Architecture Portfolio 2009-2013

Page 1

marco d’ambrogio

PORTFOLI

2009-2014


personal data marco d’ambrogio

name: surname:

architecture student

profession:

bolzano 26.10.1989

place of birth: date of birth:

italian

nationality: email: website:

marco.dambrogio@student.unife.it www.mikodesign.weebly.com

DK_CPR:

261089-3743

education

workplaces

2013-2014 Royal Academy of Fine Arts, School of Architecture, Copenhagen, Denmark

MiKo Architectural Design (2012/-)

for a complete CV overwiev:

e

Ro

m

po re Sin ga

nb ul Ist a

n do

Lo n

da pe Bu

n rli Be

is

st

https://www.linkedin.com/in/marcodambrogio

Pa r

ila n M

re nc e Flo

ice

Arciragazzi (social association) (2005/2008)

Ve n

CITIES I’VE VISITED, CULTURE I’VE DISCOVERED

NOTE:

references: info@ing-mayer.it

lza no

2003-2008 Math and Science High School Bolzano, South Tyrol Italy

Mair Dr. Ing. Herbert Ingenieurburo

(2008/2009)

Bo

2009-2013 Università degli Studi di Ferrara Facoltà di Architettura Ferrara, Italy

QuBo Architecture Studio (2011/-)


something about me I was born in Bolzano, a city on the border between Austria and Italy. For this reason I have always lived in a mixture halfway between the two very different cultures. This fact has characterized unequivocally my character: I’m always ready to seek confrontation with other cultures in order to draw the best experience as possible. I was employed in an engineering office, and in my free time I also started working as a draftsman in my father’s architectural office. This experience made me extremely motivated in the choice of my academic journey. I’ve studied architecture at the University of Ferrara, well known for being the best one of Italy, for four years, then i moved to the Danish Royal Academy of Fine Arts, thanks to the Erasmus Exchange Program to write my Master Graduation Thesis. This particular situation gives me freedom to move or to stay wherever i find a place which I think it might be good for my study and personal research. Recently I’ve founded MiKo, an Architecture and Design Ideas Laboratory. My biggest dream and aspiration is to travel and discover the atmosphere of the most diverse environments. Experience firsthand sensations of open and closed spaces. Materially understand the close relationships between what has been built and the pristine environment. In the particular region where I was born there is a very close relationship between man and nature. This led me during my architectural study to investigate the right combination of what’s built and the natural spaces. The thing that has always surprised me in architecture is the fact that the architect designs the full volumes, while the user lives in the blanks. You should always work in a sort of continuous negative image of the reality you want to create. For this reason architecture for me is the right mixture between the culture of the past and a deep look into our future. In my future I’m planning to finish my studies and find a nice work in an office with a great experience, who can help me to form my broadly on contemporary style and that gives me the opportunity to get in touch directly with the practice, because nothing more than reality teaches you what it means to talk about architecture.

languages, technical skills and passions: Languages: Italian, English and German Technical Skills: MSOffice, Autocad 2014, Archicad, Revit, 3dS Max, Rhinoceros, Grasshopper, Allplan, Cinema 4d, Photoshop, InDesign, Illustrator, After Effects, Premiere Pro and really good and fast in learning any other kind of program. Personal Skills: Working closely with my colleagues since the first year of university gave me a strong sense of team work, and helped me to develop both a sense of organization and planning of the work, both to experience in every project new technologies and new architectural styles, as well as new methods of representation. This has opened my mind to be ready to adapt to the most diverse situ ations.

ille ar se M

ich un M

gn a lo Bo

W ien

rg

Fr ib ou

Ha ag n

De

Fr an k

ha Do

us

se

l

fu

rt

rg Br

sb ou

St ra

br u ns In

es ap l Ne

ce Ni

ste Am

ck

m rd a

m ol kh St oc

a Pr ah

Co pe n

ha ge

n

Passions: I have been the captain of a Volleyball team in the Third Division Championship in Italy. I also play Basketball, listen and play good music (I’m a Multi-Instrument Player and a Dj), learning Photography and Hand-drawing.


contemplation leisure

W.A.F. Singapore

ageing catalyst

IDEAS AND COMPETITION - personal research

08 2010 - Innsbruck

10 2010 - Singapore

2010 - Berlin venerdì 4 ottobre 2013 venerdì 4 ottobre 2013

checkpoint mixed

monzuno sport center

DESIGN AND RESTORATION - university

38

44 2013 - Monzuno


rimesse district urban rdv.

St. Antonio restoration

2T House structure

2010 - Welschnhofen

18

2013 - Bologna 2014 - Copenhagen

22

2012 - Ferrara 2011 - Oberbozen

28

2012 - Ferrara

2010 - Oberbozen

48 56 60

32

trapezious community c.

mc house housing

Nordvest Plads revitalization

holz pichler exposition


IDEAS AND COMPETITIONS 6


Project name

Page

contemplation ageing catalyst holz pichler nordvest plads mc house trapezious

08 10 18 22 28 32

PERSONAL RESEARCH

“design is the real function of all our emotions”

7


CONTEMPLATION Concept phase 1

Schemes

CAVERN

drop of water year 2011 location Innsbruck 8

Plans sections


contemplation leisure Sections and Elevations

Concept phase 2 The idea is to combine business with pleasure. a place where you can both enjoy the surrounding landscape and make personal reflection. the structure is made of steel, glass and wood that are joined between modernity and warmth.

REST,

CONTEMPLATE

PEACE & RELAX

Render

9


AGEING CATALYST

10


W.A.F. Singapore

ageing catalyst

World Architecture Festival 2013, Student Charrette, Singapore Finalist The competition was focused on the role of eldery people. How architecture can answer to the aging society? The project presented establish a wisely way to involve elders into daily activities of their neighborhood. Using some facilities as skidproof flooring or sensor device, elders may live safety even if they’re suffering of dementia. Including thermal bath for healt insurance elders can be involved with a new social commitment in a community whose priority tends to ghettoize them.

SINGAPORE - 2013 11


year 2013 location Singapore

Design Development

Functional Plan

1.

2.

Use of the riverfront

3.

To stretch the volumes

venerdì 4 ottobre 2013

venerdì 4 ottobre 2013

venerdì 4 ottobre 2013

Long Section

4.

Dinamic roof

venerdì 4 ottobre 2013

Final solution

12


W.A.F. Singapore

ageing catalyst Masterplan

Ground floor venerdĂŹ 4 ottobre 2013

13


year 2013 location Singapore

Internal pool and bath

venerdĂŹ 4 ottobre 2013

14


W.A.F. Singapore

ageing catalyst Main Italian keyfacts

Italian history

Ancient Romans have always used bath both as a leasure and healthcare facility!

Italian answer

THE ANSWER IS WRITTEN IN OUR PAST

15


year 2013 location Singapore

External pool and bath

WATER & ELDERLY BATH & HEALTH

venerdĂŹ 4 ottobre 2013

16


W.A.F. Singapore

ageing catalyst Solar system

Sustainable approach Water system

venerdĂŹ 4 ottobre 2013

17


HOLZ PICHLER

18


holz pichler exposition Project Description The final aim was the actual realization of the physical model, first studied only in a virtual way. The model was realized with the lumber company, and was exposed to the temporary exhibition at the end of the course.

19


year 2010 location Welschnofen

BUILT FOR AN EXPO

IN 3 PHASES

20


holz pichler exposition Exposition Phase

3. step

Building Phase

1. step

Packing Phase

2. step

21


NORDVESTPLADS

View of the square from the north-east gate. The building in the background summarizes in its design all the basic principles of transformation arising from the strategy and the work of analysis.

22


nordvestplads revitalization

FINAL RESULT

Design Evolution

.1

Schemes

.2

.3

Main Square

.4 23


year 2014 location Copenhagen

Development strategy

Schemes

To highlight the entire project and make it visible from the park and the bike path, it was decided to reuse the soil extracted for the construction of the square as a filling material for the rise in the surrounding top soil. In this way it has been created less material to dispose and attenuates both the working times that the traffic of vehicles for transport. Population

Nørrebro is inhabited by people from all parts of the world. The largest minority groups of people living in Nørrebro are Arabs, Turks, Pakistanis, Bosnians, Somalians and Albanians.

Densification

To cope with a sure increase in population in the district, it will be necessary to ensure completion of appropriate support structures, both in terms of housing and spaces of aggregation.

Plans:

In the underground plan it’s possible to highlight the relationship between the new public space and the surrounding buildings, as well as a possible rol e of new polarity triggered by the enclosed nature of the place. All underground spaces are overlooking the square, in order to ensure an adequate supply of sunlight. Where this principle is not possible to be apllied, openings on the ceiling are provided. Tthe square doesn’t interfere directly with the surrounding buildings, granting the possibility to be managed with more freedom of time and without disrupting the local residents.

24


25

nordvestplads revitalization


year 2014 location Copenhagen

Long Section

26


nordvestplads revitalization Functions

Masterplan

1.

2.

3.

START

processing...

END

TARGET:

STRATEGY:

Developing an area of mitigation ​​ between the city and the park, which is suitable to accommodate the features needed and which is conducive to creativity and cohesion.

Using a square planned out of the common rules, designed at the intersection of a passing motion, which functions as a magnet for the entire new district, with shapes that connect the built system with the natural environment.

1. This building is the closest to the natural green belt, therefore it has been designed with the most irregular shapes. It has been selected to embody all the public functions which might need the sunlight such as a bar and a canteen. 2. This building incorporates the fundamental principles used as base for the development of the project. Starting from rigid lines when closed to the road, we arrive at the opposite side to the mitigation with nature through broken forms and lines. 3. This building has been designed to give opportunities to the creation of “sharing spaces”.

Long Section

27


MC HOUSE

HOUSING

OBERBOZEN - 2012 28


29

mc house housing


year 2011 location Oberbozen

Section

The concept for the shape of the building comes from the study of the sunlight. Due to the particular microclimate, we have to defend the windows from the cold winters wind coming from the east, and open as much as possible the walls on the west side, for emphasize the view to the beautiful panorama and to gather the most sunlight as possible. t

concep

concept

cciata

ento fa

arretram

tpecnoc

iata

ento facc

arretram

Concept

tpecnoc

The study of the sunlight was instrumental in the realization of the project of all outside partitions. Only in that way we could analyze the real needs of the dwelling, as regards both the outer walls and its openings, both for the coating in shading devices of the main facade facing the southern direction. The size of the overhang is correctly measured based on the position of the sun in the summer and in the winter.

ataiccaf otnemarterra

golo ento an retram ataar iccaf otnemarterra golo

ento an

arretram

01 30

ologna otnemarterra

02

03

ologna otnemarterra

04


mc house housing

TAV_0

concept

Study of the shadows concept

TAV_0

summer

arretramento facciata

solstizio estate 21st h12.00

arretramento facciata

winter

solstizio estate 21st h12.00

arretramento angolo

arretramento angolo

solstizio inverno 21st h12.00

Study of the shadows The materials used in the design phase are all coming directly from the vicinity of the yard, so as to reduce the environmental impact of long-distance transportation and give more work to local companies. The entire structure is made of wood, then covered with plasterboard. the roof is covered in green with local plants, and the alternation of wood and the stone base to the tradition of building typical of the mountain landscape.

solstizio inverno 21st h12.00

31


TRAPEZIOUS

32


trapezious community c.

100% WOOD

0 km

The aim of the project was to give the building a shape the most natural way as possible, in relation to the context of the surrounding mountains. The sloping roofs shelter from the prevailing winds, the opening collect sunlight and space functionality is measured in every single detail. All load-bearing structures are made of wood and the green roof give back to the nature the soil that have been stolen. 33


year 2010 location Oberbozen

Elevation

Design Development

.1

.2

Section

.3

.4

34


trapezious community c. Plan - Ground Floor

The aim of the project was to give the building a form the most natural way as possible, in relation to the context of the surrounding mountains. The sloping roofs shelter from the prevailing winds, the opening collect sunlight and space functionality is measured in every single detail. All load-bearing structures are made of wood and the green roof give back to the nature the soil that have been stolen.

Montiggler See

Inside this public building there’s enough room for one bar/caffeteria with it’s own terrace on the first floor, one exhibition room and one conference hall.

35


DESIGN AND RESTORATION


Project name

Page

checkpoint charlie monzuno rimesse sant’antonio abate 2thouse

38 44 48 56 60

UNIVERSITY PROJECT

“A gap is a matter that combine spaces, breaking what architecture creates, the solids, connecting what the man lives, the voids”


CHECKPOINT

38


checkpoint mixed

T

MIXED USE

BERLIN - 2011 39


year 2010 location Berlin

Wiew from Mauerstrasse

Concept The area of intervention is right over the old path of the Berlin Wall. We wanted to give at the same time a look into the past made of memories and a modern building. For this reason a wound on the main facade gives the impression of the cut given to the city by the existence of the historic Berlin Wall but at the same time represent a connection between past and future. The building is organized around a central gallery and an inner courtyard, which are suitable venues for events and exhibitions. On the different floors of the building can be carried out many activities, from shopping to work in offices, up to the residences that overlook the famous Friedrichstrasse and the Check Point Charlie. It has been very important the study of sunlight , because the idea was to try to illuminate all the indoor environments, even if we are in a very compact district.

Wiew of the area

berlin wal

40


checkpoint mixed Concept

Offices plan

Friedrichstrasse Elevation

Section A-A’

ll

41


year 2010 location Berlin

Wiew from Friedrichstrasse

42


checkpoint mixed Study of the light Fundamental, as we stand in a densely built buildings with at least six floors each, was the study of light, especially for the winter period and the illumination of the inner courtyard. We used software such as Ecotech to achieve the most realistic results possible. We then demonstrated compliance with legislation of Berlin for lighting interior rooms and we calculated the calorific value generated by the sun on the windows of our building to promote energy intake during the coldest months of the year. The special stone shading panels designed by us offers wide versatility, leaving freedom to the individual office owner to manage lighting with natural light. Where it was not possible to illuminate in a direct manner, mirrors have been positioned (see for example the inner court) to reflect the light and give rise to a general indirect lighting. Light schemes

43


MONZUNO

44


monzuno sport center Wiew from the bar

LINEAR COMPOSITION The municipality of Monzuno, in the province of Bologna, decided to collaborate with the University of Ferrara in the late January, 2013 to the realization of participatory projects to bring new ideas that can help the small town of the Emilian Apennine in finding a new local importance. One of these projects is to build up to a detailed scale of 1:5 a sports center with two multi-purpose courts (of which one outdoor and one indoor) and a small bar, with a large park where it might be possible to have special country fair and cultural appointments. We tried to give the municipalities an efficient and modern building, with the latest technology and keeping costs under control, knowing that financial resources in a context so small are never readily available. We also sought contacts with local businesses to save on labor and transport costs, trying to create a building capable of doing a driving force for the local economy.

SPORT CENTER

MONZUNO - 2013 45


year 2013 location Monzuno

Masterplan

46


monzuno sport center CREATO CON LA VERSIONE DIDATTICA DI UN PRODOTTO AUTODESK

Construction Details

FROM 1:2000

CREATO CON LA VERSIONE DIDATTICA DI UN PRODOTTO AUTODESK

CREATO CON LA VERSIONE DIDATTICA DI UN PRODOTTO AUTODESK

ESK

DOWN TO 1:5 47


RIMESSE

48


rimesse district urban rdv. The site of the project was located just outside the city centre of Bologna, Italy. The goal was the realisation of a new neighbourhood that could attract people as a place of exchange, both physical and cultural. It was decided to develop the project around the concept of courtyard building, typical of the Italian architectural typology. The connections with the environment have led to the development of an open public space. We tried to work on diferent levels of social life, so as to maintain the active area day and night, as well as the inclusion of a strong functional mixitĂŠ. The project was supported by a very famous shopping mall company, which helped us in finding a new way of seeing the spaces for the commerce, to study the psycological aspect of architecture.

URBAN REDEVELOPMENT BOLOGNA - 2013

49


year 2013 location Bologna

View from the central square

The development of the project took place after a careful analysis of the site and its surroundings. We wanted to create a catalyst element working on the connection between the functions and the time of their use, in order to reach a live mixitĂŠ that made the public space full of life both day and night, making it a new attraction for this portion of the city. 50


Masterplan 51

CONCEPT DEVELOPMENT rimesse district urban rdv.


year 2013 location Bologna

Elevations and sections

52


rimesse district urban rdv. Section reference A-A’

Partnership with a real company: Despar Thanks to the close relationship we have had with the Despar company, we were able to designin a defined manner all the space necessary for the proper functioning of a supermarket. However, we have introduced some new fundamental features. A difference in height between the road outside and the floor of the supermarket allows passers-by to admire the benches of fresh goods on the perimeter, thus encouraging them to enter. While placing windows on each side, we avoid the perceived sense of closure in department stores, making the shopping experience more pleasant. The connections between car, bicycle and the entrance have been reduced as minimum as possible, and we have also eliminated all architectural barriers.

Section A- A’ from the model

53


year 2013 location Bologna

View from the street

Main plan

CUSTOMIZABLE SPACES

100 %

FLEXIBILITY

54


View from the Courtyard

55

rimesse district urban rdv.


S.A.ABATE restoration of a XVth century church damaged by the 2012 northern italy earthquakes. After we’ve completed all the measurement of the plants and of the facades, we proceeded with the analysis of the states of both surface and structural degradation. Starting from these data, we have developed a recovery plan for the entire structure.

56


St. Antonio restoration

RESTORATION FERRARA - 2012

57


year 2012 location Ferrara

1

58

2


St. Antonio restoration 1

2

3

FISSURE/SLIT

1. photoplan 2. materials and interventions 3. damage analysis

3

59


2THOUSE 1

2

1. elevations 2. architectural plan 3. structural plan 4. beams disposition

1 2

3

4

The final target of this laboratory was to make us able to realize the entire structural system of the building. We studied all the pillars, beams and foundations, a retaining wall for the basement and the stairwell. We made static patterns, thus determining the correct amount of required reinforcement to the concrete to resist various efforts. All calculations were done by hand with mathematical procedures without the use of any engineering software.

60


n* 20 posti auto

0,4

A

A

5,6

6

B

A

A'

5,6

6

B'

C

C

0,4

C C

5,6

6

D

D

0,4

D D

C'

5,6

6

E

E

0,4

E E

5,6

6

F

F

0,4

F F

1

2

3

4 5

6

7

scala 1:100

N

CREATO CON LA VERSIONE DIDATTICA DI UN PRODOTTO AUTODESK

B

B

B

0,4

B

D B'

0,4

STRUCTURAL STUDY

FERRARA - 2012

61

Studenti: Albanesi Francesca, Maria Vittoria Campagna, Marco D'Ambrogio PIANTA PIANO INTERRATO: Autorimessa

26

PIANTA DEL PIANO TIPO:

1

C

A A

1 2 3

3,6 5,6 5,6 5,6

0,4 0,4 0,4 0,4

4 5 6 7

A' A'

2

3

4 5

6

7

26

3,6 0,4

4 6 3,9 2,1 6 4

1 2 3 A 4 5 6 7 A

B B' B

3

4 6 6 6 4

vano tecnico e caldaia

CREATO CON LA VERSIONE DIDATTICA DI UN PRODOTTO AUTODESK

CREATO CON LA VERSIONE DIDATTICA DI UN PRODOTTO AUTODESK

4

2T House structure


year 2012 location Ferrara

Beams and pillars deformations study

Iron bars for stairs

5 FLOORS HAND CALCULATED

62


2T House structure Main pillars and floors sections

63


Seminars / Workshop attended International Workshop Chengdu Metropolis - Urban Frames / Water Frames 27/06/2014 - 13/07/2014 (CHINA) Romeo Farinella

Interneational Workshop Istanbul – Galata Beyoglu 20/04/2013 – 28/04/2013 (TURKY) Gianluca Frediani

Promo_legno seminar Cavit-Mezzocorona (ITALY) 15-16/03/2012 Franco Laner

Restoration seminar – Ferrara (ITALY) 10/2013 – 12/2013 Riccardo Dalla Negra Giovanni Cangi Antonio Borri Paolo Rocchi

Passions: The work combined with all the passions that I have always followed, such as the role of the federal judge in Italian national volleyball championships, led me to find a great confidence in myself, determination in the choices to be made and a great reactivity. Having then played in several bands as lead guitarist, have been for three years representative institution in high school and captain of a volleyball team in the Third Division, they helped me find the leadership traits needed in group work that I carried out at the university. Music has always been a constant presence in my life: I can play a lot of instruments and I usually work during parties as a Dj. When I find some free time, I usually learn Photography and Hand-drawing. Driving License: A1, B

contacts marco d’ambrogio www.linkedin.com/in/marcodambrogio marco.dambrogio@student.unife.it

64


NOTE TO THE READERS: I’ve tried to summarize my work by choosing different subjects and targets, scale of intervention and visualization style, to give as much as possible a complete view over the path that took me up to this point in my career. Marco D’Ambrogio 65


66


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.