Portfolio MANI MAKHIJA SELECTED WORKS (2019-2022)
Recommendation Letter
Recommendation Letter
Hello I’m Mani Architect+Designer From Delhi, India Contact https://www.behance.net/ManiMakhija14 manimakhija.14@gmail.com +91-8860123435
Languages I can speak/write
Academic Background
English, Hindi, Punjabi, French (Intermediate)
2022 U.S Green Building Council LEED Green Associate (Current)
Professional Experience
2016-2021 School of Planning and Architecture Bachelors of Architecture (8+ CGPA)
2022 Equilib Earth, Goa + KOTA Architects, Dublin + Self Freelance Architect (Current) 2021,2022 Field Atelier, Goa, India Junior Architect (6 months) 2021 Garage Aid, Goa, India Apprenticeship (2 months)
2020 IIHS, Solar Decathlon India-Team Lead Net-Zero Building Design (Top Learner) 2002-2016 Sachdeva Public School Schooling (9+ CGPA)
2020 Worklounge-03, Hanoi, Vietnam Architectural Internship (6 months)
Relevant Courses Revit for Architectural Design , Autodesk UNFCC Green Building Program- A grade HARVARD Architectural Imagination, EDX MIT Site Planning, EDX HARVARD Women Making History, EDX Carlo Stanga, Architectural Illustration, Do
Software Skills
Hobbies and Interests
AutoCAD
Sketching, Reading, Writing, Animating, Tr Cycling.
SketchUp, Rhino Revit, ArchiCAD Ladybug+Plugins, Climate Studio Lumion, Enscape, Vray Photoshop, Illustrator, Indesign, Premier Pro Microsoft Office, Google suite
Interested in designing with a wholesome sustainability in cultural, social, economic environmental states.
Workshops partaken 2022 Exhibitor for City For All, Social Design & Alliance Francaise 2021 CLT Induction in India 2020,2018 Z-Axis,Charles Correa Foundation 2019 Architectural Observation and Assesment across Vietnam, Ar. Mohor Bose 2019 Bamboo Pavilion Construction, Ar. Pablo Juan, CaveUrban, World Bamboo Festival 2018 Bamboo Architecture in North East India, KARWAAN Achievements 2021 Top6, Solar Decathlon India -Team Lead 2020 Top 10, Form Follows Climate, UNI 2019 Top 10, Writing Architecture, NASA Top 40, Pop-Up Bazaar, Archasm 2018 II Prize, Writing Architecture, NASA Top 25, Berkeley Essay Prize I Prize, Bamboo Playpen Design, KARWAAN Publications
omestika
Permaculture Education Weekly blogs on permaculture design
ravelling,
UIA2021Rio-World Congress of Architects Spatial Analysis and Mapping of the Transgender Community: A Case Study of Bhopal
sense of and
Inner Magazine,Issue 04 Post Pandemic Interiors- The Design Interns Vista NASA Newsletter Architectural Education
CURRICULUM-VITAE
CONTENTS
“When I’m working on a problem, I never think about its beauty, I just think about how to solve the problem, but when I finish it, if the solution is not beautiful, I know it’s wrong.” Richard Buckminster Fuller
01
House at Socorro Goa, India Field Atelier, 2022 Residential Extension
02 Tree Grove School Odisha, India FFC Competition, 2022 Kindergarten Project
03 NHM Headquarters
Bhopal, India Solar Decathlon Competition, 2020 Net-Zero Office Building
04 Liveability of Hijra Community Delhi, India Thesis Project, 2021 Research and Analysis
05 Tokyo Hikari Complex
Ho Chi Minh, Vietnam Worklounge-03 & T.Niwa Architects, 2019 Commercial Masterplan
06 123 House Project Delhi, India Freelance, 2022 Residential Interiors
07 Architectural Videos India Freelance, 2022 Process and Walkthrough
08 Other Works
India 2017-2022 Sketches and Bamboo Pavilions
01
House at Socorro Residential Extension
Field Atelier, 2022 Confidential
Design-Ground Floor Plan
Garden
Swimming Pool
Verandah Dining Room Bedroom
Pantry
Existing House
Existing House Views
Site: Extend house from Verandah
Entrance
Goan Ae
First Floor Plan
esthetics
Bedroom
0
Side Passage
1
Current House view
2
4m
Construction Process
Foundation
Combined Footing
Columns
First Floor Structure
Masonry
Pool Scaffolding
Plinth beam
Beam Bottom Marking
Swimming Pool
Door-Window
Filtration Room
Beams
Masonry
Roofing
Top Roof
Final Glimpse
Section through Plan
Bedroom
Dining Room
Pantry
Washroom
Washroom
Bedroom
Filtration
Section through Site
Bedroom
Pantry
Verandah
Swimming Pool
0
1
2
4m
Interior Electrical Elevations-Ground Floor
Store
Washroom
Pantry
Dining Room
First Floor
Bedroom
Washroom
Bedroom
View from Walkway
Poolside View
02
Tree Grove School Kindergarten Project
Form Follows Climate,2019 Top-10
Form Development
Site Orientation The site is elongated along N-S direction.
Building Orientation E-W elongation minimises thermal gains.
Deep Sun Staggering The form is staggered to allow more sunlight.
Ventilation Displacement The form is displaced to orient along the SW wind.
Microclimate Design Functions are distributed around atriums and courtyards.
Disaster Safety Vernacular form is adapted to protect against cyclones.
Buffer Zones Coridoors act as buffer zone to increase time lag.
Operable Shading Louvres introduces to aid light and ventilation
Sloped roof design Openings designed form maximum north light
Courtyard-Playground
Form Development
Exploded Isometric View
03
NHM Headquarters Net Zero Office Building
Solar Decathlon Competition,2020 Top-6, Team Lead
Site Study
Maximum built up area: 9100 sqm The project is a Government Office Building for the National Health Mission Headquarters in Bhopal.
Construction budget: ₹30,000/sqm Project budget: ₹28,00,00,000/-
Integrated Design Approach
Phase 1- Base Models Analysis
11 of us split into 3 teams to develop 3 different iterations on the basis of passive strategies and architectural themes discussed.
Site-Climate study
Architectural ideas
Passive design
Bubble diagrams
Design Analysis
Phase 2- Design Development
The base models were further developed to combine into one model which was consecutively simulated at all stages of design-zoning, interior detail, material conjecture and element detail etc.
Simulating the Prototypes
Analysing Results
Combining the Aspects
Zoning in levels
Allocating strategies
Adding specific details
Phase 3- Finalised Design-Planned
The last step was to enhance elemental strategies, by mindfully incorporating innovative and cost efficient solutions resulting in an optimum building design.
Innovation
Enhancing strategies
Design development
Design Analysis
Cost Effective
Climate Study
General Temperatures : 10°C to 43°C. Summers : April-July Peak : 43°C. Winters : November-February Minimum : 7°C. Monsoon : July-September Humidity 30-70%
Temperature Plot
Sun path
Humidity Plot
Summer Winds
Discomfort Plot
Winter Winds
LEVEL 6
Uncomfortable winds : November-June Comfortable winds : July-October Prominent wind direction : West
Passive Design Bundle
A charette organised the climate analysis into applicable strategies to be followed at various stages of design.
LEVEL 5
Passive building design
Cooling zones
Permeable building
Mixed mode cooling
Locating outdoor rooms
Clustered rooms
Sun,wind,light facing rooms
Shading courtyards
Night cooling mass
Stack ventilation rooms
Cross Ventilation rooms
Evaporative cooling
Mechanical heating
Combined openings
Opening Arrangement
Layer of shades
Insulation outside
Thermal mass
Ducts and plumbing
External shading
Breathing walls
Air-air exchangers
Movable insulation
Exterior surface colours
In-between hading
LEVEL 2
LEVEL 3
LEVEL 4
Buffer zones
LEVEL 1
Mechanical ventilation
Mass surface absorptance SITUATIONAL
Daylight reflecting surfaces
Double skin materials CORE
REFINER
Net-Zero Energy
OPTION 1 Central Connecting Atrium
OPTION 2 Dispersed Scattered blocks
OPTIMISED A hierarchy of connecting atriums
Solar Radiation v/s Daylighting A combination was needed which had least solar radiation absorbed by the surface, but in the meantime allowing in optimal daylight. Staggering towards the North east allowed for this, as understood form model 1 and 2. Solar Radiation
Daylighting
Phase Change Material and Night Ventilation In the morning, the heat recovery system and radiant cooling system work to cool the building. During the night, the chiller recharges the PCM and the latent thermal storage cools itself down.
Optimisation Results EUI optimizations were done parametrically, against a default value defined earlier. After achieving a desirably low EUI value, elements were added to increase visual and thermal comfort, especially in non-HVAC areas.
Optimised Inner Surface Temperature
North-East
South-West
South-East
North-West
Optimising the zoning, layout and Window-wall ratios allowed us to create comfortable (less than 27°C) inner surface temperatures in more than 70% of our building. Buffer zones, lower HVAC set points and PCM was utilised to reduce temperatures in West and South-West sections.
Net-Zero Water Water Optimisation The overall water performance was improved by explorations done in three phases. 1. Base case: A base water demand calculation was done for the required footfall. 2. Reduction 1: Rainwater harvesting was explored and implemented. This helped reduced the fresh water demand by more than 50%. 3. Reduction 2: A thorough research was done on the various available efficient fixtures with the proper flow rates. The right fixtures were chosen which helped reduced fresh water demand to 87%.
Rain water harvesting coupled with a root zone water treatment that treats surface runoff and grey water are used as alternate sources of water. Local vegetation has been used to reduce turf area, thus, minimizing on landscaping requirements. In the monsoon months extra grey water is sent to Ground recharge.
User Comfort and Incitement
Open place office space helpsin providing a comfortable work environment with more interaction among the co-workers. The Intelligent Building System is zoned to track overall consumption of each department allowing us to create an additional interface on the Management Tracking. Detailed Design video
04
Liveability of Hijra Community Research and Analysis
Architectural Thesis, 2021 Presented and Published in UIA2021 Rio-World Congress of Architects
Street Study of the Hijra Community : Working the streets and living in camps
Street Study of the Hijra Community : Alleyways leading to and surrounded by Hijra community housing
Liveability Analysis
A liveability study of : 4 places using 4 factors. Laxmi Nagar tops the index. People have better monetary support and occupational opportunities. Turkman Gate goes the opposite way because of the same reason.
Analysis and Architectural Ideas The analysis of the problems recuperated during the research are put to a reason and possible architectural interventions. Problems
Owing to
Interventions
Mystery and Fear Lost history Rural-urban migration Limited occupations Lack of healthcare
Lack of information Lack of documentation Religious myths, Discrimination Lack of acceptance Lack of subsidies and awareness
Museums,Public Installations Archives,Museums,Libraries Safe homes,NGO Offices Training centers,Career Counselling Rehabilitation spaces,Medical Facilitation
Ideas and Iterations
An OAT to attract crowd in with performances and dance and music.
Semi Open spaces and streamlined views to navigate the place in a defined path.
Spatial Opportunities for a Social Development Center
Commercial spaces
Fair Ground
PUBLIC
Toilet
Auditorium
Parking
Entry 1
Museum Gallery
Archive
Library
Toilet
Informative Spaces
Cafeteria
Courtyard
Admin
Meeting Spaces
Rental offices
Administration spaces
Workshops
Classrooms
Toilet
Canteen
Playground
Laboratories
Kitchen
Vegetable Garden
SEMI-PUBLIC
Reception
Connecting spaces
Parking
Toilet
Counsel spaces OAT
Admin
Dance Room
Kitchen
Rooms
Dorms Entry 2
Music Room Courtyard
Institutional Spaces
Toilet
Reception
Care Rooms
Medical services
Living Spaces
PRIVATE
Formal-Informal market areas where the community can sell their training and interact.
Meeting and Gathering spaces for NGOs to come together and plan, process the vision.
05
Tokyo Hikari Complex Commercial Masterplan
Worklounge-03 & Takashi Niwa Architects, 2019 Confidential-Future Project of the Year, ASHUI Awards
Vegetation Drawings- landscaped with seasonal edible plants and fruit trees with the concept of “Edible Landscape”.
P-3 PS
UP-1
FT-1
UDL
1
SP-1
UDL-1
UP-1
UP-1
1
1
UDL-2
UDL-1UD
UDL-2
1
UDL-2
UDL-1
UP-1
UDL-2
UDL-2
UP-1
UDL-1
UDL-2
UP-1
UDL-1 UDL-1
UDL-2 UDL-2
-1
UDL-1 UP-1 UP-1
UDL-1 UP-1
FT-1
FT-1
UP-1 UP-1 UP-1
FT-1
SP-1
FT-1
UP-1
FT-1
FT
-1
SL-1
UP-1 FT-1
SL-1
UP-1
SL-1
1
SL-1
FT-1
-1
1
SL-1
SL-1
6
1 UP-
6-8
1
UDL-1
1
4-5
SL-1
SL-1
UP-
5-6
8
SL-1 SL-1
UP -1
0.4-0.5
2-2.5
UP-1
SL-1
PSP-2
SP-1
SP-1
0.15-0.25
UP-1
SL-1
SL-1 FT
FT-1
UDL-1
3-4
WL-1
UDL-1
1
UDL-1 PSP-
2
1
UP
1
UP-1 UP-1 UP-1 UP-1
-1
PS
2 P-
WL-2
SP-1
WL
-2 WL
SP-1
FT-1
FT-1
FT-1
GD-1
PSP -3
UP-1
SP-1
1
1
UDL-1 UDL-1 UDL-1
FT-
1
1
FT-
1
SP-1
-1
GD-1
6
UP-1 UP-1
1
C1
GD-1 UP-1
UP-1 SP-4 SP-4
UP-1 UP-1
UP-1 FT-1
C2 -1 UP
UP-1
6
UP-1 UP-1 UP-1
UP-1
GD-1
LUD
BSP-1
6-8
UP-1
UP-1
UP-1
BSP-1
1
UDL-1
GD-1
UP-1
LUD
1 FT-1
UP-1 UP-1 L-3 UD L-3 UD L-1 UD L-3 L-1 UD L-3 UD L-3UD UP-1 UD L-1 L-3 UD UD L-1 L-3 UD UD L-3 UD L-3 UD L-3 UD L-3 UD L-3 UD L-3 UP-1 UD L-3 UD
LUD
1
-1 SP
0.5-0.6
3-4
5-6 SP-1
8-10
GD-1
0.4-0.5
1.5-2
5-6
4-5
8-10
PS
P-
3
0.08-0.10
UP-1
GD-1
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)
Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
SP-1
UDL-1
L-3 UD L-3 UD L-3 UD L-3 UD L-3 L-1 UD L-3 UD UD L-3 L-3 UD L-3 UD UD L-1 L-3 UP-1 UD UD L-1 UD L-1 L-1 UD UD L-1 UD
UDL-1
GD-1
5-6
6
SP-4 GD-1 SP-4
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M) 0.4
FT1 FT1 FT1 FT1 FT1 FT-
GD-1
UP-1
4-5
FT-1
FT-1
-1 UP
6-8
-1 UP
GD-1
BSP-1
BSP-1 UP-1
UP-1
2.5-3
-1 UP
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)
-1 UP
UP-1
-1 UP
-1 UP
UDL-1
UP-1
0.6-0.7
P-2 PS
GD-1
UDL-1
6-8
0.25-0.3
UDL-1
UP-1
-1 UP
1
SP-1
SP
5-6
GD-1
-1
0.4-0.5
2-2.5
1
UDL-1
SP
0.15-0.18
4-5
PART PHẦN 36
FT-1
SL-1
SP1
TAMARIND Cây me chua
7
UP-1 UDL-1
FT-1
SP-1
FT
UP-1
UP-1 SL-1 SL-1 SL-1 SL-1 SL-1SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1 SL-1
UDL-1
FT-1 UP-1
UDL-1
UDL-2
1
UP
UDL-2 UDL-2 UDL-2
1 UDL-1
UDL-2 UDL-2
2 P-
1.5-2
UDL-1
UDL-2 UDL-2
UDL-1 UDL-1
PS
0.15-0.2
0.3-0.5
UP-1
UDL-1
FT-1
3-4
0.03-0.05
UDL-1
UDL-1 FT-1
UP-1 UP-1 UP-1
PSP-1
-1
PSP-1
1
1 GD-1
GD-1
Height (M) Chiều cao (M)
GUAVA Cay Oi Le Dai Loan
11
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)
Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
0.2-0.25
0.4-0.5
0.3-0.5
2-3
Height (M) Chiều cao (M)
0.08-0.1
3-4
11
PART PHẦN
13
Height (M) Chiều cao (M)
PICTURE HÌNH ẢNH
QUANTITY ĐỊNH LƯỢNG
AFZELIA XYLOCARPA Cay Go Do SYMBOL BIỂU TƯỢNG
A
PART PHẦN 13
SYMBOL BIỂU TƯỢNG
C
Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
PART PHẦN 2
SYMBOL BIỂU TƯỢNG
D
Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
0
9
Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
PART PHẦN 23
SYMBOL BIỂU TƯỢNG
F
0.3-0.4
0.3-0.5
2-3
1.5
3-4
VANG HOA HONG
0.4-0.5
1.2-1.5
5-6
4-5
8-10
Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
0.25-0.35
1.5-2
5-6
3-4
8-10
0.18-0.2
0.4-0.5
1.5-2
5-6
0.08-0.10
0.4-0.5
1.5-2
5-6
4-5
8-10
0.25-0.3
0.4-0.5
2
5-6
NAME Tên
HOPEA ODORATA Cay Sao Den SYMBOL BIỂU TƯỢNG
ACACIA AURICULIFORMIS Cay Keo la tram SYMBOL BIỂU TƯỢNG
8.
ERYTHRINA FUSCA PURPLE CORALTREE Đậu san hô đỏ SYMBOL BIỂU TƯỢNG
4
37
PICTURE HÌNH ẢNH
QUANTITY ĐỊNH LƯỢNG
9.
ROSA MULTIFLORA Cay tuong vi SYMBOL BIỂU TƯỢNG
Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
0
Height (M) Chiều cao (M) PART PHẦN Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
8
Height (M) Chiều cao (M) PART PHẦN Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
0
Height (M) Chiều cao (M) PART PHẦN Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
6
K
Height (M) Chiều cao (M)
NORMANBYA NORMANBYI 10. Cây Cau đuôi chồn SYMBOL BIỂU TƯỢNG
PART PHẦN Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
9
M
8-10
11.
50
SIZE KÍCH THƯỚC
PART PHẦN
J
40
30
6
H
Height (M) Chiều cao (M)
PLUMERIA FRANGIPANI Cây Sứ đại
SYMBOL BIỂU TƯỢNG 10
SP-1
G
8-10
2-3
20
6.
7.
0.08-0.10
QUANTITY
EXISTING TREE / CÂY HIỆN CÓ
NO.
0.08-0.10
SIGN
TAY HOANG POINCIANA
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)
Height (M) Chiều cao (M) 0
0.3-0.5
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)
Height (M) Chiều cao (M)
TERMINALIA CATAPPA COUNTRY ALMOND Cay Bang
3-4
2-3
PART PHẦN
SYMBOL BIỂU TƯỢNG
2-3
0.08-0.1
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)
Height (M) Chiều cao (M)
TAMARIND Cây me chua
0.3-0.5
NAME
CAY TAM VANG
INSTALLATION(M) CÀI ĐẶT(M)
Height (M) Chiều cao (M)
ALSTONIA SCHOLARIS Cay Hoa Sua
0.4-0.5
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)
Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M) Height (M) Chiều cao (M)
BUCIDA MOLINETI Cay Bang Dai Loan
0.2-0.25
SIZE KÍCH THƯỚC
PART PHẦN 4
3-4
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)
Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
3
SYMBOL BIỂU TƯỢNG
0.08-0.1
UP-2
Height (M) Chiều cao (M)
MOMBIN Cay Coc Thai
2-3
UP-2
12
0.4-0.5
0.3-0.5
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)
Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
9
GD-1
0.2-0.25
P-1 PS
PART PHẦN
SYMBOL BIỂU TƯỢNG
SP
SP-1
Height (M) Chiều cao (M)
ORANGE Cay Cam Sanh
SP-1
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)
Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
4
SP-1
P-1 PS
PART PHẦN
GUAVA Cay Oi Ruby
GD-1
SP-1
PART PHẦN
SYMBOL BIỂU TƯỢNG
5.
2-3
SP-1
Height (M) Chiều cao (M)
10
4.
UP-1
UDL-1
SP
1
SYMBOL BIỂU TƯỢNG
3.
Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
9
2.
UP-1
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)
PART PHẦN
SYMBOL BIỂU TƯỢNG
1.
0.25-0.35
1.5-2
0.8-1
Height (M) Chiều cao (M)
8
UP-1
UDL-1
UDL-1
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)
PART PHẦN
SYMBOL BIỂU TƯỢNG
DE-1 DE-1
UP-1 UP-1
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)
Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
STAR APPLE Cay Vu Sua
-1
UP-1
UP-1
Height (M) Chiều cao (M)
2
DE-1
UDL-1
0.10-0.20
1.5-2
PART PHẦN
SAKE Cay Sake
GD-1 UP-2 UP-2
PSP-1
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)
Height (M) Chiều cao (M)
13
1 P1
UP-2
SP
Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
1
MANGO Xoai Thai
NAME Tên
PS
SP-1
SP-1
PART PHẦN
7
NO.
6-8
Height (M) Chiều cao (M)
MANGO Xoai Cat Hoa
SYMBOL BIỂU TƯỢNG
13.
1.8-2
Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
7
6
12.
Height (M) Chiều cao (M)
PART PHẦN
SYMBOL BIỂU TƯỢNG
11.
4-5
UP-1
PAPAYA Cay Du Du Thai
5
10.
0.4-0.5
0.3-0.5
Height (M) Chiều cao (M)
SYMBOL BIỂU TƯỢNG
9.
0.3-0.4
Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
6
4
8.
Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
UP-1
Cay Chuoi Lun
SYMBOL BIỂU TƯỢNG
7.
6-8
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)
PART PHẦN
3
6.
4-5
SP-1
BANANA SYMBOL BIỂU TƯỢNG
5.
5-6
Height (M) Chiều cao (M)
S
3
2
4.
0.4-0.5
2-2.5
PART PHẦN
JACKFRUIT Cay Mit Thai SYMBOL BIỂU TƯỢNG
3.
0.2-0.25
UP-1
1
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M)
Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M)
UP-1
38
PSP-1
STARFRUIT Cay Khe SYMBOL BIỂU TƯỢNG
2.
SIZE KÍCH THƯỚC
PART PHẦN
PSP-1
QUANTITY ĐỊNH LƯỢNG
PSP-1
PICTURE HÌNH ẢNH
-1
1.
NAME Tên
SP
NO.
PART PHẦN
16
Trunk Diameter (M) Đường kính thân cây (M) Foliage Diameter (M) Đường kính tán lá (M) Height (M) Chiều cao (M)
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M) 0.07-0.10
0.6-0.7
1.5-2
5-6
4-5
8-10
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M) 0.4
0.5-0.6
0.2-0.3
6-7
0.5-0.8
8-10
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M) 0.18-0.2
0.4-0.5
1.5-2
5-6
4-5
6-7
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M) 0.2-0.25
0.4-0.5
1-1.5
2-3
2-3
3-4
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M) 0.18-0.2
0.3-0.4
1-1.2
2-3
2-3
4-5
INSTALLATION(M) MATURITY(M) CÀI ĐẶT(M) TRƯỞNG THÀNH(M) 0.12-0.15
0.5-0.6
2
5-6
2-3
4-5
KEY PLAN PSP-1 SP
-1 -1 PSP
L Ê DUẨN ĐƯỜ NG
SP-1 SP-1
UP-2
UDL-1 UDL-1 UDL-1
UP-2
UDL-1 UP-2
DL-1UDL-1 UDL-1
UP-2
9
UDL-1 GD-1
UP-2 SP -1
P-1 UDL-1
UDL-1
UP-1
UDL-1
9
FT-1
UP-1 UDL-1 SP
UDL-1
UP-1
-1
-1
UDL-1
FT
UDL-1
UDL-1
UP-1
FT-
UDL-1
1
FT-
UP-1
-1 SP
UDL-1 UDL-1
UP-1
1
FT-
8
2
UDL-1
1
UP-1
GD-1
GD-1
9
1
FT-
UP-1
SP-1
UP-1
9
UDL-1
UP-1
NOTE: GHI CHÚ: PSP-1
PSP-1 UDL-1 UP-1
KHU ĐÔ THỊ MỚI THUỘC KHU LIÊN HỢP CÔNG NGHIỆP - DỊCH VỤ - ĐÔ THỊ TỈNH BÌNH DƯƠNG, PHƯỜNG HÒA PHÚ, TP THỦ DẦU MỘT, BÌNH DƯƠNG
9
PS
UDL-1 UP-1
Ổ
LOCATION: ĐỊA ĐIỂM XÂY DỰNG
9 1 P-
UDL-1 UP-1
7
G
NG VƯƠN
9
9
SP-1
UP-2
ÝT HÁI T
HIKARI COMPLEX KHU PHỨC HỢP HIKARI
9 9
-3 PSP
UDL-1
DL-1UDL-1
ĐƯ Ờ N GL
SP-1
9
1
SP-1 UDL-1
A
9
9
9
1
UP-2
UDL-1
HỰ
SP-1
1 SP-
UP-2
9
DE-1 DE-1
-1
9
9
9
SP-1
1
UP-2 DE-1
FT UP-1 -1 FT -1 UP-1 -1 UP-1
-1
9
GD-1
GN
GH Ù
1 SP-
UP-2
9
9 -3 PSP
DE-1
DE-1
FT FT
9
1
Đ ƯỜN
PSP-1
PSP-
1
1 SP-
1
UP-2
-1
9
9
SP-1
ĐƯỜN
PSP-1
SP-1
UP-2 UP-2 UP-2
SP-1
FT
Ổ
-1 SP
1
GD-1
SP-1
ÁIT Ý TH
1
1
FT
6
1
1 SP-
PSP-1
13 1 13 3 1
9
PSP-1
9
9
9
L NG
SP -1
1
PSP-1
Đ ƯỜ
1
UDL-1
UDL-1
UDL-1
2
UDL-1 WL -2
9
1 SPUDL-1
2
P-1 PS
SP
UDL-1
1
UDL-1 UDL-1
WL-1 SP-1
UDL-1
PSP-1
UDL-1
WL-
1
WL-1
PS P-
2
1 1 1 FT- 1 FT- 1 FT- 1 FT- 1 FT-
SP-1
-2 PSP PSP-1 P-1
12
PS
UP-1
12
F
F
P-1
SP-1
12
F
PSP-1
SP-1
F
SP-1
PSP-1
SP-1
F
PSP-1
1
PS
SP-1
SP-1
P-1 PS
PSP-2
PSP-1
GD-1
12 PSP-2
1
UP-1 UP-1
1 SP-
ONUMA MINORU ARCHITECTURE CONCEPT DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ Ý TƯỞNG KIẾN TRÚC
UP-2
-2 PSP
UP-1 UP-1 UP-1
UP-1
DEPUTY GENERAL DIRECTOR: PHÓ TỔNG GIÁM ĐỐC
F
P3
UP-2
1
SP-1
12 12 12 12 2 1
PS
SP-1
SP-1
6 L-1 UD
PSP-1
1
6
UP-1
9
9
1
UP-1
PSP-1
33 3
KHU ĐÔ THỊ MỚI THUỘC KHU LIÊN HỢP CÔNG NGHIỆP - DỊCH VỤ - ĐÔ THỊ TỈNH BÌNH DƯƠNG, PHƯỜNG HÒA PHÚ, TP THỦ DẦU MỘT, BÌNH DƯƠNG
PS P-
6
L-1 UD
UDL-1
1 SP-
F
SP -1
-1 SP
1
-1
-1
FT
9
SP-1
SP
-1 SP
PS P-1
6 -1
F
6
UP-2
SP
CÔNG TY TNHH BECAMEX TOKYU
-1
2
T-1
SP-1
SP-1 UP-2
6
UP-2 UP-2
UP-1
UP-2 UP-2
UP-1
PSP-1
GD-1
1 PPS -2 UP
UP-1 UP-1
6
SP-1
UP-2
10 10 10 1 SP-
GD-1
UP-2 PSP-1
H
SP-1
PSP-1
H
H
H
F
H
UP-2
GD-1 PSP-1
UP-2 PS
ad 9f - 7 ngo chua nen - dong da - hanoi - vietnam
SP-1
P1
F
F
SP-1
TAKASHI NIWA
PSP-1
GD-1
1 SP-
DIRECTOR: GIÁM ĐỐC
SP-1
GD-1 SP-1
GD-1
SP-1 SP-1
PSP -1
GD-1
-2 UP
H
GD-1
niwa architects co.,ltd t +84 24 7302 3232 w http://takashiniwa.com e admin@niwa-a.com
F
H
H
SP-1
SP-1
FT-1 FT-1 FT-1 FT-1 FT-1 FT-1 FT-1 FT-1 FT-1
UP-1
PSP-3
PSP-1
GD-1
UP-2
-1 SP
-1
ARCHITECTURE CONCEPT DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ Ý TƯỞNG KIẾN TRÚC
F
UP-2 P-1 PS
F
SP-1
UP-2
F
UP-2 PSP-3
PSP-1 GD-1
F
UP-2
F F
PSP-1
PSP-3
F
SP-1
UP-2
UP-2 PSP-1
P-1
UP-2 GD-1
F
PSP-3
UP-2
SP-1
F
UP-2
DIRECTOR: GIÁM ĐỐC
F
UP-2
HIROOMI TAKEMORI
PSP-1 UP-2
PSP-1
PSP-1
PSP-1 SP-1
GD-1
PSP-1
GD-1
C C
GD-1
C
SP-1
GD-1
GD-1
D
PSP-1
M
GD-1
GD-1
M GD-1
PSP-1
C
SP-1
GD-1
D
ADDRESS: ĐỊA CHỈ
DIRECTOR: GIÁM ĐỐC
C M
CÔNG TY CỔ PHẦN XÂY DỰNG SMT VIỆT NAM
PSP-1 SP-1
TẦNG 4, SỐ 44,NGÕ 120 TRƯỜNG CHINH,PHƯỜNG PHƯƠNG MAI,QUẬN ĐỐNG ĐA, TP. HÀ NỘI
SP-1
PSP-1
NGUYỄN THẾ HÙNG
PROJECT MANAGER CHỦ NHIỆM DỰ ÁN
GD-1 SP-1 PSP-1
GD-1
PSP-1
C3
NGUYỄN THẾ HÙNG
CHIEF ARCHITECT CHỦ TRÌ
GD-1
GD-1
C
MAIN DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ CHÍNH
SP-1
GD-1
GD-1
Worklounge 03- Vietnam co.,Itd t +84 24 7301 8998 url www.03-x.vn e info@03-x.vn ad 9f - 7 ngo chua nen - dong da - hanoi - vietnam
PSP-1
PSP-1
GD-1 PSP-1
PSP-1
PSP-1 SP-1
C3
PS
F
PSP-1
UP-2
5
KIỂM CHECK
ADDRESS: ĐỊA CHỈ
SP
WL-
1
GD-1
GD-1 UP-2 UP-2 UP-2
FT-1
9
SP-1
UDL-1
WL-1 FT-
6
NỘI DUNG PHÁT HÀNH ISSUE FOR
9
-1
10
SP -1
WL-2
UDL-1
6 4 4 4 4 4 4 33 3 UP
SP
-1 UP
WL-1 UDL-1
SP-1
P-3 PS
WL-1
UDL-1
1 SP-
10
UDL-1
WL-1
UDL-1
GD-1
SP -1
-1 UP
-1 UP
SP-1
WL-2
WL-1
UDL-1 UDL-1
10 4
-1
2
WL-1 WL-1 WL-1
WL-1
80%
NGÀY DATE
SP
WL-
FT-1
UDL-1
UDL-1
23th April
SP-1
GD-1 UDL-1
1 SP-
1
UDL-1 UDL-1
9
10
P-
UP-1
SP-1
-1
UDL-1
-1 PSP
UP-
10 10
UDL-1
00 LẦN REV.
OWNER: CHỦ ĐẦU TƯ
PSP-
WL-2
9
-1 PSP
2
WL-2
10
WL-2 FT -1
7
10
SP-1
UDL-1
P-1 PS
WL-
-2 WL
WL-1
6
SP-1
1
UDL-1
UDL-1
WL-1
WL-1 WL -2
GD-1
PSP-1
UDL-1
S P-1
WL-2
UDL-1
UDL-1
WL-1
L-1
SP-1
-1
UP1
UDL-1
WL-1
SP
WL-1
1 SP-
-2 WL
WL-1 WL-1
WL -2
PS
1
PSP-
UDL-1
PSP-1
UDL-1
WL-2
GD-1
GD-1
TAKASHI NIWA
TECHNICAL MANAGER QUẢN LÝ KỸ THUẬT BÙI CÔNG KỲ
DESIGNED BY THIẾT KẾ
PSP-1
VŨ THỊ THANH HƯƠNG GD-1 SP-1
PSP-1
DRAWN BY THỂ HIỆN TRẦN THỊ THU TRANG
GD-1
SP-1
C
GD-1
SP-1
DESIGN STATE GIAI ĐOẠN THIẾT KẾ
CONSTRUCTION DESIGN HỒ SƠ THIẾT KẾ BẢN VẼ THI CÔNG HẠNG MỤC
ITEM
GD-1
A
A
SP-1
C
SP-1
A GD-1
K SP-1
K K K
C
SP-1
C
SP-1
SP-1
A
K K
GD-1
LANDSCAPE CẢNH QUAN
C
SP-1
C
SP-1
TÊN BẢN VẼ
DRAWING NAME
TREE PLAN_GENERAL MẶT BẰNG CÂY_CHUNG
SP-1
C
SP-1
SP-1
HOÀN THÀNH
FINISH
16/03/20
TỶ LỆ
SCALE
As indicated
KÝ HIỆU BẢN VẼ
DRAWING SIGN
SP -1
1 SP-
HC
LH-017
Flooring Sections- Detailed flooring demarcations with changing materials and textures to guide the visitor along their d
TERRAZZO MÀI HOÀN THIỆN
BÓ VỈA ĐÁ BAZAN t=300x50mm
TERRAZZO FINISHING
THICKNESS 50 BASALT STONE
LỚP VỮA XI MĂNG MÁC 75#
LỚP VỮA XI MĂNG MÁC 75#
CEMENT MORTAR LAYER #75
CEMENT MORTAR LAYER #75
TƯỜNG GẠCH ĐẶC KHÔNG NUNG
TƯỜNG GẠCH ĐẶC KHÔNG NUNG
WALL UNBURNT BRICK
WALL UNBURNT BRICK
BÊ TÔNG LÓT ĐÁ 1X2 #150
BÊ TÔNG LÓT ĐÁ 1X2 #150
STONE CONCRETE 1x2 #150
STONE CONCRETE 1x2 #150
ĐẤT TỰ NHIÊN
ĐẤT TỰ NHIÊN
NATURAL SOIL
NATURAL SOIL
B
BÓ VỈA ĐÁ BAZAN t=300x50mm
T
THICKNESS 50 BASALT STONE LỚP VỮA XI MĂNG MÁC 75#
ĐÁ BAZAN 100x100x20
CEMENT MORTAR LAYER #75
BASALT STONE 100x100x20
BÊ TÔNG LÓT ĐÁ 1X2 #150
VỮA LÁNG NỀN XI MĂNG MÁC 100#
STONE CONCRETE 1x2 #150
SCREED CONCRETE FLATTEN FLOOR,
CẤP PHỐI ĐÁ DĂM LOẠI 2
LỚP BTCT (XEM BVKC)
CRUSHED STONE OF SUBBASE (TYPE 2)
CONCRETE FLOOR (RF TO STRUC DWG)
ĐẤT SAN NỀN ĐẦM CHẶT K>=0.95, TẠO PHẲNG
ĐẤT SAN NỀN ĐẦM CHẶT K>=0.95, TẠO PHẲNG
COMPACT SOIL K>=0.95
SOIL COMPACTED, K>=0.95
ĐẤT TỰ NHIÊN
ĐẤT TỰ NHIÊN
NATURAL SOIL
NATURAL SOIL
L
C
B
S
C
C
Đ
C
Đ
N
870 800
15 20
15 20
20 15
300
15 50
150
600
3030 100 200
100
50
100 30 30
300
800
415
450
150
100
CT20
DETAIL 20 - CT ĐƯỜNG NỘI BỘ VÀ ĐÀI PHUN NƯỚC SCALE 1 : 10
100
100
200
LA-027
NẸP INOX T20 CHỐNG TRƠN TRƯỢT NON-SLIP T20 SPLINT
100
200
ĐÁ XANH THANH HÓA (300X600X20)
100
ĐÁ XANH THANH HÓA (300X600X20)
BLUE STONE (300X600X20) CT18 LA-027
DETAIL 18 - CT GHẾ ỐP ĐÁ (LOẠI 2)
BLUE STONE (300X600X20) LỚP VỮA XI MĂNG MÁC 75#
LỚP VỮA XI MĂNG MÁC 75#
CEMENT MORTAR LAYER #75
CEMENT MORTAR LAYER #75
SCALE 1 : 10
TƯỜNG GẠCH ĐẶC KHÔNG NUNG
LỚP BTCT (XEM BVKC)
WALL UNBURNT BRICK
REINFORCED CONCRETE (RF TO STRUC DWG)
ANTI-SLIP GROOVES XẺ RÃNH CHỐNG TRƯỢT
355 5 5 ĐÁ ONG KÍCH THƯỚC 150 X 300 X 12
GRANITE STONE FINISH
BEESTONE SIZE 150 X 300 X 12
LỚP VỮA XI MĂNG MÁC 75#
LỚP VỮA XI MĂNG MÁC 75#
CEMENT MORTAR LAYER #75
CEMENT MORTAR LAYER #75
TƯỜNG GẠCH ĐẶC KHÔNG NUNG
TƯỜNG GẠCH ĐẶC KHÔNG NUNG
WALL UNBURNT BRICK
WALL UNBURNT BRICK
BÊ TÔNG LÓT ĐÁ 1X2 #150
20
10
15 5
5 10 LỚP ĐÁ GRANITE
300
20
BÊ TÔNG LÓT ĐÁ 1X2 #150
STONE CONCRETE 1x2 #150
STONE CONCRETE 1x2 #150
ĐẤT TỰ NHIÊN
ĐẤT TỰ NHIÊN
NATURAL SOIL
NATURAL SOIL
CT22 LA-027
DETAIL 22 - CT MŨI BẬ SCALE 1 : 10
200
BÓ VỈA ĐÁ BAZAN t=300x50mm
15 12
350
15 20
230
240
12
12 15
ĐÁ XANH THANH HÓA (300X600X20)
THICKNESS 50 BASALT STONE
BLUE STONE (300X600X20)
LỚP VỮA XI MĂNG MÁC 75#
LỚP VỮA XI MĂNG MÁC 75#
CEMENT MORTAR LAYER #75
CEMENT MORTAR LAYER #75
BÊ TÔNG LÓT ĐÁ 1X2 #150
TƯỜNG GẠCH ĐẶC KHÔNG NUNG
STONE CONCRETE 1x2 #150
WALL UNBURNT BRICK
ĐÁ BA
CẤP PHỐI ĐÁ DĂM LOẠI 2
LỚP BTCT (XEM BVKC)
BASAL
CRUSHED STONE OF SUBBASE (TYPE 2)
REINFORCED CONCRETE (RF TO STRUC DWG)
ĐẤT SAN NỀN ĐẦM CHẶT K>=0.95, TẠO PHẲNG
BÊ TÔNG LÓT ĐÁ 1X2 #150
SCREE
COMPACT SOIL K>=0.95
STONE CONCRETE 1x2 #150
TƯỜN
VỮA L
ĐẤT TỰ NHIÊN
ĐẤT TỰ NHIÊN
WALL
NATURAL SOIL
ĐẤT T
NATURAL SOIL
300
NATUR
200
150
100
200
CT25
550
200
3030 100
100
LA-027
50
160
200
ANTI-SLIP GROOVES XẺ RÃNH CHỐNG TRƯỢT
200
DETAIL 25 - CT TƯỜNG CHẮN ĐẤT SÂN KHẤU EVENT SCALE 1 : 10
100
100
CT23 LA-027
200
100
DETAIL 23 - CT BẬC TAM CẤP NHÀ A2 VÀ ĐƯỜNG NỘI BỘ SCALE 1 : 10
desired paths.
KEY PLAN
BÓ VỈA ĐÁ BAZAN t=300x50mm
ĐÁ BAZAN 300x300x20
THICKNESS 50 BASALT STONE
L Ê DUẨN ĐƯỜ NG
BASALT STONE 300x300x20
LỚP VỮA XI MĂNG MÁC 75#
VỮA LÁNG NỀN XI MĂNG MÁC 100#
CEMENT MORTAR LAYER #75
SCREED CONCRETE FLATTEN FLOOR,
BÊ TÔNG LÓT ĐÁ 1X2 #150
Đ ƯỜ
BÊ TÔNG LÓT ĐÁ 1X2 #150
L NG ÁIT Ý TH Ổ
STONE CONCRETE 1x2 #150
STONE 1x2 #150 CONCRETE
CẤP PHỐI ĐÁ DĂM LOẠI 2
Đ ƯỜN
GN
HỰ
A
ĐƯỜN
GH Ù
NG VƯƠN
SOIL COMPACTED, K>=0.95
ĐẤT SAN NỀN ĐẦM CHẶT K>=0.95, TẠO PHẲNG
G
ĐẤT SAN NỀN ĐẦM CHẶT K>=0.95, TẠO PHẲNG
CRUSHED STONE OF SUBBASE (TYPE 2)
COMPACT SOIL K>=0.95
ĐẤT TỰ NHIÊN
ĐẤT TỰ NHIÊN
NATURAL SOIL
ĐƯ Ờ N GL
ÝT HÁI T
Ổ
NATURAL SOIL
HIKARI COMPLEX KHU PHỨC HỢP HIKARI BÓ VỈA ĐÁ BAZAN t=300x50mm
LOCATION: ĐỊA ĐIỂM XÂY DỰNG
THICKNESS 50 BASALT STONE
300
LỚP VỮA XI MĂNG MÁC 75# CEMENT MORTAR LAYER #75
GRANITE STONE FINISH
BÊ TÔNG LÓT ĐÁ 1X2 #150
15 50
100 30 30
NOTE: GHI CHÚ:
LỚP VỮA XI MĂNG MÁC 75#
STONE CONCRETE 1x2 #150
CEMENT MORTAR LAYER #75
CẤP PHỐI ĐÁ DĂM LOẠI 2
150
KHU ĐÔ THỊ MỚI THUỘC KHU LIÊN HỢP CÔNG NGHIỆP - DỊCH VỤ - ĐÔ THỊ TỈNH BÌNH DƯƠNG, PHƯỜNG HÒA PHÚ, TP THỦ DẦU MỘT, BÌNH DƯƠNG
LỚP ĐÁ GRANITE
TƯỜNG GẠCH ĐẶC KHÔNG NUNG
CRUSHED STONE OF SUBBASE (TYPE 2)
WALL UNBURNT BRICK
ĐẤT SAN NỀN ĐẦM CHẶT K>=0.95, TẠO PHẲNG
BÊ TÔNG LÓT ĐÁ 1X2 #150
COMPACT SOIL K>=0.95
STONE CONCRETE 1x2 #150
ĐẤT TỰ NHIÊN
ĐẤT TỰ NHIÊN NATURAL SOIL
NATURAL SOIL
50
20
200
300
23th April
80%
NGÀY DATE
NỘI DUNG PHÁT HÀNH ISSUE FOR
KIỂM CHECK
OWNER: CHỦ ĐẦU TƯ
300
50
200
180
00 LẦN REV.
CÔNG TY TNHH BECAMEX TOKYU
200
DETAIL 21 - CT ĐƯỜNG NỘI BỘ VÀ ĐƯỜNG DẠO
700
CT21 LA-027
SCALE 1 : 10
ADDRESS: ĐỊA CHỈ
200
DEPUTY GENERAL DIRECTOR: PHÓ TỔNG GIÁM ĐỐC
100
KHU ĐÔ THỊ MỚI THUỘC KHU LIÊN HỢP CÔNG NGHIỆP - DỊCH VỤ - ĐÔ THỊ TỈNH BÌNH DƯƠNG, PHƯỜNG HÒA PHÚ, TP THỦ DẦU MỘT, BÌNH DƯƠNG
ARCHITECTURE CONCEPT DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ Ý TƯỞNG KIẾN TRÚC
ONUMA MINORU
GỖ BÊ TÔNG MÀU XÁM, KÍCH THƯỚC 120X2200X25MM CONWOOD, LIGHT GREY, 120X2200X25MM KHUNG SÀN DÀY 30MM FRAME, THICKNESS 30MM BÊ TÔNG LÓT ĐÁ 1X2 #150
niwa architects co.,ltd
STONE CONCRETE 1x2 #150
t +84 24 7302 3232 w http://takashiniwa.com e admin@niwa-a.com
CÁT ĐEN ĐẦM CHẶT SAND COMPACTED
100
200
ad 9f - 7 ngo chua nen - dong da - hanoi - vietnam
100
DIRECTOR: GIÁM ĐỐC
0
TAKASHI NIWA
CT24
100 3025
LA-027
DETAIL 24 - CT SÂN KHẤU EVENT VÀ ĐƯỜNG NỘI BỘ
ARCHITECTURE CONCEPT DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ Ý TƯỞNG KIẾN TRÚC
SCALE 1 : 10 Worklounge 03- Vietnam co.,Itd t +84 24 7301 8998 url www.03-x.vn e info@03-x.vn ad 9f - 7 ngo chua nen - dong da - hanoi - vietnam
DIRECTOR: GIÁM ĐỐC HIROOMI TAKEMORI
LỚP ĐÁ GRANITE
ẬC TAM CẤP NHÀ A2
MAIN DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ CHÍNH
GRANITE STONE FINISH LỚP VỮA XI MĂNG MÁC 75# CEMENT MORTAR LAYER #75 SỎI
TƯỜNG GẠCH ĐẶC KHÔNG NUNG
GRAVEL
WALL UNBURNT BRICK
BÊ TÔNG LÓT ĐÁ 1X2 #150
BÊ TÔNG LÓT ĐÁ 1X2 #150
STONE CONCRETE 1x2 #150
STONE CONCRETE 1x2 #150
ĐẤT SAN NỀN ĐẦM CHẶT K>=0.95, TẠO PHẲNG
ĐẤT SAN NỀN ĐẦM CHẶT K>=0.95, TẠO PHẲNG
COMPACT SOIL K>=0.95
COMPACT SOIL K>=0.95
ĐÁ BAZAN 300x300x20
ĐẤT TỰ NHIÊN
ĐẤT TỰ NHIÊN
BASALT STONE 300x300x20
NATURAL SOIL
NATURAL SOIL
AZAN 300x300x20
VỮA LÁNG NỀN XI MĂNG MÁC 100#
LT STONE 300x300x20
SCREED CONCRETE FLATTEN FLOOR,
LÁNG NỀN XI MĂNG MÁC 100#
BÊ TÔNG LÓT ĐÁ 1X2 #150
ED CONCRETE FLATTEN FLOOR,
STONE 1x2 #150 CONCRETE
NGUYỄN THẾ HÙNG
NGUYỄN THẾ HÙNG
CHIEF ARCHITECT CHỦ TRÌ
20 20
ĐẤT TỰ NHIÊN
RAL SOIL
NATURAL SOIL
TAKASHI NIWA
TECHNICAL MANAGER QUẢN LÝ KỸ THUẬT
20
SOIL COMPACTED, K>=0.95
UNBURNT BRICK
TỰ NHIÊN
TẦNG 4, SỐ 44,NGÕ 120 TRƯỜNG CHINH,PHƯỜNG PHƯƠNG MAI,QUẬN ĐỐNG ĐA, TP. HÀ NỘI
DIRECTOR: GIÁM ĐỐC
PROJECT MANAGER CHỦ NHIỆM DỰ ÁN
ĐẤT SAN NỀN ĐẦM CHẶT K>=0.95, TẠO PHẲNG
NG GẠCH ĐẶC KHÔNG NUNG
CÔNG TY CỔ PHẦN XÂY DỰNG SMT VIỆT NAM ADDRESS: ĐỊA CHỈ
150
150
150
50
50
20
30
20
150
20 20
BÙI CÔNG KỲ
DESIGNED BY THIẾT KẾ VŨ THỊ THANH HƯƠNG
DRAWN BY THỂ HIỆN
200
450
200
TRẦN THỊ THU TRANG
DESIGN STATE GIAI ĐOẠN THIẾT KẾ
200
200
CONSTRUCTION DESIGN HỒ SƠ THIẾT KẾ BẢN VẼ THI CÔNG HẠNG MỤC
ITEM
100
LANDSCAPE CẢNH QUAN TÊN BẢN VẼ
100
200
DRAWING NAME
DETAILS SECTION
100
300
400
CT19 LA-027
DETAIL 19 - CT ĐƯỜNG ĐI DẠO SCALE 1 : 10
CT26 LA-027
DETAIL 26 - CT MŨI BẬC SÂN KHẤU EVENT SCALE 1 : 10
HOÀN THÀNH
FINISH
TỶ LỆ
SCALE
KÝ HIỆU BẢN VẼ
HC
04/10/20 1 : 10 DRAWING SIGN
LA-027
Swale Calculations & Drawings- Designed to capture the rainwater and utilise it in the aquaponics system, creating a su
-1300
-1300
-1200 -1300
-1200 -1200
-1400
% 0.3
-1700 -1700
-1700 -1400
0.5%
-1700
10
-1200 -1200
-12
-1400 -1400 -1300
0.9%
-1300
0.9%
-1700
-1400
0.8%
-1400 -1700
0% 1.
-1400
1300 700
2000 2000
0.9 %
-1700 0. 7%
-1700
2000
1300 700
2000 2000
-1700 0.7%
-1700
2000
-1700
2000 2000 2000
9
0.8%
-1700
34842
2000
2000 2000
117.74 m2
-1700
0. 7%
-1700
-1700 2000
-1700
-1700
0.7%
-1700
0.9% 0.3%
2000 2000
Swale 1
2000
0.6%
-1600 -1600
2000 2000
-1700
-1700
0.9%
-1700
-1700 -1700
-1200
-1200
-1400
0.8%
-1700
-1200
-1200
-1500
% 0.7
-1400
0.3%
-1200 2000 2000
% 0.9
0.4%
-1700
0.3%
2000 2000
-1700
Swale 3
736
% 1.0
-1200
% 0.5
2000 2000
200 200 0 0
143.228
-1500
300 300 0 0
9
2000 2000
m2
-1200 1.0%
0.6%
8
2000 2000
% 1.0
-1700
-1200
200 0 200 0
-1700
2.5%
2.2 %
2.2%
-1400
-1200 -1200
2.2 %
2.2%
-1400
1.4%
-1300
-1400
ustainable biome.
KEY PLAN L Ê DUẨN ĐƯỜ NG
L NG ÁIT Ý TH Ổ
205
Đ ƯỜ
Đ ƯỜN
700
GH Ù ĐƯỜN
* IF THE EXISTING SOIL IS NOT SUITABLE, IT HAS TO BE REPLACED TO THE COMPACT EXISTING SOIL * NẾU SOIL EXISTING KHÔNG PHÙ HỢP, NÓ ĐÃ ĐƯỢC THAY ĐỔI SOIL EXISTING SOIL
4
ÝT HÁI T
Ổ
HIKARI COMPLEX KHU PHỨC HỢP HIKARI LOCATION: ĐỊA ĐIỂM XÂY DỰNG KHU ĐÔ THỊ MỚI THUỘC KHU LIÊN HỢP CÔNG NGHIỆP - DỊCH VỤ - ĐÔ THỊ TỈNH BÌNH DƯƠNG, PHƯỜNG HÒA PHÚ, TP THỦ DẦU MỘT, BÌNH DƯƠNG NOTE: GHI CHÚ:
Typical section detail of swale Chi tiết phần điển hình của swale SCALE 1 : 20
m2
(55.109-13.718)
3.
3%
41.391
1.1%
1.1%
A
ĐƯ Ờ N GL
TẤT CẢ CÁC THÀNH PHẦN DƯỚI ĐÂY TRỌNG LƯỢNG KHÔ - 75% CÁT - 10% LỚP LỚN LỚN HƠN 5MM - VẤN ĐỀ 5% GEOTEXTILE FABRIC VẢI ĐỊA KỸ THUẬT
LB-025
HỰ
NG VƯƠN
ALL COMPONENTS BELOW BY DRY WEIGHT - 75% SAND - 10% FINE GRAVEL LESS THAN 5MM - 5% ORGANIC MATTER
-1200
GN
G
75
STONE MULCH T=75MM ĐÁ MULCH T = 75MM CULTURE SOIL T MAX=700MM, T MIN=200MM ĐẤT NUÔI CẤY T MAX=700MM, T MIN=200MM
-1200
80%
NGÀY DATE
NỘI DUNG PHÁT HÀNH ISSUE FOR
KIỂM CHECK
800
-1200
-1200
200 200 0 0
-1300
80 0 800 800
-1200 CÔNG TY TNHH BECAMEX TOKYU
-1300
ADDRESS: ĐỊA CHỈ
2. 2 %
-1300
KHU ĐÔ THỊ MỚI THUỘC KHU LIÊN HỢP CÔNG NGHIỆP - DỊCH VỤ - ĐÔ THỊ TỈNH BÌNH DƯƠNG, PHƯỜNG HÒA PHÚ, TP THỦ DẦU MỘT, BÌNH DƯƠNG
-1200 1. 1 %
5
1. 1 %
-1300 -1200 -1300 8 .9 %
-1300
2000
-1200
6
DEPUTY GENERAL DIRECTOR: PHÓ TỔNG GIÁM ĐỐC
ONUMA MINORU ARCHITECTURE CONCEPT DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ Ý TƯỞNG KIẾN TRÚC
7
-1300
3000 3000
niwa architects co.,ltd t +84 24 7302 3232 w http://takashiniwa.com e admin@niwa-a.com
ad 9f - 7 ngo chua nen - dong da - hanoi - vietnam
2000 2000
? -1400 ?
2000 2000
230.657m2
Swale 4
-1300
DIRECTOR: GIÁM ĐỐC TAKASHI NIWA ARCHITECTURE CONCEPT DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ Ý TƯỞNG KIẾN TRÚC
2. 6 %
-1200
9. 2 4. 1 % %
800
23th April
OWNER: CHỦ ĐẦU TƯ
120 0
200 0
200
00 LẦN REV.
Worklounge 03- Vietnam co.,Itd t +84 24 7301 8998 url www.03-x.vn e info@03-x.vn ad 9f - 7 ngo chua nen - dong da - hanoi - vietnam
2
DIRECTOR: GIÁM ĐỐC HIROOMI TAKEMORI MAIN DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ CHÍNH
-1400
CÔNG TY CỔ PHẦN XÂY DỰNG SMT VIỆT NAM
-1000
ADDRESS: ĐỊA CHỈ TẦNG 4, SỐ 44,NGÕ 120 TRƯỜNG CHINH,PHƯỜNG PHƯƠNG MAI,QUẬN ĐỐNG ĐA, TP. HÀ NỘI
-1400
DIRECTOR: GIÁM ĐỐC NGUYỄN THẾ HÙNG
PROJECT MANAGER CHỦ NHIỆM DỰ ÁN
1
NGUYỄN THẾ HÙNG
CHIEF ARCHITECT CHỦ TRÌ TAKASHI NIWA
TECHNICAL MANAGER QUẢN LÝ KỸ THUẬT
-1400
BÙI CÔNG KỲ
DESIGNED BY THIẾT KẾ VŨ THỊ THANH HƯƠNG
DRAWN BY THỂ HIỆN TRẦN THỊ THU TRANG
DESIGN STATE GIAI ĐOẠN THIẾT KẾ
3 Ground level area distribution Roof Green Roof Hardscape Car drop off Softscape (Swale) Total
Swale 2
2198.519 m2 678.677 m2 293.648 m2 140.274 m2 1155.675 m2 (533.016) m2 4473.162 m2
49.22 % 15.19 % 6.57 % 3.14 % 25.87 % (11.93) % 100.00 %
CONSTRUCTION DESIGN HỒ SƠ THIẾT KẾ BẢN VẼ THI CÔNG HẠNG MỤC
ITEM
LANDSCAPE CẢNH QUAN TÊN BẢN VẼ
DRAWING NAME
BIO-SWALE GENERAL CHUNG MƯƠNG SINH THÁI HOÀN THÀNH
FINISH
03/02/20
TỶ LỆ
SCALE
As indicated
KÝ HIỆU BẢN VẼ
HC
DRAWING SIGN
LB-025
Swale Sections-Interaction around and on the waterbodies is promoted by adding small platforms and bridges culminati
800
2839
630
300
819
300
170
LEED BOUNDARY LINE ĐƯỜNG BIÊN FLOOR FINISHING LV.1 TẦNG HOÀN THIỆN.1 -1700
-1900
-1550
PEDESTRIAN PATHWAY LEVEL CẤP ĐƯỜNG CHO NGƯỜI ĐI BỘ
PARKING ROAD LEVEL KHAI THÁC ĐƯỜNG ĐÊ -1215
-1320
2.9%
500
350
250
1 LB-028
STONE MULCH T=75MM ĐÁ MULCH T = 75MM
700
GEOTEXTILE FABRIC VẢI ĐỊA KỸ THUẬT
400
CULTURE SOIL T MAX=700MM, T MIN=200MM ĐẤT NUÔI CẤY T MAX= 700MM, T MIN=200MM
OVERFLOW PIPE CONNECTS TO THE INFRASTRUCTURE 400MM ỐNG TRÀN KẾT NỐI VỚI CƠ SỞ HẠ TẦNG 400MM
GREEN PATH_SECTION 21
4 LB-028
PHẦN MÀU XANH 21 SCALE 1 : 25
5
GRE
PHẦN
SCALE 1
6
7 7 LB-028
LANDSCAPE LIGHTING PLAN_ZONE-A Copy 2 - Callout 1 SCALE 1 : 200
LEED BOUNDARY LINE ĐƯỜNG BIÊN 800 630
FLOOR FINISHING LV.1 TẦNG HOÀN THIỆN.1 -750
2668
300
170
900
300
4 LB-028
100
800
100
-1190
-1080
-970
-860
800
100
800
100
PEDESTRIAN PATHWAY LEVEL CẤP ĐƯỜNG CHO NGƯỜI ĐI BỘ
PARKING ROAD LEVEL KHAI THÁC ĐƯỜNG ĐÊ
670
100
110 110 110 110
-1225
250
300
250 250
300
250
250
300
-1320 2.7%
250 300
120
700
250
STONE MULCH T=75MM ĐÁ MULCH T = 75MM CULTURE SOIL T MAX=700MM, T MIN=200MM ĐẤT NUÔI CẤY T MAX= 700MM, T MIN=200MM
GEOTEXTILE FABRIC VẢI ĐỊA KỸ THUẬT
2 LB-028
GREEN PATH_SECTION 22 PHẦN MÀU XANH SCALE 1 : 25
3 LB-028
THE SCALE
ing them to the artificial lake.
KEY PLAN L Ê DUẨN ĐƯỜ NG
Đ ƯỜ L NG ÁIT Ý TH Ổ
HỰ
A
ĐƯỜN
GH Ù
-1080
G
GN
NG VƯƠN
Đ ƯỜN
ĐƯ Ờ N GL
ÝT HÁI T
Ổ
HIKARI COMPLEX KHU PHỨC HỢP HIKARI LOCATION: ĐỊA ĐIỂM XÂY DỰNG KHU ĐÔ THỊ MỚI THUỘC KHU LIÊN HỢP CÔNG NGHIỆP - DỊCH VỤ - ĐÔ THỊ TỈNH BÌNH DƯƠNG, PHƯỜNG HÒA PHÚ, TP THỦ DẦU MỘT, BÌNH DƯƠNG NOTE: GHI CHÚ:
250
300
1500
250
250
00
23th April
80%
LẦN REV.
NGÀY DATE
NỘI DUNG PHÁT HÀNH ISSUE FOR
KIỂM CHECK
OWNER: CHỦ ĐẦU TƯ
CÔNG TY TNHH BECAMEX TOKYU ADDRESS: ĐỊA CHỈ KHU ĐÔ THỊ MỚI THUỘC KHU LIÊN HỢP CÔNG NGHIỆP - DỊCH VỤ - ĐÔ THỊ TỈNH BÌNH DƯƠNG, PHƯỜNG HÒA PHÚ, TP THỦ DẦU MỘT, BÌNH DƯƠNG
DEPUTY GENERAL DIRECTOR: PHÓ TỔNG GIÁM ĐỐC
ONUMA MINORU
EEN PATH_SECTION 22 - Callout 1
5 LB-028
N MÀU XANH 22 - Chú thích 1
1 : 10
Section 118
ARCHITECTURE CONCEPT DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ Ý TƯỞNG KIẾN TRÚC
PHẦN 118
SCALE 1 : 10
niwa architects co.,ltd t +84 24 7302 3232 w http://takashiniwa.com e admin@niwa-a.com
ad 9f - 7 ngo chua nen - dong da - hanoi - vietnam
DIRECTOR: GIÁM ĐỐC TAKASHI NIWA ARCHITECTURE CONCEPT DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ Ý TƯỞNG KIẾN TRÚC
Worklounge 03- Vietnam co.,Itd t +84 24 7301 8998 url www.03-x.vn e info@03-x.vn ad 9f - 7 ngo chua nen - dong da - hanoi - vietnam
DIRECTOR: GIÁM ĐỐC
66 0
20 00
HIROOMI TAKEMORI MAIN DESIGN CONSULTANCY: TƯ VẤN THIẾT KẾ CHÍNH
10 0
-1190
80 0
CÔNG TY CỔ PHẦN XÂY DỰNG SMT VIỆT NAM
25 0
ADDRESS: ĐỊA CHỈ
-1080
TẦNG 4, SỐ 44,NGÕ 120 TRƯỜNG CHINH,PHƯỜNG PHƯƠNG MAI,QUẬN ĐỐNG ĐA, TP. HÀ NỘI
10 0
DIRECTOR: GIÁM ĐỐC NGUYỄN THẾ HÙNG
PROJECT MANAGER CHỦ NHIỆM DỰ ÁN NGUYỄN THẾ HÙNG
25 0
80 0
15 00
-970
25 0
10 0
30 0
CHIEF ARCHITECT CHỦ TRÌ
25 0
TAKASHI NIWA
TECHNICAL MANAGER QUẢN LÝ KỸ THUẬT
80 0
BÙI CÔNG KỲ
DESIGNED BY THIẾT KẾ
-860
VŨ THỊ THANH HƯƠNG
DRAWN BY THỂ HIỆN TRẦN THỊ THU TRANG
DESIGN STATE GIAI ĐOẠN THIẾT KẾ
CONSTRUCTION DESIGN HỒ SƠ THIẾT KẾ BẢN VẼ THI CÔNG HẠNG MỤC
ITEM
LANDSCAPE CẢNH QUAN TÊN BẢN VẼ
DRAWING NAME
BIO-SWALE DETAIL 3 CHI TIẾT MƯƠNG SINH THÁI 3
E GREEN PATH DETAILS PLAN_ZONE B - Callout 1 1 : 20
HOÀN THÀNH
FINISH
04/01/20
TỶ LỆ
SCALE
As indicated
KÝ HIỆU BẢN VẼ
HC
DRAWING SIGN
LB-028
Initial Site Pictures
Entrance
Bedroom3
Dining Space
Kitchen
Bedroom2
Living Room
Design Sketches
Kitc
Living Room
Material Pale
TV Cabinet
Kitchen
06
Toilet1
123 House Project Residential Interiors
Study Table
Washroom
chen
Toilet2
Bedroom3
Toilet1
Toilet2
Kitchen
Balcony
Bedroom1
Living Room
ette
Freelance, 2022
Construction
Dining Space
Kitchen
Dining Space
Bedroom3
Living Room
Toilet2
Toilet1
Living Space
Toilet1
Bedroom1
Kitchen
Bedroom2
Bedroom2
Living Room
Toilet1
Bedroom3
Complete Site Pictures
Entrance
Bedroom1
Bedroom1
Kitchen
Living Room
Dining Space
Bedroom3
Bedroom1
Bedroom1
Toilet1
Dining Space
Living Room
Toilet1
Bedroom2
Bedroom2
Funding Pitch Walkthrough : AFC Foundation, Dehradun
07
Architectural Videos
Walkthrough and Construction Process
Interior Renovation Process : DLF Project, Gurgaon.
Freelance, 2022 Confidential, To be published.
A colonial chemist shop in Cannaught Place, Delhi
08
Sketches
Urban Sketching
A 50 year old bookshop and legacy Italian cafe in Cannaught Place, Delhi
Freelance, 2022
Bubble Pavilion, CaveUrban-World Bamboo Festival, Imphal The workshop began with various lectures on different types of bamboo, how to grow them and where to use them. We continued to develop the pavilion on site in the latter half, learning to slice, bend and fix bamboo.
08
Bamboo Construction Hands-on work
Bamboo Playpen, Karwaan-Bamboo and Nature Workshop, Nagaland The workshop led with learning nurturing practices of the North East India region combined with a competition to choose one structure, to finally construct the semi-permanent playpen for the farm.
Workshops 2018, 2019
Mani Makhija +91-8860123435 manimakhija.14@gmail.com Art : @childwhocriedwolf