Mariajose Meza: Portfolio 2021

Page 1

MARIAJOSE MEZA


2021 PORTFOLIO

Mariajose Meza 2827 S. La Brea Ave. Apt#12 Los Angeles, CA 90016 Cell: (323) 359-9012 E-mail: mariajose3meza@gmail.com

Summary: Presented my thesis alongside my work partner in April 2019, worked as an Assistant Teacher for SCI-Arc’s summer program DID in June 2019, Graduated with distinction from SCI-Arc in September 2019, started working at Oyler Wu Collaborative as Manager for their sub-company LACE by Jenny Wu in August 2019. Education: 2014 - 2019 B.Arch Bachelors of Architecture Southern California Institute of Architecture - Los Angeles, CA GPA: 3.80 Graduated with Distinction 2010-2014 High School Diploma: Academy of Engineering University Senior High School - Los Angeles, CA G.P.A: 4.2 Top 10% of Class Enrichment Programs: 2013 Summer D.I.D- Design Immersion Days 2010 - 2014 A.C.E- Architecture, Construction, Engineering 2008 Fall & Spring M.E.S.A- Mathematics, Engineering, Science, Achievement

2


ACADEMIC WORK

Work Experience: August 2019-Current Oyler Wu Collaborative LACE by Jenny Wu Brand Manager -In charge of everything related to production and marketing of the company . -Planning e-mail campaigns, website collections, landing pages, IG posts and stories. -Manage every day tasks including customer service, sales, packing & shipping orders. -Keeping a fast order fulfillment turn around -Assisting customers and working around their budget and timeline. -Preparing for live events like WestEdge Design Fair, PTTOW, & LUXUREA -Brainstorming, prototyping and modeling new jewelry designs. -Designing website pages, curating & writing blog posts, overall website navigation (Shopify). Summer 2019 Southern California Institute of Architecture Assistant Teacher for Summer Program: Design Immersion Days (DID) -Giving students introductory tutorials to Rhino 2D & 3D, Adobe Photoshop, & Illustrator. -Provided additional assistance to students in further developing their ideas & designs. Alexandra Loew Inc. 3D Modeling Freelancer -Responsible for digitally modeling a bathroom & living room space for a project in Paris. -3D modeled custom, readily available furniture & existing spaces for a 360° VR experience. Summer 2017 Alexandra Loew Inc. Interior Design Freelancer -Responsible for digitally designing and replicating interior materials. -Rendered and modeled custom materials and hardware. Fall 2016 - Spring 2019 Southern California Institute of Architecture Admissions Office Assistant -Responsible for researching and developing a local housing map for incoming students. -Assisted in filing and documenting incoming and potential student’s information onto the school system. 3

MARIAJOSE MEZA

Skills: -Fast Learner -Detail Oriented -Motivated -Problem Solver -Cooperative -Responsible -Hard Working -Communicative Software Skills: -Rhinoceros -Revit -Google Sketch-Up -Adobe Illustrator -Adobe Photoshop -Adobe InDesign -Microsoft Office -V-ray (rendering) -KeyShot (rendering) -Maya (basic 3D modeling) -Klaviyo (email campaigns) -Shopify (website designs) -Canva (graphic designs) Languages: -English -Spanish


Academic Work 2014-2019

4


Contents 01 02 03 04 05

WeWork, WeLive, WePlay Mixed Use Space WeWork Offices Library Hotel & Office

5

pg.6 pg.22 pg.32 pg.38 pg.54


2021 PORTFOLIO Site Axon

6


ACADEMIC

01 We Work, We Live, We Play Site: New York City, New York Software: Rhino 3D, V-Ray, Adobe Photoshop, Adobe Illustrator Collaborators: Christopher Becerra Thesis Advisor: Jenny Wu

Project Description: Our project is located in the lower east side of Manhattan and consists of both WeWork offices and WeLive communal housing. Our thesis explores the tension between the mundane monolith and the vibrant inefficiency of play. Our objective is to disrupt the mundane, repetitive nature of the tower typology and create a dialogue between the stable line and unstable figure. The thick inhabitable facade is composed of distinct worlds, each developing its own character and in return reflecting its own program. By pushing the communal activities to the exterior of the tower, we are building a visual connection between the activity occurring inside and contextual forces outside. This establishes an extroverted approach to combat the highly privatized New York realm. This extroverted presence takes the tenants and turns them into performers in an urban theater. Today, the sharing economy is thriving more than ever, the community-oriented systems are rapidly replacing privatization. Companies like Airbnb and Uber are sharing resources that otherwise would have been exclusive. In a similar fashion, the concept behind WeLive is to share experiences. Our objective is to incentivize interactions by blurring the line between what’s considered communal and private activities. In order to do this, the program is spread throughout the floors to encourage people to circulate beyond your neighborhood floor. Every living unit is supplied with only essential resources to push people out of isolation. By shuffling the program throughout the tower creates a variety of social conditions that cater to different lifestyles. As the tower rises, it undergoes an inverted formal shift. On the facade, the fragmented parts become a whole and exterior pieces become swallowed by the volume of the tower. 7


2021 PORTFOLIO

te Plan

Water Street

South Street FDR Drive

8

John Street

Maiden Lane

Wall Street Front Street


ACADEMIC

Level 11: WeLive- Living Units, Diving Pool, Skate Park, Rock Climbing Gym

A

B

C

D

E

F

Level 1: Lobby- Reception, Public Forum, Cafe, Gallery Space, Grocery Store

1

2

3

4

9

5

6

Plans 1/16” = 1’


F

2021 PORTFOLIO

Level 16: WeLive & WeWork- Living Units, Working Spaces, Pool, Aerial Studio

A

B

C

D

E

F

Level 11: WeLive- Living Units, Diving Pool, Skate Park, Rock Climbing Gym

10

A


ACADEMIC

Level 31: WeWork- Open Office Floor Plan, Conference Rooms, Auditorium

A

B

C

D

E

F

Level 16: WeLive & WeWork- Living Units, Working Spaces, Pool, Aerial Studio

11 A


F

2021 PORTFOLIO

Level 33: WeLive- Living Units, Gym, Activity Room

A

B

C

D

E

F

Level 31: WeWork- Open Office Floor Plan, Conference Rooms, Auditorium

12 A


ACADEMIC

A

B

C

D

E

F

Level 33: WeLive- Living Units, Gym, Activity Room

13 A


14 Nineteenth Floor +155’-0” ft

Twentieth Floor +170’-0” ft

Twenty-first Floor +185’-0” ft

Twenty-second Floor +200’-0” ft

Twenty-third Floor +215’-0” ft

Twenty-fourth Floor +230’-0” ft

Twenty-fifth Floor +245’-0” ft

Twenty-sixth Floor +260’-0” ft

Twenty-seventh Floor +275’-0” ft

Twenty-eighth Floor +290’-0” ft

Twenty-ninth Floor +305’-0” ft

Thirtieth Floor +320’-0” ft

Thirty-first Floor +335’-0” ft

Thirty-second Floor +350’-0” ft

Thirty-third Floor +365’-0” ft

Thirty-fourth Floor +380’-0” ft

Thirty-fifth Floor +395’-0” ft

Thirty-sixth Floor +410’-0” ft

Rooftop +425’-0”

2021 PORTFOLIO


15 Basement Floor 2 -20’-0”

Basement Floor 1 -10’-0”

Ground Floor +0’-0” ft

First Floor +15’-0” ft

Second Floor +30’-0” ft

Third Floor +45’-0” ft

Fourth Floor +60’-0” ft

Fifth Floor +75’-0” ft

Sixth Floor +90’-0” ft

Seventh Floor +105’-0” ft

Eighth Floor +105’-0” ft

Ninth Floor +120’-0” ft

Tenth Floor +135’-0” ft

Eleventh Floor +150’-0” ft

Twelfth Floor +165’-0” ft

Thirteenth Floor +165’-0” ft

Fourteenth Floor +180’-0” ft

Fifteenth Floor +195’-0” ft

Sixteenth Floor +110’-0” ft

Seventeenth Floor +125’-0” ft

Eighteenth Floor +140’-0” ft

Section 3/32”=1’

ACADEMIC


2021 PORTFOLIO

F

E

D

C

4 3 2

1

16


Exploded Axon

ACADEMIC

17




2021 PORTFOLIO

20


ACADEMIC

21


2021 PORTFOLIO

3D View 3 1

Cons Addre Addre Phon Fax: ( e-ma

Cons Addre Addre Phon Fax: ( e-ma

22

Cons Addre


ACADEMIC

02

Mixed Use Office, Retail, & Residential Space Site: Los Angeles, California Software: Revit Collaborators: Christopher Becerra, Sarah Carcamo, Emma Manguy Instructor: Pavel Getov & David Ross Project Description: For this project my team members and I decided to design a building that had a strong presence on the street. The facade is mostly a curtain wall with FRP panels that mimick the look of concrete. Looking at the building longitudinally and “splitting” it in half we lifted the first floor allowing for a parking entrance and an exterior cafe. The first floor serves as a small cafe, a gallery, and a lobby. The second floor is office space and the third floor contains 1-bedroom apartments and lofts with an exterior communal area.

23

MARIAJOSE MEZA


2021 PORTFOLIO

2

3

4

5

6

7

8

9

10

11

12

Glass Rooftop Access Port

1 A-2.2

1101 S B

4'X8" FRP PANELS

Roof 39' - 0"

3.5'x5' Operable Ribbon Window Panel

3.5'x5' Operable Ribbon Window Panel Exterior Patio Access Door

Exterior Aluminum Hand Railing 1

A-2.1

Level 3 27' - 0"

1.5"x2.5" Window Mullion

Consultant: Soil En Address: 1423 S. B Address: Los Ange Phone: (310) 429-6 Fax: (310) 429-668 e-mail: jonathanmil

4'x8' FRP Panels

Level 2 15' - 0" 6'x6' Exterior Window Panels

Consultant: MEP S Address: 510 West Address: Los Ange Phone: (213) 254-4 Fax: (213) 254-475 e-mail: AustinAllen@

Consultant Structur Address: 888 S. Fig Address: Los Ange Phone: (323) 733-6 Fax: (323) 733-667 e-mail: la@englekir

Main Lobby Entrance Exterior Cafe Patio

Consultant: Landsc Address: 185 S My Address: Los Ange Phone: (213) 384-3 Fax: (213) 384-383 e-mail: office@stud

Exterior Cafe Tables

Level 1 0' - 0"

Consultant: Civil En Address: 5200 Wes Address: Los Ange Phone: (310) 645-3 Fax: (310) 645-320 e-mail: info@whitso

No. Parking -11' - 6"

NORT 1 A-2.2

North 1

1/4" = 1'-0"

24


ACADEMIC

F

E

D

C

B

Glass Rooftop Access Port

A 1 A-2.0

4'X8" FRP PANELS

Roof 39' - 0"

3.5'x5' Operable Ribbon Window Panel

Sloped Glazing System

Level 3 27' - 0" 6'x6' Exterior Window Panels

Level 2 15' - 0"

Exterior Stucco Wall Exterior Cafe Extrance Exterior Cafe Tables

Level 1 0' - 0"

Basement Parking -11' - 6"

1 A-2.0

25 East


2021 PORTFOLIO

2

3

4

5

6

7

8

9

10

11

1

Glass Rooftop Access Port

1

12

A-2.1

1101

A-2.2

Roof Drainage Slope

Roof 39' - 0"

APARTMENT

APARTMENT

320

330

DINING TERRACE

14' - 0"

Exterior Aluminium Hand Rail

12' - 0"

Exterior Patio Access Door

Consultant: Land Address: 185 S M Address: Los An Phone: (213) 38 Fax: (213) 384-3 e-mail: office@s

Interior Hand Rails MEZZANINE

CONFERENCE ROOM

CONFERENCE ROOM

270

280

12' - 0"

Level 3 27' - 0"

Interior Hand Rails MEZZANINE

Consultant: MEP Address: 510 W Address: Los An Phone: (213) 25 Fax: (213) 254-4 e-mail: AustinAll

Level 2 15' - 0"

16' - 6"

1 A-2.3

DINING PATIO

LOBBY

762 SqFt

762 SqFt

10' - 1 1/32"

6' - 6 13/16"

Level 1 0' - 0"

9' - 0"

Consultant Struc Address: 888 S. Address: Los An Phone: (323) 73 Fax: (323) 733-6 e-mail: la@engle

Consultant: Civil Address: 5200 W Address: Los An Phone: (310) 64 Fax: (310) 645-3 e-mail: info@wh

PARKING ENTRY

GARAGE

Consultant: Soil Address: 1423 S Address: Los An Phone: (310) 42 Fax: (310) 429-6 e-mail: jonathanm

No.

Parking -11' - 6" 48' - 0"

LONGIT

1

1

A-2.1

A-2.2

Section 2 1 1/4" = 1'-0"

26


ACADEMIC

$

6

&: $

$

/2%%<

$

83

/2%%< 6T)W

$

&RQVXOWDQW /DQGVF $GGUHVV 6 0\ $GGUHVV /RV $QJH 3KRQH )D[ H PDLO RIILFH#VWXG

%

&RQVXOWDQW 6RLO (Q $GGUHVV 6 % $GGUHVV /RV $QJH 3KRQH )D[ H PDLO MRQDWKDQPL

83

&

&RQVXOWDQW 0(3 6 $GGUHVV :HV $GGUHVV /RV $QJH 3KRQH )D[ H PDLO $XVWLQ$OOHQ

6T)W

&RQVXOWDQW &LYLO ( $GGUHVV :H $GGUHVV /RV $QJH 3KRQH )D[ H PDLO LQIR#ZKLWV

( $

&$)(

6T)W

$

$

*$//(5<

&RQVXOWDQW 6WUXFWX $GGUHVV 6 )L $GGUHVV /RV $QJH 3KRQH )D[ H PDLO OD#HQJOHNL

:$ $

'1

'

83

)

1R

$

:$// 7<3( $

27

:$// 7<3( &

:$// 7<3( )

),5


2021 PORTFOLIO

6

&: $

&: $

$

$

'1

$

$

%

&: $

6T)W '1

6T)W

&

:$ $

&RQVXOWDQW 0(3 6 $GGUHVV :HV $GGUHVV /RV $QJH 3KRQH )D[ H PDLO $XVWLQ$OOHQ

83

$

'

'1

83

2)),&( 6T)W

2)),&( 6T)W

6T)W

2)),&( 6T)W

.,7&+(1

$

6833/< 5220

6T)W

5(675220

5(675220

(

$

:$ $

:$ $

:$ $

:$ $

&RQVXOWDQW 6RLO (Q $GGUHVV 6 % $GGUHVV /RV $QJH 3KRQH )D[ H PDLO MRQDWKDQPL

:$ $

&RQVXOWDQW /DQGV $GGUHVV 6 0\ $GGUHVV /RV $QJH 3KRQH )D[ H PDLO RIILFH#VWX

&21)(5(1&( 5220

&21)(5(1&( 5220

&RQVXOWDQW 6WUXFWX $GGUHVV 6 ) $GGUHVV /RV $QJH 3KRQH )D[ H PDLO OD#HQJOHN

&RQVXOWDQW &LYLO ( $GGUHVV :H $GGUHVV /RV $QJH 3KRQH )D[ H PDLO LQIR#ZKLWV

$

1R

$

:$// 7<3( $

:$// 7<3( &

:$// 7<3( (

:$// 7<3( )

6(&

28 /HYHO


ACADEMIC

$

6/23(' &857$,1 :$//

+$1'5$,/

6T)W

:$ $

&

:$ $

&RQVXOWDQW /DQG $GGUHVV 6 0 $GGUHVV /RV $Q 3KRQH )D[ H PDLO RIILFH#VW

6T)W

5220

%

$3$570(17

$3$570(17

6T)W

5220

5220

&RQVXOWDQW 6WUXF $GGUHVV 6 $GGUHVV /RV $Q 3KRQH )D[ H PDLO OD#HQJOH

&RQVXOWDQW &LYLO $GGUHVV : $GGUHVV /RV $Q 3KRQH )D[ H PDLO LQIR#ZKL

6T)W

(

678',2 $3$570(17

:$ &

:$ &

'1

$

:$ $

5220

'

'1

:$ $

:$ $

5220

$

$

:$ $

&RQVXOWDQW 6RLO ( $GGUHVV 6 $GGUHVV /RV $Q 3KRQH )D[ H PDLO MRQDWKDQP

&RQVXOWDQW 0(3 $GGUHVV :H $GGUHVV /RV $Q 3KRQH )D[ H PDLO $XVWLQ$OOH

6T)W

287'225 $5($

5220

$3$570(17

5220

5220

$

1R

$

:$// 7<3( $

29

:$// 7<3( &

:$// 7<3( '

:$// 7<3( )

7+

/HYHO


2021 PORTFOLIO

; :' +($'(5

; :' +($'(5

; :' +($'(5

; :' +($'(5

; :' +($'(5

; :' 678' 63$&(' 2 &

*<3 %'

*<3 %'

%$77( ,168/$7,21

%$77( ,168/$7,21

,17(5,25

,17(5,25

,17(5,25

,17(5,25 ,17(5,25

; :' +($'(5

,17(5,25 ,17(5,25

,17(5,25

,17(5,25

,17(5,25 ; :' +($'(5 ,17(5,25

; :' 678' 63$&(' 2 &

*<3 %'

:$// 7<3( %

,17(5,25

678'

3/<:22' 6+($7+,1* ;

6721( )/225 ),1,6+ $,5 *$3 &21&5(7( '(&.,1*

*<3 %' 0(7$/ 678'

$/80,1,80 6,// 08//,21

$/80,1,80 6,// 08//,21 ,168/$7,21 3/<:22' 6+($7+,1* ;

$,5 *$3

:$// 7<3( %

'28%/( */$=(' /2: ( */$66

:$7(53522) %$55,(5 6833257 )5$0(

0(7$/ /$7+

0(7$/ /$7+

)53 ; 3$1(/6

)53 ; 3$1(/6

9$325 %$55,(5

:$// 7<3( %

(;7(5,25

5811(5 &+$11(/6

:$// 7<3( & '28%/( */$=(' /2: ( */$66 )53 %5$&.(7 :$7(53522) %$55,(5 6833257 )5$0( 0(7$/ /$7+ )53 ; 3$1(/6

9$325 %$55,(5

,17(5,25

5811(5 &+$11(/6

678'

)53 %5$&.(7

9$325 %$55,(5 :$// 7<3( &

(;7(5,25 ,17(5,25

(;7(5,25 6758&785$/ %($0 $1' &2/801

6758&785$/ %($0 $1' &2/801

678' 5811(5 &+$11(/6 ,168/$7,21

5811(5 &+$11(/6

,17(5,25

3/<:22' 6+($7+,1* ;

,17(5,25

5811(5 &+$11(/6

(;7(5,25

(;7(5,25

,17(5,25

$,5 *$3

*<3 %'

(;7 :$// : )53 3$1(/

678' )53 %5$&.(7

(;7 :$// : )53 3$1(/

,168/$7,21

:$7(53522) %$55,(5 6833257 )5$0( 3/<:22' 6+($7+,1* ;

0(7$/ /$7+ $,5 *$3 )53 ; 3$1(/6

:$// 7<3( '

6RXWK 5REHUWVRQ %RXOHYDUG

&RQVXOWDQW 6RLO (QJLQHHU %D\ &LW\ *HRORJ\ $GGUHVV 6 %HYHUO\ *OHQ %OYG % 5811(5 &+$11(/6 $GGUHVV /RV $QJHOHV &$ 3KRQH )D[ H PDLO MRQDWKDQPLOOHU#ED\FLW\JHRORJ\ FRP

6RXWK 5REHUWVRQ %RXOHYDUG 6&, $5&

&RQVXOWDQW /DQGVFDSH 6SHFLDOLVW 6WXGLR $GGUHVV 6 0\HUV 6W $GGUHVV /RV $QJHOHV &$ 3KRQH )D[ H PDLO RIILFH#VWXGLR POD FRP

&RQVXOWDQW 6RLO (QJLQHHU %D\ &LW\ *HROR $GGUHVV 6 %HYHUO\ *OHQ %OYG % $GGUHVV /RV $QJHOHV &$ 3KRQH )D[ H PDLO MRQDWKDQPLOOHU#ED\FLW\JHRORJ\ FR

&RQVXOWDQW 0(3 6SHFLDOLVWV +HQGHUVRQ $GGUHVV :HVW WK 6W 6XLWH $GGUHVV /RV $QJHOHV &$ 3KRQH )D[ H PDLO $XVWLQ$OOHQ#KHQGHUVRQHQJLQHHUV

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

:$// 7<3(6

*<3 %'

(;7 :$// : )53 3$1(/

,17(5,25

6&, $5&

,17(5,25

:$7(53522) 0(0%5$1(

0(7$/ 678'

$,5 *$3 &21&5(7( '(&.,1*

:$7(53522) %$55,(5 6833257 )5$0(

,17(5,25

:$7(53522) 0(0%5$1(

3/<:22' 6+($7+,1* ;

6721( )/225 ),1,6+

5811(5 &+$11(/6 )53 %5$&.(7

:$// 7<3( $

678'

%$77( ,168/$7,21 ,168/$7,21

%$77( ,168/$7,21

,17(5,25

3/<:22' 6+($7+,1* ;

3/<:22' 6+($7+,1* ;

*<3 %'

678'

,17(5,25

6&, $5&

&RQVXOWDQW 0(3 6SHFLDOLVWV +HQGHUVRQ (QJLQHHUV $GGUHVV :HVW WK 6W 6XLWH $GGUHVV /RV $QJHOHV &$ :$// 7<3( & 3KRQH )D[ H PDLO $XVWLQ$OOHQ#KHQGHUVRQHQJLQHHUV FRP

*<3 %'

:$// 7<3( & :$// 7<3( % ,17(5,25

,17(5,25

*<3 :$// %2$5'

*<3 :$// %2$5'

:$// 7<3( $

,17(5,25&21&5(7(

,17(5,25

,168/$7,21 %$77( ,168/$7,21

:$// 7<3( & 7+,&. &$67 ,1 3/$&(

,17(5,25

*<3 %'

; :' 678' 63$&(' 2 &

:$// 7<3( % :$// 7<3( $

%$77( ,168/$7,21

,17(5,25

5811(5 &+$11(/6 678'

%$77( ,168/$7,21

7+,&. &$67 ,1 3/$&( &21&5(7(

; :' 678' 63$&(' 2 &

,17(5,25

5811(5 &+$11(/6 *<3 %'

5811(5 &+$11(/6

6&, $5&

,17(5,25

&RQVXOWDQW /DQGVFDSH 6SHFLDOLVW 6WXGLR 0/$ $GGUHVV 6 0\HUV 6W $GGUHVV /RV $QJHOHV &$ 3KRQH )D[ H PDLO RIILFH#VWXGLR POD FRP

; :' 678' 63$&(' 2 & 5811(5 &+$11(/6

%$77( ,168/$7,21

:$// 7<3( $

,17(5,25 ,17(5,25

; :' +($'(5

5811(5 &+$11(/6 *<3 %'

,17(5,25

%$77( ,168/$7,21

7+,&. &$67 ,1 3/$&( &21&5(7(

; :' +($'(5

:$// 7<3( $

*<3 %'

%$77( ,168/$7,21

7+,&. &$67 ,1 3/$&( &21&5(7(

%$77( ,168/$7,21

6RXWK 5REH %RXOHYDUG

; :' 678' 63$&(' 2 &

*<3 %'

*<3 %'

7+,&. &$67 ,1 3/$&( &21&5(7(

,17(5,25

6RXWK 5REHUWVRQ %RXOHYDUG

; :' 678' 63$&(' 2 & ; :' 678' 63$&(' 2 &

635,1* B$6 &216758&7,21 '2&80(176 635,1* B$6 &216758&7,21 '2&80(176 635,1* B$6 &216758&7,21 '2&80(176

,17(5,25

; :' 678' 63$&(' 2 &

$

:$// 7<3( '

1R

:$// 7<3( '

'HVFULSWLRQ

'DWH

9$325 %$55,(5 )53 %5$&.(7

,17(5,25

:$7(53522) %$55,(5 (;7(5,25 6833257 )5$0( 0(7$/ /$7+

1R

)53 ; 3$1(/6 9$325 %$55,(5

(;7(5,25

,17(5,25

5811(5 &+$11(/6

&21&5(7( 3$9(5

&21&5(7( 3$9(5

%2/7

%2/7

3$9(5 3('(67$/

3$9(5 3('(67$/

&21&5(7( )281$7,21

&21&5(7( )281$7,21

'HVFULSWLRQ

&$67 ,1 3/$&( &21&5(7( 6/$%

5,*,' ,168/$7,21 *5$9(/ /$<(5

5,*,' ,168/$7,21 *5$9(/ /$<(5

; .(<:$<

; .(<:$<

6

:$// 7<3(6 $

&RQVXOWDQW 6WUXFWXUD $GGUHVV 6 )LJX $GGUHVV /RV $QJHOH 3KRQH )D[ H PDLO OD#HQJOHNLUN

&RQVXOWDQW &LYLO (QJ $GGUHVV :HVW $GGUHVV /RV $QJHOH 3KRQH )D[ H PDLO LQIR#ZKLWVRQ

:$// 7<3(6 $ :$// 7<3(6

(;7 :$// : )53 3$1(/ 5811(5 &+$11(/6

1R

$

:$// 7<3( ' (;7 :$// : )53 3$1(/

:$// 7<3( '

'DWH

&$67 ,1 3/$&( &21&5(7( 6/$%

6R %

:$// 7<3( (

:$// 7<3( (

:$// 7<3( )

:$// 7<3( )

:$

30


ACADEMIC

2% slope 2% slope

7 A-5.3

7 Sim A-5.3

Sim

STRUCTURAL BEAM AND COLUMNBEAM CONNECTIONS STRUCTURAL AND COLUMN CONNECTIONS GYPSUM WALL BOARD GYPSUM WALL BOARD STUD STUD INSULATION INSULATION

GYPSUM WALL BOARD GYPSUM WALL092900 BOARD 092900 STUD STUD INSULATION INSULATION

5/8 " PLYWOOD SHEATHING (X2) 5/8 " PLYWOOD SHEATHING (X2) VAPOR BARRIER VAPOR BARRIER 5/8 " PLYWOOD SHEATHING (X2) 5/8 " PLYWOOD SHEATHING (X2) VAPOR BARRIER VAPOR BARRIER

6 A-5.3

GLASS CURTAIN 084426 GLASSWALLS CURTAIN WALLS 084426

6 Sim A-5.3

STONE FLOOR FINISH STONE FLOOR FINISH CAST IN PLACE CONCRETE CAST IN PLACE 033000 CONCRETE 033000

C CHANNEL RUNNER FOR METAL STUDS C CHANNEL RUNNER FOR METAL STUDS

5 A-5.3

5 Sim A-5.3

Sim

SUPPORT FRAME SUPPORT FRAME BEAM AND COLUMN BEAM CONNECTIONS AND COLUMN CONNECTIONS

EXTERIOR EXTERIOR

SCI-ARC SCI-ARC

WATERPROOF MEMBRANE WATERPROOF MEMBRANE AIR GAP AIR GAP METAL LATH METAL LATH

Sim

STEEL DECKING 053100 STEEL DECKING 053100

INTERIOR INTERIOR

1101 South Robertson 1101 South Robertson Boulevard Boulevard

3

INTERIOR INTERIOR

3 Sim A-5.3

Sim

A-5.3 EXTERIOR EXTERIOR

FRP PANEL FRP PANEL

FRP BRACKET TIES FRP BRACKET TIES

4 A-5.3

4 Sim A-5.3

Consultant: Landscape Specialist, Studio-MLA Address: 185 S Myers St Studio-MLA Consultant: Landscape Specialist, Address: Los Angeles, CA 90033 Address: 185 S Myers St Phone: (213) 384-3844 Address: Los Angeles, CA 90033 384-3833 Phone:Fax: (213)(213) 384-3844 e-mail: office@studio-mla.com Fax: (213) 384-3833 e-mail: office@studio-mla.com Consultant: Soil Engineer, Bay City Geology Address: 1423 S. Beverly Glen Blvd #B Consultant: Soil Engineer, Bay City Geology Address: Angeles, 90024 Address: 1423 S.Los Beverly GlenCA Blvd #B Phone: (310) 429-6681 Address: Los Angeles, CA 90024 429-6682 Phone:Fax: (310)(310) 429-6681 e-mail: jonathanmiller@baycitygeology.com Fax: (310) 429-6682 e-mail: jonathanmiller@baycitygeology.com

Consultant: MEP Specialists, Henderson Engineers Address: West 6thHenderson St Suite 800 Consultant: MEP510 Specialists, Engineers Address: Los6th Angeles, CA 90014 Address: 510 West St Suite 800 Phone: (213) 254-4750 Address: Los Angeles, CA 90014 254-4751 Phone:Fax: (213)(213) 254-4750 e-mail: AustinAllen@hendersonengineers.com Fax: (213) 254-4751 e-mail: AustinAllen@hendersonengineers.com Consultant Structural Engineer, Englekirk Address: 888 S. FigueroaEnglekirk St. 18th Floor Consultant Structural Engineer, Address: Angeles, CA 90017 Address: 888 S. Los Figueroa St. 18th Floor Phone: (323) 733-6673 Address: Los Angeles, CA 90017 Fax: (323) 733-6674 Phone: (323) 733-6673 e-mail: la@englekirk.com Fax: (323) 733-6674 e-mail: la@englekirk.com Consultant: Civil Engineer, Whitson Egineers Address: WestWhitson Century Egineers Blvd, Suite 430 Consultant: Civil 5200 Engineer, Address: Los Angeles, CA 90045 Address: 5200 West Century Blvd, Suite 430 Phone: (310) 645-3205 Address: Los Angeles, CA 90045 (310) 645-3206 Phone:Fax: (310) 645-3205 e-mail: info@whitsonengineers.com Fax: (310) 645-3206 e-mail: info@whitsonengineers.com

Sim

No.

CAST IN PLACE CONC. FOUNDATION WALL 033000 CAST IN PLACE CONC. FOUNDATION WALL 033000 CONC. FOUNDATION TUBES CONC. FOUNDATION TUBES CONCRETE FOOTING CONCRETE FOOTING

31

No.

Description Description

Date Date

WALL SECTIONS WALL SECTIONS A-4.5 A-4.5

SPRING 2018_AS 3041 - CONSTRUCTION DOCUMENTS

STEEL DECKING 053100 STEEL DECKING 053100

SPRING 2018_AS 3041 - CONSTRUCTION DOCUMENTS

2% SLOPE 2% SLOPE


2021 PORTFOLIO

32


ACADEMIC

03 WeWork Offices Site: Los Angeles, California Software: Rhino 3D, V-Ray, Adobe Photoshop, Adobe Illustrator Collaborators: Christopher Becerra Instructor: Eric Owen Moss

Project Description: This project investigates the relationship between objects and grids. It further develops by allowing the objects; cubes and cones to become meeting spaces and offices. WeWork is becoming the model of office work and through its idea of open plans and interactive spaces, we begin to incorporate these ideas through shifts of the common office building. This project allows for objects and structure to serve more than just one purpose. The conical figures develop into stepping meeting rooms while the tilting cubes vary in program usage. The cubes become an office building, gallery spaces, restaurants, and even convention spaces. The structural grid serves as an intermediate between the residential hillside and the tech-commercial buildings sitting in the “bowl”. The grid becomes more than just structure, it details its space and bridges all the components of the site. 33


2021 PORTFOLIO

34


ACADEMIC

35


2021 PORTFOLIO

36


ACADEMIC

37


2021 PORTFOLIO

38


ACADEMIC

04 Library Site: Berkeley, California Software: Rhino 3D, V-Ray, Adobe Photoshop, Adobe Illustrator Collaborators: Christopher Becerra Instructor: Herwig Baumgartner

Project Description: For the Library project in Berkeley, California, my partner and I wanted to study the potential for an aggregate of fi gures to produce a holistic reading. We were particularly interested in the idea of fi gures being nested into one another and forming clusters. To further push the part to whole relationship we projected a graphic that wraps around the whole building in order to falsify the parts and disguise the seams. The apertures became their own independent system that rejected the linearity of the graphic. The building’s profi le became the carving for the ground, in order for the building to not sit heavily on the sloped ground a new ground was created and the building sits on “feet,” this allows people to really experience the building from all around including the underneath. 39


BA

2021 PORTFOLIO

PRARTHNA MISR ANNA BAHUDIAN

MARIA JOSE ME

ALEX STEPHAN

CHRISTOPHER B

A

B

C

D

E

F

G

Roof +48’-00”

Third Floor +36’-00”

Second Floor +24’-00”

RECORD

rev

date / issue

A 12/4/2017 B C D E F

DISCLAIMER

To the best of my kn plans are drawn to c and/or builder’s spe changes made on them be done at the owner expense and responsi actor shall verify a enclosed drawings, a responsible thereaft

STAMP

First Floor 12’-00”

PROJECT ADDRE

South Ground Level

BERKELEY 2642 BANC BERKELEY,

SHEET TITLE

BUILD ELEVA 1

1

40

BUILDING ELEVATION

Building Elevation

SHEET NUMBER

A16


BANDITSBA

ACADEMIC

PRARTHNA MI ANNA BAHUDI MARIA JOSE

ALEX STEPHA

CHRISTOPHER

PRARTHNA MI ANNA BAHUDI MARIA JOSE

ALEX STEPHA

CHRISTOPHER

A

B

C

D

E

F

G

H

I

A

B

C

D

E

F

G

H

I

RECORD

rev

date / issue

A 12/4/2017 B C D E F

RECORD

rev

Book Stacks

Book Stacks Book Stacks

Book Stacks Book Stacks Book Stacks

Auditorium

Stage Storage Auditorium

date / issue

DISCLAIMER

Reading Rooms

Third Floor Level +45

A 12/4/2017 To the best of my Bplans are drawn to Cand/or builder’s s Dchanges made on th Ebe done at the own expense and respon Factor shall verify

Second Floor Level +30

responsible therea DISCLAIMER

Third Floor Level +45 First Floor Level +15

Reading Rooms

Book Stacks

Reading Rooms

Book Stacks

Reading Rooms

Second Floor Level +30

enclosed drawings,

To the best of my plans are drawn to and/or builder’s s

changes made on th STAMP be done at the own

expense and respon actor shall verify enclosed drawings, responsible therea

Ground Floor Level 00

First Floor Level +15

Ground Floor Level 00

Parking

Basement One Level -30

Stage Storage

Parking 1 Level -12

Parking

Parking 2 Level One -12 Basement Level -30

Parking 1 Level -12

1

1

BUILDING SECTION

Parking 2 Level -12

STAMP

PROJECT ADD

BERKELEY 2642 BAN BERKELEY

PROJECT ADD

BERKELEY SHEET TITLE

2642 BAN BERKELEY BUIL

SEC

SHEET TITLE SHEET NUMBE

BUIL

BUILDING SECTION

SEC A15

SHEET NUMBE

A15

41


A

B

C

D

E

G

F

I

H

J

L

K

M

N

P

O

BANDITS

2021 PORTFOLIO

Q

Bancroft Ave.

PRARTHNA ANNA BAHU

MARIA JOS

ALEX STEP

+30’

CHRISTOPH

5’

1

2 Storage Room

3

Lobby

Entrance

Main Entrance

4

Restrooms

5

Stairs

RECORD

+25’

rev

+20’

6

5’

DISCLAIME

Stairs

To the best of plans are draw and/or builder changes made o be done at the expense and re actor shall ve enclosed drawi responsible th

Cafe

7

date / issue

A 12/4/2017 B C D E F

8

STAMP Offices

Stairs

Lobby

9

Entrance

Entrance

PROJECT A

10

BERKEL 2642 B BERKEL

N 00’

+05’

+10’

+15’

E

W Duran Ave.

0’

10’

5’

1

42

20’

SITE PLAN

S

SHEET TIT

SIT

SHEET NUM

A1


A

B

C

E

D

G

F

H

I

J

L

K

N

M

O

P

BANDITS

ACADEMIC

Q

PRARTHNA MISR ANNA BAHUDIAN

20’

MARIA JOSE ME

ALEX STEPHAN

CHRISTOPHER B

1 20’

2 Reading Rooms Media Viewing Area

3

1.5’

1

A15

11’

7’

Escalator

3’

Elevator

Book Stacks

Auditorium

4

5

RECORD

rev

Reading Space

7

DISCLAIMER

To the best of my kn plans are drawn to c and/or builder’s spe changes made on them be done at the owner expense and responsi actor shall verify a enclosed drawings, a responsible thereaft

5’ 2’ 3’

8

Book Stacks

Stairs

9 Book Stacks

5’

Reading Space

Reading Space

11’

date / issue

A 12/4/2017 B C D E F

6

Stairs

STAMP

2’

Elevator Elevator

10

PROJECT ADDRE

BERKELEY 2642 BANC BERKELEY,

11 N E

W 0’

1

43

5’

10’

1

20’

FLOOR PLAN

Plan Level 4

S

SHEET TITLE

TYPI FLOOR SHEET NUMBER

A14


1 A-6.00

BANDITS

2021 PORTFOLIO

PRARTHNA ANNA BAHU

MARIA JOS

ALEX STEP

CHRISTOPH

1 A-3.00

1 A-5.00

12” Steel Tube Secondary Structure

RECORD

rev

date / issue

A 12/4/2017 B C D E F

DISCLAIME

Steel I-Beam

To the best of plans are draw and/or builder changes made o be done at the expense and re actor shall ve enclosed drawi responsible th

LED Lighting System 18” Steel Tube Primary Structure

STAMP

Escalators Columns

PROJECT A

BERKEL 2642 B BERKEL

SHEET TIT

1

3D MEGA CHUNK

3D C

SHEET NUM

A1

44


BANDITS

ACADEMIC

1/2” SHEATHING WATERPROOFING MEMBRANE

PRARTH ANNA B

1-1/2” RIGID INSULATION

ALEX S

MARIA

CHRIST

FRP CASTED VOLUMES FRP 4’x8’ PANELS TERTIARY STRUCTURE 2”x2” STEEL TRACK

FRP CASTED VOLUMES

ROOF GUTTER

FRP 4’x8’ PANELS TERTIARY STRUCTURE 2”x2” STEEL TRACK 1/2” SHEATHING

RECO

rev

date / is

A 12/4/2 B C D E F

DISCLA

To the be plans are and/or bu changes m be done a expense a actor sha enclosed responsib

STAMP

C-CHANNELS

PROJEC

SOFT INSULATION

BER 264 BER

DRYWALL C-CHANNELS

METAL DECKING

METAL DECKING

4” PEDESTAL

4” PEDESTAL

SHEET

ROOF GUTTER

3D

FRP CASTED VOLUME

1

3D FACADE CHUNK SHEET

A

45


PRARTHNA MISRA ANNA BAHUDIAN

MARIA JOSE MEZA

ALEX STEPHAN BICA

2021 PORTFOLIO

CHRISTOPHER BECERRA

1-1/2” RIGID INSULATION FRP CASTED VOLUMES FRP 4’x8’ PANELS TERTIARY STRUCTURE 2”x2” STEEL TRACK ROOF GUTTER 1/2” SHEATHING WATERPROOFING MEMBRANE

RECORD

rev

date / issue

A 12/4/2017 B C D E F

DISCLAIMER

To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.

1

A6.00

STAMP

PROJECT ADDRESS

BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA METAL DECKING 4” PEDESTAL

SHEET TITLE

DRYWALL

3D WALL SECTIONROOF TO WALL

SOFT INSULATION C-CHANNELS

1

ROOF TO WALL

SHEET NUMBER

BANDITS

A3.01

PRARTHNA MISRA ANNA BAHUDIAN

MARIA JOSE MEZA

ALEX STEPHAN BICA

CHRISTOPHER BECERRA

RECORD

rev

date / issue

A 12/4/2017 B C D E F

DISCLAIMER

To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.

1

STAMP

A4.00

PROJECT ADDRESS

BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA

SHEET TITLE

RIGID INSULATION SECONDARY STRUCTURE

1

FLOOR TO WALL

3D WALL SECTIONFLOOR TO WALL

SHEET NUMBER

A3.02

SOFT INSULATION DRYWALL/INTERIOR FINISH C-CHANNELS

BANDITS

GUTTER/DRAIN

PRARTHNA MISRA ANNA BAHUDIAN

MARIA JOSE MEZA

ALEX STEPHAN BICA

CHRISTOPHER BECERRA

1

1/2” SHEATHING

A5.01

WATERPROOFING MEMBRANE FRP 4’x8’ PANELS 4” PEDESTAL TERTIARY STRUCTURE 2”x2” STEEL TRACK

RECORD

rev

date / issue

A 12/4/2017 B C D E F

DISCLAIMER

To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.

STAMP

PROJECT ADDRESS

BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA

SECONDARY STRUCTURE

SHEET TITLE

SOFT INSULATION DRYWALL/INTERIOR FINISH C-CHANNELS GUTTER/DRAIN

46

FLOOR TILES

1

GROUND TO WALL

3D WALL SECTIONGROUND TO WALL SHEET NUMBER

A3.03


BANDITS

ACADEMIC

PRARTHNA MISRA ANNA BAHUDIAN

MARIA JOSE MEZA

ALEX STEPHAN BICA

CHRISTOPHER BECERRA

1” FRP Panel

Tertiary

Structure

18” Steel Tube Primary Structure

Welded Pipe Connection

12” Steel Tube Secondary Structure

RECORD

rev

date / issue

A 12/4/2017 B C D E F

Steel Studs 16” O.C

DISCLAIMER

Welded Steel Plate Connection

To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.

Waterproofing Membrane

STAMP

Dry Wall

PROJECT ADDRESS

BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA

SHEET TITLE

3D DETAIL 1

ROOF DETAIL SHEET NUMBER

BANDITS

A6.00

PRARTHNA MISRA ANNA BAHUDIAN

MARIA JOSE MEZA

ALEX STEPHAN BICA

CHRISTOPHER BECERRA

12” Steel Tube Secondary Structure

Steel Studs 16” O.C

Tertiary

Structure

Welded Pipe Connection

RECORD

Dry Wall

rev

date / issue

A 12/4/2017 B C D E F

1” FRP Panel

DISCLAIMER

To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.

Waterproofing Membrane

STAMP

PROJECT ADDRESS

BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA

SHEET TITLE

3D DETAIL

47

1

GROUND TO WALL DETAIL SHEET NUMBER

A5.01


BANDITS

2021 PORTFOLIO 1 A-4.01

PRARTHNA MISRA ANNA BAHUDIAN

MARIA JOSE MEZA

ALEX STEPHAN BICA

CHRISTOPHER BECERRA

Aliuminum Window Frame

Low-E Double Pane Glass Dry Wall FRP Apeture Tertiary

Structure

1” FRP Panel

RECORD

rev

12” Steel Tube Secondary Structure

date / issue

A 12/4/2017 B C D E F

DISCLAIMER

Steel Studs 16” O.C

To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.

Corrugated Concrete Tray

STAMP

18” Steel Tube Primary Structure

Steel I-Beam PROJECT ADDRESS

Air Conditioning Ducts

BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA

Drop Ceiling Ties

SHEET TITLE

3D DETAIL 1

FLOOR TO WALL DETAIL SHEET NUMBER

BANDITS

A4.00

PRARTHNA MISRA ANNA BAHUDIAN

MARIA JOSE MEZA

Tertiary Structure

ALEX STEPHAN BICA

CHRISTOPHER BECERRA

Welded Pipe Connection

Window Flashing

Window Frame

Low-E Double Pane Glass

FRP Window

RECORD

rev

date / issue

A 12/4/2017 B C D E F

DISCLAIMER

To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.

STAMP

PROJECT ADDRESS

BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA

SHEET TITLE

3D DETAIL 1

48

WINDOW DETAIL SHEET NUMBER

A5.02


BANDITS

ACADEMIC

PRARTHNA ANNA BAH

MARIA J

ALEX STE

CHRISTOP

Gutter FRP Panels Tertiary Structure Sheathing Waterproofing Membrane Rigid Insulation FRP Window Frames Tongue In Groove System Secondary Steel Structure

0

A4.00

C-Channels Insulation Attachment Pedestal Drywall Concrete filled Deck Primary Steel Structure

RECOR

rev

date / issue

A 12/4/201 B C D E F

DISCLAIM

To the best plans are dr and/or build changes made be done at t expense and actor shall enclosed dra responsible

STAMP

I-Beam T-Bar Suspender Dropped Ceiling PROJECT

BERKE 2642 BERKE

SHEET TI

WALL 2

WALL DETAIL-RENDER

1

WALL DETAIL

SHEET NU

A1

49


2021 PORTFOLIO INTERIOR FINISH TONGUE-IN-GROOVE FLOORING LAMINATE BOLTS

SILL PLATE

INTERIOR FINISH TONGUE-IN-GROOVE FLOORING LAMINATE

FOOTING/ STEM WALL

BOLTS

SILL PLATE

RECORD

rev

date / issue

A 12/4/2017 B C D E F

3

SCALE = NTS

RECOR

rev

date / issue

A 12/4/201 B C D E F

PRARTHNA MISRA ANNA BAHUDIAN

DISCLAIM

MARIA JOSE MEZA To the

INTERIOR FLOORING DETAIL ALEX STEPHAN

3

DISCLAIMER

INTERIOR FLOORING DETAIL

SCALECHRISTOPHER = NTS

To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.

best

plans are dr BICA and/or build

changes made BECERRA be done at t expense and actor shall enclosed dra responsible

STAMP

STAMP

WPM STEEL COLUMN

PM

FLASHING

BOLTS

BASE PLATE

LASHING

ANCHORAGE BOLTS

INTERIOR FINISH TONGUE-IN-GROOVE FLOORING LAMINATE

STEEL COLUMN BOLTS BASE PLATE

BOLTS

SILL PLATE

ANCHORAGE BOLTS

FOOTING/ STEM WALL

PROJECT ADDRESS

PROJECT

BERKE 2642 BERKE

BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA

RECORD

rev

CRUSHED STONE

SHEET TITLE

ENT CLOGGING TE CATCH ER TIGHT

CALE = NTS

BANDITS

FOOTING/ STEM WALL

2D DETAILS

date / issue

A 12/4/2017 B C D E F

FILTER TO PREVENT CLOGGING 24”x24” CONCRETE CATCH BASIN WITH WATER TIGHT BOTTOM

SHEET TI

2D

DISCLAIMER

1

FOOTING & ANCHORAGE

SCALE = NTS

SHEET NUMBER

A19.00

2

DRAIN DETAIL

SCALE = NTS

3

To the best of my knowledge, these

plans are drawn to comply with owne SHEET NU FOOTINGDETAIL & ANCHORAGE INTERIOR FLOORING and/or builder’s specifications. An

1

SCALE = NTS

A1

SCALEchanges = NTSmade on them after prints w

be done at the owner’s and/or build expense and responsibility. The con actor shall verify all dimension an enclosed drawings, and be solely responsible thereafter.

STAMP

WPM FLASHING

STEEL COLUMN BOLTS BASE PLATE ANCHORAGE BOLTS

PROJECT ADDRESS

BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA

50 SHEET TITLE


A B C D E F

C-CHANNEL

FLOOR TO WALL DETAIL

5

64

SCALE = NTS

TONGUE-IN-GROOVE PANEL WALL DETAIL

SCALE = NTS SCALE = NTS

C-CHANNEL

FLOOR ACADEMIC 5

TO WALL DETAIL

6

SCALE = NTS

TONGUE-IN-GROOVE WALL DETAILPANEL

4

SCALE = NTS SCALE = NTS

DISCLAIMER

RECESSED GUTTER BREATHER MEMBRANE

STAMP

COLUMN CAP BOLTS

WPM PLYWOOD SHEATHING OVERFLOW PIPE

STEEL

WPM PLYWOOD SHEATHING OVERFLOW PIPE

STEEL

RECESSED GUTTER BREATHER MEMBRANE

RECESSED GUTTER BREATHER MEMBRANE

PROJECT ADDRESS

FRP SYSTEM

2

3

SCALE = NTS

COLUMN CAP DETAIL ROOFFRP DETAIL HOOK CONNECTION

1

SCALE = NTS SCALE = NTS

TERTIARY STRUCTURE STEEL TRACK

SECONDARY STRUCTURE

INTR. FINISH

DRYWALL SOFT INSULATION

RIGID INSULATION WPM

SOFT INSULATION INTR. FINISH

SHEET TITLE

(END COLUMN CAP)

(COLUMN CAP)

A18.00

MARIA JOSE MEZA

2

GUTTER DETAIL

1

SCALE = NTS SCALE = NTS

ALEX STEPHAN BICA

SECONDARY STRUCTURE

INTR. FINISH DRYWALL

INTR. FINISH

SOFT INSULATION

DRYWALL

C-CHANNEL

SOFT INSULATION

SECONDARY STRUCTURE

A18.00

MARIA JOSE MEZA

2

GUTTER

INTR. FINISH DRYWALL

SOFT INSULATION

FRP SYSTEM

C-CHANNEL

FRP HOOK CONNECTION

SECONDARY STRUCTURE

TERTIARY STRUCTURE STEEL TRACK

PEDESTAL SHEATHING WPM

WPM

TERTIARY STRUCTURE FRP

FRP

SHEATHING

SHEATHING

WPM

WPM

TERTIARY STRUCTURE

TERTIARY STRUCTURE

FRP

FRP

RECORD

PEDESTAL

rev

C-CHANNEL

64

TONGUE-IN-GROOVE PANEL WALL DETAIL

SCALE = NTS SCALE = NTS

date / issue

A 12/4/2017 B C D E F

RECORD

PEDESTAL

rev

C-CHANNEL

5

FLOOR TO WALL DETAIL

4

SCALE = NTS

WALL DETAIL

SCALE = NTS

To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.

To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.

COLUMN CAP BOLTS

STAMP

STEEL

date / issue

A 12/4/2017 B C D E F

DISCLAIMER

DISCLAIMER

WPM PLYWOOD SHEATHING OVERFLOW PIPE

PRARTHNA MISRA SHEET NUMBER ANNA BAHUDIAN

CHRISTOPHER BECERRA

CHRISTOPHER BECERRA

TERTIARY STRUCTURE

SCALE = NTS

ROOF DETAILCOLUMN CAP DETAIL

2D DETAILS

ALEX STEPHAN BICA

PEDESTAL

FLOOR TO WALL DETAIL

3

SCALE = NTS

SHEATHING

5

SHEET TITLE

(END COLUMN CAP)

(COLUMN CAP)

2D DETAILS

PRARTHNA MISRA SHEET NUMBER ANNA BAHUDIAN

BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA

BANDITS

INTR. FINISH

BANDITS

RIGID INSULATION WPM

GUTTER DETAIL

PROJECT ADDRESS

BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA

SOFT INSULATION

FLOOR

To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.

STAMP

COLUMN CAP BOLTS

5

DISCLAIMER

To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.

WPM PLYWOOD SHEATHING OVERFLOW PIPE

A 12/4/2017 B C D E F

WPM PLYWOOD SHEATHING OVERFLOW PIPE

6

TONGUE-IN-GROOVE PANEL COLUMN CAP BOLTS

STAMP

5

SCALE = NTS

STEEL

RECESSED GUTTER BREATHER MEMBRANE

RECESSED GUTTER BREATHER MEMBRANE

PROJECT ADDRESS

BERKELEY LIBRARY 2642 BANCROFT WAY

51

PROJECT ADDRESS

BERKELEY LIBRARY 2642 BANCROFT WAY

WPM

FLOOR


2021 PORTFOLIO

52


ACADEMIC

53


2021 PORTFOLIO

54


ACADEMIC

05 Hotel and Office Tower Site: Mexico City, Mexico Software: Rhino 3D, V-Ray, Adobe Photoshop, Adobe Illustrator Collaborators: Christopher Becerra Instructor: Margeret Griffin

Project Description: For the tower project in Mexico City, my partner and I were interested in how a continuous arrangement of lines could accentuate the tower typology. From our previous facade studies we determined that we wanted to keep the idea of louvers wrapping around the tower therefore the corners would be continuous and we eliminated any horizontal fi ns in order to keep the verticality of both the pattern and the tower. Through the linework we realized that some fi gures became too prominent and decided to shear the fi ns in diff erent directions in order to provide a diff erent reading of the project as you walk through the building from the inside and outside, producing diff erent solid-void relationships throughout the whole extent of the building. 55


2021 PORTFOLIO Facade Studies

Intersecting Planes- Horizontal, Vertical, and Diagnol

Non-Intersecting Planes- Horizontal, Vertical, and Diagnol

Continuous Planes- Horizontal, Vertical, and Diagnol

Chunk Design Development

56


ACADEMIC

2’ THICK HIGH DENSITY REINFORCED CONCRET CORE WITH POST TENSION CABLES

4” DRY WALL PARTITIONS

8” THICK CONCRETE FLOOR SLAB WITH INTEGRATED HIGH TENSION STEEL CABLE

10’x6’ HIGH PERFORMANCE GLASS SYSTEM WITH ALUMINUM MOLEANS

CAST IN PLACE GFRC LOUVERS 6” O.C. WITH TITANIUM OXIDE COATING. INTERLOCKING CONCRETE FIN

57


2021 PORTFOLIO

H

O

H

O

58


ACADEMIC

59


2021 PORTFOLIO

60


ACADEMIC

61


Professional Work 2019-2021

62


Contents 01 02 03 04 05

Living Room - Dining Area Instagram Graphics Photoshoot Storyboards Email Campaigns Jewelry Design

63

pg.64 pg.70 pg.74 pg.84 pg.88


2021 PORTFOLIO

64


PROFESSIONAL

01 Dining Area & Living Room Site: Paris, France Software: Rhino 3D, V-Ray, Adobe Photoshop Company: Alexandra Loew Inc. Project Description: For this project our client was in Paris and wanted to rennovate and reimagine their living and dining room space. As part of the Alexandra Loew Inc. team I built the segment of the condo in 3D space from AutoCAD drawings and replicated important furniture pieces selected by Alexandra Loew and the client. I was also in charge of rendering the space using the selected materials, furniture, color palette, and hardwares, modeling exactly as they would be placed in the rennovated space. This not only helped the client visualize the space but also feel part of the overall process and provided input.

65


2021 PORTFOLIO

66


PROFESSIONAL

67


2021 PORTFOLIO

68


PROFESSIONAL

69


2021 PORTFOLIO

70


PROFESSIONAL

02 Instagram Graphics Purpose: Social Media Interaction & Conversion Software: Canva, Adobe Photoshop, Instagram Brand: LACE by Jenny Wu Project Description: As part of growing a brand is customer engagement. Social media allows brands and their followers to connect and view insights on not only the products, but also the production process, celebrity features, and key updates. Through frequent posts and stories our customers are kept up to date on the latest promotions and releases. I curate the theme and select the focus of the story along with the images that will be used. The stories are at times informative on any upcoming sales, on the design process of our latest designs, and most of the time are showcasing the jewelry pieces.

71


2021 PORTFOLIO

72


PROFESSIONAL

73


2021 PORTFOLIO

74


PROFESSIONAL

03 Photoshoot Preparations Purpose: Showcase jewelry and ways to accessorize. Keep website and Instagram graphics fresh. Software: Canva, Adobe Photoshop, Instagram Brand: LACE by Jenny Wu Project Description: Part of keeping a website up to date is having new and fresh images to work with. Every few months it’s important to plan photoshoots for the season and upcoming launches. As manager of the LACE brand, I organize and prepare call sheets for upcoming photoshoots. These photoshoots are key and need to be planned with location, jewelry pieces, and outfits in mind. The outcome is a range of photos varying from model shots to close ups. The images are used for the website, social media, blogs, and email campaigns.

75


2021 PORTFOLIO

76


PROFESSIONAL

77


2021 PORTFOLIO

78


PROFESSIONAL

79


2021 PORTFOLIO

80


PROFESSIONAL

81


2021 PORTFOLIO

82


PROFESSIONAL

83


2021 PORTFOLIO

84


PROFESSIONAL

04 Email Campaigns Purpose: Connect with our clients signed up to our newsletter Software: Canva, Adobe Photoshop, Klaviyo Brand: LACE by Jenny Wu

Project Description: As part of keeping customers informed regular email campaigns are sent out to those who subscribe to our newsletter. These emails are curated in inform our customers on upcoming promotions, sales, events, and releases. Other content includes information on our blogs like proposal stories and behind the scenes of the making of our pieces.

85


2021 PORTFOLIO

86


PROFESSIONAL

87


2021 PORTFOLIO

88


PROFESSIONAL

05 Jewelry design and prototypes Purpose: Bring new designs and jewelry items to the brand Software: Maya, Rhino Brand: LACE by Jenny Wu

Project Description: Every so often new pieces are added to the brand collection. I’ve been involved in numerous adjustments and modifications to current designs as well as taking part in the brainstorming, designing, and prototyping process. Among the latest releases was a new diamond ring, Iris, which was designed to accomodate for a smaller diamond in the 0.50 carat range. This allows people on a budget or with an interest in discrete minimal engagement rings to have a unique and elegant ring without compromising quality or design.

89


2021 PORTFOLIO

90


PROFESSIONAL

91


2021 PORTFOLIO

92


PROFESSIONAL

93


2021 PORTFOLIO

94


PROFESSIONAL

Mariajose Meza

Contact Phone: (323) 359-9012 Email: meza3mariajose@gmail.com Instagram: @mariajosemeza3

95



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.