ROSE PARK MASTER PLAN
PHASE ONE PUBLIC MEETING JULY 7, 2022
JULY 7 MEETING AGENDA ● Project Background ● Existing Conditions/Constraints ● Playground Improvements ● Redevelopment Master Plan Draft Concept ● Public Feedback
● Property originally owned by Conway and Katherine Rose, who used it as their private weekend ranch ● Rose Park opened in 1996 as the first park developed under the newly-adopted half-cent sales tax ordinance approved by voters in 1992 ● Connection to Town and McKnight Parks added with opening of Walnut Creek Linear Park in 2007 ● Playground was replaced in 2010; all other amenities unchanged beyond repairs
ROSE PARK MASTER PLAN
PROJECT HISTORY
● Rose Playground identified in 2020 Master Plan for replacement with inclusive, signature playground due to heavy use and strong community sentiment ● $1.5 million allotted by City Council in 2021 to replace playground ● Master plan process begun to create overall plan for the best use of the space ● Plan includes Hardy Allmon Soccer Complex, which hosted MSA games from 1987-1996; Currently used for practices and private rentals only
ROSE PARK MASTER PLAN
PROJECT HISTORY
● Replace 2010 playground ● Create a signature playground ● Reinforce the “family favorite” park experience ● Uniquely Mansfield ● Design for all abilities ● Minor park improvements ● Review site alternatives Total Project Cost = $1.5M
ROSE PARK MASTER PLAN
PROPOSED PROJECT
EXISTING CONDITIONS
NATURAL BEAUTY
POND
PLAYGROUND
SPORT COURTS
FITNESS
RESTROOMS & PAVILIONS
ISSUES & CONCERNS ● Not enough parking ● Lack of park lighting ● Aging infrastructure ● Not enough sport courts ● Not enough playground equipment ● Prone to flooding
EXISTING CONDITIONS
PARK USER
ROSE PARK FLOODING
ROSE PARK FLOODING
ROSE PARK FLOODING
ROSE PARK FLOODING
SIGNATURE
PLAYGROUND
Unique features or look Custom, interactive experience Unexpected, surprising Photo-friendly look Optimized for multiple ages, interests and/or uses ● Something special to invoke community pride ● Distinctive overall theme/style ● ● ● ● ●
SIGNATURE PLAYGROUND
What defines a Signature Playground?
● River Legacy Park (Arlington) ● Play Grand Adventures (GP) ● DREAM Park (Fort Worth) ● Bicentennial Park (Southlake)
SIGNATURE PLAYGROUND
Dallas-Ft Worth area Signature Playgrounds
Earthy look and feel with elements or style of wood, plants, animals and other natural materials
POSSIBLE AESTHETICS
NATURAL
Bright colors, clean lines, mix of materials and more artistic and/or modern style construction
POSSIBLE AESTHETICS
MODERN
Colorful, creative, more imaginative and stylized
POSSIBLE AESTHETICS
WHIMSICAL
Fully coordinated theme with characters and/or specific elements
POSSIBLE AESTHETICS
THEMED
INCLUSIVE & ADAPTIVE
PLAY
INCLUSIVE PLAY
INCLUSIVE PLAY
HIGH NEED HIGH DEMAND
AMENITIES
● 2020 Master Plan surveys, focus groups & public meetings ● 2021 Feasibility Study survey, focus groups & public meetings ● Public meetings and webpage for information & questions on each new park project; email alerts for project news
Rose Park Master Plan Feedback ● ● ● ●
Online survey June 30-July 11 Public meeting July 7 Outreach events June 24 and July 8 Additional input gathering planned for next phase
DESIGNED BY YOU
Plans Driven by Community Feedback
PLAYGROUND AMENITIES
PLAYGROUND AMENITIES
PLAYGROUND AMENITIES
PLAYGROUND AMENITIES
SPORT COURTS
SPLASH PAD
REDEVELOPMENT MASTER PLAN
DRAFT CONCEPT
PROJECT GOALS ● Preserve the beauty and history of the park ● Create a unique signature playground that’s inclusive and adaptive ● Add high-demand park amenities like splash pad, sport courts ● Maximize layout of usable space within floodway restrictions with as little impact to trees and natural areas as possible ● Create overall master plan to guide this phase and future projects
DRAFT CONCEPT
DRAFT CONCEPT
DRAFT CONCEPT
MOVE SOCCER FIELDS
DRAFT CONCEPT
Tennis & Pickleball Basketball & Sand Volleyball
MOVE/ADD SPORT COURTS
DRAFT CONCEPT
CREATE FITNESS SPACE
DRAFT CONCEPT
RECONFIGURE/EXPAND PARKING
DRAFT CONCEPT
NEW SIGNATURE PLAYGROUND
DRAFT CONCEPT
ADD SPLASHPAD
DRAFT CONCEPT
RESTROOMS & PAVILIONS
DRAFT CONCEPT
OVERALL CONCEPT
TENTATIVE PROJECT TIMELINE ●
Conceptual Master Plan Development ○ Online Survey ○ Public Meetings/Engagement
May-September 2022 June-July 2022 July-August 2022
●
Plan Adoption
October 2022
●
Phase One Construction Documents
November 2022 - April 2023
●
Bidding / Contract Award
May - July 2023
●
Phase One Construction
August 2023 - April 2024
YOUR FEEDBACK TONIGHT ➔ Q & A with City Staff & Design Team ➔ Dot Exercise 1. Playground Amenity Priorities 2. Playground Themes 3. Redevelopment Plan Concept
➔ Online Survey
QUESTIONS & EXERCISES JAMES FISH PROJECT MANAGER Mansfield Parks & Recreation Senior Park Planner