MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY JUNE 8, 2021
MANSFIELD COMMUNITYCOMMUNITY ENGAGEMENTCENTER & INPUTFEASIBILITY STUDY PUBLIC MEETING AGENDA WELCOME - INTRODUCTIONS MANSFIELD LIBRARY & MULTIACTIVITY CENTER HISTORY AND PROJECT BACKGROUND PROJECT PROCESS NATIONAL SLIDE TOUR OF LIBRARY & RECREATION CENTER SPACES GATHER PUBLIC INPUT FOR ACTIVITIES DESIRED COLLECT RESULTS NEXT STEPS
JUNE 8
MANSFIELD EXISTING FACILITIES Mansfield Public Library ~ 15,700 square feet Mansfield Activities Center ~ 21,700 square feet
CITY HALL
ACTIVITIES CENTER
PUBLIC LIBRARY
MANSFIELD LIFESTYLE WANTS? NEEDS? RIGHT SIZE FOR MANSFIELD? COST? OPERATIONS? SCHEDULE?
MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY
JUNE 2021
FEASIBILITY STUDY TEAM EXECUTIVE STEERING COMMITTEE City Council
Casey Lewis Julie Short Tamera Bounds Mansfield Park Facilities Development Corporation (Park Board)
Wendy Collini Scot Bowman Mansfield Public Library Advisory Board
Bobby Quinten (president) Cindy Kuster (vice president) Citizens Raul Najera Tamika Shorten Nancy Bergvall Jessica Ng-Hinojosa Jaden Rivers (youth member)
Mansfield Team Support Matt Young, Director of Community Services Shelly Lanners, Deputy City Manager Ann Beck, Parks Marketing & Communications Manager James Fish, Senior Park Planner Andrew Binz, Recreation Superintendent Coco Garcia, Activities Center Manager Yolanda Botello, Director of Library & Historical Services Faria Matin, Assistant Director of Library Services
MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY
CONSULTING TEAM
PROJECT DIRECTOR
ROBBIE HAZELBAKER
PRINCIPAL IN CHARGE
PROJECT MANAGER
PROJECT PLANNER
CRAIG BOUCK
BILL CLIFFORD
MICK
PROJECT DEVELOPMENT
JEN GERBER
FACILITY PERFORMANCE ADVISOR
MASSEY
JENNA KATSAROS
LEAD LANDSCAPE ARCHITECT LEAD CIVIL ENGINEER
AMBER DAVIS
KEVIN MINKLER
PRINCIPAL IN CHARGE
WADE PETERSON
LIBRARY CONSULTANT
JUNE GARCIA
A PROVEN PROCESS TO GET THE BEST RESULTS!
SCHEDULE
MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY
JUNE 2021
PROJECT SCHEDULE SCHEDULE
MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY
JUNE 2021
MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY PLANNING CHART
PUBLIC PARTICIPATION WORKSHOP 1
INSIGHTS DISCOVERY
PROJECT KICKOFF
Consider • Executive Steering Committee & Public Input • Level of Service • Dot-Ocracy • Wish List • Program • Budget • Schedule
Confirm
WORKSHOP 2
FINDINGS AND VISIONING
WORKSHOP 3
FINAL DRAFT RECOMMENDATIONS RECOMMENDATIONS
Confirm • Program • Budget • Schedule • Operations model • Refine as needed
PLAN ADOPTION & IMPLEMENTATION
Commit • Program • Budget • Schedule • Operations model
ROUND ROCK INDOOR RECREATION NEEDS ASSESSMENT
JUNE 2021
FEASIBILITY STUDY PROJECT SCOPE PHASE 1 - MAY TO AUGUST Prepare space and cost analysis for a future Mansfield Community Center Determine conditions and constraints of the available site Determine building program for multigenerational recreation center, aquatics center, and library Determine total project budget, project schedule
PHASE 2 – SEPTEMBER TO OCTOBER Produce Proforma based on facility program Develop Facility Renderings Develop Final Floor Plan rendering Develop Final Site Plan rendering Deliver Public Presentation Materials Provide final report in PowerPoint format
MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY
JUNE 2021
MANSFIELD COMMUNITY CENTER NEEDS ASSESSMENT
STEERING COMMITTEE PRELIMINARY SCHEDULE Kickoff Meeting May 19
Possible tour of DFW Recreation Centers
Workshop 1 | Public Meeting 1 June 8 include facility tours
Workshop 2 | Public Meeting 2
Workshop 3 Tuesday, August 3
Phase One Report to City Council Monday, July 23
July 7
Survey by Mansfield PARD June 8 through July 11
Workshop 5 | Commit to final draft Tuesday, October 5
Final Report
Workshop 4
TBD (October 15)
Thursday, September 9
Phase One
Phase Two
MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY
JUNE 2021
PROJECT BUDGET SCHEDULE
MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY
JUNE 2021
CONSTRUCTION COSTS
$$$ $
$$
CREATE YOUR BUDGET JUNE 2021 MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY
CHOICES THAT LAST A LIFETIME
LIFE-CYCLE COST?
DURABILITY?
AESTHETICS?
S pa ce
E Me a n s
ng Guid stimati
t Indexe City C os 2012
s
e
E st imat ed Den Value/ ver Cos t D ensity
Indexe d Cost to Ft. Col lins Const ruct ion Midpo int
/Cultural Re cre ation Southeast DGET SUMMARY
Ce nte Community
r
BU PROJECT 2013 ruary 20, Date: Feb Revis ed:
Cost
Unit Cos t Ja nua Office gram 00 Quant ity $162,717,0 ft Fac ility Pro Space ry 1, 20 See BRS Dra Office 12 $ 2,717,000 ponent S torage $246 $16 Project Com N SF $0 TIO ated $ 662,569 13 -none anticip Y CONSTRUC N ideo ILIT 8 w ) t vFAC Lobby 1. 15 $0 15f No Site struction ( $ Public cipated $ $121 102 Building Con $0 None anti Toile 0 LF TION Comm 156 O icipated $305 E CONSTRUC $ unity R ts $ 189 $0 None ant 0 LF ffice S 2. OFF-SIT Dec el / Turn lanes ated oom $ $26 paceAcc el / 11 None anticip $0 5 LF $ site 0 f 204 Classro Office ets through $0 ide @ $4- 5/s S torage om $ Public stre $0 15 ft w 214 Lo 0 EA ment Corps sew er $ 184 ter replace $72 ater, 8-12" bby Chape Cur b & Gut $0 6-8" w 0 LF 23 l $ Lock er al 1 1 $ sign $12 163 Public ugh land sale Traffic Room $0 0 LF W eigh funded thro scape be To land ill w alk, ile s w 208 C ts and ements $6,342 $ $ 204 $0 Improv ommun ts ROW side to ROW storm, w ater, w aste 0 EA F age $0 ity RooUpgrades Athletic itnes s $ 18 ew ay sign Gat w 4 $0 Allo $ 1 230 Classro m Sto ting $0 icipated om Street Ligh $0 None ant 231 C 1 Allow Running rage $ $ 173 rov emets orps C $61 Track Off -site imp ation hapel 0 LF 260 Lo etlands mitig $3,680,260 age $ $ Gymna 101 mate for w Off -siite sign ck er R $0 City esti sium ng Wall aini oo Ret / 19 ms $0 $ 6 W ei $ Ear thw ork Nat at or e site ) 97 bldg $0 LS acr ide 1 (8 gh N outs ft ts and ium $ RUCTIO $0 114 A cut/fill of 3-6 Lap P oo SITE CONST Fitn3.es $ 179 gutter $43,771 Ave thletic 28,999 SF s ing, cur b & Mitigation $5 sl W ater $ Leis Storage Wetlands asphalt pav 110 R $ rturCeolPlin 9,680 CY $4,935,360 209 unning ool W l $1,960 ft w / cur b 2012 Fo Demolition figuration s at taer $ Trac k 20 To $32,331 24 street con 2,518 car & Prep to 2 $ ding due n 2 d t W G Gra $16 184 uire Ic e E ncIn st allatio et Sto ymnasi Overlot Adjus $0 Not req Driv es 200 LF rage um 236 N & Internal y concrete .9 $ $75 erial losure/ Fie 98 at $ M Par king Lot 18 scored gre at 9 LF 4 ,60 at 0 ld $22 orium House e 96.8 $6 Fact or 208 La w ide Acc ess Driv $ $7,235 5ft 112 82.0 $ 4,000 SF t for both Total p 103.6 $18 l length & cos Fire Lane 208 Le P ool W at er 79.1 Ic e Rink .2$ 99% $19,896 tota 400 LF $ as is ure P $50 92 Entry plaz 100.4 Spe Ic.6e Suppo89 100.1 oo 400 LF $87,045 12 ctures l rt W stru 7 % 79 d, $62 $ g at er 99 ct at or $ pon W et S Sidew alks 102 $0 Piping, ns to Buildin a bollards S eatin 102.6 torage 1,400 LF 99.0 king, plaz er extensio 83.2 $0 104 Ic cut- off par Libr81 Water & Sew $ ary.2 S pa g $ 1 LS 97% 143 e Enc lo $69,019 std rants .9 $4,930 anc e e Loop & 4 hyd ces 96 su w rag Fire 116.5 91.6 Allo Sto re 11 9 e, EA / Field $ inag 5 Ice 14 $74,94 $ 148 .1Thea /sf ave 80 ection, Dra ,949 2.00 Coll 109% H R $74 0-$ rm ou in Sto $1.5 k 7 se ter $76.9 1 LS Lighting 162 Ic nts on site -$1,811,95 112.8 94.5 $ Pedestrian $2 184 e S uppo c. improv eme Par king & SF 55.2 re 105% $50,000 Mis -905,978 rt 167 S e & Fur nitu $ $50,000 94.2 w anc e Site Signag 91.9 110.8 306 pect at n 1 Allow $50,000 Allo g & Irrigatio or Sea 81.1 92% 208 Li $50,000 w anc e Landsc apin rov ements Allo w 0 Imp $ tin Allo 0,00 .7 1 tion 7 g brary S $10 87 100. 83.7 ive Rec rea $100,000 paces Par k & Act 346 Th 4 82.1 res 1 LS 94% $31,244,74 ash structu eater icipated 90.2 95.4 Pool Bac kw 99.7 $0 None ant ts .9
ve r 2012 Den allation st In l ia Mater 103.6 92.4 N 80.7 DIVISIO n 4 io 0. ct 10 stru 85.2 Site Con s .1 98 rm fo 95.5 t Concrete forc emen 0.3 in 10 re e et 83.5 Concr 100.0 rete nc co P 76.1 C-I95.5 e et 67 cr 100% 88.7 Con 105.4 87.8 105.2 ry 83.6 97% on 82.2 as M 101.4 .6 93.2 95 81.8 96% 77.0 Metals 2.7 2 s 0.9 4. 10 ic 10 10 st la P 81.8 99% 84.8 W ood & 99.5 6.3 oisture 88.3 10 M & al % 57.4 98 81.8 Therm 105.7 90.0 104.6 indow s W & % 42.4 s .8 91 81 Door board 0 8 3. um 9 0. 10 5. ps 10 gy ent 10 74% 71.4 88.8 Plaster & . Treatm 0 st .7 8 3. ou 5. 88 10 10 ac & 79.8 90.4 93% Ceilings .6 0.0 3.0 91 10 10 g 80.1 81.9 100% Floorin .1 3.9 es 100.0 98 10 sh ni Fi l 86.8 W al 100% 90.4 98.9 0.0 92.1 10 es % 79.1 97 80.5 Finish 102.6 95.3 99.9 -14 10 n % .0 io 98 87 Divis .2 1 4. 94 10 ca l 84.7 Mecha ni 101.7 l Electrica ra ge ve A d W eighte
96.9 87.8 87.8 91.5 65.6 85.4 98.1 91.9 92.6 92.2
Cos cipated Mis c Site ativ es ENT COSTS $0 None anti des ign initi DEV ELOPM sus tainable PROJECT 3 Value of , Conting 4. OTHER $1,663,97 Off -Site, Site se mis c % of Bldg, Land Pur cha 9.0 ,454 , rec equip, 1% $17,126 for furniture Allocation Public Art Allow anc e fitness m per s.f. of LEED Premiu Allow anc e of kitc hen $239,205 s s.f. Fee al per e $52 ent a Profes sion Allow anc s & Equipm building are $200,000 4,600 SF re, Fixture per s.f. of $200 a FFE - Fur nitu Allow anc e building are 1,000 SF $4,494,045 ipment per s.f. of $7 Exercis e Equ Allow anc e $6,741,067 662,569 SF ipment $10 anc e r util. fees w Kitc hen Equ othe Allo sew er, $50,000 662,569 SF E for w ater, e ,000 anc $50 General FF& w Allo land sur vey 1 Allow $500,000 ls tes ting, Equipment el Computer s & Materia 0,000 Soil ver ies, trav ipment $10 deli , Equ ting cial prin Other Spe Doc ument s $100,000 ent / Tap Fee Plant Investm Survey $30,000 n tes ting & none ume Constructio Ass $0 es le Expens 0% Reimbur sab 4 Fees $197,642,00 Plan Rev iew ,764,200 10% $19 Sales Tax COSTS T 04 JEC PRO $217,406,2 TAL AL L 5. SUB-TO ENCY COSTS 6. CONTING $281 PROJECT -TOTAL ALL 3,6 7. GRAND $272 l item s 1,2, t ($/SF) inc s 1,6 8. Unit Cos item l st ($/SF) inc 9. Unit Co
MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY
JUNE 2021
COST ESTIMATION
HARD COSTS
COST ESCALATION
= TOTAL PROJECT BUDGET SOFT COSTS
RECREATION AMENITIES vs. REVENUE PRODUCTION HIGH REVENUE POTENTIAL LEISURE POOLS WEIGHT / CARDIOVASCULAR AEROBICS / DANCE AREAS GYM / TRACK CONCESSIONS PARTY ROOMS
MEDIUM REVENUE POTENTIAL ARTS + CRAFTS AREA RACQUETBALL SPORTS MEDICINE CLINIC GAME ROOMS GYMNASTICS AREAS CLIMBING WALL COMPETITIVE POOLS — 25 METER
LOW REVENUE POTENTIAL SENIOR AREAS ADMINISTRATIVE / SUPPORT TEEN LOUNGE BABYSITTING KITCHEN LOCKER ROOM THEATER MEETING ROOMS TENNIS COURTS COMPETITIVE POOLS — 25 METER
MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY
JUNE 2021
PROJECT PROGRAM SCHEDULE
MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY
JUNE 2021
PEOPLE | PACE | PLACE
MANSFIELD INDOOR RECREATION NEEDS ASSESSMENT
MAY 2021
FIVE IMPORTANT QUESTIONS
1.
HOW DO YOU DESCRIBE WHERE YOU LIVE WHEN YOU ARE AWAY FROM MANSFIELD?
2. 3. 4.
WHAT PLACES OR EVENTS MUST VISITORS EXPERIENCE WHEN THEY ARE HERE IN MANSFIELD? WHY DO YOU LIVE IN MANSFIELD? HOW DO YOU WANT TO BE PERCEIVED AS A COMMUNITY?
5.
HOW DO YOU NOT WANT TO BE PERCEIVED AS A COMMUNITY? MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY
JUNE 2021
MANSFIELD COMMUNITY CENTER POTENTIAL SITE
~12 ACRES
MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY
JUNE 2021
CITY OF MANSFIELD IDEATION
INDOOR RECREATION & LIBRARY TRENDS NATIONAL TOUR MANSFIELD RECREATION CENTER & LIBRARY IDEATION
CREATING A MANSFIELD EXPERIENCE
INDOOR RECREATION TRENDS
#NIRSAbuild
PHYSICAL OCCUPATIONAL
INTELLECTUAL
SOCIAL
EMOTIONAL
FINANCIAL
SPIRITUAL
ENVIRONMENTAL
8 DIMENSIONS OF WELLNESS SOURCE: SUBSTANCE ABUSE AND MENTAL HEALTH SERVICES ADMINISTRATION (SAMHSA)
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
ADVENTURE TRACK
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
WELLNESS ESSENTIALS
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
WELLNESS ESSENTIALS
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
FUNCTIONAL TRAINING AREAS
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
FUNCTIONAL TRAINING AREAS
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
ADAPTABILITY
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
ADAPTABILITY
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
#NIRSAbuild
STREAMING FITNESS
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
PROJECTION GYM | INTERACTIVE LIGHTING
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
INCLUSIVE SPACES
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
SOCIAL SPACES
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
SOCIAL SPACES
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
SOCIAL SPACES
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
MULTI-PURPOSE SPACES
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
MULTI-PURPOSE SPACES
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
MULTIPURPOSE EVENT SPACE
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
INDOOR PLAY
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
SOCIAL AQUATICS - LEISURE WATER
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
LED LIGHTING & SOUND
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
LIQUID GYM
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
THERAPEUTIC POOL
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
INNERTUBE WATER POLO
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
SLACKLINE
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
COMPETITION POOL – LEARN TO SWIM
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
E SPORTS
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
TEACHING KITCHENS - HEALTH & NUTRITION
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
BRINGING THE OUTDOORS IN AND INDOORS OUT
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
BRINGING THE OUTDOORS IN AND INDOORS OUT
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
LEARNING GARDEN
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
OUTDOOR SOCIAL SPACES
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
AMPHITEATHER
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
LIBRARY TRENDS
LIBRARY SPECIFIC CONSIDERATIONS
THE POSSIBILITIES
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
CONNECTIONS WITH LIBRARIES WORLDWIDE – VIRTUAL TOURS
MANSFIELD RECREATION CENTERTHE & LIBRARY IDEATION POSSIBILITIES
OFFLINE IS THE NEW “LUXURY”
MANSFIELD RECREATION CENTER & LIBRARY IDEATION
NEXT STEPS MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY
JUNE 2021
MANSFIELD COMMUNITY CENTER NEEDS ASSESSMENT
STEERING COMMITTEE PRELIMINARY SCHEDULE Kickoff Meeting May 19
Possible tour of DFW Recreation Centers
Workshop 1 | Public Meeting 1 June 8 include facility tours
Workshop 2 | Public Meeting 2
Workshop 3 Tuesday, August 3
Phase One Report to City Council Monday, July 23
July 7
Survey by Mansfield PARD June 8 through July 11
Workshop 5 | Commit to final draft Tuesday, October 5
Final Report
Workshop 4
TBD (October 15)
Thursday, September 9
Phase One
Phase Two
MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY
JUNE 2021
TIME TO PLAY DOT-OCRACY, 5 QUESTIONS & COMMENT CARDS
MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY
JUNE 2021
CALL TO ACTION – DOTOCRACY
MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY
JUNE 2021
PUBLIC MEETING COMMENT CARDS
MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY
JUNE 2021
THANK YOU FOR PARTICIPATING! MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY
PUBLIC MEETING MANSFIELD COMMUNITY CENTER FEASIBILITY STUDY
JUNE 2021