An EU embassy for climate change in the shifting Arctic region

Page 1

N

W

N

N

N

N

N

E

1

W

E

W

E

W

E

3 4 2 7 6 8

W

E 5

9

W

E

W

E

10

12 11

W

E

W

1

Naarassaari

2

Pielpajärvi wilderness church

3

Hautuumaasaari

4

Ukonsaari

5

Kalkuvaara

6

Vanha hautuumaasaari

7

Aviosaaret

8

Tissikivisaari

9

Inari

10

Akka hill

11

Ukko sland

12

Project site

13

Ivalo

E

13

S

Lake Inari

5 km

S

5 km

S

5 km

S

5 km

S

5 km

S

5 km

S


1

2

3

4

13

16

5

8

7

11

6

15

9

10

14

12

1

Debating chamber and seed archive

2

Third access point

3

Plant preservation workshops and dwellings

4

Pavilion towards the twin site (970 m away)

5

Second access point

6

Offices and greenhouses

7

Main access point

8

Disappearing path (270 m)

9

Covered path

10

Direction of the prevailing winds

11

Sediment collection

12

Future access point

13

Possible future path between buildings

14

Connection to Ivalo city (14 km) and airport (20 km)

15

Concrete stepping stones above flooding level

16

Sunpath on 21.09 from 15:00 to 18:00

SITEP 1-2


PLAN 200


FLOW OF NO


THE SITE OW


FLOW OF NOW DURI


THE SITE ING FLOOD


FLOW OF IN THE F


THE SITE FUTURE


FLOW OF IN THE FUTURE


THE SITE DURING FLOOD


Toilets

Covered path

Dwelling

ELEM


MENTS

Embassy

Smoking corner

Debating chamber dome


4

1

Water

2

Concrete

3

Timber

4

Future path

EMBASSY AND GREENHOUS 1-2


SES // GROUND FLOOR PLAN 200

2

3

1


EMBASSY AND GREENHOU 1-2


USES // FIRST FLOOR PLAN 200


EMBASSY AND GREENHOUS 1-2


SES // SECOND FLOOR PLAN 200


1

Boreal

13 workers

2

Black sea

5 workers

3

Arctic

3 workers

4

Atlantic

21 workers

5

Macronesian

5 workers

6

Mediterranean

15 workers

7

Steppic

3 workers

8

Alpine

29 workers

9

Pannonian

13 workers

10

Continental

27 workers

EMBASSY AND GREENHOU 1-2


USES // THIRD FLOOR PLAN 200

1

2

3

4

5

6

7

8

9

10


EMBASSY AND GREENHOUS 1-2


SES // FOURTH FLOOR PLAN 200


SAU 1-5


UNA 50


OFFICES AND G 1-5


GREENHOUSES 50


8

6

5

+ 14.300

+11.100

+ 7.900

+ 4.700

+ 1.500

+ 0.000

2.400

2.400

2.900

2.900

OFFICES AND G 1-5


GREENHOUSES 50

4

3

2

7

1

2.100

+ 1.000

+ 0.000

-1.100

2.400

2.400

2.900

2.900 Spring flooding level 1 Snow collection on the facade 2 Light reflection from the facade 3 Library 4 Offices and greenhouses 5 Sauna 6 Water gutter 7 Smoking corner 8




5 45

5:

-1 9

.0

21

21

.09

-1

5:3

0

5:1 -1

.09

21

21

.09

-1

5:0

0

9

0 1.

2

0

:0

6 -1

09

. 21

:15

6 -1 9

.0 21

:30

6 -1

.09

21

0

7:0

1 9-

.0

21

:45

6 -1

:15

17 9-

0

21.

2

9 1.0

:30

- 17

7:45 9-1 0 . 1 2 0 - 18:0 9 0 . 1 2 - 18:15 21.09 8:30 21.09 - 1

4

1

2

1

Water

2

Concrete

3

Timber

4

Future path

3

“JAM FACTORY” AND DWELLIN 1-2


NGS // GROUND FLOOR PLAN 200


“JAM FACTORY” AND DWELL 1-2


LINGS // FIRST FLOOR PLAN 200


“JAM FACTORY” AND DWELLIN 1-2


NGS // SECOND FLOOR PLAN 200


“JAM FACTORY” AND DWELL 1-2


LINGS // THIRD FLOOR PLAN 200


DWEL 1-5


LLING 50

1

Skylight towards the northern lights 1


+ 15.270

9

1 + 10.310

2 8

+ 7.700

3

4

5 + 4.700

7 6

+ 1.500 + 1.000

+ 0.000

DWEL 1-5


LLING 50

9

2.400

1

2.900

2.400

2

2.900

3 Snow collection on the facade 1 Dwelling 2 Plant preservation in water 3 Drying of the seeds 4 Drying of the berries 5 Fire pit, jam making 6 Spring flooding level 7 Heating sources 8 Collecting snow with the help of wind turbulence 9




1

1

Water

2

Concrete

3

Timber

4

Future path

2

DEBATING CHAMBER // 1-2


/ GROUND FLOOR PLAN 200

3

4


16.01 - 13:45

DEBATING CHAMBER 1-2


16.01 - 13:00

// FIRST FLOOR PLAN 200






DRY T


TOILET




4

1

2

3

4

d (mm)

Îť

5

1

Plywood

22 mm

0,13

2

Wood bracing + insulation

45 mm

0,13 + 0,032

3

Vapor barrier

0,5 mm

4

Timber frames + insulation

365 mm

0,13

5

Insulation with ventilation

30 mm

0,037

6

Wind barrier

25 mm

0,049

7

Timber boards

20 mm

0,13

8

Snow

200 mm (average 100 mm)

0,05 - 0,25

9

Timber water gutter

10

Ventilation openings 15mm x 22mm x 150 mm

9

SNOW COLLECTIONG FA 1-


9

6

7

8

10

U-values Wall without the snow

U = 0,093 W/m2K

Wall with snow - maximum

U = 0,089 W/m2K

Wall with snow - average

U = 0,087 W/m2K

Wall with snow - minimum

U = 0,078 W/m2K

Passivhaus standard

U = 0,15 W/m2K

ACADE DETAIL // RESIST -5


d (mm) 1

Plywood

22 mm

2

Wood bracing + insulation

45 mm

3

Vapor barrier

0,5 mm

4

Timber frames + insulation

365 mm

5

Insulation with ventilation

30 mm

6

Wind barrier

25 mm

7

Timber boards

20 mm

8

Snow

200 mm (average 100 mm)

SNOW COLLECTIONG FA 1-


ACADE DETAIL // RESIST -5

1 2 3

4 5 6 7

8


SNOW COLLECT 1-2


TIONG FACADE 20


SNOW COLLECT 1-2


TIONG FACADE 20


W

1

1

1

Timber frames

2

Wood bracing

3

Timber boards

4

Snow collecting shelf

5

Opening for the water

6

Direction of the prevailing wind

2

3

4

5

SNOW COLLECTIONG FA 1-


ACADE DETAIL // RESIGN -5

S

6


1

Timber frames

2

Wood bracing

3

Timber support

4

Timber boards

5

Snow

6

Shelf for snow collection

SNOW COLLECTIONG FA 1-


1

ACADE DETAIL // RESIGN -5

2

1

3

4

5

6


1

Timber frames

2

Wood bracing

3

Timber support

4

Timber boards

5

Snow

6

Shelf for snow collection

SNOW COLLECTIONG FA 1-


1

ACADE DETAIL // RESIGN -5

2

1

3

4

5

6


SNOW COLLECT 1-2


TIONG FACADE 20


FAR FU


UTURE


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.