FEI MAN
26 E. Daniels,#215, Cincinnati, OH, 45219 manfi@mail.uc.edu 513.442.6934 http://issuu.com/manfei7/docs/fei_man_portfolio_2015
EDUCATION 2013.09 - Present
University of Cincinnati
Cincinnati , OH
College of Design, Architecuture, Art and Planning, Bachelor of Science in Architecture Bachelor of Science in Architecture
EXPERIENCE
2015.08 - 2015.11
FRCH Design Worldwide
Cincinnati, OH
Capital One Bank, Cincinnati - Construction Documents Payless Shoes Store, Cincinnati - Construction Documents - Project Cost and Feasibility
2015.02 - 2015.04
Skidmore, Owings & Merrill (SOM) Moynihan Station Phase 2 , New York - Sit Data Collection, Photography - Plan and Elevation Drawing - Physical Model Building - Digital Model Building and Schematic - Presentation Booklet
New York, NY
SKILL Revit
Microsoft office
SketchUp
Sketch
InDesign
Woodshop
Illustrator
Rhino
Photoshop
AutoCad
LANGUAGE Native Mandarin Fluent in English, Korean
HONORS 2013 - 2014
UC Global Scholarship
2009
Swimming Competition
CONTENTS
01
Mass Transit Station
02
Performing Arts Center
03
Engineering Research Center
04
Building From Within
05
Case Studies
06
Drawing
01 Location Program Semester
Mass Transit Station Internship New york Ny Transportation Spring 2015
Since the 1990s, SOM has taken a leading role in the advocacy and design of the monumental civic project to convert theBeaux-Arts James A. Farley Post Office into a 21st-century train station. Situated across Eighth Avenue from Pennsylvania Station, the new Daniel Patrick Moynihan Station will create needed capacity in the region’s rail system and catalyze development of Manhattan’s Far West Side, while restoring and preserving an important historical resource. After it was demolished in 1963, New York’s original Pennsylvania Station acquired a mythic status as a symbol of the lost grandeur of rail travel and public space in the United States. SOM’s design for a new Penn Station restores this sense of civic monumentality and represents America’s new era of high-speed rail. The new station transforms the Farley Building into a new train station while preserving the landmark postal hall. The first phase of the project includes five major transportation and infrastructure-related components: doubling the width and length of the West End Concourse, which connects to the A/C/E subway line and is located below the post office; improving platform ventilation and signal work; upgrading the connector between the post office and the existing Penn Station beneath West 33rd Street; and adding two new entry points on both sides of the post office’s grand staircase on Eighth Avenue.
Render by SOM
Render by SOM
1/4 ‘‘ Scale Model The 1/4 ‘‘ scale model shows the main structure of the skylight. The frame was made with eight layers of laser cutting .
Contribution Revit Modeling AutoCad
PASSENGER LOADS AT AMTRAK WAITING AREA PAX
40 0
350
30 0
250
20 0
150
100
50
0 2:00 PM
2:30 PM
3:00 PM
3:30 PM
M ONDAY W EDNESDAY FRIDAY
2
AMTRAK WAITING AREA
MONDAY
C1
2:00PM
C4 3:00PM
C 1 2:30PM
C3 3:30PM
WEDNESDAY C1
C6 2:00PM FRIDAY
C 1 2:00PM
C 6 2:30PM
C2 3:00PM
C5 3:30PM
02 Location Program Semester
Performing Arts Center Cincinnati OH Existing Garage Superstructure Summer 2014
The main feature of the project is the ride itself, allowing passengers to enter through spaces that further educate them more about space transportation. The existing structure sits on an old parking garage located on Race and Fourth street. The task was to develop a program that must include a pool, theater, and an interstitial space. My concept idea is based on the feature of the circulation and spiral of the garage. By several iterations, I decided to raise the pool to the same level of the theater in order to maximize the transportation between the two spaces, and also keep enough space for parking. The purpose I created a serious overhang on the balcony is for the amazing city views and makes the space more functional.
Bird’s Eye View Rhino Vray Render
Iteration
Raise the pool to the same level of the theater in order to maximize the circulation
Figure 1
Overhang on the balcony is for the amazing city views
Figure 2
Both sides of the ring bridge for better flow
Figure 3
First Floor Plan
Second Floor Plan
Third Floor Plan
Axon
Section 1
Section 2
03
Location Program Semester
Engineering Research Center Cincinnati OH Institution Spring, 2014
The Engineering Research Center Buildings stair threshold is symmetrical, with the combination of an arch extruding through the rectangle volume and a staircase as the centroid of the space and movement in space.
Nature Light
Geometry
Circulation
Massing
04 Program Semester
Building From Within Stairs Winter 2014
Starting with the human scale inside it , a space is created through several transformation actions. After scaling and measuring the human body is several poses, a program is created to fit the body’s proportions. The program is abstracted into five models, using a single operation word and an aggregation word. After iteration, the five form one model using a multiple operation word.
simplify the figure, wrap the other model to create a balcony to make the space more open also contrast the pause space
interlock the model, flip down the original figure, off the edge a little bit,create different level, make the space more interesting
simply the idea to create another entrance
make a pause space
simplify the idea, lift up the stage to stop people a little bit to enjoy the inside space
05 Program Semester
Clinton Presidential Center Transportation Spring 2014
06 Program Semester
Drawing Common Skill Spring 2013
Detail drawing
Pencil , Tangent University Center from left to right scale 1/32’’=1’,3/16’’=1,1/4’’=1’, Cincinnati
Thank You