Gertie Barrett Park Presentation Slides

Page 1

Gertie Barrett Park Preliminary Master Development Plan

September 08, 2021


Planning Process Task 1 – Data Gathering & Programming ✓ Base Mapping & Kick Off Meeting ✓ Site Review / Analysis / Opportunities & Constraints

Task 2 – Concept Development

Current Task

✓ Prepare Conceptual Alternatives

Task 3 – Master Development Plan ✓ Prepare Preliminary Master Development Plan ✓ Community Meeting ❑ Prepare Final Master Development Plan

Other Tasks to be Performed: Flood Study // Construction Documents // Construction


The Site Today


Existing Conditions Gertie Barrett Park • New Neighborhood Park • Serves NW Mansfield • Approx 8 Acres • Mature Shade Trees Gertie Barrett Park

• Open Grassland

• Wooded Creek

N


Existing Conditions - Site Drainage & Utilities Drainage Floodway Zone AE Creek Centerline Swale FLOODWAY ZONE AE

Utilities 667

Water Sewer Overhead Electric Easements

N


Existing Conditions - Natural Rooms Legend Shade Canopy The Pasture

The Pasture

The Meadow

The Arrival

Shade Canopy

Pecan Room

The Homestead

The Meadow

Shade Canopy

The Creek

Front Yard

Front Yard

The Arrival

The Homestead

Open Understory

Pecan Room

N


Existing Site Photos

2

1

North Towards Country Meadow Dr.

2

South Towards Garretson Ln.

1

N


Existing Site Photos

3

North Towards Gertie Barrett Rd.

4

East Towards Garretson Ln.

4

3 N


Existing Site Photos

6 5

N

5

North On Gertie Barrett Rd.

6

South Towards Garretson Ln.


Existing Site Photos

8

7

N

7

North Towards Country Meadow Dr.

8

South Towards Garretson Ln.


Preliminary Master Development Plan


Preliminary Master Development Plan KEY FEATURES ❑ Playground w/ Security Lighting

TRAIL LOOP

❑ Sprayground ❑ Restroom & Filtration Building ❑ Pavilion(s)

Pedestrian Crossing

Park Sign

❑ Picnicking

ENTRY

❑ Parking (Approx. 36 Spaces) ❑ Monument Sign ❑ Trail Loop ❑ 1/2 Basketball Court

Culvert Crossing

Pedestrian Crossing

OPEN SPACE

Pavilion

Fitness Hub

❑ Dumpster

Picnicking

PARKING

Dumpster

15 SPACES

❑ Open Space

PLAYGROUND

Restroom & Filtration Building

SPRAYGROUND

PARKING 21 SPACES

Pavilion

1/2 BASKETBALL COURT

N


Sample Program Images – Playground


Sample Program Images - Sprayground


Sample Program Images – Pavilion


Sample Program Images – Restroom / Filtration Building


Sample Program Images – 1/2 Basketball Court


Sample Program Images – Trail Loop


Tentative Schedule 2021 Master Development Plan……………………………………………………....... JULY – SEPT. Community Meeting…………………………………………………………………………….... SEPT.

Design / Construction Documents……………………………………………SEPT. – NOV. Bidding / Contract Award…………………………………………………………..…………. DEC. 2022 Construction………………………………………………………….…………………….... JAN. – JUNE Park Dedication………………………………………………………………………………… SUMMER


Your Feedback Tonight • Comment Cards • Park Amenity Priorities • Q&A with City Staff and Design Team

Amenity Board Sample


Questions / Comments:

James Fish, Project Manager Landscape Architect, Parks & Recreation Department 817.728.3394 james.fish@mansfieldtexas.gov mansfieldparks.com