Gertie Barrett Park Preliminary Master Development Plan
September 08, 2021
Planning Process Task 1 – Data Gathering & Programming ✓ Base Mapping & Kick Off Meeting ✓ Site Review / Analysis / Opportunities & Constraints
Task 2 – Concept Development
Current Task
✓ Prepare Conceptual Alternatives
Task 3 – Master Development Plan ✓ Prepare Preliminary Master Development Plan ✓ Community Meeting ❑ Prepare Final Master Development Plan
Other Tasks to be Performed: Flood Study // Construction Documents // Construction
The Site Today
Existing Conditions Gertie Barrett Park • New Neighborhood Park • Serves NW Mansfield • Approx 8 Acres • Mature Shade Trees Gertie Barrett Park
• Open Grassland
• Wooded Creek
N
Existing Conditions - Site Drainage & Utilities Drainage Floodway Zone AE Creek Centerline Swale FLOODWAY ZONE AE
Utilities 667
Water Sewer Overhead Electric Easements
N
Existing Conditions - Natural Rooms Legend Shade Canopy The Pasture
The Pasture
The Meadow
The Arrival
Shade Canopy
Pecan Room
The Homestead
The Meadow
Shade Canopy
The Creek
Front Yard
Front Yard
The Arrival
The Homestead
Open Understory
Pecan Room
N
Existing Site Photos
2
1
North Towards Country Meadow Dr.
2
South Towards Garretson Ln.
1
N
Existing Site Photos
3
North Towards Gertie Barrett Rd.
4
East Towards Garretson Ln.
4
3 N
Existing Site Photos
6 5
N
5
North On Gertie Barrett Rd.
6
South Towards Garretson Ln.
Existing Site Photos
8
7
N
7
North Towards Country Meadow Dr.
8
South Towards Garretson Ln.
Preliminary Master Development Plan
Preliminary Master Development Plan KEY FEATURES ❑ Playground w/ Security Lighting
TRAIL LOOP
❑ Sprayground ❑ Restroom & Filtration Building ❑ Pavilion(s)
Pedestrian Crossing
Park Sign
❑ Picnicking
ENTRY
❑ Parking (Approx. 36 Spaces) ❑ Monument Sign ❑ Trail Loop ❑ 1/2 Basketball Court
Culvert Crossing
Pedestrian Crossing
OPEN SPACE
Pavilion
Fitness Hub
❑ Dumpster
Picnicking
PARKING
Dumpster
15 SPACES
❑ Open Space
PLAYGROUND
Restroom & Filtration Building
SPRAYGROUND
PARKING 21 SPACES
Pavilion
1/2 BASKETBALL COURT
N
Sample Program Images – Playground
Sample Program Images - Sprayground
Sample Program Images – Pavilion
Sample Program Images – Restroom / Filtration Building
Sample Program Images – 1/2 Basketball Court
Sample Program Images – Trail Loop
Tentative Schedule 2021 Master Development Plan……………………………………………………....... JULY – SEPT. Community Meeting…………………………………………………………………………….... SEPT.
Design / Construction Documents……………………………………………SEPT. – NOV. Bidding / Contract Award…………………………………………………………..…………. DEC. 2022 Construction………………………………………………………….…………………….... JAN. – JUNE Park Dedication………………………………………………………………………………… SUMMER
Your Feedback Tonight • Comment Cards • Park Amenity Priorities • Q&A with City Staff and Design Team
Amenity Board Sample
Questions / Comments:
James Fish, Project Manager Landscape Architect, Parks & Recreation Department 817.728.3394 james.fish@mansfieldtexas.gov mansfieldparks.com