Sample of a rooms based college condition survey

Page 1

Physical Condition Survey for Sample College

Reference: 0000 Issue

Reviewed By

Verified By

Alys Meston

Claire Mellors

Rob Willcox

Production Team

Production Manager

Surveyor

Prepared By

File Ref: 0000 Oakleaf Surveying Ltd

Telephone: 0845 293 7571

7 Brookfield

Fax:

0845 293 7572

Duncan Close

E-mail:

info@theoakleafgroup.co.uk

Northampton NN3 6WL

Sample College Physical Condition Survey

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


Physical Condition Survey

Buildings included in this report Sample College (001) - Site (00) Sample College (001) - The Bunglow (01) Sample College (001) - The Residence (02) Sample College (001) - The House (03) Sample College (001) - Main Block (04) Sample College (001) - Study Centre (05) Sample College (001) - B Hostel (06) Sample College (001) - C Hostel (07) Sample College (001) - A Hostel (08) Sample College (001) - Learning Resources Block (09) Sample College (001) - Sports Hall (10) Sample College (001) - Garage (11)

Sample College Physical Condition Survey

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


Physical Condition Survey

Index Executive Summary General Comments Survey Method Physical Condition Methodology Risk Assessment Matrix Remaining Life of Building Elements Remaining Life of M & E Elements

Sample College Physical Condition Survey

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


Physical Condition Survey

Executive Summary Oakleaf have undertaken a Physical Condition Survey of the Sample College site. The surveys undertaken within this study relate to conditions prevailing on site in November 2009. MAIN ISSUES Backlog Maintenance Works Total remedial work required for the BUILDING and M&E Elements: Building Survey M & E Survey TOTAL COST Cost per m2 (average)

£ 666,142.00 £ 223,800.00 £ 889,942.00 £ 67.00/m2

(Please note that this is based on an estimated Gross Internal Floor Area of 13,282m2) Budget for Future Maintenance Works Total remedial work likely to be required within a five year period for the BUILDING and M&E Elements: Building Survey M&E Survey TOTAL COST Cost per m2 (average)

£ 1,390,223.00 £ 308,600.00 £ 1,698,823.00 £ 127.90/m2

(Please note that this is based on an estimated Gross Internal Floor Area of 13,282m2) These figures are exclusive of Prelims, Profit, Contingency, Fees, Expenses and VAT. Please note that these costs are for backlog works only, they exclude costs relating to any proposed service or facilities developments. They are based on bringing all areas up to a sound and operational (not new) condition. Breakdown of Condition Bands The Sample College blocks surveyed fall into the following Condition Bands: Band 1 (£0 - £25/m2) Band 2 (£26 - £75/m2) Band 3 (£76 - £100/m2) Band 4 (>£100/m2)

13.3% 13.3% 00.0% 73.4%

Please note that the percentages above are based on the number of properties that fall into each band. Breakdown of Priority Grading The Sample College blocks surveyed fall into the following Priority Grading: Priority 1 Priority 2 Priority 3 Priority 4

Sample College Physical Condition Survey

22.3% 42.6% 24.2% 10.8%

£ 578,450.00 £ 1,102,816.00 £ 626,975.00 £ 280,524.00

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


Physical Condition Survey

General Comments Sample College is located to the west of Sample and is located just outside the city centre. Oakleaf identified 15 blocks onsite with the majority being constructed in the mid part of the 1960’s. Of the 15 blocks identified there are 6 educational blocks, 5 residential blocks, a sports hall, 1 garage and 2 blocks are derelict. General Structure 11 – Garage: The building has existed beyond its life expectancy with complete replacement required. The cost allows for the removal of the existing structure and a temporary building of a similar size to be installed. 14 – Derelict Block: This block has been part demolished due to adjacent building works, with structural survey required. 15 – Derelict Block: This block has been part demolished due to adjacent building works, with structural survey required. External Fabric 02 – The Residence: There is evidence of minor cracking to the rear of the garage indicating that some movement has occurred. Remedial action includes the monitoring of the crack to observe any on-going movement. 06 – B Hostel: There is evidence that one of the zinc cladding sheets located above the windows has slipped with remedial work required. 08 – A Hostel: There is evidence of significant cracking to the brickwork on elevation 3 with remedial works to include making good and monitoring for further crack expansion. It is also noted that, like block 6, a number of the zinc cladding panels located above the windows have dismounted with their replacement required. 10 – Sports Hall: The metal sheet cladding to the block has been vandalised along the side elevation with evidence of steel reinforcing rods protruding from the cladding, costs allow for removal and making good. Windows & Doors 01 – The Bungalow: The crittal steel single glazed windows and door to the block are considered to be in poor condition along with having poor insulating qualities. Their complete replacement is therefore required. 02 – The Residence: The crittal steel single glazed windows and door to the block are considered to be in poor condition along with having poor insulating qualities. Their complete replacement is therefore required. 03 – The House: The crittal steel single glazed windows to the block are considered to be in poor condition along with having poor insulating qualities; their complete replacement is therefore required. The steel garage door is also considered to be coming to the end of its life and requiring replacement. 04 – Teaching Block: The crittal steel single glazed windows to the block are considered to be in poor condition along with having poor insulating qualities; their complete replacement is therefore required. There are also a number of softwood timber single glazed windows that are in varying condition with either making good and redecoration required or replacement. There has been some window replacement to the block with aluminium and PVCU framed double glazed windows

Sample College

Physical Condition Survey

January 2010 Project 0000

Issued by Oakleaf Surveying Ltd - 0845 293 7571


Physical Condition Survey some window replacement to the block with aluminium and PVCU framed double glazed windows being installed and these are considered to be in reasonable condition. The doors to the block are predominately of softwood timber construction and considered to be in reasonable condition with only decorative works required within the maintenance period, however the automatic aluminium doors to the main entrance are considered to be dated and require replacement within the maintenance period. 05 – Study Centre: The aluminium double glazed windows to the block are considered to be coming to the end of their expected life and complete replacement is therefore required. The doors to the block are of aluminium and timber construction and considered to be in reasonable condition with only decorative works to the timber doors required within the maintenance period. 06 – B Hostel: The crittal steel single glazed windows to the block are considered to be in poor condition along with having poor insulating qualities; their complete replacement is therefore required. There are also a number of softwood timber single glazed windows that are in poor condition and require replacement. There has been some window replacement to the block with aluminium framed double glazed windows being installed and these are considered to be in reasonable condition. The doors to the block are predominately of softwood timber construction and considered to be in reasonable condition, however there is a steel door that requires replacement due to its age and condition. 07 – C Hostel: The crittal steel single glazed windows to the block are considered to be in poor condition along with having poor insulating qualities; their complete replacement is therefore required. There are also a number of softwood timber single glazed windows that are in poor condition and require replacement. There has been some window replacement to the block with PVCU framed double glazed windows being installed and these are considered to be in reasonable condition. The doors to the block are predominately of softwood timber construction and considered to be in reasonable condition, however there is a steel door that requires replacement due to its age and condition. 08 – A Hostel: The crittal steel single glazed windows to the block are considered to be in poor condition along with having poor insulating qualities; their complete replacement is therefore required. There are also a number of softwood timber and aluminium single glazed windows that are in poor condition and require replacement. There has been some window replacement to the block with aluminium and PVCU framed double glazed windows being installed and these are considered to be in reasonable condition despite the seals to one of the windows failing. The doors to the block are predominately of softwood timber construction and considered to be in reasonable condition, however there is a steel door that requires replacement due to its age and condition. 09 – Learning Resources Block: The windows to the block are of aluminium framed single glazed construction and considered to be coming to the end of their expected life with complete replacement required. The doors to the block are of aluminium and timber construction with the original aluminium doors all requiring replacement due to their age and condition and the timber doors all requiring redecoration works within the maintenance period. 12 – Link Corridor: The corridor is lined with full height aluminium framed single glazed windows which are considered to be coming to the end of their expected life with complete replacement Sample College Physical Condition Survey

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


Physical Condition Survey which are considered to be coming to the end of their expected life with complete replacement required within the maintenance period. Roofs N.B. It was noted that the vast majority of gutters, downpipes and drainage outlets are suffering from a build up of debris with a regular clearing programme recommended to be implemented. Pitched Roofs 01 – The Bungalow: The Bungalow has one pitched concrete tile roof that is considered to be in reasonable condition however the mineral felt flashing is showing signs of deterioration with replacement required. 02 – The Residence: The Residence has one pitched concrete tile roof that is considered to be in reasonable condition however the mineral felt flashing is showing signs of deterioration with replacement required. 03 – The House: The House has one pitched concrete tile roof that is considered to be in reasonable condition however the mineral felt flashing is showing signs of deterioration with replacement required.

Sample College Physical Condition Survey

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


Physical Condition Survey

Survey Method Oakleaf have developed specific data capture pro-forma’s to cover each aspect of the regulations for each type of survey. This approach enables us to not only identify which items do not meet an appropriate condition, but also those which do. We consider that this approach is thorough and also enables the client to confirm that no items have simply been missed. Client Checks on Data Capture This approach enables the client to be able to check all on site data captured to see first hand that all items are covered and that nothing has been missed. Survey Quality Checks It also provides a mechanism to standardise on the quality of information being collected and allows ongoing monitoring of survey staff to check for quality and standard. Hand Held Electronic Data Capture using PDA's Oakleaf have their own data capture software which we will use to ensure data consistency. This uses pre-populated 'pick lists' to ensure data integrity between all auditors.

Sample College Physical Condition Survey

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


Physical Condition Survey

Physical Condition Methodology Oakleaf have developed specific data capture pro-forma’s to cover each aspect of a Physical Condition Appraisal. Oakleaf's approach is not only to identify which items do not meet an appropriate condition, but also those which do. We consider that this approach is thorough and also enables the client to confirm that no items have simply been missed. We will also provide a written Executive Summary that lists the main findings. Aspects covered in the appraisal:Each element states Condition Category (A, B, C, CX, D or DX). Each element has been identified with a budget cost to repair it. Each element has been identified with a remaining life expectancy when it will have to be either repaired or replaced. Each element has been identified with a budget cost to upgrade it to Condition 'B'. All the above have been recorded on our standard pro-forma’s and listed in a spreadsheet and database to enable the local users to maintain and update the data base on an ongoing basis. The survey covers:a) The condition of all building and engineering components, the cost for repairs and renewals and the time scale projected over a twenty year period. b) Any enforceable requirement necessary to comply with current legislation. Each building (block) has been appraised under the following categories:BUILDING A) Physical Structure B) External Fabric C) Internal Fabric D) Roof F) External Works G) Gardens MECHANICAL H) Drainage I) Heating Systems J) Steam Systems K) Vent & Air Con L) Medical Gases M) Hot/Cold Water N) Lifts O) Main Plant (Boilers/Calorifiers) P) Main Plant (Fixed Plant) P) Lightning Protection

Sample College Physical Condition Survey

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


Physical Condition Survey ELECTRICAL R) Electrical V) Fire Alarms W) Telecoms Each element category has been sub-divided into subsidiary components for ease of identification for example structure has been sub-divided into: General Structure, Foundations, Ground Stability etc. A supplementary note and cost has been provided to support identifiable work listed under subsidiary components i.e. a roof frame may require numerous items of repair such as work to wall plates, tie rods, bracing, etc. Each subsidiary component has been graded, utilising the WIMS system viz: Condition A = Good. Performing as intended and operating efficiently. B = Satisfactory. Performing as intended but exhibiting minor deterioration. B(C) = Items currently condition B but will fall to condition C within 5 year period. C = Poor. Exhibiting major defects and/or not operating as intended. D = Bad. Life expired and/or serious risk of imminent failure. X = Added to C or D if item cannot be repaired and must be replaced. In addition a repair cost has been entered against each repair to bring the component up to a sound/operationally safe condition. An estimate of time remaining until the repair is implemented has also been allocated. Time allocation covers a five year projection. Extent of items has been measured and a descriptive note recording location within premises so that items can be located. A note describing the fault and corrective work has been provided together with its location by floor and room number. Digital Photographs We have included digital photographs of key items requiring remedial work to assist in communicating the works required.

Sample College Physical Condition Survey

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


Physical Condition Survey

Risk Assessment Matrix

Sample College Physical Condition Survey

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


Physical Condition Survey

Remaining Life of Building Elements When calculating the remaining life of elements Oakleaf use the BMI publication: Life Expectancy of Building Components. Below are building elements that have the potential to fall within the 5 year backlog maintenance plan and their respective life expectancy. Timber Pitched Roof Asphalt Flat Roof Bitumen Felt Flat Roof Slate Covering to Pitched Roof Tile Covering to Pitched Roof Softwood Windows Hardwood Windows Aluminium Windows Cast Iron Gutters PVC Gutters PVC Windows Steel Windows Vinyl Sheet Flooring Carpet Flooring Decorations Lathe and Plaster Ceiling Suspended Ceilings

85 years 35 years 20 years 75 years 65 years 35 years 50 years 45 years 50 years 30 years 35 years 50 years 10 years 10 years 7 years 60 years 25 years

Clearly these are affected by on site conditions and in many cases have deteriorated to the extent that they require replacement within the above stated periods. Conversely; if the element has reached the end of its expected life but is in good condition the stated remaining life will be greater than the above.

Sample College Physical Condition Survey

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


Physical Condition Survey

Remaining Life of M & E Elements When calculating the remaining life of elements Oakleaf use the BMI publication: Life Expectancy of Building Components. Below are building elements that have the potential to fall within the 5 year backlog maintenance plan and their respective life expectancy. Plastic Water Storage Tank GRP Water Storage Tank PVCU Water Storage Tank Copper Pipework Boiler Solid Fuel Back Boiler Major Pump Radiators Thermostatic Radiator Valves Aluminium Air-Conditioning Ductwork Steel Air-Conditioning Ductwork Air-Conditioning Heater Air-Conditioning Chiller Air-Conditioning Pump Air-Conditioning Fan Heating Program Controller/Timer Thermostat Controls Electric Lighting Circuit Electric Power Circuit Fuse Box/Consumer Unit Power Outlet Socket Light Switch Fluorescent Luminaire Fluorescent Tube Incandescent Light Bulb Wet Riser Sprinkler System Dry Riser Sprinkler System Sprinkler Head Traction Drive Passenger Lift Hydraulic Passenger Lift Industrial Scissor Lift

30 years 35 years 25 years 40 years 20 years 20 years 12 years 25 years 15 years 30 years 25 years 15 years 15 years 15 years 15 years 15 years 15 years 30 years 30 years 30 years 25 years 25 years 15 years 3 years 2 years 30 years 40 years 25 years 30 years 25 years 20 years

Clearly these are affected by on site conditions and in many cases have deteriorated to the extent that they require replacement within the above stated periods. Conversely; if the element has reached the end of its expected life but is in good condition the stated remaining life will be greater than the above.

Sample College Physical Condition Survey

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


utility subrepor

Physical Condition Survey - Backlog Summary

Site :

001 - Sample College

Block : 01 - The Bunglow Condition: Year

C Year Total

2009 Block Total :

Site :

C Building

Engineering

£9,500

£8,000

£1,500

£9,500

£8,000

£1,500

001 - Sample College

Block : 02 - The Residence Condition: Year

C Year Total

2009 Block Total :

Site :

Building

Engineering

£64,150

£64,150

£0

£64,150

£64,150

£0

001 - Sample College

Block : 03 - The House Condition: Year

C Year Total

2009 Block Total :

Site :

C Building

Engineering

£23,372

£20,472

£2,900

£23,372

£20,472

£2,900

001 - Sample College

Block : 04 - Main Block Condition: Year

C Year Total

2009 Block Total :

Site :

C Building

Engineering

£538,549

£350,649

£187,900

£538,549

£350,649

£187,900

001 - Sample College

Block : 05 - Study Centre Condition: Year

C Year Total

2009 Block Total :

Sample College Physical Condition Survey

C Building

Engineering

£9,970

£2,120

£7,850

£9,970

£2,120

£7,850

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager Site :

Physical Condition Survey - Backlog Summary

001 - Sample College

Block : 06 - B Hostel Condition: Year

C Year Total

2009 Block Total :

Site :

C Building

Engineering

£40,462

£39,362

£1,100

£40,462

£39,362

£1,100

001 - Sample College

Block : 07 - C Hostel Condition: Year

C Year Total

2009 Block Total :

Site :

C Building

Engineering

£31,550

£30,100

£1,450

£31,550

£30,100

£1,450

001 - Sample College

Block : 08 - A Hostel Condition: Year

C Year Total

2009 Block Total :

Site :

C Building

Engineering

£34,894

£33,794

£1,100

£34,894

£33,794

£1,100

001 - Sample College

Block : 09 - Learning Resources Block Condition: Year

C Year Total

2009 Block Total :

Site :

C Building

Engineering

£63,240

£51,240

£12,000

£63,240

£51,240

£12,000

001 - Sample College

Block : 10 - Sports Hall Condition: Year

C Year Total

2009 Block Total :

Sample College Physical Condition Survey

C Building

Engineering

£11,380

£3,380

£8,000

£11,380

£3,380

£8,000

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager Site :

Physical Condition Survey - Backlog Summary

001 - Sample College

Block : 11 - Garage Condition: Year

C Year Total

2009

Building

Engineering

£60,000

£60,000

£0

Block Total :

£60,000

£60,000

£0

SiteTotal :

£887,067

£663,267

£223,800

Report Total :

£887,067

£663,267

£223,800

Sample College Physical Condition Survey

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


utility subrepor

Physical Condition Survey - Budget Summary

Site :

001 - Sample College

Block : 00 - Site Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

Engineering

2010

£800

£800

£0

2013

£45,000

£45,000

£0

£45,800

£45,800

£0

Block Total :

Site :

Building

001 - Sample College

Block : 01 - The Bunglow Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

Engineering

2010

£1,260

£1,260

£0

2011

£2,760

£2,760

£0

2012

£1,300

£1,300

£0

2013

£400

£400

£0

£5,720

£5,720

£0

Block Total :

Site :

Building

001 - Sample College

Block : 02 - The Residence Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

Building

Engineering

2010

£2,000

£2,000

£0

2011

£800

£800

£0

2013

£2,450

£2,450

£0

2014

£1,500

£1,500

£0

£6,750

£6,750

£0

Block Total :

Sample College Physical Condition Survey

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager Site :

Physical Condition Survey - Budget Summary

001 - Sample College

Block : 03 - The House Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

Engineering

2010

£4,342

£4,342

£0

2011

£1,850

£1,100

£750

2012

£1,180

£1,180

£0

2013

£3,120

£3,120

£0

2014

£14,450

£1,000

£13,450

£24,942

£10,742

£14,200

Block Total :

Site :

Building

001 - Sample College

Block : 04 - Main Block Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

Engineering

2010

£19,745

£19,745

£0

2011

£59,416

£57,016

£2,400

2012

£50,004

£18,604

£31,400

2013

£253,554

£253,554

£0

2014

£117,489

£91,439

£26,050

£500,208

£440,358

£59,850

Block Total :

Site :

Building

001 - Sample College

Block : 05 - Study Centre Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

Building

Engineering

2010

£7,420

£7,420

£0

2011

£89,850

£52,550

£37,300

2012

£14,733

£14,733

£0

2013

£1,400

£1,400

£0

2014

£111,800

£111,800

£0

£225,203

£187,903

£37,300

Block Total :

Sample College Physical Condition Survey

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager Site :

Physical Condition Survey - Budget Summary

001 - Sample College

Block : 06 - B Hostel Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

Engineering

2010

£53,577

£53,577

£0

2011

£45,928

£30,928

£15,000

2012

£25,404

£22,804

£2,600

2013

£14,760

£14,760

£0

2014

£2,200

£0

£2,200

£141,869

£122,069

£19,800

Block Total :

Site :

Building

001 - Sample College

Block : 07 - C Hostel Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

Engineering

2010

£16,240

£16,240

£0

2011

£22,538

£22,538

£0

2012

£29,219

£13,719

£15,500

2013

£46,293

£46,293

£0

2014

£31,400

£0

£31,400

£145,690

£98,790

£46,900

Block Total :

Site :

Building

001 - Sample College

Block : 08 - A Hostel Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

Building

Engineering

2010

£92,935

£92,935

£0

2011

£47,895

£22,395

£25,500

2012

£34,398

£32,998

£1,400

2013

£12,175

£11,775

£400

2014

£10,775

£2,775

£8,000

£198,178

£162,878

£35,300

Block Total :

Sample College Physical Condition Survey

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager Site :

Physical Condition Survey - Budget Summary

001 - Sample College

Block : 09 - Learning Resources Block Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

Engineering

2010

£1,500

£1,500

2011

£63,750

£63,750

£0

2012

£3,750

£3,750

£0

£0

2013

£90,460

£10,460

£80,000

2014

£108,140

£108,140

£0

£267,600

£187,600

£80,000

Block Total :

Site :

Building

001 - Sample College

Block : 10 - Sports Hall Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

Building

Engineering

2010

£2,150

£2,150

£0

2011

£3,545

£3,545

£0

2012

£870

£870

£0

2013

£1,743

£1,743

£0

2014

£17,455

£2,205

£15,250

Block Total :

£25,763

£10,513

£15,250

SiteTotal :

£1,587,723

£1,279,123

£308,600

£1,587,723

£1,279,123

£308,600

Report Total :

Sample College Physical Condition Survey

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


Summary of Block Appraisal Cost by Total Cost

Site

Block

GIA (m2)

Block Total Cost/m2 Band

Physical Condition 001 - Sample College

04 - Main Block

3,433

£1,038,757

302.6

4

001 - Sample College

09 - Learning Resources Block

2,600

£330,840

127.2

4

001 - Sample College

05 - Study Centre

1,263

£235,173

186.2

4

001 - Sample College

08 - A Hostel

1,507

£233,072

154.7

4

001 - Sample College

06 - B Hostel

1,299

£182,331

140.4

4

001 - Sample College

07 - C Hostel

955

£177,240

185.6

4

001 - Sample College

02 - The Residence

101

£70,900

702.0

4

001 - Sample College

11 - Garage

425

£60,000

141.2

4

001 - Sample College

03 - The House

100

£48,314

483.1

4

001 - Sample College

10 - Sports Hall

850

£37,143

43.7

2

001 - Sample College

01 - The Bunglow

100

£15,220

152.2

4

Overall Total:

Sample College Physical Condition Survey

£2,428,990

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


Physical Condition Survey - Costs Summary

Year Total

Building

Engineering

Status Backlog 2009

£887,067

£663,267

£223,800

Total

£887,067

£663,267

£223,800

VAT

£155,237

£116,072

£39,165

Fees

£133,060

£99,490

£33,570

Total

£1,175,364

£878,829

£296,535

Sample College Physical Condition Survey

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


Physical Condition Survey - Costs Summary

EstateManager Year Total

Building

Engineering

Status Budget - Based on year condition 'B' becomes condition 'C' or worse 2010

£201,969

£201,969

£0

2011

£338,332

£257,382

£80,950

2012

£160,858

£109,958

£50,900

2013

£471,355

£390,955

£80,400

2014

£415,209

£318,859

£96,350

Total

£1,587,723

£1,279,123

£308,600

VAT

£277,852

£223,847

£54,005

Fees

£238,158

£191,868

£46,290

Total

£2,103,733

£1,694,838

£408,895

Sample College Physical Condition Survey

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


Physical Condition Survey - Costs Summary

EstateManager Year Total

Building

Engineering

Overall Budget - Backlog & Budget Total

£2,474,790

£1,942,390

£532,400

VAT

£433,088

£339,918

£93,170

Fees

£371,219

£291,359

£79,860

Total

£3,279,097

£2,573,667

£705,430

Sample College Physical Condition Survey

January 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


Summary of Block Appraisal Cost by Priority

Site

Block

Block Total

Priority 1

%

Priority 2

%

Priority 3

%

Priority 4

%

Physical Condition 001 - Sample College

00 - Site

£45,800

001 - Sample College

01 - The Bunglow

£15,220

£7,450

48.9%

£45,000

98.3%

£3,050

20.0%

£800

1.7%

£1,820

12.0%

001 - Sample College

02 - The Residence

£70,900

£63,250

89.2%

£6,400

9.0%

£1,250

1.8%

001 - Sample College

03 - The House

£48,314

£12,850

26.6%

£16,100

33.3%

£16,790

34.8%

£2,574

5.3%

001 - Sample College

04 - Main Block

£1,038,757

£318,700

30.7%

£457,786

44.1%

£170,595

16.4%

£91,676

8.8%

001 - Sample College

05 - Study Centre

£235,173

£149,550

001 - Sample College

06 - B Hostel

£182,331

£27,800

15.2%

£69,380

63.6%

£53,305

22.7%

£32,318

13.7%

38.1%

£53,145

29.1%

£32,006

17.6%

001 - Sample College

07 - C Hostel

£177,240

£21,050

11.9%

001 - Sample College

08 - A Hostel

£233,072

£20,700

8.9%

£42,950

24.2%

£87,500

49.4%

£25,740

14.5%

£115,050

49.4%

£69,970

30.0%

£27,352

11.7%

£2,900

19.1%

001 - Sample College

09 - Learning Resources Block

£330,840

£42,700

12.9%

£79,500

24.0%

£148,580

44.9%

£60,060

18.2%

001 - Sample College

10 - Sports Hall

£37,143

£950

2.6%

£10,400

28.0%

£21,815

58.7%

£3,978

10.7%

001 - Sample College

11 - Garage

£60,000

£60,000 100.0%

£2,474,790

£575,450

Totals: Percentage:

Sample College Physical Condition Survey

23.3%

£995,166 40.2%

£625,850 25.3%

£278,324 11.2%

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Site : Sample College - 001 Block : Site - 00 Facet: 1 - Building F - Building - External Works

Location: External 01 - Roads

B(C)

£40,000

4

2

0 0

0

2013

02 - Car Parks

B

£0

6

0

0 0

0

2015

02 - Car Parks

B

£0

6

0

0 0

0

2015

02 - Car Parks

B

£0

8

0

0 0

0

2017

02 - Car Parks

B

£0

10

0

0 0

0

2019

£5,000

4

2

0 0

0

2013

03 - Paths

B(C)

Tarmac: Clean and re-surface likely to be required within the maintenance period. Concrete grass: Located to main car park. Loose stones: Located to sports hall car park. Tarmac: Located to sports hall car park.

Brick paviours: Located to main car park. Tarmac: Clean and re-surface likely to be required within the maintenance period.

G - Building - Gardens

Location: External

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Fences

B(C)

01 - Fences 01 - Fences

Block Total

Sample College Physical Condition Survey

Cost to B Rem Life Priority C L

R

Year

£800

1

4

0 0

0

2010

B

£0

6

0

0 0

0

2015

B

£0

10

0

0 0

0

2019

Notes

Remedial Action

Painted metal: Requires redecoration. Located to road edge. Timber post & rail: Low-level to path and road edge. Gate - Metal (painted): Located to courtyard between A & C Hostel.

£45,800.00

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Site : Sample College - 001 Block : The Bunglow - 01 Facet: 1 - Building A - Building - Physical Structure

Location: Whole Block 01 - General Structure 02 - Foundations 03 - Ground Stability

B B B

£0 £0 £0

40 60 60

0 0 0

0 0 0 0 0 0

0 0 0

2049 2069 2069

Brickwork: Generally sound. Generally sound. Generally sound.

04 - Windows

C

£850

0

1

0 0

0

2009

06 - Doors

C

£1,500

0

1

0 0

0

2009

06 - Doors

B

£0

8

0

0 0

0

2017

Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 1 - 1No. Steel: Need to replace - located to elevation 1 - 1No. single. PVCU: Located to elevation 1.

C

£850

0

1

0 0

0

2009

Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 2 - 1No.

C

£2,550

0

1

0 0

0

2009

£200

4

3

0 0

0

2013

Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 3 - 3No. Softwood timber: Redecorate and make good located to elevation 3 - 1No. single.

B - Building - External Fabric

Location: Elevation 01

Location: Elevation 02 04 - Windows

Location: Elevation 03 04 - Windows

06 - Doors

Sample College Physical Condition Survey

B(C)

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: Elevation 04 04 - Windows

06 - Doors

C

B(C)

£1,700

0

1

0 0

0

2009

Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 4 - 2No. Softwood timber: Redecorate and make good located to elevation 4 - 1No. single.

£200

4

3

0 0

0

2013

£0 £0 £0 £0

20 20 20 20

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2029 2029 2029 2029

Brickwork. Brickwork. Brickwork. Brickwork.

£260

2

4

0 0

0

2011

£0

20

0

0 0

0

2029

£350

2

3

0 0

0

2011

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule. Anti-slip vinyl sheet flooring: In good condition. Fixed units: Kitchen units in good condition.

Location: Whole Block 01a - Masonry - Cracking 01b - Masonry - Spalling 01c - Masonry - Pointing 01d - Masonry - Finish

B B B B

C - Building - Internal Fabric

Location: 001-01-0-001 01 - Decorations

02 - Ceiling

B(C)

B

03 - Floor

B(C)

03 - Floor

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

15

0

0 0

0

2024

£260

3

4

0 0

0

2012

£0

20

0

0 0

0

2029

Location: 001-01-0-002 01 - Decorations

02 - Ceiling Sample College Physical Condition Survey

B(C)

B

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor 08 - Fixed Units

B B

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£0 £0

6 10

0 0

0 0 0 0

0 0

2015 2019

Anti-slip vinyl sheet flooring. Sanitary fittings: In good condition.

£260

3

4

0 0

0

2012

£0

20

0

0 0

0

2029

B(C)

£350

2

3

0 0

0

2011

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

B(C)

£260

3

4

0 0

0

2012

£0

20

0

0 0

0

2029

B(C)

£350

2

3

0 0

0

2011

B(C)

£260

3

4

0 0

0

2012

£0

20

0

0 0

0

2029

£350

2

3

0 0

0

2011

Location: 001-01-0-003 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Location: 001-01-0-004 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-01-0-005 01 - Decorations

02 - Ceiling 03 - Floor

B B(C)

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-01-0-006 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

Cost to B Rem Life Priority C L

R

Year

£260

3

4

0 0

0

2012

£0

20

0

0 0

0

2029

B(C)

£350

2

3

0 0

0

2011

B(C)

£260

1

4

0 0

0

2010

£0

20

0

0 0

0

2029

B(C)

£350

2

3

0 0

0

2011

C

£250

0

2

0 0

0

2009

B

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-01-0-007 01 - Decorations

02 - Ceiling 03 - Floor

05 - Condition of Internal Walls

B

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule. Plaster - make good and redecorate water damage to plaster walls. Located to rear of shower.

D - Building - Roof

Location: Roof 01 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing

B B B(C)

£0 £0 £1,000

6 8 1

0 0 2

0 0 0 0 0 0

0 0 0

2015 2017 2010

01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins

B(C)

£400

2

3

0 0

0

2011

£0 £0

40 40

0 0

0 0 0 0

0 0

2049 2049

Sample College Physical Condition Survey

B B

Concrete tiles. Mineral felt. Mineral felt: Evidence of deterioration, with replacement required within the maintenance period. Painted timber: Redecorate completely. Timber. Timber. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

01g - Attached - Guttering

C

£150

0

2

0 0

0

2009

Mineral felt lined: Require clearing. PVCU - Internal: Require clearing.

01h - Attached - Down Rainwater pipes

C

£150

0

2

0 0

0

2009

01 - Heat Emitters

C

£1,500

0

2

0 0

0

2009

01 - Heat Emitters

B

£0

17

0

0 0

0

2026

B

£0

17

0

0 0

0

2026

Aniston combination boiler in good order.

B

£0

12

0

0 0

0

2021

Extract fans in good order.

03 - Distribution Boards

B

£0

15

0

0 0

0

2024

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

Hager distribution board in good order. Surface fluorescent lights in good order. Emergency lights in good order.

Facet: 2 - Engineering I - Engineering - Heating Systems

Location: Whole Block 6No. high efficiency convectors with no low surface temperature covers throughout the building require covering or replacement. Heat emitters with low surface temperature covers in good order.

O - Engineering - Main Plant

Location: Whole Block 01 - Heating Boilers P - Engineering - Main Plant

Location: Whole Block 04 - Extract Fans R - Engineering - Electrical

Location: Whole Block

V - Engineering - Fire Alarms

Location: Whole Block Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Sounders 02 - Call Points 03 - Smoke Detectors 05 - Fire Main/Zone Panel Block Total

Sample College Physical Condition Survey

Cost to B Rem Life Priority C L

B B B B

£0 £0 £0 £0

12 12 12 10

0 0 0 0

0 0 0 0

0 0 0 0

R

Year

0 0 0 0

2021 2021 2021 2019

Notes

Remedial Action

Fire sounders in good order. Fire call points in good order. Smoke detectors in good order. Fixfire main panel in good order.

£15,220.00

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Site : Sample College - 001 Block : The Residence - 02 Facet: 1 - Building A - Building - Physical Structure

Location: Whole Block 01 - General Structure 02 - Foundations 03 - Ground Stability

B B B

£0 £0 £0

40 60 60

0 0 0

0 0 0 0 0 0

0 0 0

2049 2069 2069

Brickwork: Generally sound. Generally sound. Generally sound.

04 - Windows

C

£3,400

0

1

0 0

0

2009

06 - Doors

C

£800

0

1

0 0

0

2009

06 - Doors

C

£1,500

0

1

0 0

0

2009

Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 1 - 4No. Softwood timber: Need to replace located to elevation 1 1No. single. Steel: Need to replace located to elevation 1 - 1No. single.

C

£250

0

3

0 0

0

2009

Brickwork: Remove ivy growth located to elevation 2.

C

£500

0

1

0 0

0

2009

Brickwork: Evidence of minor cracking, with monitoring for further movement required located to rear of garage (elevation 3).

B - Building - External Fabric

Location: Elevation 01

Location: Elevation 02 01d - Masonry - Finish

Location: Elevation 03 01a - Masonry - Cracking

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

01b - Masonry - Spalling

C

£250

0

1

0 0

0

2009

Brickwork: Make good to missing bricks - located to elevation 3 - 1st floor level.

04 - Windows

C

£5,950

0

1

0 0

0

2009

B(C)

£200

4

3

0 0

0

2013

Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 3 - 7No. Softwood timber: Redecorate and make good - located to elevation 3 - 1No. single.

C

£850

0

1

0 0

0

2009

Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 4 - 1No.

B

£0

20

0

0 0

0

2029

Brickwork.

B(C)

£2,250

4

2

0 0

0

2013

Galvanised Steel garage doors: Need to replace.

C

£50,000

0

1

0 0

0

2009

Derelict, with cost allowing for complete refurbishment.

06 - Doors

Location: Elevation 04 04 - Windows

Location: Whole Block 01c - Masonry - Pointing

06 - Doors C - Building - Internal Fabric

Location: Whole Block 12 - Comments D - Building - Roof Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: Roof 01 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing

B B B(C)

£0 £0 £2,000

6 8 1

0 0 2

0 0 0 0 0 0

0 0 0

2015 2017 2010

01d - Attached - Verges/Fascias/ Soffits

B(C)

£800

2

3

0 0

0

2011

01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

B B C

£0 £0 £250

40 40 0

0 0 2

0 0 0 0 0 0

0 0 0

2049 2049 2009

01h - Attached - Down Rainwater pipes

C

£250

0

2

0 0

0

2009

£1,500

5

2

0 0

0

2014

£0 £0 £150

10 10 0

0 0 2

0 0 0 0 0 0

0 0 0

2019 2019 2009

Concrete tiles. Mineral felt. Mineral felt: Evidence of deterioration with replacement required. Close boarded timber: Redecorate and make good close boarded timber fascia/soffit. Timber. Timber. Parapet gutters with mineral felt lining: Require clearing. PVCU - Internal: Require clearing.

Location: Roof 02 02a - Flat - Covering

02b - Flat - Decking 02c - Flat - Flashing 02h - Flat - Down Rainwater pipes Block Total

Sample College Physical Condition Survey

B(C)

B B C

Mineral felt: Evidence of significant moss growth with replacement likely to be required within the maintenance period. Softwood. Lead. PVCU - Internal: Require clearing.

£70,900.00

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Site : Sample College - 001 Block : The House - 03 Facet: 1 - Building A - Building - Physical Structure

Location: Whole Block 01 - General Structure 02 - Foundations 03 - Ground Stability

B B B

£0 £0 £0

40 60 60

0 0 0

0 0 0 0 0 0

0 0 0

2049 2069 2069

Brickwork: Generally sound. Generally sound. Generally sound.

04 - Windows

C

£5,950

0

1

0 0

0

2009

06 - Doors

C

£400

0

2

0 0

0

2009

Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 1 - 7No. Softwood timber: Redecorate and make good located to elevation 1 - 2No. single.

C

£850

0

1

0 0

0

2009

Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 2 - 1No.

C

£4,250

0

1

0 0

0

2009

Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 3 - 5No.

B - Building - External Fabric

Location: Elevation 01

Location: Elevation 02 04 - Windows

Location: Elevation 03 04 - Windows

Location: Elevation 04

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Windows

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£1,700

0

1

0 0

0

2009

Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 4 - 2No.

B B B B B(C)

£0 £0 £0 £0 £2,250

20 20 20 20 4

0 0 0 0 2

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2029 2029 2029 2029 2013

£0

10

0

0 0

0

2019

Brickwork. Brickwork. Brickwork. Brickwork. Galvanised steel garage doors: Need to replace. PVCU.

Location: Whole Block 01a - Masonry - Cracking 01b - Masonry - Spalling 01c - Masonry - Pointing 01d - Masonry - Finish 06 - Doors 06 - Doors

B

C - Building - Internal Fabric

Location: 001-03-0-001 01 - Decorations

B(C)

£260

4

4

0 0

0

2013

02 - Ceiling 03 - Floor

B B(C)

£0 £350

10 4

0 3

0 0 0 0

0 0

2019 2013

B(C)

£260

4

4

0 0

0

2013

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-03-0-002 01 - Decorations

02 - Ceiling 03 - Floor

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2019 2019

05 - Condition of Internal Walls

B

£0

10

0

0 0

0

2019

08 - Fixed Units

B

£0

10

0

0 0

0

2019

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Laminate flooring: In good condition. Ceramic wall tiling: In good condition. Fixed units: Kitchen units in good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-03-0-003 01 - Decorations

C

£130

0

4

0 0

0

2009

02 - Ceiling 03 - Floor

B C

£0 £175

6 0

0 3

0 0 0 0

0 0

2015 2009

£1,250

1

2

0 0

0

2010

C

£260

0

4

0 0

0

2009

B B(C)

£0 £350

6 2

0 3

0 0 0 0

0 0

2015 2011

C

£260

0

4

0 0

0

2009

B B(C)

£0 £350

6 2

0 3

0 0 0 0

0 0

2015 2011

B(C)

£130

1

4

0 0

0

2010

£0

6

0

0 0

0

2015

08 - Fixed Units

B(C)

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Vinyl sheet flooring: Requires replacement due to age and condition. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-03-0-004 01 - Decorations

02 - Ceiling 03 - Floor

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-03-0-005 01 - Decorations

02 - Ceiling 03 - Floor

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-03-0-006 01 - Decorations

02 - Ceiling Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

03 - Floor

C

£175

0

3

0 0

0

2009

Vinyl sheet tiles: Require replacement due to age and condition. Sanitary fittings: Require replacement due to age and level of deterioration.

08 - Fixed Units

C

£5,000

0

2

0 0

0

2009

B

£0

6

0

0 0

0

2015

Cupboard fit for purpose.

01 - Decorations

C

£182

0

4

0 0

0

2009

02 - Ceiling 03 - Floor

B C

£0 £245

6 0

0 3

0 0 0 0

0 0

2015 2009

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet.

B(C)

£130

3

4

0 0

0

2012

Location: 001-03-0-007 12 - Comments

Location: 001-03-0-008

Location: 001-03-1-001 01 - Decorations

02 - Ceiling 03 - Floor

B B

£0 £0

6 6

0 0

0 0 0 0

0 0

2015 2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Laminate flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-03-1-002 01 - Decorations

B(C)

£260

1

4

0 0

0

2010

02 - Ceiling 03 - Floor

B B(C)

£0 £350

6 3

0 3

0 0 0 0

0 0

2015 2012

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-03-1-003 01 - Decorations

B(C)

£260

1

4

0 0

0

2010

02 - Ceiling 03 - Floor

B B(C)

£0 £350

6 3

0 3

0 0 0 0

0 0

2015 2012

01 - Decorations

B(C)

£260

1

4

0 0

0

2010

02 - Ceiling 03 - Floor

B B(C)

£0 £350

6 3

0 3

0 0 0 0

0 0

2015 2012

B(C)

£182

1

4

0 0

0

2010

B C

£0 £245

6 0

0 3

0 0 0 0

0 0

2015 2009

£0 £0 £2,000

6 8 1

0 0 2

0 0 0 0 0 0

0 0 0

2015 2017 2010

£0 £0

8 40

0 0

0 0 0 0

0 0

2017 2049

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-03-1-004 Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-03-1-005 01 - Decorations

02 - Ceiling 03 - Floor

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet.

D - Building - Roof

Location: Roof 01 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing

B B B(C)

01c - Attached - Flashing 01e - Attached - Rafters

B B

Sample College Physical Condition Survey

Concrete tiles. Mineral felt. Mineral felt: Evidence of deterioration with replacement required. Lead. Timber. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

01f - Attached - Purlins 01g - Attached - Guttering

B C

£0 £250

40 0

0 2

0 0 0 0

0 0

2049 2009

01h - Attached - Down Rainwater pipes

C

£250

0

2

0 0

0

2009

£1,000

5

2

0 0

0

2014

£0

10

0

0 0

0

2019

Notes

Remedial Action

Timber. Parapet gutters with mineral felt lining: Require clearing. PVCU - Internal: Require clearing.

Location: Roof 02 02a - Flat - Covering

B(C)

02b - Flat - Decking

B

02c - Flat - Flashing 02e - Flat - Verges/Fascias/ Soffits

B B(C)

£0 £400

10 2

0 3

0 0 0 0

0 0

2019 2011

02h - Flat - Down Rainwater pipes

C

£150

0

2

0 0

0

2009

Mineral felt: Evidence of significant moss growth with replacement likely to be required within the maintenance period. Softwood.

Lead. Close boarded timber: Redecorate and make good close boarded timber fascia/soffit. PVCU - Internal: Require clearing.

Facet: 2 - Engineering I - Engineering - Heating Systems

Location: Whole Block

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

C

01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£100

0

1

0 0

0

2009

Old radiant heater to be removed.

B(C)

£4,800

5

3

0 0

0

2014

12No. steel panel radiators require upgrading within the maintenance schedule.

01 - Heating Boilers

B(C)

£5,000

5

3

0 0

0

2014

02 - Pumps

B(C)

£750

2

2

0 0

0

2011

Netaheat Profile heating boiler requires upgrading within the maintenance schedule. Grundfos heating pump requires upgrading within the maintenance schedule.

03 - Calorifiers

B(C)

£1,000

5

3

0 0

0

2014

O - Engineering - Main Plant

Location: Whole Block

Pre-insulated cylinder calorifier requires upgrading within the maintenance schedule.

P - Engineering - Main Plant

Location: Whole Block

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Controls

Cost to B Rem Life Priority C L

B(C)

R

Year

Notes

Remedial Action

£300

5

3

0 0

0

2014

3 Port Honeywell control valves require upgrading within the maintenance schedule.

Incoming cable in good order. MEM distribution board in good order. 14No. tungsten lights require replacement. 2No. surface fluorescent lights in good order.

R - Engineering - Electrical

Location: Whole Block 01 - Incoming Cable 03 - Distribution Boards

B B

£0 £0

10 20

0 0

0 0 0 0

0 0

2019 2029

04 - Lighting Installation

C

£2,800

0

2

0 0

0

2009

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

V - Engineering - Fire Alarms

Location: Whole Block 03 - Smoke Detectors

B(C)

£1,350

5

3

0 0

0

2014

05 - Fire Main/Zone Panel

B(C)

£1,000

5

3

0 0

0

2014

Block Total

Sample College Physical Condition Survey

9No. smoke detectors require upgrading within the maintenance schedule. Minerva main fire panel requires upgrading within the maintenance schedule.

£48,314.00

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Site : Sample College - 001 Block : Main Block - 04 Facet: 1 - Building A - Building - Physical Structure

Location: Elevation 06 & 08 05 - External Fire Escape

B

£0

10

0

0 0

0

2019

Galvanised steel walk-way to first floor - located between elevations 6 & 8.

B B B

£0 £0 £0

40 60 60

0 0 0

0 0 0 0 0 0

0 0 0

2049 2069 2069

Brickwork: Generally sound. Generally sound. Generally sound.

Aluminium: Requires replacing due to age and condition located to elevation 1 automatic. Steel framed canopy: Requires redecoration to frame and fascias - located to elevation 1 (main entrance).

Location: Whole Block 01 - General Structure 02 - Foundations 03 - Ground Stability B - Building - External Fabric

Location: Elevation 01 06 - Doors

B(C)

£1,200

4

2

0 0

0

2013

08 - Porches

B(C)

£400

1

3

0 0

0

2010

04 - Windows

B(C)

£4,400

5

3

0 0

0

2014

06 - Doors

B(C)

£400

4

3

0 0

0

2013

Location: Elevation 02

Sample College Physical Condition Survey

Softwood timber - Single: Redecorate and make good including infill panels - located to elevation 20 - 11No. Softwood timber: Redecorate and make good - located to elevation 20 - 2No. single. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: Elevation 03 04 - Windows

B(C)

£1,500

5

3

0 0

0

2014

Softwood timber - Single: Redecorate and make good including infill panels - located to elevation 3 - 5No. Softwood timber: Redecorate and make good - located to elevation 3 - 2No. single.

06 - Doors

B(C)

£400

4

3

0 0

0

2013

£0

6

0

0 0

0

2015

£700

4

3

0 0

0

2013

£0

6

0

0 0

0

2015

B(C)

£1,000

4

3

0 0

0

2013

Softwood timber: Redecorate and make good - located to elevation 7 - 2No. double & 2No. single.

04 - Windows

C

£1,200

0

1

0 0

0

2009

04 - Windows

C

£2,400

0

1

0 0

0

2009

£500

1

3

0 0

0

2010

Steel - Single: Replace crittal steel windows with more suitable alternative - located to elevation 10 - 2No. Softwood timber - Single: Replace with new - located to elevation 10 - 3No. Softwood timber: Redecorate and make good - located to elevation 10 - 1No. single & 1No. double.

Location: Elevation 06 04 - Windows

B

06 - Doors

B(C)

06 - Doors

B

Aluminium - Double: Located to elevation 6. Softwood timber: Redecorate and make good - located to elevation 6 - 2No. single & 1No. double. Aluminium: Located to elevation 6.

Location: Elevation 07 06 - Doors

Location: Elevation 10

06 - Doors

Sample College Physical Condition Survey

B(C)

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: Elevation 11 06 - Doors

B

£0

10

0

0 0

0

2019

Steel: Located to elevation 11 1No. single. Steel framed lean-to with polycarbonate covering located to elevation 11.

08 - Porches

B

£0

8

0

0 0

0

2017

C

£24,000

0

1

0 0

0

2009

B(C)

£1,500

1

3

0 0

0

2010

C

£1,800

0

1

0 0

0

2009

Steel - Single: Replace crittal steel windows with more suitable alternative - located to elevation 13 - 3No.

02a - Cladding - Attachment

B

£0

15

0

0 0

0

2024

02b - Cladding - Cracking

B

£0

15

0

0 0

0

2024

02c - Cladding - Joints

B

£0

15

0

0 0

0

2024

02d - Cladding - Finish

B

£0

15

0

0 0

0

2024

Plastic profiled sheet cladding: Located to elevation 14. Plastic profiled sheet cladding: Located to elevation 14. Plastic profiled sheet cladding: Located to elevation 14. Plastic profiled sheet cladding: Located to elevation 14.

C

£14,400

0

1

0 0

0

2009

Location: Elevation 12 04 - Windows

06 - Doors

Steel - Single: Replace crittal steel windows with more suitable alternative - located to elevation 12 - 40No. Softwood timber: Redecorate and make good located to elevation 12 - 3No. double & 3No. single.

Location: Elevation 13 04 - Windows

Location: Elevation 14

Location: Elevation 16 04 - Windows

Sample College Physical Condition Survey

Steel - Single: Replace crittal steel windows with more suitable alternative - located to elevation 16 - 24No. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 06 - Doors

B(C)

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£400

4

3

0 0

0

2013

Softwood timber: Redecorate and make good - located to elevation 16 - 2No. single.

C

£11,400

0

1

0 0

0

2009

Steel - Single: Replace crittal steel windows with more suitable alternative - located to elevation 17 - 19No.

C

£10,800

0

1

0 0

0

2009

Steel - Single: Replace crittal steel windows with more suitable alternative - located to elevation 18 - 18No.

C

£36,600

0

1

0 0

0

2009

B(C)

£1,400

4

3

0 0

0

2013

Steel - Single: Replace crittal steel windows with more suitable alternative - located to elevation 19 - 61No. Softwood timber: Redecorate and make good - located to elevation 19 - 4No. single & 2No. double.

£0 £0 £0 £0 £0 £0 £0 £0 £0

10 20 10 20 10 20 10 20 10

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

2019 2029 2019 2029 2019 2029 2019 2029 2019

Location: Elevation 17 04 - Windows

Location: Elevation 18 04 - Windows

Location: Elevation 19 04 - Windows

06 - Doors

Location: Whole Block 01a - Masonry - Cracking 01a - Masonry - Cracking 01b - Masonry - Spalling 01b - Masonry - Spalling 01c - Masonry - Pointing 01c - Masonry - Pointing 01d - Masonry - Finish 01d - Masonry - Finish 04 - Windows

Sample College Physical Condition Survey

B B B B B B B B B

0 0 0 0 0 0 0 0 0

Render. Brickwork. Render. Brickwork. Render. Brickwork. Render. Brickwork. PVCU - Double.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C - Building - Internal Fabric

Location: 001-04-0-001/2/3 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

£1,300

4

4

0 0

0

2013

Redecoration required as part of a regular maintenance schedule.

£0

20

0

0 0

0

2029

B(C)

£1,750

1

3

0 0

0

2010

Plaster ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£1,300

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

£1,750

3

3

0 0

0

2012

£0

6

0

0 0

0

2015

£104

4

4

0 0

0

2013

£0

20

0

0 0

0

2029

B

Location: 001-04-0-001a 01 - Decorations

02 - Ceiling

B

03 - Floor

B(C)

03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Parquet timber block flooring: In good condition.

Location: 001-04-0-004 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B(C)

B

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

03 - Floor

C

£140

0

3

0 0

0

2009

08 - Fixed Units

B

£0

10

0

0 0

0

2019

Notes

Remedial Action

Anti-slip vinyl sheet flooring: Requires replacement due to age and condition. Sanitary fittings: In good condition.

Location: 001-04-0-005 01 - Decorations

B(C)

£390

4

4

0 0

0

2013

02 - Ceiling 03 - Floor

B B(C)

£0 £525

6 4

0 3

0 0 0 0

0 0

2015 2013

Redecoration required as part of a regular maintenance schedule. Ceiling paper: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B

£0

6

0

0 0

0

2015

Fit for purpose.

B

£0

6

0

0 0

0

2015

Fit for purpose.

C

£390

0

4

0 0

0

2009

B B(C)

£0 £525

6 2

0 3

0 0 0 0

0 0

2015 2011

Redecoration required as part of a regular maintenance schedule. Ceiling paper: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£1,170

4

4

0 0

0

2013

Location: 001-04-0-005a 12 - Comments

Location: 001-04-0-005b 12 - Comments

Location: 001-04-0-006 01 - Decorations

02 - Ceiling 03 - Floor

Location: 001-04-0-007 01 - Decorations

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

02 - Ceiling

B(C)

£5,400

5

2

0 0

0

2014

03 - Floor

B(C)

£1,575

2

3

0 0

0

2011

B(C)

£312

4

4

0 0

0

2013

C

£312

0

2

0 0

0

2009

B(C)

£420

4

3

0 0

0

2013

B(C)

£312

4

4

0 0

0

2013

C

£312

0

2

0 0

0

2009

B(C)

£420

4

3

0 0

0

2013

B(C)

£208

4

4

0 0

0

2013

C

£100

0

3

0 0

0

2009

Notes

Remedial Action

Suspended ceiling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-008 01 - Decorations

02 - Ceiling 03 - Floor

Redecoration required as part of a regular maintenance schedule. Ceiling paper: Requires replacement. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-008a 01 - Decorations

02 - Ceiling 03 - Floor

Redecoration required as part of a regular maintenance schedule. Ceiling paper: Requires replacement. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-009 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

08 - Fixed Units

B(C)

Cost to B Rem Life Priority C L

R

Year

£280

3

3

0 0

0

2012

£0

12

0

0 0

0

2021

B(C)

£208

4

4

0 0

0

2013

C

£100

0

3

0 0

0

2009

B(C)

£280

3

3

0 0

0

2012

£0

12

0

0 0

0

2021

£208

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

B(C)

£280

3

3

0 0

0

2012

B(C)

£5,200

4

4

0 0

0

2013

£0

20

0

0 0

0

2029

B

Notes

Remedial Action

Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Fitted units in good condition.

Location: 001-04-0-010 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Fitted units in good condition.

Location: 001-04-0-011 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-012 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£7,000

5

3

0 0

0

2014

Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£1,300

4

4

0 0

0

2013

£0

20

0

0 0

0

2029

B(C)

£1,750

5

3

0 0

0

2014

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£208

4

4

0 0

0

2013

C

£200

0

2

0 0

0

2009

B(C)

£280

5

3

0 0

0

2014

B(C)

£520

4

4

0 0

0

2013

£0

20

0

0 0

0

2029

£700

5

3

0 0

0

2014

Location: 001-04-0-012a 01 - Decorations

02 - Ceiling 03 - Floor

B

Location: 001-04-0-012b 01 - Decorations

02 - Ceiling

03 - Floor

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: Make good and redecorate water ingress to plaster ceiling. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-012c 01 - Decorations

02 - Ceiling 03 - Floor

Sample College Physical Condition Survey

B B(C)

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-04-0-012e 01 - Decorations

£208

4

4

0 0

0

2013

£0

20

0

0 0

0

2029

B(C)

£280

5

3

0 0

0

2014

01 - Decorations

B(C)

£520

1

4

0 0

0

2010

02 - Ceiling

B(C)

£2,400

4

2

0 0

0

2013

03 - Floor

B(C)

£700

1

3

0 0

0

2010

01 - Decorations

C

£520

0

4

0 0

0

2009

02 - Ceiling

B

£0

20

0

0 0

0

2029

£700

3

3

0 0

0

2012

£0

10

0

0 0

0

2019

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-013 Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-014

03 - Floor

08 - Fixed Units

B(C)

B

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Kitchen units in good condition.

Location: 001-04-0-014a

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

B(C)

Cost to B Rem Life Priority C L

R

Year

£208

3

4

0 0

0

2012

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£208

3

4

0 0

0

2012

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-04-0-014b 01 - Decorations

B(C)

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£104

5

4

0 0

0

2014

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-04-0-014c 01 - Decorations

B(C)

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

8

0

0 0

0

2017

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition.

Location: 001-04-0-015 01 - Decorations

B(C)

£390

1

4

0 0

0

2010

02 - Ceiling

B(C)

£1,800

4

2

0 0

0

2013

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£525

2

3

0 0

0

2011

Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

01 - Decorations

B(C)

£1,040

1

4

0 0

0

2010

02 - Ceiling

B(C)

£4,800

4

2

0 0

0

2013

03 - Floor

B(C)

£1,400

2

3

0 0

0

2011

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Vinyl sheet: Requires replacement within the maintenance schedule due to age and condition.

01 - Decorations

B(C)

£208

3

4

0 0

0

2012

02 - Ceiling

B(C)

£960

4

2

0 0

0

2013

03 - Floor

B(C)

£280

2

3

0 0

0

2011

01 - Decorations

C

£312

0

4

0 0

0

2009

02 - Ceiling

C

£1,440

0

2

0 0

0

2009

Location: 001-04-0-016

Location: 001-04-0-017 Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-017b

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£420

1

3

0 0

0

2010

Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£312

3

4

0 0

0

2012

£1,440

0

2

0 0

0

2009

B(C)

£420

1

3

0 0

0

2010

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£910

1

4

0 0

0

2010

C

£4,200

0

2

0 0

0

2009

B(C)

£1,225

4

3

0 0

0

2013

01 - Decorations

C

£1,040

0

4

0 0

0

2009

02 - Ceiling

C

£4,800

0

2

0 0

0

2009

Location: 001-04-0-017c 01 - Decorations

02 - Ceiling

03 - Floor

C

Location: 001-04-0-018 01 - Decorations

02 - Ceiling

03 - Floor

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-019

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£1,400

2

3

0 0

0

2011

Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

01 - Decorations

B(C)

£1,040

2

4

0 0

0

2011

02 - Ceiling

B(C)

£4,800

4

2

0 0

0

2013

03 - Floor

B(C)

£1,400

2

3

0 0

0

2011

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Vinyl sheet: Requires replacement within the maintenance schedule due to age and condition.

B(C)

£1,040

2

4

0 0

0

2011

£150

0

3

0 0

0

2009

B(C)

£1,400

4

3

0 0

0

2013

B(C)

£208

3

4

0 0

0

2012

Location: 001-04-0-020

Location: 001-04-0-021 01 - Decorations

02 - Ceiling 03 - Floor

C

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-022a 01 - Decorations

02 - Ceiling

B

£0

8

0

0 0

0

2017

03 - Floor

B

£0

8

0

0 0

0

2017

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition.

Location: 001-04-0-022b Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

Cost to B Rem Life Priority C L

R

Year

B(C)

£78

3

4

0 0

0

2012

02 - Ceiling

B

£0

8

0

0 0

0

2017

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

10

0

0 0

0

2019

B(C)

£78

3

4

0 0

0

2012

02 - Ceiling

B

£0

8

0

0 0

0

2017

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

10

0

0 0

0

2019

B(C)

£78

3

4

0 0

0

2012

02 - Ceiling

B

£0

8

0

0 0

0

2017

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

10

0

0 0

0

2019

B(C)

£78

3

4

0 0

0

2012

B

£0

8

0

0 0

0

2017

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-04-0-022c 01 - Decorations

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-04-0-022d 01 - Decorations

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-04-0-022e 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£910

4

4

0 0

0

2013

Notes

Remedial Action

Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-04-0-023 01 - Decorations

B(C)

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

C

£1,225

0

3

0 0

0

2009

B(C)

£78

3

4

0 0

0

2012

02 - Ceiling

B

£0

8

0

0 0

0

2017

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

10

0

0 0

0

2019

B(C)

£78

3

4

0 0

0

2012

02 - Ceiling

B

£0

8

0

0 0

0

2017

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

10

0

0 0

0

2019

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet.

Location: 001-04-0-023a 01 - Decorations

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-04-0-023b 01 - Decorations

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-04-0-023c Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

B(C)

Cost to B Rem Life Priority C L

R

Year

£208

3

4

0 0

0

2012

02 - Ceiling

B

£0

8

0

0 0

0

2017

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£104

3

4

0 0

0

2012

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-04-0-023d 01 - Decorations

B(C)

02 - Ceiling

B

£0

8

0

0 0

0

2017

03 - Floor

B

£0

8

0

0 0

0

2017

£312

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

B(C)

£420

4

3

0 0

0

2013

01 - Decorations

B(C)

£650

2

4

0 0

0

2011

02 - Ceiling

B(C)

£3,000

4

2

0 0

0

2013

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition.

Location: 001-04-0-024 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-025

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£875

2

3

0 0

0

2011

Vinyl sheet: Requires replacement within the maintenance schedule due to age and condition.

C

£208

0

4

0 0

0

2009

B(C)

£960

4

2

0 0

0

2013

B

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Quarry tile flooring: In good condition.

C

£78

0

4

0 0

0

2009

B(C)

£360

4

2

0 0

0

2013

£0

6

0

0 0

0

2015

B(C)

£1,250

2

3

0 0

0

2011

01 - Decorations

B(C)

£1,560

1

4

0 0

0

2010

02 - Ceiling

B(C)

£7,200

4

2

0 0

0

2013

Location: 001-04-0-026 01 - Decorations

02 - Ceiling

03 - Floor

Location: 001-04-0-027 01 - Decorations

02 - Ceiling

03 - Floor 08 - Fixed Units

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Quarry tile flooring: In good condition. Fixed unit: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-04-0-028

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

B(C)

Cost to B Rem Life Priority C L

R

Year

£2,100

1

3

0 0

0

2010

08 - Fixed Units

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

6

0

0 0

0

2015

B(C)

£208

2

4

0 0

0

2011

C

£960

0

2

0 0

0

2009

B(C)

£280

4

3

0 0

0

2013

B(C)

£520

2

4

0 0

0

2011

Notes

Remedial Action

Vinyl sheet: Requires replacement within the maintenance schedule due to age and condition. Fixed units: Art units in good condition. Fixed units: Belfast sink unit in good condition.

Location: 001-04-0-028a 01 - Decorations

02 - Ceiling

03 - Floor

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-029 01 - Decorations

02 - Ceiling

C

£2,400

0

2

0 0

0

2009

03 - Floor

B

£0

8

0

0 0

0

2017

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Anti-slip vinyl sheet flooring: In good condition.

Location: 001-04-0-030 01 - Decorations

B(C)

£520

2

4

0 0

0

2011

02 - Ceiling

B(C)

£2,400

4

2

0 0

0

2013

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

C

£1,250

0

3

0 0

0

2009

£650

4

4

0 0

0

2013

£0

20

0

0 0

0

2029

B(C)

£875

2

3

0 0

0

2011

01 - Decorations

B(C)

£520

4

4

0 0

0

2013

02 - Ceiling

B(C)

£2,400

5

2

0 0

0

2014

03 - Floor

B(C)

£700

2

3

0 0

0

2011

B(C)

£3,900

5

4

0 0

0

2014

£250

0

3

0 0

0

2009

£5,250

2

3

0 0

0

2011

Notes

Remedial Action

Anti-slip vinyl sheet flooring: In good condition. Fixed units: Sink unit requires replacement due to age and level of deterioration.

Location: 001-04-0-031 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Vinyl sheet: Requires replacement within the maintenance schedule due to age and condition.

Location: 001-04-0-032 Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Vinyl sheet: Requires replacement within the maintenance schedule due to age and condition.

Location: 001-04-0-033 01 - Decorations

02 - Ceiling 03 - Floor

Sample College Physical Condition Survey

C B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Vinyl sheet: Requires replacement within the maintenance schedule due to age and condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-04-0-033a 01 - Decorations

B(C)

£156

4

4

0 0

0

2013

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

C

£210

0

3

0 0

0

2009

B(C)

£260

4

4

0 0

0

2013

C

£100

0

3

0 0

0

2009

B(C)

£350

5

3

0 0

0

2014

B(C)

£312

4

4

0 0

0

2013

C

£100

0

3

0 0

0

2009

B(C)

£420

5

3

0 0

0

2014

01 - Decorations

C

£312

0

4

0 0

0

2009

02 - Ceiling

B

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Vinyl sheet: Requires replacement due to age and condition.

Location: 001-04-0-033b 01 - Decorations

02 - Ceiling 03 - Floor

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-033c 01 - Decorations

02 - Ceiling 03 - Floor

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-034

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£420

4

3

0 0

0

2013

Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

01 - Decorations

C

£312

0

4

0 0

0

2009

02 - Ceiling

B

£0

6

0

0 0

0

2015

B(C)

£420

1

3

0 0

0

2010

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£1,560

4

4

0 0

0

2013

£0

20

0

0 0

0

2029

B(C)

£2,100

4

3

0 0

0

2013

B(C)

£1,040

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

£1,400

4

3

0 0

0

2013

Location: 001-04-0-035

03 - Floor

Location: 001-04-0-036 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-037 01 - Decorations

02 - Ceiling 03 - Floor

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-038 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

Cost to B Rem Life Priority C L

R

Year

£1,040

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

B(C)

£1,400

4

3

0 0

0

2013

B(C)

£78

4

4

0 0

0

2013

B

£0

20

0

0 0

0

2029

B(C)

£105

4

3

0 0

0

2013

B(C)

£260

4

4

0 0

0

2013

£0

20

0

0 0

0

2029

B(C)

£350

4

3

0 0

0

2013

B(C)

£104

1

4

0 0

0

2010

£0

6

0

0 0

0

2015

B

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-038a 01 - Decorations

02 - Ceiling 03 - Floor

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-038b 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-038c 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£140

0

3

0 0

0

2009

Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

01 - Decorations

C

£78

0

4

0 0

0

2009

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Quarry tile flooring: In good condition.

£4,550

5

4

0 0

0

2014

£250

0

3

0 0

0

2009

B(C)

£6,125

4

3

0 0

0

2013

B(C)

£780

4

4

0 0

0

2013

£0

15

0

0 0

0

2024

£1,050

5

3

0 0

0

2014

Location: 001-04-0-038d

Location: 001-04-0-039 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

C

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Vinyl sheet: Requires replacement within the maintenance schedule due to age and condition.

Location: 001-04-0-040 01 - Decorations

02 - Ceiling 03 - Floor

B B(C)

Redecoration required as part of a regular maintenance schedule. Timber panelling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-040b

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

Cost to B Rem Life Priority C L

R

Year

£208

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

B(C)

£280

5

3

0 0

0

2014

B(C)

£104

1

4

0 0

0

2010

B

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-040c 01 - Decorations

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

C

£140

0

3

0 0

0

2009

01 - Decorations

C

£312

0

4

0 0

0

2009

02 - Ceiling

C

£312

0

2

0 0

0

2009

03 - Floor

C

£420

0

3

0 0

0

2009

01 - Decorations

C

£208

0

4

0 0

0

2009

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

C

£280

0

3

0 0

0

2009

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Vinyl tile flooring: Requires replacement due to age and condition.

Location: 001-04-0-041 Redecoration required as part of a regular maintenance schedule. Ceiling paper: Requires replacement. Carpet: Requires replacement with contract quality carpet.

Location: 001-04-0-041a

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Vinyl tile flooring: Requires replacement due to age and condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-04-0-042 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

£650

2

4

0 0

0

2011

£0

10

0

0 0

0

2019

B(C)

£875

2

3

0 0

0

2011

B(C)

£208

2

4

0 0

0

2011

£0

10

0

0 0

0

2019

B(C)

£280

2

3

0 0

0

2011

B(C)

£650

2

4

0 0

0

2011

£0

10

0

0 0

0

2019

B(C)

£875

4

3

0 0

0

2013

B(C)

£1,300

2

4

0 0

0

2011

B

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Vinyl tile flooring: Requires replacement within the maintenance schedule due to age and condition.

Location: 001-04-0-042a 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Vinyl tile flooring: Requires replacement within the maintenance schedule due to age and condition.

Location: 001-04-0-043 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-044 01 - Decorations

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02 - Ceiling 03 - Floor

08 - Fixed Units

B B(C)

B

Cost to B Rem Life Priority C L

R

Year

£0

10

0

0 0

0

2019

£1,750

2

3

0 0

0

2011

£0

6

0

0 0

0

2015

Notes

Remedial Action

Plaster ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-04-0-101 01 - Decorations

B(C)

£4,550

4

4

0 0

0

2013

02 - Ceiling 03 - Floor

B B(C)

£0 £6,125

40 5

0 3

0 0 0 0

0 0

2049 2014

B

£0

8

0

0 0

0

2017

02 - Ceiling

B

£0

20

0

0 0

0

2029

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

20

0

0 0

0

2029

02 - Ceiling

B

£0

20

0

0 0

0

2029

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

20

0

0 0

0

2029

03 - Floor

Redecoration required as part of a regular maintenance schedule. Exposed decking: Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Timber floor: In good condition.

Location: 001-04-0-101a Plaster ceiling: In good condition. Vinyl sheet flooring: In good condition. Fairfaced blockwork: In good condition.

Location: 001-04-0-101b Plaster ceiling: In good condition. Vinyl sheet flooring: In good condition. Fairfaced blockwork: In good condition.

Location: 001-04-0-C1 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

Cost to B Rem Life Priority C L

R

Year

£1,300

2

4

0 0

0

2011

£150

0

3

0 0

0

2009

B(C)

£1,750

2

3

0 0

0

2011

B(C)

£2,600

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£3,500

2

3

0 0

0

2011

B(C)

£2,600

4

4

0 0

0

2013

£0

10

0

0 0

0

2019

B(C)

£3,500

2

3

0 0

0

2011

B(C)

£1,560

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

C

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-C2 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-C3 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-0-C4 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£2,100

2

3

0 0

0

2011

Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

01 - Decorations

B(C)

£2,600

3

4

0 0

0

2012

02 - Ceiling

B(C)

£12,000

4

2

0 0

0

2013

03 - Floor

B(C)

£3,500

2

3

0 0

0

2011

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

B(C)

£520

4

4

0 0

0

2013

£0

20

0

0 0

0

2029

B(C)

£700

5

3

0 0

0

2014

01 - Decorations

C

£390

0

4

0 0

0

2009

02 - Ceiling

C

£1,800

0

2

0 0

0

2009

03 - Floor

C

£525

0

3

0 0

0

2009

Location: 001-04-0-C5

Location: 001-04-1-001 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-LG-045

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Vinyl tile flooring: Requires replacement due to age and condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-04-LG-045a 01 - Decorations

C

£312

0

4

0 0

0

2009

02 - Ceiling

B

£0

20

0

0 0

0

2029

03 - Floor

C

£420

0

3

0 0

0

2009

01 - Decorations

C

£156

0

4

0 0

0

2009

02 - Ceiling

B

£0

20

0

0 0

0

2029

B(C)

£210

2

3

0 0

0

2011

01 - Decorations

B(C)

£520

4

4

0 0

0

2013

02 - Ceiling

B(C)

£2,400

2

2

0 0

0

2011

£0

8

0

0 0

0

2017

£1,300

3

4

0 0

0

2012

£150

0

3

0 0

0

2009

Redecoration required as part of a regular maintenance schedule. Concrete decking: In good condition. Carpet tiles: Require replacement with contract quality carpet.

Location: 001-04-LG-045b

03 - Floor

Redecoration required as part of a regular maintenance schedule. Concrete decking: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-LG-045c

03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Anti-slip vinyl sheet flooring: In good condition.

Location: 001-04-LG-045d 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B(C)

C

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

B

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£0

6

0

0 0

0

2015

Anti-slip vinyl sheet flooring: In good condition.

£1,040

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

B(C)

£1,400

4

3

0 0

0

2013

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£650

4

4

0 0

0

2013

C

£150

0

3

0 0

0

2009

B(C)

£875

4

3

0 0

0

2013

B(C)

£10,400

4

4

0 0

0

2013

Location: 001-04-LG-046 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Location: 001-04-LG-048 01 - Decorations

02 - Ceiling 03 - Floor

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-LG-049 01 - Decorations

02 - Ceiling

B

£0

20

0

0 0

0

2029

02 - Ceiling

B

£0

20

0

0 0

0

2029

03 - Floor

B

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Plaster ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition.

Location: 001-04-LG-050

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

B(C)

Cost to B Rem Life Priority C L

R

Year

£5,200

4

4

0 0

0

2013

02 - Ceiling

B

£0

20

0

0 0

0

2029

03 - Floor

B

£0

6

0

0 0

0

2015

B(C)

£1,250

2

3

0 0

0

2011

B(C)

£390

4

4

0 0

0

2013

08 - Fixed Units

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-04-LG-051 01 - Decorations

02 - Ceiling

B

£0

20

0

0 0

0

2029

03 - Floor

B

£0

8

0

0 0

0

2017

£130

4

4

0 0

0

2013

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Vinyl sheet flooring: In good condition.

Location: 001-04-LG-051a 01 - Decorations

B(C)

02 - Ceiling

B

£0

20

0

0 0

0

2029

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

8

0

0 0

0

2017

£390

4

4

0 0

0

2013

£0

20

0

0 0

0

2029

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-04-LG-052 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£525

1

3

0 0

0

2010

Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£130

4

4

0 0

0

2013

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-04-LG-052a 01 - Decorations

02 - Ceiling

B

£0

20

0

0 0

0

2029

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

8

0

0 0

0

2017

B(C)

£600

4

2

0 0

0

2013

03 - Floor

C

£175

0

3

0 0

0

2009

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

6

0

0 0

0

2015

C

£208

0

4

0 0

0

2009

B(C)

£960

4

2

0 0

0

2013

C

£280

0

3

0 0

0

2009

Location: 001-04-LG-053 02 - Ceiling

Suspended ceiling: Requires replacement within the maintenance schedule. Anti-slip vinyl sheet flooring: Requires replacement due to age and condition. Ceramic wall tiling: In good condition. Fixed units: Steel kitchen units in good condition.

Location: 001-04-LG-053a 01 - Decorations

02 - Ceiling

03 - Floor

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Anti-slip vinyl sheet flooring: Requires replacement due to age and condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

6

0

0 0

0

2015

Fixed units: Sink unit in good condition.

C

£312

0

4

0 0

0

2009

£1,440

4

2

0 0

0

2013

C

£420

0

3

0 0

0

2009

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Anti-slip vinyl sheet flooring: Requires replacement due to age and condition.

01 - Decorations

B(C)

£312

1

4

0 0

0

2010

02 - Ceiling

B(C)

£1,440

4

2

0 0

0

2013

£0

6

0

0 0

0

2015

£1,440

4

2

0 0

0

2013

Location: 001-04-LG-053b 01 - Decorations

02 - Ceiling

03 - Floor

B(C)

Location: 001-04-LG-053c

03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Quarry tile flooring: In good condition.

Location: 001-04-LG-053d 02 - Ceiling

B(C)

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

£910

1

4

0 0

0

2010

Suspended ceiling: Requires replacement within the maintenance schedule. Concrete flooring: In good condition. Plastic Sheet walls: In good condition.

Location: 001-04-LG-054 01 - Decorations

Sample College Physical Condition Survey

B(C)

Redecoration required as part of a regular maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

02 - Ceiling

B(C)

£4,200

4

2

0 0

0

2013

03 - Floor

B(C)

£1,225

2

3

0 0

0

2011

Suspended ceiling: Requires replacement within the maintenance schedule. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition.

B

£0

6

0

0 0

0

2015

Plant room fit for purpose.

B

£0

6

0

0 0

0

2015

Plant room fit for purpose.

B

£0

6

0

0 0

0

2015

Plant room fit for purpose.

£130

1

4

0 0

0

2010

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-04-LG-055 12 - Comments

Location: 001-04-LG-056 12 - Comments

Location: 001-04-LG-057 12 - Comments

Location: 001-04-LG-058 01 - Decorations

B(C)

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

10

0

0 0

0

2019

B(C)

£78

1

4

0 0

0

2010

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

10

0

0 0

0

2019

Location: 001-04-LG-058a 01 - Decorations

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-04-LG-059 01 - Decorations

B(C)

£312

1

4

0 0

0

2010

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£130

1

4

0 0

0

2010

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-04-LG-059a 01 - Decorations

B(C)

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£5,200

3

4

0 0

0

2012

£0

15

0

0 0

0

2024

B(C)

£7,000

4

3

0 0

0

2013

B(C)

£130

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-04-LG-060 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Timber ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-04-LG-060a 01 - Decorations

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02 - Ceiling 03 - Floor

B

Cost to B Rem Life Priority C L

R

Year

£0

20

0

0 0

0

2029

B(C)

£175

2

3

0 0

0

2011

B(C)

£260

2

4

0 0

0

2011

£0

20

0

0 0

0

2029

Notes

Remedial Action

Plaster ceiling: In good condition. Vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition.

Location: 001-04-LG-060b 01 - Decorations

02 - Ceiling

B

03 - Floor

B(C)

£350

2

3

0 0

0

2011

08 - Fixed Units

B(C)

£1,250

2

3

0 0

0

2011

08 - Fixed Units

B(C)

£5,000

2

3

0 0

0

2011

£0

20

0

0 0

0

2029

£350

2

3

0 0

0

2011

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration. Timber Bar - is in poor condition with replacement required within the maintenance period.

Location: 001-04-LG-060c 02 - Ceiling 03 - Floor

B B(C)

05 - Condition of Internal Walls

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

8

0

0 0

0

2017

Plaster ceiling: In good condition. Vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-04-LG-060d Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£260

1

4

0 0

0

2010

£0

15

0

0 0

0

2024

£350

2

3

0 0

0

2011

B B B B B

£0 £0 £0 £0 £0

20 50 50 10 10

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2029 2059 2059 2019 2019

Metal sheet. Metal. Metal. Aluminium. PVCU.

B B C

£0 £0 £1,000

20 30 0

0 0 3

0 0 0 0 0 0

0 0 0

2029 2039 2009

B B B B

£0 £0 £0 £0

50 50 10 10

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2059 2059 2019 2019

Metal sheet. Timber. Painted timber: Redecorate complete. Metal. Timber. PVCU. PVCU.

B

£0

10

0

0 0

0

2019

Aluminium Velux.

£0 £0 £1,000

8 15 1

0 0 3

0 0 0 0 0 0

0 0 0

2017 2024 2010

Concrete tile. Mineral felt. Painted timber: Redecorate complete.

B B(C)

Redecoration required as part of a regular maintenance schedule. Timber ceiling: In good condition. Vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition.

D - Building - Roof

Location: Roof 01 01a - Attached - Covering 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering 01h - Attached - Down Rainwater pipes

Location: Roof 02 01a - Attached - Covering 01b - Attached - Sarking 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering 01h - Attached - Down Rainwater pipes 01i - Attached - Skylights

Location: Roof 03 01a - Attached - Covering 01b - Attached - Sarking 01d - Attached - Verges/Fascias/ Soffits Sample College Physical Condition Survey

B B B(C)

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

R

Year

£0

8

0

0 0

0

2017

B B B(C)

£0 £0 £1,250

40 40 2

0 0 2

0 0 0 0 0 0

0 0 0

2049 2049 2011

B(C)

£600

2

2

0 0

0

2011

01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

B B B B(C)

£0 £0 £0 £250

8 15 15 5

0 0 0 3

0 0 0 0

0 0 0 0

0 0 0 0

2017 2024 2024 2014

B B B(C)

£0 £0 £250

40 40 2

0 0 2

0 0 0 0 0 0

0 0 0

2049 2049 2011

01h - Attached - Down Rainwater pipes

B(C)

£100

2

2

0 0

0

2011

£0 £0 £0 £0 £0

8 15 15 40 40

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2017 2024 2024 2049 2049

01h - Attached - Down Rainwater pipes

B

Cost to B Rem Life Priority C L

Notes

Remedial Action

Hanging clay tiles: Located to eaves. Timber. Timber. PVCU: Evidence of deterioration with replacement likely to be required within the maintenance period. PVCU: Evidence of deterioration with replacement likely to be required within the maintenance period.

Location: Roof 04 Concrete tile. Mineral felt. Lead. Painted timber: Redecorate complete. Timber. Timber. PVCU: Evidence of deterioration with replacement likely to be required within the maintenance period. PVCU: Evidence of deterioration with replacement likely to be required within the maintenance period.

Location: Roof 05 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01e - Attached - Rafters 01f - Attached - Purlins Sample College Physical Condition Survey

B B B B B

0 0 0 0 0

Single ply membrane. Timber. Lead. Timber. Timber. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

01g - Attached - Guttering

C

£250

0

2

0 0

0

2009

Integrated: Requires the implementation of a regular clearing programme. PVCU - Internal.

01h - Attached - Down Rainwater pipes 01i - Attached - Skylights

B

£0

6

0

0 0

0

2015

B

£0

6

0

0 0

0

2015

Polycarbonate domed skylights (4No).

£35,000

4

2

0 0

0

2013

Mineral felt with stone chippings: Evidence of deterioration with replacement required within the maintenance period. Timber. Lead. Timber. Timber. Integrated: Requires the implementation of a regular clearing programme. PVCU - Internal.

Location: Roof 06 01a - Attached - Covering

B(C)

01b - Attached - Sarking 01c - Attached - Flashing 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

B B B B C

£0 £0 £0 £0 £250

6 15 40 40 0

0 0 0 0 2

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2015 2024 2049 2049 2009

01h - Attached - Down Rainwater pipes 01i - Attached - Skylights

B

£0

6

0

0 0

0

2015

£3,000

4

2

0 0

0

2013

Polycarbonate domed skylights (5No.): Evidence of deterioration with replacement required within the maintenance period.

Single ply membrane. Timber. Rendered brick with stone coping. PVCU - Internal.

B(C)

Location: Roof 07 02a - Flat - Covering 02b - Flat - Decking 02d - Flat - Parapets

B B B

£0 £0 £0

10 15 10

0 0 0

0 0 0 0 0 0

0 0 0

2019 2024 2019

02h - Flat - Down Rainwater pipes

B

£0

10

0

0 0

0

2019

Location: Roof 08 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02a - Flat - Covering 02b - Flat - Decking 02c - Flat - Flashing 02e - Flat - Verges/Fascias/ Soffits 02h - Flat - Down Rainwater pipes

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B B B B B

£0 £0 £0 £0 £0

10 15 15 10 10

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2019 2024 2024 2019 2019

Single ply membrane. Timber. Lead. Composite fibre board. PVCU - Internal.

B B B B

£0 £0 £0 £0

10 15 8 10

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2019 2024 2017 2019

Single ply membrane. Timber. PVCU. PVCU - Internal.

02a - Flat - Covering

C

£50,000

0

1

0 0

0

2009

02b - Flat - Decking

C

£0

0

1

0 0

0

2009

£400

4

2

0 0

0

2013

£0

6

0

0 0

0

2015

Mineral felt with solar reflective covering: Evidence of deterioration to the covering with complete replacement required. Woodwool: Replacement required with roof covering. Cost included. PVCU - part Internal: Require replacing due to age and condition. Polycarbonate domed skylights (6No).

Location: Roof 09 02a - Flat - Covering 02b - Flat - Decking 02e - Flat - Verges/Fascias/ Soffits 02h - Flat - Down Rainwater pipes

Location: Roof 10

02h - Flat - Down Rainwater pipes

02i - Flat - Skylights

B(C)

B

Location: Roof 11 02a - Flat - Covering

B(C)

£2,000

1

2

0 0

0

2010

02b - Flat - Decking

B(C)

£0

1

2

0 0

0

2010

£250

0

1

0 0

0

2009

02f - Flat - Drainage Fall

Sample College Physical Condition Survey

C

Mineral felt: Requires replacing due to age and condition. Woodwool: Replacement required with roof covering. Cost included. Mineral felt: Evidence of significant standing water with investigation into drainage outlets required. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02h - Flat - Down Rainwater pipes

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

6

0

0 0

0

2015

PVCU - Internal.

02a - Flat - Covering

C

£60,000

0

1

0 0

0

2009

02b - Flat - Decking

C

£0

0

1

0 0

0

2009

B B(C)

£0 £16,200

6 4

0 2

0 0 0 0

0 0

2015 2013

Mineral felt with solar reflective covering: Evidence of deterioration of the covering with complete replacement required. Woodwool: Replacement required with roof covering. Cost included. PVCU - Internal. Polycarbonate domed skylights (27No.): Evidence of minor sun damage with replacement within the maintenance period likely to be required.

02a - Flat - Covering

C

£17,500

0

1

0 0

0

2009

02b - Flat - Decking

C

£0

0

1

0 0

0

2009

02h - Flat - Down Rainwater pipes 02i - Flat - Skylights

B C

£0 £20,000

6 0

0 1

0 0 0 0

0 0

2015 2009

Location: Roof 12

02h - Flat - Down Rainwater pipes 02i - Flat - Skylights

Location: Roof 13 Mineral felt with solar reflective covering: Evidence of deterioration of the covering with complete replacement required. Woodwool: Replacement required with roof covering. Cost included. Roof drains directly onto roof 16. Aluminium framed North lights with Georgian wire glazing: In poor condition with evidence of failure to seals, complete replacement required.

Location: Roof 14

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

02a - Flat - Covering

C

£2,500

0

1

0 0

0

2009

02b - Flat - Decking

C

£0

0

1

0 0

0

2009

02h - Flat - Down Rainwater pipes 02i - Flat - Skylights

B B

£0 £0

6 6

0 0

0 0 0 0

0 0

2015 2015

02a - Flat - Covering

C

£60,000

0

1

0 0

0

2009

02b - Flat - Decking

C

£0

0

1

0 0

0

2009

02h - Flat - Down Rainwater pipes 02i - Flat - Skylights

B C

£0 £600

6 0

0 1

0 0 0 0

0 0

2015 2009

B(C)

£3,000

4

2

0 0

0

2013

B(C)

£45,000

4

2

0 0

0

2013

Notes

Remedial Action

Mineral felt with solar reflective covering: Evidence of deterioration of the covering with complete replacement required. Woodwool: Replacement required with roof covering. Cost included. Roof drains directly onto roof 16. Polycarbonate domed skylights (2No).

Location: Roof 15

02i - Flat - Skylights

Mineral felt with solar reflective covering: Evidence of deterioration of the covering with complete replacement required. Woodwool: Replacement required with roof covering. Cost included. PVCU - Internal. Polycarbonate domed skylights (1No.): Evidence of significant sun damage with replacement required. Polycarbonate domed skylights (5No.): Evidence of deterioration with replacement required within the maintenance period.

Location: Roof 16 02a - Flat - Covering

Sample College Physical Condition Survey

Mineral with stone chippings: Evidence of deterioration with replacement required within the maintenance period.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02b - Flat - Decking

B(C)

02c - Flat - Flashing

Cost to B Rem Life Priority C L

R

Year

£0

4

2

0 0

0

2013

C

£4,000

0

1

0 0

0

2009

B B(C)

£0 £5,400

6 4

0 2

0 0 0 0

0 0

2015 2013

02a - Flat - Covering

B(C)

£15,000

4

2

0 0

0

2013

02b - Flat - Decking

B(C)

£0

4

2

0 0

0

2013

02c - Flat - Flashing

C

£1,000

0

1

0 0

0

2009

£0 £600

6 2

0 2

0 0 0 0

0 0

2015 2011

02h - Flat - Down Rainwater pipes 02i - Flat - Skylights

Notes

Remedial Action

Woodwool: Replacement required with roof covering. Cost included. Lead: Evidence of the removal of the flashing as a result of theft with part of the flashing already replaced with a lead substitute. Cost allows for further replacement. PVCU - Internal. Polycarbonate domed skylights (9No.): Evidence of deterioration with replacement required.

Location: Roof 17

02h - Flat - Down Rainwater pipes 02i - Flat - Skylights

B B(C)

Mineral with stone chippings: Evidence of deterioration with replacement required within the maintenance period. Woodwool: Replacement required with roof covering. Cost included. Lead: Evidence of the removal of the flashing as a result of theft with part of the flashing already replaced with a lead substitute. Cost allows for further replacement. PVCU - Internal. Polycarbonate domed skylights (1No.): Evidence of deterioration with replacement required.

Location: Roof 18

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02a - Flat - Covering

B(C)

02b - Flat - Decking 02c - Flat - Flashing

B C

02d - Flat - Parapets

B(C)

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£50,000

5

2

0 0

0

2014

Asphalt: Evidence of deterioration with re-covering likely to be required within the maintenance period. Reinforced concrete. Lead: Evidence of flashing coming away from the wall with making good required. Concrete wall part covered with mineral felt: Evidence of localised deterioration with making good required.

£0 £250

10 0

0 1

0 0 0 0

0 0

2019 2009

£1,250

1

2

0 0

0

2010

B B B B B B

£0 £0 £0 £0 £0 £0

10 20 10 10 10 10

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

2019 2029 2019 2019 2019 2019

Single ply membrane. Metal. Lead. Zinc. PVCU - Internal. Aluminium framed glazed skylight.

01 - Heat Emitters

C

£250

0

2

0 0

0

2009

01 - Heat Emitters

B(C)

£3,000

5

3

0 0

0

2014

High efficiency convector with no low surface temperature cover require replacement. Perimeter heating sill line requires upgrading within the maintenance schedule.

£250

0

2

0 0

0

2009

Location: Roof 19 02a - Flat - Covering 02b - Flat - Decking 02c - Flat - Flashing 02e - Flat - Verges/Fascias/ Soffits 02h - Flat - Down Rainwater pipes 02i - Flat - Skylights

Facet: 2 - Engineering I - Engineering - Heating Systems

Location: 001-04-1-001/2/3

Location: 001-04-1-005 01 - Heat Emitters

Sample College Physical Condition Survey

C

High efficiency convector with no low surface temperature cover require replacement. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-04-1-005b 01 - Heat Emitters

C

£400

0

2

0 0

0

2009

Fan convector requires replacement.

B(C)

£2,000

5

3

0 0

0

2014

Perimeter heating sill line requires upgrading within the maintenance schedule.

B(C)

£2,000

5

3

0 0

0

2014

Perimeter heating sill line requires upgrading within the maintenance schedule.

B

£0

10

0

0 0

0

2019

Steel panel radiator in good order.

B

£0

10

0

0 0

0

2019

Steel panel radiator in good order.

B

£0

10

0

0 0

0

2019

Steel panel radiator in good order.

£400

3

3

0 0

0

2012

Fan convector requires upgrading within the maintenance schedule.

Location: 001-04-1-006 01 - Heat Emitters

Location: 001-04-1-007 01 - Heat Emitters

Location: 001-04-1-008a 01 - Heat Emitters

Location: 001-04-1-009 01 - Heat Emitters

Location: 001-04-1-011 01 - Heat Emitters

Location: 001-04-1-012 01 - Heat Emitters

B(C)

Location: 001-04-1-012a Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£800

3

3

0 0

0

2012

2No. fan convectors require upgrading within the maintenance schedule.

B(C)

£400

2

3

0 0

0

2011

Fan convector requires upgrading within the maintenance schedule.

B

£0

10

0

0 0

0

2019

Fan convector in good order.

B

£0

10

0

0 0

0

2019

2No. heat emitters with low surface temperature covers in good order.

£400

3

3

0 0

0

2012

Fan convector requires upgrading within the maintenance schedule.

B

£0

10

0

0 0

0

2019

Fan convector in good order.

B

£0

10

0

0 0

0

2019

Steel panel radiator in good order.

B(C)

£500

5

3

0 0

0

2014

Perimeter heating sill line requires upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Fan convector requires upgrading within the maintenance schedule.

Location: 001-04-1-012b 01 - Heat Emitters

Location: 001-04-1-012c 01 - Heat Emitters

Location: 001-04-1-012d 01 - Heat Emitters

Location: 001-04-1-012e 01 - Heat Emitters

B(C)

Location: 001-04-1-013 01 - Heat Emitters

Location: 001-04-1-014 01 - Heat Emitters

Location: 001-04-1-015 01 - Heat Emitters

Location: 001-04-1-016 01 - Heat Emitters

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-04-1-017b 01 - Heat Emitters

B(C)

£400

3

3

0 0

0

2012

Fan convector requires upgrading within the maintenance schedule.

£0

10

0

0 0

0

2019

Electric convector in good order.

£400

3

3

0 0

0

2012

Fan convector requires upgrading within the maintenance schedule.

£0

10

0

0 0

0

2019

Steel panel radiator in good order at high level.

B(C)

£800

3

3

0 0

0

2012

2No. fan convectors require upgrading within the maintenance schedule.

B(C)

£800

3

3

0 0

0

2012

2No. fan convectors require upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Fan convector requires upgrading within the maintenance schedule.

£0

10

0

0 0

0

2019

Heat emitter with low surface temperature cover in good order.

Location: 001-04-1-017c 01 - Heat Emitters

B

Location: 001-04-1-018 01 - Heat Emitters

B(C)

Location: 001-04-1-018a 01 - Heat Emitters

B

Location: 001-04-1-019 01 - Heat Emitters

Location: 001-04-1-020 01 - Heat Emitters

Location: 001-04-1-021 01 - Heat Emitters

Location: 001-04-1-022b 01 - Heat Emitters

B

Location: 001-04-1-022d Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2019

Heat emitter with low surface temperature cover in good order.

B

£0

10

0

0 0

0

2019

Heat emitter with low surface temperature cover in good order.

B

£0

10

0

0 0

0

2019

Fan convector in good order.

B

£0

10

0

0 0

0

2019

Heat emitter with low surface temperature cover in good order.

B

£0

10

0

0 0

0

2019

Heat emitter with low surface temperature cover in good order.

B

£0

10

0

0 0

0

2019

Steel panel radiator in good order.

B(C)

£800

3

3

0 0

0

2012

2No. fan convectors require upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Fan convector requires upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Fan convector requires upgrading within the maintenance schedule.

Location: 001-04-1-022e 01 - Heat Emitters

Location: 001-04-1-023 01 - Heat Emitters

Location: 001-04-1-023c 01 - Heat Emitters

Location: 001-04-1-023d 01 - Heat Emitters

Location: 001-04-1-024 01 - Heat Emitters

Location: 001-04-1-028 01 - Heat Emitters

Location: 001-04-1-029 01 - Heat Emitters

Location: 001-04-1-030 01 - Heat Emitters

Location: 001-04-1-031 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£400

3

3

0 0

0

2012

Fan convector requires upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Fan convector requires upgrading within the maintenance schedule.

B(C)

£800

3

3

0 0

0

2012

2No. fan convectors require upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Fan convector requires upgrading within the maintenance schedule.

B

£0

10

0

0 0

0

2019

Heat emitter with low surface temperature cover in good order.

B

£0

10

0

0 0

0

2019

Heat emitter with low surface temperature cover in good order.

B

£0

10

0

0 0

0

2019

Heat emitter with low surface temperature cover in good order.

£800

3

3

0 0

0

2012

2No. fan convectors require upgrading within the maintenance schedule.

Location: 001-04-1-032 01 - Heat Emitters

Location: 001-04-1-036 01 - Heat Emitters

Location: 001-04-1-040 01 - Heat Emitters

Location: 001-04-1-042 01 - Heat Emitters

Location: 001-04-1-043 01 - Heat Emitters

Location: 001-04-1-044 01 - Heat Emitters

Location: 001-04-1-C1 01 - Heat Emitters

B(C)

Location: 001-04-1-C2

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£1,200

3

3

0 0

0

2012

3No. fan convectors require upgrading within the maintenance schedule.

01 - Heat Emitters

C

£1,000

0

2

0 0

0

2009

2No. pipe coils require replacement.

01 - Heat Emitters

B(C)

£800

3

3

0 0

0

2012

2No. fan convectors require upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Fan convector requires upgrading within the maintenance schedule.

01 - Heat Emitters

B(C)

£400

3

3

0 0

0

2012

01 - Heat Emitters

B

£0

10

0

0 0

0

2019

2No. fan convectors require upgrading within the maintenance schedule. Skirting heater in good order.

B(C)

£400

3

3

0 0

0

2012

Fan convector requires upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Fan convector requires upgrading within the maintenance schedule.

Location: 001-04-1-C3

Location: 001-04-1-C4 01 - Heat Emitters

Location: 001-04-1-C5

Location: 001-04-LG-045 01 - Heat Emitters

Location: 001-04-LG-045c 01 - Heat Emitters

Location: 001-04-LG-046 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£400

0

2

0 0

0

2009

Fan convector requires replacement.

C

£400

0

2

0 0

0

2009

Fan convector requires replacement.

B

£0

10

0

0 0

0

2019

Underfloor heating in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

10

0

0 0

0

2019

Vent in good order.

B

£0

10

0

0 0

0

2019

Vent in good order.

Location: 001-04-LG-048 01 - Heat Emitters

Location: 001-04-LG-049 01 - Heat Emitters

Location: 001-04-LG-050 01 - Heat Emitters

Location: 001-04-LG-051 01 - Heat Emitters

Location: 001-04-LG-051a 01 - Heat Emitters

Location: 001-04-LG-052 01 - Heat Emitters

Location: 001-04-LG-052a 01 - Heat Emitters K - Engineering - Vent & Air Con

Location: 001-04-1-022b 03 - Grilles & Diffusers

Location: 001-04-1-022c 03 - Grilles & Diffusers Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-04-1-022d 03 - Grilles & Diffusers

B

£0

10

0

0 0

0

2019

Vent in good order.

B

£0

10

0

0 0

0

2019

Vent in good order.

B

£0

10

0

0 0

0

2019

Vent in good order.

B

£0

10

0

0 0

0

2019

Vent in good order.

B

£0

10

0

0 0

0

2019

Vent in good order.

B

£0

10

0

0 0

0

2019

Vent in good order.

£2,000

2

3

0 0

0

2011

Vent is tired and requires upgrading within the maintenance schedule.

B

£0

10

0

0 0

0

2019

Air conditioning unit in good order.

B

£0

10

0

0 0

0

2019

Air conditioning unit in good order.

B

£0

10

0

0 0

0

2019

Vent in good order.

Location: 001-04-1-022e 03 - Grilles & Diffusers

Location: 001-04-1-023a 03 - Grilles & Diffusers

Location: 001-04-1-023b 03 - Grilles & Diffusers

Location: 001-04-1-023c 03 - Grilles & Diffusers

Location: 001-04-1-033 03 - Grilles & Diffusers

Location: 001-04-1-039 03 - Grilles & Diffusers

B(C)

Location: 001-04-LG-045a 05 - Cooling Units

Location: 001-04-LG-045b 05 - Cooling Units

Location: 001-04-LG-045d 03 - Grilles & Diffusers

Location: 001-04-LG-053 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Grilles & Diffusers

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£10,000

3

3

0 0

0

2012

Kitchen canopy is tired and in need of upgrade.

B(C)

£500

5

3

0 0

0

2014

Ductwork requires upgrading within the maintenance schedule.

C

£15,000

0

2

0 0

0

2009

Ductwork is very old and requires replacement.

B

£0

10

0

0 0

0

2019

Ductwork in good order.

01 - Local Water Heaters

B

£0

10

0

0 0

0

2019

03 - Blending Valves

B

£0

10

0

0 0

0

2019

Heatre Sadia under sink water heater in good order. Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

Location: 001-04-LG-055 01 - Ductwork

Location: 001-04-LG-057 01 - Ductwork

Location: 001-04-LG-060 01 - Ductwork M - Engineering - Hot/Cold Water

Location: 001-04-1-004

Location: 001-04-1-022b 03 - Blending Valves

Location: 001-04-1-022d 03 - Blending Valves

Location: 001-04-1-022e 03 - Blending Valves

Location: 001-04-1-023a Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Blending Valves

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

15

0

0 0

0

2024

Over sink water heater in good order.

C

£100,000

0

2

0 0

0

2009

2No. lifts require replacement.

B

£0

15

0

0 0

0

2024

Worcester heating boiler in good order.

C

£40,000

0

2

0 0

0

2009

4No. Potterton Derwent condensing boilers require replacement.

Location: 001-04-1-023b 03 - Blending Valves

Location: 001-04-1-023c 03 - Blending Valves

Location: 001-04-LG-052b 01 - Local Water Heaters N - Engineering - Lifts

Location: 001-04-LG-045e 01 - Lifts

O - Engineering - Main Plant

Location: 001-04-LG- 060d 01 - Heating Boilers

Location: 001-04-LG-057 01 - Heating Boilers

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

01 - Heating Boilers

B

£0

10

0

0 0

0

2019

Lochinvar boiler serving two (No Suggestions) calorifiers in good order. Domestic hot water service flow pump newly installed in parallel which causes a deadleg issue also top pump is a heating pump.

02 - Pumps

C

£1,000

0

2

0 0

0

2009

02 - Pumps

C

£3,000

0

2

0 0

0

2009

Grundfos heating pump requires replacement.

02 - Pumps

B

£0

12

0

0 0

0

2021

02 - Pumps

B

£0

15

0

0 0

0

2024

£10,000

5

2

0 0

0

2014

Grundfos domestic hot water service return pump in good order. 5No. Grundfos heating pumps in good order. 2No. Lochinvar calorifiers in good order will require upgrading within the maintenance schedule. Lochinvar DGF calorifier in good order.

03 - Calorifiers

B(C)

03 - Calorifiers

B

£0

12

0

0 0

0

2021

B

£0

7

0

0 0

0

2016

Extract fan in good order.

B

£0

7

0

0 0

0

2016

Extract fan in good order.

P - Engineering - Main Plant

Location: 001-04-1-014a 04 - Extract Fans

Location: 001-04-1-014b 04 - Extract Fans

Location: 001-04-1-014c Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Extract Fans

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2019

Extract fan in good order.

B

£0

10

0

0 0

0

2019

Extract fan in good order.

05 - AHUs

C

£15,000

0

2

0 0

0

2009

06 - Plant Room Ventilation

B

£0

10

0

0 0

0

2019

Air handling unit is very old and requires replacement. Louvered door in good order.

B

£0

15

0

0 0

0

2024

Air handling unit in good order.

B(C)

£1,500

5

3

0 0

0

2014

Roof unit extract fan requires upgrading within the maintenance schedule.

C

£10,000

0

2

0 0

0

2009

Control panel is very old and requires replacement.

£750

5

3

0 0

0

2014

Extract fan requires upgrading within the maintenance schedule.

Location: 001-04-1-033b 04 - Extract Fans

Location: 001-04-LG- 057

Location: 001-04-LG- 060d 05 - AHUs

Location: 001-04-LG-055 04 - Extract Fans

Location: 001-04-LG-057 03 - Controls

Location: 001-04-LG-060c 04 - Extract Fans

B(C)

R - Engineering - Electrical Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-04-1-001/2/3 04 - Lighting Installation 05 - Emergency Lighting

B B

£0 £0

13 13

0 0

0 0 0 0

0 0

2022 2022

CAT II light in good order. Emergency light in good order.

B

£0

13

0

0 0

0

2022

Surface fluorescent light in good order.

B

£0

13

0

0 0

0

2022

Surface fluorescent light in good order.

B B

£0 £0

13 10

0 0

0 0 0 0

0 0

2022 2019

2No. CAT II lights in good order. Sockets and switches in good order.

C

£200

0

2

0 0

0

2009

Tungsten light requires replacement.

04 - Lighting Installation

B

£0

13

0

0 0

0

2022

05 - Emergency Lighting

B

£0

13

0

0 0

0

2022

Surface fluorescent light in good order. Emergency light in good order.

B

£0

13

0

0 0

0

2022

CAT II light in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

12No. surface fluorescent lights in good order. Sockets and switches in good order.

Location: 001-04-1-004 04 - Lighting Installation

Location: 001-04-1-004a 04 - Lighting Installation

Location: 001-04-1-005 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-04-1-005a 04 - Lighting Installation

Location: 001-04-1-005b

Location: 001-04-1-006 04 - Lighting Installation

Location: 001-04-1-007

Location: 001-04-1-008a Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation

06 - Sockets/Switches

B(C)

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£400

5

3

0 0

0

2014

2No. CAT II lights require upgrading within the maintenance schedule. Sockets and switches in good order.

B

£0

10

0

0 0

0

2019

B B

£0 £0

13 10

0 0

0 0 0 0

0 0

2022 2019

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

13 10

0 0

0 0 0 0

0 0

2022 2019

CAT II light in good order. Sockets and switches in good order.

B B B B B

£0 £0 £0 £0 £0

20 13 15 13 10

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2029 2022 2024 2022 2019

Distribution board in good order. CAT II light in good order. CAT II light in good order. Emergency light in good order. Sockets and switches in good order.

B B B B

£0 £0 £0 £0

15 13 13 10

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2024 2022 2022 2019

Distribution board in good order. CAT II light in good order. Emergency light in good order. Sockets and switches in good order.

B B

£0 £0

20 13

0 0

0 0 0 0

0 0

2029 2022

Distribution board in good order. Surface fluorescent light in good order.

Location: 001-04-1-009 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-04-1-011 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-04-1-012 03 - Distribution Boards 04 - Lighting Installation 04 - Lighting Installation 05 - Emergency Lighting 06 - Sockets/Switches

Location: 001-04-1-012a 03 - Distribution Boards 04 - Lighting Installation 05 - Emergency Lighting 06 - Sockets/Switches

Location: 001-04-1-012b 03 - Distribution Boards 04 - Lighting Installation

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-04-1-012c 04 - Lighting Installation

B

£0

13

0

0 0

0

2022

Surface fluorescent light in good order. Sockets and switches in good order.

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

B

£0

13

0

0 0

0

2022

CAT II light in good order.

£400

5

3

0 0

0

2014

£0

10

0

0 0

0

2019

2No. surface fluorescent lights require upgrading within the maintenance schedule. Sockets and switches in good order.

£600

3

3

0 0

0

2012

Location: 001-04-1-012d 04 - Lighting Installation

Location: 001-04-1-012e 04 - Lighting Installation

06 - Sockets/Switches

B(C)

B

Location: 001-04-1-013 04 - Lighting Installation

B(C)

3No. surface fluorescent lights require upgrading within the maintenance schedule. CAT II light in good order.

04 - Lighting Installation

B

£0

13

0

0 0

0

2022

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

13 10

0 0

0 0 0 0

0 0

2022 2019

B

£0

10

0

0 0

0

2019

2No. surface fluorescent lights in good order.

£800

5

3

0 0

0

2014

4No. surface fluorescent lights require upgrading within the maintenance schedule.

Location: 001-04-1-014 Hager distribution board in good order. CAT II light in good order. Sockets and switches in good order.

Location: 001-04-1-014a 04 - Lighting Installation

Location: 001-04-1-014b 04 - Lighting Installation

Sample College Physical Condition Survey

B(C)

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-04-1-014c 03 - Distribution Boards

B

£0

20

0

0 0

0

2029

Hager distribution board in good order. Surface fluorescent light in good order.

04 - Lighting Installation

B

£0

13

0

0 0

0

2022

B

£0

13

0

0 0

0

2022

CAT II light in good order.

B B

£0 £0

13 10

0 0

0 0 0 0

0 0

2022 2019

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

13 10

0 0

0 0 0 0

0 0

2022 2019

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

13 10

0 0

0 0 0 0

0 0

2022 2019

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

13 10

0 0

0 0 0 0

0 0

2022 2019

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

13 10

0 0

0 0 0 0

0 0

2022 2019

CAT II light in good order. Sockets and switches in good order.

B

£0

13

0

0 0

0

2022

CAT II light in good order.

Location: 001-04-1-015 04 - Lighting Installation

Location: 001-04-1-016 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-04-1-017 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-04-1-017b 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-04-1-017c 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-04-1-018 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-04-1-018a 04 - Lighting Installation Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-04-1-019 04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

13 10

0 0

0 0 0 0

0 0

2022 2019

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

13 10

0 0

0 0 0 0

0 0

2022 2019

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

13 10

0 0

0 0 0 0

0 0

2022 2019

CAT II light in good order. Sockets and switches in good order.

04 - Lighting Installation

B

£0

13

0

0 0

0

2022

05 - Emergency Lighting

B

£0

13

0

0 0

0

2022

Surface fluorescent light in good order. Emergency light in good order.

B

£0

13

0

0 0

0

2022

Surface fluorescent light in good order.

B

£0

13

0

0 0

0

2022

Surface fluorescent light in good order.

B

£0

13

0

0 0

0

2022

Surface fluorescent light in good order.

B

£0

13

0

0 0

0

2022

Surface fluorescent light in good order.

Location: 001-04-1-020 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-04-1-021 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-04-1-022a

Location: 001-04-1-022b 04 - Lighting Installation

Location: 001-04-1-022c 04 - Lighting Installation

Location: 001-04-1-022d 04 - Lighting Installation

Location: 001-04-1-022e 04 - Lighting Installation

Location: 001-04-1-023 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation 06 - Sockets/Switches

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B B

£0 £0

13 10

0 0

0 0 0 0

0 0

2022 2019

CAT II light in good order. Sockets and switches in good order.

B

£0

13

0

0 0

0

2022

Surface fluorescent light in good order.

04 - Lighting Installation

B

£0

13

0

0 0

0

2022

05 - Emergency Lighting

B

£0

13

0

0 0

0

2022

Surface fluorescent light in good order. Emergency light in good order.

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B

£0

13

0

0 0

0

2022

3No. Hager distribution boards in good order. CAT II light in good order.

B

£0

13

0

0 0

0

2022

CAT II light in good order.

C

£200

0

2

0 0

0

2009

Tungsten light requires replacement.

B(C)

£200

3

3

0 0

0

2012

Surface fluorescent light requires upgrading within the maintenance schedule.

B B

£0 £0

13 10

0 0

0 0 0 0

0 0

2022 2019

CAT II light in good order. Sockets and switches in good order.

B

£0

13

0

0 0

0

2022

CAT II light in good order.

Location: 001-04-1-023c 04 - Lighting Installation

Location: 001-04-1-023d

Location: 001-04-1-024

Location: 001-04-1-025 04 - Lighting Installation

Location: 001-04-1-026 04 - Lighting Installation

Location: 001-04-1-027 04 - Lighting Installation

Location: 001-04-1-028 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-04-1-028a 04 - Lighting Installation Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-04-1-028b 03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B

£0

13

0

0 0

0

2022

05 - Emergency Lighting

B

£0

13

0

0 0

0

2022

2No. Hager distribution boards in good order. Surface fluorescent lights in good order. Emergency light in good order.

B

£0

13

0

0 0

0

2022

CAT II light in good order.

B

£0

13

0

0 0

0

2022

CAT II light in good order.

B B

£0 £0

13 10

0 0

0 0 0 0

0 0

2022 2019

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

13 10

0 0

0 0 0 0

0 0

2022 2019

CAT II light in good order. Sockets and switches in good order.

B

£0

13

0

0 0

0

2022

CAT II light in good order.

B

£0

13

0

0 0

0

2022

Surface fluorescent light in good order.

B B

£0 £0

13 10

0 0

0 0 0 0

0 0

2022 2019

2No. CAT II lights in good order. Sockets and switches in good order.

Location: 001-04-1-029 04 - Lighting Installation

Location: 001-04-1-030 04 - Lighting Installation

Location: 001-04-1-031 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-04-1-032 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-04-1-033 04 - Lighting Installation

Location: 001-04-1-033a 04 - Lighting Installation

Location: 001-04-1-033b 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-04-1-033c Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation 05 - Emergency Lighting

B B

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£0 £0

13 13

0 0

0 0 0 0

0 0

2022 2022

CAT II light in good order. Emergency light in good order.

£0 £400

13 5

0 3

0 0 0 0

0 0

2022 2014

£0

10

0

0 0

0

2019

Distribution board in good order. 2No. CAT II lights require upgrading within the maintenance schedule. Sockets and switches in good order.

£0 £2,000

10 3

0 3

0 0 0 0

0 0

2019 2012

B

£0

10

0

0 0

0

2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting

B

£0

13

0

0 0

0

2022

04 - Lighting Installation

C

£200

0

2

0 0

0

2009

04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

13 10

0 0

0 0 0 0

0 0

2022 2019

03 - Distribution Boards

B

£0

10

0

0 0

0

2019

04 - Lighting Installation

B

£0

13

0

0 0

0

2022

Location: 001-04-1-034 03 - Distribution Boards 04 - Lighting Installation

06 - Sockets/Switches

B B(C)

B

Location: 001-04-1-036 03 - Distribution Boards 04 - Lighting Installation

06 - Sockets/Switches

B B(C)

Distribution board in good order. 10No. surface fluorescent lights require upgrading within the maintenance schedule. Sockets and switches in good order.

Location: 001-04-1-039 Surface fluorescent light in good order. 2No. emergency lights in good order.

Location: 001-04-1-040 Tungsten light requires replacement. 4No. CAT II lights in good order. Sockets and switches in good order.

Location: 001-04-1-040b

Sample College Physical Condition Survey

MK distribution board in good order. Surface fluorescent light in good order. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-04-1-040c 04 - Lighting Installation

C

£200

0

2

0 0

0

2009

Tungsten light requires replacement.

£1,200

3

3

0 0

0

2012

£0

13

0

0 0

0

2022

6No. CAT II lights require upgrading within the maintenance schedule. Emergency light in good order.

£1,200

3

3

0 0

0

2012

£0 £0

13 10

0 0

0 0 0 0

0 0

2022 2019

£2,000

5

3

0 0

0

2014

£0 £0

13 10

0 0

0 0 0 0

0 0

2022 2019

£600

3

3

0 0

0

2012

£0

13

0

0 0

0

2022

£0 £800

20 3

0 3

0 0 0 0

0 0

2029 2012

Location: 001-04-1-042 04 - Lighting Installation

B(C)

05 - Emergency Lighting

B

Location: 001-04-1-043 04 - Lighting Installation

B(C)

05 - Emergency Lighting 06 - Sockets/Switches

B B

6No. CAT II lights require upgrading within the maintenance schedule. Emergency light in good order. Sockets and switches in good order.

Location: 001-04-1-044 04 - Lighting Installation

B(C)

05 - Emergency Lighting 06 - Sockets/Switches

B B

10No. surface fluorescent lights require upgrading within the maintenance schedule. Emergency light in good order. Sockets and switches in good order.

Location: 001-04-1-044a 04 - Lighting Installation

B(C)

05 - Emergency Lighting

B

3No. CAT II lights require upgrading within the maintenance schedule. Emergency light in good order.

Location: 001-04-1-061 03 - Distribution Boards 04 - Lighting Installation

Sample College Physical Condition Survey

B B(C)

Distribution board in good order. 4No. surface fluorescent lights require upgrading within the maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-04-1-061a 04 - Lighting Installation

B(C)

£400

3

3

0 0

0

2012

2No. surface fluorescent lights require upgrading within the maintenance schedule.

B(C)

£1,200

3

3

0 0

0

2012

6No. surface fluorescent lights require upgrading within the maintenance schedule.

Surface fluorescent light in good order. Emergency light in good order.

Location: 001-04-1-061b 04 - Lighting Installation

Location: 001-04-1-C1 04 - Lighting Installation

B

£0

13

0

0 0

0

2022

05 - Emergency Lighting

B

£0

13

0

0 0

0

2022

04 - Lighting Installation

B

£0

13

0

0 0

0

2022

05 - Emergency Lighting

B

£0

13

0

0 0

0

2022

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

12 13

0 0

0 0 0 0

0 0

2021 2022

05 - Emergency Lighting

B

£0

13

0

0 0

0

2022

04 - Lighting Installation

B

£0

13

0

0 0

0

2022

05 - Emergency Lighting

B

£0

13

0

0 0

0

2022

B

£0

20

0

0 0

0

2029

Location: 001-04-1-C2 Surface fluorescent light in good order. Emergency light in good order.

Location: 001-04-1-C3 Down light in good order. Surface fluorescent light in good order. 2No. emergency lights in good order.

Location: 001-04-1-C4 Surface fluorescent light in good order. Emergency light in good order.

Location: 001-04-1-C5 03 - Distribution Boards

Sample College Physical Condition Survey

MEM distribution board in good order.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

04 - Lighting Installation

B

£0

13

0

0 0

0

2022

2No. surface fluorescent lights in good order. 2No. emergency lights in good order.

05 - Emergency Lighting

B

£0

13

0

0 0

0

2022

B

£0

20

0

0 0

0

2029

Distribution board in good order.

B

£0

20

0

0 0

0

2029

2No. distribution boards in good order.

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

13 14

0 0

0 0 0 0

0 0

2022 2023

05 - Emergency Lighting

B

£0

13

0

0 0

0

2022

CAT II light in good order. Surface fluorescent light in good order. Emergency light in good order.

B

£0

13

0

0 0

0

2022

2No. CAT II lights in good order.

B

£0

10

0

0 0

0

2019

2No. CAT II lights in good order.

04 - Lighting Installation

B

£0

14

0

0 0

0

2023

05 - Emergency Lighting

B

£0

13

0

0 0

0

2022

Surface fluorescent light in good order. Emergency light in good order.

04 - Lighting Installation

B

£0

14

0

0 0

0

2023

05 - Emergency Lighting

B

£0

13

0

0 0

0

2022

Surface fluorescent light in good order. Emergency light in good order.

B

£0

13

0

0 0

0

2022

CAT II light in good order.

Location: 001-04-LG- 045a 03 - Distribution Boards

Location: 001-04-LG- 060d 03 - Distribution Boards

Location: 001-04-LG-045

Location: 001-04-LG-045a 04 - Lighting Installation

Location: 001-04-LG-045b 04 - Lighting Installation

Location: 001-04-LG-045c

Location: 001-04-LG-045d

Location: 001-04-LG-046 04 - Lighting Installation Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 05 - Emergency Lighting

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

13

0

0 0

0

2022

Emergency light in good order.

B B

£0 £0

13 13

0 0

0 0 0 0

0 0

2022 2022

CAT II light in good order. Emergency light in good order.

04 - Lighting Installation

B

£0

14

0

0 0

0

2023

05 - Emergency Lighting

B

£0

14

0

0 0

0

2023

Surface fluorescent light in good order. Emergency light in good order.

04 - Lighting Installation

B

£0

14

0

0 0

0

2023

04 - Lighting Installation 05 - Emergency Lighting

B B

£0 £0

14 14

0 0

0 0 0 0

0 0

2023 2023

£400

5

3

0 0

0

2014

2No. CAT II lights require upgrading within the maintenance schedule.

B

£0

14

0

0 0

0

2023

Surface fluorescent light in good order.

B

£0

14

0

0 0

0

2023

Surface fluorescent light in good order.

B B

£0 £0

10 14

0 0

0 0 0 0

0 0

2019 2023

2No. CAT II lights in good order. Surface fluorescent light in good order.

Location: 001-04-LG-048 04 - Lighting Installation 05 - Emergency Lighting

Location: 001-04-LG-049

Location: 001-04-LG-050 Surface fluorescent light in good order. 6No. uplighters in good order. Emergency light in good order.

Location: 001-04-LG-051 04 - Lighting Installation

B(C)

Location: 001-04-LG-051a 04 - Lighting Installation

Location: 001-04-LG-051b 04 - Lighting Installation

Location: 001-04-LG-052 04 - Lighting Installation 04 - Lighting Installation

Location: 001-04-LG-052a Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

14

0

0 0

0

2023

Surface fluorescent light in good order.

B

£0

14

0

0 0

0

2023

Surface fluorescent light in good order.

04 - Lighting Installation

B

£0

14

0

0 0

0

2023

05 - Emergency Lighting

B

£0

13

0

0 0

0

2022

Surface fluorescent light in good order. Emergency light in good order.

B

£0

14

0

0 0

0

2023

Surface fluorescent light in good order.

B

£0

14

0

0 0

0

2023

Surface fluorescent light in good order.

B

£0

14

0

0 0

0

2023

Surface fluorescent light in good order.

B

£0

14

0

0 0

0

2023

Surface fluorescent light in good order.

B

£0

14

0

0 0

0

2023

Surface fluorescent light in good order.

B

£0

14

0

0 0

0

2023

Surface fluorescent light in good order.

Location: 001-04-LG-052b 04 - Lighting Installation

Location: 001-04-LG-053

Location: 001-04-LG-053a 04 - Lighting Installation

Location: 001-04-LG-053b 04 - Lighting Installation

Location: 001-04-LG-053c 04 - Lighting Installation

Location: 001-04-LG-053d 04 - Lighting Installation

Location: 001-04-LG-053e 04 - Lighting Installation

Location: 001-04-LG-054 04 - Lighting Installation

Location: 001-04-LG-055 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02 - Main Switchgear 04 - Lighting Installation

B

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£0

30

0

0 0

0

2039

Eaton William MEM switchgear in good order. 2No. surface fluorescent lights require upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

C

£400

0

2

0 0

0

2009

2No. tungsten lights require replacement.

6No. surface fluorescent lights require upgrading within the maintenance schedule. Emergency light requires upgrading within the maintenance schedule.

Location: 001-04-LG-056 04 - Lighting Installation

Location: 001-04-LG-057 04 - Lighting Installation

B(C)

£1,200

5

3

0 0

0

2014

05 - Emergency Lighting

B(C)

£200

5

3

0 0

0

2014

Location: 001-04-LG-060 04 - Lighting Installation

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order. 3No. HID lights in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

04 - Lighting Installation

B

£0

14

0

0 0

0

2023

05 - Emergency Lighting

B

£0

13

0

0 0

0

2022

B

£0

10

0

0 0

0

2019

9No. down lighters in good order.

04 - Lighting Installation

B

£0

14

0

0 0

0

2023

05 - Emergency Lighting

B

£0

13

0

0 0

0

2022

Surface fluorescent light in good order. Emergency light in good order.

Location: 001-04-LG-060a Surface fluorescent light in good order. Emergency light in good order.

Location: 001-04-LG-060b 04 - Lighting Installation

Location: 001-04-LG-060c

Location: 001-04-LG-060d Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2019

2No. surface fluorescent lights in good order.

B

£0

13

0

0 0

0

2022

Fire alarm main panel in good order.

B

£0

13

0

0 0

0

2022

Smoke detector in good order.

B

£0

13

0

0 0

0

2022

Smoke detector in good order.

B

£0

13

0

0 0

0

2022

Smoke detector in good order.

B

£0

13

0

0 0

0

2022

Smoke detector in good order.

B

£0

13

0

0 0

0

2022

Smoke detector in good order.

B

£0

13

0

0 0

0

2022

4No. smoke detectors in good order.

B

£0

13

0

0 0

0

2022

Smoke detector in good order.

B

£0

13

0

0 0

0

2022

Smoke detector in good order.

B

£0

13

0

0 0

0

2022

Smoke detector in good order.

V - Engineering - Fire Alarms

Location: 001-04-1-005b 05 - Fire Main/Zone Panel

Location: 001-04-1-007 03 - Smoke Detectors

Location: 001-04-1-012c 03 - Smoke Detectors

Location: 001-04-1-014c 03 - Smoke Detectors

Location: 001-04-1-033 03 - Smoke Detectors

Location: 001-04-1-034 03 - Smoke Detectors

Location: 001-04-1-039 03 - Smoke Detectors

Location: 001-04-1-040 03 - Smoke Detectors

Location: 001-04-1-042 03 - Smoke Detectors

Location: 001-04-1-044 03 - Smoke Detectors Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-04-1-044a 03 - Smoke Detectors

B

£0

13

0

0 0

0

2022

Smoke detector in good order.

B

£0

13

0

0 0

0

2022

Smoke detector in good order.

B

£0

13

0

0 0

0

2022

Smoke detector in good order.

B

£0

13

0

0 0

0

2022

2No. smoke detectors in good order.

B

£0

13

0

0 0

0

2022

Smoke detector in good order.

B

£0

13

0

0 0

0

2022

Smoke detector in good order.

B

£0

14

0

0 0

0

2023

2No. smoke detectors in good order.

B

£0

14

0

0 0

0

2023

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

14

0

0 0

0

2023

Smoke detector in good order.

B

£0

14

0

0 0

0

2023

Smoke detector in good order.

Location: 001-04-1-C1 03 - Smoke Detectors

Location: 001-04-1-C2 03 - Smoke Detectors

Location: 001-04-1-C3 03 - Smoke Detectors

Location: 001-04-1-C4 03 - Smoke Detectors

Location: 001-04-1-C5 03 - Smoke Detectors

Location: 001-04-LG-045 03 - Smoke Detectors

Location: 001-04-LG-045a 03 - Smoke Detectors

Location: 001-04-LG-045b 03 - Smoke Detectors

Location: 001-04-LG-045d 03 - Smoke Detectors

Location: 001-04-LG-046 03 - Smoke Detectors

Location: 001-04-LG-048 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Smoke Detectors

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

14

0

0 0

0

2023

Smoke detector in good order.

B

£0

14

0

0 0

0

2023

2No. smoke detectors in good order.

B

£0

14

0

0 0

0

2023

Smoke detector in good order.

B

£0

14

0

0 0

0

2023

Smoke detector in good order.

B

£0

14

0

0 0

0

2023

Smoke detector in good order.

B

£0

14

0

0 0

0

2023

Smoke detector in good order.

B

£0

14

0

0 0

0

2023

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

14

0

0 0

0

2023

Smoke detector in good order.

01 - Sounders

B

£0

12

0

0 0

0

2021

02 - Call Points

B

£0

12

0

0 0

0

2021

Fire alarm sounders in good order. Fire alarm call points in good order.

Location: 001-04-LG-050 03 - Smoke Detectors

Location: 001-04-LG-051 03 - Smoke Detectors

Location: 001-04-LG-051b 03 - Smoke Detectors

Location: 001-04-LG-052b 03 - Smoke Detectors

Location: 001-04-LG-054 03 - Smoke Detectors

Location: 001-04-LG-056 03 - Smoke Detectors

Location: 001-04-LG-060 03 - Smoke Detectors

Location: 001-04-LG-060b 03 - Smoke Detectors

Location: Whole block

Block Total

Sample College Physical Condition Survey

£1,038,757.00

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Site : Sample College - 001 Block : Study Centre - 05 Facet: 1 - Building A - Building - Physical Structure

Location: Whole Block 01 - General Structure 02 - Foundations 03 - Ground Stability

B B B

£0 £0 £0

60 80 80

0 0 0

0 0 0 0 0 0

0 0 0

2069 2089 2089

Steel frame: Generally sound. Generally sound. Generally sound.

Aluminium - Double: Require replacing due to age and condition - located to elevation 1 - 40No. Softwood timber: Redecorate and make good located to elevation 1 - 2No. double.

B - Building - External Fabric

Location: Elevation 01 04 - Windows

B(C)

£26,000

5

2

0 0

0

2014

06 - Doors

B(C)

£600

3

3

0 0

0

2012

B(C)

£29,250

5

2

0 0

0

2014

Aluminium - Double: Require replacing due to age and condition - located to elevation 2 - 45No.

04 - Windows

B(C)

£23,400

5

2

0 0

0

2014

06 - Doors

B(C)

£300

3

3

0 0

0

2012

Aluminium - Double: Require replacing due to age and condition - located to elevation 3 - 36No. Softwood timber: Redecorate and make good located to elevation 3 - 1No. double.

Location: Elevation 02 04 - Windows

Location: Elevation 03

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: Elevation 04 04 - Windows

B(C)

£23,400

5

2

0 0

0

2014

06 - Doors

B(C)

£600

3

3

0 0

0

2012

B B B B B B B B B(C)

£0 £0 £0 £0 £0 £0 £0 £0 £3,925

40 40 40 40 10 10 10 10 3

0 0 0 0 0 0 0 0 3

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

2049 2049 2049 2049 2019 2019 2019 2019 2012

£0

8

0

0 0

0

2017

£780

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

£1,050

2

3

0 0

0

2011

Aluminium - Double: Require replacing due to age and condition - located to elevation 4 - 36No. Softwood timber: Redecorate and make good located to elevation 4 - 2No. double.

Location: Whole Block 01a - Masonry - Cracking 01b - Masonry - Spalling 01c - Masonry - Pointing 01d - Masonry - Finish 02a - Cladding - Attachment 02b - Cladding - Cracking 02c - Cladding - Joints 02d - Cladding - Finish 05 - Window cills 06 - Doors

B

Brickwork. Brickwork. Brickwork. Brickwork. Curtain walling. Curtain walling. Curtain walling. Curtain walling. Timber: Need to make good & redecorate. Aluminium.

C - Building - Internal Fabric

Location: 001-05-0-100 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-0-100a Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

Cost to B Rem Life Priority C L

R

Year

£390

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£525

2

3

0 0

0

2011

B(C)

£390

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£525

2

3

0 0

0

2011

B(C)

£780

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£1,050

2

3

0 0

0

2011

B(C)

£780

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-0-100b 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-0-101 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-0-102 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£1,050

2

3

0 0

0

2011

Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

B(C)

£780

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£1,050

2

3

0 0

0

2011

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

B(C)

£780

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£1,050

2

3

0 0

0

2011

B(C)

£780

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

£1,050

2

3

0 0

0

2011

Location: 001-05-0-103 01 - Decorations

02 - Ceiling 03 - Floor

B

Location: 001-05-0-104 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-0-105 01 - Decorations

02 - Ceiling 03 - Floor

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-0-106 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

Cost to B Rem Life Priority C L

R

Year

£780

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£1,050

2

3

0 0

0

2011

B(C)

£780

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£1,050

2

3

0 0

0

2011

B(C)

£780

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£1,050

2

3

0 0

0

2011

B(C)

£650

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-0-107 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-0-108 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-0-109 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£875

2

3

0 0

0

2011

Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

B(C)

£520

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£700

2

3

0 0

0

2011

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

B(C)

£130

2

4

0 0

0

2011

C

£100

0

3

0 0

0

2009

B(C)

£175

2

3

0 0

0

2011

B(C)

£780

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

£1,050

2

3

0 0

0

2011

Location: 001-05-0-110 01 - Decorations

02 - Ceiling 03 - Floor

B

Location: 001-05-0-110a 01 - Decorations

02 - Ceiling 03 - Floor

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-0-111 01 - Decorations

02 - Ceiling 03 - Floor

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-0-112 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Cost to B Rem Life Priority C L

R

Year

£1,690

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

£2,275

5

3

0 0

0

2014

£0

8

0

0 0

0

2017

£208

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Fixed units: Kitchen units in good condition.

Location: 001-05-0-112a 01 - Decorations

02 - Ceiling

B(C)

B

03 - Floor

B(C)

£280

5

3

0 0

0

2014

08 - Fixed Units

B(C)

£1,750

1

3

0 0

0

2010

B(C)

£1,040

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£1,400

5

3

0 0

0

2014

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Fixed units: Kitchen unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-05-0-113 01 - Decorations

02 - Ceiling 03 - Floor

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition.

Location: 001-05-0-114 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

Cost to B Rem Life Priority C L

R

Year

£650

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£875

5

3

0 0

0

2014

B(C)

£520

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£700

5

3

0 0

0

2014

B(C)

£520

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£700

5

3

0 0

0

2014

B(C)

£130

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition.

Location: 001-05-0-115 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition.

Location: 001-05-0-116 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition.

Location: 001-05-0-117 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

B(C)

Cost to B Rem Life Priority C L

R

Year

£175

2

3

0 0

0

2011

08 - Fixed Units

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

8

0

0 0

0

2017

£260

5

4

0 0

0

2014

Notes

Remedial Action

Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition. Fixed units: Sluice in good condition.

Location: 001-05-0-118 01 - Decorations

B(C)

02 - Ceiling

B

£0

10

0

0 0

0

2019

03 - Floor

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

12

0

0 0

0

2021

£260

5

4

0 0

0

2014

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-05-0-119 01 - Decorations

B(C)

02 - Ceiling

B

£0

10

0

0 0

0

2019

03 - Floor

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

12

0

0 0

0

2021

£130

5

4

0 0

0

2014

£0

10

0

0 0

0

2019

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-05-0-120 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

03 - Floor

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

12

0

0 0

0

2021

£130

5

4

0 0

0

2014

Notes

Remedial Action

Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-05-0-121 01 - Decorations

B(C)

02 - Ceiling

B

£0

10

0

0 0

0

2019

03 - Floor

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

12

0

0 0

0

2021

£390

5

4

0 0

0

2014

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-05-0-122 01 - Decorations

B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

02 - Ceiling

B

£0

10

0

0 0

0

2019

03 - Floor

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

12

0

0 0

0

2021

B

£0

6

0

0 0

0

2015

Electrics - Fit for purpose

B

£0

6

0

0 0

0

2015

Boiler Plant - Fit for purpose

£520

2

4

0 0

0

2011

Redecoration required as part of a regular maintenance schedule.

Location: 001-05-0-123 12 - Comments

Location: 001-05-0-124 12 - Comments

Location: 001-05-1-001 01 - Decorations

Sample College Physical Condition Survey

B(C)

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02 - Ceiling 03 - Floor

B

Cost to B Rem Life Priority C L

R

Year

£0

6

0

0 0

0

2015

B(C)

£700

2

3

0 0

0

2011

B(C)

£520

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£700

2

3

0 0

0

2011

B(C)

£390

1

4

0 0

0

2010

C

£100

0

3

0 0

0

2009

B(C)

£525

2

3

0 0

0

2011

B(C)

£650

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£875

2

3

0 0

0

2011

Notes

Remedial Action

Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-1-002 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-1-004 01 - Decorations

02 - Ceiling 03 - Floor

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-1-005 01 - Decorations

02 - Ceiling 03 - Floor

Sample College Physical Condition Survey

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-05-1-006 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

£650

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£875

2

3

0 0

0

2011

B(C)

£650

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£875

2

3

0 0

0

2011

B(C)

£650

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£875

2

3

0 0

0

2011

B(C)

£650

3

4

0 0

0

2012

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-1-007 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-1-008 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-1-009 01 - Decorations

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02 - Ceiling 03 - Floor

B

Cost to B Rem Life Priority C L

R

Year

£0

6

0

0 0

0

2015

B(C)

£875

2

3

0 0

0

2011

B(C)

£910

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£1,225

2

3

0 0

0

2011

B(C)

£1,560

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£2,100

2

3

0 0

0

2011

B(C)

£520

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

£700

2

3

0 0

0

2011

Notes

Remedial Action

Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-1-010 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-1-011 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-1-012 01 - Decorations

02 - Ceiling 03 - Floor

Sample College Physical Condition Survey

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-05-1-013 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

£780

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£1,050

2

3

0 0

0

2011

B(C)

£390

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£525

2

3

0 0

0

2011

B(C)

£1,300

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-1-014 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-1-015 01 - Decorations

02 - Ceiling

B

03 - Floor

B(C)

£1,750

2

3

0 0

0

2011

08 - Fixed Units

B(C)

£1,500

2

3

0 0

0

2011

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Reception desk requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-05-1-016 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

Cost to B Rem Life Priority C L

R

Year

£780

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£1,050

2

3

0 0

0

2011

B(C)

£2,600

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£3,500

2

3

0 0

0

2011

B(C)

£1,040

1

4

0 0

0

2010

B

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-1-017 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-05-1-018 01 - Decorations

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

C

£1,400

0

3

0 0

0

2009

B(C)

£2,500

1

3

0 0

0

2010

£520

0

4

0 0

0

2009

08 - Fixed Units

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet. Fixed units: Kitchen units require replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-05-1-019 01 - Decorations

Sample College Physical Condition Survey

C

Redecoration required as part of a regular maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02 - Ceiling 03 - Floor

B

Cost to B Rem Life Priority C L

R

Year

£0

6

0

0 0

0

2015

B(C)

£700

4

3

0 0

0

2013

B(C)

£520

1

4

0 0

0

2010

£0

6

0

0 0

0

2015

£700

1

3

0 0

0

2010

£0

6

0

0 0

0

2015

£390

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

£525

2

3

0 0

0

2011

£0

10

0

0 0

0

2019

£130

1

4

0 0

0

2010

£0

6

0

0 0

0

2015

Notes

Remedial Action

Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition.

Location: 001-05-1-020 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule. Fixed units: Kitchen units in good condition.

Location: 001-05-1-021 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule. Sanitary fittings: In good condition.

Location: 001-05-1-022 01 - Decorations

02 - Ceiling Sample College Physical Condition Survey

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

08 - Fixed Units

B(C)

B

Cost to B Rem Life Priority C L

R

Year

£175

4

3

0 0

0

2013

£0

10

0

0 0

0

2019

£130

1

4

0 0

0

2010

£0

6

0

0 0

0

2015

£175

4

3

0 0

0

2013

£0

10

0

0 0

0

2019

£182

1

4

0 0

0

2010

£0

8

0

0 0

0

2017

£245

4

3

0 0

0

2013

Notes

Remedial Action

Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Sanitary fittings: In good condition.

Location: 001-05-1-023 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Sanitary fittings: In good condition.

Location: 001-05-1-024 01 - Decorations

02 - Ceiling

B(C)

B

03 - Floor

B(C)

03 - Floor

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

B(C)

£78

1

4

0 0

0

2010

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Quarry tile flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-05-1-025 01 - Decorations

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02 - Ceiling 03 - Floor

B

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£0

6

0

0 0

0

2015

Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition.

B(C)

£105

4

3

0 0

0

2013

B B B B B B(C)

£0 £0 £0 £0 £0 £1,750

15 25 60 60 6 5

0 0 0 0 0 2

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

2024 2034 2069 2069 2015 2014

Metal. Mineral felt. Metal. Metal. Box gutters. Aluminium: Evidence of minor deterioration with replacement likely to be required within the maintenance period.

B B B(C)

£0 £0 £300

6 10 5

0 0 2

0 0 0 0 0 0

0 0 0

2015 2019 2014

Mineral felt with stone chippings. Plywood. Aluminium: Evidence of minor deterioration with replacement likely to be required within the maintenance period.

B B B(C)

£0 £0 £300

6 10 5

0 0 2

0 0 0 0 0 0

0 0 0

2015 2019 2014

Mineral felt with stone chippings. Plywood. Aluminium: Evidence of minor deterioration with replacement likely to be required within the maintenance period.

D - Building - Roof

Location: Roof 01 01a - Attached - Covering 01b - Attached - Sarking 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering 01h - Attached - Down Rainwater pipes

Location: Roof 02 02a - Flat - Covering 02b - Flat - Decking 02h - Flat - Down Rainwater pipes

Location: Roof 03 02a - Flat - Covering 02b - Flat - Decking 02h - Flat - Down Rainwater pipes

Facet: 2 - Engineering Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

I - Engineering - Heating Systems

Location: 001-05-0-100 01 - Heat Emitters

B

£0

15

0

0 0

0

2024

Heat emitter with low surface temperature cover in good order.

B

£0

15

0

0 0

0

2024

Heat emitter with low surface temperature cover in good order.

B

£0

15

0

0 0

0

2024

Heat emitter with low surface temperature cover in good order.

B

£0

15

0

0 0

0

2024

Heat emitter with low surface temperature cover in good order.

B

£0

15

0

0 0

0

2024

2No. heat emitter with low surface temperature cover in good order.

B

£0

15

0

0 0

0

2024

2No. heat emitter with low surface temperature cover in good order.

B

£0

15

0

0 0

0

2024

Heat emitter with low surface temperature cover in good order.

B

£0

15

0

0 0

0

2024

Heat emitter with low surface temperature cover in good order.

Location: 001-05-0-101 01 - Heat Emitters

Location: 001-05-0-102 01 - Heat Emitters

Location: 001-05-0-103 01 - Heat Emitters

Location: 001-05-0-104 01 - Heat Emitters

Location: 001-05-0-105 01 - Heat Emitters

Location: 001-05-0-106 01 - Heat Emitters

Location: 001-05-0-107 01 - Heat Emitters

Location: 001-05-0-108 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

15

0

0 0

0

2024

2No. heat emitter with low surface temperature cover in good order.

B

£0

15

0

0 0

0

2024

Heat emitter with low surface temperature cover in good order.

B

£0

15

0

0 0

0

2024

Heat emitter with low surface temperature cover in good order.

B

£0

15

0

0 0

0

2024

Heat emitter with low surface temperature cover in good order.

B

£0

15

0

0 0

0

2024

Heat emitter with low surface temperature cover in good order.

B

£0

15

0

0 0

0

2024

Heat emitter with low surface temperature cover in good order.

B

£0

15

0

0 0

0

2024

2No. heat emitter with low surface temperature cover in good order.

B

£0

15

0

0 0

0

2024

Heat emitter with low surface temperature cover in good order.

B

£0

15

0

0 0

0

2024

Heat emitter with low surface temperature cover in good order.

Location: 001-05-0-109 01 - Heat Emitters

Location: 001-05-0-110 01 - Heat Emitters

Location: 001-05-0-110a 01 - Heat Emitters

Location: 001-05-0-111 01 - Heat Emitters

Location: 001-05-0-112 01 - Heat Emitters

Location: 001-05-0-113 01 - Heat Emitters

Location: 001-05-0-114 01 - Heat Emitters

Location: 001-05-0-115 01 - Heat Emitters

Location: 001-05-0-116 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

15

0

0 0

0

2024

Heat emitter with low surface temperature cover in good order.

B

£0

15

0

0 0

0

2024

Heat emitter with low surface temperature cover in good order.

B

£0

15

0

0 0

0

2024

Heat emitter with low surface temperature cover in good order.

B

£0

15

0

0 0

0

2024

Heat emitter with low surface temperature cover in good order.

B

£0

15

0

0 0

0

2024

Heat emitter with low surface temperature cover in good order.

B

£0

15

0

0 0

0

2024

Heat emitter with low surface temperature cover in good order.

C

£250

0

2

0 0

0

2009

High efficiency convector with no low surface temperature cover requires replacement.

C

£250

0

2

0 0

0

2009

High efficiency convector with no low surface temperature cover requires replacement.

C

£250

0

2

0 0

0

2009

High efficiency convector with no low surface temperature cover requires replacement.

Location: 001-05-0-118 01 - Heat Emitters

Location: 001-05-0-119 01 - Heat Emitters

Location: 001-05-0-120 01 - Heat Emitters

Location: 001-05-0-121 01 - Heat Emitters

Location: 001-05-0-122 01 - Heat Emitters

Location: 001-05-1-001 01 - Heat Emitters

Location: 001-05-1-002 01 - Heat Emitters

Location: 001-05-1-004 01 - Heat Emitters

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-05-1-005 01 - Heat Emitters

C

£500

0

2

0 0

0

2009

2No. high efficiency convector with no low surface temperature cover requires replacement. Electric heater requires replacement.

01 - Heat Emitters

C

£300

0

2

0 0

0

2009

C

£250

0

2

0 0

0

2009

High efficiency convector with no low surface temperature cover requires replacement.

C

£500

0

2

0 0

0

2009

2No. high efficiency convector with no low surface temperature cover requires replacement.

C

£250

0

2

0 0

0

2009

High efficiency convector with no low surface temperature cover requires replacement.

01 - Heat Emitters

C

£500

0

2

0 0

0

2009

01 - Heat Emitters

C

£300

0

2

0 0

0

2009

2No. high efficiency convector with no low surface temperature cover requires replacement. Electric heater requires replacement.

C

£250

0

2

0 0

0

2009

High efficiency convector with no low surface temperature cover requires replacement.

C

£250

0

2

0 0

0

2009

High efficiency convector with no low surface temperature cover requires replacement.

Location: 001-05-1-006 01 - Heat Emitters

Location: 001-05-1-007 01 - Heat Emitters

Location: 001-05-1-008 01 - Heat Emitters

Location: 001-05-1-009

Location: 001-05-1-010 01 - Heat Emitters

Location: 001-05-1-011 01 - Heat Emitters

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-05-1-012 01 - Heat Emitters

C

£250

0

2

0 0

0

2009

High efficiency convector with no low surface temperature cover requires replacement.

C

£250

0

2

0 0

0

2009

High efficiency convector with no low surface temperature cover requires replacement.

C

£250

0

2

0 0

0

2009

High efficiency convector with no low surface temperature cover requires replacement.

C

£250

0

2

0 0

0

2009

High efficiency convector with no low surface temperature cover requires replacement.

C

£250

0

2

0 0

0

2009

High efficiency convector with no low surface temperature cover requires replacement.

C

£250

0

2

0 0

0

2009

High efficiency convector with no low surface temperature cover requires replacement.

C

£250

0

2

0 0

0

2009

High efficiency convector with no low surface temperature cover requires replacement.

Location: 001-05-1-013 01 - Heat Emitters

Location: 001-05-1-015 01 - Heat Emitters

Location: 001-05-1-016 01 - Heat Emitters

Location: 001-05-1-017 01 - Heat Emitters

Location: 001-05-1-018 01 - Heat Emitters

Location: 001-05-1-020 01 - Heat Emitters

Location: 001-05-1-021

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£250

0

2

0 0

0

2009

High efficiency convector with no low surface temperature cover requires replacement.

B

£0

10

0

0 0

0

2019

Grille in good order.

B

£0

10

0

0 0

0

2019

Grille in good order.

B

£0

10

0

0 0

0

2019

Grille in good order.

B

£0

10

0

0 0

0

2019

Grille in good order.

B

£0

10

0

0 0

0

2019

Grille in good order.

B

£0

10

0

0 0

0

2019

Grille in good order.

B

£0

10

0

0 0

0

2019

Grille in good order.

B

£0

10

0

0 0

0

2019

Grille in good order.

B

£0

10

0

0 0

0

2019

Grille in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

K - Engineering - Vent & Air Con

Location: 001-05-0-118 03 - Grilles & Diffusers

Location: 001-05-0-119 03 - Grilles & Diffusers

Location: 001-05-0-120 03 - Grilles & Diffusers

Location: 001-05-0-121 03 - Grilles & Diffusers

Location: 001-05-0-122 03 - Grilles & Diffusers

Location: 001-05-1-020 03 - Grilles & Diffusers

Location: 001-05-1-023 03 - Grilles & Diffusers

Location: 001-05-1-024 03 - Grilles & Diffusers

Location: 001-05-1-025 03 - Grilles & Diffusers M - Engineering - Hot/Cold Water

Location: 001-05-0-118 03 - Blending Valves Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-05-0-119 03 - Blending Valves

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

4No. Seagold heating boilers require upgrading within the maintenance schedule. 2No. Grundfos heating twinhead pumps require upgrading within the maintenance schedule. Hertel pre-insulated cylinder requires upgrading within the maintenance schedule. 2No. Crane systems pressurisation units require upgrading within the maintenance schedule.

Location: 001-05-0-121 03 - Blending Valves

Location: 001-05-0-122 03 - Blending Valves

Location: 001-05-1-020 03 - Blending Valves

Location: 001-05-1-023 03 - Blending Valves O - Engineering - Main Plant

Location: 001-05-0-123a 01 - Heating Boilers

B(C)

£20,000

2

2

0 0

0

2011

02 - Pumps

B(C)

£3,000

2

2

0 0

0

2011

03 - Calorifiers

B(C)

£1,000

2

2

0 0

0

2011

05 - Pressurisation Units

B(C)

£5,000

2

2

0 0

0

2011

C

£2,000

0

2

0 0

0

2009

Location: 001-05-1-019 03 - Calorifiers

Calorifier requires replacement.

P - Engineering - Main Plant Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-05-0-123a 03 - Controls

B(C)

£7,500

2

2

0 0

0

2011

ASTEC Services Limited control panel requires upgrading within the maintenance schedule.

B B

£0 £0

14 14

0 0

0 0 0 0

0 0

2023 2023

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

14 14

0 0

0 0 0 0

0 0

2023 2023

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

14 14

0 0

0 0 0 0

0 0

2023 2023

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

14 14

0 0

0 0 0 0

0 0

2023 2023

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

14 14

0 0

0 0 0 0

0 0

2023 2023

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

14 14

0 0

0 0 0 0

0 0

2023 2023

CAT II light in good order. Sockets and switches in good order.

R - Engineering - Electrical

Location: 001-05-0-100 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-05-0-100a 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-05-0-100b 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-05-0-101 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-05-0-102 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-05-0-103 04 - Lighting Installation 06 - Sockets/Switches

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-05-0-104 04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

14 14

0 0

0 0 0 0

0 0

2023 2023

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

14 14

0 0

0 0 0 0

0 0

2023 2023

CAT II light in good order. Sockets and switches in good order.

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

14 14

0 0

0 0 0 0

0 0

2023 2023

Merlin Gerin distribution board in good order. CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

14 14

0 0

0 0 0 0

0 0

2023 2023

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

14 14

0 0

0 0 0 0

0 0

2023 2023

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

14 14

0 0

0 0 0 0

0 0

2023 2023

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

14 14

0 0

0 0 0 0

0 0

2023 2023

CAT II light in good order. Sockets and switches in good order.

Location: 001-05-0-105 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-05-0-106

Location: 001-05-0-107 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-05-0-108 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-05-0-109 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-05-0-110 04 - Lighting Installation 06 - Sockets/Switches

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-05-0-110a 04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

14 14

0 0

0 0 0 0

0 0

2023 2023

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

14 14

0 0

0 0 0 0

0 0

2023 2023

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

14 15

0 0

0 0 0 0

0 0

2023 2024

CAT II light in good order. Emergency light in good order.

B B

£0 £0

14 15

0 0

0 0 0 0

0 0

2023 2024

CAT II light in good order. Emergency light in good order.

B B

£0 £0

14 15

0 0

0 0 0 0

0 0

2023 2024

CAT II light in good order. Emergency light in good order.

B

£0

14

0

0 0

0

2023

CAT II light in good order.

04 - Lighting Installation

B

£0

14

0

0 0

0

2023

04 - Lighting Installation

B

£0

14

0

0 0

0

2023

Surface fluorescent light in good order. CAT II light in good order.

B

£0

14

0

0 0

0

2023

Location: 001-05-0-111 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-05-0-112 04 - Lighting Installation 05 - Emergency Lighting

Location: 001-05-0-113 04 - Lighting Installation 05 - Emergency Lighting

Location: 001-05-0-114 04 - Lighting Installation 05 - Emergency Lighting

Location: 001-05-0-115 04 - Lighting Installation

Location: 001-05-0-116

Location: 001-05-0-117 04 - Lighting Installation

Surface fluorescent light in good order.

Location: 001-05-0-118 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

14

0

0 0

0

2023

Surface fluorescent light in good order.

B

£0

14

0

0 0

0

2023

Surface fluorescent light in good order.

04 - Lighting Installation

B

£0

14

0

0 0

0

2023

05 - Emergency Lighting

B

£0

15

0

0 0

0

2024

Surface fluorescent light in good order. Emergency light in good order.

B

£0

14

0

0 0

0

2023

Surface fluorescent light in good order.

B

£0

14

0

0 0

0

2023

2No. surface fluorescent lights in good order.

01 - Incoming Cable 02 - Main Switchgear

B B

£0 £0

15 15

0 0

0 0 0 0

0 0

2024 2024

03 - Distribution Boards

B

£0

15

0

0 0

0

2024

03 - Distribution Boards

B

£0

15

0

0 0

0

2024

Incoming cable in good order. 2No. compartmentalised switchgear in good order. Square D distribution board in good order. Load Centre Square D distribution board in good order.

£800

2

2

0 0

0

2011

4No. surface fluorescent lights require upgrading within the maintenance schedule.

£0

14

0

0 0

0

2023

CAT II light in good order.

Location: 001-05-0-119 04 - Lighting Installation

Location: 001-05-0-120

Location: 001-05-0-121 04 - Lighting Installation

Location: 001-05-0-122 04 - Lighting Installation

Location: 001-05-0-123

Location: 001-05-0-123a 04 - Lighting Installation

B(C)

Location: 001-05-1-001 04 - Lighting Installation

Sample College Physical Condition Survey

B

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 06 - Sockets/Switches

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

15

0

0 0

0

2024

Sockets and switches in good order.

B B

£0 £0

14 15

0 0

0 0 0 0

0 0

2023 2024

CAT II light in good order. Sockets and switches in good order.

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B

£0

14

0

0 0

0

2023

2No. Square D distribution boards in good order. 2No. surface fluorescent lights in good order.

B B

£0 £0

14 15

0 0

0 0 0 0

0 0

2023 2024

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

14 15

0 0

0 0 0 0

0 0

2023 2024

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

14 15

0 0

0 0 0 0

0 0

2023 2024

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

14 15

0 0

0 0 0 0

0 0

2023 2024

CAT II light in good order. Sockets and switches in good order.

B

£0

14

0

0 0

0

2023

CAT II light in good order.

Location: 001-05-1-002 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-05-1-004

Location: 001-05-1-005 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-05-1-006 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-05-1-007 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-05-1-008 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-05-1-009 04 - Lighting Installation Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 06 - Sockets/Switches

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

15

0

0 0

0

2024

Sockets and switches in good order.

B B

£0 £0

14 15

0 0

0 0 0 0

0 0

2023 2024

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

14 15

0 0

0 0 0 0

0 0

2023 2024

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

14 15

0 0

0 0 0 0

0 0

2023 2024

CAT II light in good order. Sockets and switches in good order.

B B B

£0 £0 £0

14 12 15

0 0 0

0 0 0 0 0 0

0 0 0

2023 2021 2024

CAT II light in good order. Emergency light in good order. Sockets and switches in good order.

04 - Lighting Installation

B

£0

14

0

0 0

0

2023

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order. Emergency light in good order.

B B B

£0 £0 £0

14 12 15

0 0 0

0 0 0 0 0 0

0 0 0

2023 2021 2024

Location: 001-05-1-010 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-05-1-011 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-05-1-012 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-05-1-013 04 - Lighting Installation 05 - Emergency Lighting 06 - Sockets/Switches

Location: 001-05-1-014

Location: 001-05-1-015 04 - Lighting Installation 05 - Emergency Lighting 06 - Sockets/Switches

CAT II light in good order. Emergency light in good order. Sockets and switches in good order.

Location: 001-05-1-016 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

14

0

0 0

0

2023

CAT II light in good order.

B B B

£0 £0 £0

14 12 15

0 0 0

0 0 0 0 0 0

0 0 0

2023 2021 2024

CAT II light in good order. Emergency light in good order. Sockets and switches in good order.

B

£0

14

0

0 0

0

2023

CAT II light in good order.

B

£0

14

0

0 0

0

2023

2No. surface fluorescent light in good order.

B B

£0 £0

14 12

0 0

0 0 0 0

0 0

2023 2021

CAT II light in good order. Emergency light in good order.

04 - Lighting Installation

B

£0

14

0

0 0

0

2023

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order. Emergency light in good order.

04 - Lighting Installation

B

£0

14

0

0 0

0

2023

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

B

£0

14

0

0 0

0

2023

Surface fluorescent light in good order.

B

£0

14

0

0 0

0

2023

Surface fluorescent light in good order.

Location: 001-05-1-017 04 - Lighting Installation 05 - Emergency Lighting 06 - Sockets/Switches

Location: 001-05-1-018 04 - Lighting Installation

Location: 001-05-1-019 04 - Lighting Installation

Location: 001-05-1-020 04 - Lighting Installation 05 - Emergency Lighting

Location: 001-05-1-021

Location: 001-05-1-022 Surface fluorescent light in good order. Emergency light in good order.

Location: 001-05-1-023 04 - Lighting Installation

Location: 001-05-1-024 04 - Lighting Installation

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 05 - Emergency Lighting

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

12

0

0 0

0

2021

Emergency light in good order.

B

£0

14

0

0 0

0

2023

Surface fluorescent light in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Fire alarm main panel in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

Sounders in good order. Call points in good order.

Location: 001-05-1-025 04 - Lighting Installation V - Engineering - Fire Alarms

Location: 001-05-1-011 03 - Smoke Detectors

Location: 001-05-1-013 03 - Smoke Detectors

Location: 001-05-1-014 05 - Fire Main/Zone Panel

Location: 001-05-1-016 03 - Smoke Detectors

Location: 001-05-1-018 03 - Smoke Detectors

Location: Whole Block 01 - Sounders 02 - Call Points Block Total

Sample College Physical Condition Survey

£235,173.00

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Site : Sample College - 001 Block : B Hostel - 06 Facet: 1 - Building A - Building - Physical Structure

Location: Whole Block 01 - General Structure 02 - Foundations 03 - Ground Stability

B B B

£0 £0 £0

40 60 60

0 0 0

0 0 0 0 0 0

0 0 0

2049 2069 2069

Brickwork: Generally sound. Generally sound. Generally sound.

04 - Windows

C

£4,500

0

1

0 0

0

2009

04 - Windows

B(C)

£2,300

1

2

0 0

0

2010

06 - Doors

B(C)

£1,000

4

3

0 0

0

2013

Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 1 - 10No. Softwood timber - Single: Require replacement - located to elevation 1 - 2No. Softwood timber: Redecorate and make good - located to elevation 1 - 5No. single.

B - Building - External Fabric

Location: Elevation 01

Location: Elevation 02 02a - Cladding - Attachment

C

£200

0

1

0 0

0

2009

04 - Windows

C

£3,150

0

1

0 0

0

2009

Zinc sheet: Section has come away with making good required - located to elevation 2. Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 2 - 7No.

Location: Elevation 03

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Windows

06 - Doors

C

B(C)

Cost to B Rem Life Priority C L

R

Year

£4,950

0

1

0 0

0

2009

£900

4

3

0 0

0

2013

Notes

Remedial Action

Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 3 - 11No. Softwood timber: Redecorate and make good - located to elevation 3 - 3No. single & 1No. double.

Location: Elevation 04 02a - Cladding - Attachment

B

£0

10

0

0 0

0

2019

02b - Cladding - Cracking

B

£0

10

0

0 0

0

2019

02c - Cladding - Joints

B

£0

10

0

0 0

0

2019

02d - Cladding - Finish

B

£0

10

0

0 0

0

2019

02a - Cladding - Attachment

B

£0

8

0

0 0

0

2017

02b - Cladding - Cracking

B

£0

8

0

0 0

0

2017

02c - Cladding - Joints

B

£0

8

0

0 0

0

2017

02d - Cladding - Finish

B

£0

8

0

0 0

0

2017

Plastic profiled sheet cladding: Located to elevation 4 (extension). Plastic profiled sheet cladding: Located to elevation 4 (extension). Plastic profiled sheet cladding: Located to elevation 4 (extension). Plastic profiled sheet cladding: Located to elevation 4 (extension).

Location: Elevation 05

Sample College Physical Condition Survey

Plastic profiled sheet cladding: Located to elevation 5 (two storey section). Plastic profiled sheet cladding: Located to elevation 5 (two storey section). Plastic profiled sheet cladding: Located to elevation 5 (two storey section). Plastic profiled sheet cladding: Located to elevation 5 (two storey section).

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

04 - Windows

C

£5,850

0

1

0 0

0

2009

06 - Doors

C

£1,250

0

1

0 0

0

2009

04 - Windows

C

£5,400

0

1

0 0

0

2009

04 - Windows

B(C)

£1,150

1

2

0 0

0

2010

06 - Doors

B(C)

£600

4

3

0 0

0

2013

Notes

Remedial Action

Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 5 - 13No. Steel: Need to replace located to elevation 5 - 1No. single.

Location: Elevation 06 Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 6 - 12No. Softwood timber - Single: Require replacement - located to elevation 6 - 1No. Softwood timber: Redecorate and make good - located to elevation 6 - 3No. single.

Location: Whole Block 01a - Masonry - Cracking 01b - Masonry - Spalling 01c - Masonry - Pointing 01d - Masonry - Finish 02b - Cladding - Cracking

B B B B B

£0 £0 £0 £0 £0

20 20 20 20 6

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2029 2029 2029 2029 2015

Brickwork. Brickwork. Brickwork. Brickwork. Zinc sheet.

02c - Cladding - Joints 02d - Cladding - Finish 04 - Windows 06 - Doors

B B B B

£0 £0 £0 £0

6 6 6 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2015 2015 2015

Zinc sheet. Zinc sheet. Aluminium - Double. Aluminium.

C - Building - Internal Fabric Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-06-0-001 01 - Decorations

02 - Ceiling

B(C)

B

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

03 - Floor

B(C)

£350

2

3

0 0

0

2011

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

B(C)

£312

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-06-0-002 01 - Decorations

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

10

0

0 0

0

2019

08 - Fixed Units

B

£0

6

0

0 0

0

2015

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£350

2

3

0 0

0

2011

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-06-0-003 01 - Decorations

02 - Ceiling 03 - Floor

Sample College Physical Condition Survey

B(C)

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£1,250

1

2

0 0

0

2010

Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

B(C)

£208

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-06-0-004 01 - Decorations

02 - Ceiling

B

03 - Floor

B(C)

£280

2

3

0 0

0

2011

08 - Fixed Units

B(C)

£1,250

2

2

0 0

0

2011

B(C)

£208

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

£280

4

3

0 0

0

2013

£0

8

0

0 0

0

2017

£520

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

Location: 001-06-0-004a 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit - In Good Condition

Location: 001-06-0-004b 01 - Decorations

02 - Ceiling Sample College Physical Condition Survey

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

08 - Fixed Units

B(C)

B

Cost to B Rem Life Priority C L

R

Year

£700

4

3

0 0

0

2013

£0

8

0

0 0

0

2017

£208

3

4

0 0

0

2012

Notes

Remedial Action

Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit - In Good Condition

Location: 001-06-0-005 01 - Decorations

B(C)

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

£260

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition.

Location: 001-06-0-006 01 - Decorations

B(C)

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

10

0

0 0

0

2019

08 - Fixed Units

B

£0

6

0

0 0

0

2015

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-06-0-007 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

08 - Fixed Units

B(C)

B

Cost to B Rem Life Priority C L

R

Year

£350

3

3

0 0

0

2012

£0

6

0

0 0

0

2015

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

Notes

Remedial Action

Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-06-0-008 01 - Decorations

02 - Ceiling

B(C)

B

03 - Floor

B(C)

£350

2

3

0 0

0

2011

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

B(C)

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-06-0-009 01 - Decorations

02 - Ceiling

B

03 - Floor

B(C)

£350

2

3

0 0

0

2011

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-06-0-010 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling

B(C)

B

Cost to B Rem Life Priority C L

R

Year

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

03 - Floor

B(C)

£350

2

3

0 0

0

2011

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

B(C)

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-06-0-015 01 - Decorations

02 - Ceiling

B

03 - Floor

B(C)

£350

2

3

0 0

0

2011

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

B(C)

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£350

2

3

0 0

0

2011

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-06-0-016 01 - Decorations

02 - Ceiling 03 - Floor

Sample College Physical Condition Survey

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£1,250

1

2

0 0

0

2010

Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

B(C)

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-06-0-017 01 - Decorations

02 - Ceiling

B

03 - Floor

B(C)

£350

2

3

0 0

0

2011

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

B(C)

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£350

3

3

0 0

0

2012

£0

6

0

0 0

0

2015

£260

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

Location: 001-06-0-018 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-06-0-019 01 - Decorations

02 - Ceiling Sample College Physical Condition Survey

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

£130

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£175

2

3

0 0

0

2011

B(C)

£442

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£595

3

3

0 0

0

2012

£0

6

0

0 0

0

2015

£312

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£420

3

3

0 0

0

2012

Notes

Remedial Action

Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition.

Location: 001-06-0-020 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-021 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-06-0-022 01 - Decorations

02 - Ceiling 03 - Floor

Sample College Physical Condition Survey

B(C)

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units

B

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£0

6

0

0 0

0

2015

Fixed units: Sink unit in good condition.

£312

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£420

3

3

0 0

0

2012

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

£208

3

4

0 0

0

2012

Location: 001-06-0-023 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Location: 001-06-0-024 01 - Decorations

B(C)

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

10

0

0 0

0

2019

08 - Fixed Units

B

£0

6

0

0 0

0

2015

B(C)

£442

3

4

0 0

0

2012

02 - Ceiling

C

£100

0

3

0 0

0

2009

03 - Floor

B

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-06-0-025 01 - Decorations

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Anti-slip vinyl sheet flooring: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

05 - Condition of Internal Walls

B

£0

10

0

0 0

0

2019

08 - Fixed Units

B

£0

6

0

0 0

0

2015

£130

3

4

0 0

0

2012

Notes

Remedial Action

Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-06-0-026 01 - Decorations

B(C)

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

01 - Decorations

B(C)

£78

3

4

0 0

0

2012

02 - Ceiling 03 - Floor

B B(C)

£0 £105

10 2

0 3

0 0 0 0

0 0

2019 2011

B(C)

£104

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition.

Location: 001-06-0-027 Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-035 01 - Decorations

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Fixed units: Sink unit in good condition.

Location: 001-06-0-036

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

B(C)

Cost to B Rem Life Priority C L

R

Year

£182

3

4

0 0

0

2012

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

8

0

0 0

0

2017

£260

3

4

0 0

0

2012

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition.

Location: 001-06-0-037 01 - Decorations

B(C)

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£312

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£420

3

3

0 0

0

2012

£0

6

0

0 0

0

2015

£312

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-06-0-038 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-06-0-039 01 - Decorations

Sample College Physical Condition Survey

B(C)

Redecoration required as part of a regular maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

6

0

0 0

0

2015

£442

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£595

3

3

0 0

0

2012

£0

6

0

0 0

0

2015

£208

3

4

0 0

0

2012

Notes

Remedial Action

Suspended ceiling: In good condition. Vinyl sheet flooring: In good condition. Fixed units: Sink unit in good condition.

Location: 001-06-0-040 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-06-0-041 01 - Decorations

B(C)

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

8

0

0 0

0

2017

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition.

Location: 001-06-0-042 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

08 - Fixed Units

B(C)

B

Cost to B Rem Life Priority C L

R

Year

£350

3

3

0 0

0

2012

£0

6

0

0 0

0

2015

£260

3

4

0 0

0

2012

Notes

Remedial Action

Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-06-0-043 01 - Decorations

B(C)

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

B(C)

£10,000

1

2

0 0

0

2010

B(C)

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

08 - Fixed Units

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: Require replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-06-0-044 01 - Decorations

02 - Ceiling

B

03 - Floor

B(C)

£350

2

3

0 0

0

2011

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

B(C)

£260

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-06-0-045 01 - Decorations

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02 - Ceiling

B

Cost to B Rem Life Priority C L

R

Year

£0

6

0

0 0

0

2015

Notes

Remedial Action

Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

03 - Floor

B(C)

£350

2

3

0 0

0

2011

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

N/A

£0

0

0

0 0

0

2009

No Access

B(C)

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-06-0-046 12 - Comments

Location: 001-06-0-047 01 - Decorations

02 - Ceiling

B

03 - Floor

B(C)

£350

2

3

0 0

0

2011

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

B(C)

£468

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£630

3

3

0 0

0

2012

Location: 001-06-0-048 01 - Decorations

02 - Ceiling 03 - Floor

Sample College Physical Condition Survey

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units

B

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£0

6

0

0 0

0

2015

Fixed units: Sink unit in good condition.

£468

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£630

3

3

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£78

3

4

0 0

0

2012

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£350

2

3

0 0

0

2011

Location: 001-06-0-050 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Location: 001-06-0-050a 01 - Decorations

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-06-0-051 01 - Decorations

02 - Ceiling 03 - Floor

Sample College Physical Condition Survey

B(C)

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£1,250

1

2

0 0

0

2010

Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

B(C)

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-06-0-052 01 - Decorations

02 - Ceiling

B

03 - Floor

B(C)

£350

2

3

0 0

0

2011

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

B(C)

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

Location: 001-06-0-053 01 - Decorations

02 - Ceiling

B

03 - Floor

B(C)

£350

2

3

0 0

0

2011

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

B(C)

£260

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-06-0-054 01 - Decorations

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02 - Ceiling 03 - Floor

08 - Fixed Units

B B(C)

B

Cost to B Rem Life Priority C L

R

Year

£0

6

0

0 0

0

2015

£350

3

3

0 0

0

2012

£0

6

0

0 0

0

2015

£260

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

£350

1

3

0 0

0

2010

£0

6

0

0 0

0

2015

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

Notes

Remedial Action

Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-06-0-055 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-06-0-056 01 - Decorations

02 - Ceiling

B(C)

B

03 - Floor

B(C)

£350

2

3

0 0

0

2011

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-06-0-057 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

B(C)

Cost to B Rem Life Priority C L

R

Year

£260

3

4

0 0

0

2012

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-06-0-058 01 - Decorations

02 - Ceiling

B(C)

B

03 - Floor

B(C)

£350

2

3

0 0

0

2011

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

B(C)

£130

1

4

0 0

0

2010

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-06-0-059 01 - Decorations

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units

B(C)

08 - Fixed Units

B

Cost to B Rem Life Priority C L

R

Year

£1,750

2

2

0 0

0

2011

£0

6

0

0 0

0

2015

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

Notes

Remedial Action

Fixed units: Fitted unit requires replacement within the maintenance schedule due to age and level of deterioration. Fixed units: Sluice in good condition.

Location: 001-06-0-060 01 - Decorations

02 - Ceiling

B(C)

B

03 - Floor

B(C)

£350

2

3

0 0

0

2011

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

B(C)

£130

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-06-0-061 01 - Decorations

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

£390

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition.

Location: 001-06-0-062 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£525

1

3

0 0

0

2010

Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£312

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£420

1

3

0 0

0

2010

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£260

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£350

1

3

0 0

0

2010

B(C)

£312

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

£420

1

3

0 0

0

2010

Location: 001-06-0-063 01 - Decorations

02 - Ceiling 03 - Floor

B

Location: 001-06-0-064 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-065 01 - Decorations

02 - Ceiling 03 - Floor

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-066 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

Cost to B Rem Life Priority C L

R

Year

£260

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£350

1

3

0 0

0

2010

B(C)

£104

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£140

2

3

0 0

0

2011

B(C)

£156

3

4

0 0

0

2012

B

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-067 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-068 01 - Decorations

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

B(C)

£10,000

1

2

0 0

0

2010

B(C)

£312

3

4

0 0

0

2012

08 - Fixed Units

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: Require replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-06-0-069 01 - Decorations

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02 - Ceiling 03 - Floor

B

Cost to B Rem Life Priority C L

R

Year

£0

6

0

0 0

0

2015

B(C)

£420

2

3

0 0

0

2011

B(C)

£390

3

4

0 0

0

2012

Notes

Remedial Action

Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-070 01 - Decorations

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

£156

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition.

Location: 001-06-0-071 01 - Decorations

B(C)

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

8

0

0 0

0

2017

£312

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

£420

1

3

0 0

0

2010

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Fixed units: Kitchen units in good condition.

Location: 001-06-0-072 01 - Decorations

02 - Ceiling 03 - Floor

Sample College Physical Condition Survey

B(C)

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-06-0-073 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

£442

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£595

1

3

0 0

0

2010

B(C)

£208

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£280

1

3

0 0

0

2010

B(C)

£312

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£420

1

3

0 0

0

2010

B(C)

£1,300

4

4

0 0

0

2013

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-074 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-075 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-076 01 - Decorations

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02 - Ceiling 03 - Floor

B

Cost to B Rem Life Priority C L

R

Year

£0

15

0

0 0

0

2024

B(C)

£1,750

3

3

0 0

0

2012

B(C)

£312

3

4

0 0

0

2012

Notes

Remedial Action

Timber panelling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-077 01 - Decorations

02 - Ceiling

B

£0

20

0

0 0

0

2029

03 - Floor

B

£0

10

0

0 0

0

2019

08 - Fixed Units

B

£0

20

0

0 0

0

2029

B(C)

£52

4

4

0 0

0

2013

02 - Ceiling

B

£0

20

0

0 0

0

2029

03 - Floor

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£260

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Vinyl sheet flooring: In good condition. Fixed units: Kitchen units in good condition.

Location: 001-06-0-078 01 - Decorations

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-06-0-079 01 - Decorations

B(C)

02 - Ceiling 03 - Floor

B B

£0 £0

10 6

0 0

0 0 0 0

0 0

2019 2015

08 - Fixed Units

B

£0

8

0

0 0

0

2017

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Fixed units: Kitchen units in good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-06-0-080 01 - Decorations

B(C)

£468

3

4

0 0

0

2012

02 - Ceiling 03 - Floor

B B(C)

£0 £630

10 2

0 3

0 0 0 0

0 0

2019 2011

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

£0

6

0

0 0

0

2015

Cupboard fit for purpose.

£390

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£525

1

3

0 0

0

2010

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£1,170

4

4

0 0

0

2013

Location: 001-06-0-081 12 - Comments

B

Location: 001-06-0-082 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Location: 001-06-0-083 01 - Decorations

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

8

0

0 0

0

2017

£390

2

4

0 0

0

2011

Redecoration required as part of a regular maintenance schedule. Timber panelling: In good condition. Anti-slip vinyl sheet flooring: In good condition.

Location: 001-06-0-084 01 - Decorations

Sample College Physical Condition Survey

B(C)

Redecoration required as part of a regular maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02 - Ceiling 03 - Floor

B

Cost to B Rem Life Priority C L

R

Year

£0

6

0

0 0

0

2015

B(C)

£525

1

3

0 0

0

2010

B(C)

£312

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£420

1

3

0 0

0

2010

B(C)

£260

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£350

1

3

0 0

0

2010

B(C)

£312

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

£420

1

3

0 0

0

2010

Notes

Remedial Action

Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-085 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-086 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-087 01 - Decorations

02 - Ceiling 03 - Floor

Sample College Physical Condition Survey

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-06-0-088 01 - Decorations

02 - Ceiling

B(C)

C

£1,170

2

4

0 0

0

2011

£150

0

3

0 0

0

2009

£1,575

2

3

0 0

0

2011

03 - Floor

B(C)

03 - Floor

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

8

0

0 0

0

2017

£312

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

B(C)

£420

1

3

0 0

0

2010

B(C)

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

£350

2

3

0 0

0

2011

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Anti-slip vinyl sheet flooring: In good condition. Fixed units: Kitchen units in good condition.

Location: 001-06-0-089 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-101 01 - Decorations

02 - Ceiling 03 - Floor

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-102 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

B(C)

Cost to B Rem Life Priority C L

R

Year

£104

3

4

0 0

0

2012

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

B(C)

£350

2

3

0 0

0

2011

B(C)

£104

3

4

0 0

0

2012

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-06-0-103 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-104 01 - Decorations

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-06-0-105

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

Cost to B Rem Life Priority C L

R

Year

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

B(C)

£350

2

3

0 0

0

2011

B(C)

£104

3

4

0 0

0

2012

B

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-106 01 - Decorations

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

B(C)

£350

2

3

0 0

0

2011

B(C)

£104

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-06-0-107 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-108 01 - Decorations

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

B(C)

£350

2

3

0 0

0

2011

B(C)

£104

3

4

0 0

0

2012

Notes

Remedial Action

Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-06-0-109 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-110 01 - Decorations

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£260

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-06-0-111 01 - Decorations

Sample College Physical Condition Survey

B(C)

Redecoration required as part of a regular maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

B(C)

£350

2

3

0 0

0

2011

B(C)

£104

3

4

0 0

0

2012

Notes

Remedial Action

Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-06-0-112 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-113 01 - Decorations

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£130

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-06-0-114 01 - Decorations

Sample College Physical Condition Survey

B(C)

Redecoration required as part of a regular maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

B(C)

£350

2

3

0 0

0

2011

B(C)

£104

3

4

0 0

0

2012

Notes

Remedial Action

Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-06-0-115 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-116 01 - Decorations

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£260

4

4

0 0

0

2013

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-06-0-117 01 - Decorations

Sample College Physical Condition Survey

B(C)

Redecoration required as part of a regular maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02 - Ceiling 03 - Floor

B

Cost to B Rem Life Priority C L

R

Year

£0

6

0

0 0

0

2015

B(C)

£350

2

3

0 0

0

2011

B(C)

£104

3

4

0 0

0

2012

Notes

Remedial Action

Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-118 01 - Decorations

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

B(C)

£52

3

4

0 0

0

2012

B

£0

6

0

0 0

0

2015

B(C)

£70

2

3

0 0

0

2011

B(C)

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-06-0-119 01 - Decorations

02 - Ceiling 03 - Floor

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-0-120 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£350

2

3

0 0

0

2011

Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£104

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-06-0-121 01 - Decorations

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£130

3

4

0 0

0

2012

Location: 001-06-0-122 01 - Decorations

B(C)

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-06-0-123 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£350

2

3

0 0

0

2011

Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

C

£100

0

3

0 0

0

2009

B(C)

£350

2

3

0 0

0

2011

B

£0

20

0

0 0

0

2029

Suspended ceiling: Replace water damaged tiles. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fairfaced brickwork: In good condition.

B(C)

£78

2

4

0 0

0

2011

02 - Ceiling

C

£150

0

2

0 0

0

2009

03 - Floor

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

Location: 001-06-0-124 02 - Ceiling 03 - Floor

05 - Condition of Internal Walls

Location: 001-06-1-001 01 - Decorations

Redecoration required as part of a regular maintenance schedule. Artex ceiling: Make good and redecorate water ingress to Artex ceiling. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-06-1-002 01 - Decorations

B(C)

£260

4

4

0 0

0

2013

02 - Ceiling 03 - Floor

B B(C)

£0 £350

10 2

0 3

0 0 0 0

0 0

2019 2011

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-1-003 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

01 - Decorations

B(C)

£390

4

4

0 0

0

2013

02 - Ceiling 03 - Floor

B B(C)

£0 £525

10 2

0 3

0 0 0 0

0 0

2019 2011

01 - Decorations

B(C)

£208

4

4

0 0

0

2013

02 - Ceiling 03 - Floor

B B(C)

£0 £280

10 2

0 3

0 0 0 0

0 0

2019 2011

B(C)

£650

2

4

0 0

0

2011

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-1-004 Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-LG-001 01 - Decorations

02 - Ceiling

B

£0

20

0

0 0

0

2029

03 - Floor

B

£0

8

0

0 0

0

2017

B(C)

£4,000

4

2

0 0

0

2013

B(C)

£650

4

4

0 0

0

2013

£0

20

0

0 0

0

2029

08 - Fixed Units

Laundry: Redecoration required as part of a regular maintenance schedule. Laundry: Plaster ceiling: In good condition. Laundry: Anti-slip vinyl sheet flooring: In good condition. Laundry: Fixed units: Laundry units require replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-06-LG-002 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Laundry: Redecoration required as part of a regular maintenance schedule. Laundry: Plaster ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

03 - Floor

B

£0

8

0

0 0

0

2017

05 - Condition of Internal Walls

C

£250

0

2

0 0

0

2009

B(C)

£650

4

4

0 0

0

2013

Notes

Remedial Action

Laundry: Anti-slip vinyl sheet flooring: In good condition. Laundry: Plaster wall: Make good and redecorate plaster walls.

Location: 001-06-LG-003 01 - Decorations

02 - Ceiling

B

£0

20

0

0 0

0

2029

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

8

0

0 0

0

2017

02 - Ceiling

B

£0

20

0

0 0

0

2029

03 - Floor

B

£0

8

0

0 0

0

2017

05 - Condition of Internal Walls

B

£0

10

0

0 0

0

2019

Laundry: Redecoration required as part of a regular maintenance schedule. Laundry: Plaster ceiling: In good condition. Laundry: Anti-slip vinyl sheet flooring: In good condition. Laundry: Fixed units: Belfast sink unit in good condition. Laundry: Fixed units: Sink unit in good condition.

Location: 001-06-LG-004 Laundry: Plaster ceiling: In good condition. Laundry: Anti-slip vinyl sheet flooring: In good condition. Laundry: Plastic walls: In good condition.

Location: 001-06-LG-005 01 - Decorations

B(C)

£260

2

4

0 0

0

2011

02 - Ceiling

B(C)

£1,200

2

2

0 0

0

2011

03 - Floor

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

Sample College Physical Condition Survey

Laundry: Redecoration required as part of a regular maintenance schedule. Laundry: Suspended ceiling: Requires replacement within the maintenance schedule. Laundry: Anti-slip vinyl sheet flooring: In good condition. Laundry: Sanitary fittings: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-06-LG-006 01 - Decorations

B(C)

£130

1

4

0 0

0

2010

02 - Ceiling

B(C)

£600

2

2

0 0

0

2011

03 - Floor

B(C)

£175

1

3

0 0

0

2010

C

£312

0

4

0 0

0

2009

Bursar's Room's: Redecoration required as part of a regular maintenance schedule. Bursar's Room's: Suspended ceiling: Requires replacement within the maintenance schedule. Bursar's Room's: Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-06-LG-007 01 - Decorations

02 - Ceiling

B(C)

£1,440

2

2

0 0

0

2011

03 - Floor

B(C)

£420

1

3

0 0

0

2010

£2,500

0

2

0 0

0

2009

08 - Fixed Units

C

Bursar's Room's: Redecoration required as part of a regular maintenance schedule. Bursar's Room's: Suspended ceiling: Requires replacement within the maintenance schedule. Bursar's Room's: Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Bursar's Room's: Fixed units: Kitchen units require replacement due to age and level of deterioration.

Location: 001-06-LG-008 01 - Decorations

B(C)

£312

1

4

0 0

0

2010

02 - Ceiling

B(C)

£1,440

2

2

0 0

0

2011

Sample College Physical Condition Survey

Bursar's Room's: Redecoration required as part of a regular maintenance schedule. Bursar's Room's: Suspended ceiling: Requires replacement within the maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£420

1

3

0 0

0

2010

Bursar's Room's: Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B B B(C)

£0 £0 £500

10 20 2

0 0 3

0 0 0 0 0 0

0 0 0

2019 2029 2011

B

£0

60

0

0 0

0

2069

Metal sheet. Metal sheet. Painted timber: Require redecoration. Metal.

B B B

£0 £0 £0

60 8 8

0 0 0

0 0 0 0 0 0

0 0 0

2069 2017 2017

Timber. Box gutters - Metal. PVCU.

B B B B

£0 £0 £0 £0

6 6 10 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2015 2019 2015

B B B

£0 £0 £0

20 20 6

0 0 0

0 0 0 0 0 0

0 0 0

2029 2029 2015

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. Aluminium framed glazed skylights.

B B

£0 £0

6 8

0 0

0 0 0 0

0 0

2015 2017

D - Building - Roof

Location: Roof 01 01a - Attached - Covering 01b - Attached - Sarking 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters

01f - Attached - Purlins 01g - Attached - Guttering 01g - Attached - Guttering

Location: Roof 02 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01i - Attached - Skylights

Location: Roof 03 01a - Attached - Covering 01b - Attached - Sarking Sample College Physical Condition Survey

Concrete tiles. Mineral felt. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

01h - Attached - Down Rainwater pipes

Cost to B Rem Life Priority C L

R

Year

B B

£0 £0

15 6

0 0

0 0 0 0

0 0

2024 2015

B B C

£0 £0 £1,000

20 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2029 2029 2009

B

£0

6

0

0 0

0

2015

B B B B

£0 £0 £0 £0

6 8 15 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2017 2024 2015

B B C

£0 £0 £1,000

20 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2029 2029 2009

B

£0

6

0

0 0

0

2015

B B B B

£0 £0 £0 £0

6 8 15 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2017 2024 2015

B B

£0 £0

20 20

0 0

0 0 0 0

0 0

2029 2029

Notes

Remedial Action

Lead. Metal sheet coping to brick parapets. Timber. Timber. Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

Location: Roof 04 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

01h - Attached - Down Rainwater pipes

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

Location: Roof 05 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins Sample College Physical Condition Survey

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

01g - Attached - Guttering

C

£1,000

0

2

0 0

0

2009

01h - Attached - Down Rainwater pipes

B

£0

6

0

0 0

0

2015

B B B B

£0 £0 £0 £0

6 8 15 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2017 2024 2015

B B C

£0 £0 £1,000

20 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2029 2029 2009

B

£0

6

0

0 0

0

2015

B B B B

£0 £0 £0 £0

6 8 15 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2017 2024 2015

B B C

£0 £0 £1,000

20 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2029 2029 2009

Notes

Remedial Action

Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

Location: Roof 06 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

01h - Attached - Down Rainwater pipes

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

Location: Roof 07 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

Sample College Physical Condition Survey

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01h - Attached - Down Rainwater pipes

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

6

0

0 0

0

2015

PVCU - Internal.

B B B B

£0 £0 £0 £0

6 8 15 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2017 2024 2015

B B C

£0 £0 £1,000

20 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2029 2029 2009

B

£0

6

0

0 0

0

2015

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

B B B B

£0 £0 £0 £0

6 8 15 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2017 2024 2015

B B C

£0 £0 £1,000

20 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2029 2029 2009

B

£0

6

0

0 0

0

2015

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

B

£0

6

0

0 0

0

2015

Concrete tiles.

Location: Roof 08 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

01h - Attached - Down Rainwater pipes

Location: Roof 09 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

01h - Attached - Down Rainwater pipes

Location: Roof 10 01a - Attached - Covering Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B B B

£0 £0 £0

8 15 6

0 0 0

0 0 0 0 0 0

0 0 0

2017 2024 2015

B B C

£0 £0 £1,000

20 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2029 2029 2009

B

£0

6

0

0 0

0

2015

Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

B B B

£0 £0 £0

6 8 6

0 0 0

0 0 0 0 0 0

0 0 0

2015 2017 2015

Mineral felt with stone chippings. Timber. Mineral felt.

02a - Flat - Covering 02b - Flat - Decking

B B

£0 £0

6 8

0 0

0 0 0 0

0 0

2015 2017

Mineral felt with stone chippings. Timber.

02c - Flat - Flashing

B

£0

6

0

0 0

0

2015

Mineral felt.

B B B

£0 £0 £0

6 8 6

0 0 0

0 0 0 0 0 0

0 0 0

2015 2017 2015

Mineral felt with stone chippings. Timber. Mineral felt.

01h - Attached - Down Rainwater pipes

Location: Roof 11 02a - Flat - Covering 02b - Flat - Decking 02c - Flat - Flashing

Location: Roof 12

Location: Roof 13 02a - Flat - Covering 02b - Flat - Decking 02c - Flat - Flashing

Location: Roof 14 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02a - Flat - Covering

B(C)

02b - Flat - Decking

Cost to B Rem Life Priority C L

R

Year

£500

1

2

0 0

0

2010

B

£0

6

0

0 0

0

2015

02d - Flat - Parapets

B

£0

6

0

0 0

0

2015

02i - Flat - Skylights

B

£0

6

0

0 0

0

2015

£500

3

2

0 0

0

2012

Notes

Remedial Action

Mineral felt: Requires replacing due to age and condition. Timber.

Brickwork with metal sheet coping. Polycarbonate domed skylights.

Location: Roof 15 02a - Flat - Covering

B(C)

Mineral felt: Requires replacing due to age and condition. Timber.

02b - Flat - Decking

B

£0

6

0

0 0

0

2015

02d - Flat - Parapets

B

£0

6

0

0 0

0

2015

02i - Flat - Skylights

B

£0

6

0

0 0

0

2015

Brickwork with metal sheet coping. Polycarbonate domed skylights.

B B

£0 £0

10 20

0 0

0 0 0 0

0 0

2019 2029

Mineral felt. Timber.

Location: Roof 16 02a - Flat - Covering 02b - Flat - Decking

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

02c - Flat - Flashing

C

£2,500

0

1

0 0

0

2009

Temporary tape: Requires replacement with a lead alternative product. Brickwork with metal sheet coping and metal tubular rails.

02d - Flat - Parapets

B

£0

10

0

0 0

0

2019

02h - Flat - Down Rainwater pipes

B

£0

10

0

0 0

0

2019

PVCU - Internal.

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

£0

10

0

0 0

0

2019

Natural convector in good order.

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

Facet: 2 - Engineering I - Engineering - Heating Systems

Location: 001-06-0-001 01 - Heat Emitters

Location: 001-06-0-003 01 - Heat Emitters

Location: 001-06-0-004 01 - Heat Emitters

B

Location: 001-06-0-005 01 - Heat Emitters

Sample College Physical Condition Survey

B(C)

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-06-0-007 01 - Heat Emitters

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

£0

10

0

0 0

0

2019

Skirting heating in good order.

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

Location: 001-06-0-008 01 - Heat Emitters

Location: 001-06-0-009 01 - Heat Emitters

Location: 001-06-0-010 01 - Heat Emitters

Location: 001-06-0-011 01 - Heat Emitters

B

Location: 001-06-0-015 01 - Heat Emitters

Location: 001-06-0-016 01 - Heat Emitters

Location: 001-06-0-017 01 - Heat Emitters

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-06-0-018 01 - Heat Emitters

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

B

£0

10

0

0 0

0

2019

Natural convector in good order.

B

£0

10

0

0 0

0

2019

Steel panel radiator in good order.

B

£0

10

0

0 0

0

2019

Skirting heating in good order.

B

£0

10

0

0 0

0

2019

Skirting heating in good order.

B

£0

10

0

0 0

0

2019

Skirting heating in good order.

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

B

£0

10

0

0 0

0

2019

Skirting heating in good order.

B

£0

10

0

0 0

0

2019

Skirting heating in good order.

B

£0

10

0

0 0

0

2019

Skirting heating in good order.

Location: 001-06-0-019 01 - Heat Emitters

Location: 001-06-0-020 01 - Heat Emitters

Location: 001-06-0-021 01 - Heat Emitters

Location: 001-06-0-022 01 - Heat Emitters

Location: 001-06-0-023 01 - Heat Emitters

Location: 001-06-0-037 01 - Heat Emitters

B(C)

Location: 001-06-0-038 01 - Heat Emitters

Location: 001-06-0-039 01 - Heat Emitters

Location: 001-06-0-040 01 - Heat Emitters

Location: 001-06-0-042 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

£0

10

0

0 0

0

2019

Skirting heating in good order.

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

Location: 001-06-0-044 01 - Heat Emitters

Location: 001-06-0-045 01 - Heat Emitters

Location: 001-06-0-047 01 - Heat Emitters

Location: 001-06-0-048 01 - Heat Emitters

B

Location: 001-06-0-051 01 - Heat Emitters

Location: 001-06-0-052 01 - Heat Emitters

Location: 001-06-0-053 01 - Heat Emitters

Location: 001-06-0-054 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

B(C)

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

£0

10

0

0 0

0

2019

2No. steel panel radiators in good order.

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

£0

12

0

0 0

0

2021

Natural convector in good order.

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

B(C)

£1,000

2

3

0 0

0

2011

2No. natural convectors require upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

Location: 001-06-0-055 01 - Heat Emitters

B

Location: 001-06-0-056 01 - Heat Emitters

Location: 001-06-0-058 01 - Heat Emitters

Location: 001-06-0-059 01 - Heat Emitters

B

Location: 001-06-0-060 01 - Heat Emitters

Location: 001-06-0-064 01 - Heat Emitters

Location: 001-06-0-066 01 - Heat Emitters

Location: 001-06-0-068 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2019

Heat emitter with low surface temperature cover in good order.

B

£0

10

0

0 0

0

2019

Skirting heating in good order.

B(C)

£1,000

2

3

0 0

0

2011

2No. natural convectors require upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2019 2019

Skirting heating in good order. Fan convector in good order.

B

£0

10

0

0 0

0

2019

Skirting heating in good order.

C

£500

0

2

0 0

0

2009

Steel panel radiator with no low surface temperature cover requires replacement

B

£0

10

0

0 0

0

2019

Skirting heating in good order.

£500

2

3

0 0

0

2011

Natural convector requires upgrading within the maintenance schedule.

Location: 001-06-0-070 01 - Heat Emitters

Location: 001-06-0-073 01 - Heat Emitters

Location: 001-06-0-075 01 - Heat Emitters

Location: 001-06-0-076 01 - Heat Emitters 01 - Heat Emitters

Location: 001-06-0-077 01 - Heat Emitters

Location: 001-06-0-080 01 - Heat Emitters

Location: 001-06-0-083 01 - Heat Emitters

Location: 001-06-0-086 01 - Heat Emitters

B(C)

Location: 001-06-0-088 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2019 2019

Fan convector in good order. Skirting heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

Location: 001-06-0-101 01 - Heat Emitters

Location: 001-06-0-103 01 - Heat Emitters

Location: 001-06-0-105 01 - Heat Emitters

Location: 001-06-0-107 01 - Heat Emitters

Location: 001-06-0-109 01 - Heat Emitters

Location: 001-06-0-111 01 - Heat Emitters

Location: 001-06-0-112 01 - Heat Emitters

Location: 001-06-0-115 01 - Heat Emitters

Location: 001-06-0-117

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

10

0

0 0

0

2019

Heat emitter with low surface temperature cover in good order.

B

£0

10

0

0 0

0

2019

Skirting heating in good order.

B

£0

10

0

0 0

0

2019

Skirting heating in good order.

01 - Heat Emitters

B

£0

10

0

0 0

0

2019

01 - Heat Emitters

B

£0

15

0

0 0

0

2024

Skirting heating in the Care Staff Rest Room in good order. Heat emitters with low surface temperature covers in good order.

Location: 001-06-0-120 01 - Heat Emitters

Location: 001-06-0-122 01 - Heat Emitters

Location: 001-06-0-123 01 - Heat Emitters

Location: 001-06-0-124 01 - Heat Emitters

Location: 001-06-1-001 01 - Heat Emitters

Location: 001-06-1-002 01 - Heat Emitters

Location: 001-06-1-003 01 - Heat Emitters

Location: Lower Ground

K - Engineering - Vent & Air Con Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: Lower Ground 01 - Ductwork

B

£0

12

0

0 0

0

2021

Ductwork in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

C

£200

0

2

0 0

0

2009

Door closer clashes with the pipes and requires attention.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

M - Engineering - Hot/Cold Water

Location: 001-06-0-002 03 - Blending Valves

Location: 001-06-0-006 03 - Blending Valves

Location: 001-06-0-022 03 - Blending Valves

Location: 001-06-0-023 03 - Blending Valves

Location: 001-06-0-024 03 - Blending Valves

Location: 001-06-0-026 02 - Pipework

Location: 001-06-0-037 03 - Blending Valves

Location: 001-06-0-043 03 - Blending Valves

Location: 001-06-0-057 03 - Blending Valves

Location: 001-06-0-077 03 - Blending Valves

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-06-0-102 03 - Blending Valves

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

Location: 001-06-0-104 03 - Blending Valves

Location: 001-06-0-106 03 - Blending Valves

Location: 001-06-0-108 03 - Blending Valves

Location: 001-06-0-110 03 - Blending Valves

Location: 001-06-0-111 03 - Blending Valves

Location: 001-06-0-113 03 - Blending Valves

Location: 001-06-0-116 03 - Blending Valves

Location: 001-06-0-118 03 - Blending Valves

Location: 001-06-0-121 03 - Blending Valves

Location: 001-06-0-122 03 - Blending Valves P - Engineering - Main Plant

Location: 001-06-0-002 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Extract Fans

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

12

0

0 0

0

2021

Extract fan in good order.

B

£0

12

0

0 0

0

2021

Extract fan in good order.

B

£0

12

0

0 0

0

2021

Silavent extract fan in good order.

B

£0

12

0

0 0

0

2021

Extract fan in good order.

B

£0

12

0

0 0

0

2021

Extract fan in good order.

B

£0

12

0

0 0

0

2021

Extract fan in good order.

B

£0

12

0

0 0

0

2021

Extract fan in good order.

B

£0

12

0

0 0

0

2021

Extract fan in good order.

B

£0

12

0

0 0

0

2021

Extract fan in good order.

B

£0

12

0

0 0

0

2021

Extract fan in good order.

B

£0

12

0

0 0

0

2021

Extract fan in good order.

B

£0

12

0

0 0

0

2021

Extract fan in good order.

Location: 001-06-0-006 04 - Extract Fans

Location: 001-06-0-019 04 - Extract Fans

Location: 001-06-0-024 04 - Extract Fans

Location: 001-06-0-025 04 - Extract Fans

Location: 001-06-0-035 04 - Extract Fans

Location: 001-06-0-037 04 - Extract Fans

Location: 001-06-0-043 04 - Extract Fans

Location: 001-06-0-057 04 - Extract Fans

Location: 001-06-0-068 04 - Extract Fans

Location: 001-06-0-071 04 - Extract Fans

Location: 001-06-0-079 04 - Extract Fans

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-06-0-102 04 - Extract Fans

B

£0

12

0

0 0

0

2021

Extract fan in good order.

B

£0

12

0

0 0

0

2021

Extract fan in good order.

B

£0

12

0

0 0

0

2021

Extract fan in good order.

B

£0

12

0

0 0

0

2021

Extract fan in good order.

B

£0

12

0

0 0

0

2021

Extract fan in good order.

B

£0

12

0

0 0

0

2021

Extract fan in good order.

B

£0

12

0

0 0

0

2021

Extract fan in good order.

B

£0

12

0

0 0

0

2021

Extract fan in good order.

B

£0

12

0

0 0

0

2021

Extract fan in good order.

B

£0

12

0

0 0

0

2021

Extract fan in good order.

B

£0

12

0

0 0

0

2021

Extract fan in good order.

B

£0

12

0

0 0

0

2021

Xpelair extract fan in good order.

Location: 001-06-0-104 04 - Extract Fans

Location: 001-06-0-106 04 - Extract Fans

Location: 001-06-0-108 04 - Extract Fans

Location: 001-06-0-110 04 - Extract Fans

Location: 001-06-0-111 04 - Extract Fans

Location: 001-06-0-113 04 - Extract Fans

Location: 001-06-0-114 04 - Extract Fans

Location: 001-06-0-116 04 - Extract Fans

Location: 001-06-0-118 04 - Extract Fans

Location: 001-06-0-121 04 - Extract Fans

Location: Lower Ground 04 - Extract Fans Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

R - Engineering - Electrical

Location: 001-06-0-001 04 - Lighting Installation

B(C)

£200

3

3

0 0

0

2012

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

£200

3

3

0 0

0

2012

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-06-0-002 Surface fluorescent light in good order. Emergency light in good order.

Location: 001-06-0-003 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

C

£200

0

2

0 0

0

2009

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

B

£0

12

0

0 0

0

2021

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-06-0-004 Fluorescent light over visual display equipment is not suitable and requires upgrading. Sockets and switches in good order.

Location: 001-06-0-005 04 - Lighting Installation

Surface fluorescent light in good order.

Location: 001-06-0-006 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

2No. surface fluorescent lights in good order. Emergency light in good order.

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

Lighting track in good order. Surface fluorescent light in good order.

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

Lighting track in good order. Surface fluorescent light in good order.

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

Lighting track in good order. Surface fluorescent light in good order.

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light requires upgrading within the maintenance schedule. Sockets and switches in good order.

Location: 001-06-0-007 Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-06-0-008 04 - Lighting Installation 04 - Lighting Installation

Location: 001-06-0-009 04 - Lighting Installation 04 - Lighting Installation

Location: 001-06-0-010 04 - Lighting Installation 04 - Lighting Installation

Location: 001-06-0-011 04 - Lighting Installation

B(C)

£200

3

3

0 0

0

2012

04 - Lighting Installation

B(C)

£200

3

3

0 0

0

2012

B

£0

12

0

0 0

0

2021

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

Location: 001-06-0-015 04 - Lighting Installation Sample College Physical Condition Survey

Lighting track in good order. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

Lighting track in good order. Surface fluorescent light in good order.

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

Lighting track in good order. Surface fluorescent light in good order.

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

Lighting track in good order. Surface fluorescent light in good order.

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B(C)

£400

3

3

0 0

0

2012

MEM distribution board in good order. 2No. surface fluorescent lights require upgrading within the maintenance schedule.

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

2No. CAT II lights in good order. Sockets and switches in good order.

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-06-0-016 04 - Lighting Installation 04 - Lighting Installation

Location: 001-06-0-017 04 - Lighting Installation 04 - Lighting Installation

Location: 001-06-0-018 04 - Lighting Installation 04 - Lighting Installation

Location: 001-06-0-019

Location: 001-06-0-020 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-06-0-021

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-06-0-022 04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

Lighting track in good order. Surface fluorescent light in good order.

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

Lighting track in good order. Surface fluorescent light in good order.

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order. Emergency light in good order.

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

MEM distribution board in good order. Surface fluorescent light in good order.

B

£0

12

0

0 0

0

2021

Location: 001-06-0-023 04 - Lighting Installation 04 - Lighting Installation

Location: 001-06-0-024

Location: 001-06-0-025 2No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-06-0-026 04 - Lighting Installation

Location: 001-06-0-027

Location: 001-06-0-035 04 - Lighting Installation

Surface fluorescent light in good order.

Location: 001-06-0-036

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation

B(C)

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£200

3

3

0 0

0

2012

Surface fluorescent light requires upgrading within the maintenance schedule.

Surface fluorescent light in good order. Emergency light in good order.

Location: 001-06-0-037 04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

Lighting track in good order. Sockets and switches in good order.

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

Lighting track in good order. Surface fluorescent light in good order.

Location: 001-06-0-038 Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-06-0-039 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-06-0-040

Location: 001-06-0-041 04 - Lighting Installation

Location: 001-06-0-042 04 - Lighting Installation 04 - Lighting Installation

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 06 - Sockets/Switches

B

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£0

12

0

0 0

0

2021

Sockets and switches in good order.

£200

5

3

0 0

0

2014

CAT II light requires upgrading within the maintenance schedule. Surface fluorescent light in good order.

Location: 001-06-0-043 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

Location: 001-06-0-044 Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-06-0-045 Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-06-0-047 Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-06-0-048

Sample College Physical Condition Survey

Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-06-0-051 04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

Lighting track in good order. Sockets and switches in good order.

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

Lighting track in good order. Sockets and switches in good order.

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

£600

5

3

0 0

0

2014

Location: 001-06-0-052

Location: 001-06-0-053 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-06-0-054

Location: 001-06-0-055 04 - Lighting Installation

B(C)

05 - Emergency Lighting 06 - Sockets/Switches

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

3No. CAT II light requires upgrading within the maintenance schedule. Emergency light in good order. Sockets and switches in good order.

Location: 001-06-0-056 04 - Lighting Installation 04 - Lighting Installation

Sample College Physical Condition Survey

Lighting track in good order. Surface fluorescent light in good order. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 06 - Sockets/Switches

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

12

0

0 0

0

2021

Sockets and switches in good order.

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order. Emergency light in good order.

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

B

£0

12

0

0 0

0

2021

2No. surface fluorescent lights in good order.

04 - Lighting Installation

C

£200

0

2

0 0

0

2009

04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

Fluorescent light over visual display equipment is not suitable and requires upgrading. Lighting track in good order. Sockets and switches in good order.

£0 £0 £200

30 30 5

0 0 3

0 0 0 0 0 0

0 0 0

2039 2039 2014

Incoming cable in good order. MEM switchgear in good order. Surface fluorescent light requires upgrading within the maintenance schedule.

£0

12

0

0 0

0

2021

3No. surface fluorescent lights in good order.

Location: 001-06-0-057

Location: 001-06-0-058 Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-06-0-059 04 - Lighting Installation

Location: 001-06-0-060

Location: 001-06-0-061 01 - Incoming Cable 02 - Main Switchgear 04 - Lighting Installation

B B B(C)

Location: 001-06-0-062 04 - Lighting Installation

Sample College Physical Condition Survey

B

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 05 - Emergency Lighting

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

12

0

0 0

0

2021

Emergency light in good order.

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

3No. surface fluorescent lights in good order. Emergency light in good order.

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B(C)

£200

3

3

0 0

0

2012

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

Location: 001-06-0-063

Location: 001-06-0-064 3No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-06-0-065 3No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-06-0-066 MEM distribution board in good order. 2No. surface fluorescent lights in good order.

Location: 001-06-0-067 MEM distribution board in good order. Tungsten light requires upgrading within the maintenance schedule. Emergency light in good order.

Location: 001-06-0-068 Surface fluorescent light in good order. Emergency light in good order.

Location: 001-06-0-070 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation

06 - Sockets/Switches

B(C)

B

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£400

5

3

0 0

0

2014

2No. tungsten lights require upgrading within the maintenance schedule. Sockets and switches in good order.

£0

12

0

0 0

0

2021

£200

3

3

0 0

0

2012

Surface fluorescent light requires upgrading within the maintenance schedule.

3No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-06-0-071 04 - Lighting Installation

B(C)

Location: 001-06-0-072 04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

Location: 001-06-0-073 3No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-06-0-074 3No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-06-0-075 MEM distribution board in good order. 3No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-06-0-076

Sample College Physical Condition Survey

Surface fluorescent light in good order. Emergency light in good order. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-06-0-077 04 - Lighting Installation

B

£0

12

0

0 0

0

2021

2No. surface fluorescent lights in good order.

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

£400

5

3

0 0

0

2014

B

£0

12

0

0 0

0

2021

2No. tungsten lights require upgrading within the maintenance schedule. Sockets and switches in good order.

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

£400

5

3

0 0

0

2014

Location: 001-06-0-078 04 - Lighting Installation

Location: 001-06-0-079 04 - Lighting Installation

Location: 001-06-0-080 04 - Lighting Installation

06 - Sockets/Switches

B(C)

Location: 001-06-0-082 3No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-06-0-083 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

2No. tungsten lights require upgrading within the maintenance schedule. 2No. surface fluorescent lights in good order.

Location: 001-06-0-084 3No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-06-0-085 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

3No. surface fluorescent lights in good order. Emergency light in good order.

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

B

£0

12

0

0 0

0

2021

8No. surface fluorescent lights in good order.

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

3No. surface fluorescent lights in good order. Emergency light in good order.

B B B

£0 £0 £0

10 10 12

0 0 0

0 0 0 0 0 0

0 0 0

2019 2019 2021

Lighting track in good order. CAT II light in good order. Sockets and switches in good order.

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

B B B

£0 £0 £0

10 10 12

0 0 0

0 0 0 0 0 0

0 0 0

2019 2019 2021

CAT II light in good order. Lighting track in good order. Sockets and switches in good order.

Location: 001-06-0-086 MEM distribution board in good order. 2No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-06-0-088 04 - Lighting Installation

Location: 001-06-0-089

Location: 001-06-0-101 04 - Lighting Installation 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-06-0-102 04 - Lighting Installation

Location: 001-06-0-103 04 - Lighting Installation 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-06-0-104 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

B B B

£0 £0 £0

10 10 12

0 0 0

0 0 0 0 0 0

0 0 0

2019 2019 2021

CAT II light in good order. Lighting track in good order. Sockets and switches in good order.

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

B B B

£0 £0 £0

10 10 12

0 0 0

0 0 0 0 0 0

0 0 0

2019 2019 2021

CAT II light in good order. Lighting track in good order. Sockets and switches in good order.

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

B B B

£0 £0 £0

10 10 12

0 0 0

0 0 0 0 0 0

0 0 0

2019 2019 2021

Lighting track in good order. CAT II light in good order. Sockets and switches in good order.

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

B

£0

12

0

0 0

0

2021

2No. surface fluorescent lights in good order.

Location: 001-06-0-105 04 - Lighting Installation 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-06-0-106 04 - Lighting Installation

Location: 001-06-0-107 04 - Lighting Installation 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-06-0-108 04 - Lighting Installation

Location: 001-06-0-109 04 - Lighting Installation 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-06-0-110 04 - Lighting Installation

Location: 001-06-0-111 04 - Lighting Installation

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-06-0-112 04 - Lighting Installation 04 - Lighting Installation 06 - Sockets/Switches

B B B

£0 £0 £0

10 10 12

0 0 0

0 0 0 0 0 0

0 0 0

2019 2019 2021

Lighting track in good order. CAT II light in good order. Sockets and switches in good order.

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

B B B

£0 £0 £0

10 10 12

0 0 0

0 0 0 0 0 0

0 0 0

2019 2019 2021

CAT II light in good order. Lighting track in good order. Sockets and switches in good order.

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

B B B

£0 £0 £0

10 10 12

0 0 0

0 0 0 0 0 0

0 0 0

2019 2019 2021

Lighting track in good order. CAT II light in good order. Sockets and switches in good order.

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

Location: 001-06-0-113 04 - Lighting Installation

Location: 001-06-0-114 04 - Lighting Installation

Location: 001-06-0-115 04 - Lighting Installation 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-06-0-116 04 - Lighting Installation

Location: 001-06-0-117 04 - Lighting Installation 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-06-0-118 04 - Lighting Installation

Location: 001-06-0-119

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

MEM distribution board in good order. Surface fluorescent light in good order.

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

B B B

£0 £0 £0

10 10 12

0 0 0

0 0 0 0 0 0

0 0 0

2019 2019 2021

Lighting track in good order. CAT II light in good order. Sockets and switches in good order.

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

B

£0

12

0

0 0

0

2021

Sockets and switches in good order.

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

22No. surface fluorescent lights in good order. 4No. emergency lights in good order.

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

£200

3

3

0 0

0

2012

Tungsten light requires upgrading within the maintenance schedule.

Location: 001-06-0-120 04 - Lighting Installation 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-06-0-121 04 - Lighting Installation

Location: 001-06-0-122 04 - Lighting Installation

Location: 001-06-0-123 06 - Sockets/Switches

Location: 001-06-0-124

Location: 001-06-1-001 04 - Lighting Installation

Location: 001-06-1-002 04 - Lighting Installation

Sample College Physical Condition Survey

B(C)

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 06 - Sockets/Switches

B

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£0

12

0

0 0

0

2021

Sockets and switches in good order.

£200

3

3

0 0

0

2012

£0

12

0

0 0

0

2021

Tungsten light requires upgrading within the maintenance schedule. Sockets and switches in good order.

£200

3

3

0 0

0

2012

Location: 001-06-1-003 04 - Lighting Installation

06 - Sockets/Switches

B(C)

B

Location: 001-06-1-004 04 - Lighting Installation

B(C)

Tungsten light requires upgrading within the maintenance schedule. Emergency light in good order.

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B(C)

£200

3

3

0 0

0

2012

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting 06 - Sockets/Switches

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

Location: Lower Ground Square D distribution board in good order. MEM distribution board in good order. Surface fluorescent light in the Care Staff Rest Room requires upgrading within the maintenance schedule. Surface fluorescent lights in good order. Emergency lights in good order. Sockets and switches in good order.

V - Engineering - Fire Alarms

Location: 001-06-0-001 03 - Smoke Detectors

Location: 001-06-0-002 03 - Smoke Detectors Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-06-0-003 03 - Smoke Detectors

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

Location: 001-06-0-004 03 - Smoke Detectors

Location: 001-06-0-005 03 - Smoke Detectors

Location: 001-06-0-007 03 - Smoke Detectors

Location: 001-06-0-008 03 - Smoke Detectors

Location: 001-06-0-009 03 - Smoke Detectors

Location: 001-06-0-010 03 - Smoke Detectors

Location: 001-06-0-011 03 - Smoke Detectors

Location: 001-06-0-015 03 - Smoke Detectors

Location: 001-06-0-016 03 - Smoke Detectors

Location: 001-06-0-017 03 - Smoke Detectors

Location: 001-06-0-018 03 - Smoke Detectors Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-06-0-020 03 - Smoke Detectors

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

Location: 001-06-0-021 03 - Smoke Detectors

Location: 001-06-0-022 03 - Smoke Detectors

Location: 001-06-0-023 03 - Smoke Detectors

Location: 001-06-0-025 03 - Smoke Detectors

Location: 001-06-0-026 03 - Smoke Detectors

Location: 001-06-0-027 03 - Smoke Detectors

Location: 001-06-0-035 03 - Smoke Detectors

Location: 001-06-0-036 03 - Smoke Detectors

Location: 001-06-0-038 03 - Smoke Detectors

Location: 001-06-0-039 03 - Smoke Detectors

Location: 001-06-0-040 03 - Smoke Detectors Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-06-0-041 03 - Smoke Detectors

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

Location: 001-06-0-042 03 - Smoke Detectors

Location: 001-06-0-043 03 - Smoke Detectors

Location: 001-06-0-044 03 - Smoke Detectors

Location: 001-06-0-045 03 - Smoke Detectors

Location: 001-06-0-047 03 - Smoke Detectors

Location: 001-06-0-048 03 - Smoke Detectors

Location: 001-06-0-051 03 - Smoke Detectors

Location: 001-06-0-052 03 - Smoke Detectors

Location: 001-06-0-053 03 - Smoke Detectors

Location: 001-06-0-054 03 - Smoke Detectors

Location: 001-06-0-055 03 - Smoke Detectors Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-06-0-056 03 - Smoke Detectors

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

Smoke detector in good order. Fixfire main panel in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

Location: 001-06-0-057 03 - Smoke Detectors

Location: 001-06-0-058 03 - Smoke Detectors

Location: 001-06-0-059 03 - Smoke Detectors

Location: 001-06-0-060 03 - Smoke Detectors

Location: 001-06-0-061 03 - Smoke Detectors

Location: 001-06-0-062 03 - Smoke Detectors 05 - Fire Main/Zone Panel

Location: 001-06-0-063 03 - Smoke Detectors

Location: 001-06-0-064 03 - Smoke Detectors

Location: 001-06-0-065 03 - Smoke Detectors

Location: 001-06-0-066 03 - Smoke Detectors

Location: 001-06-0-067 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Smoke Detectors

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

Location: 001-06-0-070 03 - Smoke Detectors

Location: 001-06-0-071 03 - Smoke Detectors

Location: 001-06-0-072 03 - Smoke Detectors

Location: 001-06-0-074 03 - Smoke Detectors

Location: 001-06-0-075 03 - Smoke Detectors

Location: 001-06-0-076 03 - Smoke Detectors

Location: 001-06-0-079 03 - Smoke Detectors

Location: 001-06-0-080 03 - Smoke Detectors

Location: 001-06-0-082 03 - Smoke Detectors

Location: 001-06-0-083 03 - Smoke Detectors

Location: 001-06-0-084 03 - Smoke Detectors

Location: 001-06-0-085 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Smoke Detectors

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

Location: 001-06-0-088 03 - Smoke Detectors

Location: 001-06-0-089 03 - Smoke Detectors

Location: 001-06-0-101 03 - Smoke Detectors

Location: 001-06-0-103 03 - Smoke Detectors

Location: 001-06-0-105 03 - Smoke Detectors

Location: 001-06-0-107 03 - Smoke Detectors

Location: 001-06-0-109 03 - Smoke Detectors

Location: 001-06-0-111 03 - Smoke Detectors

Location: 001-06-0-112 03 - Smoke Detectors

Location: 001-06-0-115 03 - Smoke Detectors

Location: 001-06-0-117 03 - Smoke Detectors

Location: 001-06-0-119 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Smoke Detectors

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

3No. smoke detectors in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

03 - Smoke Detectors

B

£0

10

0

0 0

0

2019

03 - Smoke Detectors

B

£0

12

0

0 0

0

2021

Smoke detectors in the Care Staff Rest Room in good order. Smoke detectors in good order.

01 - Sounders

B

£0

12

0

0 0

0

2021

02 - Call Points

B

£0

12

0

0 0

0

2021

Location: 001-06-0-120 03 - Smoke Detectors

Location: 001-06-0-123 03 - Smoke Detectors

Location: 001-06-0-124 03 - Smoke Detectors

Location: 001-06-1-002 03 - Smoke Detectors

Location: 001-06-1-003 03 - Smoke Detectors

Location: 001-06-1-004 03 - Smoke Detectors

Location: Lower Ground Floor

Location: Whole Block

Block Total

Sample College Physical Condition Survey

Fire alarm sounders in good order. Fire alarm call points in good order.

£182,331.00

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Site : Sample College - 001 Block : C Hostel - 07 Facet: 1 - Building A - Building - Physical Structure

Location: Whole Block 01 - General Structure 02 - Foundations 03 - Ground Stability

B B B

£0 £0 £0

40 60 60

0 0 0

0 0 0 0 0 0

0 0 0

2049 2069 2069

Brickwork: Generally sound. Generally sound. Generally sound.

04 - Windows

C

£1,800

0

1

0 0

0

2009

04 - Windows

B(C)

£1,150

1

2

0 0

0

2010

06 - Doors

B(C)

£200

3

3

0 0

0

2012

Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 1 - 4No. Softwood timber - Single: Replace with new located to elevation 1 - 1No. Softwood timber: Redecorate and make good located to elevation 1 - 1No. single.

B - Building - External Fabric

Location: Elevation 01

Location: Elevation 02 02a - Cladding - Attachment

B

£0

8

0

0 0

0

2017

02b - Cladding - Cracking

B

£0

8

0

0 0

0

2017

02c - Cladding - Joints

B

£0

8

0

0 0

0

2017

Sample College Physical Condition Survey

Plastic profiled sheet cladding: Located to elevation 2 (two storey section). Plastic profiled sheet cladding: Located to elevation 2 (two storey section). Plastic profiled sheet cladding: Located to elevation 2 (two storey section).

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

02d - Cladding - Finish

B

£0

8

0

0 0

0

2017

Plastic profiled sheet cladding: Located to elevation 2 (two storey section). Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 2 - 12No. Steel: Need to replace located to elevation 2 - 1No. single.

04 - Windows

C

£5,400

0

1

0 0

0

2009

06 - Doors

C

£1,250

0

1

0 0

0

2009

04 - Windows

C

£4,500

0

1

0 0

0

2009

04 - Windows

B(C)

£2,300

1

2

0 0

0

2010

06 - Doors

B(C)

£800

3

3

0 0

0

2012

C

£2,700

0

1

0 0

0

2009

Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 4 - 6No.

04 - Windows

C

£5,400

0

1

0 0

0

2009

04 - Windows

B(C)

£1,150

1

2

0 0

0

2010

06 - Doors

B(C)

£600

3

3

0 0

0

2012

Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 5 - 12No. Softwood timber - Single: Replace with new located to elevation 5 - 1No. Softwood timber: Redecorate and make good located to elevation 5 - 3No. single.

Location: Elevation 03 Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 3 - 10No. Softwood timber - Single: Replace with new located to elevation 3 - 2No. Softwood timber: Redecorate and make good located to elevation 3 - 4No. single.

Location: Elevation 04 04 - Windows

Location: Elevation 05

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: Whole Block 01a - Masonry - Cracking 01b - Masonry - Spalling 01c - Masonry - Pointing 01d - Masonry - Finish 02a - Cladding - Attachment 02a - Cladding - Attachment 02b - Cladding - Cracking 02c - Cladding - Joints 02d - Cladding - Finish 04 - Windows 06 - Doors

B B B B B B B B B B B

£0 £0 £0 £0 £0 £0 £0 £0 £0 £0 £0

20 20 20 20 6 6 6 6 6 6 6

0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0

2029 2029 2029 2029 2015 2015 2015 2015 2015 2015 2015

Brickwork. Brickwork. Brickwork. Brickwork. Zinc sheet. Zinc sheet. Zinc sheet. Zinc sheet. Zinc sheet. PVCU - Double. Aluminium.

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

C - Building - Internal Fabric

Location: 001-07-0-001 01 - Decorations

02 - Ceiling

B(C)

B

03 - Floor

B(C)

£350

4

3

0 0

0

2013

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

B(C)

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

Location: 001-07-0-002 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

B(C)

Cost to B Rem Life Priority C L

R

Year

£350

2

3

0 0

0

2011

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

6

0

0 0

0

2015

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

Notes

Remedial Action

Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-07-0-003 01 - Decorations

02 - Ceiling

B(C)

B

03 - Floor

B(C)

£350

4

3

0 0

0

2013

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

B(C)

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

£350

4

3

0 0

0

2013

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-07-0-004 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-07-0-004a Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

R

Year

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

£350

4

3

0 0

0

2013

£0

6

0

0 0

0

2015

£650

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

£875

4

3

0 0

0

2013

£0

6

0

0 0

0

2015

B(C)

£260

3

4

0 0

0

2012

02 - Ceiling

C

£100

0

3

0 0

0

2009

03 - Floor

B

£0

6

0

0 0

0

2015

£260

3

4

0 0

0

2012

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

Cost to B Rem Life Priority C L

B B(C)

B

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-07-0-004b 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-07-0-005 01 - Decorations

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Anti-slip vinyl sheet flooring: In good condition.

Location: 001-07-0-006 01 - Decorations

Sample College Physical Condition Survey

B(C)

Redecoration required as part of a regular maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

£350

4

3

0 0

0

2013

£0

8

0

0 0

0

2017

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

£350

4

3

0 0

0

2013

£0

8

0

0 0

0

2017

Notes

Remedial Action

Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-07-0-007 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-07-0-008 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-07-0-009

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling

B(C)

B

Cost to B Rem Life Priority C L

R

Year

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

03 - Floor

B(C)

£350

4

3

0 0

0

2013

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

B(C)

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-07-0-010 01 - Decorations

02 - Ceiling

B

03 - Floor

B(C)

£350

4

3

0 0

0

2013

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

B(C)

£390

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

£525

4

3

0 0

0

2013

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-07-0-011 01 - Decorations

02 - Ceiling 03 - Floor

Sample College Physical Condition Survey

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-07-0-011a 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B B(C)

£130

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£175

2

3

0 0

0

2011

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-07-0-015 01 - Decorations

02 - Ceiling

B(C)

B

03 - Floor

B(C)

£350

4

3

0 0

0

2013

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

B(C)

£520

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-07-0-016 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

08 - Fixed Units

B(C)

B

Cost to B Rem Life Priority C L

R

Year

£700

4

3

0 0

0

2013

£0

8

0

0 0

0

2017

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

Notes

Remedial Action

Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-07-0-017 01 - Decorations

02 - Ceiling

B(C)

B

03 - Floor

B(C)

£350

4

3

0 0

0

2013

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

B(C)

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-07-0-018 01 - Decorations

02 - Ceiling

B

03 - Floor

B(C)

£350

4

3

0 0

0

2013

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-07-0-019 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

Cost to B Rem Life Priority C L

R

Year

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£350

4

3

0 0

0

2013

B(C)

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

£350

4

3

0 0

0

2013

£0

8

0

0 0

0

2017

£520

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

£700

4

3

0 0

0

2013

£0

8

0

0 0

0

2017

B

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition.

Location: 001-07-0-020 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-07-0-021 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-07-0-022

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Cost to B Rem Life Priority C L

R

Year

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

£350

4

3

0 0

0

2013

£0

8

0

0 0

0

2017

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

£350

4

3

0 0

0

2013

£0

8

0

0 0

0

2017

£208

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£280

2

3

0 0

0

2011

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-07-0-023 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-07-0-024 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B B(C)

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-07-0-025 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B B(C)

£390

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£525

2

3

0 0

0

2011

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£104

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£140

4

3

0 0

0

2013

01 - Decorations

B(C)

£130

4

4

0 0

0

2013

02 - Ceiling 03 - Floor

B B(C)

£0 £175

10 3

0 3

0 0 0 0

0 0

2019 2012

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-07-0-026 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition.

Location: 001-07-0-027 Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-07-0-035 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

Cost to B Rem Life Priority C L

R

Year

£130

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£175

4

3

0 0

0

2013

£0

6

0

0 0

0

2015

£156

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£210

4

3

0 0

0

2013

B(C)

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£350

2

3

0 0

0

2011

B B(C)

B

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Fixed units: Sink unit in good condition.

Location: 001-07-0-036 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-07-0-037 01 - Decorations

02 - Ceiling 03 - Floor

B B(C)

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-07-0-038 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Cost to B Rem Life Priority C L

R

Year

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

£350

4

3

0 0

0

2013

£0

8

0

0 0

0

2017

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

£350

4

3

0 0

0

2013

£0

8

0

0 0

0

2017

£520

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

£700

4

3

0 0

0

2013

£0

8

0

0 0

0

2017

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-07-0-039 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-07-0-040 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-07-0-041 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

R

Year

£130

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£175

4

3

0 0

0

2013

B(C)

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

£350

4

3

0 0

0

2013

£0

8

0

0 0

0

2017

B(C)

£260

3

4

0 0

0

2012

02 - Ceiling

C

£100

0

3

0 0

0

2009

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

8

0

0 0

0

2017

02 - Ceiling 03 - Floor

B(C)

Cost to B Rem Life Priority C L

B

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-07-0-042 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-07-0-043 01 - Decorations

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-07-0-044

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling

B(C)

B

Cost to B Rem Life Priority C L

R

Year

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

03 - Floor

B(C)

£350

4

3

0 0

0

2013

08 - Fixed Units

B(C)

£1,250

2

2

0 0

0

2011

B(C)

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

£350

4

3

0 0

0

2013

£0

8

0

0 0

0

2017

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

£350

4

3

0 0

0

2013

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-07-0-045 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-07-0-047 01 - Decorations

02 - Ceiling 03 - Floor

Sample College Physical Condition Survey

B(C)

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£1,250

2

2

0 0

0

2011

Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

B(C)

£130

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

B(C)

£175

2

3

0 0

0

2011

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition.

B(C)

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

Location: 001-07-0-048 01 - Decorations

02 - Ceiling 03 - Floor

B

Location: 001-07-0-051 01 - Decorations

02 - Ceiling

B

03 - Floor

B(C)

£350

4

3

0 0

0

2013

08 - Fixed Units

B(C)

£1,250

2

2

0 0

0

2011

B(C)

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-07-0-052 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

03 - Floor

B(C)

£350

4

3

0 0

0

2013

08 - Fixed Units

B(C)

£1,250

2

2

0 0

0

2011

B(C)

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

Notes

Remedial Action

Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-07-0-053 01 - Decorations

02 - Ceiling

B

03 - Floor

B(C)

£350

4

3

0 0

0

2013

08 - Fixed Units

B(C)

£1,250

2

2

0 0

0

2011

B(C)

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

£350

4

3

0 0

0

2013

£0

8

0

0 0

0

2017

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-07-0-054 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-07-0-055 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Cost to B Rem Life Priority C L

R

Year

£520

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£700

2

3

0 0

0

2011

£0

6

0

0 0

0

2015

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-07-0-056 01 - Decorations

02 - Ceiling

B(C)

B

03 - Floor

B(C)

£350

4

3

0 0

0

2013

08 - Fixed Units

B(C)

£1,250

2

2

0 0

0

2011

B(C)

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£350

2

3

0 0

0

2011

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-07-0-057 01 - Decorations

02 - Ceiling 03 - Floor

05 - Condition of Internal Walls Sample College Physical Condition Survey

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Ceramic wall tiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units

B

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£0

10

0

0 0

0

2019

Sanitary fittings: In good condition.

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-07-0-058 01 - Decorations

02 - Ceiling

B(C)

B

03 - Floor

B(C)

£350

4

3

0 0

0

2013

08 - Fixed Units

B(C)

£1,250

2

2

0 0

0

2011

B(C)

£156

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£210

2

3

0 0

0

2011

£0

6

0

0 0

0

2015

£1,500

4

2

0 0

0

2013

£0

6

0

0 0

0

2015

Location: 001-07-0-059 01 - Decorations

02 - Ceiling 03 - Floor

05 - Condition of Internal Walls

B B(C)

B

08 - Fixed Units

B(C)

08 - Fixed Units

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Ceramic wall tiling: In good condition. Fixed units: Fitted unit requires replacement within the maintenance schedule due to age and level of deterioration. Fixed units: Sluice in good condition.

Location: 001-07-0-060 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling

B(C)

B

Cost to B Rem Life Priority C L

R

Year

£260

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

03 - Floor

B(C)

£350

4

3

0 0

0

2013

08 - Fixed Units

B(C)

£1,250

2

2

0 0

0

2011

01 - Decorations

B(C)

£208

2

4

0 0

0

2011

02 - Ceiling 03 - Floor

B B(C)

£0 £280

6 2

0 3

0 0 0 0

0 0

2015 2011

B(C)

£390

1

4

0 0

0

2010

£0

6

0

0 0

0

2015

B(C)

£525

4

3

0 0

0

2013

B(C)

£312

3

4

0 0

0

2012

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-07-0-061 Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition.

Location: 001-07-0-062 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-07-0-063 01 - Decorations

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02 - Ceiling 03 - Floor

Cost to B Rem Life Priority C L

R

Year

C

£100

0

3

0 0

0

2009

B(C)

£420

4

3

0 0

0

2013

B(C)

£260

3

4

0 0

0

2012

C

£100

0

3

0 0

0

2009

B(C)

£350

4

3

0 0

0

2013

B(C)

£312

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£420

4

3

0 0

0

2013

B(C)

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£350

4

3

0 0

0

2013

Notes

Remedial Action

Suspended ceiling: Replace water damaged tiles. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-07-0-064 01 - Decorations

02 - Ceiling 03 - Floor

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-07-0-065 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-07-0-066 01 - Decorations

02 - Ceiling 03 - Floor

Sample College Physical Condition Survey

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-07-0-067 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

£312

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£420

4

3

0 0

0

2013

B(C)

£208

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£280

4

3

0 0

0

2013

B(C)

£390

3

4

0 0

0

2012

C

£100

0

3

0 0

0

2009

B(C)

£525

4

3

0 0

0

2013

B(C)

£260

3

4

0 0

0

2012

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-07-0-068 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-07-0-069 01 - Decorations

02 - Ceiling 03 - Floor

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-07-0-070 01 - Decorations

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02 - Ceiling 03 - Floor

Cost to B Rem Life Priority C L

R

Year

C

£100

0

3

0 0

0

2009

B(C)

£350

4

3

0 0

0

2013

B(C)

£312

3

4

0 0

0

2012

C

£100

0

3

0 0

0

2009

B(C)

£420

4

3

0 0

0

2013

B(C)

£1,430

3

4

0 0

0

2012

£0

15

0

0 0

0

2024

Notes

Remedial Action

Suspended ceiling: Replace water damaged tiles. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-07-0-071 01 - Decorations

02 - Ceiling 03 - Floor

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-07-0-072 01 - Decorations

02 - Ceiling

B

03 - Floor

B(C)

£1,925

4

3

0 0

0

2013

03 - Floor

B(C)

£1,925

4

3

0 0

0

2013

£0

6

0

0 0

0

2015

£5,000

2

2

0 0

0

2011

05 - Condition of Internal Walls 08 - Fixed Units

Sample College Physical Condition Survey

B B(C)

Redecoration required as part of a regular maintenance schedule. Timber panelling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Ceramic wall tiling: In good condition. Fixed units: Kitchen unit requires replacement within the maintenance schedule due to age and level of deterioration. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-07-0-073 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

£52

4

4

0 0

0

2013

B

£0

6

0

0 0

0

2015

B(C)

£70

4

3

0 0

0

2013

B

£0

10

0

0 0

0

2019

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Sanitary fittings: In good condition.

Location: 001-07-0-074 01 - Decorations

B(C)

£260

4

4

0 0

0

2013

02 - Ceiling 03 - Floor

B B(C)

£0 £350

10 4

0 3

0 0 0 0

0 0

2019 2013

£0

8

0

0 0

0

2017

08 - Fixed Units

B

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Fixed units: Kitchen units in good condition.

Location: 001-07-0-075 01 - Decorations

B(C)

£520

4

4

0 0

0

2013

02 - Ceiling 03 - Floor

B B(C)

£0 £700

10 3

0 3

0 0 0 0

0 0

2019 2012

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-07-0-076

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

Cost to B Rem Life Priority C L

R

Year

B(C)

£312

3

4

0 0

0

2012

C

£100

0

3

0 0

0

2009

B(C)

£420

4

3

0 0

0

2013

B(C)

£1,170

4

4

0 0

0

2013

£0

15

0

0 0

0

2024

B(C)

£1,575

4

3

0 0

0

2013

B(C)

£520

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£700

4

3

0 0

0

2013

B(C)

£312

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-07-0-077 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Timber panelling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition.

Location: 001-07-0-078 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-07-0-079 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£420

4

3

0 0

0

2013

Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

B(C)

£350

4

3

0 0

0

2013

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£104

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£140

2

3

0 0

0

2011

Location: 001-07-0-080 01 - Decorations

02 - Ceiling 03 - Floor

B

Location: 001-07-0-081 01 - Decorations

02 - Ceiling 03 - Floor

B B(C)

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

B(C)

£52

4

4

0 0

0

2013

B

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-07-0-082 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£70

2

3

0 0

0

2011

Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition.

B(C)

£208

4

4

0 0

0

2013

£0

15

0

0 0

0

2024

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Fixed units: Kitchen unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-07-0-083 01 - Decorations

02 - Ceiling

B

03 - Floor

B(C)

£280

2

3

0 0

0

2011

08 - Fixed Units

B(C)

£2,500

1

2

0 0

0

2010

01 - Decorations

B(C)

£468

4

4

0 0

0

2013

02 - Ceiling 03 - Floor

B B(C)

£0 £630

10 2

0 3

0 0 0 0

0 0

2019 2011

B(C)

£312

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

Location: 001-07-0-084 Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition.

Location: 001-07-0-085 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£420

4

3

0 0

0

2013

Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£312

3

4

0 0

0

2012

C

£100

0

3

0 0

0

2009

B(C)

£420

4

3

0 0

0

2013

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£1,430

4

4

0 0

0

2013

£0

6

0

0 0

0

2015

Location: 001-07-0-086 01 - Decorations

02 - Ceiling 03 - Floor

Location: 001-07-0-087 01 - Decorations

02 - Ceiling

B

03 - Floor

B(C)

£1,925

2

3

0 0

0

2011

03 - Floor

B(C)

£1,925

4

3

0 0

0

2013

£0

8

0

0 0

0

2017

£312

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

08 - Fixed Units

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Fixed units: Kitchen units in good condition.

Location: 001-07-0-088 01 - Decorations

02 - Ceiling Sample College Physical Condition Survey

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£420

4

3

0 0

0

2013

Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£130

4

4

0 0

0

2013

C

£150

0

2

0 0

0

2009

B(C)

£175

4

3

0 0

0

2013

£0

10

0

0 0

0

2019

Redecoration required as part of a regular maintenance schedule. Artex ceiling - evidence of water ingress with making good and redecoration required. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Sanitary fittings: In good condition.

Location: 001-07-1-001 01 - Decorations

02 - Ceiling

03 - Floor

08 - Fixed Units

B

Location: 001-07-1-002 01 - Decorations

B(C)

£260

4

4

0 0

0

2013

02 - Ceiling 03 - Floor

B B(C)

£0 £350

10 4

0 3

0 0 0 0

0 0

2019 2013

01 - Decorations

B(C)

£260

4

4

0 0

0

2013

02 - Ceiling 03 - Floor

B B(C)

£0 £350

10 4

0 3

0 0 0 0

0 0

2019 2013

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-07-1-003

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-07-1-004 01 - Decorations

B(C)

£208

4

4

0 0

0

2013

02 - Ceiling 03 - Floor

B B(C)

£0 £280

10 4

0 3

0 0 0 0

0 0

2019 2013

B B B(C)

£0 £0 £500

10 20 2

0 0 3

0 0 0 0 0 0

0 0 0

2019 2029 2011

B B(C)

£0 £150

60 4

0 3

0 0 0 0

0 0

2069 2013

B B B

£0 £0 £0

60 8 8

0 0 0

0 0 0 0 0 0

0 0 0

2069 2017 2017

B B B B

£0 £0 £0 £0

6 6 10 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2015 2019 2015

B B B

£0 £0 £0

20 20 6

0 0 0

0 0 0 0 0 0

0 0 0

2029 2029 2015

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

D - Building - Roof

Location: Roof 01 01a - Attached - Covering 01b - Attached - Sarking 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins

01f - Attached - Purlins 01g - Attached - Guttering 01g - Attached - Guttering

Metal sheet. Metal sheet. Painted timber: Require redecoration. Metal. Timber pier: Requires restaining - located to central courtyard. Timber. Box gutters - Metal. PVCU.

Location: Roof 02 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01i - Attached - Skylights

Sample College Physical Condition Survey

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. Aluminium framed glazed skylights.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: Roof 03 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

01h - Attached - Down Rainwater pipes

B B B B

£0 £0 £0 £0

6 8 15 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2017 2024 2015

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

B B C

£0 £0 £1,000

20 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2029 2029 2009

B

£0

6

0

0 0

0

2015

B B B B

£0 £0 £0 £0

6 8 15 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2017 2024 2015

B B C

£0 £0 £1,000

20 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2029 2029 2009

B

£0

6

0

0 0

0

2015

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

B B B

£0 £0 £0

6 8 15

0 0 0

0 0 0 0 0 0

0 0 0

2015 2017 2024

Concrete tiles. Mineral felt. Lead.

Location: Roof 04 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

01h - Attached - Down Rainwater pipes

Location: Roof 05 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

01h - Attached - Down Rainwater pipes

Cost to B Rem Life Priority C L

R

Year

B

£0

6

0

0 0

0

2015

B B C

£0 £0 £1,000

20 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2029 2029 2009

B

£0

6

0

0 0

0

2015

B B B B

£0 £0 £0 £0

6 8 15 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2017 2024 2015

B B C

£0 £0 £1,000

20 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2029 2029 2009

B

£0

6

0

0 0

0

2015

B B B B

£0 £0 £0 £0

6 8 15 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2017 2024 2015

B B

£0 £0

20 20

0 0

0 0 0 0

0 0

2029 2029

Notes

Remedial Action

Metal sheet coping to brick parapets. Timber. Timber. Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

Location: Roof 06 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

01h - Attached - Down Rainwater pipes

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

Location: Roof 07 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins Sample College Physical Condition Survey

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

01g - Attached - Guttering

C

£1,000

0

2

0 0

0

2009

01h - Attached - Down Rainwater pipes

B

£0

6

0

0 0

0

2015

B B B B

£0 £0 £0 £0

6 8 15 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2017 2024 2015

B B C

£0 £0 £1,000

20 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2029 2029 2009

B

£0

6

0

0 0

0

2015

B B B B

£0 £0 £0 £0

6 8 15 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2017 2024 2015

B B C

£0 £0 £1,000

20 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2029 2029 2009

Notes

Remedial Action

Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

Location: Roof 08 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

01h - Attached - Down Rainwater pipes

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

Location: Roof 09 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

Sample College Physical Condition Survey

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01h - Attached - Down Rainwater pipes

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

6

0

0 0

0

2015

PVCU - Internal.

B B B B

£0 £0 £0 £0

6 8 15 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2017 2024 2015

B B C

£0 £0 £1,000

20 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2029 2029 2009

B

£0

6

0

0 0

0

2015

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

B B B

£0 £0 £0

6 8 6

0 0 0

0 0 0 0 0 0

0 0 0

2015 2017 2015

Mineral felt with stone chippings. Timber. Mineral felt.

B B B

£0 £0 £0

6 8 6

0 0 0

0 0 0 0 0 0

0 0 0

2015 2017 2015

Mineral felt with stone chippings. Timber. Mineral felt.

B B B

£0 £0 £0

6 8 6

0 0 0

0 0 0 0 0 0

0 0 0

2015 2017 2015

Mineral felt with stone chippings. Timber. Mineral felt.

Location: Roof 10 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

01h - Attached - Down Rainwater pipes

Location: Roof 11 02a - Flat - Covering 02b - Flat - Decking 02c - Flat - Flashing

Location: Roof 12 02a - Flat - Covering 02b - Flat - Decking 02c - Flat - Flashing

Location: Roof 13 02a - Flat - Covering 02b - Flat - Decking 02c - Flat - Flashing

Location: Roof 14

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02a - Flat - Covering

B(C)

02b - Flat - Decking 02d - Flat - Parapets 02h - Flat - Down Rainwater pipes 02i - Flat - Skylights

Cost to B Rem Life Priority C L

R

Year

£500

3

2

0 0

0

2012

B B

£0 £0

6 6

0 0

0 0 0 0

0 0

2015 2015

B B

£0 £0

6 6

0 0

0 0 0 0

0 0

2015 2015

£500

3

2

0 0

0

2012

Notes

Remedial Action

Mineral felt: Requires replacing due to age and condition. Timber. Brickwork with metal sheet coping. PVCU. Polycarbonate domed skylights.

Location: Roof 15 02a - Flat - Covering

B(C)

Mineral felt: Requires replacing due to age and condition. Timber. Brickwork with metal sheet coping. PVCU. Polycarbonate domed skylights.

02b - Flat - Decking 02d - Flat - Parapets

B B

£0 £0

6 6

0 0

0 0 0 0

0 0

2015 2015

02h - Flat - Down Rainwater pipes 02i - Flat - Skylights

B B

£0 £0

6 6

0 0

0 0 0 0

0 0

2015 2015

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

Facet: 2 - Engineering I - Engineering - Heating Systems

Location: 001-07-0-001 01 - Heat Emitters

Location: 001-07-0-003 01 - Heat Emitters

Location: 001-07-0-004 01 - Heat Emitters

Location: 001-07-0-004a

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

B(C)

£800

3

3

0 0

0

2012

2No. natural convectors require upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

£0

10

0

0 0

0

2019

Heat emitter with low surface temperature cover in good order.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

Location: 001-07-0-004b 01 - Heat Emitters

Location: 001-07-0-005 01 - Heat Emitters

Location: 001-07-0-006 01 - Heat Emitters

B

Location: 001-07-0-007 01 - Heat Emitters

Location: 001-07-0-008 01 - Heat Emitters

Location: 001-07-0-009 01 - Heat Emitters

Location: 001-07-0-010 01 - Heat Emitters

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-07-0-011 01 - Heat Emitters

B

£0

12

0

0 0

0

2021

Skirting heater in good order.

B

£0

10

0

0 0

0

2019

Heat emitter with low surface temperature cover in good order.

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

£0

12

0

0 0

0

2021

Skirting heater in good order.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

B

£0

12

0

0 0

0

2021

Skirting heater in good order.

B

£0

12

0

0 0

0

2021

Skirting heater in good order.

Location: 001-07-0-011a 01 - Heat Emitters

Location: 001-07-0-015 01 - Heat Emitters

B(C)

Location: 001-07-0-016 01 - Heat Emitters

B

Location: 001-07-0-017 01 - Heat Emitters

Location: 001-07-0-018 01 - Heat Emitters

Location: 001-07-0-020 01 - Heat Emitters

Location: 001-07-0-021 01 - Heat Emitters

Location: 001-07-0-022 01 - Heat Emitters

Location: 001-07-0-023 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

12

0

0 0

0

2021

Skirting heater in good order.

B

£0

10

0

0 0

0

2019

Heat emitter with low surface temperature cover in good order.

B

£0

12

0

0 0

0

2021

Natural convector in good order.

C

£400

0

2

0 0

0

2009

Skirting heater requires replacement.

B

£0

12

0

0 0

0

2021

Natural convector in good order.

B

£0

12

0

0 0

0

2021

Skirting heater in good order.

B

£0

12

0

0 0

0

2021

Skirting heater in good order.

B

£0

12

0

0 0

0

2021

Skirting heater in good order.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

Location: 001-07-0-024 01 - Heat Emitters

Location: 001-07-0-025 01 - Heat Emitters

Location: 001-07-0-036 01 - Heat Emitters

Location: 001-07-0-037 01 - Heat Emitters

Location: 001-07-0-038 01 - Heat Emitters

Location: 001-07-0-039 01 - Heat Emitters

Location: 001-07-0-040 01 - Heat Emitters

Location: 001-07-0-041 01 - Heat Emitters

Location: 001-07-0-042 01 - Heat Emitters

Location: 001-07-0-043 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

B

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£0

10

0

0 0

0

2019

Heat emitter with low surface temperature cover in good order.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

Location: 001-07-0-044 01 - Heat Emitters

Location: 001-07-0-045 01 - Heat Emitters

Location: 001-07-0-047 01 - Heat Emitters

Location: 001-07-0-051 01 - Heat Emitters

Location: 001-07-0-052 01 - Heat Emitters

Location: 001-07-0-053 01 - Heat Emitters

Location: 001-07-0-054 01 - Heat Emitters

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-07-0-055 01 - Heat Emitters

B

£0

10

0

0 0

0

2019

Steel panel radiator in good order.

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

£0

12

0

0 0

0

2021

Natural convector in good order.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

B(C)

£800

3

3

0 0

0

2012

2No. natural convectors require upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

Location: 001-07-0-056 01 - Heat Emitters

B(C)

Location: 001-07-0-059 01 - Heat Emitters

B

Location: 001-07-0-062 01 - Heat Emitters

Location: 001-07-0-064 01 - Heat Emitters

Location: 001-07-0-066 01 - Heat Emitters

Location: 001-07-0-068 01 - Heat Emitters

Location: 001-07-0-071 01 - Heat Emitters

Location: 001-07-0-072 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

Skirting heater in good order. Fan convector in good order.

C

£250

0

2

0 0

0

2009

High efficiency convector with no low surface temperature cover requires replacement.

B

£0

12

0

0 0

0

2021

Skirting heater in good order.

B(C)

£800

3

3

0 0

0

2012

2No. natural convectors require upgrading within the maintenance schedule.

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

B

£0

10

0

0 0

0

2019

Steel panel radiator in good order.

B

£0

10

0

0 0

0

2019

Heat emitter with low surface temperature cover in good order.

B

£0

10

0

0 0

0

2019

Heat emitter with low surface temperature cover in good order.

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

Fan convector in good order. Perimeter heating in good order.

Location: 001-07-0-075 01 - Heat Emitters

Location: 001-07-0-077 01 - Heat Emitters

Location: 001-07-0-078 01 - Heat Emitters

Location: 001-07-0-080 01 - Heat Emitters

Location: 001-07-0-081 01 - Heat Emitters

Location: 001-07-0-084 01 - Heat Emitters

Location: 001-07-0-085 01 - Heat Emitters

Location: 001-07-0-087 01 - Heat Emitters 01 - Heat Emitters

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-07-0-089 01 - Heat Emitters

B(C)

£400

3

3

0 0

0

2012

Natural convector requires upgrading within the maintenance schedule.

01 - Heat Emitters

B(C)

£400

5

3

0 0

0

2014

01 - Heat Emitters

B

£0

10

0

0 0

0

2019

Fan convector require upgrading within the maintenance schedule. Electric heater in good order.

B

£0

12

0

0 0

0

2021

Blending valve in good order.

B

£0

12

0

0 0

0

2021

Blending valve in good order.

B

£0

12

0

0 0

0

2021

Blending valve in good order.

B

£0

12

0

0 0

0

2021

Blending valve in good order.

B

£0

12

0

0 0

0

2021

Blending valve in good order.

B

£0

12

0

0 0

0

2021

Blending valve in good order.

C

£200

0

2

0 0

0

2009

Boxing around pipes smashed by door require replacement.

B

£0

12

0

0 0

0

2021

Blending valve in good order.

Location: Lower Ground

M - Engineering - Hot/Cold Water

Location: 001-07-0-001 03 - Blending Valves

Location: 001-07-0-003 03 - Blending Valves

Location: 001-07-0-004b 03 - Blending Valves

Location: 001-07-0-006 03 - Blending Valves

Location: 001-07-0-024 03 - Blending Valves

Location: 001-07-0-025 03 - Blending Valves

Location: 001-07-0-026 02 - Pipework

Location: 001-07-0-037 03 - Blending Valves Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-07-0-043 03 - Blending Valves

B

£0

12

0

0 0

0

2021

Blending valve in good order.

B

£0

12

0

0 0

0

2021

Blending valve in good order.

B

£0

12

0

0 0

0

2021

Blending valve in good order.

B

£0

12

0

0 0

0

2021

Blending valve in good order.

B

£0

12

0

0 0

0

2021

Blending valve in good order.

B

£0

12

0

0 0

0

2021

Vent Axia extract fan in good order.

B

£0

12

0

0 0

0

2021

Vent Axia extract fan in good order.

B

£0

12

0

0 0

0

2021

Vent Axia extract fan in good order.

B

£0

12

0

0 0

0

2021

Vent Axia extract fan in good order.

B

£0

12

0

0 0

0

2021

Vent Axia extract fan in good order.

Location: 001-07-0-057 03 - Blending Valves

Location: 001-07-0-058 03 - Blending Valves

Location: 001-07-0-060 03 - Blending Valves

Location: 001-07-0-073 03 - Blending Valves P - Engineering - Main Plant

Location: 001-07-0-001 04 - Extract Fans

Location: 001-07-0-002 04 - Extract Fans

Location: 001-07-0-003 04 - Extract Fans

Location: 001-07-0-006 04 - Extract Fans

Location: 001-07-0-011a 04 - Extract Fans

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-07-0-019 04 - Extract Fans

B

£0

12

0

0 0

0

2021

Vent Axia extract fan in good order.

B

£0

12

0

0 0

0

2021

Vent Axia extract fan in good order.

B

£0

12

0

0 0

0

2021

Vent Axia extract fan in good order.

£1,500

3

3

0 0

0

2012

Extract fan requires upgrading within the maintenance schedule.

B

£0

12

0

0 0

0

2021

Vent Axia extract fan in good order.

B

£0

12

0

0 0

0

2021

Vent Axia extract fan in good order.

B

£0

12

0

0 0

0

2021

Vent Axia extract fan in good order.

B

£0

12

0

0 0

0

2021

Vent Axia extract fan in good order.

B

£0

12

0

0 0

0

2021

Vent Axia extract fan in good order.

Location: 001-07-0-024 04 - Extract Fans

Location: 001-07-0-025 04 - Extract Fans

Location: 001-07-0-026 04 - Extract Fans

B(C)

Location: 001-07-0-035 04 - Extract Fans

Location: 001-07-0-037 04 - Extract Fans

Location: 001-07-0-043 04 - Extract Fans

Location: 001-07-0-057 04 - Extract Fans

Location: 001-07-0-058 04 - Extract Fans

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-07-0-060 04 - Extract Fans

B

£0

12

0

0 0

0

2021

Vent Axia extract fan in good order.

B

£0

12

0

0 0

0

2021

Vent Axia extract fan in good order.

B

£0

12

0

0 0

0

2021

Vent Axia extract fan in good order.

B

£0

12

0

0 0

0

2021

Vent Axia extract fan in good order.

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

Location: 001-07-0-072 04 - Extract Fans

Location: 001-07-0-077 04 - Extract Fans

Location: 001-07-0-087 04 - Extract Fans R - Engineering - Electrical

Location: 001-07-0-001

Location: 001-07-0-002 Surface fluorescent light in good order. Emergency light in good order.

Location: 001-07-0-003

Sample College Physical Condition Survey

Surface fluorescent light in good order. Lighting track in good order. Sockets and switches in good order.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-07-0-004 04 - Lighting Installation

C

£200

0

2

0 0

0

2009

Tungsten light requires replacement. Surface fluorescent light in good order. Sockets and switches in good order.

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

2No. surface fluorescent lights in good order. Emergency light in good order.

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

Location: 001-07-0-004a 2No. surface fluorescent lights in good order. Sockets and switches in good order.

Location: 001-07-0-004b 2No. surface fluorescent lights in good order. Sockets and switches in good order.

Location: 001-07-0-005 04 - Lighting Installation

Location: 001-07-0-006

Location: 001-07-0-007 Surface fluorescent light in good order. Lighting track in good order. Sockets and switches in good order.

Location: 001-07-0-008 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-07-0-009 Surface fluorescent light in good order. Lighting track in good order. Sockets and switches in good order.

Location: 001-07-0-010 Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-07-0-011 Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-07-0-011a 04 - Lighting Installation

Location: 001-07-0-015

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-07-0-016 04 - Lighting Installation

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order. Lighting track in good order. Sockets and switches in good order.

Location: 001-07-0-017 Surface fluorescent light in good order. Lighting track in good order. Sockets and switches in good order.

Location: 001-07-0-018 Surface fluorescent light in good order. Lighting track in good order. Sockets and switches in good order.

Location: 001-07-0-019 MEM distribution board in good order. Surface fluorescent light in good order.

Location: 001-07-0-020 Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-07-0-021 04 - Lighting Installation Sample College Physical Condition Survey

Surface fluorescent light in good order. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation 06 - Sockets/Switches

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

Lighting track in good order. Sockets and switches in good order.

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

B

£0

12

0

0 0

0

2021

2No. surface fluorescent lights in good order.

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

MEM distribution board in good order. Surface fluorescent light in good order. Emergency light in good order.

Location: 001-07-0-022

Location: 001-07-0-023 Surface fluorescent light in good order. Lighting track in good order. Sockets and switches in good order.

Location: 001-07-0-024 Surface fluorescent light in good order. Emergency light in good order.

Location: 001-07-0-025 04 - Lighting Installation

Location: 001-07-0-026 04 - Lighting Installation

Location: 001-07-0-027

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-07-0-035 04 - Lighting Installation

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order. Emergency light in good order.

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

B

£0

12

0

0 0

0

2021

Location: 001-07-0-036 04 - Lighting Installation

Location: 001-07-0-037

Location: 001-07-0-038 Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-07-0-039 Surface fluorescent light in good order. Lighting track in good order. Sockets and switches in good order.

Location: 001-07-0-040 Surface fluorescent light in good order. Lighting track in good order. Sockets and switches in good order.

Location: 001-07-0-041 04 - Lighting Installation Sample College Physical Condition Survey

Surface fluorescent light in good order. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-07-0-042 04 - Lighting Installation

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order. Lighting track in good order. Sockets and switches in good order.

Location: 001-07-0-043 Surface fluorescent light in good order. Emergency light in good order.

Location: 001-07-0-044 Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-07-0-045 Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-07-0-047 Surface fluorescent light in good order. Lighting track in good order. Sockets and switches in good order.

Location: 001-07-0-048 04 - Lighting Installation Sample College Physical Condition Survey

Surface fluorescent light in good order. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 05 - Emergency Lighting

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

12

0

0 0

0

2021

Emergency light in good order.

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

£200

5

3

0 0

0

2014

£0

12

0

0 0

0

2021

Location: 001-07-0-051

Location: 001-07-0-052 Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-07-0-053 Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-07-0-054 Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-07-0-055 04 - Lighting Installation

06 - Sockets/Switches

Sample College Physical Condition Survey

B(C)

B

CAT II light requires upgrading within the maintenance schedule. Sockets and switches in good order.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-07-0-056 04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

Lighting track in good order. Surface fluorescent light in good order. Sockets and switches in good order.

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order. Emergency light in good order.

£30,000

5

3

0 0

0

2014

Location: 001-07-0-057 Surface fluorescent light in good order. Emergency light in good order.

Location: 001-07-0-058 Surface fluorescent light in good order. Emergency light in good order.

Location: 001-07-0-059 04 - Lighting Installation

Location: 001-07-0-060

Location: 001-07-0-061 01 - Incoming Cable

B(C)

02 - Main Switchgear 03 - Distribution Boards

B B

£0 £0

30 20

0 0

0 0 0 0

0 0

2039 2029

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

Incoming cable is cloth covered and requires upgrading within the maintenance schedule. MEM switchgear in good order. MEM distribution board in good order. Surface fluorescent light in good order.

Location: 001-07-0-062 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

B

£0

12

0

0 0

0

2021

Notes

Remedial Action

3No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-07-0-063 3No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-07-0-064 3No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-07-0-065 3No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-07-0-066 MEM distribution board in good order. 2No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-07-0-067 3No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-07-0-068 04 - Lighting Installation

3No. surface fluorescent lights in good order.

Location: 001-07-0-069 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

3No. surface fluorescent lights in good order. Emergency light in good order.

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order. Sockets and switches in good order.

04 - Lighting Installation

C

£400

0

2

0 0

0

2009

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

Location: 001-07-0-070 3No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-07-0-071 MEM distribution board in good order. Surface fluorescent light in good order.

Location: 001-07-0-072 04 - Lighting Installation

Location: 001-07-0-073 04 - Lighting Installation

Location: 001-07-0-074

Location: 001-07-0-075 2No. tungsten lights require replacement. Sockets and switches in good order.

Location: 001-07-0-076

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

3No. surface fluorescent lights in good order. Emergency light in good order.

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

06 - Sockets/Switches

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

B

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

Location: 001-07-0-077 Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-07-0-078 3No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-07-0-079 3No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-07-0-080 MEM distribution board in good order. 2No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-07-0-081 04 - Lighting Installation

Location: 001-07-0-082 04 - Lighting Installation

Location: 001-07-0-083

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation

B

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£0

12

0

0 0

0

2021

Surface fluorescent light in good order.

£400

5

3

0 0

0

2014

B

£0

12

0

0 0

0

2021

2No. CAT II lights require upgrading within the maintenance schedule. Sockets and switches in good order.

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

CAT II light in good order. Sockets and switches in good order.

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

3No. surface fluorescent lights in good order. Emergency light in good order.

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

£400

5

3

0 0

0

2014

£0

12

0

0 0

0

2021

Location: 001-07-0-084 04 - Lighting Installation

06 - Sockets/Switches

B(C)

Location: 001-07-0-085 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-07-0-086

Location: 001-07-0-087 Surface fluorescent light in good order. Emergency light in good order.

Location: 001-07-0-088 3No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-07-0-089 04 - Lighting Installation

06 - Sockets/Switches

Sample College Physical Condition Survey

B(C)

B

2No. CAT II lights require upgrading within the maintenance schedule. Sockets and switches in good order.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: Lower Ground 02 - Main Switchgear 03 - Distribution Boards

B B

£0 £0

20 20

0 0

0 0 0 0

0 0

2029 2029

MEM switchgear in good order. MEM distribution board in good order. CAT II lights in good order. Surface fluorescent lights in good order. Emergency lights in good order. Sockets and switches in good order.

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2019 2019

05 - Emergency Lighting 06 - Sockets/Switches

B B

£0 £0

10 15

0 0

0 0 0 0

0 0

2019 2024

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

V - Engineering - Fire Alarms

Location: 001-07-0-001 03 - Smoke Detectors

Location: 001-07-0-003 03 - Smoke Detectors

Location: 001-07-0-004 03 - Smoke Detectors

Location: 001-07-0-004a 03 - Smoke Detectors

Location: 001-07-0-004b 03 - Smoke Detectors

Location: 001-07-0-005 03 - Smoke Detectors

Location: 001-07-0-007 03 - Smoke Detectors

Location: 001-07-0-008 03 - Smoke Detectors Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-07-0-009 03 - Smoke Detectors

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

Location: 001-07-0-010 03 - Smoke Detectors

Location: 001-07-0-011 03 - Smoke Detectors

Location: 001-07-0-015 03 - Smoke Detectors

Location: 001-07-0-016 03 - Smoke Detectors

Location: 001-07-0-017 03 - Smoke Detectors

Location: 001-07-0-018 03 - Smoke Detectors

Location: 001-07-0-019 03 - Smoke Detectors

Location: 001-07-0-020 03 - Smoke Detectors

Location: 001-07-0-021 03 - Smoke Detectors

Location: 001-07-0-022 03 - Smoke Detectors

Location: 001-07-0-023 03 - Smoke Detectors Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-07-0-026 03 - Smoke Detectors

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

Location: 001-07-0-035 03 - Smoke Detectors

Location: 001-07-0-036 03 - Smoke Detectors

Location: 001-07-0-038 03 - Smoke Detectors

Location: 001-07-0-039 03 - Smoke Detectors

Location: 001-07-0-040 03 - Smoke Detectors

Location: 001-07-0-041 03 - Smoke Detectors

Location: 001-07-0-042 03 - Smoke Detectors

Location: 001-07-0-043 03 - Smoke Detectors

Location: 001-07-0-044 03 - Smoke Detectors

Location: 001-07-0-045 03 - Smoke Detectors

Location: 001-07-0-047 03 - Smoke Detectors Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-07-0-048 03 - Smoke Detectors

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

Location: 001-07-0-051 03 - Smoke Detectors

Location: 001-07-0-052 03 - Smoke Detectors

Location: 001-07-0-053 03 - Smoke Detectors

Location: 001-07-0-054 03 - Smoke Detectors

Location: 001-07-0-055 03 - Smoke Detectors

Location: 001-07-0-056 03 - Smoke Detectors

Location: 001-07-0-057 03 - Smoke Detectors

Location: 001-07-0-058 03 - Smoke Detectors

Location: 001-07-0-059 03 - Smoke Detectors

Location: 001-07-0-060 03 - Smoke Detectors

Location: 001-07-0-061 03 - Smoke Detectors Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-07-0-063 03 - Smoke Detectors

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

Location: 001-07-0-064 03 - Smoke Detectors

Location: 001-07-0-065 03 - Smoke Detectors

Location: 001-07-0-066 03 - Smoke Detectors

Location: 001-07-0-067 03 - Smoke Detectors

Location: 001-07-0-068 03 - Smoke Detectors

Location: 001-07-0-069 03 - Smoke Detectors

Location: 001-07-0-070 03 - Smoke Detectors

Location: 001-07-0-072 03 - Smoke Detectors

Location: 001-07-0-074 03 - Smoke Detectors

Location: 001-07-0-075 03 - Smoke Detectors

Location: 001-07-0-076 03 - Smoke Detectors Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-07-0-078 03 - Smoke Detectors

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

12

0

0 0

0

2021

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detectors in good order.

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

Sounders in good order. Call points in good order.

Location: 001-07-0-079 03 - Smoke Detectors

Location: 001-07-0-080 03 - Smoke Detectors

Location: 001-07-0-083 03 - Smoke Detectors

Location: 001-07-0-084 03 - Smoke Detectors

Location: 001-07-0-085 03 - Smoke Detectors

Location: 001-07-0-086 03 - Smoke Detectors

Location: 001-07-0-087 03 - Smoke Detectors

Location: 001-07-0-088 03 - Smoke Detectors

Location: Lower Ground 03 - Smoke Detectors

Location: Whole Block 01 - Sounders 02 - Call Points Block Total Sample College Physical Condition Survey

£177,240.00 January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Site : Sample College - 001 Block : A Hostel - 08 Facet: 1 - Building A - Building - Physical Structure

Location: Whole Block 01 - General Structure 02 - Foundations 03 - Ground Stability 05 - External Fire Escape

B B B B(C)

£0 £0 £0 £100

40 60 60 4

0 0 0 3

0 0 0 0

0 0 0 0

0 0 0 0

2049 2069 2069 2013

Brickwork: Generally sound. Generally sound. Generally sound. Cantilevered concrete staircase with a painted metal handrail: Cost allows for redecoration of metal railings.

B - Building - External Fabric

Location: Elevation 01 04 - Windows

C

£2,700

0

1

0 0

0

2009

Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 1 - 6No.

06 - Doors

B

£0

8

0

0 0

0

2017

Aluminium: Located to elevation 1.

04 - Windows

C

£4,950

0

1

0 0

0

2009

04 - Windows

B(C)

£2,300

1

2

0 0

0

2010

Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 2 - 11No. Softwood timber - Single: Replace with new located to elevation 2 - 2No.

Location: Elevation 02

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 06 - Doors

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£800

3

3

0 0

0

2012

Softwood timber: Redecorate and make good located to elevation 2 - 4No. single.

01a - Masonry - Cracking

C

£500

0

1

0 0

0

2009

02a - Cladding - Attachment

C

£800

0

1

0 0

0

2009

04 - Windows

C

£6,750

0

1

0 0

0

2009

06 - Doors

C

£1,250

0

1

0 0

0

2009

Brickwork: Evidence of cracking, with making good and monitoring for further crack expansion - located to elevation 3. Zinc sheets: 2 panels have dismounted with re-attachment and making good required. Located to elevation 3. Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 3 - 15No. Steel: Need to replace located to elevation 3 - 1No. single.

02a - Cladding - Attachment

B

£0

8

0

0 0

0

2017

04 - Windows

C

£150

0

1

0 0

0

2009

B(C)

£200

3

3

0 0

0

2012

£3,600

0

1

0 0

0

2009

Location: Elevation 03

Location: Elevation 04

06 - Doors

Softwood timber boarding: Located to elevation 4 (where extension joins original building). Aluminium - Double: Evidence that the seal has failed with making good required - located to elevation 4. Softwood timber: Redecorate and make good located to elevation 4 - 1No. single.

Location: Elevation 05 04 - Windows

Sample College Physical Condition Survey

C

Steel - Single: Replace crittal steel windows with more suitable alternative located to elevation 5 - 8No. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

04 - Windows

B(C)

£2,300

1

2

0 0

0

2010

Softwood timber - Single: Replace with new located to elevation 5 - 2No.

06 - Doors

B(C)

£200

3

3

0 0

0

2012

Softwood timber: Redecorate and make good located to elevation 5 - 1No. single.

04 - Windows

B(C)

£4,600

1

2

0 0

0

2010

04 - Windows

B(C)

£36,400

1

2

0 0

0

2010

06 - Doors

B(C)

£1,000

3

3

0 0

0

2012

Softwood timber - Single: Replace with new located to elevation 6 - 4No. Aluminium - Single: Replace with new located to elevation 6 56No. Softwood timber: Redecorate and make good located to elevation 6 - 2No. single & 2No. double.

Location: Elevation 06

Location: Whole Block 01b - Masonry - Spalling

B

£0

20

0

0 0

0

2029

Brickwork.

01c - Masonry - Pointing 01d - Masonry - Finish

B B

£0 £0

20 20

0 0

0 0 0 0

0 0

2029 2029

Brickwork. Brickwork.

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

02b - Cladding - Cracking

B

£0

6

0

0 0

0

2015

Zinc sheets.

02b - Cladding - Cracking

B

£0

8

0

0 0

0

2017

Softwood timber boarding.

02c - Cladding - Joints 02c - Cladding - Joints 02d - Cladding - Finish 02d - Cladding - Finish 04 - Windows

B B B B B

£0 £0 £0 £0 £0

6 8 6 6 6

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2015 2017 2015 2015 2015

Zinc sheets. Softwood timber boarding. Zinc sheets. Softwood timber boarding. PVCU - Double.

B(C)

£260

1

4

0 0

0

2010

C

£250

0

2

0 0

0

2009

03 - Floor

B(C)

£350

1

3

0 0

0

2010

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

Redecoration required as part of a regular maintenance schedule. Artex ceiling: Make good and redecorate water ingress to Artex ceiling. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

C - Building - Internal Fabric

Location: 001-08-0-001 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-002 01 - Decorations

B(C)

£260

1

4

0 0

0

2010

02 - Ceiling 03 - Floor

B B(C)

£0 £350

6 1

0 3

0 0 0 0

0 0

2015 2010

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

B(C)

£260

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-08-0-003 01 - Decorations

02 - Ceiling 03 - Floor

B B

£0 £0

6 6

0 0

0 0 0 0

0 0

2015 2015

08 - Fixed Units

B

£0

6

0

0 0

0

2015

B(C)

£520

3

4

0 0

0

2012

02 - Ceiling

C

£100

0

3

0 0

0

2009

03 - Floor

B

£0

6

0

0 0

0

2015

£260

1

4

0 0

0

2010

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Fixed units: Kitchen units in good condition.

Location: 001-08-0-004 01 - Decorations

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Anti-slip vinyl sheet flooring: In good condition.

Location: 001-08-0-006 01 - Decorations

02 - Ceiling Sample College Physical Condition Survey

B(C)

B

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

03 - Floor

B(C)

£350

1

3

0 0

0

2010

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

01 - Decorations

B(C)

£260

1

4

0 0

0

2010

02 - Ceiling 03 - Floor

B B(C)

£0 £350

6 1

0 3

0 0 0 0

0 0

2015 2010

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

01 - Decorations

B(C)

£442

3

4

0 0

0

2012

02 - Ceiling 03 - Floor

B B(C)

£0 £595

6 1

0 3

0 0 0 0

0 0

2015 2010

B(C)

£78

3

4

0 0

0

2012

B

£0

6

0

0 0

0

2015

Notes

Remedial Action

Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-08-0-007 Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-08-0-008 Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-008a 01 - Decorations

02 - Ceiling Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

03 - Floor

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

Notes

Remedial Action

Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-08-0-009 01 - Decorations

B(C)

£260

1

4

0 0

0

2010

02 - Ceiling 03 - Floor

B B(C)

£0 £350

6 1

0 3

0 0 0 0

0 0

2015 2010

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

01 - Decorations

B(C)

£442

3

4

0 0

0

2012

02 - Ceiling 03 - Floor

B B(C)

£0 £595

6 1

0 3

0 0 0 0

0 0

2015 2010

C

£500

0

2

0 0

0

2009

B(C)

£78

3

4

0 0

0

2012

B

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-08-0-010

05 - Condition of Internal Walls

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Plaster - make good and redecorate damage to plaster walls.

Location: 001-08-0-010a 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

03 - Floor

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

Notes

Remedial Action

Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-08-0-011 01 - Decorations

B(C)

£260

1

4

0 0

0

2010

02 - Ceiling 03 - Floor

B B(C)

£0 £350

6 1

0 3

0 0 0 0

0 0

2015 2010

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

01 - Decorations

B(C)

£130

4

4

0 0

0

2013

02 - Ceiling

B(C)

£600

2

2

0 0

0

2011

03 - Floor

B(C)

£175

1

3

0 0

0

2010

B(C)

£260

1

4

0 0

0

2010

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-08-0-012 Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-013 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

03 - Floor

B(C)

£350

1

3

0 0

0

2010

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

01 - Decorations

B(C)

£260

1

4

0 0

0

2010

02 - Ceiling 03 - Floor

B B(C)

£0 £350

6 1

0 3

0 0 0 0

0 0

2015 2010

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

B(C)

£260

3

4

0 0

0

2012

£0

8

0

0 0

0

2017

£350

3

3

0 0

0

2012

£0

8

0

0 0

0

2017

Notes

Remedial Action

Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-08-0-014 Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-08-0-016 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-08-0-017

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Cost to B Rem Life Priority C L

R

Year

£260

3

4

0 0

0

2012

£0

8

0

0 0

0

2017

£350

3

3

0 0

0

2012

£0

8

0

0 0

0

2017

£260

3

4

0 0

0

2012

£0

8

0

0 0

0

2017

£350

3

3

0 0

0

2012

£0

8

0

0 0

0

2017

£260

3

4

0 0

0

2012

£0

8

0

0 0

0

2017

£350

3

3

0 0

0

2012

£0

8

0

0 0

0

2017

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-08-0-018 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-08-0-019 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-08-0-020 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Cost to B Rem Life Priority C L

R

Year

£260

3

4

0 0

0

2012

£0

8

0

0 0

0

2017

£350

3

3

0 0

0

2012

£0

8

0

0 0

0

2017

£260

3

4

0 0

0

2012

£0

8

0

0 0

0

2017

£350

3

3

0 0

0

2012

£0

8

0

0 0

0

2017

£260

3

4

0 0

0

2012

£0

8

0

0 0

0

2017

£350

3

3

0 0

0

2012

£0

8

0

0 0

0

2017

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-08-0-021 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-08-0-022 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-08-0-023 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

01 - Decorations

B(C)

£260

1

4

0 0

0

2010

02 - Ceiling 03 - Floor

B B(C)

£0 £350

6 1

0 3

0 0 0 0

0 0

2015 2010

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

01 - Decorations

B(C)

£260

1

4

0 0

0

2010

02 - Ceiling 03 - Floor

B B(C)

£0 £350

6 1

0 3

0 0 0 0

0 0

2015 2010

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

01 - Decorations

B(C)

£260

1

4

0 0

0

2010

02 - Ceiling 03 - Floor

B B(C)

£0 £350

6 1

0 3

0 0 0 0

0 0

2015 2010

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-08-0-024 Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-08-0-025

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£1,250

1

2

0 0

0

2010

Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

01 - Decorations

B(C)

£260

1

4

0 0

0

2010

02 - Ceiling 03 - Floor

B B(C)

£0 £350

6 1

0 3

0 0 0 0

0 0

2015 2010

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

01 - Decorations

B(C)

£156

3

4

0 0

0

2012

02 - Ceiling 03 - Floor

B B(C)

£0 £210

10 1

0 3

0 0 0 0

0 0

2019 2010

01 - Decorations

B(C)

£468

3

4

0 0

0

2012

02 - Ceiling 03 - Floor

B B(C)

£0 £630

10 1

0 3

0 0 0 0

0 0

2019 2010

Location: 001-08-0-026

Location: 001-08-0-027a Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-027b

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-027c 01 - Decorations

B(C)

£260

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

02 - Ceiling 03 - Floor

B B(C)

£0 £350

10 1

0 3

0 0 0 0

0 0

2019 2010

B(C)

£78

3

4

0 0

0

2012

B B

£0 £0

10 6

0 0

0 0 0 0

0 0

2019 2015

£1,500

2

2

0 0

0

2011

£0

6

0

0 0

0

2015

Cupboard fit for purpose.

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-08-0-027d 01 - Decorations

02 - Ceiling 03 - Floor 08 - Fixed Units

B(C)

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: Require replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-08-0-027e 12 - Comments

B

Location: 001-08-0-028 01 - Decorations

B(C)

£260

1

4

0 0

0

2010

02 - Ceiling 03 - Floor

B B(C)

£0 £350

6 1

0 3

0 0 0 0

0 0

2015 2010

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-029 01 - Decorations

02 - Ceiling

B(C)

B

£260

3

4

0 0

0

2012

£0

8

0

0 0

0

2017

03 - Floor

B(C)

£350

1

3

0 0

0

2010

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

01 - Decorations

B(C)

£260

1

4

0 0

0

2010

02 - Ceiling 03 - Floor

B B(C)

£0 £350

6 1

0 3

0 0 0 0

0 0

2015 2010

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

01 - Decorations

B(C)

£260

1

4

0 0

0

2010

02 - Ceiling 03 - Floor

B B(C)

£0 £350

6 1

0 3

0 0 0 0

0 0

2015 2010

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-08-0-030 Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-08-0-031

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£1,250

1

2

0 0

0

2010

Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

B(C)

£260

4

4

0 0

0

2013

£0

8

0

0 0

0

2017

B(C)

£350

4

3

0 0

0

2013

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£260

3

4

0 0

0

2012

£0

8

0

0 0

0

2017

£350

3

3

0 0

0

2012

£0

8

0

0 0

0

2017

Location: 001-08-0-032 01 - Decorations

02 - Ceiling 03 - Floor

B

Location: 001-08-0-033 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed unit: Sink unit in good condition.

Location: 001-08-0-034 01 - Decorations

B(C)

£260

1

4

0 0

0

2010

02 - Ceiling 03 - Floor

B B(C)

£0 £350

6 1

0 3

0 0 0 0

0 0

2015 2010

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£1,250

1

2

0 0

0

2010

Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

01 - Decorations

B(C)

£260

3

4

0 0

0

2012

02 - Ceiling 03 - Floor

B B(C)

£0 £350

10 1

0 3

0 0 0 0

0 0

2019 2010

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-08-0-034b

08 - Fixed Units

B

Location: 001-08-0-035 01 - Decorations

B(C)

£260

1

4

0 0

0

2010

02 - Ceiling 03 - Floor

B B(C)

£0 £350

6 1

0 3

0 0 0 0

0 0

2015 2010

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

B(C)

£260

1

4

0 0

0

2010

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-08-0-036 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

03 - Floor

B(C)

£350

1

3

0 0

0

2010

08 - Fixed Units

B(C)

£1,250

1

2

0 0

0

2010

B(C)

£260

3

4

0 0

0

2012

Notes

Remedial Action

Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit requires replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-08-0-037 01 - Decorations

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

B

£0

6

0

0 0

0

2015

Electrical Switch Room - fit for purpose.

B(C)

£130

1

4

0 0

0

2010

C

£50

0

3

0 0

0

2009

03 - Floor

B(C)

£175

2

3

0 0

0

2011

05 - Condition of Internal Walls

B(C)

£175

2

2

0 0

0

2011

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Ceramic wall tiling: Requires replacement within the maintenance schedule.

Location: 001-08-0-038 12 - Comments

Location: 001-08-0-039 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units

B(C)

08 - Fixed Units

B

Cost to B Rem Life Priority C L

R

Year

£1,250

2

2

0 0

0

2011

£0

6

0

0 0

0

2015

£260

3

4

0 0

0

2012

Notes

Remedial Action

Fixed units: Fitted units require replacement within the maintenance schedule due to age and level of deterioration. Fixed units: Sluice in good condition.

Location: 001-08-0-040 01 - Decorations

B(C)

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

£350

2

2

0 0

0

2011

£0

10

0

0 0

0

2019

05 - Condition of Internal Walls

08 - Fixed Units

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: Requires replacement within the maintenance schedule. Sanitary fittings: In good condition.

Location: 001-08-0-041 01 - Decorations

B(C)

£312

4

4

0 0

0

2013

02 - Ceiling

B(C)

£1,440

2

2

0 0

0

2011

03 - Floor

B(C)

£420

1

3

0 0

0

2010

B(C)

£650

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-042 01 - Decorations

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

02 - Ceiling

B(C)

£1,625

4

2

0 0

0

2013

03 - Floor

B(C)

£875

1

3

0 0

0

2010

B(C)

£182

3

4

0 0

0

2012

Notes

Remedial Action

Timber panelling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-043 01 - Decorations

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

£245

2

2

0 0

0

2011

£0

10

0

0 0

0

2019

05 - Condition of Internal Walls

08 - Fixed Units

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: Requires replacement within the maintenance schedule. Sanitary fittings: In good condition.

Location: 001-08-0-044 01 - Decorations

B(C)

£442

4

4

0 0

0

2013

02 - Ceiling

B(C)

£2,040

2

2

0 0

0

2011

03 - Floor

B(C)

£595

1

3

0 0

0

2010

B(C)

£312

4

4

0 0

0

2013

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-045 01 - Decorations

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

02 - Ceiling

B(C)

£1,440

2

2

0 0

0

2011

03 - Floor

B(C)

£420

1

3

0 0

0

2010

B(C)

£208

3

4

0 0

0

2012

Notes

Remedial Action

Suspended ceiling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-046 01 - Decorations

02 - Ceiling 03 - Floor

B B

£0 £0

6 6

0 0

0 0 0 0

0 0

2015 2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

B(C)

£78

3

4

0 0

0

2012

02 - Ceiling 03 - Floor

B B

£0 £0

6 6

0 0

0 0 0 0

0 0

2015 2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£130

3

4

0 0

0

2012

£0 £0

6 6

0 0

0 0 0 0

0 0

2015 2015

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Vinyl sheet flooring: In good condition. Fixed units: Kitchen units in good condition.

Location: 001-08-0-047 01 - Decorations

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-08-0-048 01 - Decorations

02 - Ceiling 03 - Floor

Sample College Physical Condition Survey

B(C)

B B

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£1,750

3

2

0 0

0

2012

Fixed units: Laundry units require replacement within the maintenance schedule due to age and level of deterioration.

01 - Decorations

B(C)

£442

3

4

0 0

0

2012

02 - Ceiling 03 - Floor

B B(C)

£0 £595

6 1

0 3

0 0 0 0

0 0

2015 2010

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£260

3

4

0 0

0

2012

£0

6

0

0 0

0

2015

£350

3

3

0 0

0

2012

£0

6

0

0 0

0

2015

Location: 001-08-0-049

Location: 001-08-0-050 01 - Decorations

02 - Ceiling 03 - Floor

05 - Condition of Internal Walls

B B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Ceramic wall tiling: In good condition.

Location: 001-08-0-051 01 - Decorations

B(C)

£650

3

4

0 0

0

2012

02 - Ceiling

B(C)

£1,625

4

2

0 0

0

2013

03 - Floor

B(C)

£875

1

3

0 0

0

2010

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Timber panelling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-052 01 - Decorations

B(C)

£442

4

4

0 0

0

2013

02 - Ceiling

B(C)

£2,040

2

2

0 0

0

2011

03 - Floor

B(C)

£595

1

3

0 0

0

2010

01 - Decorations

C

£104

0

4

0 0

0

2009

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

10

0

0 0

0

2019

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£260

1

4

0 0

0

2010

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-053 Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-08-0-054 01 - Decorations

B(C)

02 - Ceiling

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

C

£250

0

2

0 0

0

2009

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Plaster - make good and redecorate damage to plaster walls.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units

B

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£0

10

0

0 0

0

2019

Sanitary fittings: In good condition.

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-055 01 - Decorations

B(C)

£130

3

4

0 0

0

2012

02 - Ceiling 03 - Floor

B B(C)

£0 £175

10 4

0 3

0 0 0 0

0 0

2019 2013

01 - Decorations

B(C)

£312

4

4

0 0

0

2013

02 - Ceiling

B(C)

£1,440

2

2

0 0

0

2011

03 - Floor

B(C)

£420

1

3

0 0

0

2010

01 - Decorations

B(C)

£104

3

4

0 0

0

2012

02 - Ceiling

B(C)

£480

4

2

0 0

0

2013

03 - Floor

C

£140

0

3

0 0

0

2009

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

6

0

0 0

0

2015

Location: 001-08-0-056 Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-057

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Anti-slip vinyl sheet flooring: Requires replacement due to age and condition. Ceramic wall tiling: In good condition. Fixed units: Sink unit in good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-058 01 - Decorations

B(C)

£208

3

4

0 0

0

2012

02 - Ceiling 03 - Floor

B B(C)

£0 £280

10 2

0 3

0 0 0 0

0 0

2019 2011

08 - Fixed Units

B(C)

£2,250

5

2

0 0

0

2014

B(C)

£52

3

4

0 0

0

2012

C

£150

0

2

0 0

0

2009

B(C)

£70

2

3

0 0

0

2011

B

£0

10

0

0 0

0

2019

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Vinyl tile flooring: Requires replacement within the maintenance schedule due to age and condition. Fixed units: Kitchen units require replacement within the maintenance schedule due to age and level of deterioration.

Location: 001-08-0-059 01 - Decorations

02 - Ceiling

03 - Floor

08 - Fixed Units

Redecoration required as part of a regular maintenance schedule. Plaster ceiling: Make good and redecorate water ingress to plaster ceiling. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Sanitary fittings: In good condition.

Location: 001-08-0-060 01 - Decorations

B(C)

£104

3

4

0 0

0

2012

02 - Ceiling 03 - Floor

B B(C)

£0 £140

10 3

0 3

0 0 0 0

0 0

2019 2012

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-061 01 - Decorations

B(C)

£572

3

4

0 0

0

2012

02 - Ceiling 03 - Floor

B B(C)

£0 £770

10 3

0 3

0 0 0 0

0 0

2019 2012

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

£0

6

0

0 0

0

2015

Cupboard fit for purpose.

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-062 12 - Comments

B

Location: 001-08-0-063 01 - Decorations

B(C)

£182

3

4

0 0

0

2012

02 - Ceiling 03 - Floor

B B(C)

£0 £245

10 3

0 3

0 0 0 0

0 0

2019 2012

B(C)

£520

3

4

0 0

0

2012

02 - Ceiling

C

£100

0

3

0 0

0

2009

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

Location: 001-08-0-064 01 - Decorations

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-08-0-065 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

Cost to B Rem Life Priority C L

R

Year

B(C)

£182

3

4

0 0

0

2012

02 - Ceiling

C

£100

0

3

0 0

0

2009

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2019

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-08-0-066 01 - Decorations

B(C)

£312

4

4

0 0

0

2013

02 - Ceiling

B(C)

£1,440

2

2

0 0

0

2011

03 - Floor

B(C)

£420

1

3

0 0

0

2010

01 - Decorations

B(C)

£520

3

4

0 0

0

2012

02 - Ceiling

B(C)

£1,300

4

2

0 0

0

2013

03 - Floor

B(C)

£700

1

3

0 0

0

2010

N/A

£0

0

0

0 0

0

2009

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-067 Redecoration required as part of a regular maintenance schedule. Timber panelling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-068 12 - Comments Sample College Physical Condition Survey

No Access January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-069 01 - Decorations

B(C)

£260

3

4

0 0

0

2012

02 - Ceiling

C

£100

0

3

0 0

0

2009

03 - Floor

B

£0

6

0

0 0

0

2015

£350

2

2

0 0

0

2011

£0

10

0

0 0

0

2019

05 - Condition of Internal Walls

08 - Fixed Units

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: Requires replacement within the maintenance schedule. Sanitary fittings: In good condition.

Location: 001-08-0-070 01 - Decorations

B(C)

£312

4

4

0 0

0

2013

02 - Ceiling

B(C)

£1,440

2

2

0 0

0

2011

03 - Floor

B(C)

£420

1

3

0 0

0

2010

01 - Decorations

B(C)

£312

4

4

0 0

0

2013

02 - Ceiling

B(C)

£1,440

2

2

0 0

0

2011

03 - Floor

B(C)

£420

1

3

0 0

0

2010

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-071

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-072 01 - Decorations

B(C)

£312

4

4

0 0

0

2013

02 - Ceiling

B(C)

£1,440

2

2

0 0

0

2011

03 - Floor

B(C)

£420

1

3

0 0

0

2010

B(C)

£442

3

4

0 0

0

2012

£0

8

0

0 0

0

2017

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-073 01 - Decorations

02 - Ceiling

B

02 - Ceiling 03 - Floor

B B(C)

£0 £595

10 1

0 3

0 0 0 0

0 0

2019 2010

01 - Decorations

B(C)

£520

3

4

0 0

0

2012

02 - Ceiling

B(C)

£1,300

4

2

0 0

0

2013

03 - Floor

B(C)

£700

1

3

0 0

0

2010

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-074 Redecoration required as part of a regular maintenance schedule. Timber panelling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-075

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

01 - Decorations

B(C)

£312

4

4

0 0

0

2013

02 - Ceiling

B(C)

£1,440

2

2

0 0

0

2011

03 - Floor

B(C)

£420

1

3

0 0

0

2010

01 - Decorations

B(C)

£390

3

4

0 0

0

2012

02 - Ceiling

B(C)

£1,800

2

2

0 0

0

2011

03 - Floor

B(C)

£525

5

3

0 0

0

2014

B(C)

£260

3

4

0 0

0

2012

£0

8

0

0 0

0

2017

B(C)

£350

3

3

0 0

0

2012

B(C)

£104

3

4

0 0

0

2012

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-076 Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Requires replacement within the maintenance schedule. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-101 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-102 01 - Decorations

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

02 - Ceiling

B

£0

8

0

0 0

0

2017

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

10

0

0 0

0

2019

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£104

3

4

0 0

0

2012

Notes

Remedial Action

Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-08-0-103 01 - Decorations

B(C)

02 - Ceiling

B

£0

8

0

0 0

0

2017

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

10

0

0 0

0

2019

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£260

3

4

0 0

0

2012

£0

8

0

0 0

0

2017

B(C)

£350

3

3

0 0

0

2012

B(C)

£390

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-08-0-104 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-105 01 - Decorations

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02 - Ceiling 03 - Floor

05 - Condition of Internal Walls

B

Cost to B Rem Life Priority C L

R

Year

£0

8

0

0 0

0

2017

B(C)

£525

3

3

0 0

0

2012

C

£250

0

2

0 0

0

2009

B(C)

£130

3

4

0 0

0

2012

Notes

Remedial Action

Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Plaster - make good and redecorate damage to plaster walls.

Location: 001-08-0-106 01 - Decorations

02 - Ceiling

B

£0

8

0

0 0

0

2017

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

10

0

0 0

0

2019

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£390

3

4

0 0

0

2012

£0

8

0

0 0

0

2017

B(C)

£525

3

3

0 0

0

2012

B(C)

£130

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-08-0-107 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-108 01 - Decorations

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

02 - Ceiling

B

£0

8

0

0 0

0

2017

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

10

0

0 0

0

2019

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£338

3

4

0 0

0

2012

£0

8

0

0 0

0

2017

B(C)

£455

3

3

0 0

0

2012

B(C)

£78

3

4

0 0

0

2012

02 - Ceiling

B

£0

8

0

0 0

0

2017

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

10

0

0 0

0

2019

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£260

3

4

0 0

0

2012

Notes

Remedial Action

Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-08-0-109 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-110 01 - Decorations

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-08-0-111 01 - Decorations

Sample College Physical Condition Survey

B(C)

Redecoration required as part of a regular maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02 - Ceiling

R

Year

£0

8

0

0 0

0

2017

B(C)

£350

3

3

0 0

0

2012

B(C)

£78

3

4

0 0

0

2012

02 - Ceiling

B

£0

8

0

0 0

0

2017

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

10

0

0 0

0

2019

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£260

3

4

0 0

0

2012

03 - Floor

B

Cost to B Rem Life Priority C L

Notes

Remedial Action

Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-112 01 - Decorations

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-08-0-113 01 - Decorations

B(C)

02 - Ceiling

B

£0

8

0

0 0

0

2017

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

10

0

0 0

0

2019

08 - Fixed Units

B

£0

10

0

0 0

0

2019

B(C)

£78

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-08-0-114 01 - Decorations

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02 - Ceiling 03 - Floor

B

Cost to B Rem Life Priority C L

R

Year

£0

8

0

0 0

0

2017

B(C)

£105

3

3

0 0

0

2012

B(C)

£104

3

4

0 0

0

2012

Notes

Remedial Action

Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-115 01 - Decorations

02 - Ceiling

B

£0

8

0

0 0

0

2017

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

10

0

0 0

0

2019

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£208

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-08-0-116 01 - Decorations

B(C)

02 - Ceiling

B

£0

8

0

0 0

0

2017

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

10

0

0 0

0

2019

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£260

3

4

0 0

0

2012

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-08-0-117 01 - Decorations

Sample College Physical Condition Survey

B(C)

Redecoration required as part of a regular maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02 - Ceiling 03 - Floor

B

Cost to B Rem Life Priority C L

R

Year

£0

8

0

0 0

0

2017

B(C)

£350

3

3

0 0

0

2012

B(C)

£104

3

4

0 0

0

2012

Notes

Remedial Action

Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-118 01 - Decorations

02 - Ceiling

B

£0

8

0

0 0

0

2017

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

10

0

0 0

0

2019

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£260

3

4

0 0

0

2012

£0

8

0

0 0

0

2017

B(C)

£350

3

3

0 0

0

2012

B(C)

£104

3

4

0 0

0

2012

£0

8

0

0 0

0

2017

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-08-0-119 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-0-120 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

10

0

0 0

0

2019

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£260

3

4

0 0

0

2012

£0

8

0

0 0

0

2017

£350

3

3

0 0

0

2012

B

£0

8

0

0 0

0

2017

B

£0

10

0

0 0

0

2019

£1,750

3

3

0 0

0

2012

B

£0

20

0

0 0

0

2029

B(C)

£26

3

4

0 0

0

2012

02 - Ceiling

B

£0

10

0

0 0

0

2019

03 - Floor

B

£0

8

0

0 0

0

2017

Notes

Remedial Action

Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-08-0-121 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

Location: 001-08-0-122 02 - Ceiling 03 - Floor

05 - Condition of Internal Walls

B(C)

Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fairfaced brickwork:

Location: 001-08-0-123 01 - Decorations

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-1-001 01 - Decorations

B(C)

£260

3

4

0 0

0

2012

02 - Ceiling 03 - Floor

B B(C)

£0 £350

10 3

0 3

0 0 0 0

0 0

2019 2012

£0

10

0

0 0

0

2019

08 - Fixed Units

B

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Work top in good condition.

Location: 001-08-1-002 01 - Decorations

B(C)

£260

3

4

0 0

0

2012

02 - Ceiling 03 - Floor

B B(C)

£0 £350

10 3

0 3

0 0 0 0

0 0

2019 2012

£0

10

0

0 0

0

2019

£104

3

4

0 0

0

2012

08 - Fixed Units

B

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Work top in good condition.

Location: 001-08-1-003 01 - Decorations

B(C)

02 - Ceiling 03 - Floor

B B

£0 £0

10 6

0 0

0 0 0 0

0 0

2019 2015

05 - Condition of Internal Walls

B

£0

10

0

0 0

0

2019

08 - Fixed Units

B

£0

10

0

0 0

0

2019

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-08-1-004 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

01 - Decorations

B(C)

£130

3

4

0 0

0

2012

02 - Ceiling 03 - Floor

B B(C)

£0 £175

10 3

0 3

0 0 0 0

0 0

2019 2012

Redecoration required as part of a regular maintenance schedule. Artex ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B

£0

6

0

0 0

0

2015

Stores - fit for purpose.

B

£0

6

0

0 0

0

2015

Stores - fit for purpose.

B(C)

£70

1

3

0 0

0

2010

B

£0

6

0

0 0

0

2015

Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Sanitary fittings: In good condition.

Location: 001-08-B-001 12 - Comments

Location: 001-08-B-002 12 - Comments

Location: 001-08-B-003 03 - Floor

05 - Condition of Internal Walls

Location: 001-08-B-004 01 - Decorations

B(C)

£390

3

4

0 0

0

2012

02 - Ceiling 03 - Floor

B B(C)

£0 £525

20 4

0 3

0 0 0 0

0 0

2029 2013

B(C)

£390

3

4

0 0

0

2012

£0

20

0

0 0

0

2029

Redecoration required as part of a regular maintenance schedule. Exposed Concrete Slab: Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-08-B-005 01 - Decorations

02 - Ceiling Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Exposed Concrete Slab: January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

B(C)

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£525

4

3

0 0

0

2013

Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B

£0

6

0

0 0

0

2015

Stores - fit for purpose.

02 - Ceiling

C

£250

0

2

0 0

0

2009

12 - Comments

B

£0

6

0

0 0

0

2015

Reinforced concrete slab evidence of water ingress - due to failed utilities with further investigation required. Stores - fit for purpose.

B

£0

6

0

0 0

0

2015

Stores - fit for purpose.

02 - Ceiling

C

£250

0

2

0 0

0

2009

12 - Comments

B

£0

6

0

0 0

0

2015

Reinforced concrete slab evidence of water ingress - due to failed utilities with further investigation required. Stores - fit for purpose.

B

£0

6

0

0 0

0

2015

Stores - fit for purpose.

B B B B

£0 £0 £0 £0

6 6 10 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2015 2019 2015

B

£0

20

0

0 0

0

2029

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber.

Location: 001-08-B-006 12 - Comments

Location: 001-08-B-007

Location: 001-08-B-008 12 - Comments

Location: 001-08-B-009

Location: 001-08-B-010 12 - Comments D - Building - Roof

Location: Roof 01 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01f - Attached - Purlins 01i - Attached - Skylights

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B B

£0 £0

20 6

0 0

0 0 0 0

0 0

2029 2015

Timber. Aluminium framed glazed skylights.

B B B B

£0 £0 £0 £0

6 8 15 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2017 2024 2015

B B C

£0 £0 £1,000

20 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2029 2029 2009

B

£0

6

0

0 0

0

2015

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

B B B B

£0 £0 £0 £0

6 8 15 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2017 2024 2015

B B C

£0 £0 £1,000

20 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2029 2029 2009

B

£0

6

0

0 0

0

2015

Location: Roof 02 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

01h - Attached - Down Rainwater pipes

Location: Roof 03 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

01h - Attached - Down Rainwater pipes

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

Location: Roof 04 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

01h - Attached - Down Rainwater pipes

Cost to B Rem Life Priority C L

R

Year

B B B B

£0 £0 £0 £0

6 8 15 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2017 2024 2015

B B C

£0 £0 £1,000

20 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2029 2029 2009

B

£0

6

0

0 0

0

2015

B B B B

£0 £0 £0 £0

6 8 15 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2017 2024 2015

B B C

£0 £0 £1,000

20 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2029 2029 2009

B

£0

6

0

0 0

0

2015

B B B B

£0 £0 £0 £0

6 8 15 6

0 0 0 0

0 0 0 0

0 0 0 0

2015 2017 2024 2015

Notes

Remedial Action

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

Location: Roof 05 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

01h - Attached - Down Rainwater pipes

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

Location: Roof 06 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits Sample College Physical Condition Survey

0 0 0 0

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

B B C

£0 £0 £1,000

20 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2029 2029 2009

01h - Attached - Down Rainwater pipes

B

£0

6

0

0 0

0

2015

B B B B

£0 £0 £0 £0

6 8 15 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2017 2024 2015

B B C

£0 £0 £1,000

20 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2029 2029 2009

B

£0

6

0

0 0

0

2015

B B B B

£0 £0 £0 £0

6 8 15 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2017 2024 2015

B B

£0 £0

20 20

0 0

0 0 0 0

0 0

2029 2029

Notes

Remedial Action

Timber. Timber. Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

Location: Roof 07 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

01h - Attached - Down Rainwater pipes

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

Location: Roof 08 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins

Sample College Physical Condition Survey

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

01g - Attached - Guttering

C

£1,000

0

2

0 0

0

2009

Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

01h - Attached - Down Rainwater pipes

B

£0

6

0

0 0

0

2015

B B B B

£0 £0 £0 £0

6 8 15 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2015 2017 2024 2015

B B C

£0 £0 £1,000

20 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2029 2029 2009

B

£0

6

0

0 0

0

2015

Concrete tiles. Mineral felt. Lead. Metal sheet coping to brick parapets. Timber. Timber. Mineral felt lined valley: Evidence of continued failures with replacement required and the implementation of a regular clearing programme. PVCU - Internal.

B B B

£0 £0 £0

6 8 6

0 0 0

0 0 0 0 0 0

0 0 0

2015 2017 2015

Mineral felt with stone chippings. Timber. Mineral felt.

B B B

£0 £0 £0

6 8 6

0 0 0

0 0 0 0 0 0

0 0 0

2015 2017 2015

Mineral felt with stone chippings. Timber. Mineral felt.

B B

£0 £0

6 8

0 0

0 0 0 0

0 0

2015 2017

Mineral felt with stone chippings. Timber.

Location: Roof 09 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01d - Attached - Verges/Fascias/ Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

01h - Attached - Down Rainwater pipes

Location: Roof 10 02a - Flat - Covering 02b - Flat - Decking 02c - Flat - Flashing

Location: Roof 11 02a - Flat - Covering 02b - Flat - Decking 02c - Flat - Flashing

Location: Roof 12 02a - Flat - Covering 02b - Flat - Decking Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02c - Flat - Flashing

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

6

0

0 0

0

2015

Mineral felt.

02a - Flat - Covering 02b - Flat - Decking 02c - Flat - Flashing

B B C

£0 £0 £2,500

10 20 0

0 0 2

0 0 0 0 0 0

0 0 0

2019 2029 2009

02d - Flat - Parapets

B

£0

10

0

0 0

0

2019

02h - Flat - Down Rainwater pipes

B

£0

10

0

0 0

0

2019

Mineral felt. Timber. Temporary tape: Requires replacement with a lead alternative product. Brickwork with metal sheet coping and metal tubular rails. PVCU - Internal.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£1,500

2

3

0 0

0

2011

3No. natural convectors are tired and require upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

Location: Roof 13

Facet: 2 - Engineering I - Engineering - Heating Systems

Location: 001-08-0-001 01 - Heat Emitters

Location: 001-08-0-002 01 - Heat Emitters

Location: 001-08-0-004 01 - Heat Emitters

Location: 001-08-0-006 01 - Heat Emitters

Location: 001-08-0-007 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

Location: 001-08-0-008 01 - Heat Emitters

Location: 001-08-0-008a 01 - Heat Emitters

Location: 001-08-0-009 01 - Heat Emitters

Location: 001-08-0-010 01 - Heat Emitters

Location: 001-08-0-010a 01 - Heat Emitters

Location: 001-08-0-011 01 - Heat Emitters

Location: 001-08-0-013 01 - Heat Emitters

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-014 01 - Heat Emitters

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

Location: 001-08-0-016 01 - Heat Emitters

Location: 001-08-0-017 01 - Heat Emitters

Location: 001-08-0-018 01 - Heat Emitters

Location: 001-08-0-019 01 - Heat Emitters

Location: 001-08-0-020 01 - Heat Emitters

Location: 001-08-0-021 01 - Heat Emitters

Location: 001-08-0-022

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B

£0

10

0

0 0

0

2019

Skirting heating in good order.

B

£0

10

0

0 0

0

2019

Skirting heating in good order.

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

Location: 001-08-0-023 01 - Heat Emitters

Location: 001-08-0-024 01 - Heat Emitters

Location: 001-08-0-025 01 - Heat Emitters

Location: 001-08-0-026 01 - Heat Emitters

Location: 001-08-0-027a 01 - Heat Emitters

Location: 001-08-0-027b 01 - Heat Emitters

Location: 001-08-0-028 01 - Heat Emitters

B(C)

Location: 001-08-0-029

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

£0

10

0

0 0

0

2019

Natural convector in good order.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

Location: 001-08-0-031 01 - Heat Emitters

Location: 001-08-0-032 01 - Heat Emitters

Location: 001-08-0-033 01 - Heat Emitters

Location: 001-08-0-034 01 - Heat Emitters

Location: 001-08-0-034b 01 - Heat Emitters

B

Location: 001-08-0-035 01 - Heat Emitters

Location: 001-08-0-036 01 - Heat Emitters

Location: 001-08-0-042 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£1,500

2

3

0 0

0

2011

3No. natural convectors are tired and require upgrading within the maintenance schedule.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

C

£500

0

2

0 0

0

2009

Towel rail with no low surface temperature cover requires replacement.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£1,000

2

3

0 0

0

2011

2No. natural convectors are tired and require upgrading within the maintenance schedule.

£0

20

0

0 0

0

2029

Natural convector in good order.

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

£0

10

0

0 0

0

2019

Natural convector in good order.

Location: 001-08-0-045 01 - Heat Emitters

Location: 001-08-0-047 01 - Heat Emitters

Location: 001-08-0-048 01 - Heat Emitters

Location: 001-08-0-049 01 - Heat Emitters

Location: 001-08-0-050 01 - Heat Emitters

B

Location: 001-08-0-051 01 - Heat Emitters

B(C)

Location: 001-08-0-053 01 - Heat Emitters

B

Location: 001-08-0-054 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

B

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£0

10

0

0 0

0

2019

Natural convector in good order.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

01 - Heat Emitters

B(C)

£500

2

3

0 0

0

2011

01 - Heat Emitters

B

£0

10

0

0 0

0

2019

Natural convector is tired and requires upgrading within the maintenance schedule. Skirting heating in good order.

B

£0

10

0

0 0

0

2019

Natural convector in good order.

B

£0

10

0

0 0

0

2019

Natural convector in good order.

£1,000

2

3

0 0

0

2011

2No. natural convectors are tired and require upgrading within the maintenance schedule.

£0

10

0

0 0

0

2019

Natural convector in good order.

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B(C)

£1,000

2

3

0 0

0

2011

2No. natural convectors are tired and require upgrading within the maintenance schedule.

Location: 001-08-0-056 01 - Heat Emitters

Location: 001-08-0-061

Location: 001-08-0-064 01 - Heat Emitters

Location: 001-08-0-065 01 - Heat Emitters

Location: 001-08-0-067 01 - Heat Emitters

B(C)

Location: 001-08-0-069 01 - Heat Emitters

B

Location: 001-08-0-071 01 - Heat Emitters

Location: 001-08-0-074 01 - Heat Emitters

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-076 01 - Heat Emitters

B(C)

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

Location: 001-08-0-101 01 - Heat Emitters

Location: 001-08-0-102 01 - Heat Emitters

Location: 001-08-0-103 01 - Heat Emitters

Location: 001-08-0-104 01 - Heat Emitters

Location: 001-08-0-105 01 - Heat Emitters

Location: 001-08-0-106 01 - Heat Emitters

Location: 001-08-0-107 01 - Heat Emitters

Location: 001-08-0-108 01 - Heat Emitters

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-109 01 - Heat Emitters

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

Location: 001-08-0-110 01 - Heat Emitters

Location: 001-08-0-111 01 - Heat Emitters

Location: 001-08-0-112 01 - Heat Emitters

Location: 001-08-0-113 01 - Heat Emitters

Location: 001-08-0-114 01 - Heat Emitters

Location: 001-08-0-115 01 - Heat Emitters

Location: 001-08-0-117 01 - Heat Emitters

Location: 001-08-0-118 01 - Heat Emitters

Location: 001-08-0-119 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

B

£0

15

0

0 0

0

2024

Underfloor heating in good order.

£500

2

3

0 0

0

2011

Natural convector is tired and requires upgrading within the maintenance schedule.

Underfloor heating in good order. Manifold for underfloor heating in good order.

Location: 001-08-0-120 01 - Heat Emitters

Location: 001-08-0-121 01 - Heat Emitters

B(C)

Location: 001-08-0-122 01 - Heat Emitters

B

£0

15

0

0 0

0

2024

02 - Pipework

B

£0

15

0

0 0

0

2024

B

£0

10

0

0 0

0

2019

Skirting heating in good order.

B

£0

10

0

0 0

0

2019

Skirting heating in good order.

B

£0

10

0

0 0

0

2019

Heat emitter with low surface temperature cover in good order.

B

£0

15

0

0 0

0

2024

Manifold for underfloor heating in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

Location: 001-08-1-001 01 - Heat Emitters

Location: 001-08-1-002 01 - Heat Emitters

Location: 001-08-1-003 01 - Heat Emitters L - Engineering - Medical Gases

Location: 001-08-0-122 03 - Manifolds/Outlets M - Engineering - Hot/Cold Water

Location: 001-08-0-010a 03 - Blending Valves Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-027d 03 - Blending Valves

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

C

£200

0

2

0 0

0

2009

Pipework clashes against door and requires attention.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

Location: 001-08-0-037 03 - Blending Valves

Location: 001-08-0-047 03 - Blending Valves

Location: 001-08-0-053 03 - Blending Valves

Location: 001-08-0-054 03 - Blending Valves

Location: 001-08-0-055 02 - Pipework

Location: 001-08-0-064 03 - Blending Valves

Location: 001-08-0-065 03 - Blending Valves

Location: 001-08-0-069 03 - Blending Valves

Location: 001-08-0-113 03 - Blending Valves

Location: 001-08-1-003 03 - Blending Valves O - Engineering - Main Plant Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-B-010 02 - Pumps

B

£0

15

0

0 0

0

2024

Grundfos heating pump in good order. Grundfos destrat domestic hot water service return pump in good order. ACU HM with Riello Burner calorifier in good order.

02 - Pumps

B

£0

15

0

0 0

0

2024

03 - Calorifiers

B

£0

10

0

0 0

0

2019

B

£0

10

0

0 0

0

2019

Vent Axia extract fan in good order.

B

£0

10

0

0 0

0

2019

Vent Axia extract fan in good order.

B

£0

10

0

0 0

0

2019

Vent Axia extract fan in good order.

B

£0

10

0

0 0

0

2019

Vent Axia extract fan in good order.

B

£0

10

0

0 0

0

2019

Vent Axia extract fan in good order.

B

£0

10

0

0 0

0

2019

Vent Axia extract fan in good order.

B

£0

10

0

0 0

0

2019

Vent Axia extract fan in good order.

P - Engineering - Main Plant

Location: 001-08-0-050 04 - Extract Fans

Location: 001-08-0-053 04 - Extract Fans

Location: 001-08-0-057 04 - Extract Fans

Location: 001-08-0-064 04 - Extract Fans

Location: 001-08-0-065 04 - Extract Fans

Location: 001-08-0-069 04 - Extract Fans

Location: 001-08-0-102 04 - Extract Fans Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-103 04 - Extract Fans

B

£0

10

0

0 0

0

2019

Vent Axia extract fan in good order.

B

£0

10

0

0 0

0

2019

Vent Axia extract fan in good order.

B

£0

10

0

0 0

0

2019

Vent Axia extract fan in good order.

B

£0

10

0

0 0

0

2019

Vent Axia extract fan in good order.

B

£0

10

0

0 0

0

2019

Vent Axia extract fan in good order.

B

£0

10

0

0 0

0

2019

Vent Axia extract fan in good order.

B

£0

10

0

0 0

0

2019

Vent Axia extract fan in good order.

B

£0

10

0

0 0

0

2019

Vent Axia extract fan in good order.

B

£0

10

0

0 0

0

2019

Vent Axia extract fan in good order.

Location: 001-08-0-106 04 - Extract Fans

Location: 001-08-0-108 04 - Extract Fans

Location: 001-08-0-110 04 - Extract Fans

Location: 001-08-0-112 04 - Extract Fans

Location: 001-08-0-113 04 - Extract Fans

Location: 001-08-0-115 04 - Extract Fans

Location: 001-08-0-116 04 - Extract Fans

Location: 001-08-0-118 04 - Extract Fans

Location: 001-08-0-120 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Extract Fans

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2019

Vent Axia extract fan in good order.

B

£0

15

0

0 0

0

2024

Control panel in good order.

£200

5

3

0 0

0

2014

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-08-B-010 03 - Controls R - Engineering - Electrical

Location: 001-08-0-001 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

£200

5

3

0 0

0

2014

Location: 001-08-0-002 04 - Lighting Installation

B(C)

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order. Sockets and switches in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

£200

4

3

0 0

0

2013

CAT II light requires upgrading within the maintenance schedule.

4No. surface fluorescent lights in good order. Emergency light in good order. Sockets and switches in good order.

Location: 001-08-0-003 04 - Lighting Installation

B(C)

Location: 001-08-0-004 04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting 06 - Sockets/Switches

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2019 2019

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-006 04 - Lighting Installation

B(C)

£200

5

3

0 0

0

2014

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

£200

5

3

0 0

0

2014

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-08-0-007 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

£600

3

3

0 0

0

2012

B

£0

10

0

0 0

0

2019

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

£200

5

3

0 0

0

2014

£0

10

0

0 0

0

2019

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-08-0-008 04 - Lighting Installation

06 - Sockets/Switches

B(C)

3No. surface fluorescent lights require upgrading within the maintenance schedule. Sockets and switches in good order.

Location: 001-08-0-008a Eaton William MEM distribution board in good order. 2No. surface fluorescent lights in good order.

Location: 001-08-0-009 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

Sample College Physical Condition Survey

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 06 - Sockets/Switches

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2019

Sockets and switches in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

2No. surface fluorescent lights in good order. Sockets and switches in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

£200

5

3

0 0

0

2014

Location: 001-08-0-010

Location: 001-08-0-010a 2No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-08-0-011 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

£200

5

3

0 0

0

2014

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-08-0-012 Hager distribution board in good order. Surface fluorescent light in good order. Emergency light in good order.

Location: 001-08-0-013 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

Sample College Physical Condition Survey

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order. Sockets and switches in good order. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-014 04 - Lighting Installation

B(C)

£200

5

3

0 0

0

2014

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

£200

5

3

0 0

0

2014

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-08-0-016 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

£200

5

3

0 0

0

2014

£0

10

0

0 0

0

2019

£200

5

3

0 0

0

2014

£0

10

0

0 0

0

2019

£200

5

3

0 0

0

2014

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-08-0-017 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order.

Location: 001-08-0-018 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order.

Location: 001-08-0-019 04 - Lighting Installation

Sample College Physical Condition Survey

B(C)

Tungsten light requires upgrading within the maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

£200

5

3

0 0

0

2014

Notes

Remedial Action

Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-08-0-020 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

£200

5

3

0 0

0

2014

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-08-0-021 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

£200

4

3

0 0

0

2013

£0

10

0

0 0

0

2019

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-08-0-022 2No. surface fluorescent lights in good order. Sockets and switches in good order.

Location: 001-08-0-023 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

CAT II light requires upgrading within the maintenance schedule. Surface fluorescent light in good order.

Location: 001-08-0-024 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation

06 - Sockets/Switches

B(C)

B

Cost to B Rem Life Priority C L

R

Year

£200

5

3

0 0

0

2014

£0

10

0

0 0

0

2019

£200

5

3

0 0

0

2014

£0

10

0

0 0

0

2019

£200

5

3

0 0

0

2014

Notes

Remedial Action

Tungsten light requires upgrading within the maintenance schedule. Sockets and switches in good order.

Location: 001-08-0-025 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order.

Location: 001-08-0-026 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

£200

5

3

0 0

0

2014

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-08-0-027a Eaton William MEM distribution board in good order. Surface fluorescent light in good order.

Location: 001-08-0-027b 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

B

£0

10

0

0 0

0

2019

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order.

Location: 001-08-0-027c 04 - Lighting Installation Sample College Physical Condition Survey

Surface fluorescent light in good order. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 06 - Sockets/Switches

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2019

Sockets and switches in good order.

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

B(C)

£200

5

3

0 0

0

2014

Tungsten light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

5

3

0 0

0

2014

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order. Sockets and switches in good order.

£200

5

3

0 0

0

2014

Location: 001-08-0-027d 04 - Lighting Installation

Location: 001-08-0-027e 04 - Lighting Installation

Location: 001-08-0-028

Location: 001-08-0-029 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

£200

5

3

0 0

0

2014

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-08-0-030 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

Sample College Physical Condition Survey

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order. Sockets and switches in good order. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-031 04 - Lighting Installation

B(C)

£200

5

3

0 0

0

2014

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

£200

5

3

0 0

0

2014

£0

10

0

0 0

0

2019

£200

5

3

0 0

0

2014

£0

10

0

0 0

0

2019

£200

5

3

0 0

0

2014

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-08-0-032 2No. surface fluorescent lights in good order. Sockets and switches in good order.

Location: 001-08-0-033 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order.

Location: 001-08-0-034 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order.

Location: 001-08-0-034b 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

Sample College Physical Condition Survey

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order. Sockets and switches in good order. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-035 04 - Lighting Installation

B(C)

£200

5

3

0 0

0

2014

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

£200

5

3

0 0

0

2014

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-08-0-036 04 - Lighting Installation

B(C)

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order. Sockets and switches in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

B

£0

10

0

0 0

0

2019

Emergency light in good order.

£200

5

3

0 0

0

2014

Tungsten light requires upgrading within the maintenance schedule. Surface fluorescent light in good order.

Location: 001-08--0-037 05 - Emergency Lighting

Location: 001-08-0-037 04 - Lighting Installation

B(C)

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

B

£0

10

0

0 0

0

2019

2No. surface fluorescent lights in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order. Emergency light in good order.

Location: 001-08-0-039 04 - Lighting Installation

Location: 001-08-0-040

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 06 - Sockets/Switches

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2019

Sockets and switches in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

2No. surface fluorescent lights in good order. Emergency light in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting 06 - Sockets/Switches

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2019 2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

Location: 001-08-0-041

Location: 001-08-0-042 3No. surface fluorescent lights in good order. Emergency light in good order. Sockets and switches in good order.

Location: 001-08-0-043 2No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-08-0-044 2No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-08-0-045 Surface fluorescent light in good order. Emergency light in good order.

Location: 001-08-0-046 04 - Lighting Installation

Location: 001-08-0-047 04 - Lighting Installation Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-048 04 - Lighting Installation

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

£400

5

3

0 0

0

2014

B

£0

10

0

0 0

0

2019

2No. tungsten lights require upgrading within the maintenance schedule. Sockets and switches in good order.

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B(C)

£400

3

3

0 0

0

2012

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting 06 - Sockets/Switches

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2019 2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

B

£0

10

0

0 0

0

2019

Location: 001-08-0-049 04 - Lighting Installation

06 - Sockets/Switches

B(C)

Location: 001-08-0-050 Eaton William MEM distribution board in good order. 2No. surface fluorescent lights require upgrading within the maintenance schedule. Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-08-0-051 Surface fluorescent light in good order. Emergency light in good order. Sockets and switches in good order.

Location: 001-08-0-053 Surface fluorescent light in good order. Emergency light in good order.

Location: 001-08-0-054 04 - Lighting Installation

Sample College Physical Condition Survey

2No. surface fluorescent lights in good order. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 05 - Emergency Lighting

B

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£0

10

0

0 0

0

2019

Emergency light in good order.

£200

5

3

0 0

0

2014

Tungsten light requires upgrading within the maintenance schedule.

Eaton William MEM distribution board in good order. 3No. surface fluorescent lights in good order. 2No. emergency lights in good order.

Location: 001-08-0-055 04 - Lighting Installation

B(C)

Location: 001-08-0-056 03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

Eaton William MEM distribution board in good order. 2No. surface fluorescent lights in good order.

Location: 001-08-0-057 Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-08-0-058 Surface fluorescent light in good order. Sockets and switches in good order.

Location: 001-08-0-059 04 - Lighting Installation

Location: 001-08-0-060

Location: 001-08-0-061 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation

06 - Sockets/Switches

B(C)

B

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£400

5

3

0 0

0

2014

2No. tungsten lights require upgrading within the maintenance schedule. Sockets and switches in good order.

£0

10

0

0 0

0

2019

£200

5

3

0 0

0

2014

Tungsten light requires upgrading within the maintenance schedule.

3No. surface fluorescent lights in good order. Emergency light in good order.

Location: 001-08-0-063 04 - Lighting Installation

B(C)

Location: 001-08-0-064 04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

2No. surface fluorescent lights in good order. Emergency light in good order.

B

£0

10

0

0 0

0

2019

Emergency light in good order.

B

£0

10

0

0 0

0

2019

Sockets and switches in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order. Emergency light in good order.

Location: 001-08-0-065 Surface fluorescent light in good order. Emergency light in good order.

Location: 001-08-0-066

Location: 001-08-0-067 05 - Emergency Lighting

Location: 001-08-0-068 06 - Sockets/Switches

Location: 001-08-0-069

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-070 04 - Lighting Installation

B

£0

10

0

0 0

0

2019

2No. surface fluorescent lights in good order. Emergency light in good order.

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

04 - Lighting Installation

C

£400

0

2

0 0

0

2009

04 - Lighting Installation

B(C)

£400

3

3

0 0

0

2012

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

2No. surface fluorescent lights in good order. Emergency light in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

2No. surface fluorescent lights in good order. Emergency light in good order.

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2019 2019

Lighting track in good order. CAT II light in good order.

Location: 001-08-0-071 Surface fluorescent light in good order. Emergency light in good order.

Location: 001-08-0-073 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 2No. surface fluorescent lights require upgrading within the maintenance schedule. 2No. surface fluorescent lights in good order.

Location: 001-08-0-074 04 - Lighting Installation

Location: 001-08-0-075

Location: 001-08-0-076

Location: 001-08-0-101 04 - Lighting Installation 04 - Lighting Installation Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 06 - Sockets/Switches

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2019

Sockets and switches in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

2No. surface fluorescent lights in good order. Sockets and switches in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

B B B

£0 £0 £0

10 10 10

0 0 0

0 0 0 0 0 0

0 0 0

2019 2019 2019

Lighting track in good order. CAT II light in good order. Sockets and switches in good order.

B B B

£0 £0 £0

10 10 10

0 0 0

0 0 0 0 0 0

0 0 0

2019 2019 2019

Lighting track in good order. CAT II light in good order. Sockets and switches in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

2No. surface fluorescent lights in good order. Sockets and switches in good order.

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2019 2019

Location: 001-08-0-102

Location: 001-08-0-103 2No. surface fluorescent lights in good order. Sockets and switches in good order.

Location: 001-08-0-104 04 - Lighting Installation 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-08-0-105 04 - Lighting Installation 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-08-0-106

Location: 001-08-0-107 04 - Lighting Installation 04 - Lighting Installation Sample College Physical Condition Survey

Lighting track in good order. CAT II light in good order. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 06 - Sockets/Switches

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2019

Sockets and switches in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

2No. surface fluorescent lights in good order. Sockets and switches in good order.

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2019 2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

B B B

£0 £0 £0

10 10 10

0 0 0

0 0 0 0 0 0

0 0 0

2019 2019 2019

CAT II light in good order. Lighting track in good order. Sockets and switches in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

2No. surface fluorescent lights in good order. Sockets and switches in good order.

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

B

£0

10

0

0 0

0

2019

Lighting track in good order.

Location: 001-08-0-108

Location: 001-08-0-109 Lighting track in good order. Surface fluorescent light in good order. CAT II light in good order.

Location: 001-08-0-110 04 - Lighting Installation

Location: 001-08-0-111 04 - Lighting Installation 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-08-0-112

Location: 001-08-0-113 04 - Lighting Installation

Location: 001-08-0-114 04 - Lighting Installation Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation 06 - Sockets/Switches

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2019 2019

CAT II light in good order. Sockets and switches in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

2No. surface fluorescent lights in good order. Sockets and switches in good order.

B

£0

10

0

0 0

0

2019

2No. surface fluorescent lights in good order.

B B B

£0 £0 £0

10 10 10

0 0 0

0 0 0 0 0 0

0 0 0

2019 2019 2019

Lighting track in good order. CAT II light in good order. Sockets and switches in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

2No. surface fluorescent lights in good order. Sockets and switches in good order.

B B B

£0 £0 £0

10 10 10

0 0 0

0 0 0 0 0 0

0 0 0

2019 2019 2019

CAT II light in good order. Lighting track in good order. Sockets and switches in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2019

2No. surface fluorescent lights in good order. Sockets and switches in good order.

Location: 001-08-0-115

Location: 001-08-0-116 04 - Lighting Installation

Location: 001-08-0-117 04 - Lighting Installation 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-08-0-118

Location: 001-08-0-119 04 - Lighting Installation 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-08-0-120

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-121 04 - Lighting Installation

B(C)

£200

5

3

0 0

0

2014

04 - Lighting Installation

B(C)

£200

5

3

0 0

0

2014

B

£0

10

0

0 0

0

2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

B(C)

£200

5

3

0 0

0

2014

Tungsten light requires upgrading within the maintenance schedule.

B(C)

£200

5

3

0 0

0

2014

Tungsten light requires upgrading within the maintenance schedule.

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

£200

5

3

0 0

0

2014

£0

10

0

0 0

0

2019

Tungsten light requires upgrading within the maintenance schedule. Emergency light in good order.

06 - Sockets/Switches

Tungsten light requires upgrading within the maintenance schedule. CAT II light requires upgrading within the maintenance schedule. Sockets and switches in good order.

Location: 001-08-0-122 20No. surface fluorescent lights in good order. 3No. emergency lights in good order.

Location: 001-08-1-001 04 - Lighting Installation

Location: 001-08-1-002 04 - Lighting Installation

Location: 001-08-1-003 04 - Lighting Installation

B

Location: 001-08-1-004 04 - Lighting Installation

B(C)

05 - Emergency Lighting

B

V - Engineering - Fire Alarms Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-001 03 - Smoke Detectors

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

Location: 001-08-0-002 03 - Smoke Detectors

Location: 001-08-0-003 03 - Smoke Detectors

Location: 001-08-0-004 03 - Smoke Detectors

Location: 001-08-0-006 03 - Smoke Detectors

Location: 001-08-0-007 03 - Smoke Detectors

Location: 001-08-0-008 03 - Smoke Detectors

Location: 001-08-0-0089 03 - Smoke Detectors

Location: 001-08-0-008a 03 - Smoke Detectors

Location: 001-08-0-010 03 - Smoke Detectors

Location: 001-08-0-010a 03 - Smoke Detectors

Location: 001-08-0-011 03 - Smoke Detectors Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-012 03 - Smoke Detectors

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

Location: 001-08-0-013 03 - Smoke Detectors

Location: 001-08-0-014 03 - Smoke Detectors

Location: 001-08-0-016 03 - Smoke Detectors

Location: 001-08-0-017 03 - Smoke Detectors

Location: 001-08-0-018 03 - Smoke Detectors

Location: 001-08-0-019 03 - Smoke Detectors

Location: 001-08-0-020 03 - Smoke Detectors

Location: 001-08-0-021 03 - Smoke Detectors

Location: 001-08-0-022 03 - Smoke Detectors

Location: 001-08-0-023 03 - Smoke Detectors

Location: 001-08-0-024 03 - Smoke Detectors Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-025 03 - Smoke Detectors

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

Location: 001-08-0-026 03 - Smoke Detectors

Location: 001-08-0-027a 03 - Smoke Detectors

Location: 001-08-0-027b 03 - Smoke Detectors

Location: 001-08-0-027c 03 - Smoke Detectors

Location: 001-08-0-027e 03 - Smoke Detectors

Location: 001-08-0-028 03 - Smoke Detectors

Location: 001-08-0-029 03 - Smoke Detectors

Location: 001-08-0-030 03 - Smoke Detectors

Location: 001-08-0-031 03 - Smoke Detectors

Location: 001-08-0-032 03 - Smoke Detectors

Location: 001-08-0-033 03 - Smoke Detectors Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-034 03 - Smoke Detectors

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

Location: 001-08-0-034b 03 - Smoke Detectors

Location: 001-08-0-037 03 - Smoke Detectors

Location: 001-08-0-039 03 - Smoke Detectors

Location: 001-08-0-040 03 - Smoke Detectors

Location: 001-08-0-041 03 - Smoke Detectors

Location: 001-08-0-042 03 - Smoke Detectors

Location: 001-08-0-043 03 - Smoke Detectors

Location: 001-08-0-044 03 - Smoke Detectors

Location: 001-08-0-045 03 - Smoke Detectors

Location: 001-08-0-046 03 - Smoke Detectors

Location: 001-08-0-048 03 - Smoke Detectors Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-049 03 - Smoke Detectors

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

Location: 001-08-0-051 03 - Smoke Detectors

Location: 001-08-0-054 03 - Smoke Detectors

Location: 001-08-0-055 03 - Smoke Detectors

Location: 001-08-0-056 03 - Smoke Detectors

Location: 001-08-0-057 03 - Smoke Detectors

Location: 001-08-0-058 03 - Smoke Detectors

Location: 001-08-0-060 03 - Smoke Detectors

Location: 001-08-0-061 03 - Smoke Detectors

Location: 001-08-0-063 03 - Smoke Detectors

Location: 001-08-0-064 03 - Smoke Detectors

Location: 001-08-0-066 03 - Smoke Detectors Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-08-0-069 03 - Smoke Detectors

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B B

£0 £0

10 12

0 0

0 0 0 0

0 0

2019 2021

Smoke detector in good order. Fixfire main panel in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

Location: 001-08-0-070 03 - Smoke Detectors

Location: 001-08-0-071 03 - Smoke Detectors

Location: 001-08-0-073 03 - Smoke Detectors

Location: 001-08-0-074 03 - Smoke Detectors

Location: 001-08-0-075 03 - Smoke Detectors

Location: 001-08-0-076 03 - Smoke Detectors 05 - Fire Main/Zone Panel

Location: 001-08-0-101 03 - Smoke Detectors

Location: 001-08-0-104 03 - Smoke Detectors

Location: 001-08-0-105 03 - Smoke Detectors

Location: 001-08-0-107 03 - Smoke Detectors

Location: 001-08-0-109 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Smoke Detectors

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

3No. smoke detectors in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

01 - Sounders

B

£0

12

0

0 0

0

2021

02 - Call Points

B

£0

12

0

0 0

0

2021

Fire alarm sounders in good order. Fire alarm call points in good order.

Location: 001-08-0-111 03 - Smoke Detectors

Location: 001-08-0-114 03 - Smoke Detectors

Location: 001-08-0-117 03 - Smoke Detectors

Location: 001-08-0-119 03 - Smoke Detectors

Location: 001-08-0-121 03 - Smoke Detectors

Location: 001-08-0-122 03 - Smoke Detectors

Location: 001-08-1-001 03 - Smoke Detectors

Location: 001-08-1-002 03 - Smoke Detectors

Location: 001-08-1-004 03 - Smoke Detectors

Location: Whole Block

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. Block Total

Sample College Physical Condition Survey

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

ÂŁ233,072.00

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Site : Sample College - 001 Block : Learning Resources Block - 09 Facet: 1 - Building A - Building - Physical Structure

Location: Elevation 01 05 - External Fire Escape

B

£0

25

0

0 0

0

2034

Galvanised steel walk-way to first floor - located to elevation 1.

B B B

£0 £0 £0

50 70 70

0 0 0

0 0 0 0 0 0

0 0 0

2059 2079 2079

Steel frame. Generally sound. Generally sound.

B(C)

£8,750

2

2

0 0

0

2011

Aluminium - Single: Replace with new located to elevation 1 7No.

04 - Windows

B(C)

£13,750

2

2

0 0

0

2011

06 - Doors

B(C)

£2,500

3

2

0 0

0

2012

06 - Doors

B(C)

£300

4

3

0 0

0

2013

Aluminium - Single: Replace with new located to elevation 2 11No. Aluminium: Need to replace located to elevation 2 - 2No. double. Softwood timber: Redecorate and make good located to elevation 2 - 1No. double.

Location: Whole Block 01 - General Structure 02 - Foundations 03 - Ground Stability B - Building - External Fabric

Location: Elevation 01 04 - Windows

Location: Elevation 02

Location: Elevation 03

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

04 - Windows

B(C)

£6,250

2

2

0 0

0

2011

Aluminium - Single: Replace with new located to elevation 3 5No. Softwood timber: Redecorate and make good located to elevation 3 - 2No. double & 1No. single.

06 - Doors

B(C)

£800

1

3

0 0

0

2010

B(C)

£3,750

2

2

0 0

0

2011

Aluminium - Single: Replace with new located to elevation 4 3No.

B(C)

£31,250

2

2

0 0

0

2011

Aluminium - Single: Replace with new located to elevation 5 25No.

B(C)

£1,250

3

2

0 0

0

2012

Aluminium: Need to replace located to elevation 6 - 1 No double

£0 £0 £0 £0 £0 £0 £0 £0 £0

30 30 30 30 20 20 20 20 15

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

2039 2039 2039 2039 2029 2029 2029 2029 2024

Brickwork. Brickwork. Brickwork. Brickwork. Zinc sheet. Zinc sheet. Zinc sheet. Zinc sheet. Aluminium.

Location: Elevation 04 04 - Windows

Location: Elevation 05 04 - Windows

Location: Elevation 06 06 - Doors

Location: Whole Block 01a - Masonry - Cracking 01b - Masonry - Spalling 01c - Masonry - Pointing 01d - Masonry - Finish 02a - Cladding - Attachment 02b - Cladding - Cracking 02c - Cladding - Joints 02d - Cladding - Finish 06 - Doors

B B B B B B B B B

0 0 0 0 0 0 0 0 0

C - Building - Internal Fabric

Location: 001-09-0-001 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

Cost to B Rem Life Priority C L

R

Year

£416

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£560

5

3

0 0

0

2014

B(C)

£1,300

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£1,750

5

3

0 0

0

2014

B(C)

£624

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£840

5

3

0 0

0

2014

B(C)

£624

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-0-002 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-0-003 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-0-004 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£840

5

3

0 0

0

2014

Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

B(C)

£416

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£560

5

3

0 0

0

2014

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

B(C)

£416

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£560

5

3

0 0

0

2014

N/A

£0

0

0

0 0

0

2009

Under refurbishment.

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls 08 - Fixed Units

B B

£0 £0

10 20

0 0

0 0 0 0

0 0

2019 2029

Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Plastic walls: In good condition. Fixed units: Steel kitchen units in good condition.

Location: 001-09-0-005 01 - Decorations

02 - Ceiling 03 - Floor

B

Location: 001-09-0-006 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-0-007 12 - Comments

Location: 001-09-0-012

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-09-0-012a 02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

10

0

0 0

0

2019

£624

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£840

5

3

0 0

0

2014

B(C)

£520

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£700

5

3

0 0

0

2014

B(C)

£624

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Plastic walls: In good condition.

Location: 001-09-0-013 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-0-014 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-0-015 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£840

5

3

0 0

0

2014

Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

B(C)

£1,040

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

£1,400

5

3

0 0

0

2014

£0

15

0

0 0

0

2024

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Fixed units: Sink unit in good condition.

£1,664

5

4

0 0

0

2014

Location: 001-09-0-016 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B B(C)

B

Location: 001-09-0-017 01 - Decorations

B(C)

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

8

0

0 0

0

2017

£1,300

4

4

0 0

0

2013

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition.

Location: 001-09-0-018 01 - Decorations

B(C)

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Vinyl sheet flooring: In good condition.

Location: 001-09-0-019

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

B(C)

Cost to B Rem Life Priority C L

R

Year

£208

4

4

0 0

0

2013

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

6

0

0 0

0

2015

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Vinyl sheet flooring: In good condition.

Location: 001-09-0-020 01 - Decorations

B(C)

£520

4

4

0 0

0

2013

02 - Ceiling 03 - Floor

B B(C)

£0 £700

40 1

0 3

0 0 0 0

0 0

2049 2010

Redecoration required as part of a regular maintenance schedule. Concrete decking: Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition.

N/A

£0

0

0

0 0

0

2009

Cupboard under stairs.

B(C)

£312

5

4

0 0

0

2014

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Vinyl sheet flooring: In good condition.

Location: 001-09-0-021 12 - Comments

Location: 001-09-0-022 01 - Decorations

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

8

0

0 0

0

2017

£416

4

4

0 0

0

2013

Location: 001-09-0-023 01 - Decorations

B(C)

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

8

0

0 0

0

2017

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units

B

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£0

15

0

0 0

0

2024

Sanitary fittings: In good condition.

£312

4

4

0 0

0

2013

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-09-0-024 01 - Decorations

B(C)

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

15

0

0 0

0

2024

£780

4

4

0 0

0

2013

£0

15

0

0 0

0

2024

B(C)

£1,050

4

3

0 0

0

2013

B(C)

£780

4

4

0 0

0

2013

£0

15

0

0 0

0

2024

£1,050

4

3

0 0

0

2013

Location: 001-09-0-025 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Concrete with applied finish: Is in poor condition and requires making good within the maintenance schedule.

Location: 001-09-0-026 01 - Decorations

02 - Ceiling 03 - Floor

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Concrete with applied finish: Is in poor condition and requires making good within the maintenance schedule.

Location: 001-09-0-027

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

B(C)

Cost to B Rem Life Priority C L

R

Year

£520

5

4

0 0

0

2014

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

15

0

0 0

0

2024

£520

5

4

0 0

0

2014

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-09-0-028 01 - Decorations

B(C)

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

15

0

0 0

0

2024

£104

5

4

0 0

0

2014

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-09-0-029 01 - Decorations

B(C)

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

15

0

0 0

0

2024

£104

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-09-0-030 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

15

0

0 0

0

2024

£3,120

5

4

0 0

0

2014

Notes

Remedial Action

Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-09-0-031 01 - Decorations

B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Timber flooring: In good condition. Vinyl sheet flooring: In good condition.

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

6

0

0 0

0

2015

03 - Floor

B

£0

8

0

0 0

0

2017

N/A

£0

0

0

0 0

0

2009

No Access

B(C)

£416

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£560

5

3

0 0

0

2014

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£208

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

Location: 001-09-1-001 12 - Comments

Location: 001-09-1-002 01 - Decorations

02 - Ceiling 03 - Floor

B

Location: 001-09-1-003 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£280

5

3

0 0

0

2014

Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£624

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£840

5

3

0 0

0

2014

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£1,560

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£2,100

5

3

0 0

0

2014

B(C)

£1,560

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

£2,100

5

3

0 0

0

2014

Location: 001-09-1-004 01 - Decorations

02 - Ceiling 03 - Floor

B

Location: 001-09-1-005 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-1-006 01 - Decorations

02 - Ceiling 03 - Floor

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-1-007 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

Cost to B Rem Life Priority C L

R

Year

£1,560

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£2,100

5

3

0 0

0

2014

B(C)

£1,560

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£2,100

5

3

0 0

0

2014

B(C)

£4,160

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£5,600

5

3

0 0

0

2014

B(C)

£520

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-1-008 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-1-009 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-1-010 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£700

5

3

0 0

0

2014

Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£2,080

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£2,800

5

3

0 0

0

2014

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£624

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£840

5

3

0 0

0

2014

B(C)

£780

4

4

0 0

0

2013

Location: 001-09-1-011 01 - Decorations

02 - Ceiling 03 - Floor

B

Location: 001-09-1-012 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-1-013 01 - Decorations

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Concrete with applied finish: In good condition.

Location: 001-09-1-014

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

B(C)

Cost to B Rem Life Priority C L

R

Year

£416

4

4

0 0

0

2013

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

8

0

0 0

0

2017

£780

4

4

0 0

0

2013

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Vinyl sheet flooring: In good condition.

Location: 001-09-1-015 01 - Decorations

B(C)

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

8

0

0 0

0

2017

£780

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£1,050

5

3

0 0

0

2014

B(C)

£416

4

4

0 0

0

2013

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Vinyl sheet flooring: In good condition.

Location: 001-09-1-016 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-1-017 01 - Decorations

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Concrete with applied finish: In good condition.

Location: 001-09-1-018 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

B(C)

Cost to B Rem Life Priority C L

R

Year

£416

4

4

0 0

0

2013

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

6

0

0 0

0

2015

£624

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£840

5

3

0 0

0

2014

B(C)

£156

4

4

0 0

0

2013

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Concrete with applied finish: In good condition.

Location: 001-09-1-019 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-1-020 01 - Decorations

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

6

0

0 0

0

2015

08 - Fixed Units

B

£0

12

0

0 0

0

2021

£624

5

4

0 0

0

2014

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Fixed units: Belfast sink unit in good condition.

Location: 001-09-1-021 01 - Decorations

B(C)

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

8

0

0 0

0

2017

Sample College Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units

B

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£0

15

0

0 0

0

2024

Sanitary fittings: In good condition.

£416

5

4

0 0

0

2014

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-09-1-022 01 - Decorations

B(C)

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

15

0

0 0

0

2024

£416

5

4

0 0

0

2014

Location: 001-09-1-023 01 - Decorations

B(C)

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

15

0

0 0

0

2024

£208

5

4

0 0

0

2014

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-09-1-024 01 - Decorations

B(C)

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

15

0

0 0

0

2024

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-09-1-025 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

B(C)

Cost to B Rem Life Priority C L

R

Year

£208

5

4

0 0

0

2014

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

15

0

0 0

0

2024

£1,300

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£1,750

5

3

0 0

0

2014

B(C)

£624

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£840

5

3

0 0

0

2014

B(C)

£728

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-09-2-000 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-2-001 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-2-002 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£980

5

3

0 0

0

2014

Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£728

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£980

5

3

0 0

0

2014

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£728

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£980

5

3

0 0

0

2014

B(C)

£728

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

£980

5

3

0 0

0

2014

Location: 001-09-2-003 01 - Decorations

02 - Ceiling 03 - Floor

B

Location: 001-09-2-004 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-2-005 01 - Decorations

02 - Ceiling 03 - Floor

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-2-006 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

Cost to B Rem Life Priority C L

R

Year

£624

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£840

5

3

0 0

0

2014

B(C)

£624

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£840

5

3

0 0

0

2014

B(C)

£1,560

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£2,100

5

3

0 0

0

2014

B(C)

£1,300

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-2-007 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-2-008 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-2-009 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£1,750

5

3

0 0

0

2014

Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£884

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£1,190

5

3

0 0

0

2014

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£884

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£1,190

5

3

0 0

0

2014

B(C)

£1,300

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

£1,750

5

3

0 0

0

2014

Location: 001-09-2-010 01 - Decorations

02 - Ceiling 03 - Floor

B

Location: 001-09-2-011 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-2-012 01 - Decorations

02 - Ceiling 03 - Floor

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-2-013 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

Cost to B Rem Life Priority C L

R

Year

£1,820

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£2,450

5

3

0 0

0

2014

B(C)

£416

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£560

5

3

0 0

0

2014

B(C)

£624

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£840

5

3

0 0

0

2014

B(C)

£1,300

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-2-014 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-2-015 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-2-016 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£1,750

5

3

0 0

0

2014

Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

B(C)

£416

5

4

0 0

0

2014

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Fixed units: Kitchen units in good condition.

Location: 001-09-2-017 01 - Decorations

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

15

0

0 0

0

2024

£780

4

4

0 0

0

2013

Location: 001-09-2-018 01 - Decorations

B(C)

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

6

0

0 0

0

2015

£416

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

£560

5

3

0 0

0

2014

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Concrete with applied finish: In good condition.

Location: 001-09-2-019 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

B B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-2-020

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

Cost to B Rem Life Priority C L

R

Year

£780

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£1,050

5

3

0 0

0

2014

B(C)

£1,300

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£1,750

5

3

0 0

0

2014

B(C)

£156

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B(C)

£210

5

3

0 0

0

2014

B(C)

£624

5

4

0 0

0

2014

£0

15

0

0 0

0

2024

B

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-2-021 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-2-022 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-09-2-023 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£840

0

3

0 0

0

2009

Concrete with applied finish: requires re-application of finish

B(C)

£52

5

4

0 0

0

2014

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

15

0

0 0

0

2024

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Fixed units: Belfast sink unit in good condition.

£416

5

4

0 0

0

2014

Location: 001-09-2-024 01 - Decorations

Location: 001-09-2-025 01 - Decorations

B(C)

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

15

0

0 0

0

2024

£416

5

4

0 0

0

2014

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-09-2-026 01 - Decorations

B(C)

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

15

0

0 0

0

2024

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

Location: 001-09-2-027 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

B(C)

Cost to B Rem Life Priority C L

R

Year

£156

5

4

0 0

0

2014

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

8

0

0 0

0

2017

08 - Fixed Units

B

£0

15

0

0 0

0

2024

01a - Attached - Covering

C

£10,000

0

1

0 0

0

2009

01b - Attached - Sarking 01c - Attached - Flashing

B C

£0 £400

10 0

0 1

0 0 0 0

0 0

2019 2009

01e - Attached - Rafters

B

£0

50

0

0 0

0

2059

01f - Attached - Purlins 01g - Attached - Guttering 01h - Attached - Down Rainwater pipes

B B C

£0 £0 £5,000

50 6 0

0 0 3

0 0 0 0 0 0

0 0 0

2059 2015 2009

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Sanitary fittings: In good condition.

D - Building - Roof

Location: Roof 01

Sample College Physical Condition Survey

Clay tiles: Evidence of slipped & broken tiles with localised replacement required. Mineral felt. Lead: Appears to have been subject to theft with localised replacement and making good required. Located to plant room door surround. Metal.

Timber. Parapet gutters: Felt lined. Cast iron: Require redecoration and making good.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01i - Attached - Skylights

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£32,300

0

1

0 0

0

2009

Aluminium/timber Velux: In very poor condition with windows currently screwed shut complete replacement required - 38No.

B B B

£0 £0 £0

15 25 15

0 0 0

0 0 0 0 0 0

0 0 0

2024 2034 2024

Single ply membrane. Timber. Polycarbonate domed skylights.

02a - Flat - Covering 02b - Flat - Decking 02h - Flat - Down Rainwater pipes

B B C

£0 £0 £2,000

6 15 0

0 0 3

0 0 0 0 0 0

0 0 0

2015 2024 2009

02i - Flat - Skylights

B

£0

6

0

0 0

0

2015

Mineral felt with stone chippings. Timber. Cast iron: Require redecoration and making good. Steel and aluminium framed glazed lantern light.

02a - Flat - Covering

B

£0

6

0

0 0

0

2015

02b - Flat - Decking

B

£0

10

0

0 0

0

2019

02h - Flat - Down Rainwater pipes

C

£100

0

3

0 0

0

2009

Location: Roof 02 02a - Flat - Covering 02b - Flat - Decking 02i - Flat - Skylights

Location: Roof 03

Location: Roof 04 Mineral felt (assumed condition, no access). Timber.

Cast iron: Require redecoration and making good.

G - Building - Gardens

Location: External Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Other Structure (specify)

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£600

0

3

0 0

0

2009

Steel framed tank room with clay tile cladding and a single ply membrane flat roof: The timber doors are in poor condition and require making good.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

Facet: 2 - Engineering I - Engineering - Heating Systems

Location: 001-09-0-001 01 - Heat Emitters

Location: 001-09-0-002 01 - Heat Emitters

Location: 001-09-0-003 01 - Heat Emitters

Location: 001-09-0-004 01 - Heat Emitters

Location: 001-09-0-005 01 - Heat Emitters

Location: 001-09-0-006 01 - Heat Emitters

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-09-0-013 01 - Heat Emitters

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

2No. heat emitters with low surface temperature covers in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

Location: 001-09-0-014 01 - Heat Emitters

Location: 001-09-0-015 01 - Heat Emitters

Location: 001-09-0-016 01 - Heat Emitters

Location: 001-09-0-017 01 - Heat Emitters

Location: 001-09-0-018 01 - Heat Emitters

Location: 001-09-0-020 01 - Heat Emitters

Location: 001-09-0-022

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

2No. heat emitters with low surface temperature covers in good order.

Location: 001-09-0-023 01 - Heat Emitters

Location: 001-09-0-024 01 - Heat Emitters

Location: 001-09-0-025 01 - Heat Emitters

Location: 001-09-0-026 01 - Heat Emitters

Location: 001-09-0-027 01 - Heat Emitters

Location: 001-09-0-028 01 - Heat Emitters

Location: 001-09-0-031 01 - Heat Emitters

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-09-1-002 01 - Heat Emitters

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

Location: 001-09-1-003 01 - Heat Emitters

Location: 001-09-1-004 01 - Heat Emitters

Location: 001-09-1-005 01 - Heat Emitters

Location: 001-09-1-006 01 - Heat Emitters

Location: 001-09-1-007 01 - Heat Emitters

Location: 001-09-1-008 01 - Heat Emitters

Location: 001-09-1-009

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

Location: 001-09-1-013 01 - Heat Emitters

Location: 001-09-1-015 01 - Heat Emitters

Location: 001-09-1-015A 01 - Heat Emitters

Location: 001-09-1-019 01 - Heat Emitters

Location: 001-09-1-021 01 - Heat Emitters

Location: 001-09-1-022 01 - Heat Emitters

Location: 001-09-1-024 01 - Heat Emitters

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-09-1-025 01 - Heat Emitters

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

2No. heat emitters with low surface temperature covers in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

Location: 001-09-2-000 01 - Heat Emitters

Location: 001-09-2-001 01 - Heat Emitters

Location: 001-09-2-002 01 - Heat Emitters

Location: 001-09-2-003 01 - Heat Emitters

Location: 001-09-2-004 01 - Heat Emitters

Location: 001-09-2-005 01 - Heat Emitters

Location: 001-09-2-006

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

2No. heat emitters with low surface temperature covers in good order.

Location: 001-09-2-007 01 - Heat Emitters

Location: 001-09-2-008 01 - Heat Emitters

Location: 001-09-2-009 01 - Heat Emitters

Location: 001-09-2-010 01 - Heat Emitters

Location: 001-09-2-011 01 - Heat Emitters

Location: 001-09-2-012 01 - Heat Emitters

Location: 001-09-2-013 01 - Heat Emitters

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-09-2-014 01 - Heat Emitters

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

Location: 001-09-2-015 01 - Heat Emitters

Location: 001-09-2-016 01 - Heat Emitters

Location: 001-09-2-018 01 - Heat Emitters

Location: 001-09-2-020 01 - Heat Emitters

Location: 001-09-2-023 01 - Heat Emitters

Location: 001-09-2-025 01 - Heat Emitters

Location: 001-09-2-026

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Heat emitter with low surface temperature cover in good order.

B

£0

20

0

0 0

0

2029

Cooker hood in good order.

B

£0

10

0

0 0

0

2019

Grille in good order.

B

£0

10

0

0 0

0

2019

Grille in good order.

B

£0

10

0

0 0

0

2019

Grille in good order.

B

£0

10

0

0 0

0

2019

Grille in good order.

B

£0

12

0

0 0

0

2021

Daikin split unit in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

Location: 001-09-2-027 01 - Heat Emitters

K - Engineering - Vent & Air Con

Location: 001-09-0-012 03 - Grilles & Diffusers

Location: 001-09-0-024 03 - Grilles & Diffusers

Location: 001-09-0-025 03 - Grilles & Diffusers

Location: 001-09-0-029 03 - Grilles & Diffusers

Location: 001-09-0-030 03 - Grilles & Diffusers

Location: 001-09-1-001 05 - Cooling Units M - Engineering - Hot/Cold Water

Location: 001-09-0-029 03 - Blending Valves

Location: 001-09-0-030 03 - Blending Valves

Location: 001-09-1-024 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Blending Valves

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

10

0

0 0

0

2019

Blending valve in good order.

B

£0

15

0

0 0

0

2024

Lift hydrant in good order.

£80,000

4

3

0 0

0

2013

Lift is very poor and will need upgrading within the maintenance schedule.

2No. Grundfos twinhead domestic hot water service pumps in good order. Grundfos heating pumps in good order. Pre insulated 400 litre cylinder with no destrat pump needs destratification pump fitting. Mikrofill pressurisation unit in good order.

Location: 001-09-1-025 03 - Blending Valves

Location: 001-09-2-027 03 - Blending Valves N - Engineering - Lifts

Location: 001-09-2-023A 02 - Comments

Location: 001-09-2-026 01 - Lifts

B(C)

O - Engineering - Main Plant

Location: 001-09-0-026A 02 - Pumps

B

£0

19

0

0 0

0

2028

02 - Pumps

B

£0

19

0

0 0

0

2028

03 - Calorifiers

C

£1,000

0

2

0 0

0

2009

05 - Pressurisation Units

B

£0

19

0

0 0

0

2028

B

£0

19

0

0 0

0

2028

Location: 001-09-0-26A 01 - Heating Boilers

3No. Wessex Modumax 120 heating boiler in good order.

P - Engineering - Lightning Protection

Location: Exterior Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01 - System

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£1,000

0

2

0 0

0

2009

Earth bonding is missing.

B

£0

10

0

0 0

0

2019

Control panel in good order.

C

£10,000

0

2

0 0

0

2009

Dale generator has seen better days, manufactured in 1980.

B

£0

10

0

0 0

0

2019

Lift hydraulic gear panel in good order.

B

£0

19

0

0 0

0

2028

Control panel as new.

B

£0

12

0

0 0

0

2021

Box fan in good order.

B

£0

10

0

0 0

0

2019

Kitchen extract in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

P - Engineering - Main Plant

Location: 001-09-0-012 03 - Controls

Location: 001-09-0-019B 08 - Generators

Location: 001-09-0-025A 03 - Controls

Location: 001-09-0-026A 03 - Controls

Location: 001-09-1-001 04 - Extract Fans

Location: 001-Exterior 04 - Extract Fans R - Engineering - Electrical

Location: 001-09-0-001 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-0-002 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation 06 - Sockets/Switches

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

20 10

0 0

0 0 0 0

0 0

2029 2019

Distribution board in good order. Surface fluorescent light in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order. Emergency light in good order.

B

£0

10

0

0 0

0

2019

Location: 001-09-0-003 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-0-004 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-0-005 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-0-006 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-0-007 03 - Distribution Boards 04 - Lighting Installation

Location: 001-09-0-012

Location: 001-09-0-012A 04 - Lighting Installation Sample College Physical Condition Survey

Surface fluorescent light in good order. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-09-0-013 04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

20

0

0 0

0

2029

Surface fluorescent light in good order. Sockets and switches in good order.

B B

£0 £0

20 12

0 0

0 0 0 0

0 0

2029 2021

Distribution board in good order. CAT II light in good order.

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

2No. CAT II lights in good order. Emergency light in good order.

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B

£0

12

0

0 0

0

2021

Location: 001-09-0-014 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-0-015 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-0-016

Location: 001-09-0-017 03 - Distribution Boards 04 - Lighting Installation

Location: 001-09-0-018

Location: 001-09-0-018A 2No. distribution boards in good order. CAT II light in good order.

Location: 001-09-0-018B Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

12

0

0 0

0

2021

CAT II light in good order.

B B

£0 £0

12 10

0 0

0 0 0 0

0 0

2021 2019

CAT II light in good order. Emergency light in good order.

B

£0

20

0

0 0

0

2029

Surface fluorescent light in good order.

B

£0

20

0

0 0

0

2029

Surface fluorescent light in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B

£0

10

0

0 0

0

2019

2No. surface fluorescent lights in good order.

B

£0

10

0

0 0

0

2019

2No. surface fluorescent lights in good order.

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

B B

£0 £0

12 10

0 0

0 0 0 0

0 0

2021 2019

CAT II light in good order. Emergency light in good order.

Location: 001-09-0-019A 04 - Lighting Installation 05 - Emergency Lighting

Location: 001-09-0-020 04 - Lighting Installation

Location: 001-09-0-021 04 - Lighting Installation

Location: 001-09-0-022 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-0-022A 04 - Lighting Installation

Location: 001-09-0-023 04 - Lighting Installation

Location: 001-09-0-024 04 - Lighting Installation

Location: 001-09-0-025 04 - Lighting Installation 05 - Emergency Lighting

Location: 001-09-0-025A Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

B B

£0 £0

12 10

0 0

0 0 0 0

0 0

2021 2019

CAT II light in good order. Emergency light in good order.

B

£0

14

0

0 0

0

2023

Lights in good order.

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

06 - Sockets/Switches

B

£0

20

0

0 0

0

2029

Surface fluorescent light in good order. Sockets and switches in good order.

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

Location: 001-09-0-026 04 - Lighting Installation 05 - Emergency Lighting

Location: 001-09-0-026A 04 - Lighting Installation

Location: 001-09-0-027 04 - Lighting Installation

Location: 001-09-0-028 04 - Lighting Installation

Location: 001-09-0-029 04 - Lighting Installation

Location: 001-09-0-030 04 - Lighting Installation

Location: 001-09-0-031

Location: 001-09-1-001

Sample College Physical Condition Survey

MEM distribution board in good order. Surface fluorescent light in good order. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-09-1-002 04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

Location: 001-09-1-003 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-1-004 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-1-005 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-1-006 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-1-007 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-1-008 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-1-009 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation 05 - Emergency Lighting 06 - Sockets/Switches

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B B B

£0 £0 £0

12 10 20

0 0 0

0 0 0 0 0 0

0 0 0

2021 2019 2029

CAT II light in good order. Emergency light in good order. Sockets and switches in good order.

B B

£0 £0

20 10

0 0

0 0 0 0

0 0

2029 2019

3No. distribution boards Surface fluorescent light in good order.

B

£0

12

0

0 0

0

2021

CAT II light in good order.

B B

£0 £0

12 10

0 0

0 0 0 0

0 0

2021 2019

CAT II light in good order. Emergency light in good order.

B B

£0 £0

12 10

0 0

0 0 0 0

0 0

2021 2019

CAT II light in good order. Emergency light in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B

£0

12

0

0 0

0

2021

CAT II light in good order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order. Emergency light in good order.

Location: 001-09-1-012 03 - Distribution Boards 04 - Lighting Installation

Location: 001-09-1-013 04 - Lighting Installation

Location: 001-09-1-014 04 - Lighting Installation 05 - Emergency Lighting

Location: 001-09-1-015 04 - Lighting Installation 05 - Emergency Lighting

Location: 001-09-1-015A 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-1-016 04 - Lighting Installation

Location: 001-09-1-018

Location: 001-09-1-019

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order. Emergency light in good order.

05 - Emergency Lighting

B

£0

10

0

0 0

0

2019

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

01 - Incoming Cable 02 - Main Switchgear

B B

£0 £0

25 25

0 0

0 0 0 0

0 0

2034 2034

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

Incoming cable in good order. Minofrm switchgear in good order. Surface fluorescent light in good order.

03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B

£0

12

0

0 0

0

2021

CAT II light in good order.

Location: 001-09-1-020 04 - Lighting Installation

Location: 001-09-1-021 04 - Lighting Installation

Location: 001-09-1-024 04 - Lighting Installation

Location: 001-09-1-025

Location: 001-09-1-026 MEM distribution board in good order. Surface fluorescent light in good order.

Location: 001-09-2-000 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-2-001 04 - Lighting Installation

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 06 - Sockets/Switches

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

20

0

0 0

0

2029

Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

Location: 001-09-2-002 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-2-003 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-2-004 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-2-005 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-2-006 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-2-007 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-2-008 04 - Lighting Installation 06 - Sockets/Switches Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-09-2-009 04 - Lighting Installation 06 - Sockets/Switches

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

Location: 001-09-2-010 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-2-011 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-2-012 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-2-013 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-2-014 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-2-015 04 - Lighting Installation 06 - Sockets/Switches

Location: 001-09-2-016 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation 06 - Sockets/Switches

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B B

£0 £0

12 20

0 0

0 0 0 0

0 0

2021 2029

CAT II light in good order. Sockets and switches in good order.

03 - Distribution Boards 04 - Lighting Installation

B B

£0 £0

20 10

0 0

0 0 0 0

0 0

2029 2019

06 - Sockets/Switches

B

£0

20

0

0 0

0

2029

Distribution board in good order. 2No. surface fluorescent lights in good order. Sockets and switches in good order.

B

£0

12

0

0 0

0

2021

CAT II light in good order.

B

£0

12

0

0 0

0

2021

CAT II light in good order.

B

£0

12

0

0 0

0

2021

CAT II light in good order.

B B

£0 £0

12 10

0 0

0 0 0 0

0 0

2021 2019

CAT II light in good order. Emergency light in good order.

B B

£0 £0

12 10

0 0

0 0 0 0

0 0

2021 2019

CAT II light in good order. Emergency light in good order.

B

£0

10

0

0 0

0

2019

2No. surface fluorescent lights in good order.

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

Location: 001-09-2-017

Location: 001-09-2-018 04 - Lighting Installation

Location: 001-09-2-019 04 - Lighting Installation

Location: 001-09-2-020 04 - Lighting Installation

Location: 001-09-2-021 04 - Lighting Installation 05 - Emergency Lighting

Location: 001-09-2-022 04 - Lighting Installation 05 - Emergency Lighting

Location: 001-09-2-023 04 - Lighting Installation

Location: 001-09-2-024 04 - Lighting Installation

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-09-2-025 04 - Lighting Installation

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

B

£0

10

0

0 0

0

2019

Surface fluorescent light in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

Location: 001-09-2-026 04 - Lighting Installation

Location: 001-09-2-027 04 - Lighting Installation V - Engineering - Fire Alarms

Location: 001-09-0-001 03 - Smoke Detectors

Location: 001-09-0-002 03 - Smoke Detectors

Location: 001-09-0-003 03 - Smoke Detectors

Location: 001-09-0-004 03 - Smoke Detectors

Location: 001-09-0-005 03 - Smoke Detectors

Location: 001-09-0-006 03 - Smoke Detectors

Location: 001-09-0-007 03 - Smoke Detectors

Location: 001-09-0-012 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Smoke Detectors

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

2No. smoke detectors in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Fire alarm panel in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

Location: 001-09-0-013 03 - Smoke Detectors

Location: 001-09-0-014 03 - Smoke Detectors

Location: 001-09-0-015 03 - Smoke Detectors

Location: 001-09-0-016 03 - Smoke Detectors

Location: 001-09-0-017 03 - Smoke Detectors

Location: 001-09-0-018 03 - Smoke Detectors

Location: 001-09-0-018A 03 - Smoke Detectors

Location: 001-09-0-018B 03 - Smoke Detectors

Location: 001-09-0-019A 03 - Smoke Detectors

Location: 001-09-0-020 05 - Fire Main/Zone Panel

Location: 001-09-0-021 03 - Smoke Detectors

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-09-0-023 03 - Smoke Detectors

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2019 2019

Smoke detector in good order. Fire alarm panel in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

Location: 001-09-0-024 03 - Smoke Detectors

Location: 001-09-0-025 03 - Smoke Detectors

Location: 001-09-0-025A 03 - Smoke Detectors

Location: 001-09-0-026 03 - Smoke Detectors 05 - Fire Main/Zone Panel

Location: 001-09-0-026A 03 - Smoke Detectors

Location: 001-09-0-027 03 - Smoke Detectors

Location: 001-09-0-028 03 - Smoke Detectors

Location: 001-09-0-029 03 - Smoke Detectors

Location: 001-09-0-030 03 - Smoke Detectors

Location: 001-09-0-031 03 - Smoke Detectors

Location: 001-09-1-001 Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Smoke Detectors

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

2No. smoke detectors in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

Location: 001-09-1-002 03 - Smoke Detectors

Location: 001-09-1-003 03 - Smoke Detectors

Location: 001-09-1-004 03 - Smoke Detectors

Location: 001-09-1-005 03 - Smoke Detectors

Location: 001-09-1-006 03 - Smoke Detectors

Location: 001-09-1-007 03 - Smoke Detectors

Location: 001-09-1-008 03 - Smoke Detectors

Location: 001-09-1-009 03 - Smoke Detectors

Location: 001-09-1-012 03 - Smoke Detectors

Location: 001-09-1-013 03 - Smoke Detectors

Location: 001-09-1-014 03 - Smoke Detectors

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-09-1-015 03 - Smoke Detectors

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

Location: 001-09-1-015A 03 - Smoke Detectors

Location: 001-09-1-018 03 - Smoke Detectors

Location: 001-09-1-020 03 - Smoke Detectors

Location: 001-09-1-021 03 - Smoke Detectors

Location: 001-09-1-026 03 - Smoke Detectors

Location: 001-09-2-000 03 - Smoke Detectors

Location: 001-09-2-001 03 - Smoke Detectors

Location: 001-09-2-002 03 - Smoke Detectors

Location: 001-09-2-003 03 - Smoke Detectors

Location: 001-09-2-004 03 - Smoke Detectors

Location: 001-09-2-005 03 - Smoke Detectors Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-09-2-006 03 - Smoke Detectors

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

Location: 001-09-2-007 03 - Smoke Detectors

Location: 001-09-2-008 03 - Smoke Detectors

Location: 001-09-2-009 03 - Smoke Detectors

Location: 001-09-2-010 03 - Smoke Detectors

Location: 001-09-2-011 03 - Smoke Detectors

Location: 001-09-2-012 03 - Smoke Detectors

Location: 001-09-2-013 03 - Smoke Detectors

Location: 001-09-2-014 03 - Smoke Detectors

Location: 001-09-2-015 03 - Smoke Detectors

Location: 001-09-2-016 03 - Smoke Detectors

Location: 001-09-2-017 03 - Smoke Detectors Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-09-2-018 03 - Smoke Detectors

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B

£0

10

0

0 0

0

2019

Smoke detector in good order.

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2021 2021

Sounders in good order. Call points in good order.

Location: 001-09-2-019 03 - Smoke Detectors

Location: 001-09-2-020 03 - Smoke Detectors

Location: 001-09-2-021 03 - Smoke Detectors

Location: 001-09-2-022 03 - Smoke Detectors

Location: 001-09-2-023 03 - Smoke Detectors

Location: 001-09-2-024 03 - Smoke Detectors

Location: 001-09-2-025 03 - Smoke Detectors

Location: 001-09-2-026 03 - Smoke Detectors

Location: 001-09-2-027 03 - Smoke Detectors

Location: Whole Block 01 - Sounders 02 - Call Points Block Total Sample College Physical Condition Survey

£330,840.00 January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Site : Sample College - 001 Block : Sports Hall - 10 Facet: 1 - Building A - Building - Physical Structure

Location: Whole Block 01 - General Structure

B

£0

60

0

0 0

0

2069

Steel frame: Generally sound.

02 - Foundations 03 - Ground Stability

B B

£0 £0

80 80

0 0

0 0 0 0

0 0

2089 2089

Generally sound. Generally sound.

B(C)

£500

1

3

0 0

0

2010

Softwood timber: Redecorate and make good - located to elevation 2 - 1No. single & 1No. double.

B(C)

£600

1

3

0 0

0

2010

Softwood timber: Redecorate and make good located to elevation 3 - 2No. double.

C

£150

0

1

0 0

0

2009

Blockwork: Need to replace missing block - located to elevation 4.

B - Building - External Fabric

Location: Elevation 02 06 - Doors

Location: Elevation 03 06 - Doors

Location: Elevation 04 01b - Masonry - Spalling

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 02b - Cladding - Cracking

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£800

0

1

0 0

0

2009

Evidence of vandalism, with making good required - located to elevation 4.

01a - Masonry - Cracking 01c - Masonry - Pointing

B B

£0 £0

40 40

0 0

0 0 0 0

0 0

2049 2049

Blockwork. Blockwork.

01d - Masonry - Finish 02a - Cladding - Attachment 02c - Cladding - Joints

B B B

£0 £0 £0

40 10 10

0 0 0

0 0 0 0 0 0

0 0 0

2049 2019 2019

Blockwork. Curtain walling: Metal. Curtain walling: Metal.

02d - Cladding - Finish 04 - Windows 06 - Doors 06 - Doors

B B B B

£0 £0 £0 £0

10 6 6 10

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2019 2015 2015 2019

Curtain walling: Metal. Aluminium - Double. Aluminium. Steel.

£1,040

2

4

0 0

0

2011

£0

6

0

0 0

0

2015

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition.

Location: Whole Block

C - Building - Internal Fabric

Location: 001-10-0-001 01 - Decorations

02 - Ceiling

Sample College Physical Condition Survey

B(C)

B

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 03 - Floor

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£1,400

5

3

0 0

0

2014

Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition.

B(C)

£650

4

4

0 0

0

2013

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-10-0-002 01 - Decorations

02 - Ceiling

B

£0

10

0

0 0

0

2019

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

12

0

0 0

0

2021

08 - Fixed Units

B

£0

12

0

0 0

0

2021

B

£0

10

0

0 0

0

2019

£105

2

3

0 0

0

2011

Location: 001-10-0-003 02 - Ceiling 03 - Floor

B(C)

05 - Condition of Internal Walls

B

£0

25

0

0 0

0

2034

08 - Fixed Units

B

£0

6

0

0 0

0

2015

B

£0

10

0

0 0

0

2019

£105

5

3

0 0

0

2014

Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Fairfaced blockwork: In good condition. Fixed units: Sluice in good condition.

Location: 001-10-0-004 02 - Ceiling 03 - Floor

Sample College Physical Condition Survey

B(C)

Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

05 - Condition of Internal Walls

B

£0

25

0

0 0

0

2034

08 - Fixed Units

B

£0

10

0

0 0

0

2019

£650

4

4

0 0

0

2013

Notes

Remedial Action

Fairfaced blockwork: In good condition. Sanitary fittings: In good condition.

Location: 001-10-0-005 01 - Decorations

B(C)

02 - Ceiling

B

£0

10

0

0 0

0

2019

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

12

0

0 0

0

2021

08 - Fixed Units

B

£0

12

0

0 0

0

2021

B(C)

£78

4

4

0 0

0

2013

B

£0

10

0

0 0

0

2019

£105

4

3

0 0

0

2013

B

£0

10

0

0 0

0

2019

02 - Ceiling

B

£0

15

0

0 0

0

2024

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

25

0

0 0

0

2034

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Ceramic wall tiling: In good condition. Sanitary fittings: In good condition.

Location: 001-10-0-006 01 - Decorations

02 - Ceiling 03 - Floor

08 - Fixed Units

B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Sanitary fittings: In good condition.

Location: 001-10-0-007

Sample College Physical Condition Survey

Exposed decking: In good condition. Vinyl sheet flooring: In good condition. Fairfaced blockwork: In good condition. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 05 - Condition of Internal Walls

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

40

0

0 0

0

2049

Timber cladding: In good condition.

02 - Ceiling

B

£0

10

0

0 0

0

2019

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

25

0

0 0

0

2034

Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Fairfaced blockwork: In good condition.

02 - Ceiling

B

£0

10

0

0 0

0

2019

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

25

0

0 0

0

2034

02 - Ceiling

B

£0

10

0

0 0

0

2019

03 - Floor

B

£0

6

0

0 0

0

2015

05 - Condition of Internal Walls

B

£0

25

0

0 0

0

2034

01 - Decorations

C

£780

0

4

0 0

0

2009

02 - Ceiling

C

£150

0

3

0 0

0

2009

£1,050

1

3

0 0

0

2010

Location: 001-10-0-008

Location: 001-10-0-009 Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Fairfaced blockwork: In good condition.

Location: 001-10-0-010 Suspended ceiling: In good condition. Anti-slip vinyl sheet flooring: In good condition. Fairfaced blockwork: In good condition.

Location: 001-10-0-011

03 - Floor

Sample College Physical Condition Survey

B(C)

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 001-10-0-012 01 - Decorations

02 - Ceiling 03 - Floor

B(C)

£520

3

4

0 0

0

2012

£0

10

0

0 0

0

2019

B(C)

£700

5

3

0 0

0

2014

B(C)

£260

4

4

0 0

0

2013

£0

10

0

0 0

0

2019

B(C)

£350

3

3

0 0

0

2012

B B B B(C)

£0 £0 £0 £1,500

6 60 60 2

0 0 0 2

0 0 0 0

0 0 0 0

0 0 0 0

2015 2069 2069 2011

£0

6

0

0 0

0

2015

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

Location: 001-10-0-013 01 - Decorations

02 - Ceiling 03 - Floor

B

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: In good condition. Carpet tiles: Require replacement with contract quality carpet within the maintenance schedule.

D - Building - Roof

Location: Roof 01 01a - Attached - Covering 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering 01h - Attached - Down Rainwater pipes

B

Metal. Metal. Metal. Box gutters: Repair joints to metal gutters. PVCU.

Location: Roof 02

Sample College Physical Condition Survey

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond. 01a - Attached - Covering

C

01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering

B B B(C)

01h - Attached - Down Rainwater pipes

Cost to B Rem Life Priority C L

R

Year

£1,500

0

3

0 0

0

2009

£0 £0 £600

60 60 2

0 0 2

0 0 0 0 0 0

0 0 0

2069 2069 2011

£0

6

0

0 0

0

2015

£0 £0 £0 £150

6 60 60 2

0 0 0 2

0 0 0 0

0 0 0 0

0 0 0 0

2015 2069 2069 2011

£0

6

0

0 0

0

2015

£0 £0 £0 £150

6 60 60 2

0 0 0 2

0 0 0 0

0 0 0 0

0 0 0 0

2015 2069 2069 2011

B

£0

6

0

0 0

0

2015

C

£1,500

0

2

0 0

0

2009

B

Notes

Remedial Action

Metal - there is evidence of deterioration to the plastic coating, with the cost allowing for the stripping and re-covering with plasticized paint. Metal. Metal. Box gutters: Repair joints to metal gutters. PVCU.

Location: Roof 03 01a - Attached - Covering 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering 01h - Attached - Down Rainwater pipes

B B B B(C) B

Metal. Metal. Metal. Box gutters: Repair joints to metal gutters. PVCU.

Location: Roof 04 01a - Attached - Covering 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering 01h - Attached - Down Rainwater pipes

B B B B(C)

Metal. Metal. Metal. Box gutters: Repair joints to metal gutters. PVCU.

Facet: 2 - Engineering I - Engineering - Heating Systems

Location: Whole Block 01 - Heat Emitters

Sample College Physical Condition Survey

3No. steel panel radiators with no low surface temperature covers require replacement. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

01 - Heat Emitters

C

£2,000

0

2

0 0

0

2009

4No. heat emitters with no low surface temperature covers require replacement. 4No. steel panel radiators in the Staff Area in good order.

01 - Heat Emitters

B

£0

10

0

0 0

0

2019

B C

£0 £2,000

20 0

0 2

0 0 0 0

0 0

2029 2009

Ductwork in good order. 10No. grilles in sports hall are damaged and require replacement.

03 - Blending Valves

C

£500

0

2

0 0

0

2009

03 - Blending Valves 08 - Tanks & Bylaws

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2019 2019

Disused shower in staff locker room to be removed. Blending valves in good order. Plastic water storage tank in good order.

K - Engineering - Vent & Air Con

Location: Whole Block 01 - Ductwork 03 - Grilles & Diffusers

M - Engineering - Hot/Cold Water

Location: Whole Block

O - Engineering - Main Plant

Location: Whole Block 01 - Heating Boilers

B(C)

£5,000

5

3

0 0

0

2014

02 - Pumps

B(C)

£1,500

5

3

0 0

0

2014

Sample College Physical Condition Survey

Potterton Derwent heating boiler requires upgrading within the maintenance schedule. Grundfos heating pump requires upgrading within the maintenance schedule.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

02 - Pumps

B(C)

£750

5

3

0 0

0

2014

03 - Calorifiers

B(C)

£1,000

5

3

0 0

0

2014

B(C)

£5,000

5

3

0 0

0

2014

Notes

Remedial Action

Grundfos domestic hot water service return pump requires upgrading within the maintenance schedule. Lochinvar DGF calorifier requires upgrading within the maintenance schedule.

P - Engineering - Main Plant

Location: Whole Block 03 - Controls

04 - Extract Fans

B

£0

10

0

0 0

0

2019

04 - Extract Fans

B

£0

12

0

0 0

0

2021

£0 £2,000

10 5

0 3

0 0 0 0

0 0

2019 2014

05 - AHUs 07 - Flue Gas Termination

B B(C)

Control panel in good order but will require upgrading within the maintenance schedule. Vent Axia Solo extract fan in good order. Duct mounted box fan in good order. Sports hall AHU in good order. Flue dilution system requires upgrading within the maintenance schedule.

R - Engineering - Electrical

Location: Whole Block 03 - Distribution Boards

B

£0

20

0

0 0

0

2029

04 - Lighting Installation

C

£800

0

2

0 0

0

2009

04 - Lighting Installation

C

£1,200

0

2

0 0

0

2009

04 - Lighting Installation

B

£0

10

0

0 0

0

2019

05 - Emergency Lighting

B

£0

12

0

0 0

0

2021

Sample College Physical Condition Survey

MEM Memshield distribution board in good order. 4No. fluorescent lights over visual display equipment in the Staff Office are not suitable and require upgrading. 6No. fluorescent lights over visual display equipment in the Computer Room are not suitable and require upgrading. Surface fluorescent lights in good order. Emergency lights in good order. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

V - Engineering - Fire Alarms

Location: Whole Block 01 - Sounders

B

£0

10

0

0 0

0

2019

02 - Call Points

B

£0

10

0

0 0

0

2019

03 - Smoke Detectors 05 - Fire Main/Zone Panel

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2019 2019

£60,000

0

1

0 0

0

2009

Block Total

Fire alarm sounders in good order. Fire alarm call points in good order. Smoke detectors in good order. Fire alarm main panel in good order.

£37,143.00

Site : Sample College - 001 Block : Garage - 11 Facet: 1 - Building A - Building - Physical Structure

Location: Whole Block 01 - General Structure

Sample College Physical Condition Survey

C

Block Total

£60,000.00

Site Total

£2,474,790.00

Overall Total

£2,474,790.00

Concrete framed & clad garage with a suspected asbestos pitched roof: Building is beyond its life expectancy with complete replacement required. Cost allows for removal of the existing structure and a temporary building of a similar size to be installed.

January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.