KEY PLAN 1
2
3
4
U.S. COAST GUARD TRAINING CENTER ITED S N U
PETALUMA, CALIFORNIA C
BUILDING - 550
CADD
T GUARD AS
TES CO A T
C
17 9 0 .
.
BUILDING RENOVATION
CONSULTANTS
ABBREVIATIONS & .....................AND < ......................ANGLE @ .....................AT C .....................CENTER LINE O .....................DIAMETER F .....................FLOOR LINE P .....................PROPERTY LINE # .....................POUND or NUMBER A.B. ................ANCHOR BOLT A.C.P. ............ASPHALT CONCRETE PAVING A/C. ..............AIR CONDITIONING ACOUS. ........ACOUSTIC AC.T. .............ACOUSTICAL TILE A.D. ................AREA DRAIN ADJ. ..............ADJUSTABLE AGG. ..............AGGREGATE AL. .................ALUMINUM ALT. ..............ALTERNATE ANCR. ...........ANCHOR APPROX. .....APPROXIMATELY ARCH. ...........ARCHITECT ASPH. ...........ASPHALT
B
BD. .................BOARD BITUM. .........BITUMINOUS BLDG. ...........BUILDING BLK. ..............BLOCK BLKG. ...........BLOCKING B.M. ................BEAM BOT. ..............BOTTOM BRK. ..............BRICK BRG. ..............BEARING BRZ. ..............BRONZE BTWN. ..........BETWEEN B.U.R. ............BUILT-UP ROOFING CAB. ..............CABINET CARP. ...........CARPET C.B. ................CATCH BASIN CEM. ..............CEMENT CER. ..............CERAMIC CER.T. ..........CERAMIC TILE C.I. .................CAST IRON CIR. ...............CIRCLE C.J. ................CONSTRUCTION JOINT CLG. ..............CEILING CLG.J. ..........CEILING JOIST CLKG. ...........CAULKING CLO. ..............CLOSET CLR. ..............CLEAR CLS. ..............CLOSURE C.M.U. ............CONCRETE MASONRY UNIT
CNTR. .........CENTER C.O. ..............CLEANOUT COL. ............COLUMN COMB. .........COMBINATION COMP. .........COMPOSITION CONC. .........CONCRETE CONN. .........CONNECTION CONST. ......CONSTRUCTION CONT. .........CONTINUOUS CONV.O. ....CONVECTION OVEN C.O.R. ..........CONTRACTING OFFICER'S REPRESENTATIVE C.W. .............COLD WATER DET. ............DETAIL D.F. ..............DRINKING FOUNTAIN DIA. .............DIAMETER DIAG. ..........DIAGONAL DIM. .............DIMENSION DISP. ..........DISPOSAL DIV. ............DIVISION DN. ...............DOWN D.O. ..............DOOR OPENING DR. ...............DOOR D.S. ...............DOWNSPOUT D.T. ...............DRAIN TILE D.W. ..............DISHWASHER DWR. ............DRAWER (E) ................EXISTING E. ...................EAST EA. ................EACH E.E. ...............EACH END E.F. ...............EXHAUST FAN E.J. ...............EXPANSION JOINT ELEC. ..........ELECTRICAL ELEV. .........ELEVATION E.N. ...............EDGE NAIL ENCL. ..........ENCLOSURE EQUIV. .......EQUIVALENT E.S. ...............EACH SIDE E.W. ..............EACH WAY EXP. .............EXPANSION EXP.B. .........EXPANSION BOLT EXPO. ..........EXPOSED EXT. .............EXTERIOR F. ...................FACE F.A. ...............FIRE ALARM F.B. ...............FACE BRICK F.BD .............FIREBOARD F.BELL .......FIRE BELL F.B.O. ...........FURNISHED BY OTHERS
F.D. ...............FLOOR DRAIN FDN. .............FOUNDATION F.E. ...............FIRE EXTINGUISHER F.E.C. ...........FIRE EXTINGUISHER CABINET F.F. ...............FINISH FLOOR F.G. ...............FINISH GRADE FGL. .............FIBERGLASS F.H. ...............FIRE HYDRANT FH.M.S. ........FLATHEAD MACHINE SCREW F.HORN .......FIRE HORN F.H.S. ...........FIRE HOSE STATION FH.W.S. .......FLATHEAD WOOD SCREWS FIN. ..............FINISH FIXT. ...........FIXTURE F.J. ...............FLOOR JOIST F.L. ...............FLOOR LINE FLASH. .......FLASHING FLR. .............FLOOR F.N. ...............FACE NAIL F.O.C. ...........FACE OF CONCRETE F.O.F. ...........FACE OF FINISH F.O.M. ...........FACE OF MASONRY F.O.S. ...........FACE OF STUD F.R. ...............FIRE RETARDANT FTG. .............FOOTING FUT. .............FUTURE GA. ................GAUGE GALV. .........GALVANIZED G.B. ...............GRAB BAR G.D. ...............GARBAGE DISPOSAL G.F.C.1. ........GOVERNMENT FURNISHED CONTRACTOR INSTALLED G.I. ................GALVANIZED IRON GL. ................GLASS GLB. .............GLUE LAMINATED BEAM GND. .............GROUND GOVT. .........GOVERNMENT GR. ................GRADE G.S.M. ...........GALVANIZED SHEET METAL GYP.BD. ......GYPSUM BOARD H.B. ...............HOSE BIBB H.C. ...............HOLLOW CORE
HDCP. ..........HANDICAPPED HDR. .............HEADER HDWD. .........HARDWOOD HDWE. .........HARDWARE HGT. .............HEIGHT H.M. ...............HOLLOW METAL HORIZ. ........HORIZONTAL H.P. ...............HIGH POINT HR. ................HOUR HTG. .............HEATING H.V.A/C .....HEATING, VENTILATION, AIR CONDITIONING H.W. ..............HOT WATER I.D. ................INSIDE DIAMETER INSUL. ........INSULATION INT. ..............INTERIOR INV. .............INVERT JAN. .............JANITOR J.H. ...............JOIST HANGER JST. .............JOIST JT. ................JOINT KIT. ..............KITCHEN LAB. .............LABORATORY LAM. .............LAMINATE LAV. ............LAVATORY L.B. ...............LAB BOLT L.H. ...............LEFT HAND L.L. ...............LIVE LOAD L.P. ...............LOW POINT LT. ................LIGHT MAT. .............MATERIAL MAX. .............MAXIMUM M.B. ...............MACHINE BOLT M.C. ...............MEDICINE CABINET MECH. ..........MECHANICAL MED. .............MEDIUM MEMB. ..........MEMBRANE MFG. .............MANUFACTURER MH. ................MANHOLE MIN. ..............MINIMUM MIR. ..............MIRROR MISC. ...........MISCELLANEOUS M.O. ...............MASONRY OPENING MOD. .............MODULAR M.T. ...............METAL THRESHOLD MTL. .............METAL (N) ................NEW N. ...................NORTH NAT. .............NATURAL N.I.C. ............NOT IN CONTRACT
NO. ................NUMBER NOM. .............NOMINAL N.T.S. ...........NOT TO SCALE O/ .................OVER O.A. ...............OVERALL OBS. .............OBSCURE O.C. ...............ON CENTER O.D. ...............OUTSIDE DIAMETER O.F. ...............OVERFLOW OFF. .............OFFICE O.F.S. ...........OUTSIDE FACE OF STUD OPP. .............OPPOSITE P. ...................PAINT P.C.F. ...........POUNDS PER CUBIC FOOT P.E.N. ...........PLYWOOD EDGE NAILING PERF. ..........PERFORATED PL. ................PLATE PLAS. ..........PLASTER P.L.F. ...........POUNDS PER LINEAR FOOT PLYWD. ......PLYWOOD P.M.F. ...........PRESSED METAL FRAME PR. ................PAIR PROP. ..........PROPERTY P.S.F. ...........POUNDS PER SQUARE FOOT P.S.I. ............POUNDS PER SQUARE INCH P.STAT. ......PULL STATION PT. ................POINT P.T.D. ...........PAPER TOWEL DISPENSER PTN. .............PARTITION P.T.R. ...........PAPER TOWEL RECEPTACLE P.V.C. ..........POLYVINYLCHLORIDE Q.T. ...............QUARRY TILE RAD. .............RADIUS R.B. ...............RUBBER BASE R.C.T. ...........RUBBERIZED CARPET TILE R.D. ...............ROOF DRAIN RDWD. .........REDWOOD REF. .............REFERENCE REFR. ..........REFRIGERATOR REINF. ........REINFORCING
RESIL. ........RESILIENT R.H. ...............ROOF HATCH RH.M.S. ........ROUNDHEAD METAL SCREW RH.W.S. .......ROUNDHEAD WOOD SCREW RM. ................ROOM R.O. ...............ROUGH OPENING R.W.L. ..........RAIN WATER LEADER
T.B. ...............TACKBOARD T&BOT. .......TOP AND BOTTOM TEL. .............TELEPHONE TEMP. ..........TEMPERED TER. .............TERRAZZO T&G. .............TONGUE & GROOVE THK. .............THICK T.J. ...............TOOL JOINT T.N. ...............TOE NAIL
S. ....................SOUTH S.A.D. ............SEE ARCHITECTURAL DRAWINGS S.BLKG. ......SOLID BLOCKING S.C. ...............SOLID CORE S.C.D. ...........SEE CIVIL DRAWINGS S.D. ...............STORM DRAIN S.DISP. .......SOAP DISPENSER SEAL. ..........SEALANT SECT. ..........SECTION S.E.D. ...........SEE ELECTRICAL DRAWINGS SHR. .............SHOWER SHT. .............SHEET SHTG. ..........SHEATHING SIM. ..............SIMILAR SL. ................SLIDING
T.O.C. ...........TOP OF CURB T.O.P. ...........TOP OF PAVEMENT T.O.PL. ........TOP OF PLATE T.O.W. ..........TOP OF WALL T.P.D. ...........TOILET PAPER DISPENSER TRN. .............TRANSOM T.S. ...............TUBE STEEL T.V. ..............TELEVISION TYP. .............TYPICAL
S.L.D. ...........SEE LANDSCAPE DRAWINGS S.M.D. ...........SEE MECHANICAL DRAWINGS S.P. ...............SOUNDPROOF SPEC. ..........SPECIFICATION SQ. ................SQUARE SQ. FT. ......SQUARE FEET S.S. ...............STAINLESS STEEL S.S.D. ...........SEE STRUCTURAL DRAWINGS STA. .............STATION STD. .............STANDARD STL. .............STEEL STO. .............STORAGE STRUC. .......STRUCTURAL SUSP. ..........SUSPENDED
INDEX OF DRAWINGS
ID
NOTE:
Name
A0-1
NOTES, LEGENDS AND COMMENTS APPLY ONLY TO INDIVIDUAL SHEETS WHERE THEY ARE SHOWN.
COVER PAGE
C-100
SITE DRAINAGE
C-200
DETAILS
UNF. .............UNFINISHED U.O.N. ...........UNLESS OTHERWISE NOTED UR. ................URINAL V.C.T. ..........VINYL COMPOSITION TILE VERT. .........VERTICAL VEST. .........VESTIBULE V.G. ..............VERTICAL GRAIN V.I.F. ...........VERIFY IN FIELD V.T. ..............VINYL TILE V.T.R. ..........VENT THROUGH ROOF V.W.C. .........VINYL WALL COVERING
W. ..................WEST W/ ................WITH W.C. ..............WATER CLOSET WD. ...............WOOD WDW. ...........WINDOW W.F. ..............WASH FOUNTAIN W.H ...............WATER HEATER W/O .............WITHOUT W.P. ..............WATERPROOF W.R. ..............WATER RESISTANT WT. ...............WEIGHT YD. ................YARD
A0-2
ORIENTATION PLANS
A1-1
DEMOLITION PLANS-WEST WING CORRIDORS-FIRST FLOOR
A1-2
DEMOLITION PLANS-WEST WING CORRIDORS-SECOND FLOOR
A1-3
DEMOLITION PLANS-EAST WING CORRIDORS-FIRST FLOOR
A1-4
DEMOLITION PLANS-EAST WING CORRIDORS-SECOND FLOOR
A1-5
DEMOLITION PLANS-WEST WING LOBBY
A1-6
DEMOLITION PLANS-EAST WING LOBBY
A2-1
RENOVATION PLANS-WEST WING CORRIDORS-FIRST FLOOR
A2-2
RENOVATION PLANS-WEST WING CORRIDORS-SECOND FLOOR
A2-3
RENOVATION PLANS-EAST WING CORRIDORS-FIRST FLOOR
A2-4
RENOVATION PLANS-EAST WING CORRIDORS-SECOND FLOOR
A2-5
RENOVATION PLANS-WEST WING LOBBY
A2-6
RENOVATION PLANS-EAST WING LOBBY
A3-1
INTERIOR ELEVATIONS-WING CORRIDORS
A3-2
INTERIOR ELEVATIONS-WING CORRIDORS
A3-3
INTERIOR ELEVATIONS-WING LOBBIES
A3-4
INTERIOR ELEVATIONS-WING LOBBIES
A3-5
INTERIOR ELEVATIONS - LOBBIES
A4-1
BERTH BATHROOM PLANS
A4-2
BERTH BATHROOM PLANS
A4-3
COMMON RESTROOM PLANS
A4-4
LAUNDRY ROOMS
A5-1
DETAILS
U.S. COAST GUARD ENGINEERING DIVISION PETALUMA
B
CG TRAINING CENTER 599 TOMALES RD PETALUMA, CA, 94562 ISSUE
DATE
MARK
VICINITY MAP
MAP OF TRAINING CENTER
MAIN GATE ENTRY
CONSTR. GATE ENTRY
TOMALES ROAD
FACILITIES ENGINEERING TO PETALUMA
U.S. GOV'T. P/L
U.S. GOV'T. P/L
A/E CONTRACT:
VALLEY FORD ROAD
Asphalt
U.S. GOV'T. P/L Asphalt
WONUM:
Asphalt
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Unpaved
X X
X
X
X
X
X
X
X
X
X
DITCH
Asphalt X
X
X X
X X
TO U.S. HWY. 1
X X
X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
101
DITCH
DESCRIPTION
2263690
Asphalt
100
P/L
CAD DWG FILE:
GOV'T.
Asphalt
U.S.
Asphalt
Asphalt
CALIFORNIA DRIVE
X
X
X
Asph
alt
SP
U.S.
Unpaved
TWO ROCK UNION SCHOOL
FO
ILL
E.
Asphalt
GH
AV
RIN
P/L
IA
GOV'T.
AN
t Asphal
AV
E
X
t Asphal
LV
Asphalt
IO
SY
P/L
H
NN
GOV'T.
105
X
O
PE
U.S. 104
U.S. GOV'T. P/L
RO
172
Playground
AD
U.S. GOV'T. P/L
171
DESIGNED BY: DRAWN BY:
MP
EDITED BY:
MP
CHECKED BY:
AJH
MP
SCALE: AS NOTED
170
BLDG. 550
SHEET TITLE
500
544
GOV'T.
P/L
165 525
U.S.
PROJECT LOCATION
550-110628.pln
163
161 524 516
Asphalt
Unpaved
Asphalt
Asphalt
115
U.S. GOV'T
543
. P/L
150
IO
AV
SEWER PONDS
E
U.S. GOV'T .
ed Unpav
RN
FO
551
IFO
262
122
P/L
560
127
130
.
561
126
136
GOV'T
E NEVADA AV
Unpave d
U.S.
139
alt
138
Asph
137
132
550
140
128
133
GOV'T.
IA D
125
124
BUILDING RENOVATION
P/L U.S.
COLORADO AVE 135
P/L
Unpaved
E
Asphalt
OH
570
RIV
159
160
141 134
123
260
250
201 253
251
Asphalt
230
231
244
243
AN
IA
AV
CALIFORNIA
PETALUMA A
BLDG
P/L
E
YLV
.
AV
NS
GOV'T
IO
N PE
E.
U.S.
OH
Unpaved
205
214 210
225
A
Asphalt
P/L
WI SC ON AV SIN E
U.S.GOV'T.
T220
FACILITIES ENGINEERING
REAR GATE NO ENTRY
CAL
261
242 T232
T825
T826
T827
ARCHITECTURAL
U.S. GOV'T
824 T828
T833
. P/L
T832
Asphalt
T835
309
T834
aved Unp
P/L U.S.
U.S GOV'T. P/L
DRIVE
LA
KE
lt
310
D AH
T823
E RIV
Aspha
UT
308
301
GOV'T.
807
COVER PAGE
812
306
416 305
Sand pit
O
.
P/L U.S.
GOV'T.
811
713
714
alt
Asph
REVIEWED BY:
810
712
715
702
404
406
400
813
P/L
GOV'T U.S.
809
P/L
413
417 418
MA
'T.
401
HO
GOV
ON
A KL
U.S.
EG
414
407
IVE
OR
415
402
E AV
DR
TEXAS
550
T822
TRAP AND SKEET RANGE
241
701
703
REVIEWED BY:
REVIEWED BY:
711 T320 .
704
405
710
P/L
GOV'T U.S. P/L U.S.
705
403 709
GOV'T.
M Walton
706 708
330
707
U.S. GOV 'T. P/L
332
T. vanWinden
AJ Hunt
410 441
331
442
431
411
440
U.S.
PROJECT ENG.
GOV'T.
430
P/L
.
P/L
GOV'T U.S.
433
A
AV
E
lt Aspha
100' 0
500'
750'
1000'
1500'
2000'
aved Unp
.
TECH. DIRECTOR
BRANCH CHIEF
432
Ditch
AL
A SK
2500'
N
J. GOOD CDR
06/20/2011
APPROVING OFFICER
DATE
P/L
GOV'T U.S.
Asphalt
aved Unp
PROJECT NUMBER
lt Aspha
T
A EX
SD .
VE RI
DRAWING NUMBER
P/L
GOV'T U.S.
0550-0019
11-3-109
DISCIPLINE/SHT NO 1
2
3
4
A0-1
SHEET
1
OF
26