MARIAJOSE MEZA
2021 PORTFOLIO
Mariajose Meza 2827 S. La Brea Ave. Apt#12 Los Angeles, CA 90016 Cell: (323) 359-9012 E-mail: mariajose3meza@gmail.com
Summary: Presented my thesis alongside my work partner in April 2019, worked as an Assistant Teacher for SCI-Arc’s summer program DID in June 2019, Graduated with distinction from SCI-Arc in September 2019, started working at Oyler Wu Collaborative as Manager for their sub-company LACE by Jenny Wu in August 2019. Education: 2014 - 2019 B.Arch Bachelors of Architecture Southern California Institute of Architecture - Los Angeles, CA GPA: 3.80 Graduated with Distinction 2010-2014 High School Diploma: Academy of Engineering University Senior High School - Los Angeles, CA G.P.A: 4.2 Top 10% of Class Enrichment Programs: 2013 Summer D.I.D- Design Immersion Days 2010 - 2014 A.C.E- Architecture, Construction, Engineering 2008 Fall & Spring M.E.S.A- Mathematics, Engineering, Science, Achievement
2
ACADEMIC WORK
Work Experience: August 2019-Current Oyler Wu Collaborative LACE by Jenny Wu Brand Manager -In charge of everything related to production and marketing of the company . -Planning e-mail campaigns, website collections, landing pages, IG posts and stories. -Manage every day tasks including customer service, sales, packing & shipping orders. -Keeping a fast order fulfillment turn around -Assisting customers and working around their budget and timeline. -Preparing for live events like WestEdge Design Fair, PTTOW, & LUXUREA -Brainstorming, prototyping and modeling new jewelry designs. -Designing website pages, curating & writing blog posts, overall website navigation (Shopify). Summer 2019 Southern California Institute of Architecture Assistant Teacher for Summer Program: Design Immersion Days (DID) -Giving students introductory tutorials to Rhino 2D & 3D, Adobe Photoshop, & Illustrator. -Provided additional assistance to students in further developing their ideas & designs. Alexandra Loew Inc. 3D Modeling Freelancer -Responsible for digitally modeling a bathroom & living room space for a project in Paris. -3D modeled custom, readily available furniture & existing spaces for a 360° VR experience. Summer 2017 Alexandra Loew Inc. Interior Design Freelancer -Responsible for digitally designing and replicating interior materials. -Rendered and modeled custom materials and hardware. Fall 2016 - Spring 2019 Southern California Institute of Architecture Admissions Office Assistant -Responsible for researching and developing a local housing map for incoming students. -Assisted in filing and documenting incoming and potential student’s information onto the school system. 3
MARIAJOSE MEZA
Skills: -Fast Learner -Detail Oriented -Motivated -Problem Solver -Cooperative -Responsible -Hard Working -Communicative Software Skills: -Rhinoceros -Revit -Google Sketch-Up -Adobe Illustrator -Adobe Photoshop -Adobe InDesign -Microsoft Office -V-ray (rendering) -KeyShot (rendering) -Maya (basic 3D modeling) -Klaviyo (email campaigns) -Shopify (website designs) -Canva (graphic designs) Languages: -English -Spanish
Academic Work 2014-2019
4
Contents 01 02 03 04 05
WeWork, WeLive, WePlay Mixed Use Space WeWork Offices Library Hotel & Office
5
pg.6 pg.22 pg.32 pg.38 pg.54
2021 PORTFOLIO Site Axon
6
ACADEMIC
01 We Work, We Live, We Play Site: New York City, New York Software: Rhino 3D, V-Ray, Adobe Photoshop, Adobe Illustrator Collaborators: Christopher Becerra Thesis Advisor: Jenny Wu
Project Description: Our project is located in the lower east side of Manhattan and consists of both WeWork offices and WeLive communal housing. Our thesis explores the tension between the mundane monolith and the vibrant inefficiency of play. Our objective is to disrupt the mundane, repetitive nature of the tower typology and create a dialogue between the stable line and unstable figure. The thick inhabitable facade is composed of distinct worlds, each developing its own character and in return reflecting its own program. By pushing the communal activities to the exterior of the tower, we are building a visual connection between the activity occurring inside and contextual forces outside. This establishes an extroverted approach to combat the highly privatized New York realm. This extroverted presence takes the tenants and turns them into performers in an urban theater. Today, the sharing economy is thriving more than ever, the community-oriented systems are rapidly replacing privatization. Companies like Airbnb and Uber are sharing resources that otherwise would have been exclusive. In a similar fashion, the concept behind WeLive is to share experiences. Our objective is to incentivize interactions by blurring the line between what’s considered communal and private activities. In order to do this, the program is spread throughout the floors to encourage people to circulate beyond your neighborhood floor. Every living unit is supplied with only essential resources to push people out of isolation. By shuffling the program throughout the tower creates a variety of social conditions that cater to different lifestyles. As the tower rises, it undergoes an inverted formal shift. On the facade, the fragmented parts become a whole and exterior pieces become swallowed by the volume of the tower. 7
2021 PORTFOLIO
te Plan
Water Street
South Street FDR Drive
8
John Street
Maiden Lane
Wall Street Front Street
ACADEMIC
Level 11: WeLive- Living Units, Diving Pool, Skate Park, Rock Climbing Gym
A
B
C
D
E
F
Level 1: Lobby- Reception, Public Forum, Cafe, Gallery Space, Grocery Store
1
2
3
4
9
5
6
Plans 1/16” = 1’
F
2021 PORTFOLIO
Level 16: WeLive & WeWork- Living Units, Working Spaces, Pool, Aerial Studio
A
B
C
D
E
F
Level 11: WeLive- Living Units, Diving Pool, Skate Park, Rock Climbing Gym
10
A
ACADEMIC
Level 31: WeWork- Open Office Floor Plan, Conference Rooms, Auditorium
A
B
C
D
E
F
Level 16: WeLive & WeWork- Living Units, Working Spaces, Pool, Aerial Studio
11 A
F
2021 PORTFOLIO
Level 33: WeLive- Living Units, Gym, Activity Room
A
B
C
D
E
F
Level 31: WeWork- Open Office Floor Plan, Conference Rooms, Auditorium
12 A
ACADEMIC
A
B
C
D
E
F
Level 33: WeLive- Living Units, Gym, Activity Room
13 A
14 Nineteenth Floor +155’-0” ft
Twentieth Floor +170’-0” ft
Twenty-first Floor +185’-0” ft
Twenty-second Floor +200’-0” ft
Twenty-third Floor +215’-0” ft
Twenty-fourth Floor +230’-0” ft
Twenty-fifth Floor +245’-0” ft
Twenty-sixth Floor +260’-0” ft
Twenty-seventh Floor +275’-0” ft
Twenty-eighth Floor +290’-0” ft
Twenty-ninth Floor +305’-0” ft
Thirtieth Floor +320’-0” ft
Thirty-first Floor +335’-0” ft
Thirty-second Floor +350’-0” ft
Thirty-third Floor +365’-0” ft
Thirty-fourth Floor +380’-0” ft
Thirty-fifth Floor +395’-0” ft
Thirty-sixth Floor +410’-0” ft
Rooftop +425’-0”
2021 PORTFOLIO
15 Basement Floor 2 -20’-0”
Basement Floor 1 -10’-0”
Ground Floor +0’-0” ft
First Floor +15’-0” ft
Second Floor +30’-0” ft
Third Floor +45’-0” ft
Fourth Floor +60’-0” ft
Fifth Floor +75’-0” ft
Sixth Floor +90’-0” ft
Seventh Floor +105’-0” ft
Eighth Floor +105’-0” ft
Ninth Floor +120’-0” ft
Tenth Floor +135’-0” ft
Eleventh Floor +150’-0” ft
Twelfth Floor +165’-0” ft
Thirteenth Floor +165’-0” ft
Fourteenth Floor +180’-0” ft
Fifteenth Floor +195’-0” ft
Sixteenth Floor +110’-0” ft
Seventeenth Floor +125’-0” ft
Eighteenth Floor +140’-0” ft
Section 3/32”=1’
ACADEMIC
2021 PORTFOLIO
F
E
D
C
4 3 2
1
16
Exploded Axon
ACADEMIC
17
2021 PORTFOLIO
20
ACADEMIC
21
2021 PORTFOLIO
3D View 3 1
Cons Addre Addre Phon Fax: ( e-ma
Cons Addre Addre Phon Fax: ( e-ma
22
Cons Addre
ACADEMIC
02
Mixed Use Office, Retail, & Residential Space Site: Los Angeles, California Software: Revit Collaborators: Christopher Becerra, Sarah Carcamo, Emma Manguy Instructor: Pavel Getov & David Ross Project Description: For this project my team members and I decided to design a building that had a strong presence on the street. The facade is mostly a curtain wall with FRP panels that mimick the look of concrete. Looking at the building longitudinally and “splitting” it in half we lifted the first floor allowing for a parking entrance and an exterior cafe. The first floor serves as a small cafe, a gallery, and a lobby. The second floor is office space and the third floor contains 1-bedroom apartments and lofts with an exterior communal area.
23
MARIAJOSE MEZA
2021 PORTFOLIO
2
3
4
5
6
7
8
9
10
11
12
Glass Rooftop Access Port
1 A-2.2
1101 S B
4'X8" FRP PANELS
Roof 39' - 0"
3.5'x5' Operable Ribbon Window Panel
3.5'x5' Operable Ribbon Window Panel Exterior Patio Access Door
Exterior Aluminum Hand Railing 1
A-2.1
Level 3 27' - 0"
1.5"x2.5" Window Mullion
Consultant: Soil En Address: 1423 S. B Address: Los Ange Phone: (310) 429-6 Fax: (310) 429-668 e-mail: jonathanmil
4'x8' FRP Panels
Level 2 15' - 0" 6'x6' Exterior Window Panels
Consultant: MEP S Address: 510 West Address: Los Ange Phone: (213) 254-4 Fax: (213) 254-475 e-mail: AustinAllen@
Consultant Structur Address: 888 S. Fig Address: Los Ange Phone: (323) 733-6 Fax: (323) 733-667 e-mail: la@englekir
Main Lobby Entrance Exterior Cafe Patio
Consultant: Landsc Address: 185 S My Address: Los Ange Phone: (213) 384-3 Fax: (213) 384-383 e-mail: office@stud
Exterior Cafe Tables
Level 1 0' - 0"
Consultant: Civil En Address: 5200 Wes Address: Los Ange Phone: (310) 645-3 Fax: (310) 645-320 e-mail: info@whitso
No. Parking -11' - 6"
NORT 1 A-2.2
North 1
1/4" = 1'-0"
24
ACADEMIC
F
E
D
C
B
Glass Rooftop Access Port
A 1 A-2.0
4'X8" FRP PANELS
Roof 39' - 0"
3.5'x5' Operable Ribbon Window Panel
Sloped Glazing System
Level 3 27' - 0" 6'x6' Exterior Window Panels
Level 2 15' - 0"
Exterior Stucco Wall Exterior Cafe Extrance Exterior Cafe Tables
Level 1 0' - 0"
Basement Parking -11' - 6"
1 A-2.0
25 East
2021 PORTFOLIO
2
3
4
5
6
7
8
9
10
11
1
Glass Rooftop Access Port
1
12
A-2.1
1101
A-2.2
Roof Drainage Slope
Roof 39' - 0"
APARTMENT
APARTMENT
320
330
DINING TERRACE
14' - 0"
Exterior Aluminium Hand Rail
12' - 0"
Exterior Patio Access Door
Consultant: Land Address: 185 S M Address: Los An Phone: (213) 38 Fax: (213) 384-3 e-mail: office@s
Interior Hand Rails MEZZANINE
CONFERENCE ROOM
CONFERENCE ROOM
270
280
12' - 0"
Level 3 27' - 0"
Interior Hand Rails MEZZANINE
Consultant: MEP Address: 510 W Address: Los An Phone: (213) 25 Fax: (213) 254-4 e-mail: AustinAll
Level 2 15' - 0"
16' - 6"
1 A-2.3
DINING PATIO
LOBBY
762 SqFt
762 SqFt
10' - 1 1/32"
6' - 6 13/16"
Level 1 0' - 0"
9' - 0"
Consultant Struc Address: 888 S. Address: Los An Phone: (323) 73 Fax: (323) 733-6 e-mail: la@engle
Consultant: Civil Address: 5200 W Address: Los An Phone: (310) 64 Fax: (310) 645-3 e-mail: info@wh
PARKING ENTRY
GARAGE
Consultant: Soil Address: 1423 S Address: Los An Phone: (310) 42 Fax: (310) 429-6 e-mail: jonathanm
No.
Parking -11' - 6" 48' - 0"
LONGIT
1
1
A-2.1
A-2.2
Section 2 1 1/4" = 1'-0"
26
ACADEMIC
$
6
&: $
$
/2%%<
$
83
/2%%< 6T)W
$
&RQVXOWDQW /DQGVF $GGUHVV 6 0\ $GGUHVV /RV $QJH 3KRQH )D[ H PDLO RIILFH#VWXG
%
&RQVXOWDQW 6RLO (Q $GGUHVV 6 % $GGUHVV /RV $QJH 3KRQH )D[ H PDLO MRQDWKDQPL
83
&
&RQVXOWDQW 0(3 6 $GGUHVV :HV $GGUHVV /RV $QJH 3KRQH )D[ H PDLO $XVWLQ$OOHQ
6T)W
&RQVXOWDQW &LYLO ( $GGUHVV :H $GGUHVV /RV $QJH 3KRQH )D[ H PDLO LQIR#ZKLWV
( $
&$)(
6T)W
$
$
*$//(5<
&RQVXOWDQW 6WUXFWX $GGUHVV 6 )L $GGUHVV /RV $QJH 3KRQH )D[ H PDLO OD#HQJOHNL
:$ $
'1
'
83
)
1R
$
:$// 7<3( $
27
:$// 7<3( &
:$// 7<3( )
),5
2021 PORTFOLIO
6
&: $
&: $
$
$
'1
$
$
%
&: $
6T)W '1
6T)W
&
:$ $
&RQVXOWDQW 0(3 6 $GGUHVV :HV $GGUHVV /RV $QJH 3KRQH )D[ H PDLO $XVWLQ$OOHQ
83
$
'
'1
83
2)),&( 6T)W
2)),&( 6T)W
6T)W
2)),&( 6T)W
.,7&+(1
$
6833/< 5220
6T)W
5(675220
5(675220
(
$
:$ $
:$ $
:$ $
:$ $
&RQVXOWDQW 6RLO (Q $GGUHVV 6 % $GGUHVV /RV $QJH 3KRQH )D[ H PDLO MRQDWKDQPL
:$ $
&RQVXOWDQW /DQGV $GGUHVV 6 0\ $GGUHVV /RV $QJH 3KRQH )D[ H PDLO RIILFH#VWX
&21)(5(1&( 5220
&21)(5(1&( 5220
&RQVXOWDQW 6WUXFWX $GGUHVV 6 ) $GGUHVV /RV $QJH 3KRQH )D[ H PDLO OD#HQJOHN
&RQVXOWDQW &LYLO ( $GGUHVV :H $GGUHVV /RV $QJH 3KRQH )D[ H PDLO LQIR#ZKLWV
$
1R
$
:$// 7<3( $
:$// 7<3( &
:$// 7<3( (
:$// 7<3( )
6(&
28 /HYHO
ACADEMIC
$
6/23(' &857$,1 :$//
+$1'5$,/
6T)W
:$ $
&
:$ $
&RQVXOWDQW /DQG $GGUHVV 6 0 $GGUHVV /RV $Q 3KRQH )D[ H PDLO RIILFH#VW
6T)W
5220
%
$3$570(17
$3$570(17
6T)W
5220
5220
&RQVXOWDQW 6WUXF $GGUHVV 6 $GGUHVV /RV $Q 3KRQH )D[ H PDLO OD#HQJOH
&RQVXOWDQW &LYLO $GGUHVV : $GGUHVV /RV $Q 3KRQH )D[ H PDLO LQIR#ZKL
6T)W
(
678',2 $3$570(17
:$ &
:$ &
'1
$
:$ $
5220
'
'1
:$ $
:$ $
5220
$
$
:$ $
&RQVXOWDQW 6RLO ( $GGUHVV 6 $GGUHVV /RV $Q 3KRQH )D[ H PDLO MRQDWKDQP
&RQVXOWDQW 0(3 $GGUHVV :H $GGUHVV /RV $Q 3KRQH )D[ H PDLO $XVWLQ$OOH
6T)W
287'225 $5($
5220
$3$570(17
5220
5220
$
1R
$
:$// 7<3( $
29
:$// 7<3( &
:$// 7<3( '
:$// 7<3( )
7+
/HYHO
2021 PORTFOLIO
; :' +($'(5
; :' +($'(5
; :' +($'(5
; :' +($'(5
; :' +($'(5
; :' 678' 63$&(' 2 &
*<3 %'
*<3 %'
%$77( ,168/$7,21
%$77( ,168/$7,21
,17(5,25
,17(5,25
,17(5,25
,17(5,25 ,17(5,25
; :' +($'(5
,17(5,25 ,17(5,25
,17(5,25
,17(5,25
,17(5,25 ; :' +($'(5 ,17(5,25
; :' 678' 63$&(' 2 &
*<3 %'
:$// 7<3( %
,17(5,25
678'
3/<:22' 6+($7+,1* ;
6721( )/225 ),1,6+ $,5 *$3 &21&5(7( '(&.,1*
*<3 %' 0(7$/ 678'
$/80,1,80 6,// 08//,21
$/80,1,80 6,// 08//,21 ,168/$7,21 3/<:22' 6+($7+,1* ;
$,5 *$3
:$// 7<3( %
'28%/( */$=(' /2: ( */$66
:$7(53522) %$55,(5 6833257 )5$0(
0(7$/ /$7+
0(7$/ /$7+
)53 ; 3$1(/6
)53 ; 3$1(/6
9$325 %$55,(5
:$// 7<3( %
(;7(5,25
5811(5 &+$11(/6
:$// 7<3( & '28%/( */$=(' /2: ( */$66 )53 %5$&.(7 :$7(53522) %$55,(5 6833257 )5$0( 0(7$/ /$7+ )53 ; 3$1(/6
9$325 %$55,(5
,17(5,25
5811(5 &+$11(/6
678'
)53 %5$&.(7
9$325 %$55,(5 :$// 7<3( &
(;7(5,25 ,17(5,25
(;7(5,25 6758&785$/ %($0 $1' &2/801
6758&785$/ %($0 $1' &2/801
678' 5811(5 &+$11(/6 ,168/$7,21
5811(5 &+$11(/6
,17(5,25
3/<:22' 6+($7+,1* ;
,17(5,25
5811(5 &+$11(/6
(;7(5,25
(;7(5,25
,17(5,25
$,5 *$3
*<3 %'
(;7 :$// : )53 3$1(/
678' )53 %5$&.(7
(;7 :$// : )53 3$1(/
,168/$7,21
:$7(53522) %$55,(5 6833257 )5$0( 3/<:22' 6+($7+,1* ;
0(7$/ /$7+ $,5 *$3 )53 ; 3$1(/6
:$// 7<3( '
6RXWK 5REHUWVRQ %RXOHYDUG
&RQVXOWDQW 6RLO (QJLQHHU %D\ &LW\ *HRORJ\ $GGUHVV 6 %HYHUO\ *OHQ %OYG % 5811(5 &+$11(/6 $GGUHVV /RV $QJHOHV &$ 3KRQH )D[ H PDLO MRQDWKDQPLOOHU#ED\FLW\JHRORJ\ FRP
6RXWK 5REHUWVRQ %RXOHYDUG 6&, $5&
&RQVXOWDQW /DQGVFDSH 6SHFLDOLVW 6WXGLR $GGUHVV 6 0\HUV 6W $GGUHVV /RV $QJHOHV &$ 3KRQH )D[ H PDLO RIILFH#VWXGLR POD FRP
&RQVXOWDQW 6RLO (QJLQHHU %D\ &LW\ *HROR $GGUHVV 6 %HYHUO\ *OHQ %OYG % $GGUHVV /RV $QJHOHV &$ 3KRQH )D[ H PDLO MRQDWKDQPLOOHU#ED\FLW\JHRORJ\ FR
&RQVXOWDQW 0(3 6SHFLDOLVWV +HQGHUVRQ $GGUHVV :HVW WK 6W 6XLWH $GGUHVV /RV $QJHOHV &$ 3KRQH )D[ H PDLO $XVWLQ$OOHQ#KHQGHUVRQHQJLQHHUV
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
:$// 7<3(6
*<3 %'
(;7 :$// : )53 3$1(/
,17(5,25
6&, $5&
,17(5,25
:$7(53522) 0(0%5$1(
0(7$/ 678'
$,5 *$3 &21&5(7( '(&.,1*
:$7(53522) %$55,(5 6833257 )5$0(
,17(5,25
:$7(53522) 0(0%5$1(
3/<:22' 6+($7+,1* ;
6721( )/225 ),1,6+
5811(5 &+$11(/6 )53 %5$&.(7
:$// 7<3( $
678'
%$77( ,168/$7,21 ,168/$7,21
%$77( ,168/$7,21
,17(5,25
3/<:22' 6+($7+,1* ;
3/<:22' 6+($7+,1* ;
*<3 %'
678'
,17(5,25
6&, $5&
&RQVXOWDQW 0(3 6SHFLDOLVWV +HQGHUVRQ (QJLQHHUV $GGUHVV :HVW WK 6W 6XLWH $GGUHVV /RV $QJHOHV &$ :$// 7<3( & 3KRQH )D[ H PDLO $XVWLQ$OOHQ#KHQGHUVRQHQJLQHHUV FRP
*<3 %'
:$// 7<3( & :$// 7<3( % ,17(5,25
,17(5,25
*<3 :$// %2$5'
*<3 :$// %2$5'
:$// 7<3( $
,17(5,25&21&5(7(
,17(5,25
,168/$7,21 %$77( ,168/$7,21
:$// 7<3( & 7+,&. &$67 ,1 3/$&(
,17(5,25
*<3 %'
; :' 678' 63$&(' 2 &
:$// 7<3( % :$// 7<3( $
%$77( ,168/$7,21
,17(5,25
5811(5 &+$11(/6 678'
%$77( ,168/$7,21
7+,&. &$67 ,1 3/$&( &21&5(7(
; :' 678' 63$&(' 2 &
,17(5,25
5811(5 &+$11(/6 *<3 %'
5811(5 &+$11(/6
6&, $5&
,17(5,25
&RQVXOWDQW /DQGVFDSH 6SHFLDOLVW 6WXGLR 0/$ $GGUHVV 6 0\HUV 6W $GGUHVV /RV $QJHOHV &$ 3KRQH )D[ H PDLO RIILFH#VWXGLR POD FRP
; :' 678' 63$&(' 2 & 5811(5 &+$11(/6
%$77( ,168/$7,21
:$// 7<3( $
,17(5,25 ,17(5,25
; :' +($'(5
5811(5 &+$11(/6 *<3 %'
,17(5,25
%$77( ,168/$7,21
7+,&. &$67 ,1 3/$&( &21&5(7(
; :' +($'(5
:$// 7<3( $
*<3 %'
%$77( ,168/$7,21
7+,&. &$67 ,1 3/$&( &21&5(7(
%$77( ,168/$7,21
6RXWK 5REH %RXOHYDUG
; :' 678' 63$&(' 2 &
*<3 %'
*<3 %'
7+,&. &$67 ,1 3/$&( &21&5(7(
,17(5,25
6RXWK 5REHUWVRQ %RXOHYDUG
; :' 678' 63$&(' 2 & ; :' 678' 63$&(' 2 &
635,1* B$6 &216758&7,21 '2&80(176 635,1* B$6 &216758&7,21 '2&80(176 635,1* B$6 &216758&7,21 '2&80(176
,17(5,25
; :' 678' 63$&(' 2 &
$
:$// 7<3( '
1R
:$// 7<3( '
'HVFULSWLRQ
'DWH
9$325 %$55,(5 )53 %5$&.(7
,17(5,25
:$7(53522) %$55,(5 (;7(5,25 6833257 )5$0( 0(7$/ /$7+
1R
)53 ; 3$1(/6 9$325 %$55,(5
(;7(5,25
,17(5,25
5811(5 &+$11(/6
&21&5(7( 3$9(5
&21&5(7( 3$9(5
%2/7
%2/7
3$9(5 3('(67$/
3$9(5 3('(67$/
&21&5(7( )281$7,21
&21&5(7( )281$7,21
'HVFULSWLRQ
&$67 ,1 3/$&( &21&5(7( 6/$%
5,*,' ,168/$7,21 *5$9(/ /$<(5
5,*,' ,168/$7,21 *5$9(/ /$<(5
; .(<:$<
; .(<:$<
6
:$// 7<3(6 $
&RQVXOWDQW 6WUXFWXUD $GGUHVV 6 )LJX $GGUHVV /RV $QJHOH 3KRQH )D[ H PDLO OD#HQJOHNLUN
&RQVXOWDQW &LYLO (QJ $GGUHVV :HVW $GGUHVV /RV $QJHOH 3KRQH )D[ H PDLO LQIR#ZKLWVRQ
:$// 7<3(6 $ :$// 7<3(6
(;7 :$// : )53 3$1(/ 5811(5 &+$11(/6
1R
$
:$// 7<3( ' (;7 :$// : )53 3$1(/
:$// 7<3( '
'DWH
&$67 ,1 3/$&( &21&5(7( 6/$%
6R %
:$// 7<3( (
:$// 7<3( (
:$// 7<3( )
:$// 7<3( )
:$
30
ACADEMIC
2% slope 2% slope
7 A-5.3
7 Sim A-5.3
Sim
STRUCTURAL BEAM AND COLUMNBEAM CONNECTIONS STRUCTURAL AND COLUMN CONNECTIONS GYPSUM WALL BOARD GYPSUM WALL BOARD STUD STUD INSULATION INSULATION
GYPSUM WALL BOARD GYPSUM WALL092900 BOARD 092900 STUD STUD INSULATION INSULATION
5/8 " PLYWOOD SHEATHING (X2) 5/8 " PLYWOOD SHEATHING (X2) VAPOR BARRIER VAPOR BARRIER 5/8 " PLYWOOD SHEATHING (X2) 5/8 " PLYWOOD SHEATHING (X2) VAPOR BARRIER VAPOR BARRIER
6 A-5.3
GLASS CURTAIN 084426 GLASSWALLS CURTAIN WALLS 084426
6 Sim A-5.3
STONE FLOOR FINISH STONE FLOOR FINISH CAST IN PLACE CONCRETE CAST IN PLACE 033000 CONCRETE 033000
C CHANNEL RUNNER FOR METAL STUDS C CHANNEL RUNNER FOR METAL STUDS
5 A-5.3
5 Sim A-5.3
Sim
SUPPORT FRAME SUPPORT FRAME BEAM AND COLUMN BEAM CONNECTIONS AND COLUMN CONNECTIONS
EXTERIOR EXTERIOR
SCI-ARC SCI-ARC
WATERPROOF MEMBRANE WATERPROOF MEMBRANE AIR GAP AIR GAP METAL LATH METAL LATH
Sim
STEEL DECKING 053100 STEEL DECKING 053100
INTERIOR INTERIOR
1101 South Robertson 1101 South Robertson Boulevard Boulevard
3
INTERIOR INTERIOR
3 Sim A-5.3
Sim
A-5.3 EXTERIOR EXTERIOR
FRP PANEL FRP PANEL
FRP BRACKET TIES FRP BRACKET TIES
4 A-5.3
4 Sim A-5.3
Consultant: Landscape Specialist, Studio-MLA Address: 185 S Myers St Studio-MLA Consultant: Landscape Specialist, Address: Los Angeles, CA 90033 Address: 185 S Myers St Phone: (213) 384-3844 Address: Los Angeles, CA 90033 384-3833 Phone:Fax: (213)(213) 384-3844 e-mail: office@studio-mla.com Fax: (213) 384-3833 e-mail: office@studio-mla.com Consultant: Soil Engineer, Bay City Geology Address: 1423 S. Beverly Glen Blvd #B Consultant: Soil Engineer, Bay City Geology Address: Angeles, 90024 Address: 1423 S.Los Beverly GlenCA Blvd #B Phone: (310) 429-6681 Address: Los Angeles, CA 90024 429-6682 Phone:Fax: (310)(310) 429-6681 e-mail: jonathanmiller@baycitygeology.com Fax: (310) 429-6682 e-mail: jonathanmiller@baycitygeology.com
Consultant: MEP Specialists, Henderson Engineers Address: West 6thHenderson St Suite 800 Consultant: MEP510 Specialists, Engineers Address: Los6th Angeles, CA 90014 Address: 510 West St Suite 800 Phone: (213) 254-4750 Address: Los Angeles, CA 90014 254-4751 Phone:Fax: (213)(213) 254-4750 e-mail: AustinAllen@hendersonengineers.com Fax: (213) 254-4751 e-mail: AustinAllen@hendersonengineers.com Consultant Structural Engineer, Englekirk Address: 888 S. FigueroaEnglekirk St. 18th Floor Consultant Structural Engineer, Address: Angeles, CA 90017 Address: 888 S. Los Figueroa St. 18th Floor Phone: (323) 733-6673 Address: Los Angeles, CA 90017 Fax: (323) 733-6674 Phone: (323) 733-6673 e-mail: la@englekirk.com Fax: (323) 733-6674 e-mail: la@englekirk.com Consultant: Civil Engineer, Whitson Egineers Address: WestWhitson Century Egineers Blvd, Suite 430 Consultant: Civil 5200 Engineer, Address: Los Angeles, CA 90045 Address: 5200 West Century Blvd, Suite 430 Phone: (310) 645-3205 Address: Los Angeles, CA 90045 (310) 645-3206 Phone:Fax: (310) 645-3205 e-mail: info@whitsonengineers.com Fax: (310) 645-3206 e-mail: info@whitsonengineers.com
Sim
No.
CAST IN PLACE CONC. FOUNDATION WALL 033000 CAST IN PLACE CONC. FOUNDATION WALL 033000 CONC. FOUNDATION TUBES CONC. FOUNDATION TUBES CONCRETE FOOTING CONCRETE FOOTING
31
No.
Description Description
Date Date
WALL SECTIONS WALL SECTIONS A-4.5 A-4.5
SPRING 2018_AS 3041 - CONSTRUCTION DOCUMENTS
STEEL DECKING 053100 STEEL DECKING 053100
SPRING 2018_AS 3041 - CONSTRUCTION DOCUMENTS
2% SLOPE 2% SLOPE
2021 PORTFOLIO
32
ACADEMIC
03 WeWork Offices Site: Los Angeles, California Software: Rhino 3D, V-Ray, Adobe Photoshop, Adobe Illustrator Collaborators: Christopher Becerra Instructor: Eric Owen Moss
Project Description: This project investigates the relationship between objects and grids. It further develops by allowing the objects; cubes and cones to become meeting spaces and offices. WeWork is becoming the model of office work and through its idea of open plans and interactive spaces, we begin to incorporate these ideas through shifts of the common office building. This project allows for objects and structure to serve more than just one purpose. The conical figures develop into stepping meeting rooms while the tilting cubes vary in program usage. The cubes become an office building, gallery spaces, restaurants, and even convention spaces. The structural grid serves as an intermediate between the residential hillside and the tech-commercial buildings sitting in the “bowl”. The grid becomes more than just structure, it details its space and bridges all the components of the site. 33
2021 PORTFOLIO
34
ACADEMIC
35
2021 PORTFOLIO
36
ACADEMIC
37
2021 PORTFOLIO
38
ACADEMIC
04 Library Site: Berkeley, California Software: Rhino 3D, V-Ray, Adobe Photoshop, Adobe Illustrator Collaborators: Christopher Becerra Instructor: Herwig Baumgartner
Project Description: For the Library project in Berkeley, California, my partner and I wanted to study the potential for an aggregate of fi gures to produce a holistic reading. We were particularly interested in the idea of fi gures being nested into one another and forming clusters. To further push the part to whole relationship we projected a graphic that wraps around the whole building in order to falsify the parts and disguise the seams. The apertures became their own independent system that rejected the linearity of the graphic. The building’s profi le became the carving for the ground, in order for the building to not sit heavily on the sloped ground a new ground was created and the building sits on “feet,” this allows people to really experience the building from all around including the underneath. 39
BA
2021 PORTFOLIO
PRARTHNA MISR ANNA BAHUDIAN
MARIA JOSE ME
ALEX STEPHAN
CHRISTOPHER B
A
B
C
D
E
F
G
Roof +48’-00”
Third Floor +36’-00”
Second Floor +24’-00”
RECORD
rev
date / issue
A 12/4/2017 B C D E F
DISCLAIMER
To the best of my kn plans are drawn to c and/or builder’s spe changes made on them be done at the owner expense and responsi actor shall verify a enclosed drawings, a responsible thereaft
STAMP
First Floor 12’-00”
PROJECT ADDRE
South Ground Level
BERKELEY 2642 BANC BERKELEY,
SHEET TITLE
BUILD ELEVA 1
1
40
BUILDING ELEVATION
Building Elevation
SHEET NUMBER
A16
BANDITSBA
ACADEMIC
PRARTHNA MI ANNA BAHUDI MARIA JOSE
ALEX STEPHA
CHRISTOPHER
PRARTHNA MI ANNA BAHUDI MARIA JOSE
ALEX STEPHA
CHRISTOPHER
A
B
C
D
E
F
G
H
I
A
B
C
D
E
F
G
H
I
RECORD
rev
date / issue
A 12/4/2017 B C D E F
RECORD
rev
Book Stacks
Book Stacks Book Stacks
Book Stacks Book Stacks Book Stacks
Auditorium
Stage Storage Auditorium
date / issue
DISCLAIMER
Reading Rooms
Third Floor Level +45
A 12/4/2017 To the best of my Bplans are drawn to Cand/or builder’s s Dchanges made on th Ebe done at the own expense and respon Factor shall verify
Second Floor Level +30
responsible therea DISCLAIMER
Third Floor Level +45 First Floor Level +15
Reading Rooms
Book Stacks
Reading Rooms
Book Stacks
Reading Rooms
Second Floor Level +30
enclosed drawings,
To the best of my plans are drawn to and/or builder’s s
changes made on th STAMP be done at the own
expense and respon actor shall verify enclosed drawings, responsible therea
Ground Floor Level 00
First Floor Level +15
Ground Floor Level 00
Parking
Basement One Level -30
Stage Storage
Parking 1 Level -12
Parking
Parking 2 Level One -12 Basement Level -30
Parking 1 Level -12
1
1
BUILDING SECTION
Parking 2 Level -12
STAMP
PROJECT ADD
BERKELEY 2642 BAN BERKELEY
PROJECT ADD
BERKELEY SHEET TITLE
2642 BAN BERKELEY BUIL
SEC
SHEET TITLE SHEET NUMBE
BUIL
BUILDING SECTION
SEC A15
SHEET NUMBE
A15
41
A
B
C
D
E
G
F
I
H
J
L
K
M
N
P
O
BANDITS
2021 PORTFOLIO
Q
Bancroft Ave.
PRARTHNA ANNA BAHU
MARIA JOS
ALEX STEP
+30’
CHRISTOPH
5’
1
2 Storage Room
3
Lobby
Entrance
Main Entrance
4
Restrooms
5
Stairs
RECORD
+25’
rev
+20’
6
5’
DISCLAIME
Stairs
To the best of plans are draw and/or builder changes made o be done at the expense and re actor shall ve enclosed drawi responsible th
Cafe
7
date / issue
A 12/4/2017 B C D E F
8
STAMP Offices
Stairs
Lobby
9
Entrance
Entrance
PROJECT A
10
BERKEL 2642 B BERKEL
N 00’
+05’
+10’
+15’
E
W Duran Ave.
0’
10’
5’
1
42
20’
SITE PLAN
S
SHEET TIT
SIT
SHEET NUM
A1
A
B
C
E
D
G
F
H
I
J
L
K
N
M
O
P
BANDITS
ACADEMIC
Q
PRARTHNA MISR ANNA BAHUDIAN
20’
MARIA JOSE ME
ALEX STEPHAN
CHRISTOPHER B
1 20’
2 Reading Rooms Media Viewing Area
3
1.5’
1
A15
11’
7’
Escalator
3’
Elevator
Book Stacks
Auditorium
4
5
RECORD
rev
Reading Space
7
DISCLAIMER
To the best of my kn plans are drawn to c and/or builder’s spe changes made on them be done at the owner expense and responsi actor shall verify a enclosed drawings, a responsible thereaft
5’ 2’ 3’
8
Book Stacks
Stairs
9 Book Stacks
5’
Reading Space
Reading Space
11’
date / issue
A 12/4/2017 B C D E F
6
Stairs
STAMP
2’
Elevator Elevator
10
PROJECT ADDRE
BERKELEY 2642 BANC BERKELEY,
11 N E
W 0’
1
43
5’
10’
1
20’
FLOOR PLAN
Plan Level 4
S
SHEET TITLE
TYPI FLOOR SHEET NUMBER
A14
1 A-6.00
BANDITS
2021 PORTFOLIO
PRARTHNA ANNA BAHU
MARIA JOS
ALEX STEP
CHRISTOPH
1 A-3.00
1 A-5.00
12” Steel Tube Secondary Structure
RECORD
rev
date / issue
A 12/4/2017 B C D E F
DISCLAIME
Steel I-Beam
To the best of plans are draw and/or builder changes made o be done at the expense and re actor shall ve enclosed drawi responsible th
LED Lighting System 18” Steel Tube Primary Structure
STAMP
Escalators Columns
PROJECT A
BERKEL 2642 B BERKEL
SHEET TIT
1
3D MEGA CHUNK
3D C
SHEET NUM
A1
44
BANDITS
ACADEMIC
1/2” SHEATHING WATERPROOFING MEMBRANE
PRARTH ANNA B
1-1/2” RIGID INSULATION
ALEX S
MARIA
CHRIST
FRP CASTED VOLUMES FRP 4’x8’ PANELS TERTIARY STRUCTURE 2”x2” STEEL TRACK
FRP CASTED VOLUMES
ROOF GUTTER
FRP 4’x8’ PANELS TERTIARY STRUCTURE 2”x2” STEEL TRACK 1/2” SHEATHING
RECO
rev
date / is
A 12/4/2 B C D E F
DISCLA
To the be plans are and/or bu changes m be done a expense a actor sha enclosed responsib
STAMP
C-CHANNELS
PROJEC
SOFT INSULATION
BER 264 BER
DRYWALL C-CHANNELS
METAL DECKING
METAL DECKING
4” PEDESTAL
4” PEDESTAL
SHEET
ROOF GUTTER
3D
FRP CASTED VOLUME
1
3D FACADE CHUNK SHEET
A
45
PRARTHNA MISRA ANNA BAHUDIAN
MARIA JOSE MEZA
ALEX STEPHAN BICA
2021 PORTFOLIO
CHRISTOPHER BECERRA
1-1/2” RIGID INSULATION FRP CASTED VOLUMES FRP 4’x8’ PANELS TERTIARY STRUCTURE 2”x2” STEEL TRACK ROOF GUTTER 1/2” SHEATHING WATERPROOFING MEMBRANE
RECORD
rev
date / issue
A 12/4/2017 B C D E F
DISCLAIMER
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
1
A6.00
STAMP
PROJECT ADDRESS
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA METAL DECKING 4” PEDESTAL
SHEET TITLE
DRYWALL
3D WALL SECTIONROOF TO WALL
SOFT INSULATION C-CHANNELS
1
ROOF TO WALL
SHEET NUMBER
BANDITS
A3.01
PRARTHNA MISRA ANNA BAHUDIAN
MARIA JOSE MEZA
ALEX STEPHAN BICA
CHRISTOPHER BECERRA
RECORD
rev
date / issue
A 12/4/2017 B C D E F
DISCLAIMER
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
1
STAMP
A4.00
PROJECT ADDRESS
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA
SHEET TITLE
RIGID INSULATION SECONDARY STRUCTURE
1
FLOOR TO WALL
3D WALL SECTIONFLOOR TO WALL
SHEET NUMBER
A3.02
SOFT INSULATION DRYWALL/INTERIOR FINISH C-CHANNELS
BANDITS
GUTTER/DRAIN
PRARTHNA MISRA ANNA BAHUDIAN
MARIA JOSE MEZA
ALEX STEPHAN BICA
CHRISTOPHER BECERRA
1
1/2” SHEATHING
A5.01
WATERPROOFING MEMBRANE FRP 4’x8’ PANELS 4” PEDESTAL TERTIARY STRUCTURE 2”x2” STEEL TRACK
RECORD
rev
date / issue
A 12/4/2017 B C D E F
DISCLAIMER
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
STAMP
PROJECT ADDRESS
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA
SECONDARY STRUCTURE
SHEET TITLE
SOFT INSULATION DRYWALL/INTERIOR FINISH C-CHANNELS GUTTER/DRAIN
46
FLOOR TILES
1
GROUND TO WALL
3D WALL SECTIONGROUND TO WALL SHEET NUMBER
A3.03
BANDITS
ACADEMIC
PRARTHNA MISRA ANNA BAHUDIAN
MARIA JOSE MEZA
ALEX STEPHAN BICA
CHRISTOPHER BECERRA
1” FRP Panel
Tertiary
Structure
18” Steel Tube Primary Structure
Welded Pipe Connection
12” Steel Tube Secondary Structure
RECORD
rev
date / issue
A 12/4/2017 B C D E F
Steel Studs 16” O.C
DISCLAIMER
Welded Steel Plate Connection
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
Waterproofing Membrane
STAMP
Dry Wall
PROJECT ADDRESS
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA
SHEET TITLE
3D DETAIL 1
ROOF DETAIL SHEET NUMBER
BANDITS
A6.00
PRARTHNA MISRA ANNA BAHUDIAN
MARIA JOSE MEZA
ALEX STEPHAN BICA
CHRISTOPHER BECERRA
12” Steel Tube Secondary Structure
Steel Studs 16” O.C
Tertiary
Structure
Welded Pipe Connection
RECORD
Dry Wall
rev
date / issue
A 12/4/2017 B C D E F
1” FRP Panel
DISCLAIMER
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
Waterproofing Membrane
STAMP
PROJECT ADDRESS
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA
SHEET TITLE
3D DETAIL
47
1
GROUND TO WALL DETAIL SHEET NUMBER
A5.01
BANDITS
2021 PORTFOLIO 1 A-4.01
PRARTHNA MISRA ANNA BAHUDIAN
MARIA JOSE MEZA
ALEX STEPHAN BICA
CHRISTOPHER BECERRA
Aliuminum Window Frame
Low-E Double Pane Glass Dry Wall FRP Apeture Tertiary
Structure
1” FRP Panel
RECORD
rev
12” Steel Tube Secondary Structure
date / issue
A 12/4/2017 B C D E F
DISCLAIMER
Steel Studs 16” O.C
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
Corrugated Concrete Tray
STAMP
18” Steel Tube Primary Structure
Steel I-Beam PROJECT ADDRESS
Air Conditioning Ducts
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA
Drop Ceiling Ties
SHEET TITLE
3D DETAIL 1
FLOOR TO WALL DETAIL SHEET NUMBER
BANDITS
A4.00
PRARTHNA MISRA ANNA BAHUDIAN
MARIA JOSE MEZA
Tertiary Structure
ALEX STEPHAN BICA
CHRISTOPHER BECERRA
Welded Pipe Connection
Window Flashing
Window Frame
Low-E Double Pane Glass
FRP Window
RECORD
rev
date / issue
A 12/4/2017 B C D E F
DISCLAIMER
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
STAMP
PROJECT ADDRESS
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA
SHEET TITLE
3D DETAIL 1
48
WINDOW DETAIL SHEET NUMBER
A5.02
BANDITS
ACADEMIC
PRARTHNA ANNA BAH
MARIA J
ALEX STE
CHRISTOP
Gutter FRP Panels Tertiary Structure Sheathing Waterproofing Membrane Rigid Insulation FRP Window Frames Tongue In Groove System Secondary Steel Structure
0
A4.00
C-Channels Insulation Attachment Pedestal Drywall Concrete filled Deck Primary Steel Structure
RECOR
rev
date / issue
A 12/4/201 B C D E F
DISCLAIM
To the best plans are dr and/or build changes made be done at t expense and actor shall enclosed dra responsible
STAMP
I-Beam T-Bar Suspender Dropped Ceiling PROJECT
BERKE 2642 BERKE
SHEET TI
WALL 2
WALL DETAIL-RENDER
1
WALL DETAIL
SHEET NU
A1
49
2021 PORTFOLIO INTERIOR FINISH TONGUE-IN-GROOVE FLOORING LAMINATE BOLTS
SILL PLATE
INTERIOR FINISH TONGUE-IN-GROOVE FLOORING LAMINATE
FOOTING/ STEM WALL
BOLTS
SILL PLATE
RECORD
rev
date / issue
A 12/4/2017 B C D E F
3
SCALE = NTS
RECOR
rev
date / issue
A 12/4/201 B C D E F
PRARTHNA MISRA ANNA BAHUDIAN
DISCLAIM
MARIA JOSE MEZA To the
INTERIOR FLOORING DETAIL ALEX STEPHAN
3
DISCLAIMER
INTERIOR FLOORING DETAIL
SCALECHRISTOPHER = NTS
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
best
plans are dr BICA and/or build
changes made BECERRA be done at t expense and actor shall enclosed dra responsible
STAMP
STAMP
WPM STEEL COLUMN
PM
FLASHING
BOLTS
BASE PLATE
LASHING
ANCHORAGE BOLTS
INTERIOR FINISH TONGUE-IN-GROOVE FLOORING LAMINATE
STEEL COLUMN BOLTS BASE PLATE
BOLTS
SILL PLATE
ANCHORAGE BOLTS
FOOTING/ STEM WALL
PROJECT ADDRESS
PROJECT
BERKE 2642 BERKE
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA
RECORD
rev
CRUSHED STONE
SHEET TITLE
ENT CLOGGING TE CATCH ER TIGHT
CALE = NTS
BANDITS
FOOTING/ STEM WALL
2D DETAILS
date / issue
A 12/4/2017 B C D E F
FILTER TO PREVENT CLOGGING 24”x24” CONCRETE CATCH BASIN WITH WATER TIGHT BOTTOM
SHEET TI
2D
DISCLAIMER
1
FOOTING & ANCHORAGE
SCALE = NTS
SHEET NUMBER
A19.00
2
DRAIN DETAIL
SCALE = NTS
3
To the best of my knowledge, these
plans are drawn to comply with owne SHEET NU FOOTINGDETAIL & ANCHORAGE INTERIOR FLOORING and/or builder’s specifications. An
1
SCALE = NTS
A1
SCALEchanges = NTSmade on them after prints w
be done at the owner’s and/or build expense and responsibility. The con actor shall verify all dimension an enclosed drawings, and be solely responsible thereafter.
STAMP
WPM FLASHING
STEEL COLUMN BOLTS BASE PLATE ANCHORAGE BOLTS
PROJECT ADDRESS
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA
50 SHEET TITLE
A B C D E F
C-CHANNEL
FLOOR TO WALL DETAIL
5
64
SCALE = NTS
TONGUE-IN-GROOVE PANEL WALL DETAIL
SCALE = NTS SCALE = NTS
C-CHANNEL
FLOOR ACADEMIC 5
TO WALL DETAIL
6
SCALE = NTS
TONGUE-IN-GROOVE WALL DETAILPANEL
4
SCALE = NTS SCALE = NTS
DISCLAIMER
RECESSED GUTTER BREATHER MEMBRANE
STAMP
COLUMN CAP BOLTS
WPM PLYWOOD SHEATHING OVERFLOW PIPE
STEEL
WPM PLYWOOD SHEATHING OVERFLOW PIPE
STEEL
RECESSED GUTTER BREATHER MEMBRANE
RECESSED GUTTER BREATHER MEMBRANE
PROJECT ADDRESS
FRP SYSTEM
2
3
SCALE = NTS
COLUMN CAP DETAIL ROOFFRP DETAIL HOOK CONNECTION
1
SCALE = NTS SCALE = NTS
TERTIARY STRUCTURE STEEL TRACK
SECONDARY STRUCTURE
INTR. FINISH
DRYWALL SOFT INSULATION
RIGID INSULATION WPM
SOFT INSULATION INTR. FINISH
SHEET TITLE
(END COLUMN CAP)
(COLUMN CAP)
A18.00
MARIA JOSE MEZA
2
GUTTER DETAIL
1
SCALE = NTS SCALE = NTS
ALEX STEPHAN BICA
SECONDARY STRUCTURE
INTR. FINISH DRYWALL
INTR. FINISH
SOFT INSULATION
DRYWALL
C-CHANNEL
SOFT INSULATION
SECONDARY STRUCTURE
A18.00
MARIA JOSE MEZA
2
GUTTER
INTR. FINISH DRYWALL
SOFT INSULATION
FRP SYSTEM
C-CHANNEL
FRP HOOK CONNECTION
SECONDARY STRUCTURE
TERTIARY STRUCTURE STEEL TRACK
PEDESTAL SHEATHING WPM
WPM
TERTIARY STRUCTURE FRP
FRP
SHEATHING
SHEATHING
WPM
WPM
TERTIARY STRUCTURE
TERTIARY STRUCTURE
FRP
FRP
RECORD
PEDESTAL
rev
C-CHANNEL
64
TONGUE-IN-GROOVE PANEL WALL DETAIL
SCALE = NTS SCALE = NTS
date / issue
A 12/4/2017 B C D E F
RECORD
PEDESTAL
rev
C-CHANNEL
5
FLOOR TO WALL DETAIL
4
SCALE = NTS
WALL DETAIL
SCALE = NTS
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
COLUMN CAP BOLTS
STAMP
STEEL
date / issue
A 12/4/2017 B C D E F
DISCLAIMER
DISCLAIMER
WPM PLYWOOD SHEATHING OVERFLOW PIPE
PRARTHNA MISRA SHEET NUMBER ANNA BAHUDIAN
CHRISTOPHER BECERRA
CHRISTOPHER BECERRA
TERTIARY STRUCTURE
SCALE = NTS
ROOF DETAILCOLUMN CAP DETAIL
2D DETAILS
ALEX STEPHAN BICA
PEDESTAL
FLOOR TO WALL DETAIL
3
SCALE = NTS
SHEATHING
5
SHEET TITLE
(END COLUMN CAP)
(COLUMN CAP)
2D DETAILS
PRARTHNA MISRA SHEET NUMBER ANNA BAHUDIAN
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA
BANDITS
INTR. FINISH
BANDITS
RIGID INSULATION WPM
GUTTER DETAIL
PROJECT ADDRESS
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA
SOFT INSULATION
FLOOR
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
STAMP
COLUMN CAP BOLTS
5
DISCLAIMER
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
WPM PLYWOOD SHEATHING OVERFLOW PIPE
A 12/4/2017 B C D E F
WPM PLYWOOD SHEATHING OVERFLOW PIPE
6
TONGUE-IN-GROOVE PANEL COLUMN CAP BOLTS
STAMP
5
SCALE = NTS
STEEL
RECESSED GUTTER BREATHER MEMBRANE
RECESSED GUTTER BREATHER MEMBRANE
PROJECT ADDRESS
BERKELEY LIBRARY 2642 BANCROFT WAY
51
PROJECT ADDRESS
BERKELEY LIBRARY 2642 BANCROFT WAY
WPM
FLOOR
2021 PORTFOLIO
52
ACADEMIC
53
2021 PORTFOLIO
54
ACADEMIC
05 Hotel and Office Tower Site: Mexico City, Mexico Software: Rhino 3D, V-Ray, Adobe Photoshop, Adobe Illustrator Collaborators: Christopher Becerra Instructor: Margeret Griffin
Project Description: For the tower project in Mexico City, my partner and I were interested in how a continuous arrangement of lines could accentuate the tower typology. From our previous facade studies we determined that we wanted to keep the idea of louvers wrapping around the tower therefore the corners would be continuous and we eliminated any horizontal fi ns in order to keep the verticality of both the pattern and the tower. Through the linework we realized that some fi gures became too prominent and decided to shear the fi ns in diff erent directions in order to provide a diff erent reading of the project as you walk through the building from the inside and outside, producing diff erent solid-void relationships throughout the whole extent of the building. 55
2021 PORTFOLIO Facade Studies
Intersecting Planes- Horizontal, Vertical, and Diagnol
Non-Intersecting Planes- Horizontal, Vertical, and Diagnol
Continuous Planes- Horizontal, Vertical, and Diagnol
Chunk Design Development
56
ACADEMIC
2’ THICK HIGH DENSITY REINFORCED CONCRET CORE WITH POST TENSION CABLES
4” DRY WALL PARTITIONS
8” THICK CONCRETE FLOOR SLAB WITH INTEGRATED HIGH TENSION STEEL CABLE
10’x6’ HIGH PERFORMANCE GLASS SYSTEM WITH ALUMINUM MOLEANS
CAST IN PLACE GFRC LOUVERS 6” O.C. WITH TITANIUM OXIDE COATING. INTERLOCKING CONCRETE FIN
57
2021 PORTFOLIO
H
O
H
O
58
ACADEMIC
59
2021 PORTFOLIO
60
ACADEMIC
61
Professional Work 2019-2021
62
Contents 01 02 03 04 05
Living Room - Dining Area Instagram Graphics Photoshoot Storyboards Email Campaigns Jewelry Design
63
pg.64 pg.70 pg.74 pg.84 pg.88
2021 PORTFOLIO
64
PROFESSIONAL
01 Dining Area & Living Room Site: Paris, France Software: Rhino 3D, V-Ray, Adobe Photoshop Company: Alexandra Loew Inc. Project Description: For this project our client was in Paris and wanted to rennovate and reimagine their living and dining room space. As part of the Alexandra Loew Inc. team I built the segment of the condo in 3D space from AutoCAD drawings and replicated important furniture pieces selected by Alexandra Loew and the client. I was also in charge of rendering the space using the selected materials, furniture, color palette, and hardwares, modeling exactly as they would be placed in the rennovated space. This not only helped the client visualize the space but also feel part of the overall process and provided input.
65
2021 PORTFOLIO
66
PROFESSIONAL
67
2021 PORTFOLIO
68
PROFESSIONAL
69
2021 PORTFOLIO
70
PROFESSIONAL
02 Instagram Graphics Purpose: Social Media Interaction & Conversion Software: Canva, Adobe Photoshop, Instagram Brand: LACE by Jenny Wu Project Description: As part of growing a brand is customer engagement. Social media allows brands and their followers to connect and view insights on not only the products, but also the production process, celebrity features, and key updates. Through frequent posts and stories our customers are kept up to date on the latest promotions and releases. I curate the theme and select the focus of the story along with the images that will be used. The stories are at times informative on any upcoming sales, on the design process of our latest designs, and most of the time are showcasing the jewelry pieces.
71
2021 PORTFOLIO
72
PROFESSIONAL
73
2021 PORTFOLIO
74
PROFESSIONAL
03 Photoshoot Preparations Purpose: Showcase jewelry and ways to accessorize. Keep website and Instagram graphics fresh. Software: Canva, Adobe Photoshop, Instagram Brand: LACE by Jenny Wu Project Description: Part of keeping a website up to date is having new and fresh images to work with. Every few months it’s important to plan photoshoots for the season and upcoming launches. As manager of the LACE brand, I organize and prepare call sheets for upcoming photoshoots. These photoshoots are key and need to be planned with location, jewelry pieces, and outfits in mind. The outcome is a range of photos varying from model shots to close ups. The images are used for the website, social media, blogs, and email campaigns.
75
2021 PORTFOLIO
76
PROFESSIONAL
77
2021 PORTFOLIO
78
PROFESSIONAL
79
2021 PORTFOLIO
80
PROFESSIONAL
81
2021 PORTFOLIO
82
PROFESSIONAL
83
2021 PORTFOLIO
84
PROFESSIONAL
04 Email Campaigns Purpose: Connect with our clients signed up to our newsletter Software: Canva, Adobe Photoshop, Klaviyo Brand: LACE by Jenny Wu
Project Description: As part of keeping customers informed regular email campaigns are sent out to those who subscribe to our newsletter. These emails are curated in inform our customers on upcoming promotions, sales, events, and releases. Other content includes information on our blogs like proposal stories and behind the scenes of the making of our pieces.
85
2021 PORTFOLIO
86
PROFESSIONAL
87
2021 PORTFOLIO
88
PROFESSIONAL
05 Jewelry design and prototypes Purpose: Bring new designs and jewelry items to the brand Software: Maya, Rhino Brand: LACE by Jenny Wu
Project Description: Every so often new pieces are added to the brand collection. I’ve been involved in numerous adjustments and modifications to current designs as well as taking part in the brainstorming, designing, and prototyping process. Among the latest releases was a new diamond ring, Iris, which was designed to accomodate for a smaller diamond in the 0.50 carat range. This allows people on a budget or with an interest in discrete minimal engagement rings to have a unique and elegant ring without compromising quality or design.
89
2021 PORTFOLIO
90
PROFESSIONAL
91
2021 PORTFOLIO
92
PROFESSIONAL
93
2021 PORTFOLIO
94
PROFESSIONAL
Mariajose Meza
Contact Phone: (323) 359-9012 Email: meza3mariajose@gmail.com Instagram: @mariajosemeza3
95