Architectural Design Portfolio

Page 1

Portfolio MANI MAKHIJA SELECTED WORKS (2019-2022)


Recommendation Letter


Recommendation Letter


Hello I’m Mani Architect+Designer From Delhi, India Contact https://www.behance.net/ManiMakhija14 manimakhija.14@gmail.com +91-8860123435

Languages I can speak/write

Academic Background

English, Hindi, Punjabi, French (Intermediate)

2022 U.S Green Building Council LEED Green Associate (Current)

Professional Experience

2016-2021 School of Planning and Architecture Bachelors of Architecture (8+ CGPA)

2022 Equilib Earth, Goa + KOTA Architects, Dublin + Self Freelance Architect (Current) 2021,2022 Field Atelier, Goa, India Junior Architect (6 months) 2021 Garage Aid, Goa, India Apprenticeship (2 months)

2020 IIHS, Solar Decathlon India-Team Lead Net-Zero Building Design (Top Learner) 2002-2016 Sachdeva Public School Schooling (9+ CGPA)

2020 Worklounge-03, Hanoi, Vietnam Architectural Internship (6 months)

Relevant Courses Revit for Architectural Design , Autodesk UNFCC Green Building Program- A grade HARVARD Architectural Imagination, EDX MIT Site Planning, EDX HARVARD Women Making History, EDX Carlo Stanga, Architectural Illustration, Do

Software Skills

Hobbies and Interests

AutoCAD

Sketching, Reading, Writing, Animating, Tr Cycling.

SketchUp, Rhino Revit, ArchiCAD Ladybug+Plugins, Climate Studio Lumion, Enscape, Vray Photoshop, Illustrator, Indesign, Premier Pro Microsoft Office, Google suite

Interested in designing with a wholesome sustainability in cultural, social, economic environmental states.


Workshops partaken 2022 Exhibitor for City For All, Social Design & Alliance Francaise 2021 CLT Induction in India 2020,2018 Z-Axis,Charles Correa Foundation 2019 Architectural Observation and Assesment across Vietnam, Ar. Mohor Bose 2019 Bamboo Pavilion Construction, Ar. Pablo Juan, CaveUrban, World Bamboo Festival 2018 Bamboo Architecture in North East India, KARWAAN Achievements 2021 Top6, Solar Decathlon India -Team Lead 2020 Top 10, Form Follows Climate, UNI 2019 Top 10, Writing Architecture, NASA Top 40, Pop-Up Bazaar, Archasm 2018 II Prize, Writing Architecture, NASA Top 25, Berkeley Essay Prize I Prize, Bamboo Playpen Design, KARWAAN Publications

omestika

Permaculture Education Weekly blogs on permaculture design

ravelling,

UIA2021Rio-World Congress of Architects Spatial Analysis and Mapping of the Transgender Community: A Case Study of Bhopal

sense of and

Inner Magazine,Issue 04 Post Pandemic Interiors- The Design Interns Vista NASA Newsletter Architectural Education

CURRICULUM-VITAE


CONTENTS

“When I’m working on a problem, I never think about its beauty, I just think about how to solve the problem, but when I finish it, if the solution is not beautiful, I know it’s wrong.” Richard Buckminster Fuller


01

House at Socorro Goa, India Field Atelier, 2022 Residential Extension

02 Tree Grove School Odisha, India FFC Competition, 2022 Kindergarten Project

03 NHM Headquarters

Bhopal, India Solar Decathlon Competition, 2020 Net-Zero Office Building

04 Liveability of Hijra Community Delhi, India Thesis Project, 2021 Research and Analysis

05 Tokyo Hikari Complex

Ho Chi Minh, Vietnam Worklounge-03 & T.Niwa Architects, 2019 Commercial Masterplan

06 123 House Project Delhi, India Freelance, 2022 Residential Interiors

07 Architectural Videos India Freelance, 2022 Process and Walkthrough

08 Other Works

India 2017-2022 Sketches and Bamboo Pavilions


01

House at Socorro Residential Extension


Field Atelier, 2022 Confidential


Design-Ground Floor Plan

Garden

Swimming Pool

Verandah Dining Room Bedroom

Pantry

Existing House

Existing House Views

Site: Extend house from Verandah

Entrance

Goan Ae


First Floor Plan

esthetics

Bedroom

0

Side Passage

1

Current House view

2

4m


Construction Process

Foundation

Combined Footing

Columns

First Floor Structure

Masonry

Pool Scaffolding

Plinth beam

Beam Bottom Marking

Swimming Pool

Door-Window

Filtration Room

Beams

Masonry

Roofing

Top Roof

Final Glimpse


Section through Plan

Bedroom

Dining Room

Pantry

Washroom

Washroom

Bedroom

Filtration

Section through Site

Bedroom

Pantry

Verandah

Swimming Pool

0

1

2

4m


Interior Electrical Elevations-Ground Floor

Store

Washroom

Pantry

Dining Room

First Floor

Bedroom

Washroom

Bedroom


View from Walkway

Poolside View


02

Tree Grove School Kindergarten Project


Form Follows Climate,2019 Top-10


Form Development

Site Orientation The site is elongated along N-S direction.

Building Orientation E-W elongation minimises thermal gains.

Deep Sun Staggering The form is staggered to allow more sunlight.

Ventilation Displacement The form is displaced to orient along the SW wind.

Microclimate Design Functions are distributed around atriums and courtyards.

Disaster Safety Vernacular form is adapted to protect against cyclones.

Buffer Zones Coridoors act as buffer zone to increase time lag.

Operable Shading Louvres introduces to aid light and ventilation

Sloped roof design Openings designed form maximum north light


Courtyard-Playground


Form Development


Exploded Isometric View


03

NHM Headquarters Net Zero Office Building


Solar Decathlon Competition,2020 Top-6, Team Lead


Site Study

Maximum built up area: 9100 sqm The project is a Government Office Building for the National Health Mission Headquarters in Bhopal.

Construction budget: ₹30,000/sqm Project budget: ₹28,00,00,000/-

Integrated Design Approach

Phase 1- Base Models Analysis

11 of us split into 3 teams to develop 3 different iterations on the basis of passive strategies and architectural themes discussed.

Site-Climate study

Architectural ideas

Passive design

Bubble diagrams

Design Analysis

Phase 2- Design Development

The base models were further developed to combine into one model which was consecutively simulated at all stages of design-zoning, interior detail, material conjecture and element detail etc.

Simulating the Prototypes

Analysing Results

Combining the Aspects

Zoning in levels

Allocating strategies

Adding specific details

Phase 3- Finalised Design-Planned

The last step was to enhance elemental strategies, by mindfully incorporating innovative and cost efficient solutions resulting in an optimum building design.

Innovation

Enhancing strategies

Design development

Design Analysis

Cost Effective


Climate Study

General Temperatures : 10°C to 43°C. Summers : April-July Peak : 43°C. Winters : November-February Minimum : 7°C. Monsoon : July-September Humidity 30-70%

Temperature Plot

Sun path

Humidity Plot

Summer Winds

Discomfort Plot

Winter Winds

LEVEL 6

Uncomfortable winds : November-June Comfortable winds : July-October Prominent wind direction : West

Passive Design Bundle

A charette organised the climate analysis into applicable strategies to be followed at various stages of design.

LEVEL 5

Passive building design

Cooling zones

Permeable building

Mixed mode cooling

Locating outdoor rooms

Clustered rooms

Sun,wind,light facing rooms

Shading courtyards

Night cooling mass

Stack ventilation rooms

Cross Ventilation rooms

Evaporative cooling

Mechanical heating

Combined openings

Opening Arrangement

Layer of shades

Insulation outside

Thermal mass

Ducts and plumbing

External shading

Breathing walls

Air-air exchangers

Movable insulation

Exterior surface colours

In-between hading

LEVEL 2

LEVEL 3

LEVEL 4

Buffer zones

LEVEL 1

Mechanical ventilation

Mass surface absorptance SITUATIONAL

Daylight reflecting surfaces

Double skin materials CORE

REFINER


Net-Zero Energy

OPTION 1 Central Connecting Atrium

OPTION 2 Dispersed Scattered blocks

OPTIMISED A hierarchy of connecting atriums

Solar Radiation v/s Daylighting A combination was needed which had least solar radiation absorbed by the surface, but in the meantime allowing in optimal daylight. Staggering towards the North east allowed for this, as understood form model 1 and 2. Solar Radiation

Daylighting


Phase Change Material and Night Ventilation In the morning, the heat recovery system and radiant cooling system work to cool the building. During the night, the chiller recharges the PCM and the latent thermal storage cools itself down.

Optimisation Results EUI optimizations were done parametrically, against a default value defined earlier. After achieving a desirably low EUI value, elements were added to increase visual and thermal comfort, especially in non-HVAC areas.

Optimised Inner Surface Temperature

North-East

South-West

South-East

North-West

Optimising the zoning, layout and Window-wall ratios allowed us to create comfortable (less than 27°C) inner surface temperatures in more than 70% of our building. Buffer zones, lower HVAC set points and PCM was utilised to reduce temperatures in West and South-West sections.


Net-Zero Water Water Optimisation The overall water performance was improved by explorations done in three phases. 1. Base case: A base water demand calculation was done for the required footfall. 2. Reduction 1: Rainwater harvesting was explored and implemented. This helped reduced the fresh water demand by more than 50%. 3. Reduction 2: A thorough research was done on the various available efficient fixtures with the proper flow rates. The right fixtures were chosen which helped reduced fresh water demand to 87%.

Rain water harvesting coupled with a root zone water treatment that treats surface runoff and grey water are used as alternate sources of water. Local vegetation has been used to reduce turf area, thus, minimizing on landscaping requirements. In the monsoon months extra grey water is sent to Ground recharge.


User Comfort and Incitement

Open place office space helpsin providing a comfortable work environment with more interaction among the co-workers. The Intelligent Building System is zoned to track overall consumption of each department allowing us to create an additional interface on the Management Tracking. Detailed Design video


04

Liveability of Hijra Community Research and Analysis


Architectural Thesis, 2021 Presented and Published in UIA2021 Rio-World Congress of Architects



Street Study of the Hijra Community : Working the streets and living in camps


Street Study of the Hijra Community : Alleyways leading to and surrounded by Hijra community housing



Liveability Analysis

A liveability study of : 4 places using 4 factors. Laxmi Nagar tops the index. People have better monetary support and occupational opportunities. Turkman Gate goes the opposite way because of the same reason.

Analysis and Architectural Ideas The analysis of the problems recuperated during the research are put to a reason and possible architectural interventions. Problems

Owing to

Interventions

Mystery and Fear Lost history Rural-urban migration Limited occupations Lack of healthcare

Lack of information Lack of documentation Religious myths, Discrimination Lack of acceptance Lack of subsidies and awareness

Museums,Public Installations Archives,Museums,Libraries Safe homes,NGO Offices Training centers,Career Counselling Rehabilitation spaces,Medical Facilitation

Ideas and Iterations

An OAT to attract crowd in with performances and dance and music.

Semi Open spaces and streamlined views to navigate the place in a defined path.


Spatial Opportunities for a Social Development Center

Commercial spaces

Fair Ground

PUBLIC

Toilet

Auditorium

Parking

Entry 1

Museum Gallery

Archive

Library

Toilet

Informative Spaces

Cafeteria

Courtyard

Admin

Meeting Spaces

Rental offices

Administration spaces

Workshops

Classrooms

Toilet

Canteen

Playground

Laboratories

Kitchen

Vegetable Garden

SEMI-PUBLIC

Reception

Connecting spaces

Parking

Toilet

Counsel spaces OAT

Admin

Dance Room

Kitchen

Rooms

Dorms Entry 2

Music Room Courtyard

Institutional Spaces

Toilet

Reception

Care Rooms

Medical services

Living Spaces

PRIVATE

Formal-Informal market areas where the community can sell their training and interact.

Meeting and Gathering spaces for NGOs to come together and plan, process the vision.


05

Tokyo Hikari Complex Commercial Masterplan


Worklounge-03 & Takashi Niwa Architects, 2019 Confidential-Future Project of the Year, ASHUI Awards


Vegetation Drawings- landscaped with seasonal edible plants and fruit trees with the concept of “Edible Landscape”.

P-3 PS

UP-1

FT-1

UDL

1

SP-1

UDL-1

UP-1

UP-1

1

1

UDL-2

UDL-1UD

UDL-2

1

UDL-2

UDL-1

UP-1

UDL-2

UDL-2

UP-1

UDL-1

UDL-2

UP-1

UDL-1 UDL-1

UDL-2 UDL-2

-1

UDL-1 UP-1 UP-1

UDL-1 UP-1

FT-1

FT-1

UP-1 UP-1 UP-1

FT-1

SP-1

FT-1

UP-1

FT-1

FT

-1

SL-1

UP-1 FT-1

SL-1

UP-1

SL-1

1

SL-1

FT-1

-1

1

SL-1

SL-1

6

1 UP-

6-8

1

UDL-1

1

4-5

SL-1

SL-1

UP-

5-6

8

SL-1 SL-1

UP -1

0.4-0.5

2-2.5

UP-1

SL-1

PSP-2

SP-1

SP-1

0.15-0.25

UP-1

SL-1

SL-1 FT

FT-1

UDL-1

3-4

WL-1

UDL-1

1

UDL-1 PSP-

2

1

UP

1

UP-1 UP-1 UP-1 UP-1

-1

PS

2 P-

WL-2

SP-1

WL

-2 WL

SP-1

FT-1

FT-1

FT-1

GD-1

PSP -3

UP-1

SP-1

1

1

UDL-1 UDL-1 UDL-1

FT-

1

1

FT-

1

SP-1

-1

GD-1

6

UP-1 UP-1

1

C1

GD-1 UP-1

UP-1 SP-4 SP-4

UP-1 UP-1

UP-1 FT-1

C2 -1 UP

UP-1

6

UP-1 UP-1 UP-1

UP-1

GD-1

LUD

BSP-1

6-8

UP-1

UP-1

UP-1

BSP-1

1

UDL-1

GD-1

UP-1

LUD

1 FT-1

UP-1 UP-1 L-3 UD L-3 UD L-1 UD L-3 L-1 UD L-3 UD L-3UD UP-1 UD L-1 L-3 UD UD L-1 L-3 UD UD L-3 UD L-3 UD L-3 UD L-3 UD L-3 UD L-3 UP-1 UD L-3 UD

LUD

1

-1 SP

0.5-0.6

3-4

5-6 SP-1

8-10

GD-1

0.4-0.5

1.5-2

5-6

4-5

8-10

PS

P-

3

0.08-0.10

UP-1

GD-1

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)

Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

SP-1

UDL-1

L-3 UD L-3 UD L-3 UD L-3 UD L-3 L-1 UD L-3 UD UD L-3 L-3 UD L-3 UD UD L-1 L-3 UP-1 UD UD L-1 UD L-1 L-1 UD UD L-1 UD

UDL-1

GD-1

5-6

6

SP-4 GD-1 SP-4

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M) 0.4

FT1 FT1 FT1 FT1 FT1 FT-

GD-1

UP-1

4-5

FT-1

FT-1

-1 UP

6-8

-1 UP

GD-1

BSP-1

BSP-1 UP-1

UP-1

2.5-3

-1 UP

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)

-1 UP

UP-1

-1 UP

-1 UP

UDL-1

UP-1

0.6-0.7

P-2 PS

GD-1

UDL-1

6-8

0.25-0.3

UDL-1

UP-1

-1 UP

1

SP-1

SP

5-6

GD-1

-1

0.4-0.5

2-2.5

1

UDL-1

SP

0.15-0.18

4-5

PART PHẦN 36

FT-1

SL-1

SP1

TAMARIND Cây me chua

7

UP-1 UDL-1

FT-1

SP-1

FT

UP-1

UP-1 SL-1 SL-1 SL-1 SL-1 SL-1SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1

UDL-1

FT-1 UP-1

UDL-1

UDL-2

1

UP

UDL-2 UDL-2 UDL-2

1 UDL-1

UDL-2 UDL-2

2 P-

1.5-2

UDL-1

UDL-2 UDL-2

UDL-1 UDL-1

PS

0.15-0.2

0.3-0.5

UP-1

UDL-1

FT-1

3-4

0.03-0.05

UDL-1

UDL-1 FT-1

UP-1 UP-1 UP-1

PSP-1

-1

PSP-1

1

1 GD-1

GD-1

Height (M) Chiều cao (M)

GUAVA Cay Oi Le Dai Loan

11

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)

Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

0.2-0.25

0.4-0.5

0.3-0.5

2-3

Height (M) Chiều cao (M)

0.08-0.1

3-4

11

PART PHẦN

13

Height (M) Chiều cao (M)

PICTURE HÌNH ẢNH

QUANTITY ĐỊNH LƯỢNG

AFZELIA XYLOCARPA Cay Go Do SYMBOL BIỂU TƯỢNG

A

PART PHẦN 13

SYMBOL BIỂU TƯỢNG

C

Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

PART PHẦN 2

SYMBOL BIỂU TƯỢNG

D

Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

0

9

Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

PART PHẦN 23

SYMBOL BIỂU TƯỢNG

F

0.3-0.4

0.3-0.5

2-3

1.5

3-4

VANG HOA HONG

0.4-0.5

1.2-1.5

5-6

4-5

8-10

Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

0.25-0.35

1.5-2

5-6

3-4

8-10

0.18-0.2

0.4-0.5

1.5-2

5-6

0.08-0.10

0.4-0.5

1.5-2

5-6

4-5

8-10

0.25-0.3

0.4-0.5

2

5-6

NAME Tên

HOPEA ODORATA Cay Sao Den SYMBOL BIỂU TƯỢNG

ACACIA AURICULIFORMIS Cay Keo la tram SYMBOL BIỂU TƯỢNG

8.

ERYTHRINA FUSCA PURPLE CORALTREE Đậu san hô đỏ SYMBOL BIỂU TƯỢNG

4

37

PICTURE HÌNH ẢNH

QUANTITY ĐỊNH LƯỢNG

9.

ROSA MULTIFLORA Cay tuong vi SYMBOL BIỂU TƯỢNG

Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

0

Height (M) Chiều cao (M) PART PHẦN Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

8

Height (M) Chiều cao (M) PART PHẦN Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

0

Height (M) Chiều cao (M) PART PHẦN Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

6

K

Height (M) Chiều cao (M)

NORMANBYA NORMANBYI 10. Cây Cau đuôi chồn SYMBOL BIỂU TƯỢNG

PART PHẦN Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

9

M

8-10

11.

50

SIZE KÍCH THƯỚC

PART PHẦN

J

40

30

6

H

Height (M) Chiều cao (M)

PLUMERIA FRANGIPANI Cây Sứ đại

SYMBOL BIỂU TƯỢNG 10

SP-1

G

8-10

2-3

20

6.

7.

0.08-0.10

QUANTITY

EXISTING TREE / CÂY HIỆN CÓ

NO.

0.08-0.10

SIGN

TAY HOANG POINCIANA

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)

Height (M) Chiều cao (M) 0

0.3-0.5

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)

Height (M) Chiều cao (M)

TERMINALIA CATAPPA COUNTRY ALMOND Cay Bang

3-4

2-3

PART PHẦN

SYMBOL BIỂU TƯỢNG

2-3

0.08-0.1

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)

Height (M) Chiều cao (M)

TAMARIND Cây me chua

0.3-0.5

NAME

CAY TAM VANG

INSTALLATION(M) CÀI ĐẶT(M)

Height (M) Chiều cao (M)

ALSTONIA SCHOLARIS Cay Hoa Sua

0.4-0.5

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)

Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M) Height (M) Chiều cao (M)

BUCIDA MOLINETI Cay Bang Dai Loan

0.2-0.25

SIZE KÍCH THƯỚC

PART PHẦN 4

3-4

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)

Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

3

SYMBOL BIỂU TƯỢNG

0.08-0.1

UP-2

Height (M) Chiều cao (M)

MOMBIN Cay Coc Thai

2-3

UP-2

12

0.4-0.5

0.3-0.5

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)

Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

9

GD-1

0.2-0.25

P-1 PS

PART PHẦN

SYMBOL BIỂU TƯỢNG

SP

SP-1

Height (M) Chiều cao (M)

ORANGE Cay Cam Sanh

SP-1

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)

Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

4

SP-1

P-1 PS

PART PHẦN

GUAVA Cay Oi Ruby

GD-1

SP-1

PART PHẦN

SYMBOL BIỂU TƯỢNG

5.

2-3

SP-1

Height (M) Chiều cao (M)

10

4.

UP-1

UDL-1

SP

1

SYMBOL BIỂU TƯỢNG

3.

Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

9

2.

UP-1

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)

PART PHẦN

SYMBOL BIỂU TƯỢNG

1.

0.25-0.35

1.5-2

0.8-1

Height (M) Chiều cao (M)

8

UP-1

UDL-1

UDL-1

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)

PART PHẦN

SYMBOL BIỂU TƯỢNG

DE-1 DE-1

UP-1 UP-1

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)

Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

STAR APPLE Cay Vu Sua

-1

UP-1

UP-1

Height (M) Chiều cao (M)

2

DE-1

UDL-1

0.10-0.20

1.5-2

PART PHẦN

SAKE Cay Sake

GD-1 UP-2 UP-2

PSP-1

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)

Height (M) Chiều cao (M)

13

1 P1

UP-2

SP

Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

1

MANGO Xoai Thai

NAME Tên

PS

SP-1

SP-1

PART PHẦN

7

NO.

6-8

Height (M) Chiều cao (M)

MANGO Xoai Cat Hoa

SYMBOL BIỂU TƯỢNG

13.

1.8-2

Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

7

6

12.

Height (M) Chiều cao (M)

PART PHẦN

SYMBOL BIỂU TƯỢNG

11.

4-5

UP-1

PAPAYA Cay Du Du Thai

5

10.

0.4-0.5

0.3-0.5

Height (M) Chiều cao (M)

SYMBOL BIỂU TƯỢNG

9.

0.3-0.4

Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

6

4

8.

Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

UP-1

Cay Chuoi Lun

SYMBOL BIỂU TƯỢNG

7.

6-8

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)

PART PHẦN

3

6.

4-5

SP-1

BANANA SYMBOL BIỂU TƯỢNG

5.

5-6

Height (M) Chiều cao (M)

S

3

2

4.

0.4-0.5

2-2.5

PART PHẦN

JACKFRUIT Cay Mit Thai SYMBOL BIỂU TƯỢNG

3.

0.2-0.25

UP-1

1

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)

Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)

UP-1

38

PSP-1

STARFRUIT Cay Khe SYMBOL BIỂU TƯỢNG

2.

SIZE KÍCH THƯỚC

PART PHẦN

PSP-1

QUANTITY ĐỊNH LƯỢNG

PSP-1

PICTURE HÌNH ẢNH

-1

1.

NAME Tên

SP

NO.

PART PHẦN

16

Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M) Height (M) Chiều cao (M)

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M) 0.07-0.10

0.6-0.7

1.5-2

5-6

4-5

8-10

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M) 0.4

0.5-0.6

0.2-0.3

6-7

0.5-0.8

8-10

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M) 0.18-0.2

0.4-0.5

1.5-2

5-6

4-5

6-7

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M) 0.2-0.25

0.4-0.5

1-1.5

2-3

2-3

3-4

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M) 0.18-0.2

0.3-0.4

1-1.2

2-3

2-3

4-5

INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M) 0.12-0.15

0.5-0.6

2

5-6

2-3

4-5


KEY PLAN PSP-1 SP

-1 -1 PSP

L Ê DUẨN ĐƯỜ NG

SP-1 SP-1

UP-2

UDL-1 UDL-1 UDL-1

UP-2

UDL-1 UP-2

DL-1UDL-1 UDL-1

UP-2

9

UDL-1 GD-1

UP-2 SP -1

P-1 UDL-1

UDL-1

UP-1

UDL-1

9

FT-1

UP-1 UDL-1 SP

UDL-1

UP-1

-1

-1

UDL-1

FT

UDL-1

UDL-1

UP-1

FT-

UDL-1

1

FT-

UP-1

-1 SP

UDL-1 UDL-1

UP-1

1

FT-

8

2

UDL-1

1

UP-1

GD-1

GD-1

9

1

FT-

UP-1

SP-1

UP-1

9

UDL-1

UP-1

NOTE: GHI CHÚ: PSP-1

PSP-1 UDL-1 UP-1

KHU ĐÔ THỊ MỚI THUỘC KHU LIÊN HỢP CÔNG NGHIỆP - DỊCH VỤ - ĐÔ THỊ TỈNH BÌNH DƯƠNG, PHƯỜNG HÒA PHÚ, TP THỦ DẦU MỘT, BÌNH DƯƠNG

9

PS

UDL-1 UP-1

LOCATION: ĐỊA ĐIỂM XÂY DỰNG

9 1 P-

UDL-1 UP-1

7

G

NG VƯƠN

9

9

SP-1

UP-2

ÝT HÁI T

HIKARI COMPLEX KHU PHỨC HỢP HIKARI

9 9

-3 PSP

UDL-1

DL-1UDL-1

ĐƯ Ờ N GL

SP-1

9

1

SP-1 UDL-1

A

9

9

9

1

UP-2

UDL-1

HỰ

SP-1

1 SP-

UP-2

9

DE-1 DE-1

-1

9

9

9

SP-1

1

UP-2 DE-1

FT UP-1 -1 FT -1 UP-1 -1 UP-1

-1

9

GD-1

GN

GH Ù

1 SP-

UP-2

9

9 -3 PSP

DE-1

DE-1

FT FT

9

1

Đ ƯỜN

PSP-1

PSP-

1

1 SP-

1

UP-2

-1

9

9

SP-1

ĐƯỜN

PSP-1

SP-1

UP-2 UP-2 UP-2

SP-1

FT

-1 SP

1

GD-1

SP-1

ÁIT Ý TH

1

1

FT

6

1

1 SP-

PSP-1

13 1 13 3 1

9

PSP-1

9

9

9

L NG

SP -1

1

PSP-1

Đ ƯỜ

1

UDL-1

UDL-1

UDL-1

2

UDL-1 WL -2

9

1 SPUDL-1

2

P-1 PS

SP

UDL-1

1

UDL-1 UDL-1

WL-1 SP-1

UDL-1

PSP-1

UDL-1

WL-

1

WL-1

PS P-

2

1 1 1 FT- 1 FT- 1 FT- 1 FT- 1 FT-

SP-1

-2 PSP PSP-1 P-1

12

PS

UP-1

12

F

F

P-1

SP-1

12

F

PSP-1

SP-1

F

SP-1

PSP-1

SP-1

F

PSP-1

1

PS

SP-1

SP-1

P-1 PS

PSP-2

PSP-1

GD-1

12 PSP-2

1

UP-1 UP-1

1 SP-

ONUMA MINORU ARCHITECTURE CONCEPT DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ Ý TƯỞNG KIẾN TRÚC

UP-2

-2 PSP

UP-1 UP-1 UP-1

UP-1

DEPUTY GENERAL DIRECTOR: PHÓ TỔNG GIÁM ĐỐC

F

P3

UP-2

1

SP-1

12 12 12 12 2 1

PS

SP-1

SP-1

6 L-1 UD

PSP-1

1

6

UP-1

9

9

1

UP-1

PSP-1

33 3

KHU ĐÔ THỊ MỚI THUỘC KHU LIÊN HỢP CÔNG NGHIỆP - DỊCH VỤ - ĐÔ THỊ TỈNH BÌNH DƯƠNG, PHƯỜNG HÒA PHÚ, TP THỦ DẦU MỘT, BÌNH DƯƠNG

PS P-

6

L-1 UD

UDL-1

1 SP-

F

SP -1

-1 SP

1

-1

-1

FT

9

SP-1

SP

-1 SP

PS P-1

6 -1

F

6

UP-2

SP

CÔNG TY TNHH BECAMEX TOKYU

-1

2

T-1

SP-1

SP-1 UP-2

6

UP-2 UP-2

UP-1

UP-2 UP-2

UP-1

PSP-1

GD-1

1 PPS -2 UP

UP-1 UP-1

6

SP-1

UP-2

10 10 10 1 SP-

GD-1

UP-2 PSP-1

H

SP-1

PSP-1

H

H

H

F

H

UP-2

GD-1 PSP-1

UP-2 PS

ad 9f - 7 ngo chua nen - dong da - hanoi - vietnam

SP-1

P1

F

F

SP-1

TAKASHI NIWA

PSP-1

GD-1

1 SP-

DIRECTOR: GIÁM ĐỐC

SP-1

GD-1 SP-1

GD-1

SP-1 SP-1

PSP -1

GD-1

-2 UP

H

GD-1

niwa architects co.,ltd t +84 24 7302 3232 w http://takashiniwa.com e admin@niwa-a.com

F

H

H

SP-1

SP-1

FT-1 FT-1 FT-1 FT-1 FT-1 FT-1 FT-1 FT-1 FT-1

UP-1

PSP-3

PSP-1

GD-1

UP-2

-1 SP

-1

ARCHITECTURE CONCEPT DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ Ý TƯỞNG KIẾN TRÚC

F

UP-2 P-1 PS

F

SP-1

UP-2

F

UP-2 PSP-3

PSP-1 GD-1

F

UP-2

F F

PSP-1

PSP-3

F

SP-1

UP-2

UP-2 PSP-1

P-1

UP-2 GD-1

F

PSP-3

UP-2

SP-1

F

UP-2

DIRECTOR: GIÁM ĐỐC

F

UP-2

HIROOMI TAKEMORI

PSP-1 UP-2

PSP-1

PSP-1

PSP-1 SP-1

GD-1

PSP-1

GD-1

C C

GD-1

C

SP-1

GD-1

GD-1

D

PSP-1

M

GD-1

GD-1

M GD-1

PSP-1

C

SP-1

GD-1

D

ADDRESS: ĐỊA CHỈ

DIRECTOR: GIÁM ĐỐC

C M

CÔNG TY CỔ PHẦN XÂY DỰNG SMT VIỆT NAM

PSP-1 SP-1

TẦNG 4, SỐ 44,NGÕ 120 TRƯỜNG CHINH,PHƯỜNG PHƯƠNG MAI,QUẬN ĐỐNG ĐA, TP. HÀ NỘI

SP-1

PSP-1

NGUYỄN THẾ HÙNG

PROJECT MANAGER CHỦ NHIỆM DỰ ÁN

GD-1 SP-1 PSP-1

GD-1

PSP-1

C3

NGUYỄN THẾ HÙNG

CHIEF ARCHITECT CHỦ TRÌ

GD-1

GD-1

C

MAIN DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ CHÍNH

SP-1

GD-1

GD-1

Worklounge 03- Vietnam co.,Itd t +84 24 7301 8998 url www.03-x.vn e info@03-x.vn ad 9f - 7 ngo chua nen - dong da - hanoi - vietnam

PSP-1

PSP-1

GD-1 PSP-1

PSP-1

PSP-1 SP-1

C3

PS

F

PSP-1

UP-2

5

KIỂM CHECK

ADDRESS: ĐỊA CHỈ

SP

WL-

1

GD-1

GD-1 UP-2 UP-2 UP-2

FT-1

9

SP-1

UDL-1

WL-1 FT-

6

NỘI DUNG PHÁT HÀNH ISSUE FOR

9

-1

10

SP -1

WL-2

UDL-1

6 4 4 4 4 4 4 33 3 UP

SP

-1 UP

WL-1 UDL-1

SP-1

P-3 PS

WL-1

UDL-1

1 SP-

10

UDL-1

WL-1

UDL-1

GD-1

SP -1

-1 UP

-1 UP

SP-1

WL-2

WL-1

UDL-1 UDL-1

10 4

-1

2

WL-1 WL-1 WL-1

WL-1

80%

NGÀY DATE

SP

WL-

FT-1

UDL-1

UDL-1

23th April

SP-1

GD-1 UDL-1

1 SP-

1

UDL-1 UDL-1

9

10

P-

UP-1

SP-1

-1

UDL-1

-1 PSP

UP-

10 10

UDL-1

00 LẦN REV.

OWNER: CHỦ ĐẦU TƯ

PSP-

WL-2

9

-1 PSP

2

WL-2

10

WL-2 FT -1

7

10

SP-1

UDL-1

P-1 PS

WL-

-2 WL

WL-1

6

SP-1

1

UDL-1

UDL-1

WL-1

WL-1 WL -2

GD-1

PSP-1

UDL-1

S P-1

WL-2

UDL-1

UDL-1

WL-1

L-1

SP-1

-1

UP1

UDL-1

WL-1

SP

WL-1

1 SP-

-2 WL

WL-1 WL-1

WL -2

PS

1

PSP-

UDL-1

PSP-1

UDL-1

WL-2

GD-1

GD-1

TAKASHI NIWA

TECHNICAL MANAGER QUẢN LÝ KỸ THUẬT BÙI CÔNG KỲ

DESIGNED BY THIẾT KẾ

PSP-1

VŨ THỊ THANH HƯƠNG GD-1 SP-1

PSP-1

DRAWN BY THỂ HIỆN TRẦN THỊ THU TRANG

GD-1

SP-1

C

GD-1

SP-1

DESIGN STATE GIAI ĐOẠN THIẾT KẾ

CONSTRUCTION DESIGN HỒ SƠ THIẾT KẾ BẢN VẼ THI CÔNG HẠNG MỤC

ITEM

GD-1

A

A

SP-1

C

SP-1

A GD-1

K SP-1

K K K

C

SP-1

C

SP-1

SP-1

A

K K

GD-1

LANDSCAPE CẢNH QUAN

C

SP-1

C

SP-1

TÊN BẢN VẼ

DRAWING NAME

TREE PLAN_GENERAL MẶT BẰNG CÂY_CHUNG

SP-1

C

SP-1

SP-1

HOÀN THÀNH

FINISH

16/03/20

TỶ LỆ

SCALE

As indicated

KÝ HIỆU BẢN VẼ

DRAWING SIGN

SP -1

1 SP-

HC

LH-017


Flooring Sections- Detailed flooring demarcations with changing materials and textures to guide the visitor along their d

TERRAZZO MÀI HOÀN THIỆN

BÓ VỈA ĐÁ BAZAN t=300x50mm

TERRAZZO FINISHING

THICKNESS 50 BASALT STONE

LỚP VỮA XI MĂNG MÁC 75#

LỚP VỮA XI MĂNG MÁC 75#

CEMENT MORTAR LAYER #75

CEMENT MORTAR LAYER #75

TƯỜNG GẠCH ĐẶC KHÔNG NUNG

TƯỜNG GẠCH ĐẶC KHÔNG NUNG

WALL UNBURNT BRICK

WALL UNBURNT BRICK

BÊ TÔNG LÓT ĐÁ 1X2 #150

BÊ TÔNG LÓT ĐÁ 1X2 #150

STONE CONCRETE 1x2 #150

STONE CONCRETE 1x2 #150

ĐẤT TỰ NHIÊN

ĐẤT TỰ NHIÊN

NATURAL SOIL

NATURAL SOIL

B

BÓ VỈA ĐÁ BAZAN t=300x50mm

T

THICKNESS 50 BASALT STONE LỚP VỮA XI MĂNG MÁC 75#

ĐÁ BAZAN 100x100x20

CEMENT MORTAR LAYER #75

BASALT STONE 100x100x20

BÊ TÔNG LÓT ĐÁ 1X2 #150

VỮA LÁNG NỀN XI MĂNG MÁC 100#

STONE CONCRETE 1x2 #150

SCREED CONCRETE FLATTEN FLOOR,

CẤP PHỐI ĐÁ DĂM LOẠI 2

LỚP BTCT (XEM BVKC)

CRUSHED STONE OF SUBBASE (TYPE 2)

CONCRETE FLOOR (RF TO STRUC DWG)

ĐẤT SAN NỀN ĐẦM CHẶT K>=0.95, TẠO PHẲNG

ĐẤT SAN NỀN ĐẦM CHẶT K>=0.95, TẠO PHẲNG

COMPACT SOIL K>=0.95

SOIL COMPACTED, K>=0.95

ĐẤT TỰ NHIÊN

ĐẤT TỰ NHIÊN

NATURAL SOIL

NATURAL SOIL

L

C

B

S

C

C

Đ

C

Đ

N

870 800

15 20

15 20

20 15

300

15 50

150

600

3030 100 200

100

50

100 30 30

300

800

415

450

150

100

CT20

DETAIL 20 - CT ĐƯỜNG NỘI BỘ VÀ ĐÀI PHUN NƯỚC SCALE 1 : 10

100

100

200

LA-027

NẸP INOX T20 CHỐNG TRƠN TRƯỢT NON-SLIP T20 SPLINT

100

200

ĐÁ XANH THANH HÓA (300X600X20)

100

ĐÁ XANH THANH HÓA (300X600X20)

BLUE STONE (300X600X20) CT18 LA-027

DETAIL 18 - CT GHẾ ỐP ĐÁ (LOẠI 2)

BLUE STONE (300X600X20) LỚP VỮA XI MĂNG MÁC 75#

LỚP VỮA XI MĂNG MÁC 75#

CEMENT MORTAR LAYER #75

CEMENT MORTAR LAYER #75

SCALE 1 : 10

TƯỜNG GẠCH ĐẶC KHÔNG NUNG

LỚP BTCT (XEM BVKC)

WALL UNBURNT BRICK

REINFORCED CONCRETE (RF TO STRUC DWG)

ANTI-SLIP GROOVES XẺ RÃNH CHỐNG TRƯỢT

355 5 5 ĐÁ ONG KÍCH THƯỚC 150 X 300 X 12

GRANITE STONE FINISH

BEESTONE SIZE 150 X 300 X 12

LỚP VỮA XI MĂNG MÁC 75#

LỚP VỮA XI MĂNG MÁC 75#

CEMENT MORTAR LAYER #75

CEMENT MORTAR LAYER #75

TƯỜNG GẠCH ĐẶC KHÔNG NUNG

TƯỜNG GẠCH ĐẶC KHÔNG NUNG

WALL UNBURNT BRICK

WALL UNBURNT BRICK

BÊ TÔNG LÓT ĐÁ 1X2 #150

20

10

15 5

5 10 LỚP ĐÁ GRANITE

300

20

BÊ TÔNG LÓT ĐÁ 1X2 #150

STONE CONCRETE 1x2 #150

STONE CONCRETE 1x2 #150

ĐẤT TỰ NHIÊN

ĐẤT TỰ NHIÊN

NATURAL SOIL

NATURAL SOIL

CT22 LA-027

DETAIL 22 - CT MŨI BẬ SCALE 1 : 10

200

BÓ VỈA ĐÁ BAZAN t=300x50mm

15 12

350

15 20

230

240

12

12 15

ĐÁ XANH THANH HÓA (300X600X20)

THICKNESS 50 BASALT STONE

BLUE STONE (300X600X20)

LỚP VỮA XI MĂNG MÁC 75#

LỚP VỮA XI MĂNG MÁC 75#

CEMENT MORTAR LAYER #75

CEMENT MORTAR LAYER #75

BÊ TÔNG LÓT ĐÁ 1X2 #150

TƯỜNG GẠCH ĐẶC KHÔNG NUNG

STONE CONCRETE 1x2 #150

WALL UNBURNT BRICK

ĐÁ BA

CẤP PHỐI ĐÁ DĂM LOẠI 2

LỚP BTCT (XEM BVKC)

BASAL

CRUSHED STONE OF SUBBASE (TYPE 2)

REINFORCED CONCRETE (RF TO STRUC DWG)

ĐẤT SAN NỀN ĐẦM CHẶT K>=0.95, TẠO PHẲNG

BÊ TÔNG LÓT ĐÁ 1X2 #150

SCREE

COMPACT SOIL K>=0.95

STONE CONCRETE 1x2 #150

TƯỜN

VỮA L

ĐẤT TỰ NHIÊN

ĐẤT TỰ NHIÊN

WALL

NATURAL SOIL

ĐẤT T

NATURAL SOIL

300

NATUR

200

150

100

200

CT25

550

200

3030 100

100

LA-027

50

160

200

ANTI-SLIP GROOVES XẺ RÃNH CHỐNG TRƯỢT

200

DETAIL 25 - CT TƯỜNG CHẮN ĐẤT SÂN KHẤU EVENT SCALE 1 : 10

100

100

CT23 LA-027

200

100

DETAIL 23 - CT BẬC TAM CẤP NHÀ A2 VÀ ĐƯỜNG NỘI BỘ SCALE 1 : 10


desired paths.

KEY PLAN

BÓ VỈA ĐÁ BAZAN t=300x50mm

ĐÁ BAZAN 300x300x20

THICKNESS 50 BASALT STONE

L Ê DUẨN ĐƯỜ NG

BASALT STONE 300x300x20

LỚP VỮA XI MĂNG MÁC 75#

VỮA LÁNG NỀN XI MĂNG MÁC 100#

CEMENT MORTAR LAYER #75

SCREED CONCRETE FLATTEN FLOOR,

BÊ TÔNG LÓT ĐÁ 1X2 #150

Đ ƯỜ

BÊ TÔNG LÓT ĐÁ 1X2 #150

L NG ÁIT Ý TH Ổ

STONE CONCRETE 1x2 #150

STONE 1x2 #150 CONCRETE

CẤP PHỐI ĐÁ DĂM LOẠI 2

Đ ƯỜN

GN

HỰ

A

ĐƯỜN

GH Ù

NG VƯƠN

SOIL COMPACTED, K>=0.95

ĐẤT SAN NỀN ĐẦM CHẶT K>=0.95, TẠO PHẲNG

G

ĐẤT SAN NỀN ĐẦM CHẶT K>=0.95, TẠO PHẲNG

CRUSHED STONE OF SUBBASE (TYPE 2)

COMPACT SOIL K>=0.95

ĐẤT TỰ NHIÊN

ĐẤT TỰ NHIÊN

NATURAL SOIL

ĐƯ Ờ N GL

ÝT HÁI T

NATURAL SOIL

HIKARI COMPLEX KHU PHỨC HỢP HIKARI BÓ VỈA ĐÁ BAZAN t=300x50mm

LOCATION: ĐỊA ĐIỂM XÂY DỰNG

THICKNESS 50 BASALT STONE

300

LỚP VỮA XI MĂNG MÁC 75# CEMENT MORTAR LAYER #75

GRANITE STONE FINISH

BÊ TÔNG LÓT ĐÁ 1X2 #150

15 50

100 30 30

NOTE: GHI CHÚ:

LỚP VỮA XI MĂNG MÁC 75#

STONE CONCRETE 1x2 #150

CEMENT MORTAR LAYER #75

CẤP PHỐI ĐÁ DĂM LOẠI 2

150

KHU ĐÔ THỊ MỚI THUỘC KHU LIÊN HỢP CÔNG NGHIỆP - DỊCH VỤ - ĐÔ THỊ TỈNH BÌNH DƯƠNG, PHƯỜNG HÒA PHÚ, TP THỦ DẦU MỘT, BÌNH DƯƠNG

LỚP ĐÁ GRANITE

TƯỜNG GẠCH ĐẶC KHÔNG NUNG

CRUSHED STONE OF SUBBASE (TYPE 2)

WALL UNBURNT BRICK

ĐẤT SAN NỀN ĐẦM CHẶT K>=0.95, TẠO PHẲNG

BÊ TÔNG LÓT ĐÁ 1X2 #150

COMPACT SOIL K>=0.95

STONE CONCRETE 1x2 #150

ĐẤT TỰ NHIÊN

ĐẤT TỰ NHIÊN NATURAL SOIL

NATURAL SOIL

50

20

200

300

23th April

80%

NGÀY DATE

NỘI DUNG PHÁT HÀNH ISSUE FOR

KIỂM CHECK

OWNER: CHỦ ĐẦU TƯ

300

50

200

180

00 LẦN REV.

CÔNG TY TNHH BECAMEX TOKYU

200

DETAIL 21 - CT ĐƯỜNG NỘI BỘ VÀ ĐƯỜNG DẠO

700

CT21 LA-027

SCALE 1 : 10

ADDRESS: ĐỊA CHỈ

200

DEPUTY GENERAL DIRECTOR: PHÓ TỔNG GIÁM ĐỐC

100

KHU ĐÔ THỊ MỚI THUỘC KHU LIÊN HỢP CÔNG NGHIỆP - DỊCH VỤ - ĐÔ THỊ TỈNH BÌNH DƯƠNG, PHƯỜNG HÒA PHÚ, TP THỦ DẦU MỘT, BÌNH DƯƠNG

ARCHITECTURE CONCEPT DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ Ý TƯỞNG KIẾN TRÚC

ONUMA MINORU

GỖ BÊ TÔNG MÀU XÁM, KÍCH THƯỚC 120X2200X25MM CONWOOD, LIGHT GREY, 120X2200X25MM KHUNG SÀN DÀY 30MM FRAME, THICKNESS 30MM BÊ TÔNG LÓT ĐÁ 1X2 #150

niwa architects co.,ltd

STONE CONCRETE 1x2 #150

t +84 24 7302 3232 w http://takashiniwa.com e admin@niwa-a.com

CÁT ĐEN ĐẦM CHẶT SAND COMPACTED

100

200

ad 9f - 7 ngo chua nen - dong da - hanoi - vietnam

100

DIRECTOR: GIÁM ĐỐC

0

TAKASHI NIWA

CT24

100 3025

LA-027

DETAIL 24 - CT SÂN KHẤU EVENT VÀ ĐƯỜNG NỘI BỘ

ARCHITECTURE CONCEPT DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ Ý TƯỞNG KIẾN TRÚC

SCALE 1 : 10 Worklounge 03- Vietnam co.,Itd t +84 24 7301 8998 url www.03-x.vn e info@03-x.vn ad 9f - 7 ngo chua nen - dong da - hanoi - vietnam

DIRECTOR: GIÁM ĐỐC HIROOMI TAKEMORI

LỚP ĐÁ GRANITE

ẬC TAM CẤP NHÀ A2

MAIN DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ CHÍNH

GRANITE STONE FINISH LỚP VỮA XI MĂNG MÁC 75# CEMENT MORTAR LAYER #75 SỎI

TƯỜNG GẠCH ĐẶC KHÔNG NUNG

GRAVEL

WALL UNBURNT BRICK

BÊ TÔNG LÓT ĐÁ 1X2 #150

BÊ TÔNG LÓT ĐÁ 1X2 #150

STONE CONCRETE 1x2 #150

STONE CONCRETE 1x2 #150

ĐẤT SAN NỀN ĐẦM CHẶT K>=0.95, TẠO PHẲNG

ĐẤT SAN NỀN ĐẦM CHẶT K>=0.95, TẠO PHẲNG

COMPACT SOIL K>=0.95

COMPACT SOIL K>=0.95

ĐÁ BAZAN 300x300x20

ĐẤT TỰ NHIÊN

ĐẤT TỰ NHIÊN

BASALT STONE 300x300x20

NATURAL SOIL

NATURAL SOIL

AZAN 300x300x20

VỮA LÁNG NỀN XI MĂNG MÁC 100#

LT STONE 300x300x20

SCREED CONCRETE FLATTEN FLOOR,

LÁNG NỀN XI MĂNG MÁC 100#

BÊ TÔNG LÓT ĐÁ 1X2 #150

ED CONCRETE FLATTEN FLOOR,

STONE 1x2 #150 CONCRETE

NGUYỄN THẾ HÙNG

NGUYỄN THẾ HÙNG

CHIEF ARCHITECT CHỦ TRÌ

20 20

ĐẤT TỰ NHIÊN

RAL SOIL

NATURAL SOIL

TAKASHI NIWA

TECHNICAL MANAGER QUẢN LÝ KỸ THUẬT

20

SOIL COMPACTED, K>=0.95

UNBURNT BRICK

TỰ NHIÊN

TẦNG 4, SỐ 44,NGÕ 120 TRƯỜNG CHINH,PHƯỜNG PHƯƠNG MAI,QUẬN ĐỐNG ĐA, TP. HÀ NỘI

DIRECTOR: GIÁM ĐỐC

PROJECT MANAGER CHỦ NHIỆM DỰ ÁN

ĐẤT SAN NỀN ĐẦM CHẶT K>=0.95, TẠO PHẲNG

NG GẠCH ĐẶC KHÔNG NUNG

CÔNG TY CỔ PHẦN XÂY DỰNG SMT VIỆT NAM ADDRESS: ĐỊA CHỈ

150

150

150

50

50

20

30

20

150

20 20

BÙI CÔNG KỲ

DESIGNED BY THIẾT KẾ VŨ THỊ THANH HƯƠNG

DRAWN BY THỂ HIỆN

200

450

200

TRẦN THỊ THU TRANG

DESIGN STATE GIAI ĐOẠN THIẾT KẾ

200

200

CONSTRUCTION DESIGN HỒ SƠ THIẾT KẾ BẢN VẼ THI CÔNG HẠNG MỤC

ITEM

100

LANDSCAPE CẢNH QUAN TÊN BẢN VẼ

100

200

DRAWING NAME

DETAILS SECTION

100

300

400

CT19 LA-027

DETAIL 19 - CT ĐƯỜNG ĐI DẠO SCALE 1 : 10

CT26 LA-027

DETAIL 26 - CT MŨI BẬC SÂN KHẤU EVENT SCALE 1 : 10

HOÀN THÀNH

FINISH

TỶ LỆ

SCALE

KÝ HIỆU BẢN VẼ

HC

04/10/20 1 : 10 DRAWING SIGN

LA-027


Swale Calculations & Drawings- Designed to capture the rainwater and utilise it in the aquaponics system, creating a su

-1300

-1300

-1200 -1300

-1200 -1200

-1400

% 0.3

-1700 -1700

-1700 -1400

0.5%

-1700

10

-1200 -1200

-12

-1400 -1400 -1300

0.9%

-1300

0.9%

-1700

-1400

0.8%

-1400 -1700

0% 1.

-1400

1300 700

2000 2000

0.9 %

-1700 0. 7%

-1700

2000

1300 700

2000 2000

-1700 0.7%

-1700

2000

-1700

2000 2000 2000

9

0.8%

-1700

34842

2000

2000 2000

117.74 m2

-1700

0. 7%

-1700

-1700 2000

-1700

-1700

0.7%

-1700

0.9% 0.3%

2000 2000

Swale 1

2000

0.6%

-1600 -1600

2000 2000

-1700

-1700

0.9%

-1700

-1700 -1700

-1200

-1200

-1400

0.8%

-1700

-1200

-1200

-1500

% 0.7

-1400

0.3%

-1200 2000 2000

% 0.9

0.4%

-1700

0.3%

2000 2000

-1700

Swale 3

736

% 1.0

-1200

% 0.5

2000 2000

200 200 0 0

143.228

-1500

300 300 0 0

9

2000 2000

m2

-1200 1.0%

0.6%

8

2000 2000

% 1.0

-1700

-1200

200 0 200 0

-1700

2.5%

2.2 %

2.2%

-1400

-1200 -1200

2.2 %

2.2%

-1400

1.4%

-1300

-1400


ustainable biome.

KEY PLAN L Ê DUẨN ĐƯỜ NG

L NG ÁIT Ý TH Ổ

205

Đ ƯỜ

Đ ƯỜN

700

GH Ù ĐƯỜN

* IF THE EXISTING SOIL IS NOT SUITABLE, IT HAS TO BE REPLACED TO THE COMPACT EXISTING SOIL * NẾU SOIL EXISTING KHÔNG PHÙ HỢP, NÓ ĐÃ ĐƯỢC THAY ĐỔI SOIL EXISTING SOIL

4

ÝT HÁI T

HIKARI COMPLEX KHU PHỨC HỢP HIKARI LOCATION: ĐỊA ĐIỂM XÂY DỰNG KHU ĐÔ THỊ MỚI THUỘC KHU LIÊN HỢP CÔNG NGHIỆP - DỊCH VỤ - ĐÔ THỊ TỈNH BÌNH DƯƠNG, PHƯỜNG HÒA PHÚ, TP THỦ DẦU MỘT, BÌNH DƯƠNG NOTE: GHI CHÚ:

Typical section detail of swale Chi tiết phần điển hình của swale SCALE 1 : 20

m2

(55.109-13.718)

3.

3%

41.391

1.1%

1.1%

A

ĐƯ Ờ N GL

TẤT CẢ CÁC THÀNH PHẦN DƯỚI ĐÂY TRỌNG LƯỢNG KHÔ - 75% CÁT - 10% LỚP LỚN LỚN HƠN 5MM - VẤN ĐỀ 5% GEOTEXTILE FABRIC VẢI ĐỊA KỸ THUẬT

LB-025

HỰ

NG VƯƠN

ALL COMPONENTS BELOW BY DRY WEIGHT - 75% SAND - 10% FINE GRAVEL LESS THAN 5MM - 5% ORGANIC MATTER

-1200

GN

G

75

STONE MULCH T=75MM ĐÁ MULCH T = 75MM CULTURE SOIL T MAX=700MM, T MIN=200MM ĐẤT NUÔI CẤY T MAX=700MM, T MIN=200MM

-1200

80%

NGÀY DATE

NỘI DUNG PHÁT HÀNH ISSUE FOR

KIỂM CHECK

800

-1200

-1200

200 200 0 0

-1300

80 0 800 800

-1200 CÔNG TY TNHH BECAMEX TOKYU

-1300

ADDRESS: ĐỊA CHỈ

2. 2 %

-1300

KHU ĐÔ THỊ MỚI THUỘC KHU LIÊN HỢP CÔNG NGHIỆP - DỊCH VỤ - ĐÔ THỊ TỈNH BÌNH DƯƠNG, PHƯỜNG HÒA PHÚ, TP THỦ DẦU MỘT, BÌNH DƯƠNG

-1200 1. 1 %

5

1. 1 %

-1300 -1200 -1300 8 .9 %

-1300

2000

-1200

6

DEPUTY GENERAL DIRECTOR: PHÓ TỔNG GIÁM ĐỐC

ONUMA MINORU ARCHITECTURE CONCEPT DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ Ý TƯỞNG KIẾN TRÚC

7

-1300

3000 3000

niwa architects co.,ltd t +84 24 7302 3232 w http://takashiniwa.com e admin@niwa-a.com

ad 9f - 7 ngo chua nen - dong da - hanoi - vietnam

2000 2000

? -1400 ?

2000 2000

230.657m2

Swale 4

-1300

DIRECTOR: GIÁM ĐỐC TAKASHI NIWA ARCHITECTURE CONCEPT DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ Ý TƯỞNG KIẾN TRÚC

2. 6 %

-1200

9. 2 4. 1 % %

800

23th April

OWNER: CHỦ ĐẦU TƯ

120 0

200 0

200

00 LẦN REV.

Worklounge 03- Vietnam co.,Itd t +84 24 7301 8998 url www.03-x.vn e info@03-x.vn ad 9f - 7 ngo chua nen - dong da - hanoi - vietnam

2

DIRECTOR: GIÁM ĐỐC HIROOMI TAKEMORI MAIN DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ CHÍNH

-1400

CÔNG TY CỔ PHẦN XÂY DỰNG SMT VIỆT NAM

-1000

ADDRESS: ĐỊA CHỈ TẦNG 4, SỐ 44,NGÕ 120 TRƯỜNG CHINH,PHƯỜNG PHƯƠNG MAI,QUẬN ĐỐNG ĐA, TP. HÀ NỘI

-1400

DIRECTOR: GIÁM ĐỐC NGUYỄN THẾ HÙNG

PROJECT MANAGER CHỦ NHIỆM DỰ ÁN

1

NGUYỄN THẾ HÙNG

CHIEF ARCHITECT CHỦ TRÌ TAKASHI NIWA

TECHNICAL MANAGER QUẢN LÝ KỸ THUẬT

-1400

BÙI CÔNG KỲ

DESIGNED BY THIẾT KẾ VŨ THỊ THANH HƯƠNG

DRAWN BY THỂ HIỆN TRẦN THỊ THU TRANG

DESIGN STATE GIAI ĐOẠN THIẾT KẾ

3 Ground level area distribution Roof Green Roof Hardscape Car drop off Softscape (Swale) Total

Swale 2

2198.519 m2 678.677 m2 293.648 m2 140.274 m2 1155.675 m2 (533.016) m2 4473.162 m2

49.22 % 15.19 % 6.57 % 3.14 % 25.87 % (11.93) % 100.00 %

CONSTRUCTION DESIGN HỒ SƠ THIẾT KẾ BẢN VẼ THI CÔNG HẠNG MỤC

ITEM

LANDSCAPE CẢNH QUAN TÊN BẢN VẼ

DRAWING NAME

BIO-SWALE GENERAL CHUNG MƯƠNG SINH THÁI HOÀN THÀNH

FINISH

03/02/20

TỶ LỆ

SCALE

As indicated

KÝ HIỆU BẢN VẼ

HC

DRAWING SIGN

LB-025


Swale Sections-Interaction around and on the waterbodies is promoted by adding small platforms and bridges culminati

800

2839

630

300

819

300

170

LEED BOUNDARY LINE ĐƯỜNG BIÊN FLOOR FINISHING LV.1 TẦNG HOÀN THIỆN.1 -1700

-1900

-1550

PEDESTRIAN PATHWAY LEVEL CẤP ĐƯỜNG CHO NGƯỜI ĐI BỘ

PARKING ROAD LEVEL KHAI THÁC ĐƯỜNG ĐÊ -1215

-1320

2.9%

500

350

250

1 LB-028

STONE MULCH T=75MM ĐÁ MULCH T = 75MM

700

GEOTEXTILE FABRIC VẢI ĐỊA KỸ THUẬT

400

CULTURE SOIL T MAX=700MM, T MIN=200MM ĐẤT NUÔI CẤY T MAX= 700MM, T MIN=200MM

OVERFLOW PIPE CONNECTS TO THE INFRASTRUCTURE 400MM ỐNG TRÀN KẾT NỐI VỚI CƠ SỞ HẠ TẦNG 400MM

GREEN PATH_SECTION 21

4 LB-028

PHẦN MÀU XANH 21 SCALE 1 : 25

5

GRE

PHẦN

SCALE 1

6

7 7 LB-028

LANDSCAPE LIGHTING PLAN_ZONE-A Copy 2 - Callout 1 SCALE 1 : 200

LEED BOUNDARY LINE ĐƯỜNG BIÊN 800 630

FLOOR FINISHING LV.1 TẦNG HOÀN THIỆN.1 -750

2668

300

170

900

300

4 LB-028

100

800

100

-1190

-1080

-970

-860

800

100

800

100

PEDESTRIAN PATHWAY LEVEL CẤP ĐƯỜNG CHO NGƯỜI ĐI BỘ

PARKING ROAD LEVEL KHAI THÁC ĐƯỜNG ĐÊ

670

100

110 110 110 110

-1225

250

300

250 250

300

250

250

300

-1320 2.7%

250 300

120

700

250

STONE MULCH T=75MM ĐÁ MULCH T = 75MM CULTURE SOIL T MAX=700MM, T MIN=200MM ĐẤT NUÔI CẤY T MAX= 700MM, T MIN=200MM

GEOTEXTILE FABRIC VẢI ĐỊA KỸ THUẬT

2 LB-028

GREEN PATH_SECTION 22 PHẦN MÀU XANH SCALE 1 : 25

3 LB-028

THE SCALE


ing them to the artificial lake.

KEY PLAN L Ê DUẨN ĐƯỜ NG

Đ ƯỜ L NG ÁIT Ý TH Ổ

HỰ

A

ĐƯỜN

GH Ù

-1080

G

GN

NG VƯƠN

Đ ƯỜN

ĐƯ Ờ N GL

ÝT HÁI T

HIKARI COMPLEX KHU PHỨC HỢP HIKARI LOCATION: ĐỊA ĐIỂM XÂY DỰNG KHU ĐÔ THỊ MỚI THUỘC KHU LIÊN HỢP CÔNG NGHIỆP - DỊCH VỤ - ĐÔ THỊ TỈNH BÌNH DƯƠNG, PHƯỜNG HÒA PHÚ, TP THỦ DẦU MỘT, BÌNH DƯƠNG NOTE: GHI CHÚ:

250

300

1500

250

250

00

23th April

80%

LẦN REV.

NGÀY DATE

NỘI DUNG PHÁT HÀNH ISSUE FOR

KIỂM CHECK

OWNER: CHỦ ĐẦU TƯ

CÔNG TY TNHH BECAMEX TOKYU ADDRESS: ĐỊA CHỈ KHU ĐÔ THỊ MỚI THUỘC KHU LIÊN HỢP CÔNG NGHIỆP - DỊCH VỤ - ĐÔ THỊ TỈNH BÌNH DƯƠNG, PHƯỜNG HÒA PHÚ, TP THỦ DẦU MỘT, BÌNH DƯƠNG

DEPUTY GENERAL DIRECTOR: PHÓ TỔNG GIÁM ĐỐC

ONUMA MINORU

EEN PATH_SECTION 22 - Callout 1

5 LB-028

N MÀU XANH 22 - Chú thích 1

1 : 10

Section 118

ARCHITECTURE CONCEPT DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ Ý TƯỞNG KIẾN TRÚC

PHẦN 118

SCALE 1 : 10

niwa architects co.,ltd t +84 24 7302 3232 w http://takashiniwa.com e admin@niwa-a.com

ad 9f - 7 ngo chua nen - dong da - hanoi - vietnam

DIRECTOR: GIÁM ĐỐC TAKASHI NIWA ARCHITECTURE CONCEPT DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ Ý TƯỞNG KIẾN TRÚC

Worklounge 03- Vietnam co.,Itd t +84 24 7301 8998 url www.03-x.vn e info@03-x.vn ad 9f - 7 ngo chua nen - dong da - hanoi - vietnam

DIRECTOR: GIÁM ĐỐC

66 0

20 00

HIROOMI TAKEMORI MAIN DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ CHÍNH

10 0

-1190

80 0

CÔNG TY CỔ PHẦN XÂY DỰNG SMT VIỆT NAM

25 0

ADDRESS: ĐỊA CHỈ

-1080

TẦNG 4, SỐ 44,NGÕ 120 TRƯỜNG CHINH,PHƯỜNG PHƯƠNG MAI,QUẬN ĐỐNG ĐA, TP. HÀ NỘI

10 0

DIRECTOR: GIÁM ĐỐC NGUYỄN THẾ HÙNG

PROJECT MANAGER CHỦ NHIỆM DỰ ÁN NGUYỄN THẾ HÙNG

25 0

80 0

15 00

-970

25 0

10 0

30 0

CHIEF ARCHITECT CHỦ TRÌ

25 0

TAKASHI NIWA

TECHNICAL MANAGER QUẢN LÝ KỸ THUẬT

80 0

BÙI CÔNG KỲ

DESIGNED BY THIẾT KẾ

-860

VŨ THỊ THANH HƯƠNG

DRAWN BY THỂ HIỆN TRẦN THỊ THU TRANG

DESIGN STATE GIAI ĐOẠN THIẾT KẾ

CONSTRUCTION DESIGN HỒ SƠ THIẾT KẾ BẢN VẼ THI CÔNG HẠNG MỤC

ITEM

LANDSCAPE CẢNH QUAN TÊN BẢN VẼ

DRAWING NAME

BIO-SWALE DETAIL 3 CHI TIẾT MƯƠNG SINH THÁI 3

E GREEN PATH DETAILS PLAN_ZONE B - Callout 1 1 : 20

HOÀN THÀNH

FINISH

04/01/20

TỶ LỆ

SCALE

As indicated

KÝ HIỆU BẢN VẼ

HC

DRAWING SIGN

LB-028


Initial Site Pictures

Entrance

Bedroom3

Dining Space

Kitchen

Bedroom2

Living Room

Design Sketches

Kitc

Living Room

Material Pale

TV Cabinet

Kitchen

06

Toilet1

123 House Project Residential Interiors

Study Table

Washroom


chen

Toilet2

Bedroom3

Toilet1

Toilet2

Kitchen

Balcony

Bedroom1

Living Room

ette

Freelance, 2022


Construction

Dining Space

Kitchen

Dining Space

Bedroom3

Living Room

Toilet2

Toilet1

Living Space

Toilet1

Bedroom1

Kitchen

Bedroom2

Bedroom2

Living Room

Toilet1

Bedroom3


Complete Site Pictures

Entrance

Bedroom1

Bedroom1

Kitchen

Living Room

Dining Space

Bedroom3

Bedroom1

Bedroom1

Toilet1

Dining Space

Living Room

Toilet1

Bedroom2

Bedroom2


Funding Pitch Walkthrough : AFC Foundation, Dehradun

07

Architectural Videos

Walkthrough and Construction Process


Interior Renovation Process : DLF Project, Gurgaon.

Freelance, 2022 Confidential, To be published.


A colonial chemist shop in Cannaught Place, Delhi

08

Sketches

Urban Sketching


A 50 year old bookshop and legacy Italian cafe in Cannaught Place, Delhi

Freelance, 2022


Bubble Pavilion, CaveUrban-World Bamboo Festival, Imphal The workshop began with various lectures on different types of bamboo, how to grow them and where to use them. We continued to develop the pavilion on site in the latter half, learning to slice, bend and fix bamboo.

08

Bamboo Construction Hands-on work


Bamboo Playpen, Karwaan-Bamboo and Nature Workshop, Nagaland The workshop led with learning nurturing practices of the North East India region combined with a competition to choose one structure, to finally construct the semi-permanent playpen for the farm.

Workshops 2018, 2019


Mani Makhija +91-8860123435 manimakhija.14@gmail.com Art : @childwhocriedwolf


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.