Hanger 1:20@A1 PROPOSED DETAIL C 100 x 75mm timber strapped to outer lead of brickwork for to 1:20@A1 fix to fascia board
783
116
800
158 215
4060
425
820
251
890
New sliding doors to
fallclient specification, refer
75mm timber strapped to inner lead brickwork to IG theL10 Supreme R15A prestressed lintel onof the inner leafcut and flat roofleaf level to be under the single ply membrane Single lintel to the external leaf over with min 150mm bearing each side Supreme R15A prestressed lintel on the inner leaf and IG L10 Single leaf lintel to the external leaf over with min 150mm bearing each side Timber to Brick Joist Hanger A
200
A
svpa
fall
200
851
Existing manhole to be removed and new sealed Y branch installed, provide pipe work taken to new rodding point located outside of extension to allow access for Thames Water. Exact drainage location to be confirmed
Rain water outlet to soakaway located a minimum of 5 metres from any building or agreed on site with BCO
Drainage Location Assumed
A
New SVPa to Kitchen to connect to existing drainage run
3m
MK
Construction
Impo
Drawn By: MK
RWP
Refer to specification & construction details for full ground floor extension specification
2m
Building Regulations
For full external wall build up refer to Detail D
Rain water outlet to soakaway located a minimum of 5 metres from any building or agreed on site with BCO
1m
Title:
1:20@A1 PROPOSED DETAIL B 1:20@A1
Address: 6 Tunley Road
Stage:
600mm x 800mm C20 concrete trench fill foundation to be a
Drawing
Mr&Mrs. Chubbock
Provide cut timber edge roof D to channel For full external wall buildupstand up refertotoflat Detail surface water toward outlet
Provide pre-stressed concrete lintel over opening in foundation to allow existing drain to pass through, ensure minim 150mm gap, opening location to be checked
New frame to be cast on top of existing foundation if found to be sufficient.If not, Foundation to be replaces with a new strip footing 600mm wide to a minimum depth of 1m. To be agreed with BCO
PROPOSED DETAIL B minimum stage of 1000mm below ground level TBC by BCO Construction details at technical (N.T.S)
Project
fall
New SVPa to WC to connect to existing drainage run
ACO Drain channel DPC to lap under external doors ACO Drain channel 25mm insulation to perimeter of slab to prevent thermal DPC bridgeto lap under external doors
254UC73 base beam to be cast into footing with D49 wrapping mesh and a minimum of 75mm cover
PROPOSED B-Bstage (N.T.S) Proposed Sections SECTION at technical
New inspection chamber 450mm diameter to connect to existing drainage run to allow rodding access
12.5mm British Gypsum Gyproc Wallboard
150mm hardcore
1190
Rev
75
433 433
kitchen/ dining
2254
2254
2712
3008
WC
18mm Timber fascia board with 25 x 50mm timber edge piece to fix single ply membrane, ensure lap with flashing over half round uPVC gutter and provide minimum 75mm 18mm Timber bandage joint fascia board with 25 x 50mm timber edge piece to fix single ply membrane, ensure lap with flashing 100 100mm to outer lead of brickwork overxhalf roundtimber uPVCstrapped gutter and provide minimum 75mmfor bandage joint board to fix to fascia single ply membrane adhered to Kingspan thermaroof 100 x 100mm timber strapped to 25mm outer lead of brickwork for TR27 LPC / FM to fix to fascia board 40mm ply Kingspan Optim-r (vacuum insulated panels) single membrane adhered to 25mm Kingspan thermaroof bridged with/ FM 20.0% flex (t) infill panels where runs of TR27 LPC optim-r panel do not accurately fit dimension of roof 40mm Kingspan Optim-r (vacuum insulated panels) Glass roof window client specification installed bridged with 20.0%to flex (t) infill panels where runsas of per manufacturers guidance optim-r panel do not accurately fit dimension of roof Provide 32.5mm Kingspan Kooltherm K118 to rooflight Glass roof window to client specification installed as per reveals manufacturers guidance 3mm vapour check bituminous with 3mm rubber crumb Provide 32.5mm Kingspan Kooltherm K118 todecking rooflight protection layer on top, over 18mm plywood reveals Steel vapour frame for glassbituminous roof window to3mm be 152UC23, refer to SE 3mm check with rubber crumb design specification protection layer on top, over 18mm plywood decking Flat joists be 175 50mm C24 treated Steelroof frame fortoglass roofx window to besoftwood 152UC23, refer to SE timber @ 400mm centres, provide steel frame to opening for design specification roof light with structural engineer specification, fix timber Flat roof joists to be 175 50mm softwood treated firring strips over with minx 1:80 fallC24 toward external wall timber @ 400mm centres, provide steel frame to opening for For external wall build up referspecification, to Detail D fix timber roof full light with structural engineer firring strips over with min 1:80 fall toward external wall 12.5mm British Gypsum Wallboard For full external wall buildGyproc up refer to Detail D
22mm finishto toperimeter client specification 25mm floor insulation of slab to prevent thermal bridge 65mm sand/cement screed 22mm floor finish to client specification 70mm Kingspan Kooltherm K103 65mm sand/cement screed 175mm Ground bearing concrete slab with A393 mesh with min 30mm cover Kooltherm K103 70mm Kingspan 1200 gauge Visqueen DPM (dpm slab linked and taped withwith dpc) 175mm Ground bearing concrete with A393 mesh min 30mm coverBlinding 50mm concrete 1200 gauge Visqueen DPM (dpm linked and taped with dpc) 150mm hardcore 50mm concrete Blinding
75
Detail C
C
0m
158
3008
1:50
Tunley Road, Balham, London
PROPOSED DETAIL E 1:20@A1 PROPOSED DETAIL E 1:20@A1
600mm x 600mm C20 concrete trench fill foundation to be a minimum of 1000mm below groundPLAN level TBC by BCO PROPOSED RAFTER
1:50@A1
Rev Rev B
S
E
N
Proj
Clien
Page 4
Addr
Stage
West Barnes Lane, New Malden, London Local Authority: Merton Planning permission granted, Ref: 19/P1722 Please click the reference number above to see the planning details on Merton Website The West Barnes Lane project is rear yard development project to create 2x one bedroom flats to the rear of a mixed-use salon and residential building. I was No. 334 actively involved in the feasibility studies, concept design to client’s specification and London Housing Design Guide, Design and Access Statements writing and 3D visualisation for planning application.
B
H 2.74m
No. 336
kitchen/ living/ dinning 21m2
rl 900*1200
rl sk01
glazed window WM
shower 3.7m2
refused
1550
recycling
bedroom 13.1m2 rl 900*1200
Flat c (1B2p) 53.1m2
rl 900*1200 WM
high level FF obscured
st 1m2
Shop Entrance
kitchen/ living/ dinning 24.7m2
Flat B (1B1P Studio) 41.1 m2
refused
FF
bin storage 2.0m2
amenity 13.7m2 st 1.5m2
RB
900
1300
1000
lightwell 1.6m2
D
C
A
A
2x semi-vertical bike rack
up
high level obscured glazed window
bath 4.4m2 900
up Flat Entrance
B
amenity 9.6m2 bedroom 10.5m2
lightwell
Shop
Proposed ground floor plan at concept design stage (N.T.S)
summer sun 62o
No. 338 summer sun 62o
PROPOSED GROUND FLOOR PLAN
winter sun 15o winter sun 15o
N
00
0
D
C
RB
The copyright in all designs, drawings, reports, models, specifications, bills of quantities, calculations and any other documents prepared by GBS Architectural Limited shall remain vested in the Company.
Revisions Rev
Date
Project
Notes
Initial
Client:
Drawing Title:
Koo Anand
Address: 336 West Barnes Lane KT3 6NB
As long as the Company has received the payment in full of any fees properly due and owing, the Company grants a licence to the Client to copy and use the documents for the purposes of the project only (excluding any extension of the project). The Company shall not be liable for any use of the documents for any purpose other than that for which they were prepared and provided by the Company.
Stage:
Planning
Pro
Drawn By: mk Date:
ma
Scale:
1:10
Dwg No.: 201
10m
kitchen/ living/ dinning
render
bedroom 1800
kitchen/ living/ dinning
© Copyright
Whilst due care and attention is taken to ensure all surveys, drawings, dimensions and details provided are accurate, it is the Builders responsibility to check and verify all dimensions, details, levels and sewer invert levels on site prior to ordering any materials or commencing works. Should any discrepancies be found these should be relayed to the Architect immediately for review. Should these drawings be used without adequate site investigations and subsequent issues arise, liability will lie solely with the Builder.Do not scale off this drawing, work to figured dimensions only.This drawing must be read and checked with all structural and relevant specialist drawings.The Builder is to comply in all respects with the current Building Regulations and latest Codes of Practice.
2500
bedroom
8m
2100
6m
2500
4m
2m
Important Note
lightwell
Proposed section with sun study at planning stage (N.T.S) PROPOSED SECTION B- B
7.7 Sustainable Design The proposal will be a sustainable design to provide eco-friendly homes and create a green community for a better health and well being environment. Externally, the proposed well insulated zinc roof will be long lasting and recyclable. The proposed green roof can reduce energy cost by absorbing heat instead of attracting it and providing natural insulation for the flats. As the rear of the application site is located to the south east, the proposal will achieve a good level of daylight and winter natural heat from the sun with the pitched roof design and south facing double glazed windows and double glazed doors, as well, north facing windows will be minimised to reduce heat loss.
Long lasting & recyclable zinc roof
rainwater harvesting drainage system
Potential photovoltaic solar panels
Natural installed green roof
To reduce flood risk in a flood risk zone 2 area, a rainwater harvesting drainage system will be proposed. It will also reduce the water consumption from the residents. Potentially, photovoltaic solar panels will be installed as a renewable energy source.
2m
4m
6m
Internally, Higher than normal wall insulation will be achieved. The proposed flats will also use eco-friendly and sustainable flooring such as reclaimed hardwood or natural fibre carpet. Low energy light fittings and appliances will be use throughout homes to keep the carbon footprint down and provide sustainable low cost living for the residents.
PROPOSED 3D BIRDS EYE VIEW FROM SOUTH 10m N.T.S8m
Important Note South facing
© Copyright
Whilst due care and attention is taken to ensure all surveys, windows/ drawings, dimensions and details provided are accurate, it is the Builders responsibility to check and verify all dimensions, details, glass doors levels and sewer invert levels on site prior to ordering any materials or commencing works. Should any discrepancies be found these should be relayed to the Architect immediately for review. Should these drawings be used without adequate site investigations and subsequent issues arise, liability will lie solely with the Builder.Do not scale off this drawing, work to figured dimensions only.This drawing must be read and checked with all structural and relevant specialist drawings.The Builder is to comply in all respects with the current Building Regulations and latest Codes of Practice.
The copyright in all designs, drawings, reports, models, specifications, bills of quantities, calculations and any other documents prepared by GBS Architectural Limited shall remain vested in the Company.
double glazed
Revisions Rev
Date
Notes
Project Initial
Client:
KT3 6NB
As long as the Company has received the payment in full of any fees properly due and owing, the Company grants a licence to the Client to copy and use the documents for the purposes of the project only (excluding any extension of the project).
PROPOSED 3D BIRDS EYE VIEW FROM SOUTH The Company shall not be liable for any use of the documents for N.T.S any purpose other than that for which they were prepared and provided by the Company.
PROPOSED 3D BIRDS EYE VIEW FROM SOUTH N.T.S
Koo Anand
Address: 336 West Barnes Lane
Stage:
Planning
PR N.
The proposed sustainable eco-friendly homes will provide long term social and environmental benefits to the residents and the community such as, healthy indoor environment, highly-improved air quality, net temperature moderation, significant waste reduction, water conservation and lower carbon footprints.
Project No. 2019-015
GBS Architectural Ltd
Design & Access statement sample - Sustainable Design strategy PROPOSED 3D INTERNAL VIEW FROM FLAT B N.T.S
Mandy Kwok - Sample of Work Portfolio 2020
Natural daylight& winter sun heat 11
PROPOSED 3D INTERNAL VIEW(N.T.S) FROM FLAT B 3D visualisation sample
PR N.
N.T.S
PROPOSED 3D INTERNAL VIEW FROM FLAT C N.T.S
Important No
Page 5
Whilst due care and attention is drawings, dimensions and detai Builders responsibility to check levels and sewer invert levels on
Kingston Road, Wimbledon, London Local Authority: Merton Planning permission granted, Ref: 18/P3059 Please click the reference number above to see the planning details on Merton Website Kingston Road project is a back-land development project for a 0.054 hectare Sui Generis site proposed for Residential units. I was involved in the feasibility studies, concept design, Design and Access Statements writing and 3D visualisation for both pre-application and planning application.
lightwell/void
3854
3004
BEDROOM 1
KITCHEN LIVING/DINING
UNIT 1B GIA=52.1sqm
1050
1450 st
4065
1.5sqm
2200
27.3sqm
2000
2000
13.5sqm
KITCHEN LIVING/DINING
27.3sqm
BATH 2200
BEDROOM 1
UNIT 1C GIA=52.1sqm
KITCHEN LIVING/DINING
30.6sqm
HALL
BATH 2200 4.4sqm
1.5sqm
13.5sqm
2000
4319
3854
3069
UNIT 1A GIA=55.4sqm
1450 st
4065
FD30
3004
7265
lightwell/void
Amenity Space 5.5sqm
1050
1200
1250 st
1.5sqm
13.5sqm
lightwell/void
5.5sqm
4065
BEDROOM 1
lightwell/void
Amenity Space
5.5sqm
3004
lightwell/void
Amenity Space
03DF
lightwell/void
HALL
HALL
4.4sqm
BATH
4.4sqm
lightwell/void A
Proposed Firstplan Floor Proposed first floor at Plan planning stage (N.T.S) 1:100
lightwell/void
lightwell/void
Amenity Space
lightwell/void
Amenity Space
5.2sqm
6.1sqm
UNIT 0A GIA=82.8sqm
KITCHEN LIVING/DINING
KITCHEN LIVING/DINING
27.6sqm
32.2sqm
Amenity Space
5.2sqm
UNIT 0C GIA=81.7sqm
lightwell/void
lightwell/void
Amenity Space
5.2sqm
UNIT 0B GIA=77.3sqm
KITCHEN LIVING/DINING
lightwell/void
Amenity Space
Amenity Space
5.2sqm
UNIT 0D GIA=79.3sqm
5.2sqm
UNIT 0E GIA=79.3sqm
KITCHEN LIVING/DINING
UNIT 0F GIA=82.8sqm
KITCHEN LIVING/DINING
30.3sqm
KITCHEN LIVING/DINING
30.3sqm
32.6 sqm
1900
2.7sqm
FD30
WC
1400 WC
Entrance hall to flat 1B &1C
1900
1400 Entrance hall to flat 1A
1900
1400 WC
2.7sqm
2.7sqm
2.7sqm
03DF FD30
FD30
WC
WC
2.7sqm
2.7sqm
lightwell/void
Entrance hall
Entrance hall
Entrance hall
lightwell/void
lightwell/void
1900
1400
1900
Entrance hall
1400 WC
1900
32.6 sqm
Entrance hall
lightwell/void
lightwell/void
1400
Entrance hall
lightwell/void A
Proposed Ground Floor Plan 1:100
Amenity Space
5.1sqm
FD30
03DF
st
2.0sqm
BEDROOM 1 14.0sqm
11.2sqm
st
14.0sqm
BEDROOM 2
BEDROOM 2
11.2sqm
11.2sqm
BATH
BATH
4.4sqm
4.4sqm
Amenity Space
Proposed 3D Visualisation at planning stage 5.7sqm
5.6sqm
BEDROOM 1
Amenity Space 5.6sqm
3500
11.2sqm
4.4sqm
5.6sqm
HALL
BEDROOM 2 BATH
14.0sqm
HALL
11.2sqm
4.4sqm
BEDROOM 1
14.0sqm
BEDROOM 2
BATH
Amenity Space
st
2.0sqm
BEDROOM 2 11.2sqm
BATH
BATH
4.4sqm
4.4sqm
Amenity Space
Amenity Space
5.6sqm
5.7sqm
A
Mandy Kwok - Sample of Work Portfolio 2020
Amenity Space
st
14.0sqm
HALL
03DF
3500
2.0sqm
BEDROOM 1
HALL
8.9sqm
FD30
2.0sqm
BEDROOM 1
HALL
BEDROOM 2
03DF
st
17.7sqm
Amenity Space
8.9sqm
2.0sqm
BEDROOM 1
HALL
Amenity Space
8.9sqm
FD30
st
2.0sqm
Amenity Space
8.9sqm
4000
8.9sqm
3364
Amenity Space
Amenity Space
Page 6
Other Projects
Im
Whi draw Buil leve mat foun revi inve with dim stru com late
Albion Road, Margate - 3D visualisation at concept design stage Important Note Whilst due care and attention is taken to ensure all surveys, drawings, dimensions and details provided are accurate, it is the Builders responsibility to check and verify all dimensions, details, levels and sewer invert levels on site prior to ordering any materials or commencing works. Should any discrepancies be found these should be relayed to the Architect immediately for review. Should these drawings be used without adequate site investigations and subsequent issues arise, liability will lie solely with the Builder.Do not scale off this drawing, work to figured dimensions only.This drawing must be read and checked with all structural and relevant specialist drawings.The Builder is to comply in all respects with the current Building Regulations and latest Codes of Practice.
Š Copyright The copyright in all designs, drawings, reports, models, specifications, bills of quantities, calculations and any other documents prepared by GBS Architectural Limited shall remain vested in the Company. As long as the Company has received the payment in full of any fees properly due and owing, the Company grants a licence to the Client to copy and use the documents for the purposes of the project only (excluding any extension of the project). The Company shall not be liable for any use of the documents for any purpose other than that for which they were prepared and provided by the Company.
Re
Rev
Pr
Cl
Ad
St
High Gable, Cobham - 3D visualisation at concept design stage
Revisions Rev
Date
Notes
Project Client:
Drawing Mr & Mrs Vasili
Address: High Gable
31 Board High Way Cobham, KT11 2RR
Stage:
Initial
Planning
Title:
Proposed 3D Views
Drawn By: MK Date:
Mar2019
Scale:
NTS @ A1
Dwg No.: 2018-016 -103 Rev: I
Hamilton Road, Wimbledon - 3D visualisation at concept design stage
Knepp Castle Estate, Horsham - Ecolodge rewilding project University year 4 project at London South Bank University - Proposed ecolodge with rewilding architectural strategy to reintroduce the extinct animals
Mandy Kwok - Sample of Work Portfolio 2020
Page 7