MARIAJOSE MEZA
Academic Work 2014-2019
Contents 01 02 03
Mixed Use Space Library WeWork, WeLive, WePlay
pg.4 pg.12 pg.22
2021 PORTFOLIO
2
3
4
3.5'x5' Operable Ribbon Window Panel
1101 South Robertson Boulevard Exterior Cafe Patio
Exterior Cafe Tables
SCI-ARC
3D View 3 1
Consultant: Landscape Specialist, Studio-MLA Address: 185 S Myers St Address: Los Angeles, CA 90033 Phone: (213) 384-3844 Fax: (213) 384-3833 e-mail: office@studio-mla.com Consultant: Soil Engineer, Bay City Geology Address: 1423 S. Beverly Glen Blvd #B Address: Los Angeles, CA 90024 Phone: (310) 429-6681 Fax: (310) 429-6682 e-mail: jonathanmiller@baycitygeology.com
4
Consultant: MEP Specialists, Henderson Engineers Address: 510 West 6th St Suite 800 Address: Los Angeles, CA 90014 Phone: (213) 254-4750 Fax: (213) 254-4751 e-mail: AustinAllen@hendersonengineers.com
ACADEMIC
01 5
6
1 A-2.2
7
8
9
10
11
12
Glass Rooftop Access Port
1101 South Robertson Boulevard
4'X8" FRP PANELS
Roof 39' - 0"
Mixed Use Office, Retail, & Residential Space
SCI-ARC
3.5'x5' Operable Ribbon Window Panel Exterior Patio Access Door
Exterior Aluminum Hand Railing 1
A-2.1
Level 3 27' - 0"
Consultant: Landscape Specialist, Studio-MLA Address: 185 S Myers St Address: Los Angeles, CA 90033 Phone: (213) 384-3844 Fax: (213) 384-3833 e-mail: office@studio-mla.com Consultant: Soil Engineer, Bay City Geology Address: 1423 S. Beverly Glen Blvd #B Address: Los Angeles, CA 90024 Phone: (310) 429-6681 Fax: (310) 429-6682 e-mail: jonathanmiller@baycitygeology.com
4'x8' FRP Panels
Level 2 15' - 0" 6'x6' Exterior Window Panels
SPRING 2018_AS 3041 - CONSTRUCTION DOCUMENTS
Site: Los Angeles, California
1.5"x2.5" Window Mullion
Software: Revit
Consultant: MEP Specialists, Henderson Engineers Address: 510 West 6th St Suite 800 Address: Los Angeles, CA 90014 Phone: (213) 254-4750 Fax: (213) 254-4751 e-mail: AustinAllen@hendersonengineers.com
Collaborators: Christopher Becerra, Sarah Carcamo, Emma Manguy
Consultant Structural Engineer, Englekirk Address: 888 S. Figueroa St. 18th Floor Address: Los Angeles, CA 90017 Phone: (323) 733-6673 Fax: (323) 733-6674 e-mail: la@englekirk.com
Main Lobby Entrance
Level 1 0' - 0"
Consultant: Civil Engineer, Whitson Egineers Address: 5200 West Century Blvd, Suite 430 Address: Los Angeles, CA 90045 Phone: (310) 645-3205 Fax: (310) 645-3206 e-mail: info@whitsonengineers.com
Instructors: Pavel Getov & David Ross
No. Parking -11' - 6"
1 A-2.2
North 1
1/4" = 1'-0"
Project Description: For this project my team members and I decided to design a building that had a strong presence on the street. The facade is mostly a curtain wall with FRP panels that mimick the look of concrete. Looking at the building longitudinally and “splitting” it in half we lifted the first floor allowing for a parking entrance and an NORTH ELEVATION exterior cafe. The first floor serves as a small cafe, a gallery, and a A-3.2 lobby. The second floor is office space and the third floor contains 1-bedroom apartments and lofts with an exterior communal area. Description
1 A-2.1
5
Date
2021 PORTFOLIO
Mariajose Meza
2
3
4
5
6
7
8
9
10
11
1
Glass Rooftop Access Port
1
12
A-2.1
1101
A-2.2
Roof Drainage Slope
Roof 39' - 0"
APARTMENT
APARTMENT
320
330
DINING TERRACE
14' - 0"
Exterior Aluminium Hand Rail
12' - 0"
Exterior Patio Access Door
Consultant: Land Address: 185 S M Address: Los An Phone: (213) 38 Fax: (213) 384-3 e-mail: office@s
Interior Hand Rails MEZZANINE
CONFERENCE ROOM
CONFERENCE ROOM
270
280
12' - 0"
Level 3 27' - 0"
Interior Hand Rails MEZZANINE
Consultant: MEP Address: 510 W Address: Los An Phone: (213) 25 Fax: (213) 254-4 e-mail: AustinAll
Level 2 15' - 0"
16' - 6"
1 A-2.3
DINING PATIO
LOBBY
762 SqFt
762 SqFt
10' - 1 1/32"
6' - 6 13/16"
Level 1 0' - 0"
9' - 0"
Consultant Struc Address: 888 S. Address: Los An Phone: (323) 73 Fax: (323) 733-6 e-mail: la@engle
Consultant: Civil Address: 5200 W Address: Los An Phone: (310) 64 Fax: (310) 645-3 e-mail: info@wh
PARKING ENTRY
GARAGE
Consultant: Soil Address: 1423 S Address: Los An Phone: (310) 42 Fax: (310) 429-6 e-mail: jonathanm
No.
Parking -11' - 6" 48' - 0"
LONGIT
1
1
A-2.1
A-2.2
Section 2 1 1/4" = 1'-0"
6
ACADEMIC
Mixed Use Space
$
6
&: $
$
/2%%<
$
83
/2%%< 6T)W
$
&RQVXOWDQW /DQGVF $GGUHVV 6 0\ $GGUHVV /RV $QJH 3KRQH )D[ H PDLO RIILFH#VWXG
%
&RQVXOWDQW 6RLO (Q $GGUHVV 6 % $GGUHVV /RV $QJH 3KRQH )D[ H PDLO MRQDWKDQPL
83
&
&RQVXOWDQW 0(3 6 $GGUHVV :HV $GGUHVV /RV $QJH 3KRQH )D[ H PDLO $XVWLQ$OOHQ
6T)W
&RQVXOWDQW &LYLO ( $GGUHVV :H $GGUHVV /RV $QJH 3KRQH )D[ H PDLO LQIR#ZKLWV
( $
&$)(
6T)W
$
$
*$//(5<
&RQVXOWDQW 6WUXFWX $GGUHVV 6 )L $GGUHVV /RV $QJH 3KRQH )D[ H PDLO OD#HQJOHNL
:$ $
'1
'
83
)
1R
$
:$// 7<3( $
7
:$// 7<3( &
:$// 7<3( )
),5
/HYHO
2021 PORTFOLIO
Mariajose Meza
6
&: $
&: $
$
$
'1
$
$
%
&: $
6T)W '1
6T)W
&
:$ $
&RQVXOWDQW 0(3 6 $GGUHVV :HV $GGUHVV /RV $QJH 3KRQH )D[ H PDLO $XVWLQ$OOHQ
83
$
'
'1
83
2)),&( 6T)W
2)),&( 6T)W
6T)W
2)),&( 6T)W
.,7&+(1
$
6833/< 5220
6T)W
5(675220
5(675220
(
$
:$ $
:$ $
:$ $
:$ $
&RQVXOWDQW 6RLO (Q $GGUHVV 6 % $GGUHVV /RV $QJH 3KRQH )D[ H PDLO MRQDWKDQPL
:$ $
&RQVXOWDQW /DQGV $GGUHVV 6 0\ $GGUHVV /RV $QJH 3KRQH )D[ H PDLO RIILFH#VWX
&21)(5(1&( 5220
&21)(5(1&( 5220
&RQVXOWDQW 6WUXFWX $GGUHVV 6 ) $GGUHVV /RV $QJH 3KRQH )D[ H PDLO OD#HQJOHN
&RQVXOWDQW &LYLO ( $GGUHVV :H $GGUHVV /RV $QJH 3KRQH )D[ H PDLO LQIR#ZKLWV
$
1R
$
:$// 7<3( $
:$// 7<3( &
:$// 7<3( (
:$// 7<3( )
6(&
8 /HYHO
ACADEMIC
Mixed Use Space
$
6/23(' &857$,1 :$//
+$1'5$,/
6T)W
:$ $
&
:$ $
&RQVXOWDQW /DQG $GGUHVV 6 0 $GGUHVV /RV $Q 3KRQH )D[ H PDLO RIILFH#VW
6T)W
5220
%
$3$570(17
$3$570(17
6T)W
5220
5220
&RQVXOWDQW 6WUXF $GGUHVV 6 $GGUHVV /RV $Q 3KRQH )D[ H PDLO OD#HQJOH
&RQVXOWDQW &LYLO $GGUHVV : $GGUHVV /RV $Q 3KRQH )D[ H PDLO LQIR#ZKL
6T)W
(
678',2 $3$570(17
:$ &
:$ &
'1
$
:$ $
5220
'
'1
:$ $
:$ $
5220
$
$
:$ $
&RQVXOWDQW 6RLO ( $GGUHVV 6 $GGUHVV /RV $Q 3KRQH )D[ H PDLO MRQDWKDQP
&RQVXOWDQW 0(3 $GGUHVV :H $GGUHVV /RV $Q 3KRQH )D[ H PDLO $XVWLQ$OOH
6T)W
287'225 $5($
5220
$3$570(17
5220
5220
$
1R
$
:$// 7<3( $
:$// 7<3( &
:$// 7<3( '
:$// 7<3( )
7+
9 /HYHO
2021 PORTFOLIO
Mariajose Meza
; :' +($'(5
; :' +($'(5
; :' +($'(5
; :' +($'(5
*<3 %'
*<3 %'
%$77( ,168/$7,21
%$77( ,168/$7,21
%$77( ,168/$7,21
,17(5,25 ,17(5,25
; :' 678' 63$&(' 2 & ; :' 678' 63$&(' 2 & ; :' 678' 63$&(' 2 &
7+,&. &$67 ,1 3/$&( &21&5(7(
7+,&. &$67 ,1 3/$&( &21&5(7(
,17(5,25
,17(5,25 ,17(5,25
,17(5,25
,17(5,25 ,17(5,25
7+,&. &$67 ,1 3/$&( &21&5(7(
,17(5,25
,17(5,25
:$// 7<3( %
:$// 7<3( %
,17(5,25
:$// 7<3( %
,17(5,25
,17(5,25
*<3 %'
678'
:$7(53522) 0(0%5$1(
)53 %5$&.(7
0(7$/ /$7+
0(7$/ /$7+
)53 ; 3$1(/6
)53 ; 3$1(/6
)53 ; 3$1(/6
9$325 %$55,(5
9$325 %$55,(5
,17(5,25
,17(5,25
$/80,1,80 6,// 08//,21
'28%/( */$=(' /2: ( */$66
:$7(53522) %$55,(5 6833257 )5$0(
5811(5 &+$11(/6
:$// 7<3( & '28%/( */$=(' /2: ( */$66
9$325 %$55,(5
:$// 7<3( % (;7(5,25
(;7(5,25
,17(5,25
3/<:22' 6+($7+,1* ;
0(7$/ 678'
:$// 7<3( &
(;7(5,25
6758&785$/ %($0 $1' &2/801
6758&785$/ %($0 $1' &2/801
5811(5 &+$11(/6
5811(5 &+$11(/6
,17(5,25
3/<:22' 6+($7+,1* ;
,17(5,25
(;7(5,25
(;7(5,25
,17(5,25
$,5 *$3
*<3 %' (;7 :$// : )53 3$1(/ (;7 :$// : )53 3$1(/ (;7 :$// : )53 3$1(/ 678' )53 %5$&.(7
,168/$7,21 :$// 7<3( '
:$// 7<3( '
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
:$7(53522) %$55,(5 6833257 )5$0( 3/<:22' 6+($7+,1* ;
0(7$/ /$7+ $,5 *$3 )53 ; 3$1(/6
$
$
:$// 7<3( '
1R
'HVFULSWLRQ
'DWH
9$325 %$55,(5 )53 %5$&.(7
,17(5,25
:$7(53522) %$55,(5 (;7(5,25 6833257 )5$0( 0(7$/ /$7+
1R
)53 ; 3$1(/6 9$325 %$55,(5
(;7(5,25
,17(5,25
5811(5 &+$11(/6
&21&5(7( 3$9(5
&21&5(7( 3$9(5
%2/7
%2/7
6
3$9(5 3('(67$/
3$9(5 3('(67$/
&21&5(7( )281$7,21
&21&5(7( )281$7,21
'HVFULSWLRQ
'DWH
&$67 ,1 3/$&( &21&5(7( 6/$%
&$67 ,1 3/$&( &21&5(7( 6/$%
5,*,' ,168/$7,21 *5$9(/ /$<(5
5,*,' ,168/$7,21 *5$9(/ /$<(5
; .(<:$<
; .(<:$<
$
&RQVXOWDQW 6WUXFWXUD $GGUHVV 6 )LJX $GGUHVV /RV $QJHOH 3KRQH )D[ H PDLO OD#HQJOHNLUN
&RQVXOWDQW &LYLO (QJ $GGUHVV :HVW $GGUHVV /RV $QJHOH 3KRQH )D[ H PDLO LQIR#ZKLWVRQ
:$// 7<3(6 $ :$// 7<3(6
(;7 :$// : )53 3$1(/ 5811(5 &+$11(/6
1R
$
:$// 7<3( ' (;7 :$// : )53 3$1(/
:$// 7<3( '
6R %
:$// 7<3(6 :$// 7<3(6 :$// 7<3(6
*<3 %' 678' 5811(5 &+$11(/6 ,168/$7,21
6RXWK 5REHUWVRQ %RXOHYDUG 6&, $5& 6&, $5&
5811(5 &+$11(/6
:$// 7<3( %
:$7(53522) %$55,(5 6833257 )5$0(
0(7$/ /$7+
,17(5,25
:$7(53522) 0(0%5$1(
$/80,1,80 6,// 08//,21
)53 %5$&.(7
:$7(53522) %$55,(5 6833257 )5$0(
%$77( ,168/$7,21
0(7$/ 678'
6RXWK 5REHUWVRQ %RXOHYDUG
&RQVXOWDQW 6RLO (QJLQHHU %D\ &LW\ *HRORJ\ &RQVXOWDQW 6RLO (QJLQHHU %D\ &LW\ *HRORJ\ &RQVXOWDQW 6RLO (QJLQHHU %D\ &LW\ *HROR $GGUHVV 6 %HYHUO\ *OHQ %OYG % $GGUHVV 6 %HYHUO\ *OHQ %OYG % $GGUHVV 6 %HYHUO\ *OHQ %OYG % 5811(5 &+$11(/6 $GGUHVV /RV $QJHOHV &$ $GGUHVV /RV $QJHOHV &$ $GGUHVV /RV $QJHOHV &$ 3KRQH 3KRQH 3KRQH )D[ )D[ )D[ H PDLO MRQDWKDQPLOOHU#ED\FLW\JHRORJ\ FRP H PDLO MRQDWKDQPLOOHU#ED\FLW\JHRORJ\ FRP H PDLO MRQDWKDQPLOOHU#ED\FLW\JHRORJ\ FR
&RQVXOWDQW 0(3 6SHFLDOLVWV +HQGHUVRQ (QJLQHHUV &RQVXOWDQW 0(3 6SHFLDOLVWV +HQGHUVRQ (QJLQHHUV &RQVXOWDQW 0(3 6SHFLDOLVWV +HQGHUVRQ $GGUHVV :HVW WK 6W 6XLWH $GGUHVV :HVW WK 6W 6XLWH $GGUHVV :HVW WK 6W 6XLWH $GGUHVV /RV $QJHOHV &$ $GGUHVV /RV $QJHOHV &$ $GGUHVV /RV $QJHOHV &$ 3KRQH 3KRQH 3KRQH )D[ )D[ )D[ H PDLO $XVWLQ$OOHQ#KHQGHUVRQHQJLQHHUV FRP H PDLO $XVWLQ$OOHQ#KHQGHUVRQHQJLQHHUV FRP H PDLO $XVWLQ$OOHQ#KHQGHUVRQHQJLQHHUV
*<3 %'
:$// 7<3( & ,17(5,25
,17(5,25
3/<:22' 6+($7+,1* ;
678'
%$77( ,168/$7,21 ,168/$7,21
3/<:22' 6+($7+,1* ; 3/<:22' 6+($7+,1* ;
3/<:22' 6+($7+,1* ;
6721( )/225 ),1,6+ 6721( )/225 ),1,6+ $,5 *$3 $,5 *$3 $,5 *$3 &21&5(7( '(&.,1* &21&5(7( '(&.,1* 5811(5 &+$11(/6 )53 %5$&.(7
:$// 7<3( &
,17(5,25
*<3 %'
678'678'
,168/$7,21 ,168/$7,21 %$77( ,168/$7,21
:$// 7<3( &
,17(5,25&21&5(7(
*<3 :$// %2$5'
*<3 :$// %2$5'
*<3 %'
; :' 678' 63$&(' 2 &
7+,&. &$67 ,1 3/$&(
,17(5,25
5811(5 &+$11(/6
%$77( ,168/$7,21
7+,&. &$67 ,1 3/$&( &21&5(7(
*<3 %'
5811(5 &+$11(/6 678'
,17(5,25
6&, $5&
,17(5,25
&RQVXOWDQW /DQGVFDSH 6SHFLDOLVW 6WXGLR 0/$ &RQVXOWDQW /DQGVFDSH 6SHFLDOLVW 6WXGLR 0/$ &RQVXOWDQW /DQGVFDSH 6SHFLDOLVW 6WXGLR $GGUHVV 6 0\HUV 6W $GGUHVV 6 0\HUV 6W $GGUHVV 6 0\HUV 6W $GGUHVV /RV $QJHOHV &$ $GGUHVV /RV $QJHOHV &$ $GGUHVV /RV $QJHOHV &$ 3KRQH 3KRQH 3KRQH )D[ )D[ )D[ H PDLO RIILFH#VWXGLR POD FRP H PDLO RIILFH#VWXGLR POD FRP H PDLO RIILFH#VWXGLR POD FRP
5811(5 &+$11(/6 *<3 %'
%$77( ,168/$7,21
:$// 7<3( $
6&, $5&
635,1* B$6 &216758&7,21 '2&80(176
5811(5 &+$11(/6
%$77( ,168/$7,21
:$// 7<3( $
,17(5,25 ,17(5,25
; :' 678' 63$&(' 2 &
5811(5 &+$11(/6
; :' 678' 63$&(' 2 &
,17(5,25
%$77( ,168/$7,21
; :' +($'(5
; :' 678' 63$&(' 2 &
:$// 7<3( $
%$77( ,168/$7,21
; :' +($'(5
5811(5 &+$11(/6 *<3 %'
,17(5,25
*<3 %'
%$77( ,168/$7,21
,17(5,25 ,17(5,25
; :' +($'(5
:$// 7<3( $
*<3 %'
6&, $5&
; :' +($'(5
:$// 7<3( $
*<3 %'
635,1* B$6 &216758&7,21 '2&80(176 635,1* B$6 &216758&7,21 '2&80(176 635,1* B$6 &216758&7,21 '2&80(176
,17(5,25 ,17(5,25
,17(5,25
; :' +($'(5
6RXWK 5REHUWVRQ 6RXWK 5REHUWVRQ 6RXWK 5REH %RXOHYDUG %RXOHYDUG %RXOHYDUG
; :' 678' 63$&(' 2 & ; :' 678' 63$&(' 2 & ; :' 678' 63$&(' 2 & *<3 %'
; :' +($'(5
:$// 7<3( (
:$// 7<3( (
:$// 7<3( )
:$// 7<3( )
:$
10
ACADEMIC
2% slope 2% slope
7 A-5.3
7 Sim A-5.3
Sim
STRUCTURAL BEAM AND COLUMNBEAM CONNECTIONS STRUCTURAL AND COLUMN CONNECTIONS GYPSUM WALL BOARD GYPSUM WALL BOARD STUD STUD INSULATION INSULATION
GYPSUM WALL BOARD GYPSUM WALL092900 BOARD 092900 STUD STUD INSULATION INSULATION
5/8 " PLYWOOD SHEATHING (X2) 5/8 " PLYWOOD SHEATHING (X2) VAPOR BARRIER VAPOR BARRIER 5/8 " PLYWOOD SHEATHING (X2) 5/8 " PLYWOOD SHEATHING (X2) VAPOR BARRIER VAPOR BARRIER
6 A-5.3
GLASS CURTAIN 084426 GLASSWALLS CURTAIN WALLS 084426
6 Sim A-5.3
STONE FLOOR FINISH STONE FLOOR FINISH CAST IN PLACE CONCRETE CAST IN PLACE 033000 CONCRETE 033000
C CHANNEL RUNNER FOR METAL STUDS C CHANNEL RUNNER FOR METAL STUDS
5 A-5.3
5 Sim A-5.3
Sim
SUPPORT FRAME SUPPORT FRAME BEAM AND COLUMN BEAM CONNECTIONS AND COLUMN CONNECTIONS
EXTERIOR EXTERIOR
SCI-ARC SCI-ARC
WATERPROOF MEMBRANE WATERPROOF MEMBRANE AIR GAP AIR GAP METAL LATH METAL LATH
Sim
STEEL DECKING 053100 STEEL DECKING 053100
INTERIOR INTERIOR
1101 South Robertson 1101 South Robertson Boulevard Boulevard
3
INTERIOR INTERIOR
3 Sim A-5.3
Sim
A-5.3 EXTERIOR EXTERIOR
FRP PANEL FRP PANEL
FRP BRACKET TIES FRP BRACKET TIES
4 A-5.3
4 Sim A-5.3
Consultant: Landscape Specialist, Studio-MLA Address: 185 S Myers St Studio-MLA Consultant: Landscape Specialist, Address: Los Angeles, CA 90033 Address: 185 S Myers St Phone: (213) 384-3844 Address: Los Angeles, CA 90033 384-3833 Phone:Fax: (213)(213) 384-3844 e-mail: office@studio-mla.com Fax: (213) 384-3833 e-mail: office@studio-mla.com Consultant: Soil Engineer, Bay City Geology Address: 1423 S. Beverly Glen Blvd #B Consultant: Soil Engineer, Bay City Geology Address: Angeles, 90024 Address: 1423 S.Los Beverly GlenCA Blvd #B Phone: (310) 429-6681 Address: Los Angeles, CA 90024 429-6682 Phone:Fax: (310)(310) 429-6681 e-mail: jonathanmiller@baycitygeology.com Fax: (310) 429-6682 e-mail: jonathanmiller@baycitygeology.com
Consultant: MEP Specialists, Henderson Engineers Address: West 6thHenderson St Suite 800 Consultant: MEP510 Specialists, Engineers Address: Los6th Angeles, CA 90014 Address: 510 West St Suite 800 Phone: (213) 254-4750 Address: Los Angeles, CA 90014 254-4751 Phone:Fax: (213)(213) 254-4750 e-mail: AustinAllen@hendersonengineers.com Fax: (213) 254-4751 e-mail: AustinAllen@hendersonengineers.com Consultant Structural Engineer, Englekirk Address: 888 S. FigueroaEnglekirk St. 18th Floor Consultant Structural Engineer, Address: Angeles, CA 90017 Address: 888 S. Los Figueroa St. 18th Floor Phone: (323) 733-6673 Address: Los Angeles, CA 90017 Fax: (323) 733-6674 Phone: (323) 733-6673 e-mail: la@englekirk.com Fax: (323) 733-6674 e-mail: la@englekirk.com Consultant: Civil Engineer, Whitson Egineers Address: WestWhitson Century Egineers Blvd, Suite 430 Consultant: Civil 5200 Engineer, Address: Los Angeles, CA 90045 Address: 5200 West Century Blvd, Suite 430 Phone: (310) 645-3205 Address: Los Angeles, CA 90045 (310) 645-3206 Phone:Fax: (310) 645-3205 e-mail: info@whitsonengineers.com Fax: (310) 645-3206 e-mail: info@whitsonengineers.com
Sim
No.
CAST IN PLACE CONC. FOUNDATION WALL 033000 CAST IN PLACE CONC. FOUNDATION WALL 033000 CONC. FOUNDATION TUBES CONC. FOUNDATION TUBES CONCRETE FOOTING CONCRETE FOOTING
11
No.
Description Description
Date Date
WALL SECTIONS WALL SECTIONS A-4.5 A-4.5
SPRING 2018_AS 3041 - CONSTRUCTION DOCUMENTS
STEEL DECKING 053100 STEEL DECKING 053100
SPRING 2018_AS 3041 - CONSTRUCTION DOCUMENTS
2% SLOPE 2% SLOPE
Mixed Use Space
2021 PORTFOLIO
12
ACADEMIC
02 Library Site: Berkeley, California Software: Rhino 3D, V-Ray, Adobe Photoshop, Adobe Illustrator Collaborators: Christopher Becerra Instructor: Herwig Baumgartner
Project Description: For the Library project in Berkeley, California, my partner and I wanted to study the potential for an aggregate of figures to produce a holistic reading. We were particularly interested in the idea of figures being nested into one another and forming clusters. To further push the part to whole relationship we projected a graphic that wraps around the whole building in order to falsify the parts and disguise the seams. The apertures became their own independent system that rejected the linearity of the graphic. The building’s profile became the carving for the ground, in order for the building to not sit heavily on the sloped ground a new ground was created and the building sits on “feet,” this allows people to really experience the building from all around including the underneath. 13
2021 PORTFOLIO B
D
C
F
E
G
Roof +48’-00”
Third Floor +36’-00”
Second Floor +24’-00”
RECORD
rev
date / issue
A 12/4/2017 B C D E F
BANDITS
A
DISCLAIMER
To the best of my kn plans are drawn to c and/or builder’s spe changes made on them be done at the owner expense and responsi actor shall verify a enclosed drawings, a responsible thereaft
PRARTHNA MI ANNA BAHUDI STAMP MARIA JOSE
BANDITS
Mariajose Meza
ALEX STEPHA
CHRISTOPHER
First Floor 12’-00”
PRARTHNA MI ANNA BAHUDI
MARIA ADDRE JOSE PROJECT
ALEX STEPHA
CHRISTOPHER
A
B
C
D
E
F
G
H
I
BERKELEY 2642 BANC BERKELEY,
South Ground Level
SHEET TITLE
A
B
C
D
E
F
G
H
BUILD ELEVA
I
1
BUILDING ELEVATION
SHEET NUMBER
A16
RECORD
rev
1
Building Elevation
Book Stacks
DISCLAIMER
To the best of my
Third Floor Level +45
Book Stacks
Book Stacks
Reading Rooms
Book Stacks
Reading Rooms
Second Floor Level +30
Book Stacks Auditorium
Auditorium
First Floor Level +15 Third Floor Level +45
Book Stacks
Stage Storage
Parking
date / issue
A 12/4/2017 B C D E F
Ground Floor Level 00
Book Stacks
Reading Rooms
Book Stacks
Reading Rooms
Second Floor Level +30
First Floor Level +15 Basement One Level -30 Ground Floor Level 00 Parking 1 Level -12
Stage Storage
plans are drawn t RECORD and/or builder’s
date / issue rev changes made on t
be done at the ow
12/4/2017 Aexpense and respo Bactor shall verif Cenclosed drawings Dresponsible there E F
STAMP DISCLAIMER
To the best of my plans are drawn t and/or builder’s changes made on t be done at the ow expense and respo actor shall verif enclosed drawings responsible there
STAMP PROJECT ADD
BERKELE 2642 BA BERKELE
Parking 2 Level -12
SHEET TITLE PROJECT ADD
Parking
Basement One Level -30
14
1
BUILDING SECTION
Parking 1 Level -12
Parking 2 Level -12
BUIL
BERKELE SEC 2642 BA BERKELE
SHEET NUMBE
PRARTHNA MISRA ANNA BAHUDIAN
MARIA JOSE MEZA
ACADEMIC
ALEX STEPHAN BICA
CHRISTOPHER BECERRA
Library
1-1/2” RIGID INSULATION FRP CASTED VOLUMES FRP 4’x8’ PANELS TERTIARY STRUCTURE 2”x2” STEEL TRACK ROOF GUTTER 1/2” SHEATHING
A
B
C
E
D
G
F
I
H
J
L
K
M
N
P
O
BANDITS
WATERPROOFING MEMBRANE
Q
Bancroft Ave.
RECORD
PRARTHNA MISRA ANNA BAHUDIAN
rev
+30’
date / issue
A 12/4/2017 B C D E F
MARIA JOSE MEZA
ALEX STEPHAN BICA
CHRISTOPHER BECERRA
DISCLAIMER
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
5’
1
1
A6.00
STAMP
2 Storage Room
3
Lobby PROJECT ADDRESS
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA
Entrance
Main Entrance
4
METAL DECKING 4” PEDESTAL
SHEET TITLE
DRYWALL
3D WALL SECTIONROOF TO WALL
SOFT INSULATION
Restrooms
C-CHANNELS
Stairs
RECORD
+25’
rev
5’
SHEET NUMBER
A3.01
DISCLAIMER
Stairs
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
Cafe
7
ROOF TO WALL
A 12/4/2017 B C D E F
+20’
6
1
date / issue
8
BANDITS
5
PRARTHNA MISRA ANNA BAHUDIAN
STAMP Offices
MARIA JOSE MEZA
ALEX STEPHAN BICA
Stairs
CHRISTOPHER BECERRA
Lobby
9
Entrance
Entrance
PROJECT ADDRESS
10
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA
N +05’
00’
+10’
+15’
E
W 0’
Duran Ave.
10’
5’
SHEET TITLE
S
20’
SITE PLAN
RECORD
rev
SITE PLAN
1
A13.00
DISCLAIMER
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
B
C
E
D
G
F
H
I
J
L
K
N
M
O
P
BANDITS
1
A
Q
date / issue
A 12/4/2017 B C D E F
SHEET NUMBER
STAMP
A4.00
PROJECT ADDRESS
PRARTHNA MISRA ANNA BAHUDIAN
20’
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA
MARIA JOSE MEZA
ALEX STEPHAN BICA
CHRISTOPHER BECERRA
1
SHEET TITLE
20’
RIGID INSULATION SECONDARY STRUCTURE
2
1
FLOOR TO WALL
3D WALL SECTIONFLOOR TO WALL
SHEET NUMBER
A3.02
SOFT INSULATION DRYWALL/INTERIOR FINISH C-CHANNELS
Reading Rooms
3
1.5’
1
A15
11’
7’
GUTTER/DRAIN
Escalator
3’
Elevator
Book Stacks
BANDITS
Media Viewing Area
Auditorium
4
PRARTHNA MISRA ANNA BAHUDIAN
MARIA JOSE MEZA
ALEX STEPHAN BICA
5
CHRISTOPHER BECERRA
RECORD
rev
A 12/4/2017 B C D E F
6 Reading Space
7
DISCLAIMER
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
5’ 2’ 3’
8
Reading Space
Book Stacks
Stairs
9 Book Stacks
5’
Reading Space
11’
date / issue
Stairs
STAMP
2’
1
A5.01
1/2” SHEATHING WATERPROOFING MEMBRANE FRP 4’x8’ PANELS 4” PEDESTAL TERTIARY STRUCTURE 2”x2” STEEL TRACK
RECORD
rev
date / issue
A 12/4/2017 B C D E F
Elevator
DISCLAIMER
Elevator
10
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
PROJECT ADDRESS
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA
11 N E
W 0’
1
5’
10’
1
20’
FLOOR PLAN
S
Plan Level 4
STAMP
SHEET TITLE
TYPICAL FLOOR PLAN
PROJECT ADDRESS
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA
SHEET NUMBER
A14.00
15
SECONDARY STRUCTURE
SHEET TITLE
SOFT INSULATION DRYWALL/INTERIOR FINISH C-CHANNELS GUTTER/DRAIN FLOOR TILES
1
GROUND TO WALL
3D WALL SECTIONGROUND TO WALL SHEET NUMBER
A3.03
2021 PORTFOLIO
1 A-6.00
BANDITS
Mariajose Meza
PRARTHNA ANNA BAHU
MARIA JOS
ALEX STEP
CHRISTOPH
1 A-3.00
1 A-5.00
12” Steel Tube Secondary Structure
RECORD
rev
date / issue
A 12/4/2017 B C D E F
DISCLAIME
Steel I-Beam
To the best of plans are draw and/or builder changes made o be done at the expense and re actor shall ve enclosed drawi responsible th
LED Lighting System 18” Steel Tube Primary Structure
STAMP
Escalators Columns
PROJECT A
BERKEL 2642 B BERKEL
SHEET TIT
1
3D MEGA CHUNK
3D C
SHEET NUM
A1
16
ACADEMIC
BANDITS
Library
1/2” SHEATHING WATERPROOFING MEMBRANE
PRARTH ANNA B
1-1/2” RIGID INSULATION
ALEX S
MARIA
CHRIST
FRP CASTED VOLUMES FRP 4’x8’ PANELS TERTIARY STRUCTURE 2”x2” STEEL TRACK
FRP CASTED VOLUMES
ROOF GUTTER
FRP 4’x8’ PANELS TERTIARY STRUCTURE 2”x2” STEEL TRACK 1/2” SHEATHING
RECO
rev
date / is
A 12/4/2 B C D E F
DISCLA
To the be plans are and/or bu changes m be done a expense a actor sha enclosed responsib
STAMP
C-CHANNELS
PROJEC
SOFT INSULATION
BER 264 BER
DRYWALL C-CHANNELS
METAL DECKING
METAL DECKING
4” PEDESTAL
4” PEDESTAL
SHEET
ROOF GUTTER
3D
FRP CASTED VOLUME
1
3D FACADE CHUNK SHEET
A
17
BANDITS
2021 PORTFOLIO
Mariajose Meza 1 A-4.01
PRARTHNA MISRA ANNA BAHUDIAN
MARIA JOSE MEZA
ALEX STEPHAN BICA
CHRISTOPHER BECERRA
1” FRP Panel
Aliuminum Window Frame Tertiary
Low-E Double Pane Glass
Structure
18” Steel Tube Primary Structure
Dry Wall FRP Apeture Tertiary
Structure Welded Pipe Connection
12” Steel Tube Secondary Structure 1” FRP Panel
RECORD
rev
12” Steel Tube Secondary Structure
date / issue
A 12/4/2017 B C D E F
Steel Studs 16” O.C
DISCLAIMER
Steel Studs 16” O.C
To the best of my knowledge, these Welded Steel plans are drawn to comply with owner’s and/or builder’s specifications. Any Connection changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
Corrugated Concrete Tray
STAMP
18” Steel Tube Primary Structure
Plate
Waterproofing Membrane
Dry Wall
Steel I-Beam
PROJECT ADDRESS
Air Conditioning Ducts
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA
Drop Ceiling Ties
SHEET TITLE
3D DETAIL 1
FLOOR TO WALL DETAIL
1
SHEET NUMBER
BANDITS
A4.00
ROOF D
PRARTHNA MISRA ANNA BAHUDIAN
MARIA JOSE MEZA
Tertiary Structure
ALEX STEPHAN BICA
CHRISTOPHER BECERRA
12” Steel Tube Secondary Structure
Welded Pipe Connection
Steel Studs 16” O.C
Window Flashing
Window Frame
Low-E Double Pane Glass Tertiary FRP Window
RECORD
rev
Structure
Welded Pipe Connection
date / issue
A 12/4/2017 B C D E F
Dry Wall
1” FRP Panel
DISCLAIMER
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them Waterproofing after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
Membrane
STAMP
PROJECT ADDRESS
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA
SHEET TITLE
3D DETAIL 1
WINDOW DETAIL SHEET NUMBER
18
A5.02
1
GROUND
Library BANDITS
BANDITS
ACADEMIC
PRARTHNA MISRA ANNA BAHUDIAN
MARIA JOSE MEZA
ALEX STEPHAN BICA
CHRISTOPHER BECERRA
PRARTHNA ANNA BAH
MARIA J
ALEX STE
CHRISTOP
Gutter FRP Panels
RECORD
rev
date / issue
A 12/4/2017 B C D E F
Tertiary Structure
DISCLAIMER
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
Sheathing Waterproofing Membrane
STAMP
Rigid Insulation FRP Window Frames PROJECT ADDRESS
Tongue In Groove System
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA
Secondary Steel Structure
0
SHEET TITLE
A4.00
3D DETAIL
C-Channels
DETAIL
Insulation
SHEET NUMBER
BANDITS
A6.00
Attachment Pedestal
PRARTHNA MISRA ANNA BAHUDIAN
Drywall
MARIA JOSE MEZA
ALEX STEPHAN BICA
CHRISTOPHER BECERRA
Concrete filled Deck Primary Steel Structure
RECOR
rev
date / issue
A 12/4/201 B C D E F
DISCLAIM
To the best plans are dr and/or build changes made be done at t expense and actor shall enclosed dra responsible
STAMP
I-Beam T-Bar Suspender Dropped Ceiling PROJECT RECORD
rev
date / issue
BERKE 2642 BERKE
A 12/4/2017 B C D E F
DISCLAIMER
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
SHEET TI
STAMP
PROJECT ADDRESS
WALL 2
WALL DETAIL-RENDER
WALL DETAIL
SHEET NU
A1
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA
SHEET TITLE
3D DETAIL TO WALL DETAIL SHEET NUMBER
A5.01
1
19
BOLTS
SILL PLATE
2021 PORTFOLIO
INTERIOR Meza FINISH Mariajose
FOOTING/ STEM WALL
TONGUE-IN-GROOVE FLOORING LAMINATE
BOLTS
SILL PLATE
BANDITS
FOOTING/ STEM WALL
RECORD
rev
date / issue
A 12/4/2017 B C D E F
PRART ANNA
MARIA
3
DISCLAIMER
INTERIOR FLOORING DETAIL
3
SCALE = NTS
INTERIOR FLOORING DETAIL ALEX
SCALECHRIS = NTS
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
STAMP
WPM STEEL COLUMN
FLASHING
BOLTS
BASE PLATE ANCHORAGE BOLTS
INTERIOR FINISH TONGUE-IN-GROOVE FLOORING LAMINATE
STEEL COLUMN BOLTS
BASE PLATE
BOLTS
SILL PLATE
ANCHORAGE BOLTS
FOOTING/ STEM WALL
PROJECT ADDRESS
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA
RECO
rev
CRUSHED STONE
SHEET TITLE
FILTER TO PREVENT CLOGGING 24”x24” CONCRETE CATCH BASIN WITH WATER TIGHT BOTTOM
2D DETAILS
date /
A 12/4/ B C D E F
DISCL
1
FOOTING & ANCHORAGE
SCALE = NTS
SHEET NUMBER
A19.00
2
DRAIN DETAIL
SCALE = NTS
3
To the b
plans ar FOOTINGDETAIL & ANCHORAGE INTERIOR FLOORING and/or b
1
SCALE = NTS
SCALEchanges = NTS
be done expense actor sh enclosed responsi
STAMP
WPM FLASHING
20
STEEL COLUMN BOLTS BASE PLATE ANCHORAGE BOLTS
PROJE
BE 26 BE
DISCLAIMER
ACADEMIC
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
STAMP
COLUMN CAP BOLTS
WPM PLYWOOD SHEATHING OVERFLOW PIPE
STEEL
PIPE
To the best of my knowledge, the plans are drawn to comply with o and/or builder’s specifications. changes made on them after print be done at the owner’s and/or bu expense and responsibility. The actor shall verify all dimension enclosed drawings, and be solely responsible thereafter.
Library
STAMP
COLUMN CAP BOLTS
STEEL
RECESSED GUTTER BREATHER MEMBRANE
PROJECT ADDRESS
SOFT INSULATION INTR. FINISH
(END COLUMN CAP)
FRP SYSTEM
COLUMN CAP DETAIL ROOFFRP DETAIL HOOK CONNECTION
1
SCALE = NTS SCALE = NTS
TERTIARY STRUCTURE STEEL TRACK
SECONDARY STRUCTURE
INTR. FINISH
DRYWALL SOFT INSULATION
SOFT INSULATION INTR. FINISH
2D DETAILS
PRARTHNA MISRA SHEET NUMBER ANNA BAHUDIAN
2
A18.00
MARIA JOSE MEZA
GUTTER DETAIL
3
SCALE = NTS
ROOF DETAILCOLUMN CAP DETAIL
1
SCALE = NTS SCALE = NTS
2D DETAILS
PRARTHNA MISRA SHEET NUMBER ANNA BAHUDIAN
A18.0
MARIA JOSE MEZA
ALEX STEPHAN BICA
ALEX STEPHAN BICA
CHRISTOPHER BECERRA
CHRISTOPHER BECERRA
SECONDARY STRUCTURE
INTR. FINISH DRYWALL
INTR. FINISH
SOFT INSULATION
DRYWALL
C-CHANNEL
SOFT INSULATION
SECONDARY STRUCTURE
INTR. FINISH DRYWALL
SOFT INSULATION
FRP SYSTEM
C-CHANNEL
FRP HOOK CONNECTION
SECONDARY STRUCTURE
TERTIARY STRUCTURE STEEL TRACK
PEDESTAL
PEDESTAL
SHEATHING WPM
WPM
TERTIARY STRUCTURE
TERTIARY STRUCTURE
FRP
FRP
SHEATHING
SHEATHING
WPM
WPM
TERTIARY STRUCTURE
TERTIARY STRUCTURE
FRP
FRP
RECORD
PEDESTAL
rev
C-CHANNEL
SCALE = NTS
SHEET TITLE
(END COLUMN CAP)
(COLUMN CAP)
SHEATHING
FLOOR TO WALL DETAIL
PIPE
3
SCALE = NTS
RIGID INSULATION WPM
SHEET TITLE
(COLUMN CAP)
BERKELEY LIBRARY 2642 BANCROFT WA BERKELEY, CA
BANDITS
RIGID INSULATION WPM
GUTTER DETAIL
PROJECT ADDRESS
BERKELEY LIBRARY 2642 BANCROFT WAY BERKELEY, CA
BANDITS
G
DISCLAIMER
64
TONGUE-IN-GROOVE PANEL WALL DETAIL
SCALE = NTS SCALE = NTS
RECORD
PEDESTAL
date / issue
A 12/4/2017 B C D E F
rev
C-CHANNEL
5
FLOOR TO WALL DETAIL
4
SCALE = NTS
WALL DETAIL
SCALE = NTS
DISCLAIMER
DISCLAIMER
To the best of my knowledge, thes plans are drawn to comply with ow and/or builder’s specifications. changes made on them after prints be done at the owner’s and/or bui expense and responsibility. The c actor shall verify all dimension enclosed drawings, and be solely responsible thereafter.
To the best of my knowledge, these plans are drawn to comply with owner’s and/or builder’s specifications. Any changes made on them after prints will be done at the owner’s and/or builder’s expense and responsibility. The contractor shall verify all dimension and enclosed drawings, and be solely responsible thereafter.
COLUMN CAP BOLTS STEEL
STAMP
date / issue
A 12/4/2017 B C D E F
WPM PLYWOOD SHEATHING OVERFLOW PIPE
21
RECESSED GUTTER BREATHER MEMBRANE
6
TONGUE-IN-GROOVE PANEL COLUMN CAP BOLTS
STEEL
SCALE = NTS
STAMP
F
2021 PORTFOLIO
E
Level 11: WeLive- Living Units, Diving Pool, Skate Park, Rock Climbing Gym
F
A
Level 31: WeWork- Open Office Floor Plan, Conference Rooms, Auditorium
B
A C
B D
C E
D F
E Level 1: Lobby- Reception, Public Forum, Cafe, Gallery Space, Grocery Store
1
2
3
4
5
6
Plans 1/16” = 1’
F
Level 16: WeLive & WeWork- Living Units, Working Spaces, Pool, Aerial Studio
A
B
C
D
E
F
Level 11: WeLive- Living Units, Diving Pool, Skate Park, Rock Climbing Gym
A
22 B
ACADEMIC
03 We Work, We Live, We Play Site: New York City, New York 4
C
3
D
2
E
1
F
Software: Rhino 3D, V-Ray, Adobe Photoshop, Adobe Illustrator Collaborators: Christopher Becerra Thesis Advisor: Jenny Wu
Project Description: Our project is located in the lower east side of Manhattan and consists of both WeWork offices and WeLive communal housing. Our thesis explores the tension between the mundane monolith and the vibrant inefficiency of play. Our objective is to disrupt the mundane, repetitive nature of the tower typology and create a dialogue between the stable line and unstable figure. The thick inhabitable facade is composed of distinct worlds, each developing its own character and in return reflecting its own program. By pushing the communal activities to the exterior of the tower, we are building a visual connection between the activity occurring inside and contextual forces outside. This establishes an extroverted approach to combat the highly privatized New York realm. This extroverted presence takes the tenants and turns them into performers in an urban theater. Today, the sharing economy is thriving more than ever, the community-oriented systems are rapidly replacing privatization. Companies like Airbnb and Uber are sharing resources that otherwise would have been exclusive. In a similar fashion, the concept behind WeLive is to share experiences. Our objective is to incentivize interactions by blurring the line between what’s considered communal and private activities. In order to do this, the program is spread throughout the floors to encourage people to circulate beyond your neighborhood floor. Every living unit is supplied with only essential resources to push people out of isolation. By shuffling the program throughout the tower creates a variety of social conditions that cater to different lifestyles. As the tower rises, it undergoes an inverted formal shift. On the facade, the fragmented parts become a whole and exterior pieces become swallowed by the volume of the tower. 23 Exploded Axon
Mariajose Meza
2021 PORTFOLIO
Level 31: WeWork- Open Office Floor Plan, Conference Rooms, Auditorium
Level 33: WeLive- Living Units, Gym, Activity Room
A
B
C
D
E
F
Level 16: WeLive & WeWork- Living Units, Working Spaces, Pool, Aerial Studio
Level 31: WeWork- Open Office Floor Plan, Conference Rooms, Auditorium
24
A
ACADEMIC
WeWork, WeLive, WePlay
A
A
B
B
C
C
D
D
E
E
F
F
Level 33: WeLive- Living Units, Gym, Activity Room
A
25
A
Professional Work 2019-2021
Contents 01 02 03 04 05
Dining Area -Living Room Instagram Graphics Jewelry Design Email Campaigns Photoshoot Storyboarding
pg.28 pg.30 pg.34 pg.36 pg.38
2021 PORTFOLIO
28
PROFESSIONAL
01 Dining Area & Living Room Site: Paris, France Software: Rhino 3D, V-Ray, Adobe Photoshop Company: Alexandra Loew Inc. Project Description: For this project our client was in Paris and wanted to rennovate and reimagine their living and dining room space. As part of the Alexandra Loew Inc. team I built the segment of the condo in 3D space from AutoCAD drawings and replicated important furniture pieces selected by Alexandra Loew and the client. I was also in charge of rendering the space using the selected materials, furniture, color palette, and hardwares, modeling exactly as they would be placed in the rennovated space. This not only helped the client visualize the space but also feel part of the overall process and provided input.
29
2021 PORTFOLIO
30
PROFESSIONAL
02 Instagram Graphics Purpose: Social Media Interaction & Conversion Software: Canva, Adobe Photoshop, Instagram Brand: LACE by Jenny Wu Project Description: As part of growing a brand is customer engagement. Social media allows brands and their followers to connect and view insights on not only the products, but also the production process, celebrity features, and key updates. Through frequent posts and stories our customers are kept up to date on the latest promotions and releases. I curate the theme and select the focus of the story along with the images that will be used. The stories are at times informative on any upcoming sales, on the design process of our latest designs, and most of the time are showcasing the jewelry pieces.
31
Mariajose Meza
2021 PORTFOLIO
32
PROFESSIONAL
33
Instagram Graphics
2021 PORTFOLIO
34
PROFESSIONAL
03 Jewelry Design & Prototypes Purpose: Bring new designs and jewelry items to the brand Software: Maya, Rhino Brand: LACE by Jenny Wu
Project Description: Every so often new pieces are added to the brand collection. I’ve been involved in numerous adjustments and modifications to current designs as well as taking part in the brainstorming, designing, and prototyping process. Among the latest releases was a new diamond ring, Iris, which was designed to accomodate for a smaller diamond in the 0.50 carat range. This allows people on a budget or with an interest in discrete minimal engagement rings to have a unique and elegant ring without compromising quality or design.
35
2021 PORTFOLIO
36
PROFESSIONAL
04 Email Campaigns Purpose: Connect with our clients signed up to our newsletter Software: Canva, Adobe Photoshop, Klaviyo Brand: LACE by Jenny Wu
Project Description: As part of keeping customers informed regular email campaigns are sent out to those who subscribe to our newsletter. These emails are curated to inform our customers on upcoming promotions, sales, events, and releases. Other content includes information on our blogs like proposal stories and behind the scenes of the making of our pieces.
37
2021 PORTFOLIO
38
PROFESSIONAL
05 Photoshoot Storyboarding Purpose: Showcase jewelry and ways to accessorize. Keep website and Instagram graphics fresh. Software: Canva, Adobe Photoshop, Instagram Brand: LACE by Jenny Wu Project Description: Part of keeping a website up to date is having new and fresh images to work with. Every few months it’s important to plan photoshoots for the season and upcoming launches. As manager of the LACE brand, I organize and prepare call sheets for upcoming photoshoots. These photoshoots are key and need to be planned with location, jewelry pieces, and outfits in mind. The outcome is a range of photos varying from model shots to close ups. The images are used for the website, social media, blogs, and email campaigns.
39
2021 PORTFOLIO
40
PROFESSIONAL
Mariajose Meza
Contact Phone: (323) 359-9012 Email: meza3mariajose@gmail.com Instagram: @mariajosemeza3
41