PORTFOLIO
SELECTED
ARCHITECTURE
2019-2021
WORK
BY MARGARET YUDHIA ADITAMA
CURRICULUM VITAE EDUCATIONS 2017-2021
Bandung Institute of Technology Bachelor of Architecture
2014
SMA N 1 Tambun Selatan Science Program
2011
MARGARET
SMP N 1 Tambun Selatan Bilingual Program
YUDHIA ADITAMA
EXPERIENCES
architecture fresh graduate
2021
Urban Designer Internship in PDW Architects (6 months)
I was involved in 16 projects (intensively & from the conceptual development in 3-8 projects. I also did some detailed analysis & design developments in 7 projects and did some technical actions of masterplans in 4 projects).
PROFILE
2021
Head of Event Coordination of Coloured Glass (Academic Event with 'Placemaking' Topic)
Hello, I am Margaret Yudhia Aditama, a passionate
Colored Glass is the Academic Event with specific topics 'People,
architecture fresh graduate. These times, I was interestedly attentive to the regional context of
Environment, and Placemaking.' I led a field with three divisions,
architecture. I am also curious about the larger scale
namely research, event organizer, and technical logistics. It is
of the development cycle, especially Urban Design.
conducted in hybrid (offline and online). Leading activities that we While I am in college, I'd love to explore many roles to
learn
about
its
content
and
to
build
do is tend to be social experiments with the modules that we
good
develop in Cihapit Street, Bandung City.
communication with people. From those experiences, I see myself interested in breaking things down for making a mature (based on my perspective) concept
2021
from an issue. I define myself as an individual of
Photography Panelist of Liga Film Mahasiswa ITB Provide critique and assessment of the concept and execution of a
initiative and persistence to wrap this up.
final project by prospective LFM new members. 2020
Graphic Designer of Vakansy.co Contribute to the magazine division. It is a three months project that promotes Indonesian tourism and culture to the youth. The team is consists of 48 people with various backgrounds from around
CONTACT INFORMATION Domicile
Bekasi
+62 857 7947 3193
margaretyudhiaditama@gmail.com
www.linkedin.com/in/margaretyas
Indonesia. Repository: http://vakansy.co/ 2019
Design Camp 2019 A two days event was held by Architecture of UNPAR that focused on urban infill building (was involving Atelier Riri and AGO Architect as a jury).
2019
Event Organizer Staff of 'Facade' Manage
(with
the
team)
a
seven-days-trip
that
focused
on
vernacular, historical, and colonial architecture development in Malang & Surabaya.
CURRICULUM VITAE SKILLS
ACHIEVEMENT & PUBLICATION
HARD SKILLS
2021
Softwares
Head of Editorial Team of Gaung Bandung 2020's Book
Sketch up (4.5/5)
This journal discusses a series of projects to make Bandung a
Adobe Photoshop (4.5/5)
more livable city, ranging from materials and events packaged
AutoCAD (4/5)
with a series of settings to other manifestations.
Adobe InDesign (4/5)
Repository: https://bit.ly/JurnalGB2020
Adobe Illustrator (4/5) Enscape (4/5)
Jurnal Gaung Bandung 2020
2020
Digital Placemaking & Its Effect to the Architectural Development
Twin Motion (4/5)
Collaborative research for Seminar Arsitektur ITB 2020
Lumion (3.5/5)
10 Best Paper and presented on 'Seminar Arsitektur ITB 2020'
Microsoft Office (3/5)
in
Adobe Premiere Pro (3/5)
the
process
of
getting
international
publications
and
conferences: HABITechno 5: Resilience by Design.
Hands on
Certificate: bit.ly/sertifikatseminAR20)
Photography (4.5/5) Model making (4/5)
2020
Collaborative Publication: Student Evaluation of Studio Architecture Online
Sketch (3/5) Language
We
Indonesian (native)
have
(one
lecturer
and
two
students,
including
me)
investigated students' evaluations regarding online architecture
English (intermediate)
studios for the undergraduate level. Repository:
SOFT SKILLS
https://www.researchgate.net/publication/342122893_Student_Evaluation_of_Studio_Archi
Intellectual
tecture_Online_Evaluasi_Studio_Daring_berdasarkan_Perspektif_Mahasiswa
Problem Solving (especially in analyzing)
ORGANIZATIONAL EXPERIENCE
Concepting Presenting
2019 - 2021 Head of Material & Method Team of Gaung Bandung 2020
Designing
Compile and develop the initial theme and concept of the referral
Personality
document that has been published by the formation team into a mature
Persistence
concept (output: the substance of the event, atmosphere, and the journal
Initiative
of the entire event.
Leadership Adaptive
2019
Compile and develop the initial theme and concept of the 'Gaung Bandung
Team work
2020' event.
Work inclusively 2019
INTERESTS
theme would be present. It presented with graphic design applying the
Photography
User Experience
Head of Publication of Bioskop Kampus: Kurasi Jaman's Event Manage and do some brainstorming about how the brand of the event
Urban Context
Writing
Formature Team of Gaung Bandung 2020
concept 'two different eras'; the past and the future. 2019
Secretary & Financial Manager of 'Hijrah' (LFM goes to Bali) Manage the money that comes in and out and some needed documents before, during, and after the event.
2019
Head of Public Relations & License of Penjenjangan Mula Bina Connecting communication between prospective new members of the association with the committee and other members.
2019
Protocoler Staff of KM ITB Manage the events and/or agendas of welcoming externals guess KM ITB with a leadership rotation system in every circumstance and/or schedule.
2019
Head of Business Fund of April Graduation Celebration Raising funds for supporting April Graduation Celebration with staff.
2018
Mentor of Orientasi Studi Keluarga Mahasiswa (OSKM) ITB 2018 Guide new ITB students (2018) during three days of orientation with materials and methods that have been prepared during three months of mentor training.
LIST OF CONTENT Pages 1
11
19
29
01. Integrated Transit Hub: Final project
02. Lifestyle Center: 3rd year project
03. Apartment: 3rd year project
04. Urban Redevelopment: Mixed-use Building 4th year project
integrated transit hub
mixed-use building
1
11
lifestyle center
19
apartment
29
LIST OF CONTENT Pages 37
48
49 49
51 52
INTERNSHIP PROJECT
37
05. Internship Project 6 months project at PDW Architects 06. Other Projects: Art-space (Gallery & Commercial Room) Gubahan Bentuk & Struktur Shelter: Struktur Reciprocal Advanced Wood Construction Advanced Steel Construction Stem System Elaboration Form-Active Structure 07. Other Works: 1. Urban Event(s): Gaung Bandung Colored Glass 2. Photography 3. Graphic Poster
OTHER PROJECTS
48
OTHER WORKS
49
1.
INTEGRATED TRANSIT HUB
ABSTRACT Tambun Selatan is one of two sub-districts that is potential as the central node in transit-oriented development (TOD) in the Bekasi Regency. The main point in the spotlight as the node is the Tambun Train Station. This shape gives hope for a common problem in Bekasi Regency, namely congestion. The mix of the potential and tribulations of this area could be developed in the form of designing an integrated transit hub project that connects various nodes around the area. This integrated transit hub project is a mixed-use building that accommodates transit, commercial, and residential functions. With the main concept of 'connectivity,' this project integrates three central nodes of the area, namely Tambun Railway Station, Jalan Sultan Hassanudin (primary arterial road), and Gedung Juang '45 Tambun with a bridge design. The location carried in this project is an empty land area of ±2.5 Ha, which is located on the west side of the Juang '45 Tambun Building or currently known as the Bekasi Museum. This project aims to support or trigger the realization of the analysis of the potential of the Tambun Train Station area for the development of transit-oriented development (TOD)-a based area as a proposed solution to urban problems with the realm of design. The final result of this design is in the form of a mixed-function building with connectivity solutions, namely the requirement of public facilities, bridges, which connect the area internally and externally. There is also formed an integrated public park on the rooftop area, which can also be accessed from the bridge. This design is expected to support and/or trigger movements that support activities in the transit radius.
BACKGROUND
Exploded urbanization rate Selected works | 2019-2021
Traffic jams as the main problem
Reflecting on the cities of TOD actors in Asia
Potential Application of TOD Principles in Bekasi District. 1 | Portfolio by Margaret Yudhia Aditama
Location: Hassanudin Street, 39th, Tambun Selatan, Bekasi District. Supervisor: Dewi Larasati
PROJECT GOALS Vision: Support or trigger the realization of the Tambun Train Station area's potential for developing a Transit Oriented Development (TOD)-based area as a proposed solution to urban problems with the realm of design.
Mission:
Maximizing the potential of the area
Design buildings that can be a
Design buildings with public facilities that can
by
catalyst
and
respond to the placemaking of residents by
efficient mixed-use building to be
effective connectivity between
paying attention to good interactions between
able to accommodate the activities
regional nodes
public and private spaces.
designing
an
integrated
and
for
efficient
needs of local and long-distance residents
2 | Portfolio by Margaret Yudhia Aditama
Selected works | 2019-2021
OVERVIEW
NODE ANALYSIS
SITE INVENTORY
A
Jalan Sultan Hasanudin sumber: Dokumentasi Pribadi
DETAIL A
C
POINT: THE
EXISTENCE
PATHWAYS
OF
AROUND
STOPS
THE
AND
SITE
AREA NODE: C: Gedung Juang Area
&
PRIMARY ARTERIAL ROADS BECOME
SUPPORT
FACILITIES
FOR
B
TRANSIT-
BASED PROJECT DEVELOPMENT.
SIMPUL TRANSPORTASI: A: Tambun Station B: Sultan Hassanudin Street
POINT: 1. ROAD AROUND THE SITE (PRIME & LOCAL) 2. VEGETATION AROUND THE SITE 3. REGIONAL FOCAL POINTS
REGION ANALYSIS
Jalan Sultan Hasanudin sumber: Dokumentasi Pribadi
Kawasan Gedung Juang sumber: youtube.com
Two opposite nodes are potential for the construction of an intermodal transit hub project on the site, namely connecting two types of transportation: train motorized vehicles (cars, motorbikes, etc. both private and public transportation).
VIEW ANALYSIS
REGULATION ANALYSIS
GSB 11 m
GSB 11 m
Analisis View Sekitar Kawasan Gedung Juang '45 Tambun. sumber: Dokumentasi Pribadi.
GSB 11 m
GSB 20 m
Delineasi Tapak dan GSB sumber: Sketsa Pribadi
1. THE BEST VIEW: FROM THE EAST AREA (AROUND GEDUNG JUANG) 2. VIEW ACROSS SOUTH SIDE OF SITE: PRIMARY ARTERIAL ROAD & 2-3 FLOOR SHOP 3. THERE IS VANDALISM AROUND THE EXISTING WALLS OF THE TREAT 4. POOR SIDE AND DRAINAGE CONDITIONS DISTURBING THE VIEW
Regulasi untuk Mendirikan Bangunan. sumber: Analisis Pribadi
Selected works | 2019-2021
3 | Portfolio by Margaret Yudhia Aditama
INTEGRATED TRANSIT HUB: A MIXED USE BUILDING IN BEKASI DISTRICT
DESIGN RESPONSE:
Y
X
Moving
S U B CONCEPT CONNECTIVITY
M A I N CONCEPT
the
bus
stop
from
building activities (which will then
have an impact on retail sales value). In addition, the calculation of the cross path is shorter for commercial area users.
& APPLICATION
DESIGN RESPONSES
EXTERNALLY: Integrated bridge INTERNALLY: Plaza (inner-court) and public spaces.
This decision is also considered from the efficiency of transit activities, such as: daily needs shopping while going home.
DESIGN RESPONSE: Compact mass design.
Respon Desain terhadap Analisis Regulasi. sumber: Sketsa Pribadi.
Respon Desain terhadap Analisis View. sumber: Sketsa Pribadi.
DESIGN RESPONSE: Main view to Hassanudin street 4 | Portfolio by Margaret Yudhia Aditama
the
starting point (X) to a new point (Y) to increase the intensity of commercial
Sultan
Selected works | 2019-2021
INTEGRATED TRANSIT HUB: A MIXED USE BUILDING IN BEKASI DISTRICT
DESIGN CONCEPT
B1
A3
A
A4
EXTERNALLY
A2 B2
B B4
A1
B3
"CONNECTED" INTO USER'S PLACEMAKING
INTERNALLY Sketsa Massa dan Diagram Konektivitas. sumber: Sketsa Pribadi
The main concept is carried from the main problem, namely connectivity. The scope of connectivity in this project are: EXTERNAL: connect various modes of regional transportation (transit hub intermodal), especially Tambun Train Station with Primary Arterial Road, Sultan Hassanudin street INTERNAL: apply the concept of high permeability from all sides of the site (north, east, west, south)
Integrated connectivity is implemented to increase the quantity and quality of activities, especially those that support transit activities.
RESIDENTIAL 37.6%
COMMERCIAL 44%
DESIGN RESPONSE IN THE CONCEPT OF INTEGRATED CONNECTIVITY: 1. Bridge (externally) 2. Plaza (internally)
TRANSISION SPACE 18.4%
3. Sky-lobby concept rooftop (externally and internally) This concept is inspired by the precedent of Namba Park (Architect: Jerde). The sky-lobby applied to this design is integrated externally and internally. Internally, we could access it inside the building by using stairs and lifts. While externally, it could accessible starting from the bridge, which is integrated directly into the sky-lobby floor 2 (rooftop floor 1). Access to the sky-lobby on the rooftop of this commercial area is integrated with the addition of stairs. The facilities provided are also intended for the public, such as a jogging area, amphitheater, and park.
Rooftop Sky-lobby sumber: Sketsa Pribadi
Selected works | 2019-2021
5 | Portfolio by Margaret Yudhia Aditama
INTEGRATED TRANSIT HUB: A MIXED USE BUILDING IN BEKASI DISTRICT
SPACE PROGRAM
LT 11 LT 10
LT 9
LT 8
LT 7
LT 6
LT 5
LT 4 LT 3 LT 2 LT 1 LT B1 LT B2
6 | Portfolio by Margaret Yudhia Aditama
Selected works | 2019-2021
DESIGN FEATURES
SKYLOBBY: ROOFTOP
SKYLOBBY: ROOFTOP
LT 4 (AMPHITEATER)
LT 5 (JOGGING AREA) ATMOSPHERE OF
SOUTH ENTRANCE:
SOUTH ENTRANCE
Bridge
INTERIOR VIEWS
HOTEL LOBBY
KOMERSIL HADAP PLAZA
Selected works | 2019-2021
(6 TH FLOOR)
EAST PUBLIC SPACE
WEST DROP OFF
(TUNNEL CONCEPT)
FOR VEHICLE
7 | Portfolio by Margaret Yudhia Aditama
INTEGRATED TRANSIT HUB: A MIXED USE BUILDING IN BEKASI DISTRICT
8 | Portfolio by Margaret Yudhia Aditama
Selected works | 2019-2021
PRELIMINARY DRAWING
INTEGRATED TRANSIT HUB: A MIXED USE BUILDING IN BEKASI DISTRICT
FLOOR PLANS
Selected works | 2019-2021
9 | Portfolio by Margaret Yudhia Aditama
INTEGRATED TRANSIT HUB: A MIXED USE BUILDING IN BEKASI DISTRICT
SECTIONS
SECTION C-C'
SECTION D-D'
ELEVATIONS
SOUTH ELEVATION
EAST ELEVATION
WEST ELEVATION
NORTH ELEVATION
10 | Portfolio by Margaret Yudhia Aditama
Selected works | 2019-2021
2.
LIFESTYLE CENTER
A B O U T
T H E
P
R
O
J
E
C
T
The issue raised by this lifestyle center project is placemaking or "creating a place". A place is created from the composition of a space, user activities, and the image of the use of space. (Montgomery, 1998:98). The main objective of this project is to make architecture not just a 'mall' but a place that has meaning for its users, which in turn is expected to become a place for self-actualization of the surrounding community. This lifestyle center focuses on the third space on 2 vertical points, namely the ground floor and the rooftop. This third space can certainly attract visitors for commercial activities, as a temporary commercial space, and hopefully can become a social space. The mass of the building is designed with a fluid concept representing activities that are expected to be more fluid on the site, especially in the outdoor third space of the ground floor. Academic - Individual | January - March 2020 Location : ABC Street, Sumur Bandung District, Bandung, Indonesia. Supervisor : Ir. Tri Yuwono, S.T., M.T.
Selected works | 2019-2021
11 | Portfolio by Margaret Yudhia Aditama
Location: ABC Street, Sumur Bandung, Bandung, Indonesia. Supervision: Ir. Tri Yuwono, S.T., M.T.
D E S I G N P L A C E M A K I N G This issue is answered primarily by providing public facilities of the east site. This issue is supported by the optimism about revitalization of the Cikapundung river in the future. With the river, this area is expected to become a semi-resort area, where visitors can relax comfortably and enjoy a place around.
12 | Portfolio by Margaret Yudhia Aditama
I S S U E S RESIDENTS & VISITORS' L I F E S T Y L E Residents & visitors' lifestyle This issue demands accommodation of modern human lifestyle. This lifestyle issue is responded by the provision of retail that accommodates the needs of the modern generation. SOCIAL INTERACTIONS This issue is provided with public space facilities in the sports area in the form of a garden on the ground floor and a rooftop garden to trigger social interaction.
Selected works | 2019-2021
OVERVIEW
LIFESTYLE CENTER
Land Use: according to the RDTR map on build.cityplan.id, land use around the site: red--trade & service yellow--high-density housing purple--government office
cultural
REGION ANALYSIS
Rush Hour: according to Google Maps, the observed roads are often congested, namely, ABC street in the south and Braga street in the northeast (marked red)
Noisy: Mainly from the south, namely the Trade and Services Zone
phisycal Sun Direction: East-West all day, so the orientation of the building long-planned North-South
Wind Direction: Bandung city in general that is east to west
Selected works | 2019-2021
13 | Portfolio by Margaret Yudhia Aditama
LIFESTYLE CENTER
MASSING 1. Mass is composed of D C
A B
circular surface shapes in 3 different diameter sizes;
A=1m;
B&C=7.5m; D=10m 2. Subtraction of the C D C
A B
plane to the B & D plane,
then
imaginary
an
connecting
line is formed 3. The arcus approach is carried
out
imaginary D
M A I N CONCEPT
A B
on
an
connecting
line 4. Smoothing is done on the A & B plane joints 5. Smoothing is done on the entire mass plane to
DESIGN RESPONSE
obtain a more organic result 6. Do repetitions on the 23 floor massing
FLUID
ZONATION & CIRCULATION
Commercial Area Public Area Pedestrian Entrance Area Vehicle Area (Entrance & Drop-off)
14 | Portfolio by Margaret Yudhia Aditama
Selected works | 2019-2021
DESIGN FEATURES
LIFESTYLE CENTER
ROOFTOP GARDEN
ENTRANCE
ROOFTOP AREA
SOUTHERN COMMUNAL ROOM
ROOFTOP ACCCES
VIEW FROM THE SOUTH
VERTICAL CIRCULATION OF ROOFTOP
FOODCOURT WITH A VIEW
VIEW FROM THE NORTH
EAST COMMUNAL SPACE
Selected works | 2019-2021
15 | Portfolio by Margaret Yudhia Aditama
PRELIMINARY DRAWING
LIFESTYLE CENTER
FLOOR PLANS
DETAILED SECTIONS
16 | Portfolio by Margaret Yudhia Aditama
Selected works | 2019-2021
LIFESTYLE CENTER
SECTIONS
ELEVATIONS
Fluid facade to evoke the ambiance around. The exterior facade will be visible from the outside to feel, especially in the third space located on the ground floor.
Selected works | 2019-2021
17 | Portfolio by Margaret Yudhia Aditama
LIFESTYLE CENTER
EXPLODED AXONOMETRY
ROOFTOP SEMIPUBLIC SPACE
SECOND SKIN FASAD
3RD FLOOR COMMERCIAL AREA
2ND FLOOR COMMERCIAL AREA
GROUND FLOOR COMMERCIAL AREA PUBLIC AREA
STRUCTURE: COLUMN & BEAM 8 X 8 M
BASEMENT 1ST FLOOR: CAR & MOOTORCYLE PARKING
18 | Portfolio by Margaret Yudhia Aditama
Selected works | 2019-2021
3.
APARTMENT
A B O U T
T H E
P R O J E C T
This apartment is an infill site project from the existing lifestyle center located in the west of the apartment site. The primary purpose of constructing this apartment is to respond to the residential needs of the people of Bandung today, especially vertical housing, with an integrated building system. This building is designed with a focus on building system efficiency, mainly the functionally, with a dynamic adaptive concept, represented by an organic building mass and an active building envelope and still follows the datum of the lifestyle center envelope on the west side.
Selected works | 2019-2021
19 | Portfolio by Margaret Yudhia Aditama
Location: ABC street, Sumur Bandung District, Bandung, Indonesia. Supervisor: Ir. Tri Yuwono, S.T., M.T.
D E S I G N BUILDING SYSTEM INEGRATION It answered by providing two core facilities at two-tower points. LAND VALUE EFFECIENCY It answered by tilting the mass of the apartment. The mass slope is also an aesthetic element to answer the concept of adaptive dynamics.
20 | Portfolio by Margaret Yudhia Aditama
I S S U E S SOCIAL INTERACTIONS This issue is answered by providing public space facilities in the sports area (Volleyball Field and Jogging Area) on the ground floor to trigger social interaction. OCCUPANTS PREFERENCES & BEHAVIOR This point refers to the placemaking of a place. A public area was designed on the ground floor outdoor area to address this issue (and the issue of Social Interaction). Selected works | 2019-2021
OVERVIEW
APARTMENT
Land Use: according to the RDTR map on build.cityplan.id, land use around the site: red--trade & service yellow--high-density housing purple--government office
cultural
REGION ANALYSIS
Rush Hour: according to Google Maps, the observed roads are often congested, namely, ABC street in the south and Braga street in the northeast (marked red)
Noisy: Mainly from the south, namely the Trade and Services Zone
phisycal SunDirection: East-West all day, so the orientation of the building long-planned
Wind Directiion: Kota Bandung secara umum yakni timur ke barat
Selected works | 2019-2021
21 | Portfolio by Margaret Yudhia Aditama
APARTMENT
ZONATION & CIRCULATION
Residential Area Public Area Pedestrian Entrance Area Vehicle Area (Entrance & Drop-off)
MAIN CONCEPT DESIGN BRIEF
MASSING DYNAMIC-FUNCTIONAL
DESIGN RESPONSE
Organic follows the slope of the EAST side of the tread
mid rise building (8 floors) With 15.000 20.000 m² area
STRUCTURE Grid 8 x 8 m Beam
22 | Portfolio by Margaret Yudhia Aditama
Coloumn
Selected works | 2019-2021
DESIGN FEATURES
APARTMENT
ROOFTOP AREA
ARRIVAL AREA
FASAD AREA
DROP-OFF AREA
SPORTS AREA
COMMUNAL SPACE ENTRANCE OF VEHICLE SPORTS AREA ATMOSPHERE (Volleyball Court & Jogging Area) ENTRANCE PEDESTRIAN Selected works | 2019-2021
23 | Portfolio by Margaret Yudhia Aditama
APARTMENT
24 | Portfolio by Margaret Yudhia Aditama
Selected works | 2019-2021
PRELIMINARY DRAWING
APARTMENT
FLOOR PLANS
Selected works | 2019-2021
25 | Portfolio by Margaret Yudhia Aditama
APARTMENT
SECTIONS
TRANSVERSE SECTION
ELONGATED SECTION
ELEVATIONS
NORTH ELEVATION
WEST ELEVATION
EAST ELEVATION
SOUTH ELEVATION
26 | Portfolio by Margaret Yudhia Aditama
Selected works | 2019-2021
APARTMENT
3D ISOMETRY OF EXTERIOR
3D ISOMETRY OF INTERIOR (TYPICAL UNITS)
STUDIO TYPE 1
STUDIO TYPE 2
TYPE 1BR TYPE 2BR
Selected works | 2019-2021
27 | Portfolio by Margaret Yudhia Aditama
UTILITY INTEGRATION
LIFT PENGUNJUNG
TANGGA KEBAKARAN
LIFT SERVIS/BARANG
BERADA DI TENGAH MASSA BANGUNAN, DARI BASEMENT HINGGA LANTAI 10
BERADA PADA 2 SISI BANGUNAN, DENGAN RADIUS <30 M, YANG DILENGKAPI HYDRAN PADA DINDING TANGGA KEBAKARAN
BERADA DI AREA TENGAH MASSA BANGUNAN, DARI BASEMENT 3 HINGGA LANTAI 10
SHAFT MEKANIKAL & ELEKTRIKAL
SKEMA UTILITAS SIRKULASI VERTIKAL
SHAFT SAMPAH
TANGGA DARURAT KEBAKARAN
RUANG SAMPAH JALUR DARURAT MOBIL DAMKAR
MEKANIKAL& ELEKTRIKAL TERDAPAT SHAFT DI SETIAP LANTAI BANGUNAN BERUPA RUANG PANEL LISTRIK
INSTALASI PEMADAM KEBAKARAN
SISTEM PENGHAWAAN SISTEM AC SPLIT PADA TIAP HUNIAN, JUGA SISTEM AC SENTRAL PADA SEPANJANG KORIDOR SERTA GROUND FLOOR. TERHADAP SHAFT AHU PADA TIAP LANTAI
Dilengkapi dengan sprinkler tiap radius 4 m
PENGELOLAAN SAMPAH TERDAPAT SHAFT DI SETIAP LANTAI BANGUNAN, TERDAPAT RUANG TEMPAT BERKUMPULNYA SAMPAH (TPS) PADA GROUND FLOOR YANG DAPAT DIAKSES DARI LUAR BANGUNAN (ENTRANCE SISI BARAT)
SKEMA UTILITAS 2: SISTEM KENYAMAN & SISTEM KEBERSIHAN BANGUNAN
PEMBUANGAN LIMBAH DISTRIBUSI AIR BERSIH AIR BERSIH BERSUMBER DARI SUMUR RESAPAN BAWAH TANAH, KEMUDIAN DITAMPUNG PADA RUANG GROUND WATER TANK DI BASEMENT 1, KEMUDIAN DIPOMPA MENUJU ROOF TANK, LALU DILAKUKAN DISTRIBUSI AIR MELALUI SHAFT-SHAFT TIAP UNIT KAMAR.
KAPASITAS AIR BERSIH JUMLAH UNIT STUDIO : (15unit x 3lt) + (17 unit x 6lt) = 147 unit 1 KT : 11unitx 9lt = 99 unit 2 KT : (6unit x 3lt) + (5unit x 6lt) = 48 unit
AIR LIMBAH-LIMBAH AKAN DIALIRKAN MELALUI SHAFT PLUMBING TIAP UNIT KAMAR, KEMUDIAN DIALIRKAN (DIBELOKKAN) MENUJU BAK KONTROL,LALU RESAPAN UNTUK DIGUNAKAN KEMBALI SEBAGAI AIR FLUSH TOILET, KEMUDIAN SISA KOTORAN AKAN DIBUANG KE SEPTIC TANK
DETAIL PERHITUNGAN SEPTIC TANK VOLUME SEPTIC TANK: JUMLAH PENGGUNA x 75L X 3 HHARI =489 x 75 X 3 = 110.025 liter = 110,025 m^3 Maka, ukuran SEPTIC TANK
p x l x t = 10 x 5 x 3 m
JUMLAH ORANG (S : 1KT : 2KT = 1:2:3) S : 1 x 147unit = 147 orang 1KT : 2 x 99unit= 198 orang 2KT : 3 x 48unit = 144 orang TOTAL = 489 orang 294 unit Kebutuhan air penghuni total: 250 L x JUMLAH PENGHUNI = 250 L x 489orang = 122.250 liter = 122.25 m^3 Maka, ukuran Ground Water Tank: pxlxt=8x5x3m
28 | Portfolio by Margaret Yudhia Aditama
SKEMA UTILITAS 3:
PLUMBING
Selected works | 2019-2021
4.
MIXED-USE BUILDING
A B O U T
P R O J E C T
The rise of global structural changes in various fields has harmed the cities, especially urban decay or a decrease in environmental quality. As an architect, this leads to a design solution in the form of revitalizing the area in designing a building. The solution offered is a mixed-function building in the historic infill area, Cibadak Street. With the construction of this project, it is hoped that it can improve the quality of life of the surrounding community through a more efficient lifestyle which will then affect the revival of the region's face.
Selected works | 2019-2021
29 | Portfolio by Margaret Yudhia Aditama
LOCATION: CIBADAK STREET SUPERVISOR: DR. HANSON E. KUSUMA
D E S I G N
I S S U E S
M A I N I S S U E S Reviving the area due to the problem of urban decay (degradation of environmental quality) D E R I V A T I V E I S S U E S LAND VALUE EFFICIENCY Answered by combining the functions of the first space (residential, namely apartments), second (working space, namely coworking space), and third (public space). PEDESTRIAN PERMEABILITY It answered with four entrance points and accessibility with good way-finding. LOCALITY With a creative container that is socio-petal, open, and centered in the middle of the building.
30 | Portfolio by Margaret Yudhia Aditama
Selected works | 2019-2021
OVERVIEW
MIXED-USE BUILDING
ZONATION
S U B CONCEPT COMPACT-DINAMIS
M A I N CONCEPT
GROUND FLOOR PLAN
COMMERCIAL AREA PUBLIC AREA VEHICLE AREA
& APPLICATION Compact Design Co-living Co-creating Co-working Permeable Pedestrian
DESIGN RESPONSES
ENTRANCE
CIRCULATION & ENTRANCE
PEDESTRIAN ROAD VEHICLE LINE
Selected works | 2019-2021
31 | Portfolio by Margaret Yudhia Aditama
CONCEPT & PROGRAMMMING
MIXED-USE BUILDING
DESIGN CONCEPT
ROOM FUNCTION & PROGRAM IDENTIFICATION
32 | Portfolio by Margaret Yudhia Aditama
Selected works | 2019-2021
DESIGN FEATURES
MIXED-USE BUILDING
VIEW FROM THE NORT (Karang Anyar Street) VIEW FROM THE EAST (Gang Abuya) ROOFTOP AREA (View to the East )
EAST KORIDOR (Pedestrian)
WEST KORIDOR (Pedestrian Trail)
VIEW FROM THE NORTH (Cibadak Street)
Selected works | 2019-2021
PLAZA; CREATIVE SPACE
VIEW FROM THE WEST (Gang Kote)
33 | Portfolio by Margaret Yudhia Aditama
PRELIMINARY DRAWING
MIXED-USE BUILDING
SITE PLAN
UTILITY INTEGRATION
34 | Portfolio by Margaret Yudhia Aditama
Selected works | 2019-2021
MIXED-USE BUILDING
FLOOR PLANS
Selected works | 2019-2021
35 | Portfolio by Margaret Yudhia Aditama
MIXED-USE BUILDING
SECTIONS
SITES
Fasad: adaptive-dynamic Adaptive: Adapting the surrounding material facade motifs, namely tiles. Dynamic: Mass of steps, especially vertically.
36 | Portfolio by Margaret Yudhia Aditama
Selected works | 2019-2021
5.
INTERNSHIP PROJECTS at PDW Architects
INVOLVEMENTS OVERVIEW
JULY - DECEMBER 2021 TIMELINE:
PROJECTS INVOLVEMENT: WORK IN GENERAL: Carry out design development (alternative proposals, including enumeration of site plans) Synthesize report components such as but not limited to diagrams and finalizing data. Analysis (including but not limited to existing conditions, relevant precedents, space requirements.) Research (including but not limited to mood boards, standards.) Technical (including but not limited to 2D, 3D visualization, report layout, proofreading.) Meetings (including but not limited to discussions, coordination, study reports.) GOVERNMENT PROJECTS (RPIP, PRK, DLL): Total 441 working hours (43.28%) Manggarai City Design Guide (PRK) Tanah Abang City Design Guide (PRK) BRT Stop Revitalization BED Intermodal Integration Station in Greater Jakarta West Ancol Depot Development Provincial Industrial Development Plan (RPIP): RPIP Tondano - Tandengan Likri RPIP Tondano - Paleloan, RPIP Tondano - Lap. Sam Ratulangi Final Report PRIVATE PROJECTS (MASTERPLAN, REVITALIZATION, ETC.): Total 536 working hours (52,60%) Masterplan & Landscape of Jonggon Region, East Kalimantan Gunung Sindur Jampang Area Master Plan Jonggon Housing Master Plan Maxxbox Remasterplan (City of Dream) Visioning Integrated Agroforestry Serambut Satiruk (Katingan Mentaya) Cibarusah Master Plan Masterplan for Housing & Mixed-Use Karanganyar, Solo
Involved in 4 projects: BRT Stop Revitalization Masterplan & Landscape of Jonggon Region, East Kalimantan Jonggon Housing Master Plan Coordination Meeting (IAI Award)
JUL
(4 weeks)
Involved in 3 projects: West Ancol Depot Masterplan & Landscape of Jonggon Region, East Kalimantan BRT Stop Revitalization
by doing: Existing condition analysis Visualization (3D Modeling) Presentation Reports (diagram presentation, working on the layouts, etc.) Alternative designs (residential gates, house plans type 35 & 45, etc.) Residential enumeration based on an effective land area
AUG (4 weeks)
by doing: Precedent Analysis Visualization (3D Modeling & 2D Drafting) Meeting minutes Research (related to landscape, space program needs, etc.) Block plan design Presentation Reports (diagram presentation, working on the layouts, etc.)
OTHER PROJECTS: Total 42 working hours (4,12%) QS Program Indication PDW Coordination Meeting (PM-DIR) 2021: IAI Awards UD Team Marketing Others (including but not limited to tenders) Selected works | 2019-2021
37 | Portfolio by Margaret Yudhia Aditama
AT PT Pandega Desain Weharima
JULY - DECEMBER 2021 TIMELINE: Involved in 6 projects: Maxxbox Remasterplan (City of Dream) UD Team Marketing Cibarusah Master Plan RPIP Tondano - Paleloan Intermodal Integration Station in Greater Jakarta BRT Stop Revitalization BED
SEP
(4 weeks)
Involved in 4 projects: Sindur Mount Jampang Area Master Plan Jonggon Housing Master Plan Maxxbox Remasterplan (City of Dream) UD Team Marketing by doing: Analysis (existing [accessibility, activities, landmarks, etc.], precedent, effective land area) Meeting minutes Visualization (3D Modeling, 2D drafting [scene pieces, etc.]) Rendering (residential area) Alternative design (gate & housing icon) Presentation report
38 | Portfolio by Margaret Yudhia Aditama
by doing: Analysis (existing [water flow against contour, accessibility, etc.]) Visualization (3D Modeling, 2D drafting [basemap, scene cuts, etc.]) Research (mood images, existing conditions, etc.) Presentation reports (composing report styles, chart presentations) Alternative designs (amphitheater, etc.) Brainstorming the initial idea/concept of the master plan
OCT (4 weeks)
Involved in 3 projects RPIP Tondano - Paleloan PRK Tanah Abang Masterplan Jampang Area Mount Sindur by doing: Visualization (3D Modeling, 2D schematic drafting: floor plans, scene pieces, etc.) Alternative design (entrance area, public facilities & restaurants, commercial area facade, gate view) Rendering (setting the scene for the presentation report) Presentation Report
NOV (4 weeks)
Involved in 6 projects BED Revitalisasi Halte BRT Masterplan & Landscape of Jonggon Region, East Kalimantan Visioning Integrated Agroforestry Serambut Satiruk (Katingan Mentaya) PRK Manggarai RPIP Tondano - Paleloan QS Program Indication
DEC (3 weeks)
by doing: Visualization (3D Modeling, 2D drafting [basemap, scene cuts, etc.]) Presentation reports (composing report styles, chart presentations, toolbox visualizations) Research (village production results, village data recapitulation, etc.) Alternative designs (RTH, public spaces: bridges, reception plazas, etc.) Synthesis of diagrams (open business space, phasing, public space, utilities, etc.) Render (green area)
Selected works | 2019-2021
RPIP TONDANO Project Name: Provincial Industrial Development Plan (RPIP) - Tondano, Paleloan area
Location : Paleloan Area, Tondano City, North Sulawesi Status : Concept Design Development Supervisor : Jodi A, Luthfie M, Bimo W, Dyah F, Nafian M., Hafid M., Bagus Y. Paleloan
A B O U T P R O J E C T : The Tondano RPIP is directed at developing tourism infrastructure in the Lake Tondano area. This activity aims to provide an instrument that integrates settlement infrastructure development resources. Also, this activity aims to plan documents that are ready to be implemented according to the needs, urgency, or priority, and the authority of the Directorate General of Human Settlements so that settlement infrastructure development can be carried out effectively, efficiently, integrated, and measurably. H I G H L I G H T E D E X P E R I E N C E : Situation: this sub-project requires rapid development, especially in the Paleloan area. The Paleloan area is just added in the middle of the project, so there is no PIC for this project. In the first week, the chosen team was two people, namely 1 Junior Urban Designer and one intern. Task: works intensely with supervisors to assist in detailed development in the urban development of 3D elements and technical presentations and reports. Action: with the initiative to assist the area's development, especially in the early stages of developing the urban element, carefully working on reports and presentation materials and swiftly paying attention to sufficient & suitable description copywriting before the progress report is sent to the client. Result: the team could complete development & report on time & meet report output target.
Selected works | 2019-2021
Courtesy of
A. RPIP TONDANO: PALELOAN (75 HOURS [7,36%])
TRUSTED FOR THE FOLLOWING RESPONSIBILITIES:: 1. Design Developing architecture: resorts, restaurants, local craft displays Develop urban elements: the central plaza (brief: universal design), which integrates with the resort lobby, stage, shelter at the resort entrance, and the main entrance, especially for gate elements with regional ornaments/icons. 2. Technical Work Working on 2D schematic drawings (base map and masterplan) in AutoCAD Revising 3D model technical details from client input & team discussion Perform representative & straightforward rendering of presentation reports Create a presentation report graphic in Adobe Illustrator Develop layouts for presentation reports. 3. Coordination Do briefing and internal discussion with the team and supervisor.
39| Portfolio by Margaret Yudhia Aditama
RPIP TONDANO Project Name: Provincial Industrial Development Plan (RPIP) - Tondano, ,Tandengan Area & Likri Island and Sam Ratulangi Field (181 hours [17,76%])
Location : Tandengan & Likri Island and Sam Ratulangi Field Area, Tondano City, North Sulawesi Status : Concept Design Development Supervisor : Jodi A, Luthfie M, Bimo W, Dyah F, Nafian M., Hafid M., Bagus Y. Tandengan & Pulau Likri
Lapangan Sam Ratulangi
B. RPIP TONDANO: TANDENGAN & PULAU LIKRI
C. RPIP TONDANO: LAPANGAN SAM RATULANGI
(71 HOURS [6,97%])
(19 HOURS [1,86%])
TRUSTED FOR THE FOLLOWING RESPONSIBILITIES: 1. Design Develop three alternative amphitheater designs in the central plaza Develop public facilities (restaurants and toilets), especially on the roof design 2. Analysis & Synthesis Creating an accessibility map from the masterplan 3. Research Looking for mood images for presentation reports 4. Technical Work Working on a base map: a zoning map from the master plan that the team has developed Revising 3D model technical details from client input & team discussion. Working on 2D schematic drawings (4 pieces visible) in AutoCAD 5. Coordination Briefing & discussion with internal team Minutes of the workshop preparation meeting & public consultation Also, providing advice on the efficiency of access to Likri Island in the bridge area. 40| Portfolio by Margaret Yudhia Aditama
TRUSTED FOR THE FOLLOWING RESPONSIBILITIES: 1. Design Develop bridge areas, docks, amphitheaters, and green open spaces in the form of 3D models on Sketch Up 2. Technical Work Working on 2D schematic drawings of the entrance area (plans and sections) in AutoCAD
D. FINAL REPORT OF RPIP TONDANO (16 HOURS [1,57%])
TRUSTED FOR THE FOLLOWING RESPONSIBILITIES: 1. Technical Work Working on 2D schematic drawings of the entrance area (plans and sections) in AutoCAD Working on the general RPIP report (measurement reports and general reports on the preparation of the RPIP in several areas in Tondano, from the framework to the contents of the report).
Courtesy of
Selected works | 2019-2021
PANDUAN RANCANG KOTA Project Name: Manggarai & Tanah Abang City Design Guide (PRK) 106,5 hours [10,5%])
Location : Manggarai & Tanah Abang Status : Development Design Proposal Supervisor : Prinka C, Bimo W. Tanah Abang
Manggarai
HIGHLIGHTED EXPERIENCE: Situation: this is a sub-project just in the middle of the project, so there is no PIC at first. Simultaneously with the start of this A B O U T P R O J E C T : The Urban Design Guide (CRP) is a design guide and a control tool for large-scale project, I am also currently involved in development. The main objective is to ensure that the city design concept can realize other PDW projects. the final results of building and environmental design. Task: at Manggarai, I assisted the T R U S T E D F O R T H E F O L L O W I N G R E S P O N S I B I L I T I E S : supervisor with initial analysis to syntheses in diagrams on a macro scale. At Tanah 1. Design Abang, I assisted in developing urban Designing a commercial facade for the Tanah Abang area elements in 3D models. I was also Creating the landscape of the several regions of Tanah Abang responsible for the neatness of the 3D 2. Analysis & Synthesis Compile the following diagrams in the Manggarai report: green open spaces, models provided to the 3D visualizer. PRK: MANGGARAI & TANAH ABANG PRK MANGGARAI : 36 HOURS [3,53%] PRK TANAH ABANG : 60,5 HOURS [5,94%]
public spaces (bridges, receiving plazas, active frontage, etc.), development phasing, maps of affordable business spaces, Defines a slice of the atmosphere in the central atrium area of Tanah Abang 3. Analysis Looking for 45 mood images for the Manggarai report Compile the following analysis diagrams in the Manggarai report: land availability, clean water utility, drainage, and wastewater. 4. Technical Work Tidying up the 3D model of the Tanah Abang & Manggarai area Working on pieces & schematic looks for the Tanah Abang entrance 5. Coordination Conducting an internal briefing on the PRK framework Conduct discussions (assistance) regarding the progress that has been made.
Selected works | 2019-2021
Courtesy of
Action: due to limited time and team human resources, I try to work quickly & deftly on the tasks of my supervisor. I also learned to divide my time and priorities in working on several projects simultaneously. Result: the team can complete the development & meet the progress target of the senior urban designer, which we would submit in the form of a weekly report to the client.
41| Portfolio by Margaret Yudhia Aditama
MASTERPLAN GUNUNG SINDUR Project Name: Sindur Mount Jampang Area Master Plan (86 hours [8,44 %])
Location : Manggarai & Tanah Abang Status : Development Design Proposal Supervisor : Prinka C, Bimo W.
A B O U T P R O J E C T : This project is a mixed-use development between an eco-industrial area and the lives of residents in a dynamic residential, public and commercial space. The project strategy is network planning based around waterways (blue) and green infrastructure. The network planning aims to create an environmentally friendly urban environment and prevent the threat of future flooding and labor impacts from climate change. H I G H L I G H T E D E X P E R I E N C E : Situation: the time available is very tight, so additional team members are needed. In the end, the team formed was 4 people with 3 Junior Urban Designers and 1 intern, which was me. The demands of this condition are a fairly solid work phase and require an agile and initiative team. Task: I am doing things directed by the supervisor and providing input if there is an opportunity. Action: in this project, the main work for internal positions is directed at more technical matters. However, seeing the density of work made me take the initiative to offer assistance and also provide input during internal discussions. Result: the team can collect reports and make presentations on time and according to the target table of contents.
42| Portfolio by Margaret Yudhia Aditama
Courtesy of
TRUSTED FOR THE FOLLOWING RESPONSIBILITIES: 1. Design Enumerating the site plan for residential areas based on unit efficiency of 60% (compiling urban components such as road details, green open spaces, as well as public & social facilities comprehensively) Designing typical housing units (type 34 & 45). 2. Analysis & Synthesis Calculating the effective land area per cluster Working on the base map with the latest plan (revised meeting with clients) 3. Technical Work Tidy up 3D models in Sketch Up Residential area rendering Tidy up the 2D model in AutoCAD and then create a base map in Adobe Illustrator 4. Coordination Conduct workshops (discussions) with internal & external teams (other consultants) Taking minutes of meetings with clients
Selected works | 2019-2021
MASTERPLAN JONGGON Project Name: Masterplan & Landscape for Jonggon Region, East Kalimantan (151 hours [14,82%])
Location : Jonggon, East Kalimantan Status : Conceptual Masterplan Supervisor : Bimo W., Nurul A., Hafid M.
A B O U T P R O J E C T : This area is planned to have residential, commercial, plantation, and livestock functions for public and other supporting facilities. Based on the 2013-2033 RTRW of Kutai Kartanegara Regency, the planning area is divided into three areas, namely plantation areas, dryland agricultural areas, and transmigration areas that dominate the land within the design limits. HIGHLIGHTED EXPERIENCE: Situation: This project was a relatively new project at PDW when I joined. The team formed consists of 4 people, namely 3 Junior Urban Designers and one intern. Task: In this project, the intern is more assigned to analytical and synthesis work and technical work. Action: Since I joined early in the project, I followed the project brief from the start, so when there is discussion, and I have input, I try to give it. When my work is done, I try to offer help to other team members in critical moments. Result: The team could collect reports and make presentations according to the target time & content. The team can also provide a solid basis for my proposed research synthesis. Selected works | 2019-2021
TRUSTED FOR THE FOLLOWING RESPONSIBILITIES: 1. Develop Concept Develop sub-concepts: agroforestry, storm-water, and integration between shelter & landscape Develop sub-concepts: agritourism, community empowerment, sustainable industry) 2. Research Studies related to revitalizing ex-mining land into plantation areas Study of regulation of processing & storage of plantation & livestock products in general Study on the regulation & processing of plantation products (chocolate, palm sugar, durian, mango, corn) Further studies on space requirements per plantation, agricultural and livestock products Study on plantation behavior towards zoning development. 3. Analysis & Synthesis Working on macro, meso, and micro analysis with the team Working on 6 case studies relevant to the functions of plantations, agriculture, and livestock 4. Technical Work Perform 3D visualization for contour, toolbox, and base map Doing detailed 2D schematic with its elements (path width, delineation, etc.) Work on report layout, tidying, completing, and rechecking before submitting to clients. 5. Coordination Conduct internal team discussions & coordination Follow & take notes on coordination with clients Courtesy of
43| Portfolio by Margaret Yudhia Aditama
VISIONING INTEGRATED AGROFORESTRY SERAMBUT SATIRUK (KATINGAN MENTAYA) (182 hours [17,86%])
INVOLVEMENTS: 1. Analysis & Synthesis: Completing client data to detect the production potential of each village in Hanaut Island Subdistrict (±10 villages) using a grounded theory analysis method Compile a table of potential derivative products in agriculture, plantations, fisheries, animal husbandry; with derivative products, users, etc 2. Research: Studies related to production potential in villages in Hanaut Island Subdistrict and its surroundings 3. Coordination Briefing & discussion with internal team.
REMASTERPLAN 'PROYEK M' (182 hours [17,86%])
INVOLVEMENTS: 1. Design Enumerating housing site plans with an effective land area of 60-40 and 3 cluster typologies 2. Analysis & Synthesis: Analyzing meso (accessibility, activities, landmarks, SWOT) Looking for seven housing case studies in the golf area 3. Research: Conduct research on GBCI and its potential application to projects Conduct studies related to golf area housing standards Looking for relevant mood images related to the concept 4. Technical Work Doing layout, refining, rechecking reports Working on existing base in 3D Sketch Up model Working on 2D schematic drawings in AutoCAD & Adobe Illustrator (3 pieces, five elevations) 5. Coordination Briefing and discussion with the team
44| Portfolio by Margaret Yudhia Aditama
Courtesy of
Selected works | 2019-2021
JONGGON REAL ESTATE MASTERPLAN (28 hours [2,75%]) INVOLVEMENTS: 1. Research: Studies related to the proposed mood image for gate references and housing icons. 2. Design Develop two alternative residential gate designs Develop a typical house design type 36 and 45. 3. Coordination Briefing and discussion with the supervisor.
QS PROGRAM INDICATION: MITJ 03 (14 hours [1,37%])
INVOLVEMENTS: 1. Design Develop alternative bridge designs in the waterfront area: bridge structures, amphitheaters, urban components (chairs with shady trees), street vendors, etc., following standard of analysis & program proposals that have been carried out, namely functions and activities, intensity, materials, pedestrians, bicycle paths, street furniture, and landscapes. 2. Coordination Task reduction briefing & discussion on progress.
Selected works | 2019-2021
Courtesy of
45| Portfolio by Margaret Yudhia Aditama
INTER MODE INTEGRATION STATION IN JABODETABEK (52,5 hours [5,15%])
INVOLVEMENTS: 1. Analysis & Synthesis: Prepare reports related to customer segments (circulation matrix & 3 types of users) Creating a priority matrix Identify the guiding components used in the report. 2. Technical Work Revising 3D Modeling in Sketch Up Working on report layouts. 3. Coordination Briefing and discussion with the supervisor.
BED REVITALITATION HALTE BRT (85 hours [8,34%])
INVOLVEMENTS: 1. Analysis & Synthesis: Analyzing the existing block plan ±20 Transjakarta bus stops. 2. Design Designing block plan of ±20 Transjakarta bus stops. 3. Technical Work Plotting the stop map on five typologies. Working on a base 3D model of 23 Transjakarta bus stops' (ASMI, Pecenongan, Rawa Buaya, New Bridge, City Park, etc.) shelters. 4. Coordination Briefing and internal discussion.
46| Portfolio by Margaret Yudhia Aditama
Courtesy of
Selected works | 2019-2021
THE RIVERA AT PURI (IAI AWARDS) (12 hours [1,18%])
INVOLVEMENTS: 1. Analysis & Synthesis: Studying The Rivera At Puri documents, sorting documents, and compiling sentences in English for IAI Awards submissions. 2. Technical Work Work on the layout according to the provisions of the IAI Awards submission.
MASTERPLAN MIXED-USE SOLO (8 hours [0,79%])
INVOLVEMENTS: 1. Design: Work on a site plan in the lifestyle center area. (8. Area Komersial on the legenda) in the form of 2D detail schematic.
Selected works | 2019-2021
DEPO ANCOL BARAT (12 hours [1,18%])
INVOLVEMENTS: 1. Analysis & Synthesis: Looking for relevant case studies & analyzing two alternative master plans, Federation Square and The Shard. Case study analysis components: existing conditions, accessibility, program facilities, linkage, and interchange. 2. Technical Work Work on report layout & graphics.
MASTERPLAN CIBARUSAH (38 hours [3,73%])
INVOLVEMENTS 1. Analysis & Synthesis: Analyzing the direction of water flow (upstream to downstream) and potential water collection points (concave area/downstream points) from the existing contours. 2. Technical Work Work on analytical graphics in Adobe Illustrator.
Courtesy of
47| Portfolio by Margaret Yudhia Aditama
6.
OTHER PROJECTS ARCHITECTURES
ART-SPACE (GALLERY & COMMERCIAL) PARAHYANGAN NEW CITY, BANDUNG | Individual Project
SHAPE CHANGES & SHELTER STRUCTURE: RECIPROCAL STRUCTURE | Individual Project
STEM SYSTEM ELABORATION | Collaboration with Anifa Farah, Yodha S. Nava Ivana. 48| Portfolio by Margaret Yudhia Aditama
ADVANCED WOOD CONSTRUCTION | Collaboration with Yolanda Virgin and Kevin Mochamad
ADVANCED STEEL CONSTRUCTION | Collaboration with Yolanda Virgin and Kevin Mochamad
FORM-ACTIVE STRUCTURE | Collaboration with Salsabila Ditrasti, Asia Lutfhia, Anifa Farah
Courtesy of
Selected works | 2019-2021
7.
OTHER WORKS EVENTS
GAUNG BANDUNG 2020
Collaboration Event | Contribute as a Head of Materials and Method (Concept and Organization of Events)
Gaung Bandung is an annual activity held by the Gunadharma Architecture Student Association (IMA-G) ITB since 2011. Departing from concerns regarding the concept of a Livable City in Bandung, Gaung Bandung started a movement in the community realm with the theme Placemaking.
Against the background of the digital era and adaptation to the COVID-19 pandemic, the Gaung Bandung 2020 team tried to redefine the identity of Gaung Bandung. The primary strategy implemented is to maximize the potential for city development and minimize obstacles from the analysis of existing data, especially regarding the status of Bandung as a livable city. Discussions about the implementation of Bandung as a livable city can never be separated from Bandung as a creative city. So, our focus is on one element of the livable-friendly city, namely the development of Bandung as a creative city.
Seeing Bandung as a creative city, our main topic consists of 3 elements: people, place, and ideas. We interact with the people of Bandung by spreading discussions around and using the placemaking method. These activities are: Webinar Series Competition (architecture and photography) Online exhibition Augmented Reality Launch
Around 300-400 participants attended each webinar and 117 participants attended the competition. www.gaungbandung.com
Pameran Daring dan Peluncuran Augmented Reality
bit.ly/JurnalGB2020
Selected works | 2019-2021
Courtesy of
MORE ABOUT ACTIVITIES & ARCHIVES: bit.ly/JurnalGB2020 gaungbandung.com instagram.com/gaungbandung 49| Portfolio by Margaret Yudhia Aditama
EVENTS
COLORED GLASS 2021
Collaboration Event | Contribution: Head of Events (Research, Organization, and Technical of Events)
Colored Glass 2021 is a series of Artepolis activities carried out as part of the AR4057 elective course, with the Special Topic: People, Environment, and Placemaking.
Activities are held on a hybrid way (offline & online). In an offline way, this activity is carried out in Cihapit with the number of participants and committee in groups of no more than ten people and, of course, according to health protocols for COVID-19.
This activity directly applies theories related to this particular topic, especially placemaking. The application of placemaking itself is supported by scientific theories related to placemaking, especially The Power of 10 theory (placemaking.chicago) and 4 Placemaking Parameters (pps.org). These theories are applied with exploring the activity in the Cihapit area with curated spots and methods that might increase the intensity of the user's placemaking. These methods include: - QR Code (contains trivia of each place/spot) - Placemaking Booth (to rate a place/spot) - Workbook, with contents as shown below.
WORKBOOK Colored Glass contains questions related to placemaking in Cihapit and its surroundings. Dokumentasi Kegiatan Luring Colored Glass
The activity is also conducted with an online tour using the Google Earth platform that the committee has prepared. The points that become online tour spots are the same as offline tours. The feedback obtained from this activity was very good; that is, almost all participants felt happy because it was like finding a 'hidden gem' in the bustle of the city of Bandung. However, the participants were unfortunate because the activities took place very quickly due to time constraints. It is a win-win solution related to the implementation of placemaking. These places give special meaning to the participants so that they want to come back and feel the atmosphere of the places in Cihapit. More about activities: instagram.com/coloredglass.aritb
Workbook Colored Glass
50| Portfolio by Margaret Yudhia Aditama
Courtesy of
Selected works | 2019-2021
PHOTOGRAPH(S) SHOOT
PHOTOBOOK SERIES:
ON THE SPOT
"SELF-DEMON"
Selected works | 2019-2021
Courtesy of
51| Portfolio by Margaret Yudhia Aditama
GRAPHICS CAMPUS CINEMAS (YEARLY EVENT OF LIGA FILM MAHASISWA, A STUDENT ACTIVITY UNITS)
THEME: 'KURASI JAMAN'
VAKANSY.CO ((TRAVEL PUBLICATION COMPANY THAT PROMOTES THE BEAUTY OF INDONESIA))
CONTRIBUTION: MAGAZINE & SOCIAL MEDIA CONTENT ON JUNI - AGUSTUS 2020
52| Portfolio by Margaret Yudhia Aditama
Courtesy of
Selected works | 2019-2021
This page is purposely left blank dedicated to our projects together.
Thank you, I hope we can get along to work together.
+62 857 7947 3193 margaretyudhiaditama@gmail.com
MARGARET Y. ADITAMA +62 857 7947 3193 margaretyudhiaditama@gmail.com