N
W
N
N
N
N
N
E
1
W
E
W
E
W
E
3 4 2 7 6 8
W
E 5
9
W
E
W
E
10
12 11
W
E
W
1
Naarassaari
2
Pielpajärvi wilderness church
3
Hautuumaasaari
4
Ukonsaari
5
Kalkuvaara
6
Vanha hautuumaasaari
7
Aviosaaret
8
Tissikivisaari
9
Inari
10
Akka hill
11
Ukko sland
12
Project site
13
Ivalo
E
13
S
Lake Inari
5 km
S
5 km
S
5 km
S
5 km
S
5 km
S
5 km
S
1
2
3
4
13
16
5
8
7
11
6
15
9
10
14
12
1
Debating chamber and seed archive
2
Third access point
3
Plant preservation workshops and dwellings
4
Pavilion towards the twin site (970 m away)
5
Second access point
6
Offices and greenhouses
7
Main access point
8
Disappearing path (270 m)
9
Covered path
10
Direction of the prevailing winds
11
Sediment collection
12
Future access point
13
Possible future path between buildings
14
Connection to Ivalo city (14 km) and airport (20 km)
15
Concrete stepping stones above flooding level
16
Sunpath on 21.09 from 15:00 to 18:00
SITEP 1-2
PLAN 200
FLOW OF NO
THE SITE OW
FLOW OF NOW DURI
THE SITE ING FLOOD
FLOW OF IN THE F
THE SITE FUTURE
FLOW OF IN THE FUTURE
THE SITE DURING FLOOD
Toilets
Covered path
Dwelling
ELEM
MENTS
Embassy
Smoking corner
Debating chamber dome
4
1
Water
2
Concrete
3
Timber
4
Future path
EMBASSY AND GREENHOUS 1-2
SES // GROUND FLOOR PLAN 200
2
3
1
EMBASSY AND GREENHOU 1-2
USES // FIRST FLOOR PLAN 200
EMBASSY AND GREENHOUS 1-2
SES // SECOND FLOOR PLAN 200
1
Boreal
13 workers
2
Black sea
5 workers
3
Arctic
3 workers
4
Atlantic
21 workers
5
Macronesian
5 workers
6
Mediterranean
15 workers
7
Steppic
3 workers
8
Alpine
29 workers
9
Pannonian
13 workers
10
Continental
27 workers
EMBASSY AND GREENHOU 1-2
USES // THIRD FLOOR PLAN 200
1
2
3
4
5
6
7
8
9
10
EMBASSY AND GREENHOUS 1-2
SES // FOURTH FLOOR PLAN 200
SAU 1-5
UNA 50
OFFICES AND G 1-5
GREENHOUSES 50
8
6
5
+ 14.300
+11.100
+ 7.900
+ 4.700
+ 1.500
+ 0.000
2.400
2.400
2.900
2.900
OFFICES AND G 1-5
GREENHOUSES 50
4
3
2
7
1
2.100
+ 1.000
+ 0.000
-1.100
2.400
2.400
2.900
2.900 Spring flooding level 1 Snow collection on the facade 2 Light reflection from the facade 3 Library 4 Offices and greenhouses 5 Sauna 6 Water gutter 7 Smoking corner 8
5 45
5:
-1 9
.0
21
21
.09
-1
5:3
0
5:1 -1
.09
21
21
.09
-1
5:0
0
9
0 1.
2
0
:0
6 -1
09
. 21
:15
6 -1 9
.0 21
:30
6 -1
.09
21
0
7:0
1 9-
.0
21
:45
6 -1
:15
17 9-
0
21.
2
9 1.0
:30
- 17
7:45 9-1 0 . 1 2 0 - 18:0 9 0 . 1 2 - 18:15 21.09 8:30 21.09 - 1
4
1
2
1
Water
2
Concrete
3
Timber
4
Future path
3
“JAM FACTORY” AND DWELLIN 1-2
NGS // GROUND FLOOR PLAN 200
“JAM FACTORY” AND DWELL 1-2
LINGS // FIRST FLOOR PLAN 200
“JAM FACTORY” AND DWELLIN 1-2
NGS // SECOND FLOOR PLAN 200
“JAM FACTORY” AND DWELL 1-2
LINGS // THIRD FLOOR PLAN 200
DWEL 1-5
LLING 50
1
Skylight towards the northern lights 1
+ 15.270
9
1 + 10.310
2 8
+ 7.700
3
4
5 + 4.700
7 6
+ 1.500 + 1.000
+ 0.000
DWEL 1-5
LLING 50
9
2.400
1
2.900
2.400
2
2.900
3 Snow collection on the facade 1 Dwelling 2 Plant preservation in water 3 Drying of the seeds 4 Drying of the berries 5 Fire pit, jam making 6 Spring flooding level 7 Heating sources 8 Collecting snow with the help of wind turbulence 9
1
1
Water
2
Concrete
3
Timber
4
Future path
2
DEBATING CHAMBER // 1-2
/ GROUND FLOOR PLAN 200
3
4
16.01 - 13:45
DEBATING CHAMBER 1-2
16.01 - 13:00
// FIRST FLOOR PLAN 200
DRY T
TOILET
4
1
2
3
4
d (mm)
Îť
5
1
Plywood
22 mm
0,13
2
Wood bracing + insulation
45 mm
0,13 + 0,032
3
Vapor barrier
0,5 mm
4
Timber frames + insulation
365 mm
0,13
5
Insulation with ventilation
30 mm
0,037
6
Wind barrier
25 mm
0,049
7
Timber boards
20 mm
0,13
8
Snow
200 mm (average 100 mm)
0,05 - 0,25
9
Timber water gutter
10
Ventilation openings 15mm x 22mm x 150 mm
9
SNOW COLLECTIONG FA 1-
9
6
7
8
10
U-values Wall without the snow
U = 0,093 W/m2K
Wall with snow - maximum
U = 0,089 W/m2K
Wall with snow - average
U = 0,087 W/m2K
Wall with snow - minimum
U = 0,078 W/m2K
Passivhaus standard
U = 0,15 W/m2K
ACADE DETAIL // RESIST -5
d (mm) 1
Plywood
22 mm
2
Wood bracing + insulation
45 mm
3
Vapor barrier
0,5 mm
4
Timber frames + insulation
365 mm
5
Insulation with ventilation
30 mm
6
Wind barrier
25 mm
7
Timber boards
20 mm
8
Snow
200 mm (average 100 mm)
SNOW COLLECTIONG FA 1-
ACADE DETAIL // RESIST -5
1 2 3
4 5 6 7
8
SNOW COLLECT 1-2
TIONG FACADE 20
SNOW COLLECT 1-2
TIONG FACADE 20
W
1
1
1
Timber frames
2
Wood bracing
3
Timber boards
4
Snow collecting shelf
5
Opening for the water
6
Direction of the prevailing wind
2
3
4
5
SNOW COLLECTIONG FA 1-
ACADE DETAIL // RESIGN -5
S
6
1
Timber frames
2
Wood bracing
3
Timber support
4
Timber boards
5
Snow
6
Shelf for snow collection
SNOW COLLECTIONG FA 1-
1
ACADE DETAIL // RESIGN -5
2
1
3
4
5
6
1
Timber frames
2
Wood bracing
3
Timber support
4
Timber boards
5
Snow
6
Shelf for snow collection
SNOW COLLECTIONG FA 1-
1
ACADE DETAIL // RESIGN -5
2
1
3
4
5
6
SNOW COLLECT 1-2
TIONG FACADE 20
FAR FU
UTURE