MCCLENDON PARK WEST
TARGET COMPLETION WINTER 2023
BUDGET $2.3 million
Advertisement
DESIGN FIRM Pacheco Koch
PROJECT MANAGER James Fish
FUNDING SOURCE MPFDC/GF COs
CONTRACTOR The Fain Group
SUMMARY This project includes replacing the underutilized softball field with two new basketball courts and adding a splash pad, new restroom building and expanded parking
CURRENT UPDATE Construction continues to work towards the project closeout. The last several weeks have posed some challenges with weather delays due to rain, sleet, mud and freezing temperatures The basketball project is 95% complete with final electrical service and turf establishment still remaining. Mechanical, electrical and plumbing work inside the restroom pump house building is underway, and the walks and concrete surrounding the splash pad have been poured The block work for the restroom building has been delayed d h h S ff i ki i h b h l k h h d l
![](https://assets.isu.pub/document-structure/230306151651-904af9d4641ea3321aded059a555123d/v1/7889965341e6be394b18e9541b3b68f5.jpeg?width=720&quality=85%2C50)