Martina Leon_Architect_CV_Portfolio

Page 1

MARTINA LEON ARCHITECT

AUG 2020

INDEX 1.CV................................................2-5 2.Portfolio......................................8-37


Martina Leon ARCHITECT Phone

+44 7901 149120

Email

Flat 1, 2 Elystan Street London, SW3 3NS, United Kingdom martinaleont@gmail.com

Date of birth

Nationality

Italian

Links

09/02/1993 Linkedin: www.linkedin.com/in/martina-leon-64058ab7 Portfolio: https://issuu.com/martinaleon/docs/martinaleon_architect_cv_portfolio

Address

01 PROFILE

Accomplished architect and conceptual designer with 7 years of experience in the development of Revit models, technical drawings and construction documention, as well as visual presentations for clients. My passion for architecture and design was what led me to join a Design Studio faculty in my University as a T.A. for more than 2 years, furthering my knowledge on the subject.

02 EMPLOYMENT HISTORY November 2020 — Present Tasked based contract.

Mar 2020 — Sep 2020

2

Architectural Assistant Part II at Floyd Slaski Architects

London, United Kingdom

Floyd Slaski is a firm that specializes in the health care sector and residential architecture. My current role involves: -Developing detailed drawings for an extension of the Q Block of Northwick Park Hospital, which is currently on Stage 5. -Developing 3D Models and 2D drawings for a temporary shelter extension in Lewisham hospital, currently in Stage 2. Taking part in the conceptual design, developing images and presenting them to clients. Both projects are carried out in Revit and Autocad.

Architectural Assistant Part II at Pattern Design

London, United Kingdom

Pattern is a generalist architecture practise with offices in London, Edinburgh and Lima. Focusing mainly on Sports and Stadium Projects, some of their recent projects include two stadia for the 2022 FIFA World Cup Qatar, and eight sports venues for the Pan American Games, Lima 2019. Pattern is one of the few architectural practices in the UK to be BIM Level 2 accredited. I worked as part of the Planning Team for the new Everton FC Stadium in Liverpool, UK. I was involved in Stage 3 and Stage 4. During Stage 3 our team was responsible for redesigning the interior layout of a pre-existing project to ensure it met not only all the programme requirements but also the fire, security and acoustic strategies requirements. My main tasks were: • Studying the programme, clients requirements, Engineer's reports and redesigning different sectors of the internal layout, making sure they were compliant with all requirements and regulations, reviewing documents such as: . BS 8300-2 (Design of an accessible and inclusive built environment. Buildings - code of practice) . BS 6465-2 (Sanitary_Part 2 COP for Space Requirements for Sanitary Appliances) . BS-9999 (Fire Safety in the Design, Management and Use of Buildings) .The Green Guide . UEFA - Stadium Infrastructure Regulations . EPL - Stadium guide • Preparing plans and sketches for the Planning Addendum submission. • Preparing sketches for consultants, clients or other internal teams to review. • All tasks were carried out in Revit 2020. On Stage 4 my team was responsible for the general layout plans and for technically developing all the interior architectural elements of the building such as walls, doors, windows, internal glazing, etc. My main task on this stage was developing technical specifications for all of the building’s steel and timber doors, roller shutters, smoke curtains, opening lintels and glazed doors (1180 doors in total), developing in Revit all that was related to doors as well as schedules. • Ensuring they were correctly positioned and had the correct dimensions, taking into consideration fire, security, British Standards and accessibility strategies. • Completing and adding all parameters of all doors in the Revit model (Structural openings, fire, security and acoustic rating, AACS information, material, finishes, vision panels, grills, etc.) • Editing Revit families, elements, parameters, etc.adapting them to the design intention. • Assisting to internal coordination meeting as well as meetings with consultants. • Meeting with suppliers to ensure we could find a product that met all of our requirements. • Preparing sketches for Stage 4 submissions. • Developing Revit schedules including all parameters and characteristics for costing. (Internal Doors Schedule, Internal Glazed Doors Schedule, Roller Shutters and Smoke Curtains Schedule, Riser Doors Schedule, Opening Lintel Schedule, Ironmongery Schedule). • Developing the specification on NBS Software for all the systems I was responsible for.

1/4


Mar 2013 — Apr 2019

Junior Architect at B.Testa Architects

Montevideo, Uruguay

B.Testa Architects is an architecture practice in Montevideo, Uruguay. The practice is committed on designing and building high quality projects for a variety of programs such as Entertainment, Housing, Industry, as well as working for the largest movie theater company in Uruguay, developing projects not only in Uruguay but also in Spain, Costa Rica, Colombia, etc. During my time in the firm I evolved from simply being an assistant to being in charge of all the graphic production of the studio. Having the responsibility of producing, editing and developing drawings, CAD 3D models, BIM Models, and other documents for meetings with current and future clients. Additionally, I did all the technical drawings for construction use. During my last 2 years I also assisted directing at the construction sites, having the opportunity not only to assist in the building of high end private residence buildings but also the first CBD laboratory in Uruguay. My main tasks for this purpose included executing quality controls to ensure everything complied to clients expectations, while also making arrangements to fix any problems I encountered. Finally I was assigned to direct by myself smaller projects such as the renovation of apartments. Being a small firm I was involved in all stages of the projects. Some of my tasks were:

• Prepare, develop and edit drawings, 3D models, and documents for to the design and construction of the projects. (Autocad, 3ds Max Design, Photoshop, Illustrator, InDesign) • Prepare graphic material for meeting with clients. • Develop BIM models. (Revit) • Elaborate graphic and informational documents necessary for construction permits. • Monitor construction work in progress to ensure it met clients specifications. • Compare between offers or proposals, and suppliers technical evaluation. Working while attending school for architecture was a deeply enlighting experience, enabling me to approach not only the academic aspect of the profession but also a learning how to apply it to make a profitable business. This way, I learned how to deal with different types of clients and apply all my academical Knowledge into today's dynamic business world.

Mar 2016 — Aug 2018

Teacher Assistant at Facultad de Arquitectura, Diseño Y Urbanismo - Universidad de la República

Montevideo, Uruguay

On my fourth year at the University, as a reward for my outstanding performance as a student, I was invited by my professors to join the Faculty of Scheps Design Studio. I worked for two years for the team in charge of the Second year Studio. The first semester course aim was for students to design a vertical public building, providing a liveable infrastructure for the city. The goal was for students to reflect on the needs of a contemporary meeting space and explore what kind of programs should the building be able to hold, all while understanding the context and how the building amplifies to the city. The second semester was focused on contemporary ways of inhabiting the city. Students were asked to design a collective housing building, reflecting on the importance and sustainable aspect of increasing population density on the areas of the city that already provide a great number of services, considering new liveable layouts that are more appropriate for a present lifestyle. Later, when I was working on my degree thesis I joined the Fourth year Studio team. "Foros" was a course that was led by my thesis tutor and approached the same topic I was working on in my thesis, the Infrastructural building, "More with less". This experience allowed me to reflect and research to more extent on the topic while also collaborating with my tutor's, Luis Oreggioni Ph.D. thesis, which was on the same subject. Some of my tasks were: • Work with the lead teacher to prepare the course schedule and material. • Prepare lectures presentations. • Assist students, answering question regarding the project design, graphic design, presentation method. • Provide resources and material to support their work, encouraging them to do research • Substitute the lead teacher on needed occasions. • Participate on the grading of the final products of the students. This ose one of the most enriching experiences at the University. It allowed me to be constantly reflecting on the profession and on the importance of high quality and efficient design that is able to elevate the context it is implanted on. I developed a critical attitude and creative initiative. Being able to learn not only through my own work and my tutors, but also through my students.

2/4

3


03 EDUCATION Apr 2019 — Dec 2019

Facultad de Arquitectura, Diseño Y Urbanismo Universidad de la República

AMERICA/ ASIA/ EUROPE

Academic Architecture World Trip The Academic Architecture Trip is a consolidated instance in the training of Uruguayan architecture students since 1944. It is in permanent construction and articulates a self-organized student collective (Travel Group) and the Faculty of Architecture, Design and Urbanism. A tour around the world allows visiting and knowing through personal experience, buildings and key cities for architecture. These vivid experiences are complemented with lectures from various renowned architects around the world, and visits to several architectural firms. Such as, SANAA, MVRDV, Foster and Partners among others. Mar 2012 — Dec 2018

Facultad de Arquitectura, Diseño Y Urbanismo Universidad de la República

Montevideo, Uruguay

Undergraduate Major in Architecture By achieving this 6 year degree I gained a general and balanced training of the discipline, and can practice the profession of Architect, being enable for it. I also developed an autonomous initiative for programming, planning, project, direction, production, management, advice, maintenance and equipment related to architecture. Understood in its broadest sense, in all its dimensions and scales of action, including territorial, as well as integrating teams to address the same or other activities of greater complexity or requiring levels of interdisciplinarity. My degree thesis RESET_TROUVILLE was among the best of my class getting a 12, which is the highest mark in the grading scale. It was also used as a supporting example for my tutor's, Luis Oreggioni PhD. thesis: "More with less: Ideas for a new generation of Public Equipment in the peripheral areas of metropolitan Montevideo, generators of urbanity and based on programmatic despecialization as a tool of project." developed at the Universidad de San Pablo FAU USP, that won the second price at the 2019 Arquisur, in the research category. https://teses.usp.br/teses/disponiveis/16/16138/tde-10052019-120315/pt-br.php

4

For it, my thesis partner and I decided to explore simultaneously 2 different topics. On the one hand, the Infrastructural building, understood as a three dimensional organization capable of housing a variety of human activities, not tied to any particular programmatic package. On the other hand, understanding the urban landscape as a platform for architecture. Link: https://issuu.com/martinaleon/docs/tfc_scheps_reset_trouville_leon_ram

04 SKILLS

Autodesk AutoCAD

Google Sketchup

Autodesk 3ds Max

Dynamo

Autodesk Revit

NBS

Adobe InDesign

Microsoft Excel

Adobe Illustrator

Microsoft PowerPoint

Adobe Photoshop

Microsoft Office Word

05 LANGUAGES

Spanish

English

Dec 2011 — Present

Certificate of Proficiency in English (CPE) -Cambridge University.

3/4


06 COURSES May 2016 — May 2016

Conference by Architect Angelo Bucci atUniversidad Nacional de Córdoba - Facultad de Arquitectura Urbanismo y Diseño, Argentina

Mar 2015 — Aug 2015

Revit – BIM Project at IBEC

Oct 2014 — Oct 2014

Obras Maestras de la Arquitectura Uruguaya atFacultad de Arquitectura, Diseño Y Urbanismo Universidad de la República

Oct 2014 — Oct 2014

IX BIAU - Ibero-American Biennial of Architecture and Urbanism at Rosario, Argentina

Mar 2013 — Aug 2013

3DS Max Design 2013 ci 1, 2, and 3 at Autodesk Certificate

Oct 2013 — Oct 2013

Arquitectos del Siglo XX at Facultad de Arquitectura, Diseño Y Urbanismo - Universidad de la República

Mar 2012 — Aug 2012

AutoCAD Level 1 (2D), Level 2 (3D) at Autodesk Certificate

08 REFERENCES

Gabrielle Tester

Adriana Lorenzo

Pattern Design Architects

Pattern Design Architects

gabrielle@pattern-architects.com +44 (0) 7403362284

adriana@pattern-architects.com +44 (0) 7707096385

Beatriz Testa

Luis Lagomarsino

B.Testa Architects

LLI CONSULT

beatesta@btarq.com +598 98944794

llagomarsino@lliconsult.com +598 94441304

Matias Caraballal

Luis Oreggioni

MAPA Architects

Oreggioni y Arquitectura

matias@mapaarq.com +598 95 172411

lucho@y.org.uy +598 99199390

5

4/4



PORTFOLIO

MARTINA LEON INDEX 1.CV................................................2-5 2.Portfolio....................................8-37


Everton FC Stadium (2020) at Pattern Design Architects. Liverpool, United Kingdom. Located on the waterfront of Liverpool’s Mersey River, a UNESCO World Heritage site, the new Bramley-Moore Dock stadium will provide modern facilities, iconic design and a 52,000 capacity. The project will replace Goodison Park Stadium. Pattern were invited by the club to join the Design Team, led by New York-based MEIS Architects, as Technical Architect. All images courtesy of MEIS Architects. As a RIBA chartered practice, one of Pattern’s key roles is to present the design intent and win planning for this ambitious and challenging project. Pattern is also responsible for specialist sports planning and technical architectural consultancy to ensure the smooth delivery that is so critical to the client’s goals Stage 3 - Redesigning the interior layout of a pre-existing project to ensure it met not only all SANDON - TIDE theHALF programme requirements but also the fire, DOCK security, acoustic strategies requirements, british standars, UEFA guidance andOWNERSHIP EPL guidance. BOUNDARY

(FOR LOCAL AUTHORITY USE)

NEW ISOLATION

STRUCTURE Stage 4- Developing technical specifications for EXISTING NORTHERN all of the building’s steel and timber doors, rollDOCK WALL PLANNING ADENDUM SKETCHES WIND MITIGATION er shutters, smoke curtains, opening lintels and (IN OPERATION ONLY PER WIND MITIGATION MANAGEMENT STRATEGY) - REFER TO DETAIL BMD01-PAT-ZZ-ZZ-DR-A-215430 glazed doors (1180 doors in total), developing in Revit all that was related to doors as well as schedules. 8• Ensuring they were correctly positioned and had the correct dimensions, takingEDGE into considOF TERRACE ABOVE 7.5m eration fire,7.5msecurity, British Standards and accessibility strategies. • Completing and adding all parameters of all doors in the Revit model (Structural openings, fire, security and acoustic rating, AACS information, material, finishes, vision panels, grills, etc.) 6.8m • Editing Revit families, elements, parameters, etc.adapting them to the design intention. • Assisting to internal coordination meeting as well as meetings with consultants. STERN DOCK• Meeting with suppliers to ensure we could find LL a product that met all of our requirements. • Preparing sketches for Stage 4 submissions. OW LIGHT STORAGE 5.6m • Developing Revit schedules including all parameters and characteristics for costing. (InPLAN LAYOUTS ternal Doors Schedule, Internal Glazed Doors SLIDING GATE 6.9m Schedule, Roller Shutters and Smoke Curtains Schedule, Riser Doors Schedule, Opening Lintel Schedule, Ironmongery Schedule). • Developing the specification on NBS Software for all the systems I was responsible for.

UNITED UTILITIES WASTEWATER TREATMENT WORKS

4B

General Notes

1. DO NOT SCALE FROM THIS DRAWING 2. ALL DIMENSIONS ARE IN MILLIMETRE UNLESS STATED OTHERWISE. 3. ALL DIMENSIONS TO BE VERIFIED ON THE ENGINEER. THIS DRAWING SHOULD BE READ IN CO RELEVANT ARCHITECTURAL, STRUCTU ELECTRICAL DRAWINGS AND ALL RELE SPECIFICATIONS. 4. ANY DISCREPANCIES FROM THE INF HERE ARE TO BE REPORTED TO THE C CONSTRUCTION.

SANDON HALF - TIDE DOCK

OWNERSHIP BOUNDARY NEW ISOLATION STRUCTURE

LEGEND:

EXISTING NORTHERN DOCK WALL

SITE BOUNDARY

ACCESSIBLE PARKING ELECTRICAL VEHICLE PARKING

VEHICULAR SECURITY BOOTH & BARRIER

PROGRAM TYPE: BACK OF HOUSE GENERAL ADMISSION

EDGE OF TERRACE ABOVE

HOSPITALITY

7.1m

7.3m

7.3m

KITCHEN

7.2m

MEDIA

PLANT & RISERS

HYDRAULIC ENGINE HOUSE

MEDICAL PLANT & RISERS

BACK OF HOUSE

PLAYER AREA

GENERAL ADMISSION

MEDICAL

6.8m

FOR SOFTSCAPE, HARDSCAPE AND LANDSCAPE REFER TO LANDSCAPE DRAWINGS

6.6m

RETAIL SECURITY FACILITIES

6.6m SECURITY

6.6m EASTERN DOCK WALL

7.3m

5.6m

REGENT ROAD WALL

OUTLINE OF DOCK WALL (UNDER STADIUM)

SECURITY

WESTERN DOCK WALL

OPENINGS FOR ACCESS ON REGENT ROAD WALL

KITCHEN

7.3m

7.3m

SLIDING GATE

6.9m

FENCE AT BOUNDARY LINE

NORTH WIND MITIGATION BANNERS - REFER TO DETAILS BMD01-PAT-ZZ-EX-DR-A-904131

7.5m

GROW LIGHT STORAGE

OWNERSHIP BOUNDARY

FOR SOFTSCAPE, HARDSCAPE AND LANDSCAPE REFER TO LANDSCAPE DRAWINGS

WIND MITIGATION (IN OPERATION ONLY PER WIND MITIGATION MANAGEMENT STRATEGY) - REFER TO DETAIL BMD01-PAT-ZZ-ZZ-DR-A-215430

7.5m

7.5m

4A

FOR SOFTSCAPE, HARDSCAPE AND LANDSCAPE REFER TO LANDSCAPE DRAWINGS

DISTRIBUTED NETWORK OPERATOR COMPOUND

FOR SOFTSCAPE, HARDSCAPE AND LANDSCAPE REFER TO LANDSCAPE DRAWINGS

A 5054/BLACKSTONE STREET FAN ZONE PLAZA

RIVER MERSEY WALL

PLAYER AREA MEDIA

SLIDING GATE

RETAIL

7.3m

HOSPITALITY

No

7.3m

SLIDING GATE

EET STR FUL TON

PLANT & RISERS

6.9m

PARKING

PLAYER AREA

Description

SAFETY, HEALTH AND ENVIRONMENT INFORM Brief details on the identified hazard symbol refe hazards / risks are listed above.

FOR SOFTSCAPE, HARDSCAPE AND LANDSCAPE REFER TO LANDSCAPE DRAWINGS

REG ENT

5.6m

GENERAL ADMISSION 7.3m

OPENINGS FOR ACCESS ON REGENT ROAD WALL

STEPS TO THE WESTERN TERRACE

RO AD

6.9m

OUTSIDE BROADCAST COMPOUND

RIVER MERSEY

HOSPITALITY

BACK OF HOUSE

WATER CHANNEL

S2 FOR INFORMATION S2 FOR INFORMATION Description

Client

OPENINGS FOR ACCESS ON REGENT ROAD WALL

6.6m

P02 P01 Rev

7.3m

6.8m

6.6m

7.2m

7.3m

1

GENERAL ADMISSION

EDGE OF TERRACE ABOVE

7.3m

Main Contractor

SECURITY

6.6m 7.3m

7.3m

WIND MITIGATION (IN OPERATION ONLY PER WIND MITIGATION MANAGEMENT STRATEGY) - REFER TO DETAIL BMD01-PAT-ZZ-ZZ-DR-A-215430

Design Consultant

7.0m

7.3m

Structural / MEP / Infrastructure

FOR SOFTSCAPE, HARDSCAPE AND LANDSCAPE REFER TO LANDSCAPE DRAWINGS

SOUTHERN DOCK WALL

SOUTH WIND MITIGATION BANNERS - REFER TO DETAILS BMD01-PAT-ZZ-EX-DR-A-904130

EXISTING ISOLATION STRUCTURE

FOR SOFTSCAPE, HARDSCAPE AND LANDSCAPE REFER TO LANDSCAPE DRAWINGS

Project Title

THE PEOPLE'S PROJECT Drawing Title

PLANNING ADDENDUM STADIUM PROPOSED PLANS PROPOSED FLOOR PLA

KITCHEN NELSON DOCK

Checked

Drawn

GT

AL

Purpose of Issue

FOR INFORMATION Model File Ref:

PROPOSED FLOOR PLAN - LEVEL 00

BMD01-PAT-ZZ-ZZ-M3-A-10Plann Drawing No

1 : 500

BMD01-PAT- 4A-00-D Scale A0 (841x1189)

1 : 500

PLAYER AREA

WATER CHANNEL SLIDING GATE

HOSPITALITY

STEPS TO THE WESTERN TERRACE

Plan

STADIUM FACILITIES

7.3m

MEDIA

6.9m

Project Manager

OUTLINE OF DOCK WALL (UNDER STADIUM)

STADIUM FACILITIES

Status

S2


REVIT FAMILIES AND PARAMETERS DEVELOPMENT.

NBS SPECIFICATIONS

 

  FFL 13.200 m LEVEL 01

1

 NW9 CB





E10



 

E9



 

   

 



Ceiling

 Menu TV















1

1 : 50

  



 

E10

FIRE/SECURITY/ACOUSTIC/SECURITY SCOPE PLANS.

1

3055

L00 - L01 ROLLER SHUTTER SECTION  

 

E9



5,183 m²

  



11.800 m  LEVEL 02 

CONCOURSE

29 m²

FFL 6.800 m

 FLOOD PLANE 

50

2915

CONCESSION - PIES

FFL 7.300 m LEVEL 00



PLANE

00-L01 CONCESSION ELEVATION OPTION 1



  2650



2040



 

2475

   

0

Services Lowest level of services 3300 3200 Top of steel Top of block

TV



TV

2340

TV

2475

TV

2250

TV

2250

Horizontal Beam size to be defined by SE

Fire rated ceiling





2475







140

  

Services

Lowest level of services



COORDINATION SKETCHES. 3300 3200 Top of steel Top of block

  Stud Wall











9

BMD01-PAT- ZZ-02-SK-A-020008 L02-SOUTH VOMITORY Services Lowest level of services

Drawn: ML Date: 08/18/20 Scale: 1 : 100

135

3300 3200 Top of steel Top of block

2475

TV

TV

TV

@ A3

TV

2250

N

0

PLANE

0

L00-L01 CONCESSION ELEVATION OPTION 2

2 500 1 : 50

1 : 50

BMD01-PAT-ZZ-ZZ-SK-A- 3100 L00 - L01 CONCESSIONS ROLLER SHUTTERS Suitability: S3 Revision: P01 Date: 13/08/2020 Scale:

DOORS/SMOKE CURTAIN/ROLLER SHUTTERS/OPENING LINTELS SCHEDULES

N

0

2 500

1 : 50

@ A1


ICC LABS (2018-2019) B. Testa Architects. Montevideo, Uruguay.

10

ICC Lab was the first CBD processing Lab built in Uruguay. The building is located on Parque de las Ciencias, Canelones, Uruguay. ICC needed a place to process, test and develop their products, while also housing their offices. It is a two-story project. On the ground floor, all the storage and lab-related facilities are located while on the first floor you can find the director’s office, the team working space, 2 meeting rooms and a small scale lab. A total of 1500m2 constructed. I was involved with the project over the stages 0 to 5. Stage 0-2 -Prepare, develop and edit graphic material for meetings with clients in early stages, using Illustrator, InDesign, Photoshop. Stage 3 - Prepare drawings and documents for construction permits. Polishing the first stages drawings to ensure they meet regulations standards. Stage 4- Prepare technical drawings for construction use in AutoCAD, such as floor plans, sections, details, etc. Develop BIM projects in Revit for system coordination purposes. At the las stages, I also participated in designing the color scheme for the facade and different designs for pavements on the interior. Stage 5- During the finishing stages of the construction monitor the work in progress to ensure it met client expectations.


FLOOR PLANS

SECTIONS 1

TERMINACIONES

2

1 2 3 4

1 - PAVIMENTO 2 - ZOCALO

3- PARAMENTO

4- CIELORRASO

PAVIMENTO

Green block Piedra partida

2.80

Vinílico Epoxi Hormigón estampado 2.80

Porcelanato Piso ingenieril Alisado de arena y portland

1.15

2 3 4 5 6 7 8 9

2.60

3

Piso técnico

1-1

TEQ

CE 01

1 2 3 4 5 6

R3

2 1/7

EGRESO MATERIALES

1/2/4 1

2 1

1.60

4 1

H=3.00m

H=3.00m

M1

650 650

1000 2125

M2a

0.80

650 650

R1

2.00

9 5

2.88

0.60

900 1980

0.90

C4

0.90

0.90

0.90

0.90

C3

1.68

1.68

1.68

1.68 0.90

0.90

0.90

1.05 1.35

C3

R1

E H

G

F

R1

R1

R1

0.50

C3

+400

NPT

H=3.14m

F

E

D

C4

1.68

1.15

A2

M1

900 1980

3.00

Cierre de yeso desde 3.10 a 4.00

1.68

1.44

0.65

900 1980

R1

M1

Cierre de yeso desde 3.10 a 4.00

2/4 1

R1

R1

900 1980

CIRCULACION VISITAS 9 5

R1

2 3

0.91

M1

900 1980

900 1980

900 1980

900 1980

M1

900 1980

900 1980

900 1980

500 1980

M1

500 1980

H=3.14m

1 2

H=3.00m 0.65

1.68

WINTERIZACION 1.00

H

1 2 2 3

H=3.00m

G

1.00

0.98

FORMULACION

TOMAS EN PLANOS DELTA Revisión 6 NO APARECEN EN ELÉCTRICA R 2018 06 07

1.68

M1

0.98

0.67 2368 2612

M1

2.80

2.00

0.48

2/4 1

0.98

0.67 M1

R1

R1

C

3.00

2.00

2.50 3.50

0.80 1.00

0.80

R1

B

2.50 0.40

0.67

A-A

M1

M1

2 3

S1

H=3.00m

7 5 5 1

2.60

4.15

C3

H=3.00m

1000 2125

0.67

M7

2.60

1.23

R1

M1

1000 2125

M1

C3

SE NECESITA TOMA PARA ROTAVAPOR

Roll up

A

2.60

2.50

0.98

M1

1000 2125

PT41

GUARDRAIL 500 1680

900 1680

1000 2125

900 1680

900 1680

M1

900 1680

1000 2125

900 1680

900 1680

900 1680

9.20

M1

M1

M1

M1

2.50

0.98

1.50

1000 2125

500 1680

M1

1000 2125

1000 2125

900 1680

1000 2125

M1

0.60

900 1680

900 1680

900 1680

M1

1000 2125

2.00

0.70

R3

M1

R3

R3

2232 900

1.80

0.95

M1 M1

900 1680

PT42

0.80

D

B

PT43

0.67

PT46

CRISTALIZACION Y FRACCIONAMIENTO

1 2

M2

A

1000 2125

2 3

ACCESO PRINCIPAL

M1

C04

R1

2 3

H=2.50m

0.98

1000 2125

2 3

C1b

2.95

C

M1

C4

R1

CE 02

900 1680

M1

M1

PT16

1000 2125 M1

1.44

1000 2125

500 1680

PT21

1000 2125

C4

R1

Dintel h=3.00m

1000 2125

M1

1000 2125

700 2125

1 2

H=2.50m PT26

1 1 2/4 1

AL-202

CF

8 1 2/4 1

PT52

1 2

1 2

ALMACENAMIENTO H=3.00m

1440 480

H=3.00m

C3 M1

GUARDRAIL

8 5

900 1980

2 3

A2

H=3.00m

C3

CORTES

No

2 3

PT38

Laboratorio CBD

LAMINA

2/4 1

ROTAVAPOR

0.60

M2

AREA DE CARGA

0.70

M1

M1

900+400 2125 M1

PT18

800 2125

M1

700 2125

A1

1000 2125

PRE PACKING 2

H=2.50m

R1

1 2

0.80

C5

M1

2125

OBRA

2 3

1000 2125

700 2125

0.98

PLOMFIN S.A.

20.91

H= variable

1 2

ESCLUSA C3b 1000

374.ICC.Cortes y Fachadas R13.dwg

EXTERNO.

DECARBOXILACION

M1

PT36

C3 M1

H=3.00m

1/4 1

7

0.67

CUTTING HOLE ON SITE

M1

1 2

M1

H=2.50m

M1

PT35

C4

CIRCULACION

PT48

M1

PT1

R1

A1

M1

0.84 700 2125

PT50

1 2 2 3

1 2 2 3

PT3

VESTUARIO PT2

M2

4 1

8 1

700 2125

M1

H=2.50m

M1

2 3

A2

2 3

M1

M1

A1

1 2

R1

M2

1 1

PT44

C4

PT23

H=2.50m

PT24

PT25

MIRROR

VESTUARIO

PT27

R2

5 1

C02

H=2.50m

M1

DEPOSITO R1

0.38

6

MONTACARGAS

C5

M1

H=3.00m

Ing.L.Lagomarsino & Asoc.

0.94

PROPIETARIO

1 2 2 3

1 2

1 2

C4

2 3

1 2 2 3

M1

C5

PT33

CIRCULACION GRADO D

ROTAVAPOR

2 3

2 3

ESCLUSA

M1

1 2

H=2.50m

700 2125

1 1

R2

M7

2.00

M7

0.22

H=3.00m

0.90

M1

2 2 2 3

20.88

M1

C3b

PT32

LAVADERO

0.80

CUTTING HOLE ON SITE

PT34

H=3.00m

2 3

B1

1000 2125

M1

1 2

PT20

DEPOSITO DE EQUIPOS C3

1 2 2 3

H=3.00m

2 3

M1

900+400 2125

H=2.50m

LAVADERO

PT4

R2

0.85

D2

C3

0.60

H=3.00m

C3

M1

LAVADERO

H=2.50m 1 2

A3

M1

700 2125

3.90

0.84

3 1

H=2.50m

5 1

2 3 A1

6 -

0.71

0.50

M1

D2

900+400 2125

M1

PT5

M4b

2 3

LIMPIEZA PT29

C3

1 2

C12

SSHH

H=2.50m 0.20

INTERMEDIOS

1 2

ESC. PERSONAS

H=2.50m

PT22

3.64

M1

PT30

CUTTING HOLE ON SITE

H=2.50m

M4a

C02

M6

6 1

Cierre de yeso 4D hasta entrepiso

PT37

0.95

ESC. MATERIALES 1 2

H=2.50m

M6

ACCESO PERSONAL H=2.50m

800 2125

CIRCULACION CNC

CIRCULACION

R1

5

A-A

900+400 2125 M1 M1

B1

600 1090

800 2125

B2

Cierre de yeso desde 3.10 a 4.00

M1

PT45

PT6

A1

2 3

4.90

TBO

A1

700 2125

2 2

H=2.50m

M1

700 2125

M1

700 2125

dintel h:2.20m en yeso

H=2.50m C4

M1

PT17

1 2

90 cataC

B-B PT49

0.8x0.2/0.25xh1.2

2.70 Proyección PA Cierre de yeso desde 3.10 a 4.00

M1

2 3 PT31

H=2.50m 1 2 2 3

VESTUARIO

2.50

M3

D2

900+400 2125

ESC. MIXTA 2 3

1850 1090

1 2

M1

VESTUARIO

2.60

1000 2125

PT19

MIRROR

H=2.50m

C12

C4

H=2.50m

A1

M4a

H=2.50m

1 2 2 3

900+400 2125

700 2125

R2

2 3

2/4 1

M1

Yeso enduido y pintado Yeso placa doble con aislación enduido y pintado Prefabricado / NO COTIZAR

H=3.00m

M2a

2 1

H=2.50m

M1

D2

SUPERVISOR

PT7

3 1

0.80x0.30/0.35xh2.35

1 2 2 3

PT14

H=2.50m

R2

PT15

H=2.50m

VESTUARIO

1 2

3.60

C02

HALL

1 1 5 1

2 3

A1

M1

A1

6 -

2 1

D2

PT13

ESC. MATERIALES ESC. MATERIALES

1 2

H=2.50m

PT28

SSHH

3

4

700 2125

M1 M1

1 2

2 3

0.84

R1

PT11

700 2125

PT9

H=2.50m

SECAMANOS,SE MUEVE TOMA CANALIZACIÓN POR DUCTO VER PLANO SD-09 CORTE B-B

M6

3.70

1.40

R3

700 2125 700 2125

0.84

700 2125

1.47

M2

A2

R1

700 2125

PT8

1.70

M2

C01

D2

A1

PT12

A1 M1

2.40

4 1

H=2.10m

Cierre de yeso desde 3.10 a 4.00

VESTUARIO

VESTUARIO

A2

dintel h:3.00 en yeso

H=ALTURA GALPON 1/2/4 -

TEO

M2a

TMO

2

h Equipo: 3.70m

R3

1.80

CARGA Y DESCARGA BASKETS

4 1

CANALIZACIÓN POR DUCTO

PT10

R3

PT51

1 1

3.30

M2a

M2a

R3

A1

M2a 0.5x0.15xh0.6

H=3.00m

R1

dintel h:2.20m en yeso Cierre de yeso 4D hasta entrepiso

2/4 1 H=3.00m

MANTENIMIENTO

B-B

0.8x0.3/0.35xh2.35

4.40

2 -

2 7

M2

TAO

C03

4 1

EXTRACCION

4.00

2 1

R3

C04a

Roll up

0.95 Canaleta M5

H=3.00m

2 6 1/2/4 -

H=ALTURA GALPON

1 2 3

R3

TABIQUE A CONSTRUIR EN SEGUNDA ETAPA

DEPOSITO

Cierre de yeso desde 3.10 a 4.00

M3

0.80

2.50

CIELORRASO

M2a R3

Chapa / NO COTIZAR

Paneles Pref. de laboratorio / NO COTIZAR Porcelantao 30x60 Enduido y pintado con pintura epoxi Enduido y pintado con pintura al agua Incalex Enduido y pintado con pintura superlavable

2.50

5.29

2.80

5.10

2.80

1.40

Roll up

1.80

4 1

1.52

1.68

R3

Dintel h=3.00m

C04

21.17

PARAMENTO

2.50

TEQ

2.20

2 1

3.00

TAA

Dintel h=3.00m

2.80

2.50

2.60

CE 01

INGRESO MATERIALES 1

Sanitario Porcelanato Madera prepintada 15cm "L" de Aluminio (ver detalle) "L" de Acero Inoxidable (ver detalle)

2.50

2-2

TAA

PVC flexible Sanitario prefabricado / NO COTIZAR

3.00

ZOCALO 1 2 3 4 5 6 7

Ing.L.Lagomarsino & Asoc.

3 3

1-1

2-2

374.ICC.Plantas R13.dwg

3

PROPIETARIO

PLOMFIN S.A.

4

5

OBRA

Ing.L.Lagomarsino & Asoc.

Laboratorio CBD

6 LAMINA

374.ICC.Cortes y Fachadas R13.dwg

PLANTA BAJA

7 No

PROPIETARIO

PLOMFIN S.A. OBRA

AL-001

Laboratorio CBD

LAMINA

CORTES

No

AL-201

DETAILS TIPO

CANTIDAD

BAÑOS 12 / 32

UBICACION

1

BAÑOS PB

MONOCOMANDO DE MESADA GENEBRE TAU

GRIFERA

SIFONES CROMADOS

DUCHA DE EMBUTIR MONOCOMANDO GENEBRE GE2 + GENEBRE ROCIADOR CON BRAZO DUCHA REGULABLE

TERMINACIONES

1

1 2 3 4

2

REVESTIMIENTO

PISO : PORCELANATO 120x60 cm PORTOBELLO PIETRA DI FIRENZE

PARAMENTO : PORCELANATO 30x60 cm KLIPEN ICE MATE BLANCO

ARTEFACTOS

FERRUM BARI CON MOCHILA Y TAPA

PLATO DE DUCHA FERRUM 80x80 DE ACERO ESMALTADO BLANCO

BACHAS

PILETA DE EMBUTIR FERRUM CONGRESO

2 - ZOCALO

DESAGUES

COORDINDO CON JUNTAS PAVIMENTO

3- PARAMENTO

ACCESORIOS

SECAMANOS / DISPENSADOR DE JABON / DISPENSADOR PAPEL HIGIENICO / PERCHAS

1 - PAVIMENTO

4- CIELORRASO

LLAVES DE PASO COORDINAR CON D. de O.

PAVIMENTO

Green block Piedra partida Porcelanato Piso ingenieril Alisado de arena y portland A-A

B-B

D-D

C-C

F-F

Piso técnico

E-E

2 3 4 5 6 7 8 9

Vinílico Epoxi Hormigón estampado

ZOCALO PVC flexible Sanitario prefabricado / NO COTIZAR

390 155

20

84

60

41

llaves de paso 45

a

1-1

a

30

85

85

30

40

a

72.5

10

Altura 2.50 Tabique revestido ambas caras

Tabique revestido ambas caras

2-2

40

2-2

Altura 2.50

40 3

SSHH

40

Yeso enduido y pintado Yeso placa doble con aislación enduido y pintado 85

87.5

Melamínico Canto ABS

Prefabricado / NO COTIZAR

55

SSHH

20

R1

15

40

1 2 3

R1

155

72.5

4 -

360 20

M2

1-1

Chapa / NO COTIZAR

Paneles Pref. de laboratorio / NO COTIZAR Porcelantao 30x60 Enduido y pintado con pintura epoxi Enduido y pintado con pintura al agua Incalex Enduido y pintado con pintura superlavable

CIELORRASO

2 1

84

71

M1

a

llaves de paso

PARAMENTO

1 2 3 4 5 6

TBO

60

Sanitario Porcelanato Madera prepintada 15cm "L" de Aluminio (ver detalle) "L" de Acero Inoxidable (ver detalle)

40

1-1

2-2

1 2 3 4 5 6 7

11

40

10

OFICINA

M5

1

Dispensador PH

H=Promedio 3.80m

155

15

155

215

M2

175

374.ICC.Sec 2 - Bañ PB R13b.dwg

M7

M7

A-A

B-B

C-C

D-D

F-F

Ing.L.Lagomarsino & Asoc.

B-B

H=Promedio 3.80m 2 1

E-E

CARGA Y DESCARGA BASKETS B-B

4 -

R1

M7

PROPIETARIO TUPS 0.6x0.15xh0.8

4 2

M7

R1

OBRA

R1

M7 R1

PLOMFIN S.A.

CPD

2 1

M7

M7

M7

LAMINA

Laboratorio CBD

Sectores y detalles

M7

M7

H=2.60m

No

7 5

7 5 5 2

M7

M7a

11

M7

5 2

VISITANTES H=Promedio 3.80m

C11a

TB1

M7

M7a

R1 M7a

1 3

M7a

4 2

M7

M7

MONTACARGAS

LABORATORIO

H=2.60m

0.6x0.15xh0.8

M7 M8a

SD-04

M7

DEPOSITO

1/4 -

M7a

2 1

1 1 3/6 2

H=2.60m

C06

M8a

M7a

COMEDOR

2

3.2x0.6xh2.1

TISANERÍA

H=2.60m

C07 C05

R2

M8a

H=2.60m

TA1

8 -

H=3.00m

7 5

- -

dintel h:2.20m en yeso

5 2 C05

M7

7 5

7 5

BAÑO

5 2

7 5 6 2

M7a

5 2

BAÑO

7 5

M7a

CANTIDAD

BAÑOS 12 / 32

UBICACION

1

BAÑOS PB

TG

M7

M8a

H=2.60m

TIPO

Previsión pileta

M8

C06

TAA1

5 2

H=2.60m

0.8x0.3/0.35xh2.35

M7a

C07

1 1

M8

HALL

R1

3

H=2.60m

M9

M8

6 2 M8a

7 5

M8

R1

5 2

M7

M8a

GERENCIA

A-A

TDO

TCO

4

C08 157

dintel h:2.20m en yeso

M7

105

7 5 5 2

M8a

C10

M8a

0.8x0.3/ 0.35xh2.35

30

0.8x0.3/ 0.35xh2.35

H=2.80m

30

R1

30

A-A

C08

210

210 10

30

80

14

EQUIPOS SALA DE REUNIONES

10

E01

RECEPCION

5

H=2.80m 71

H=Promedio 4.40m M8a R1

H=2.80m

5 7 5 5 2

40

10

87.5

37.5

40

85 255

30

30

30

F

E

10

255

374.ICC.Plantas R13.dwg

1-1

152

7.10

7.10

7.10

7.35

PROPIETARIO

105

2-2 7.27

84

Ing.L.Lagomarsino & Asoc.

F

E

D

D

R1

R1

C

B

A

B

A

72.5 255

C

R1

45

PLOMFIN S.A. 210 10

30

210 10

E02

4

30

Laboratorio CBD

30

Ing.L.Lagomarsino & Asoc.

14

OBRA

71

3

LAMINA

5 No

374.ICC.Sec 2 - Bañ PB R13b.dwg

NIVEL 1

PROPIETARIO

LOCAL

AL-002

10

65

10

65

30 255

65

DENOMINACION 10

PLOMFIN S.A. 85

10

39

84

37.5

15

70

30

40

72

40

BASES PARA EQUIPOS EXTERIORES 255

267

OBRA

LAMINA

No

Laboratorio CBD

SECTORES

SD-06

BIM PROJECT

A-A

L05

Bases a d


TFC - RESET_TROUVILLE, MONTEVIDEO, URUGUAY

TROUVILLE, ARTICULATION: 3 LEVELS.

Y02

Y03

04

Y04

Y05

Y06

Y07

Y08

Y09

Y10

01 Y12

Y11

Y00

Y01

Y13

02

Y14

Y02

Y03

Y15

Y16

Y04

Y17

Y05

Y18

Y06

Y19

Y07

Y20

Y08

C02

Y01

Y21

Y09

Y22

Y10

Y23

Y11

Y12

Y24

Y13

X09

0.20 0.10

0.40 0.10

X08

X08

M14

0.30

+3.60

2.15

02

M14

0.40

X07

2

M14

+3.60

MAQUINASX07

MAQUINAS

+3.60

+3.60

+3.60

01

X06

X06

01

01

X05

X05

C03 29.70

X04

X04

X03

X03

M14

M14

+7.00

- 4.00

X02

2.15

M15

0.15 0.42

X02

C03

24.90

34.50

C03

2.08

0.30

+3.60

+3.60 GALERIA EXTERIOR

0.10 0.40

X01

0.10 0.40

X01

0.30

01

49.93

0.30

2.25

0.10 0.20

2.25

0.25

04

2.40

0.25

2.15

0.15 1.25 0.20

2.75

0.800.20 1.00

3.00

0.80 1.00 0.20

3.00

0.80 1.00 0.20

50.10

3.00

0.80 1.00 0.20

3.00

0.80 1.00 0.20

3.00

0.80 1.00 0.20

3.00

0.80 1.00 0.20

0.15

3.00

0.80 1.00 0.20

3.00

0.80 1.00 0.20

3.00

0.80 0.20

2.30

0.25

2.15

0.25

2.25

0.20 0.10

2.25

0.20 0.10

02

C01

0.10 0.20

C02

03

02 01

C02

X00

X00

THE “RAMBLA“

Cementerio del Buceo

03

04

Y00

03

Y01

Y02

Y03

Y04

04

Y05

Y06

Y07

Y08

Y09

Y10

Y11

Y12

Y13

Y14

Y15

Y16

Y17

Y18

Y19

C01

Plaza de la Armada Nacional

C02

Espacio libre Rambla República de Mexico

Espacio libre Rambla Chile

Y20

Y21

Y22

Y23

Y24

X09

Espacio libre Rambla Armenia

X08 +0.00

1 1 -

A=416m² h=3.00m

2.73

2.70

L37 TERTULIA

02

+0.00

02

0.05

X07

M14

4.50

Parque Rodoó

+0.00

0.05

0.05

Yacht Club Uruguayo

Dique Mauá

M14

01

M14

X06

0.05

01

Espacio libre Primo Levi “Kibón”

X05

Punta Trouville

25.00

C03 15.95

C03 +0.00

+0.00

- 4.00

- 4.00

X04

Frente Costero Montevideano comprende el borde de la ciudad y el territorio montevideano sobre el Río de la Plata en toda su extensión. Constituye un territorio de frontera, con fuerte vocación de espacio público recreativo, a la vez que de gran fortaleza paisajística. Se profundizarán y potenciarán las actuaciones dirigidas a promover el uso y acceso público y democrático del litoral del Río de la Plata con el objetivo de potenciar los valores geográficos y naturales del departamento, y de reafirmar la relación que la población mantiene con la costa y el agua, factor de clara identidad de los montevideanos. […] […] Bahía: En virtud de los proyectos de desarrollo y ampliación del Puerto de Montevideo y del fortalecimiento de su significación nacional y regional y con el objetivo de reconquistar para el uso público y valorizar el espacio de la Bahía de Montevideo, se reformulará el vínculo entre la ciudad y el frente costero. Se procurará recalificar las áreas urbanas contiguas y próximas a la bahía y se acordarán visiones estratégicas y actuaciones en común entre el Gobierno Departamental y las entidades públicas localizadas en el entorno de la bahía.

Club de Golf del Uruguay

X03

4.50

SECTOR DE ESTUDIO

2.78

2.73

0.05

X02

LA RAMBLA COMO OPORTUNIDAD

0.05

Teatro de verano Ramon Collazo

03

Y00

X09

LA RAMBLA COMO OPORTUNIDAD

Plaza Republica Argentina

04

C01

03

C02

THE ROOF

0.05

My degree thesis RESET_TROUVILLE was among the best of my class getting a 12, which is the highest mark in the grading scale. It was also used as a supporting example for my tutor’s, Luis Oreggioni PhD. thesis: “More with less: Ideas for a new generation of Public Equipment in the peripheral areas of metropolitan Montevideo, generators of urbanity and based on programmatic despecialization as a tool of project.” developed at the Universidad de San Pablo FAU USP. For the final degree thesis. Students have to select a subject of interest to explore. The research and plot line that the students create, concludes in an architectural project that integrates all variables and scales, incorporating and visualizing industrialization-production and assembly processes as well as all the subsystems that allow a building to function. For it, my thesis partner and I decided to explore simultaneously 2 different topics. On the one hand, the Infrastructural building, understood as a three dimensional organization capable of housing a variety of human activities, not tied to any particular programmatic package. On the other hand, understanding the urban landscape as a platform for architecture. THE URBAN LANDSCAPE - Our site of action was “La Rambla“ of Montevideo. It is a promenade, an urban public space that extends throughout the entire coastal perimeter of the city. Although it has always been one of the most iconic and used areas of the city for recreation, it lacks to support specific activities that 12infrastructure could be taking place. That is why we concluded it was an opportunity to work here, the perfect place for a diffuse infrastructural building to reinforce the essence of the Rambla.

DEGREE THESIS - DESIGN STUDIO SCHEPS

+/-0.00 - 2.00 +/-0.00

X01

Parque de la rambla Mahatma Gandhi Espacio libre Rambla República de Mexico

Espacio libre Rambla Chile

X00

Plaza de la Armada Nacional

Espacio libre Rambla Armenia

02

0.05

01

0.05

03

2.82

0.05

2.40

0.05 0.25

04

55.40

7.20

C01

Cementerio del Buceo

C02

Parque de la rambla Presidente Wilson

0.05

42.62

0.05

Yacht Club Uruguayo Dique Mauá

Digesto departamental. Directrices Departamentales de Ordenamiento Territorial y Desarrollo Sostenible. Capítulo VII Territorios Estratégicos. Artículo D.213 .

Parque Rodoó

Plaza Republica Argentina

Espacio libre Primo Levi “Kibón”

Teatro de verano Ramon Collazo

Punta Trouville

Frente Costero Montevideano comprende el borde de la ciudad y el territorio montevideano sobre el Río de la Plata en toda su extensión. Constituye un territorio de frontera, con fuerte vocación de espacio público recreativo, a la vez que de gran fortaleza paisajística. Se profundizarán y potenciarán las actuaciones dirigidas a promover el uso y acceso público y democrático del litoral del Río de la Plata con el objetivo de potenciar los valores geográficos y naturales del departamento, y de reafirmar la relación que la población mantiene con la costa y el agua, factor de clara identidad de los montevideanos. […] […] Bahía: En virtud de los proyectos de desarrollo y ampliación del Puerto de Montevideo y del fortalecimiento de su significación nacional y regional y con el objetivo de reconquistar para el uso público y valorizar el espacio de la Bahía de Montevideo, se reformulará el vínculo entre la ciudad y el frente costero. Se procurará recalificar las áreas urbanas contiguas y próximas a la bahía y se acordarán visiones estratégicas y actuaciones en común entre el Gobierno Departamental y las entidades públicas localizadas en el entorno de la bahía.

Club de Golf del Uruguay

SECTOR DE ESTUDIO

Parque de la rambla Presidente Wilson

Parque de la rambla Mahatma Gandhi

THE “BOTTOM“

Digesto departamental. Directrices Departamentales de Ordenamiento Territorial y Desarrollo Sostenible. Capítulo VII Territorios Estratégicos. Artículo D.213 .

TROUVILLE SQUARE - It is the area of the Rambla that we chose to take action. In the 30s 2 public Olympic swimming pools were built on this site. Later in the beginning of the 2000s for various reasons the pools stopped being used and were filled with land, leaving the site as a green empty space. Our building proposes re-activating the site bringing back the memory of the old pools, therefore resetting the site. Following these strategies: 27

6.05

A=15m² h=3.70m

A=20m² h=3.00m

3 3 2 -

A=55m² h=3.00m

Y06

3 3 2 -

Y07

L06 VESTUARIO

A=55m² h=3.00m

3 3 2 -

M04 - 4.00

Y08

M04

M04

- 4.00

L07 ADMINISTRACION A=60m² h=3.00m

Y09

Y10

2 1 4 1

L08 SALA EXPO

Y11

A=250m² h=3.00m

Y12

Y13

06

Y14

Y15

2 1 4 1

Y16

L09 SUBESTACION

A=49m² h=3.70m

M07

Y17

Y18

Y19

C01

05

L05 VESTUARIO

M04

M04

C02

Y05

M04

Y20

Y21

Y22

Y23

07

- 4.00 10.00

M05

M05

- 4.00

- 4.00

- 4.00

M13

- 4.00

GRADAS MOVILES

0.25

PROYECCIÓN LOSA

A=168m² h=3.00m

5.12

2 1 4 1

L31 BOLETERIA

A=15m² h=3.00m

3 1 3 2

4.95

L30 HALL

3 1 2

L13 CIRCULACION

- 4.00

A=34m² h=3.00mM132

3 1 2 2

3 1 2 2

L18 DEPOSITO

3 1 2 2

A=12m² h=3.00m

A=17m² h=3.00m

0.15

L32 COCINA

- 4.00

3 3 2 -

4.85

4.85

L16 DEPOSITO

- 4.00

0.15

M11 25.00 45.25

A=18m² h=3.00m

M10

A=12m² h=3.00m

A=15m² h=3.00m

- 4.00

- 4.00

3 3 2 -

C03

- 4.00

02

L19 SSHH

A=18m² h=3.00m

3 3 2 -

L20 DEPOSITO

A=12m² h=3.00m

A=7.5m² h=3.00m

0.15

L34 DEPOSITO

3 1 2 2

3 1 3 2

2.25

0.15

M11

02

L33 BARRA

25.00

0.15

L17 CAMARIN

- 4.00

M04

4.85

0.15

M06

L35 SSHH

3 3 2 -

L36 SSHH

3 3 2 -

7.50

M13

L21 SSHH

A=19m² h=3.00m

3 3 2 -

A=10m² h=3.00m

0.25 A=36m² h=3.00m

2 4 4 -

M13

L22 CIRCULACION

M02

2.65

0.10

X02

L23 CIRCULACION

2 1 3 1

L27 SALA MULTIUSO

2 1 3 1

A=100m² h=3.00m

L24 SALA TABLEROS

- 4.00

A=50m² h=3.70m

1 2 2

L25 SALA BOMBEO

A=23m² h=3.70m

0.25

5.21

M06

M04

X03

0.15

A=10m² h=3.00m

?

4.87

0.15

M11

M12

3 1 2 2

- 4.00

M10

C03

07

M08

- 4.00

M05

M05

A=107m² h=3.00m

3 4 4 -

3 1 2 2

- 4.00

A=18m² h=3.00m

4.85

L11 CIRCULACION

06

Y24

PROYECCIÓN LOSA

1 2 2

0.25

L04 SSHH

M04

M05 A=19m² h=3.00m

L15 CAMARIN

X04

Y04

3 3 2 -

M13

M09

0.20

2.15

A=22m² h=3.00m

L14 CAMARIN

X05

A=20m² h=3.00m

- 4.00

3 4 4 -

M01

M10

X06

L03 SSHH

9.60 0.20

L10 CIRCULACION

0.15 1.35 0.15

X07

1 2 2

M03 - 4.00

M06

Y03

L02 SALA BOMBEO

M06

Y02

M02

- 4.00

M06

Y01

M06

1 2 2

M06

0.25

L01 MAQUINAS

M06

04

Y00

M01

05

A=74m² h=3.70m

X08

2.35

?

04

X09

7.20

?

27

7.15

26

26

1 2 2

- 4.00

L26 SALA MULTIUSO A=106m² h=3.00m

2 1 3 1

A=106m² h=3.00m

L28 SALA MULTIUSO A=106m² h=3.00m

L29 SALA MULTIUSO

2 1 3 1

A=90m² h=3.00m

2 1 3 1

X01

M01 - 4.00 - 4.00

- 4.00

- 4.00

- 4.00

- 4.00

01

01

120

m.

25

m.

120

m.

25

m.

120

X01

X02

X03

X04

X05

X06

X07

X08

0.40

01

0.40

3.60

0.70 0.15

0.20 1.75

0.15

2.40

0.15

3.61

0.15

3.60

0.15

2.50

0.15

2.75

2.40

0.15

05

4.30

0.15

0.15

4.30

2.75

0.15

0.15

10.00

M01

M10 2.50

06

24.70

50.00 5.20

07

C01

9.80 0.15 1.10

M01

M10

0.30

M10

04

0.40

02

C02

03

m.

0.30

X00

X00

25

M10

M10

50.00

15.00

20.00

2.40

4.40

6.75

3.25

0.40

0.40

X09

m. X00

IDENTIFY

UNEARTH

5.00

X01

5.00

X02

5.00

X03

5.00

X04

25.00 5.00

X05

5.00

X06

5.00

X07

5.00

X08

5.00

X09

25.00

BROADEN

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

1.NOSTALGIA 1.NOSTALGIA 1.NOSTALGIA 2.EXCAVAR 2.EXCAVAR 3.DEMOLER 3.DEMOLER 4.RECONSTRUIR4.RECONSTRUIR EL BORDE EL BORDE 5.TECHO COMO EQUIPAMIENTO 5.TECHO COMO 5.TECHO EQUIPAMIENTO 6.TECHO COMO FACHADA 6.TECHO COMO 6.TECHO FACHADACOMO FACHADA 2.EXCAVAR 3.DEMOLER 4.RECONSTRUIR EL BORDE COMO EQUIPAMIENTO Se reconoce el área Seque reconoce ocupaban el área las piscinas ocupaban antes las de que ser piscinas enterradas, antes las de como ser enterradas, lugarantes de de como lugar desentierra de como el volumen Selugar desentierra el volumen las que piscinas, ocupaban reconociendo las que piscinas, el antiguo reconociendo muro deel antiguo Consideramos muro deel antiguo para Consideramos nuestro para demoler nuestro al proyecto antiguo muro deproyecto alcontención antiguodemoler muro creando dealcontención uno muro creando uno El nuevo contención nuevo muro conde losEl contención servicios que conde alos élcontención se servicios adosanque se avuelven él servicios se adosan a enterrar se avuelven Teniendo a enterrar cuenta Teniendo preexistencia en cuenta delados preexistencia piscinas diferentes, delados piscinas se decide diferentes, este se decide dividir Teniendo este en cuenta Teniendo que en predio cuenta que queen esfrente un tieneque edificios en gran tieneque altura edificios de gran se de gran altura se Seque reconoce el área ocupaban piscinas serSeenterradas, deque ocupaban Se desentierra el volumen ocupaban las piscinas, reconociendo muro deproyecto Consideramos parademoler nuestro antiguo de contención creando uno muro de El nuevo muro con los que él se adosan se en vuelven a la enterrar Teniendo en cuenta preexistencia dedividir dos piscinas diferentes, se decide dividir estees un Teniendo en predio cuenta que es frente unde predio ense frente tienealtura edificios oportunidad de proyecto. oportunidad de proyecto. contención que lascontención delimitaba.que Este lasvolumen delimitaba. vacio Este se volumen vacio en el se corazon convierte del vacio en el se corazon nuevo del enaeluncorazon offset de nuevo un manera offset de de 10m, enterrar en ese lugar enterrar equipamientos en esede lugar queequipamientos luego queequipamientos luego manera de reconstruir de manera el borde. de reconstruir Eldevacio de el borde. las El vacio piscinas de las sigue antiguas siendo piscinas centro sigue siendo vacio elen centro dos partes. vacio Reconociendose dos partes. dos Reconociendose espacios diferentes. dos espacios Una plaza diferentes. exterior Una y unplaza exterior considera y unplaza la cubierta considera como la cubierta quinta fachada. como una quinta toma fachada. lacomo decisión detoma llenarla la decisión de agua, llenarla de agua, oportunidad de proyecto. contención que lasconvierte delimitaba. Este volumen convierte del10m,a de nuevo a de un manera offset dede 10m, de manera enterrar en ese lugar quedeluego manera de antiguas reconstruir el borde. El vacio deellas antiguas piscinas sigue siendo el en centro vacio en dos partes. Reconociendose dos espacios diferentes. Una exterior y un una considera laSe cubierta unaSequinta fachada. Sede toma la decisión de llenarla de agua, Un poligono de deUn 25 poligono x 120 mts, deeldecual 25 poligono xhoy 120solo mts, queda eldecual enxhoy la120 memoria solo enhoy la memoria de colectiva proyecto. de la colectiva proyecto. sirvan al vacio central. sirvanSealabre vaciouna central. rampa que abre conecta una rampa el proyecto conecta con el plaza proyecto existente. con la el plaza existente. del proyecto. del proyecto. vacio techado. Este vacio techo techado. no es una Este simple techo cubierta no es una plana, simple sino cubierta plana, unsimple volumen sino que de es 3mplana, un volumen retomanda de es 3m laun nostalgia retomanda dedelas3m laantiguas nostalgia piscinas. de laslaantiguas Anostalgia su vez piscinas. el de agua A su vezcomo el agua reserva funciona reserva Un de 25 mts,queda elcolectiva cual sololaqueda en la memoria de la proyecto. sirvanSeal vacio central. Seque abre una la rampa que conecta proyecto con la plaza existente. del proyecto. vacio techado. Este techo noque es es una cubierta sino que volumen retomanda las funciona antiguas piscinas. A su vezcomo el agua funciona como reserva ciudad. ciudad. de alto que contiene, de alto no solo que programa contiene, no si no solo el equipamiento programa si no necesario el programa equipamiento parasielnodesarrollo necesario para de el desarrollo incendio ypara actuade incendio regulador y actua térmico. como regulador ciudad. de alto que contiene, no solo el equipamiento necesario elcomo desarrollo de incendio y actuatérmico. como regulador térmico. de variadas actividades de variadas debajoactividades de él.de variadas debajoactividades de él. debajo de él.

RECONSTRUCT

ROOF/EQUIPMENT

ROOF/ MEMORY

ARTICULATION IN 3 LEVELS - THE ROOF Serves as a stage house, holds the equipments that make the building function, generates landscape and allows for views of the landscape. THE RAMBLA - Intermediate level, enables to access or view the activities inside of the building. THE BOTTOM - Located at the level where the old pools where, the area these occupied is left empty to activate as wished, while the perimeter is where the services are located.

4.RECONSTRUIR EL BORDE EL BORDE COMO5.TECHO EQUIPAMIENTO COMO EQUIPAMIENTO FACHADACOMO FACHADA 4.RECONSTRUIR4.RECONSTRUIR EL BORDE 5.TECHO COMO 5.TECHO EQUIPAMIENTO 6.TECHO COMO 6.TECHO FACHADACOMO6.TECHO rproyecto alcontención antiguodemoler muro dealcontención antiguo creando de contención uno creando uno muro de El nuevo muro Elcontención nuevo muro conde contención servicios con élservicios se adosan que seavuelven él se adosan a enterrar se vuelven aTeniendo enterrar en cuenta Teniendo preexistencia en cuenta dela dos preexistencia piscinas diferentes, dedividir dos piscinas se decide diferentes, dividir este se decide dividir Teniendo estees en Teniendo que en es en un cuenta predio en es un frente predio tieneque edificios en se frente de gran tiene altura edificios se de gran altura se de creando uno muro El nuevo contención conde los servicios que alos él se adosanque se alos vuelven a enterrar Teniendo en cuenta la preexistencia delados piscinas diferentes, se decide este Teniendo en cuenta que un cuenta predio que frente tieneque edificios de gran altura de errar manera en esedelugar enterrar en ese lugar que equipamientos luego quede luego de manera de reconstruir devacio manera el de El vacio eldeborde. las antiguas El vacio piscinas deellascentro antiguas sigue siendo piscinas el en centro sigue siendo vacio el centro en dos partes. vacio Reconociendose enespacios dos partes. dos Reconociendose espacios diferentes. dos espacios Una diferentes. exterior Una y unplaza exterior considera y un una la cubierta considera como una la Se cubierta quinta como unaSequinta toma fachada. la decisión Sede toma llenarla la decisión de agua, de llenarla de agua, equipamientos queequipamientos luego manera de reconstruir el borde. El deborde. las reconstruir antiguas piscinas sigue siendo vacio dos partes. Reconociendose dos diferentes. Una plaza exterior y unplaza considera la cubierta como quinta fachada. toma fachada. la decisión de llenarla de agua, ue breconecta una proyecto que conecta con laelplaza proyecto existente. con la plaza existente. del proyecto. del proyecto. vacio techado. Este vacio techo techado. no es una Este simple techo no cubierta es una simple sino cubierta que plana, un volumen sino que dees 3m volumen retomanda delas 3mlaantiguas nostalgia retomanda de laslaantiguas las antiguas A su vezpiscinas. el agua funciona A su vez como el agua reserva funciona como reserva ecto con rampa la elplaza existente. del proyecto. vacio techado. Este techo no es una simple cubierta plana, sino que esplana, un volumen dees 3m retomanda launnostalgia de piscinas. Anostalgia su vezpiscinas. eldeagua funciona como reserva de alto que programa contiene, de alto no solo queel contiene, programa no si no solo elprograma equipamiento si el nonecesario el equipamiento para el desarrollo eldedesarrollo incendio y actua de como incendio regulador y actuatérmico. como regulador térmico. de alto que contiene, no solo si no equipamiento necesario para desarrollo denecesario incendio ypara actua como regulador térmico. de variadas de variadas debajoactividades de él. debajo de él. de variadas actividades debajoactividades de él.

Y00

Y01

Y02

Y03

Y04

X00

Y05

X01

Y06

X02

Y07

X03

Y08

X04

Y09

X05

Y10

X06

Y11

X07

Y12

X08

Y13

Y14

Y15

Y16

Y17

Y18

Y19

Y20

Y21

Y22

Y23

Y24

X09

60.00 55.00

X00

X01

5.00

X02

5.00

X03

5.00

5.00

X04

25.00 5.00

X05

5.00

X06

X07

4.95

X08

5.05

+7.40

X09

5.00

+6.80 +6.80 25.00 5.00

5.00

5.00

5.00

5.00

5.00

4.95

5.05

+3.00 +3.60 NPT +6.80 +1.00 Rambla ±0.00 +3.00 +1.00 Rambla +3.60 NPT ±0.00

5.00

+3.00 +1.00 Rambla ±0.00 -4.00 NPT -4.45 -5.45 -4.00 NPT -4.45 -5.45

Y00

Y01

Y02

Y03

Y04

Y05

Y06

Y07

Y08

Y09

Y10

Y11

Y12

Y13

Y14

Y15

Y16

Y17

Y18

Y19

Y20

Y21

Y22

Y23

50.00 5.00

5.00

5.00

5.00

5.00

5.00

Y24

10.00 5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

+6.80

+3.60 NPT +3.00 +1.00 Rambla ±0.00

-4.00 NPT -4.45 -5.45

Y14

Y15

Y16


13

83


INTERIOR SPACE - A CAPABLE SPACE THE ROOF AS A STAGE HOUSE - In the same way that in a theater’s stage house, the roof works like a box of tools. It supports and enables any activities that could happen underneath it. Just like in a stage house it contains a grid. Allowing staff to access any point. Motorized bars installed every 5m allowing the mounting of any equipment or scenography needed. The variations of what can happen underneath is endless. THE RAMBLA LEVEL - This level is connected to the promenade and its the upper level of access. It enables to observe what is taking place at the bottom serving as a viewing platform. It is completely surrounded by a curtain wall glass system to allow for natural light and also a fluid connection of the interior and the exterior. If the event happening in the interior requires it, there are roller blackout blinds that can be pulled down, turning the interior into a black box. The acoustic ceiling can be dismounted and replaced when needed. THE BOTTOM LEVEL - It is constituted by the central, 7m high void, and the surrounding services. The pavement is portable and can be replaced according to the users needs. The void is surrounded on the lower levels by acoustic panels that are reflective on one side and absorbent on the other, the pivotal system enables to choose which is a better fit for the event . The grandstands are retractable.

14

THE ROOF AS A STAGE BOX

THE “BOTTOM” LEVEL

THE “RAMBLA” LEVEL


CONSTRUCTION DESIGN

SECTION

DETALLE 01 Escala 1.10

SECTION

CONSTRUCTION DETAILS

DETALLE 01 Escala 1.10

DETALLE 01 Escala 1.10

DETALLE 02 Escala 1.10

DETALLE 01 Escala 1.10

DETALLE 03 Escala 1.10

PLANILLA DE MUROS Escala 1.20

DETALLE 02 Escala 1.10

15 Vista axonométrica Unidad de detalle

DETALLE 02 Escala 1.10

PLANILLA DE MUROS Escala 1.20

DETALLE 03 Escala 1.10

DETALLE 02 Escala 1.10

STRUCTURE

118

AXONOMÉTRICA GENERAL ESTRUCTURA

PLUMBING

138

AXONOMÉTRICA GENERAL ACONDICIONAMIENTO SANITARIO

HVAC

180

AXONOMÉTRICA GENERAL ACONDICIONAMIENTO TÉRMICO

181

Vista axonométrica Unidad de detalle

190

AXONOMÉTRICA GENERAL COORDINACIÓN DE SUBSISTEMAS

SYSTEM COORDINATION

191


BRITO BUILDING (2016-2019) B. Testa Architects. Montevideo, Uruguay. Brito Building is a private 3 story building constructed for a single-family, where 3 generations live together but each with their own private level. On the ground level is where the apartment of the owner and head of the family is located. On the first floor her son and wife apartment. And on the top-level her granddaughter and grandson apartments. The challenging part of this particular design and construction was to take into consideration and reflect on the plans the 3 different lifestyles and needs required by each generation. I was involved with the project over the stages A total of 1400m2 constructed with a budget of 6 million USD. 0 to 5. Stage 0-2 -Prepare, develop and edit graphic material for meetings with clients in early stages, such as photo-montages, drawings,etc., using Illustrator, InDesign, Photoshop. Stage 3 - Prepare drawings and documents for construction permits. Polishing the first stages drawings to ensure they meet regulations standards. Stage 4- Prepare technical drawings for construction use in AutoCAD, such as floor plans, sections, details, etc. Develop BIM projects in Revit for system coordination purposes. Stage 5- During the finishing stages of the con16struction monitor the work in progress to ensure it met client expectations.

STAGES 0-2

STAGES 4


REFERENCIAS LOCALES

DESTINO

NUMERO DE LOCAL

FLOOR PLANS

ALTURA

DETAILS

PLANTAS NIVEL

1

NIVEL DE PISO TERMINADO

N.P.T

2 2-2 0.85

0.20 0.05

3 2

2.00

3 1-4 1

2.30

2.30 3.20

(0.80x1.30 O/B) Movilidad 100%

0.70

1-4 1

H=2.60m

H=2.60m

0.40

0.75

DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA

H=2.60m

0.10

C03

0.15

1.22

0.15

0.30

0.30

1.60

0.75

C03

0.75

C03

Cp25

2.57

2.20 2.62

0.85

ANTEPECHO

0.75

2.40

2.00

5.30

0.85

1-4 1

2.32

2.64

2.56

8

0.05 0.20

3 2

3.20

7

TIPOLOGIA DE ABERTURA DE CARPINTERIA ANCHO ABERTURA

Piedra partida

- -

1.60

0.15

1-1

10 -

0.70

Ducto extraccion mecánica

H=2.45m

1

C03

0.85 x 0.60 0.85 x 0.60 0.85 x 0.60 (corrediza) (corrediza) (corrediza) Movilidad 50 % Movilidad 50 % Movilidad 50 %

Extracción mecánica 6 Renovac/hora 16.95

0.95

DINTEL

1.75

6 2 2

6 2

TIPOLOGIA DE ABERTURA DE CARP DE ALU 4.35

5.00

B-B

7.34

B-B

H=2.60m

3.12

3.50

6.00

4

6.12

2.32

5

3.30

0.62

6 -

H=2.60m

0.75

2 2 1.00

1

1.40 16

15

14

13

12

11

10

8

1.00

1.02

3

7

1.45 x 0.60 (corrediza) Movilidad 50 %

9.75

2

TIPOLOGIA DE PLACARD

M06

TIPOLOGÍA DE MESADAS

2.65

3.20

4.35

Rampa Vehicular pendiente 20%

Cp05

Portón Gargage Calado 4.25 x 2.45 (Basculante) Movilidad 100% Contraventilación 3.47m2

H01 C17

5

TIPOLOGÍA DE ESPEJOS

A-A

Límite de retiro Lateral

6

5

3.65

2.65

2.50

Son 16 escalones de 0.18 x 0.28

0.06

1.00 0.28

1.45

4

2 3 1 1

9

TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL

E03

2

9

4.75

4

3.20

V09

0.65

1

H=2.60m

3.60

1.05

3

1.45 x 0.60 (corrediza) Movilidad 50 %

1.45

0.35

REJILLA 20x20 DUCTO 0,04

BARANDA h=1.00m

H=2.70m

2.65

H13

6.90

1.00

3.05

2.74

3 2

C19

H=2.60m

2.90

4

H02

4

A-A

5

6.000 litros Reserva de incendio

Límite de predio

0.65

Son 7 escalones de 0.18 x 0.28 7 6

2.30

1.95 0.30

6 2 2

3

1.50

0.50

2.60

19.75

2.69

2 2

H02

TIPOLOGIA DE CORTINA DE ENROLLAR

P Cortina

6 -

H=2.70m

0.20

Límite de retiro Lateral

3.80

3.65

6 10 2

1

5.00

M4 20

H03

25.60

F

E

TIPOLOGÍA DE MUROS

REFERENC

G

D

G

F

E

D

B

C

A

B

A

2-2

1-1

C

Límite de retiro Frontal (8.50m)

3

PLANTA SUBSUELO ESC 1:100

LOC

MURO A CONSTRUIR

4 5

NUMERO DE DETALLE NUMERO DE LAMINA

CORTES 1 2 2-2

1-1

R E F E R E NNIC

BARANDA h=1.00m

1.60 x1.40 (Corrediza) Movilidad 50 %

NIVEL DE CIELORRASO

1 3 Cp14

- 5

Ducto 0.30x0.45

1.60 x1.40 (Corrediza) Movilidad 50 %

H=2.50m

NIVEL CARA SUPERIOR H.A.

Cp13

3.20 x 2.30 (Corrediza) Movilidad 50 %

H=2.50m

1 -

C02

H=2.30m

4 3

- 5 C02

C02

1 1

C15H=2.40m

4 3

1.15 x 2.30 (Batiente) Movilidad 100 %

1 3

H=2.40m H=2.40m

C02

Cp03

9 - -

A-A

C02

B-B

0.85 x 1.20 (Oscilobatiente) Movilidad 100 %

Cp12

Cp02

(0.80x1.30 O/B) Movilidad 100%

1 3

C15

1 -

NIVEL CARA INFERIOR H.A.

9 -

1 1

H=2.40m

0.50 x 1.20 (Oscilobatiente) Movilidad 100 %

0.50 x 1.20 (Oscilobatiente) Movilidad 100 %

H=2.40m

C01

H=2.60m

Cp01

0.50 x 1.20 (Oscilobatiente) Movilidad 100 %

7 3

C01

C01

Cp20

B-B

H=2.50m

1 -

0.50 x 1.20 (Oscilobatiente) Movilidad 100 % H cenefa=2.30m

H cenefa=2.30m

C01

C03

H=2.50m 1 1 3 3

2

N.P

LOC

1 1

9 C01

Terraza Estrucutra liviana Indep.

BARANDA h=1.00m 1.60 x1.40 (Corrediza) Movilidad 50 %

1 3

1 3

- 5

1

C18

01

1 1

4 1

H cenefa=2.30m

1 3

9 -

2.40 x 2.30 (Corrediza) Movilidad 50 %

2.00 x 2.30 (VF) Movilidad 0 %

1.40 x 2.30 (VF) Movilidad 0 %

4 1

BARANDA h=1.00m

H=2.50m

1.40 x 2.30 (VF) Movilidad 0 %

PLA

NIVEL DE PISO TERMINADO

Terraza Estrucutra liviana Indep.

CORTE

NUMERO DE LAMINA

PLA

H=2.30m

1.40 x 1.70 (Oscilobatiente) Movilidad 100 %

1 2

H cenefa=2.30m H=2.40m

3 -

1.80 x 2.30 (Corrediza) Movilidad 50 %

4 1 1 3

2.05 x 2.30 (VF) Movilidad 0 %

3 3

1 3

H=2.30m

9 2

1 3

1 2

C02

C05c

1 3

2.05 x 2.30 (VF) Movilidad 0 %

NI

1 1 C02

1.00 x 2.30 (Oscilobatiente) Movilidad 100 %

H=2.60m

H cenefa=2.30m

1 1

1 1

H=2.40m

H=2.40m

5 3

N.P

4 1 1 3

2.60 x 1.20 (Corrediza) Movilidad 50 %

H=2.60m C05a

1 1 3 3

H=2.60m

C05c

H=2.60m

H=2.60m

1 2 1-4 3

C09 Cp04

17

Ducto 0.34x0.33

C07b

C07b

1 1

13

12

11

10

REJILLA 20x20 DUCTO 0,04

BARANDA h=1.00m

1 1

1 3 H=2.60m

C05

C05

H cenefa=2.30m C10a

H cenefa=2.30m

1.10 x 1.20 (Corrediza) Movilidad 50 %

H=2.60m

1-4 3

H=2.60m

A-A

E03

H=2.60m

1 1

Cp05

3 3

H cenefa=2.30m C04

C02

1 2 1 2 1 3

2

1 3

1 3

C03a

H cenefa=2.30m

C04

H=2.60m

1 1

C02

6 5 4 3

1 1

1 1

5

V09

(0.80x1.30 O/B) Movilidad 100%

9 8

Son 17 escalones de 0.18 x 0.28

H=2.60m

H=2.60m

7

1

C10a

3.00x 2.30 (Corrediza) Movilidad 50 %

H=2.60m

0.70 x 1.10 (VF) Movilidad 0 %

2 3

BARANDA h=1.00m

Límite de retiro Lateral

14

1C03a 1

- -

4

15

Cp05

3 3

9 -

A-A

16

P

Cortina C03

Límite de retiro Lateral

C10

3.00x 2.30 (Corrediza) Movilidad 50 %

4

H cenefa=2.30m

3

Límite de predio

C07a

3 3

F

E

G

D

Cortina

3

PLANTA BAJA ESC 1:100

4

M06 P

1.40 x 2.30 (VF) Movilidad 0 %

- - 5

F

E

D

C

B

A

C

1.40 x 2.30 (VF) Movilidad 0 %

- -

2-2

B

1.40 x 2.30 (Oscilobatiente) Movilidad 100 % 8 -

1-1

A

1.40 x 2.30 (Oscilobatiente) Movilidad 100 %

1.40 x 2.30 (VF) Movilidad 0 %

G

0.60 x 1.50 (Oscilobatiente) Movilidad 100 %

H cenefa=2.30m

1.40 x 2.30 (VF) Movilidad 0 %

Límite de retiro Frontal (8.50m)

M4

V09 20

4 5

E03

Cp05 1

REVISIONES

4.20x 2.30 (Corrediza) Movilidad 50 %

BARANDA h=1.00m

2-2

1-1

BARANDA h=1.00m

7 -

1.60

2.95 x 2.30 (Corrediza) Movilidad 100 %

4 1 1 3

1.00 x 2.30 (Oscilobatiente) Movilidad 100 %

M06

REVISIÓN 1.55

1.10

- 4

2.95 x 2.30 (Corrediza) Movilidad 100 %

01

4.20

0.30

2

M4 COR 20

00 - LICITACION

1.10 x 2.30 (VF +Oscilobatiente) Movilidad 65 %

7 2.95

5 1

3.65

- 5

2.95

3.35

5 1 4 1

1.10

2.80

0.40

16

15

14

13

12

11

H cenefa=2.30m

C16

10

EDIFICIO BRITO

0.30

02

1.40

0.60

0.75

BARANDA h=1.00m 3.45 x 1.60 (VF+Oscilobatiente) Movilidad 45 %

05

1.10

C06

2.55

0.95

H 14

H=2.40m

C18

05

BARANDA h=1.00m

C18

0.70

0.60

F

4 5

Corte A-A Esc 1/50

A-A

Corte Integral

- -

3.65 x 2.30 (Corrediza) Movilidad 50 %

BARANDA h=1.00m

1.40 x 1.60 (Oscilobatiente) Movilidad 100 %

PLANO

7 -

- -

E

D

C

B

A

2-2

1-1

C

3.65

7 -

01

H06

1.40 x 1.60 (Oscilobatiente) Movilidad 100 %

3

370.AB.AS.De.Corte Integral - Licitaci

4 1 1 3

1.35

A3

ARCHIVO

1.10 x 2.30 (VF +Oscilobatiente) Movilidad 65 %

F

0.60

C18

H=2.60m

E

1 3

0.75

C18

1 3

1.55

0.95

BARANDA h=1.00m 3.45 x 1.60 (VF+Oscilobatiente) Movilidad 45 %

1 1

H07

1.20

D

6 3

3.45

G

1.40

BARANDA h=1.00m

0.45

1.85

1.40

1.10

1 3 5 1

1.70

1 2

A-A

9 3

5 1

1.00

H=2.60m Cp09

H=2.60m

1.10 x 2.30 (VF +Oscilobatiente) Movilidad 65 %

3 -

C05

5

H=2.60m

2

1

2.50

H=2.40m

1 3

H=2.60m

C03

C11

0.45

6 5 4 3

Son 18 escalones de 0.18 x 0.28

2 3

H=2.60m

6 3

02

8 7

Cp11

7 3

H=2.30m

1.05

1.85

Extractor

C18

H cenefa=2.30m

1.40

9

C08

1 -

C03

COR

A-A

OBRA

0.77

REJILLA 20x20 DUCTO 0,04

1 3

C12

H=2.60m 1 2

0.60

17

5 1

1.00

Cp10

H=2.30m

Cp11b

18

1.42

H=2.60m

ANA BRITO

1.10 x 2.30 (VF +Oscilobatiente) Movilidad 65 %

H=2.60m

H=2.60m

H07

1.10 0.80 1.10 0.80

Cp08

C05b

1 3

Cp11a

Rivera 7031

PROPIETARIO

C13

0.40

C07c

Cp23

4

1.85 x 1.20 (Corrediza) Movilidad 50 %

1.10 x 2.30 (VF +Oscilobatiente) Movilidad 65 %

0.50 0.75

Cp07

1.65

1 3

1.85 x 1.20 (Corrediza) Movilidad 50 %

UBICACIÓN

1 3

H=2.60m

0.50 x 1.40 (VF) Movilidad 0 % 1.65x 2.30 (VF) Movilidad 0 %

H cenefa=2.30m

1.65

5 1 1 3

B-B 1.10 x 2.30 (VF +Oscilobatiente) Movilidad 65 %

4 1

1.60 0.40

1.10 x 2.30 (VF +Oscilobatiente) Movilidad 65 %

0.30

H cenefa=2.30m

0.35

H cenefa=2.30m

C13

1.90 x 2.30 (VF) Movilidad 0 %

0.40

C11a

A-A

B

H=2.60m

0.50

0.50 x 1.40 (VF) Movilidad 0 %

1.65 x 2.30 (VF) Movilidad 0 % H cenefa=2.30m

0.50

1 2 6 3

2.80 x 1.20 (Corrediza) Movilidad 50 %

A

2.20 1.10 0.35 1.10

0.50 1.60

5.60 1.90

1.70

3

PLANTA NIVEL 1 ESC 1:100

3 9 3

0.77

0.25

BARANDA h=1.00m

H cenefa=2.30m

C13

BARANDA h=1.00m

2.00

1.70 x 1.20 Guillotina Movilidad 50 %

01

C07

H=2.60m

H=2.60m

0.60

C18

4 1 1 3

Cp06

2.00 x 2.30 (Corrediza) Movilidad 100 %

C20

H06

Cp21

H cenefa=2.30m

0.50 x 1.40 (VF) Movilidad 0 %

VACIO SOBRE PATIO

1.10 x 2.30 (VF +Oscilobatiente) Movilidad 65 %

0.30

BARANDA h=1.00m

BARANDA h=1.00m

BARANDA h=1.00m

5.00

- 5

0.50

BARANDA h=1.00m

7 -

- 4

1.00 x 2.30 (Oscilobatiente) Movilidad 100 %

H06

01

Cp22

2 B-B 7 -

H=2.60m

2.00 x 2.30 (Corrediza) Movilidad 100 %

H cenefa=2.30m

2.30

2.00

1 3

2.30 x 2.30 (Corrediza) Movilidad 100 %

1

17 ESCALA

PLANO

LAMINA

AS

1:50 1:10

1 2 2-2

1-1

C18

BARANDA h=1.00m

H08

BARANDA h=1.00m 7 -

7 -

- 4

7 - -

- 4

REVISIONES

C21a

1

7 -

REVISIÓN

- 4

2

H06

BARANDA h=1.00m

C18

4.40 x 2.30 (Corrediza) Movilidad 50 %

01

BARANDA h=1.00m

BARANDA h=1.00m

4.40 x 2.30 (Corrediza) Movilidad 50 %

4 1

4 1

1 3

1 3

3.00 x 2.30 (Oscilobatiente) Movilidad 100 %

3.00 x 2.30 (Corrediza) Movilidad 100%

B-B

00 - LICITACION

B-B H=2.70m

H=2.70m

Barra

VACIO SOBRE PATIO 7 H06 C18

01

6 3

C14

C06

4 1

Cp17

C06 REJILLA 20x20 DUCTO 0,04

4 1

H=2.30m

Cp16

C21b

8 3

1 3

Cp24

1 3

C06

1 3

4 1 Cp18

C06

C06a

H=2.60m

H=2.60m

H=2.30m 7 3

05

Cortina

Motorizada

C06

04

Cortina

0.60 x 1.60 (Oscilobatiente) Movilidad 100 %

1 3

Motorizada

2.20 x 2.30 (Corrediza) Movilidad 50 %

2.20 x 2.30 (Corrediza) Movilidad 50 %

1.00 x 1.40 (Oscilobatiente) Movilidad 100 %

Cp19

H08

C18

D

REVISIÓN

PROPIETARIO

Cortina

OBRA

1.00 x 1.60 (Oscilobatiente) Movilidad 100 %

03

BARANDA h=1.00m

B

2.20 x 2.30 (Corrediza) Movilidad 50 %

06

Motorizada

0.80 x 2.30 (VF) Movilidad 0 %

1.00 x 1.40 (Oscilobatiente) Movilidad 100 %

03

C

A

B

C18

2-2

A

H08

1-1

C

BARANDA h=1.00m

Motorizada

H=2.60m

C06

4 1

BARANDA h=1.00m

Límite de retiro Frontal (8.50m)

H=2.30m

1 3

Cortina

5 0.60 x 1.60 (Oscilobatiente) Movilidad 100 %

4 1

04

Cortina

Motorizada

04

1 3

Motorizada

3 8 3

4 1

05

Cortina

1 3

H=2.30m

1 -

04

Cortina

Motorizada

F

2.20 x 2.30 (Corrediza) Movilidad 50 %

REVISIONES UBICACIÓN 00 - LICITACION

BARANDA h=1.00m

1 3

H=2.30m

2 3

H=2.60m

H=2.30m

A-A

H=2.30m

4

E

Límite de retiro Lateral

A-A

0.75 x 1.40 (Oscilobatiente) Movilidad 100 %

H=2.30m

H08

C18

03

F

H=2.30m

C06

3 -

4 1

C13a

1 3

H=2.30m

7 3

4 1 1 3

Cp25

H=2.30m

C14

E

1 -H=2.30m

0.75 x1.40 (Oscilobatiente) Movilidad 100 %

1.25 x 1.20 (Oscilobatiente) Movilidad 100 %

H=2.70m1 -

01

H=2.30m

1 3

G

01

01

4 1 Cp15

4 1

Límite de retiro Lateral

C18

H=2.70m

1 -

6 3

C06a

D

1.25 x 1.20 (Corrediza) Movilidad 100%

01

G

C18

- 4

H06

C21 H06

3

3

PLANTA NIVEL 2 ESC 1:100

4

UBICACIÓN ARCHIVO

370.AB.

5

PROPIETARIO PLANO

BIM PROJECT

OBRA

REFERENCIAS CANTIDAD

BAÑO 34

1

GRIFERA

UBICACION

BIDET BIMANDO: Robinet niquel mate-tirol

PISO Y PARAMENTO : Mármol Limestone moca creme 60X60cm

ARTEFACTOS

INODORO: Ferrum Marina Blanco

BACHAS

PILETAS DE EMBUTIR L375

DESAGUES

REGUERA:Rejilla plate 12cm p/revestir Tece drainline: (2)120cm (2) 90cm

NIVEL N.P.T

C03

TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO

COORDINAR CON D. de O.

F-F

E-E

Ver ubicacion con D.O. Secatoalla

PLANO

DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA ANTEPECHO DINTEL

TIPOLOGIA DE CORTINA DE ENROLLAR

P Cortina

515

NIVEL DE PISO TERMINADO TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA

(0.80x1.30 O/B) Movilidad 100%

BAÑERA: Riva

TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL

V09

TIPOLOGÍA DE ESPEJOS

E03

DESAGÜES COORDINDO CON JUNTAS PAVIMENTO

TIPOLOGIA DE PLACARD

Cp05

TIPOLOGÍA DE MESADAS

M06

D-D

Ver Listado dim: 50x120

M4 20

ARCHIVO

TIPOLOGÍA DE MUROS

370.AB.

MURO A CONSTRUIR MURO EXISTENTE

140

12

220

143

e

e

a

PLANO

TIPOLOGIA BARANDA

9

9

c

Extractor

NIVEL DE PISO TERMINADO

40

NIVEL DE CIELORRASO

G-G

70

65

130

130

60

Cortes

30

9

b

40

G-G

NUMERO DE DETALLE NUMERO DE LAMINA

32.5

34

b

MURO A DEMOLER

a

Extractor

NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.

Coordinar regueras con D.O.

A-A

CORTE

NUMERO DE LAMINA

c

40

32.5

34

Corte A-A Esc 1/50

50

A-A

64

70

18

70

75

75

PLANO

A-A

41.5 135

Coordinar con D.O.

164

d

290

35

30 150

90

B-B

70

40

150

30

320

B-B

82

d

55

310 48

80

15

55

M16 f

f

f

20 30

40

55

65

f

llaves de paso 72.5

27

165

72.5

143

PLANTA

F-F

C-C

E-E

D-D

480

55 a e

REVISIONES

a

e

130

16 12 2016 01 06 2017 28 01 2018 17 04 2018 08 08 2018 28 08 2018

Revisión 01 Revisión 02 Revisión 03 Revisión 04 Revisión 05 Revisión 06

190

45

320

UBICACIÓN PROPIETARIO

ANA BRITO

OBRA

ING. ANA BRITO

NOTA: LOS INICIOS DE CERÁMICAS Y DRENAJES SE COORDINARÁN CON D.O.

A2 594x420

ARCHIVO

10

370.AB.AS.Baños 08 2018 - N1 baño veronica.dwg

PLANO

150

12

143

220

SECTOR

BAÑOS / SERVICIOS ESCALA

PLANO

525

PLANTAS Y VISTAS

LAMINA

AS.421

1:25

REFERENCIAS CANTIDAD

1

LOCALES

UBICACION

Unidad 101

DESTINO NUMERO DE LOCAL ALTURA

PLANTAS NIVEL N.P.T

C03 (0.80x1.30 O/B) Movilidad 100%

NIVEL DE PISO TERMINADO TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA ANTEPECHO DINTEL TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO

P Cortina

V09 E03 Cp05

50

33

M06

M4 20

TIPOLOGIA DE CORTINA DE ENROLLAR TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL TIPOLOGÍA DE ESPEJOS

TIPOLOGIA DE PLACARD TIPOLOGÍA DE MESADAS

TIPOLOGÍA DE MUROS

MURO A CONSTRUIR MURO EXISTENTE MURO A DEMOLER NUMERO DE DETALLE NUMERO DE LAMINA TIPOLOGIA BARANDA

a

Cortes

a

NIVEL DE PISO TERMINADO NIVEL DE CIELORRASO NIVEL CARA SUPERIOR H.A.

Bañera exenta

NIVEL CARA INFERIOR H.A.

A-A

CORTE

NUMERO DE LAMINA

55 150

12

220

65

143

90

35

34

60

34

320

25

10

525

30

145

100

50

100

50

100

50

100

4

Bañera exenta 15

71

75

a

a

a

a

a

a

10

llaves de paso 143

72.5

165 310 480

72.5

27

10

60 10

BAÑO 34

62

TIPO

C

DESTINO NUMERO DE LOCAL ALTURA

PLANTAS

SIFONES Genebre cromado recto

BAÑERA CON PEDESTAL: Robinet Charleston c/duchador niquel mate

BIDET: Ferrum Marina Blanco 3P

LLAVES DE PASO: Robinet niquel mate

ACCESORIOS SECATOALLA

LOCALES

DETALLE ZOCALO DUCHA ESC. 1:10

Unidad 101

BIMANDO PARA MESADA: Robinet niquel mate-tirol

DUCHA BIMANDO: Robinet niquel mate-tirol / Robinet Niagara techo - Sin transf. REVESTIMIENTO

C-C

TIPO

Corte A-A Esc 1/50

55 65

65

90

35

130

320

REVISIONES 16 12 2016 01 06 2017 28 01 2018 17 04 2018 08 08 2018 28 08 2018

Revisión 01 Revisión 02 Revisión 03 Revisión 04 Revisión 05 Revisión 06 UBICACIÓN PROPIETARIO

ANA BRITO

OBRA

ING. ANA BRITO

NOTA: LOS INICIOS DE CERÁMICAS Y DRENAJES SE COORDINARÁN CON D.O.

A2 594x420

ARCHIVO

370.AB.AS.Baños 08 2018 - N1 baño veronica.dwg

PLANO

SECTOR

BAÑOS / SERVICIOS ESCALA

PLANO

PLANTAS Y VISTAS

1:25

LAMINA

AS.421a

C


TE SURF

FIFTH YEAR STUDIO S2 - DESIGN STUDIO DANZA

THE EXERCISE - For this studio we were connected with some of the top surfers in our country who came to class and talked to us about the beaches, surf and different activities they were involved in. The goal was for each team to design something that addressed the beaches, their uses and current issues. Taking all of the above into consideration my partner and I decided to create some kind of infrastructure for the beaches, considering surfers and their need, but also all of the other beach users. We wanted to create an ephemeral structure that allowed the natural process of sand, water and wind to happen through it. THE SITE - This structure can be installed in any beach, anywhere. The place of action we considered was from the access of the beach to the shore line.

THE MODULE - It is a steel structure that can be assembled on site and dismantled as wished. We designed vertical closings. These can be opaque or semi opaque and are also assembled on site, the same as the flooring. There are 2 different type of modules. The “activators” and the program “containers”.

18 Martina Leon/ Nicolas Ramos

MODONEUTRO TZPEA2017


SOPORTAR CIRCULACIONES VERTICALES, HORIZONTALES Y SERVICIOS HIGIENICOS.

NEUTRAL MODE

FIFTH YEAR STUDIO S1 - DESIGN STUDIO DANZA 8

8

The rules for this project were to create a building that was able to house a variety of non defined programs. A diffuse, homogeneous, generic space. The project should be able to considerate future needs and provide solutions and strategies for future problems. Therefore the design provides wide open spaces that allow users the freedom the define them.

12

12

17

17

15

5

15

5

20

5

8

8

6

20

8

8

THE EXTERIOR - The building is covered by a uniform skin, which results on an homogeneous image, taking the concept of diffuse even further. What happens in the interior becomes a mystery to the exterior observer.

8

8

6

5

6

6

SERVICIOS

12

12

17

17

15

5

20

15

5

20

5

5

IMPLANTACION ESTEEL TERRNO SE ENCUENTRA UBICADO EN EL BARRIO PARQUE ARIEDAD DETIENE FRENTE A LA CALLE JUAN DO JACKSON, RODO. FACHADA JU AN CIO, HOMOGEOESTE Y FRENTES A DR LUIS PIERA, FACHADA SUR. D JLA FORMA DE AC KS TEARA IMPLANTAR EL EDIFICIO FUE UNA DIRECTA CONSECUENCIA ON DE AUNCONSTRUIR NO EL VOLUMEN A CAPAZ CONSTRUIBLE POR NORMATIVA. IER VOLUMEN QUE ACOMODANDOSE AL LIZA EL CRANDO RESULTADO FUEIS PUN LU IERTO GRADO Y A LA TERRENO DR ALTURA DE LAS CONSTRUCCIONES LINDERAS STOS DEFINIR PROPORCIONABA VARIEDAD DE ESPACIOS, CRUGIAS Y ORIENTAN E N CONVENICIONES, HACIENDOLO CAPAZ DE CONTENER UNA GRAN VARIEDAD LAR. DE PROGRAMAS CON NECECIDADES DIFERENTES 8

6

12

17

15

5

20

8

8

5

8

8

Martina Leon Testa Martina Leon Testa IMPLANTACION EL TERRNO SE ENCUENTRA UBICADO EN EL BARRIO PARQUE RODO. TIENE FRENTE A LA CALLE JUAN D JACKSON, FACHADA OESTE Y FRENTE A DR LUIS PIERA, FACHADA SUR. LA FORMA DE IMPLANTAR EL EDIFICIO FUE UNA DIRECTA CONSECUENCIA DE CONSTRUIR EL VOLUMEN CAPAZ CONSTRUIBLE POR NORMATIVA. EL RESULTADO FUE UN VOLUMEN QUE ACOMODANDOSE AL TERRENO Y A LA ALTURA DE LAS CONSTRUCCIONES LINDERAS PROPORCIONABA VARIEDAD DE ESPACIOS, CRUGIAS Y ORIENTAMartina Leon Martina LeonTesta Testa CIONES, HACIENDOLO CAPAZ DE CONTENER UNA GRAN VARIEDAD DE PROGRAMAS CON NECECIDADES DIFERENTES SE REALIZARON DOS OPERACIONES SOBRE EL VOLUMEN CAPAZ PARA SEGARANTIZAR REALIZARONLA DOS OPERACIONES SOBRE EL VOLUMEN CAPAZ PARA GARANTIZAR LA CORRECTA ILUMINACION Y VENTILACION DE LOS ESPACIOS. CORRECTA ILUMINACION Y VENTILACION DE LOS ESPACIOS. 8

MODONEUTRO TZPEA2017

12

THE VOLUME - The volume is a result of the max MODONEUTRO capacity of site occupation allowed by the reguMODONEUTRO TZPEA2017 TZPEA2017 lations in Montevideo, Uruguay. After, 2 subtractions were made to allow for SE REALIZARON DOS EL CAPAZ SE REALIZARON DOSOPERACIONES OPERACIONES SOBRE ELVOLUMEN VOLUMEN CAPAZPARA PARAGARANTIZAR GARANTIZARLA LA proper natural lightSOBRE and ventilation. CORRECTA ILUMINACION Y VENTILACION DE LOS ESPACIOS.

MODONEUTRO TZPEA2017

12

5

15

5

15

THE INTERIOR - The volume is horizontally sectioned, creating DIFFUSE - REPETECION DE PLANTAS LIBRES open layouts with different heights, EL VOLUMEN ESaSECCIONADO therefore allowing wide range of HORIZONTAL CREANDOSince PLANTAS LIBRES programs. the services areDE ALTURASLIB AS Y DIMENSIONES AMPLIAS. concentrated on one corner the AL ESTAR LO CONCENTRADOS freedom of the user CONTRA is total. LA MEDIANERA, L

ORGANIZACION ES COMPLETA, DEJANDO LA DIVISION EN MANOS DE LA IMAGINACION Y USUARIO.

12

12

5

5

15

15

8

Martina Leon Testa

MODONEUTRO TZPEA2017

12

5 15

FORMA FINAL PARA SALVAR EL DESNIVEL DE 2mSE ENTRE LAUNA CALLE DEFINE BANDA DE JACKSON Y LA CALLE PIERA SE PROPONE UNADERAMPA SERVICIOS 4m DEQUE ANCHO QUE UNE AMBOS NIVELES, SE DESPEGASEELPEGA EDIFICIO A LA DEL MEDIANERA MAS TERRENO Y SE GENERA UN PASAJE QUE UNE AMBOS ALTA (CON ORIENTACION SUR). ACCESOS. ESTA BANDA ES CAPAZ DE SOPORTAR CIRCULACIONES VERTICALES, HORIZONTALES Y SERVICIOS HIGIENICOS.

SE DEFINE UNA BANDA DE SERVICIOS DE 4m DE ANCHO QUE SE PEGA A LA MEDIANERA MAS ALTA (CON ORIENTACION SUR). ESTA BANDA ES CAPAZ DE SOPORTAR CIRCULACIONES VERTICALES, HORIZONTALES Y SERVICIOS HIGIENICOS.

CORRECTA ILUMINACION Y VENTILACION DE LOS ESPACIOS.

SE REALIZARON DOS OPERACIONES SOBRE EL VOLUMEN CAPAZ PARA GARANTIZAR LA CORRECTA ILUMINACION Y VENTILACION DE LOS ESPACIOS.

FORMA FORMAFINAL FINAL SE PARA SEDEFINE DEFINEUNA UNABANDA BANDADE DE PARASALVAR SALVAREL ELDESNIVEL DESNIVELDE DE2m 2mENTRE ENTRELA LACALLE CALLE SERVICIOS SERVICIOSDE DE4m 4mDE DEANCHO ANCHOQUE QUE JACKSON JACKSONYYLA LACALLE CALLEPIERA PIERASE SEPROPONE PROPONEUNA UNARAMPA RAMPAQUE QUE SE PEGA A LA MEDIANERA MAS UNE AMBOS NIVELES, SE DESPEGA EL EDIFICIO DEL SE PEGA A LA MEDIANERA MAS UNE AMBOS NIVELES, SE DESPEGA EL EDIFICIO DEL ALTA AMBOS FORMA FINAL ALTA(CON (CONORIENTACION ORIENTACIONSUR). SUR). TERRENO TERRENOYYSE SEGENERA GENERAUN UNPASAJE PASAJEQUE QUEUNE UNE AMBOS SEES DEFINE UNA BANDA PARA SALVAR EL DESNIVEL DE 2m ENTRE LA CALLE ESTA DE DE ACCESOS. ESTABANDA BANDA ESCAPAZ CAPAZ SERVICIOS DE 4mDE DE ANCHO QUEACCESOS. JACKSON Y LA CALLE PIERA SE PROPONE UNA RAMPA QUE SOPORTAR SOPORTARCIRCULACIONES CIRCULACIONES SE PEGA A LA MEDIANERA MAS UNE AMBOS NIVELES, SE DESPEGA EL EDIFICIO DEL VERTICALES, HORIZONTALES ALTA (CON ORIENTACIONYY SUR). TERRENO Y SE GENERA UN PASAJE QUE UNE AMBOS VERTICALES, HORIZONTALES ESTA BANDA ES CAPAZ DE ACCESOS. SERVICIOS SERVICIOSHIGIENICOS. HIGIENICOS.

To the south I defined a 4m wide block able to contain all type of services such as toilets, kitchens and vertical and horizontal connections, leaving the rest of the space free.

SERVICIOS

FORMA FINAL PARA SALVAR EL DESNIVEL DE 2m ENTRE LA CALLE JACKSON Y LA CALLE PIERA SE PROPONE UNA RAMPA QUE UNE AMBOS NIVELES, SE DESPEGA EL EDIFICIO DEL TERRENO Y SE GENERA UN PASAJE QUE UNE AMBOS ACCESOS.

ACCESO SERVICIOS

ACCESO

SOPORTAR CIRCULACIONES VERTICALES, HORIZONTALES Y SERVICIOS HIGIENICOS.

ACCESO

ACCESO ACCESO

Access from both streetst are connected by a ramp that unifies DIFFUSE the ground level creating anDIFFUSE- -REPETECION REPETECIONDE DEPLANTAS PLANTASLIBRES LIBRES VOLUMEN SECCIONADO other open spaceELELthat isESESconnected to the city VOLUMEN SECCIONADOHORIZONTALMENTE HORIZONTALMENTE CREANDO PLANTAS LIBRES DE ALTURASLIBRES GENEROSCREANDO PLANTAS LIBRES DE ALTURASLIBRES GENEROSPAC#3 GRADINTE IMAGEN GENERAL AS YYDIMENSIONES AMPLIAS. AL could become a public space. AS DIMENSIONES AMPLIAS. ALESTAR ESTARLOS LOSSERVICIOS SERVICIOS PARA DEFINIRand EL SISTEMA DE GRADIENTE DEL EDIFICIO SE DIO PRIORIDAD A LA CONCENTRADOS CONTRA LA MEDIANERA, LA LIBERTAD DE DIFFUSE - REPETECION DE PLANTAS LIBRES EL VOLUMEN ES SECCIONADO HORIZONTALMENTE CREANDO PLANTAS LIBRES DE ALTURASLIBRES GENEROSAS Y DIMENSIONES AMPLIAS. AL ESTAR LOS SERVICIOS CONCENTRADOS CONTRA LA MEDIANERA, LA LIBERTAD DE ORGANIZACION ES COMPLETA, DEJANDO LA OCUPACION Y DIVISION EN MANOS DE LA IMAGINACION Y NECESIDAD DEL USUARIO.

A DEFINIR POR USUARIO

2

HACIA EL INTERIOR DE LA PIEL LOS USUARIOS PODRAN ELEGIR DIFERENTES OPCIONES DE COMO RELACIONARSE CON EL EXTERIOR, DEPENDIENDO DEL PROGRAMA, NECESIDADES DE EXPANSION O PRIVACIDAD 1-CORTINA + ABERTURA CORREDIZA DE VIDRIO + PASARELA EJEMPLO EN PLANTA DE LAS TÉCNICA+ PIEL 2- CORTINA + ABERTURA CORREDIZA DE VIDRIO + AIRE + PIEL DIFERENTES OPCIONES LLA ESTRUCTURA MODULADA (MOVIMIENTO BATIENTE) + TERRAZA DEL EDIFICIO PERMITE DEFINIR 3- CORTINA +ABERTURA CORREDIZA DE VIDRIO + PATIO LOS PATIOS INTERNOS. INTERIOR + PASARELA TÉCNICA + PIEL.

LA MEDIANERA, LA LIBERTAD DE IMAGEN DEL CONJUNTO. HACIEND DE LA ACTIVIDAD CONCENTRADOS EN EL INTERIOR UNCONTRA MISTERIO ORGANIZACION PARA EL OBSERVADOR. ORGANIZACIONES ESCOMPLETA, COMPLETA,DEJANDO DEJANDOLA LAOCUPACION OCUPACIONYY DIVISION EN DE PARA ESO SE RECUBRIO TODO EL VOLUMEN CON UNA PIEL UNIFORME DE CHAPA DIVISION ENMANOS MANOS DELA LAIMAGINACION IMAGINACIONYYNECESIDAD NECESIDADDEL DEL 23.00 Leon USUARIO. Martina MICROPERFORADA NO MOVIL.DURANTE EL DIA LEDA UN EFECTO HOMOGENEO AL USUARIO. Nivel 6 EDIFICIO Y DURANTE LA NOCHE LAS LUCES QUE SE REVELAN A TRAVES DE ESA CORTINA DE CHAPA DAN INDICIOS DE LO QUE PUEDE SUCEDER DENTRO. ACENTUANDO LA CONDICION DIFUSA DEL PROYECTO. SE ACENTUAA LA CONDICION DIFUSA DEL PROYECTO,NO SOLO CREANDO ESPACIOS APTOS PARA VARIADAS ACTIVIDADES, SI NO DANDO UNA IMAGEN DE QUE TODO O NADA PUEDE ESTAR PASANDO DENTRO.

MODONEUTRO TZPEA2017 EN LA SSITUACIONES DE TERRAZA LAPIEL SE CONVIERTE EN BARANDA, RESPETANDO EL ASPECTO UNIFORME DEL EDIFICIO

1

0.95

REFERENCIAS DETALLE 2 1-PANEL CHAPA MICROPERFORADA

2

19

2-ESTRUCTURA PORTANTANTE DE LA CHAPA EN HORIZONTAL (DISTANCIA MAXIMA 1.40m) 3-PASARELA TECNICA DE ORSOGRIL (60cm de ancho) 4-ABERTURA DE ALUMINIO CORREDIZA 5- PAVIMENTO 6- PERFIL DE SECCION RECTANGULAR (25 x 55mm) 7-PERFIL L 8-MEMBRANA ASFALTICA 9-STEEL DECK 13-PERFIL I 305 X 165 10- HORMIGON 14-15-AISLACION 11- PERFIL C 130X13 16- ROLLER 12-PERFIL I 127 X 76 17 CIELORRASO DE YESO

THE STRUCTURE

1

23.00 Nivel 6

19.50 Nivel 5

DIFFUSE - REPETECION DE PLANTAS LIBRES EL VOLUMEN ES SECCIONADO HORIZONTALMENTE CREANDO PLANTAS LIBRES DE ALTURASLIBRES GENEROSAS Y DIMENSIONES AMPLIAS. AL ESTAR LOS SERVICIOS CONCENTRADOS CONTRA LA MEDIANERA, LA LIBERTAD DE ORGANIZACION ES COMPLETA, DEJANDO LA OCUPACION Y DIVISION EN MANOS DE LA IMAGINACION Y NECESIDAD DEL USUARIO.

1.40m

SERVICIOS

SERVICIOS SERVICIOS

DIFFUSE - REPETECION DE PLANTAS LIBRES EL VOLUMEN ES SECCIONADO HORIZONTALMENTE CREANDO PLANTAS LIBRES DE ALTURASLIBRES GENEROSAS Y DIMENSIONES AMPLIAS. AL ESTAR LOS SERVICIOS CONCENTRADOS CONTRA LA MEDIANERA, LA LIBERTAD DE ORGANIZACION ES COMPLETA, DEJANDO LA OCUPACION Y DIVISION EN MANOS DE LA IMAGINACION Y NECESIDAD DEL USUARIO.

2

4

2.55

2

EL CUARTO NIVEL PROPORCIONA LA LAS 3 FORMAS DE RELACION CON EL EXTERIOR PLANTEADAS EN EL PROYECTO

5

16.00 Nivel 4

0.50

19.50 Nivel 5

3

3

D

0.95

6 78 10 13

3.00

11

0.50

14

15 16 17

12.50 Nivel 3

DETALLE A 16.00 ESC1:20

0.95

2.55

EL TERCER NIVEL NO CONSTA CON ESPACIO DE TERRAZA, PERO SI SE OFRECE LA POSIBILIDAD DE CREAR PATIOS INTERIORES, SOLO CERRADOS POR LA PIELMETALICA, SE TRANFORMA UN ESPACIO EXTERIOR CONTROLADO

12

9

Nivel 4

B

2

0.95

3.00

2.55

DETALLE D ESC 1:20

EL SEGUNDO NIVEL PROPORCIONA MAYOR AMPLITUD EN ESPACIO EXTERIOR, NO ESTANDO SOLO LIMITADO A PATIOS INTERIORES

B

EXT

DETALLE B ESC1:20 A 12.50 Nivel 3

A

2.55

3.00 Nivel 1

EXT (CARPETA HORMIGON CON PENDIENTE)

INT

DETALLE C ESC1:20

D

5.00

0.00 Jackson

PARA DEFINIR EL SISTEMA DE GRADIENTE DEL EDIFICIO DAR PRIORIDAD AL CONJUNTO Y NO MOSTRAR LAS

-2.10 Piera

SECTION 3.00 Nivel 1

0.50

4.60

9.00 Nivel 2

EL PRIMER NIVEL, Y ELQUE CUENTA CON LA MAYOR AREA INTERIOR, ES EL UNICO QUE PROPORCIONA UN ESPACION DE DOBLE ALTURA. HABILTANDO PROGRAMAS CULTURALES O PUBLICOS QUE REQUIEREN ESPACIOS MENOS COMPRIMIDOS.

0.50

0.95

5.00

0.95

C

9.00 Nivel 2

CORTE PERSPECTIVADO SECTION


ROBLE 55 / ROBLE 66 (20122013) B. Testa Architects. Montevideo, Uruguay. These two buildings were designed and constructed for a gated community for which the studio also took part in the urban planning and the construction of several houses in it. The two identical, high-end, four-story buildings were developed for young families and offer a range of different apartments from 1 bedroom to 3 bedrooms. All of them have a large balcony, a kitchen that can be opened or closed into the living space, en-suite bathrooms, laundry room, etc. I was involved with the project during stages 4-6. Stage 4- Prepare technical drawings for construction use in AutoCAD, such as floor plans, sections, details, etc. Stage 5- During the finishing stages of the construction monitor the work in progress to ensure it met client expectations. Stage 6- Developing user’s guides. These guides were given to the owners of each apartment and contained instructions on how too use and look after different pavements, appliances, etc. What is more, the provided the name of the model and distributor of everything inside. (InDesign).

20


FLOOR PLANS

DETAILS

REFERENCIAS LOCALES DESTINO

C03

NUMERO DE LOCAL ALTURA

PLANTAS NIVEL

NIVEL DE PISO TERMINADO

N.P.T

TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA

A-A

B-B

C-C

SEMIENTERRADO

(0.80x1.30 O/B) P Movilidad Cortina 100%

DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA ANTEPECHO

SEMIENTERRADO

DINTEL TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO

TIPOLOGIA DE CORTINA DE ENROLLAR

Cp05

V09

TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL

E03

TIPOLOGÍA DE ESPEJOS

TIPOLOGIA DE PLACARD

M06

TIPOLOGÍA DE MESADAS

M4 20

TIPOLOGÍA DE MUROS

MURO A CONSTRUIR NUMERO DE DETALLE NUMERO DE LAMINA TIPOLOGIA BARANDA

B1

CORTES

SEMIENTERRADO

NIVEL DE PISO TERMINADO NIVEL DE CIELORRASO NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.

A-A

2.38x4.85

1

2.40x4.85

1

2.40x4.85

2

2.40x4.30

3

2.07x4.50

2.33x4.30

4

5

3.36x4.50

3.36x4.50

6

2.33x4.30

2.07x4.50

7

2.40x4.30

8

2.40x4.85

2.40x4.85

10

9

11

CORTE

NUMERO DE LAMINA

2.38x4.85

12

RAMPA ACCESO VEHICULAR MAX PENDIENTE 5%

1-1

1-1

0.80

A=604m² Lm=17.30 H=2.60m

PAVIMENTO HORMIGON ESTAMPADO

P23 2

2.33x7.55

2.37x7.55

2.48x7.55

2.45x7.00

22

23

24

15

2.28x7.00

2.35x5.50

14

20

21

12

Rejilla 20x15cm

2.55x5.50

2.28x7.00

18

19

13

Ducto 20x15cm.

2.45x7.00

2.48x7.55

16

17

2.37x7.55

14

15

2.33x7.55

13

11 10

A=2.05m² Lm=1.30 H=2.60m

9 8 7

baranda h=0.90mm

3

SEMIENTERRADO 4

SEMIENTERRADO

Tanque de agua inferior

6 5 4 3 2 1

ESCALERA ABIERTA 0.15

Pozo bombeo Primaria

Son 15 escalones de 0.19 x 0.26

Pozo bombeo Secundaria

0.15

Tanque agua inferior

TERMINACIONES

Contadores UTE

1 - PAVIMENTO

1 2

2 - ZOCALO

3 4

3- PARAMENTO

4- CIELORRASO

PAVIMENTO

1 Madera 2 Moquette 3 Porcelanato 60x60 cm. 4 Piedra laja 5 Porcelanato 80x80 cm. 6 Arena y Portland lustrado y enduercido 7 Porcelanato 60X120 cm ZOCALO

1 Mdf pintado 2 AYP Endurecido 3 Porcelanato 60x60 cm H=20cm. 1 Revoque enduido pintado Interior 2 Cerámico 30x60 3 Granito 4 Cerámico 20x20 5 Revoque fino -exterior6 Piedra 7 Ladrillo bolseado pintado

E

D

B

C

A

E

B

A

C

A-A

B-B

C-C

D

PARAMENTO

CIELORRASO

SEMIENTERRADO

SEMIENTERRADO

1 Revoque pintado 2 Placa de yeso enduido y pintado 3 Revoque enduido y pintado 4 Madera machihembrada REVISIONES DIBUJADO

FECHA

REVISADO

FECHA

NOMBRE DE ARCHIVO

361.CR.Al.Plantas 1.50 Bind.dwg

REGISTRO Revisión 1 Revisión 2

1

2012 05 21 2012 10 12

2

+10.95

CASONAS ROBLE

3

PARQUES

UBICACION

DATYLCO S.A.

PROPIETARIO

4

SUBSUELO Albañilería

PLANO

1/50 CR.AL.099.1.pdf

ESCALA LAMINA

A

SECTOR

REFERENCIAS LOCALES

1

DESTINO

C03

NUMERO DE LOCAL ALTURA

PLANTAS NIVEL

2

NIVEL DE PISO TERMINADO

N.P.T

TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA

(0.80x1.30 O/B) P Movilidad Cortina 100%

DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA

3

ANTEPECHO DINTEL TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO

4

TIPOLOGIA DE CORTINA DE ENROLLAR

Cp05

A-A

B-B

C-C

V09

TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL

E03

TIPOLOGÍA DE ESPEJOS

TIPOLOGIA DE PLACARD

M06

TIPOLOGÍA DE MESADAS

M4 TIPOLOGÍA DE MUROS 2012 05 21 20 Revisión 1

baranda h=1.00m

baranda h=1.00m

MURO A CONSTRUIR 361.CR.Al.Plantas 1.50 Bind.dwg NUMERO DE DETALLE

baranda h=1.00m

0.15

2012 05 21

TIPOLOGIA BARANDA

B1

0.15

6.75 x 2.75 m

0.80

1.20

6.75 x 2.75 m

NUMERO DE LAMINA

Revisión 1

DUCTOS D=25x30 cm (4)

DUCTOS D=25x30 cm (4)

1

CORTES NIVEL DE PISO TERMINADO NIVEL DE CIELORRASO

0.80

DATYLCO S.A.

NIVEL CARA SUPERIOR H.A.

A=16.10m² Lm=3.55m H=2.55m

A=13.30m² Lm=3.20m H=2.55m

A=16.10m² Lm=3.55m H=2.55m

H=2.20m

NIVEL CARA INFERIOR H.A.

A=11.90m² Lm=2.90m H=2.55m

A-A

CORTE

NUMERO DE LAMINA

0.80

A=11.90m² Lm=2.90m H=2.55m

1.35

2

A=3.15m² Lm=1.40m H=2.30m

0.80 0.90

1.20

3.33

1-3 2.02 2

baranda h=0.90mmventilada 7 6 5 4 3 2 8 1 9 10 1112 13 14 15

Tapa de inspección

14

6

A=4.50m² Lm=2.10m H=2.30m Rejilla 20x15cm.

12

A=2.50m² Lm=1.15 H=2.30m

A=3.45m² Lm=1.35 H=2.55m

H=2.30m

1-1 Rejilla 20x15cm.

11 10

A=1.50m² Lm=0.80m H=2.20m

A=1.50m² Lm=0.80m H=2.20m

A=10.70m² Lm=2.75m H=2.55m

DUCTO 20x40cm (1) A=4.40m² 15x20cm (2) Lm=1.70m H=2.30m Rejilla 20x15cm.

Pilar en yeso

Caño

13

A=4.50m² Lm=2.10m Rejilla 20x15cm. H=2.30m

Rejilla 20x15cm.

H=2.30m

1.85 x 1.75 m A=3.25m² A=10.70m² Lm=2.75m H=2.55m

DUCTO 20x40cm (1) 15x20cm (2)

H=2.30m

15

A=4.40m² DUCTO Lm=1.70m 20x40cm (1) H=2.30m 15x20cm (2)

Rejilla A=4.05m² 20x15cm. Lm=1.25m H=2.30m

Rejilla 20x15cm.

Rejilla 20x15cm.

ESCALERA ABIERTA Son 15 escalones de 0.19 x 0.26

A=10.70m² Lm=2.75m H=2.55m

A=4.70m² Lm=2.00m H=2.30m

A=6.35m² Lm=2.30m H=2.55m

Llaves de paso agua Son 15 esc. Llaves de paso gas de 18.5x27cm. Boca de Incendio Pase libre=2.35m Escalera Compensada

Llaves de paso agua

A=34.95m² Lm=1.40m H=2.55m

5

H=2.30m

Tapa de inspección

Tapa de inspección

3.37

7 1-3

1.10

0.30 0.30

1.20

0.80

A=4.25m² 3 Rejilla Lm=2.00m H=2.30m 1-2 220x15cm. Llaves de paso gas

Boca de Incendio

A=2.35m² Lm=1.05m H=2.30m

Ducto 0.04m2

H=2.20m 1.75

0.25

0.70

0.75

1.20

0.80

2.10

Tapa de inspección

1.40

1.00

0.80

1.25

2 -

1-2 2

1.98

1.20

3 4 5 6 7 8 9 15 14 13 12 11 10

2 1

A=6.35m² Lm=2.30m H=2.55m

DUCTO 20x40cm (1) 15x20cm (2)

A=31.40m² Lm=4.00m H=2.55m

H=2.30m

Cp14

1.20

0.85 A=2.95m² Lm=1.20m 0.43 0.85 H=2.30m

Tapa de inspección

baranda h=0.90mm

A=4.70m² Lm=2.00m H=2.30m Rejilla 20x15cm.

A=10.70m² Lm=2.75m H=2.55m

Rejilla 20x15cm.

Rejilla 20x15cm.

baranda h=0.90mm

A=1.50m² Lm=0.80m H=2.20m

1.85 x 1.75 m A=3.25m²

Tapa de inspección ventilada

A=4.05m² Lm=1.25m Rejilla H=2.30m 20x15cm.

A=1.50m² Lm=0.80m H=2.20m

0.55

Ducto 0.04m2

H=2.30m

4

1-1

A=25.80m² Lm=3.20m H=2.55m

1.37

0.63

2.53

A=3.15m² Lm=1.40m H=2.30m

A=2.35m² Lm=1.05m H=2.30m

3

1.85 x 1.75 m A=3.25m²

0.80

0.80

1.03

H=2.30m

0.80

A=31.40m² Lm=4.00m H=2.55m

1.85 x 1.75 m A=3.25m²

H=2.30m

9

A=45.15m² Lm=6.40m H=2.40m

8 7 6

A=3.45m² Lm=1.35 H=2.55m

5

A=2.50m² Lm=1.15 H=2.30m

H=2.30m

4 3

A=31.30m² Lm=4.00m H=2.55m

7

A=31.30m² Lm=4.00 H=2.55m

2 1 0.15

A=15.90m² Lm=3.35 H=2.55m

A=11.90m² Lm=2.90 H=2.55m

Pilar en yeso

H=2.20m

Pilar en yeso

A=15.90m² Lm=3.35 H=2.55m

H=2.30m

A=11.90m² Lm=2.90 H=2.55m

TERMINACIONES 1 - PAVIMENTO

1 2

2 - ZOCALO

3 4

3- PARAMENTO

4- CIELORRASO

PAVIMENTO

1 Madera 2 Moquette 3 Porcelanato 60x60 cm. 4 Piedra laja 5 Porcelanato 80x80 cm. 6 Arena y Portland lustrado y enduercido 7 Porcelanato 60X120 cm

8 DUCTOS D=25x30 cm (4)

6.75 x 2.75m

DUCTOS D=25x30 cm (4)

baranda h=1.00m

6.75 x 2.75m

ZOCALO

1 Mdf pintado 2 AYP Endurecido 3 Porcelanato 60x60 cm H=20cm.

baranda h=1.00m

PARAMENTO

1 Revoque enduido pintado Interior 2 Cerámico 30x60 3 Granito 4 Cerámico 20x20 5 Revoque fino -exterior6 Piedra 7 Ladrillo bolseado pintado

baranda h=1.00m

baranda h=1.00m

CIELORRASO

1 Revoque pintado 2 Placa de yeso enduido y pintado 3 Revoque enduido y pintado 4 Madera machihembrada

A

B

C

D

F

E

H

G

F

E

D

B

A

A-A

D

B-B

C

C-C

B

C

REVISIONES

A

F

G

DIBUJADO

H

FECHA

Revisión 2

REVISADO

2013 02 07

FECHA

NOMBRE DE ARCHIVO

361.CR.Al.Plantas 1.50 Bind.dwg

REGISTRO

Revisión 1 2012 05 21 Revisión 2 corrección de cotas sin cambios de albañilería 2013 02 07 Revisión 3 2013 05 03

5 CASONAS ROBLE

6

PARQUES

UBICACION

DATYLCO S.A.

PROPIETARIO

7 PLANTA BAJA Albañilería

PLANO

8

1/50 CR.AL.100.pdf

ESCALA LAMINA

SECTOR

A

REFERENCIAS LOCALES DESTINO

C03

1

NUMERO DE LOCAL ALTURA

PLANTAS NIVEL

NIVEL DE PISO TERMINADO

N.P.T

2

TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA

(0.80x1.30 O/B) P Movilidad Cortina 100%

DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA ANTEPECHO

3

DINTEL TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO

TIPOLOGIA DE CORTINA DE ENROLLAR

Cp05

4

V09

TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL

E03

A-A

B-B

C-C

TIPOLOGÍA DE ESPEJOS

TIPOLOGIA DE PLACARD

M06

TIPOLOGÍA DE MESADAS

M4 20

TIPOLOGÍA DE MUROS

MURO A CONSTRUIR NUMERO DE DETALLE

baranda h=1.00m

baranda h=1.00m

NUMERO DE LAMINA

1

TIPOLOGIA BARANDA

B1

baranda h=1.00m DUCTOS D=25x30 cm (4)

DUCTOS D=25x30 cm (4)

CORTES

1

5.45 x 2.20 m

5.45 x 2.20 m

NIVEL DE PISO TERMINADO NIVEL DE CIELORRASO NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.

A-A

A=11.90m² Lm=2.90m H=2.55m

A=16.10m² Lm=3.55m H=2.55m

A=17.55m² Lm=3.20m H=2.55m

A=17.55m² Lm=3.20m H=2.55m

A=16.10m² Lm=3.55m H=2.55m

2

2 A=31.40m² Lm=4.00m H=2.55m

H=2.30m

Ducto 0.04m2

3 4 5 6 7 8 9 15 14 13 12 11 10

Tapa de inspección

Llaves de paso gas

Rejilla 20x15cm.

H=2.30m

6

Tapa de inspección

A=4.70m² Lm=2.00m H=2.30m

A=6.35m² Lm=2.30m H=2.55m

Rejilla 20x15cm.

A=3.45m² Lm=1.35 H=2.30m

H=2.30m

A=1.50m² Lm=0.80m H=2.20m

A=20.55m² Lm=3.40m H=2.55m

A=3.45m² Lm=1.35 H=2.55m

A=20.55m² Lm=3.40m H=2.55m

5

1.85 x 1.75 m A=3.25m²

H=2.30m

A=2.50m² Lm=1.15 H=2.30m

H=2.30m

A=31.30m² Lm=4.00m H=2.55m

7

1-1 A=1.50m² Lm=0.80m H=2.20m

A=10.70m² Lm=2.75m H=2.55m

DUCTO 20x40cm (1) A=4.40m² Lm=1.70m A=4.50m² 15x20cm (2) H=2.30m Lm=2.10m Rejilla H=2.30m Rejilla 20x15cm. 20x15cm.

H=2.30m

+8.40 NPT

4

A=10.70m² Lm=2.75m H=2.55m

A=12.10m² Lm=1.40m H=2.55m

A=5.00m² Lm=1.60m H=2.30m

M04

A=4.50m² Lm=2.10m Rejilla H=2.30m 20x15cm.

A=2.50m² Lm=1.15 H=2.30m

1.85 x 1.75 m A=3.25m²

Rejilla 20x15cm. A=4.05m² Lm=1.25m H=2.30m

DUCTO 20x40cm (1) 15x20cm (2)

Son 17 esc. Boca de Incendio Llaves de paso agua de 18.5x27cm. Pase libre=2.35m Llaves de paso gas Escalera Compensada

175

3

H=2.30m

7 6 5 4 3 2 8 1 9 10 1112 13 14 15

Rejilla 20x15cm.

58

H=2.30m

M04

A=4.40m² DUCTO Lm=1.70m20x40cm (1) H=2.30m15x20cm (2)

baranda h=0.90mmventilada

A=4.15² Lm=1.60m H=2.30m

Rejilla 20x15cm.

Son 15 esc. Llaves de paso agua de 18.5x27cm. Boca de Incendio Pase libre=2.35m Escalera Compensada

A=5.00m² Lm=1.60m H=2.30m A=10.70m² Lm=2.75m H=2.55m

5

Tapa de inspección

Tapa de inspección

A=4.15m² Lm=1.60m H=2.30m

2 1

A=6.35m² Lm=2.30m H=2.55m

Rejilla 20x15cm. DUCTO 20x40cm (1) 15x20cm (2)

A=12.10m² Lm=1.40m H=2.55m

A=1.50m² Lm=0.80m H=2.20m

Tapa de inspección

baranda h=0.90mm

A=4.70m² Lm=2.00m H=2.30m

A=10.70m² Lm=2.75m H=2.55m

A=1.50m² Lm=0.80m H=2.20m

Ducto 0.04m2

Tapa de inspección ventilada

A=4.05m² Lm=1.25m H=2.30m Rejilla 20x15cm.

4

1-1

A=2.35m² Lm=1.05m H=2.30m

58

H=2.30m

1.85 x 1.75 m A=3.25m²

A=3.15m² Lm=1.40m H=2.30m

Ducto 0.04m2

Ducto 0.04m2

A=31.40m² Lm=4.00m H=2.55m

H=2.30m

H=2.30m

H=2.30m A=3.15m² Lm=1.40m H=2.30m

A=2.35m² Lm=1.05m H=2.30m

3

1.85 x 1.75 m A=3.25m²

CORTE

NUMERO DE LAMINA

A=11.90m² Lm=2.90m H=2.55m

A=31.30m² Lm=4.00 H=2.55m

6

TERMINACIONES

A=15.90m² Lm=3.35 H=2.55m

A=15.90m² Lm=3.35 H=2.55m

A=11.90m² Lm=2.90 H=2.55m

A=11.90m² Lm=2.90 H=2.55m

1 - PAVIMENTO

1 2

2 - ZOCALO

3 4

3- PARAMENTO

4- CIELORRASO

PAVIMENTO

1 Madera 2 Moquette 3 Porcelanato 60x60 cm. 4 Piedra laja 5 Porcelanato 80x80 cm. 6 Arena y Portland lustrado y enduercido 7 Porcelanato 60X120 cm

+8.15

ZOCALO

8

2.75x 2.30m H=2.53m

DUCTOS D=25x30 cm (4)

5.45 x 2.20m

2.75 x 2.30m H=2.53m

DUCTOS D=25x30 cm (4)

1 Mdf pintado 2 AYP Endurecido 3 Porcelanato 60x60 cm H=20cm.

5.45 x 2.20m

PARAMENTO

1 Revoque enduido pintado Interior 2 Cerámico 30x60 3 Granito 4 Cerámico 20x20 5 Revoque fino -exterior6 Piedra 7 Ladrillo bolseado pintado

baranda h=1.00m baranda h=1.00m

baranda h=1.00m

CIELORRASO

1 Revoque pintado 2 Placa de yeso enduido y pintado 3 Revoque enduido y pintado 4 Madera machihembrada REVISIONES DIBUJADO

FECHA

F

E

361.CR.Al.Plantas 1.50 Bind.dwg

G

A

B

C

D

F

E

G

G

F

E

D

C

B

A

B

A

D

FECHA

NOMBRE DE ARCHIVO

A-A

B-B

C-C

C

REVISADO

REGISTRO

Revisión 1 2012 05 21 Revisión 2 corrección de cotas sin cambios de albañilería 2013 02 07 Revisión 3 2013 05 03

5

CASONAS ROBLE

6

PARQUES

UBICACION

DATYLCO S.A.

PROPIETARIO

7

PLANTA N1 y 2 Albañilería

PLANO

8

1/50 CR.AL.101.1.pdf

ESCALA LAMINA

SECTOR

A

REFERENCIAS LOCALES

1

DESTINO

C03

NUMERO DE LOCAL ALTURA

PLANTAS NIVEL

2

NIVEL DE PISO TERMINADO

N.P.T

TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA

(0.80x1.30 O/B) P Movilidad Cortina 100%

DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA

3

ANTEPECHO DINTEL TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO

4

TIPOLOGIA DE CORTINA DE ENROLLAR

Cp05

V09

TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL

A-A

B-B

C-C

E03

TIPOLOGÍA DE ESPEJOS

TIPOLOGIA DE PLACARD

M06

TIPOLOGÍA DE MESADAS

M4 20

baranda h=1.00m

TIPOLOGÍA DE MUROS

MURO A CONSTRUIR

baranda h=1.00m

baranda h=1.00m

NUMERO DE DETALLE NUMERO DE LAMINA TIPOLOGIA BARANDA

B1

1

CORTES

5.45 x 2.20 m

5.45 x 2.20 m

NIVEL DE PISO TERMINADO NIVEL DE CIELORRASO NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.

A-A

A=11.90m² Lm=2.90m H=2.55m

A=13.60m² Lm=3.55m H=2.55m

A=18.00m² Lm=3.25m H=2.55m

A=18.00m² Lm=3.25m H=2.55m

A=13.60m² Lm=3.55m H=2.55m

CORTE

NUMERO DE LAMINA

A=11.90m² Lm=2.90m H=2.55m

2 0.75

A=34.00m² Lm=4.00m H=2.55m

H=2.30m

A=2.70m² Lm=1.05m H=2.30m

A=2.70m² Lm=1.05m H=2.30m

A=2.30m² Lm=1.45m H=2.30m

A=2.30m² Lm=1.45m H=2.30m Ducto 0.04m2

3 4 5 6 7 8 9 15 14 13 12 11 10

Llaves de paso agua Boca de Incendio

1.30

baranda h=0.90mm 7 6 5 4 3 2 8 1 9 10 1112 13 14 15

A=5.45m² Lm=2.05m H=2.30m

Rejilla 20x15cm.

DUCTO Rejilla 20x40cm (1)20x15cm. 15x20cm (2)

A=5.55m² Lm=1.65m H=2.30m

A=4.50m² Lm=2.10m H=2.30m

DUCTO 20x40cm (1) 15x20cm (2)

A=4.95m² Lm=1.60m H=2.30m

Rejilla 20x15cm.

Tapa de inspección

Rejilla 20x15cm. DUCTO 20x40cm (1) 15x20cm (2)

0.65

A=21.15m² Lm=2.85 H=2.55m

A=14.05m² Lm=3.35 H=2.55m

A=11.90m² Lm=2.90 H=2.55m

1-1 A=1.50m² Lm=0.80m H=2.20m

A=9.10m² Lm=1.40m H=2.55m

A=1.50m² Lm=0.80m H=2.20m

A=15.40m² Lm=2.75m H=2.55m

DUCTO 20x40cm (1) 15x20cm (2)

1.85 x 1.75 m

Rejilla 20x15cm.

A=2.90m² Lm=1.15m H=2.30m

H=2.30m

H=2.30m

A=34.60m² Lm=4.00m H=2.55m

7

1.85 x 1.75 m

A=15.40m² Lm=2.75m H=2.55m

Rejilla 20x15cm.

A=4.50m² Lm=2.10m H=2.30m

H=2.30m

Rejilla 20x15cm.

A=2.90m² Lm=1.15m H=2.30m

6

DUCTO 20x40cm (1) 15x20cm (2) A=4.70m² Lm=1.25m H=2.30m

A=6.35m² Lm=2.30m H=2.55m

Son 17 esc. Boca de Incendio Llaves de paso agua de 18.5x27cm. Llaves de paso gas Pase libre=2.35m Escalera Compensada

A=3.65m² Lm=1.65m H=2.30m

A=4.95m² Lm=1.60m H=2.30m

1.05

A=15.40m² Lm=2.75m H=2.55m

5

Tapa de inspección ventilada

Tapa de inspección

Llaves de paso gas

A=6.35m² Lm=2.30m H=2.55m Son 17 esc. de 18.5x27cm. Pase libre=2.35m Escalera Compensada

A=9.10m² Lm=1.40m H=2.55m

A=1.50m² Lm=0.80m H=2.20m

A=5.45m² Lm=2.05m H=2.30m

2 1

A=4.70m² Lm=2.10m Rejilla H=2.30m 20x15cm.

A=15..40m² Lm=2.75m H=2.55m

A=1.50m² Lm=0.80m H=2.20m

0.75

4 1-1

Tapa de inspección

baranda h=0.90mm

DUCTO 20x40cm (1) 15x20cm (2)

1.85 x 1.75 m

1.85 x 1.75 m

H=2.30m

Ducto 0.04m2

Tapa de inspección ventilada

0.30

3

A=34.00m² Lm=4.00m H=2.55m

H=2.30m

H=2.30m

A=21.15m² Lm=2.85 H=2.55m

A=34.60m² Lm=4.00 H=2.55m

A=14.05m² Lm=3.35 H=2.55m

0.45

TERMINACIONES

A=11.90m² Lm=2.90 H=2.55m

1 - PAVIMENTO

1 2

2 - ZOCALO

3 4

3- PARAMENTO

4- CIELORRASO

PAVIMENTO

1 Madera 2 Moquette 3 Porcelanato 60x60 cm. 4 Piedra laja 5 Porcelanato 80x80 cm. 6 Arena y Portland lustrado y enduercido 7 Porcelanato 60X120 cm

8

ZOCALO

1 Mdf pintado 2 AYP Endurecido 3 Porcelanato 60x60 cm H=20cm.

5.45 x 2.20m

5.45 x 2.20m

baranda h=1.00m

baranda h=1.00m

PARAMENTO

1 Revoque enduido pintado Interior 2 Cerámico 30x60 3 Granito 4 Cerámico 20x20 5 Revoque fino -exterior6 Piedra 7 Ladrillo bolseado pintado

baranda h=1.00m

21

CIELORRASO

2.75 x 1.30m

1 Revoque pintado 2 Placa de yeso enduido y pintado 3 Revoque enduido y pintado 4 Madera machihembrada

2.75 x 1.30m

REVISIONES DIBUJADO

FECHA

F

E

FECHA

NOMBRE DE ARCHIVO

361.CR.Al.Plantas 1.50 Bind.dwg

G

A

B

C

D

F

E

G

G

F

E

D

C

B

A

B

A

D

A-A

B-B

C-C

C

REVISADO

REGISTRO

Revisión 1 2012 05 21 Revisión 2 corrección de cotas sin cambios de albañilería 2013 02 07 Revisión 3 ajustes 2013 05 03

5 6

CASONAS ROBLE

PARQUES

UBICACION

7

DATYLCO S.A.

PROPIETARIO

8

PLANTA N3 Albañilería

PLANO

1/50 CR.AL.103.1.pdf

ESCALA LAMINA

SECTOR

A

±0.00 NPT REFERENCIAS LOCALES DESTINO

C03

NUMERO DE LOCAL ALTURA

PLANTAS NIVEL

NIVEL DE PISO TERMINADO

N.P.T

TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA

(0.80x1.30 O/B) P Movilidad Cortina 100%

DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA ANTEPECHO

A-A

B-B

C-C

DINTEL TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO

TIPOLOGIA DE CORTINA DE ENROLLAR

Cp05

V09

TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL

E03

TIPOLOGÍA DE ESPEJOS

TIPOLOGIA DE PLACARD

M06

TIPOLOGÍA DE MESADAS

M4 20

TIPOLOGÍA DE MUROS

MURO A CONSTRUIR NUMERO DE DETALLE NUMERO DE LAMINA TIPOLOGIA BARANDA

B1

Inclinación 20°

Inclinación 20°

Inclinación 20°

CORTES NIVEL DE PISO TERMINADO NIVEL DE CIELORRASO NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.

A-A

CORTE

NUMERO DE LAMINA

-0.24 Ubicación unidades exteriores AA

Ubicación unidades exteriores AA

Ducto 0.04m2

Ducto 0.04m2

baranda h=0.90mm

3 4 5 6 7 2 8 1 9 17 16 15 14 13 12 11 10

1

TANQUE DE AGUA

TANQUE DE AGUA

1-1

1-1

Inclinación 20°

A=6.35m² Lm=2.30m H=2.55m Inclinación 20°

Ubicación unidades exteriores AA

2

0.50

Ubicación unidades exteriores AA

Ubicación unidades exteriores AA

TERMINACIONES 1 - PAVIMENTO

1 2

2 - ZOCALO

3 4

3- PARAMENTO

4- CIELORRASO

PAVIMENTO

1 Madera 2 Moquette 3 Porcelanato 60x60 cm. 4 Piedra laja 5 Porcelanato 80x80 cm. 6 Arena y Portland lustrado y enduercido 7 Porcelanato 60X120 cm ZOCALO

1 Mdf pintado 2 AYP Endurecido 3 Porcelanato 60x60 cm H=20cm.

Inclinación 20°

PARAMENTO

Inclinación 20°

1 Revoque enduido pintado Interior 2 Cerámico 30x60 3 Granito 4 Cerámico 20x20 5 Revoque fino -exterior6 Piedra 7 Ladrillo bolseado pintado

Inclinación 20°

CIELORRASO

1 Revoque pintado 2 Placa de yeso enduido y pintado 3 Revoque enduido y pintado 4 Madera machihembrada REVISIONES DIBUJADO

FECHA

Revisión 1

REVISADO

2013 04 03

FECHA

NOMBRE DE ARCHIVO

C

B

A

B

A

A-A

B-B

C-C

C

361.CR.Al.Plantas 1.50 Bind.dwg

REGISTRO

Revisión 1

2013 04 03

1 CASONAS ROBLE

2

PARQUES

UBICACION

DATYLCO S.A.

PROPIETARIO

PLANTA Azotea Albañilería

PLANO

1/50 CR.AL.800.1.pdf

ESCALA LAMINA

SECTOR

A/B

SECTIONS REFERENCIAS LOCALES DESTINO

NUMERO DE LOCAL ALTURA

Ladrillo bolseado

Ladrillo bolseado

Tanque de agua

bar

PLANTAS NIVEL N.P.T

C03

NIVEL DE PISO TERMINADO TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA

(0.80x1.30 O/B) Movilidad 100%

and

DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA ANTEPECHO

a h=0

DINTEL

.90m

TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO

Teja

TIPOLOGIA DE CORTINA DE ENROLLAR

P Cortina

V09

TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL

E03

Revoque pintado

Revoque

Cielorraso de madera

TIPOLOGÍA DE ESPEJOS

Cp05

Cielorraso de madera Revoque

TIPOLOGIA DE PLACARD

M06

TIPOLOGÍA DE MESADAS

M4 20

TIPOLOGÍA DE MUROS

MURO A CONSTRUIR

baranda h=1.00m

NUMERO DE DETALLE NUMERO DE LAMINA

CORTES

a

h=0

h=0

a and

.90

m

bar

baranda h=1.00m

m .90

bar and

Rev. Piedra

NIVEL DE PISO TERMINADO NIVEL DE CIELORRASO NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.

A-A

CORTE

NUMERO DE LAMINA

Revoque

.90 h=0

a .90

bar and

a

h=0

Rev. Piedra

m

Revoque

baranda h=1.00m

a

h=0

and

.90

m

bar

baranda h=1.00m

h=0 m

.90

bar and

a

Fa *E lta *P st co ro ru or ye ctur di ct a na o ció ej ec n ut fin iv al o co sa n: ni ta ria

baranda h=1.00m

m

and bar

baranda h=1.00m

TERMINACIONES

Rev. Piedra

1 - PAVIMENTO

1 2

2 - ZOCALO

3 4

3- PARAMENTO

4- CIELORRASO

Revoque

1 Madera 2 Moquette 3 Porcelanato 60x60 cm. 4 Piedra laja 5 Porcelanato 80x80 cm. 6 Arena y Portland lustrado y enduercido 7 Porcelanato 60x120

a

h=

0.9

and bar

0m

PAVIMENTO

ZOCALO

baranda h=1.00m

0m

bar

0.9

and

a

h=

baranda h=1.00m

1 Mdf pintado 2 AYP Endurecido 3 Porcelanato 60x60 cm H=18cm. PARAMENTO

Rev. Piedra

1 Revoque enduido pintado Interior 2 Cerámico 30x60 3 Granito 4 Cerámico 20x20 5 Revoque fino - exterior 6 Piedra 7 Ladrillo bolseado pintado

CIELORRASO

Rev. Piedra

1 Revoque pintado 2 Placa de yeso enduido y pintado 3 Revoque enduido y pintado 4 Madera machihembrada REVISIONES DIBUJADO

Revisión 1

REVISADO

NOMBRE DE ARCHIVO

FECHA

2012 05 25

FECHA

361.CR.Al.Cortes 2012-10-12.dwg

REGISTRO

Revisión 1

Rampa vehicular

2012 05 25

PLANO

CORTE 1-1 ESC 1:50

ESCALA LAMINA

PARQUES

DATYLCO S.A.

CORTES Albañilería 1/50 CR.AL.201.1.pdf

REFERENCIAS

REFERENCIAS

LOCALES

LOCALES

DESTINO

DESTINO

NUMERO DE LOCAL

NUMERO DE LOCAL

ALTURA

ALTURA

NIVEL

NIVEL

NIVEL DE PISO TERMINADO

N.P.T

NIVEL DE PISO TERMINADO

N.P.T

C03

TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA

TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA

(0.80x1.30 O/B) Movilidad 100%

DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA

DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA ANTEPECHO

ANTEPECHO

DINTEL

DINTEL

TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO

TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO

TIPOLOGIA DE CORTINA DE ENROLLAR

P Cortina

V09

Cielorraso de madera Ladrillo bolseado

TIPOLOGIA DE PLACARD TIPOLOGÍA DE MESADAS

M4 20

Cielorraso de madera

TIPOLOGÍA DE ESPEJOS

Cp05

Ladrillo bolseado

TIPOLOGIA DE PLACARD

M06

TIPOLOGÍA DE MESADAS

M4 20

TIPOLOGÍA DE MUROS

baranda h=1.00m

TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL

E03

TIPOLOGÍA DE ESPEJOS

Cp05

M06

TIPOLOGIA DE CORTINA DE ENROLLAR

P Cortina

V09

TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL

E03

Ladrillo bolseado

TIPOLOGÍA DE MUROS

baranda h=1.00m

MURO A CONSTRUIR NUMERO DE DETALLE

MURO A CONSTRUIR NUMERO DE DETALLE NUMERO DE LAMINA

NUMERO DE LAMINA

1.20

CORTES

1.74

1.62

1.34

CORTES

Revoque pintado

Revoque pintado

Revoque pintado

Ladrillo bolseado

Ladrillo bolseado

Revoque pintado

NIVEL DE CIELORRASO

Ladrillo bolseado A-A

NIVEL DE CIELORRASO

Ladrillo bolseado

NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.

1.50

Ladrillo bolseado

NIVEL DE PISO TERMINADO

NIVEL DE PISO TERMINADO

Revoque pintado Revoque pintado Ladrillo bolseado

-2.85 NPT

PLANTAS

PLANTAS

C03 (0.80x1.30 O/B) Movilidad 100%

Ladrillo bolseado

A

SECTOR

CASONAS ROBLE UBICACION PROPIETARIO

NIVEL DE CIMENTACIÓN PARA ARCILLA DE BUENA CALIDAD

NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.

A-A

CORTE

CORTE

NUMERO DE LAMINA

NUMERO DE LAMINA

baranda h=1.00m

baranda h=1.00m

Revoque pintado

Revoque pintado

baranda h=1.00m

baranda h=1.00m

4- CIELORRASO

1 Madera 2 Moquette 3 Porcelanato 60x60 cm. 4 Piedra laja 5 Porcelanato 80x80 cm. 6 Arena y Portland lustrado y enduercido 7 Porcelanato 60x120 ZOCALO

baranda h=1.00m

1 Mdf pintado 2 AYP Endurecido 3 Porcelanato 60x60 cm H=18cm.

1 Mdf pintado 2 AYP Endurecido 3 Porcelanato 60x60 cm H=18cm. PARAMENTO

1 Revoque enduido pintado Interior 2 Cerámico 30x60 3 Granito 4 Cerámico 20x20 5 Revoque fino - exterior 6 Piedra 7 Ladrillo bolseado pintado

Revoque pintado Rev. piedra

1 Revoque pintado 2 Placa de yeso enduido y pintado 3 Revoque enduido y pintado 4 Madera machihembrada

Revisión 1

NOMBRE DE ARCHIVO

1 Revoque enduido pintado Interior 2 Cerámico 30x60 3 Granito 4 Cerámico 20x20 5 Revoque fino - exterior 6 Piedra 7 Ladrillo bolseado pintado 1 Revoque pintado 2 Placa de yeso enduido y pintado 3 Revoque enduido y pintado 4 Madera machihembrada

DIBUJADO

FECHA FECHA

CASONAS ROBLE

NOMBRE DE ARCHIVO

FECHA FECHA

2012 05 25

361.CR.Al.Cortes 2012-10-12.dwg

REGISTRO

Revisión 1

2012 05 25

B

SECTOR

2012 05 25

CASONAS ROBLE

PARQUES

PROPIETARIO

CORTE A-A ESC 1:50

PLANO

ESCALA LAMINA

A

SECTOR

PARQUES

UBICACION

DATYLCO S.A.

NIVEL DE CIMENTACIÓN PARAAlbañilería PLANO CORTES ARCILLA DE BUENA CALIDAD ESCALA 1/50 CR.AL.202.1.pdf LAMINA

Revisión 1

REVISADO

2012 05 25

361.CR.Al.Cortes 2012-10-12.dwg

REGISTRO

UBICACION PROPIETARIO

CIELORRASO

REVISIONES

REVISIONES DIBUJADO REVISADO

CORTE C-C ESC 1:50

3- PARAMENTO

PAVIMENTO

Revisión 1 Contrapiso H. allanado con helicópetro Balasto cemento Greda

POZO ASCENSOR ESC. 1:50

2 - ZOCALO

1 Madera 2 Moquette 3 Porcelanato 60x60 cm. 4 Piedra laja 5 Porcelanato 80x80 cm. 6 Arena y Portland lustrado y enduercido 7 Porcelanato 60x120

CIELORRASO

Rev. piedra

Rev. Piedra

nit

sa

1 - PAVIMENTO

1 2 3 4

ZOCALO

PARAMENTO

Revoque pintado

Revoque pintado

ia

al co or

3- PARAMENTO

4- CIELORRASO

Hormigón en 2° etapa

o

lta Fa

ro 2 - ZOCALO

PAVIMENTO

Ladrillo bolseado

tiv

TERMINACIONES

Revoque pintado Ladrillo bolseado

1 - PAVIMENTO

1 2 3 4

cu

ra tu eje uc cto str ye *E ro *P

TERMINACIONES

Revoque pintado Ladrillo bolseado

ar

fin ión

ta ni sa

din ac

na di

cu

or

eje

co lta

Revoque pintado Ladrillo bolseado

baranda h=1.00m

ye

Fa

ra

tu

uc

str

*E

*P

Corte Integral Esc 1/50

baranda h=1.00m

tiv o

ció

n

fin

al

BOMBEO PRIMARIA BOMBEO SECUNDARIA

ESC. 1:50

cto

RevoquePOZO pintado Ladrillo bolseado POZO

ria

co

n:

co n:

baranda h=1.00m

baranda h=1.00m

baranda h=1.00m

DATYLCO S.A.

CORTES Albañilería 1/50 CR.AL.201.2.pdf

USER GUIDE

ROBLE 55 MANUAL

2. LISTADO DE MATERIALES Y TERMINACIONES 2.1 PAVIMENTOS PORCELANÍTICOS PROVEEDOR: BOSCH Tel.: 2708 4545

Tel.: 2200 8721

2.8 GRIFERIA PROVEEDOR: ACERENZA Tel.: 24013333

TERRAZAS

AREA SOCIAL

BAÑOS

Aptos 2 y 3 dormitorios: Belize Sand Natural (45x90) Aptos 1 dormitorio: Portobello Vicenza Café (60x120)

Piso Ingenieril Roble Eslavonia con acabado Brushing de la firma Patagonia, 16mm espesor, 19cm ancho, largos Random con una capa noble de 3mm.

Servicio:

Cuidados y prevención Luego de colocado el piso En las entradas colocar un felpudo o alfombra para retener arenilla o piedrecillas. Secar derrames de agua rápidamente. No usar amoníacos ni cloros para limpiar nuestros pisos, solo use un paño apenas humedecido con agua. No encere nuestros pisos, ya que no es necesario y podría resultar muy resbaladizo. Aspire el piso en forma regular con el accesorio con cepillo, tan seguido como lo hace con las alfombras. Coloque felpas en las patas de las sillas y mesas. No adhiera cintas plásticas ni pegamentos sobre el piso ya que pueden dañar parte del lustre.

Secundarios: Lavatorio: Pared Monocomando Acerenza Eros

COCINAS Portobello Vicenza Café (60x120)

BAÑOS Servicio: Porcelanato Luna Pulido Nano (60X60) Secundarios: Porcelanato Klipen Grace Vision (60x60) Porcelanato Klipen Grace Vision (30x60) Unid. 001, 002 Roble 55 Suite: Porcelanato Marazzi Solid Concrete R10 (60 x 60) Unidades: 001, 002, 004, 005, 101, 102, 105, 106, 201(Roble 55), 202, 205 Porcelanato Grace Vision (60 x 60) Unidades: 003, 103, 104, 203, 204 Porcelanato Loft antracita (45x90) Unidades: 201(Roble66), 301, 302, 303, 304

AREAS COMUNES Hall: Pallier:

Porcelanato Marazzi Soho Brow (60x120) Porcelanato Klipen Grace Vision (30x60 y 60x60) Porcelanato Klipen Mars Grafito Natural (80x80)

AMENITIES

Camino Brunel 2930

2. LISTADO DE MATERIALES Y TERMINACIONES 2.2 PAVIMENTOS MADERA

PROVEEDOR: SAMIC

Belize Sand Natural (45x90)

COCINA Lavatorio Monocomando exterior Split

Percha Focus

Ducha: Monocomando Embutir Acerenza Eros

Portarrollo sin tapa Focus

Roseta de lluvia SOLE 5

Cuidados y prevención Luego de colocado el piso En las entradas colocar un felpudo o alfombra para retener arenilla o piedrecillas. Secar derrames de agua rápidamente. No usar amoníacos ni cloros para limpiar nuestros pisos, solo use un paño apenas humedecido con agua. No encere nuestros pisos, ya que no es necesario y podría resultar muy resbaladizo. Aspire el piso en forma regular con el accesorio con cepillo, tan seguido como lo hace con las alfombras. Coloque felpas en las patas de las sillas y mesas. No adhiera cintas plásticas ni pegamentos sobre el piso ya que pueden dañar parte del lustre.

Suite:

ACCESORIOS

Bidet: Monocomando Acerenza Eros

DORMITORIOS Piso flotante Alemán marca Classen , Categoría AC4, Cod.:32254, 7mm espesor , 194 mm ancho, 1286mm de largo.

Monocomando para cocina de mesada Ero

Toallero Barrla Focus

Lavatorio: Juego Bimando Compass

SIFONES

Bidet: Bimando para bidet Compass

Sifón para lavatorio cromado

Bañera: Bimando Transf. Embutir Compass Roseta de lluvia SOLE 5


CASA CAMPOMAR 2013) B. Testa Architects. Montevideo, Uruguay.

(2012-

Casa Campomar is a house built inside a gated neighborhood, for a married couple. On the inside all rooms flow into each other and onto the nature, blurring the division lines and creating visual connection with each other. A total of 500m2 constructed. I was involved with the project during stages 4. Stage 4- Prepare technical drawings for construction use in AutoCAD, such as floor plans, sections, details, etc.

22


FLOOR PLANS

Revestimeinto piedra

Borde libre

A B

0.15

M-01

0.40 1.20

1.00 0.30

1.05

2.65

1.70

2.90 7.90

2.10 2.90

3.72

0.80

0.95

0.20

0.45

1.30

0.90 2.85

0.40 1.35

Proyección losa alero Proyección losa alero 1.54

Proyección tirante

2.06

Proyección muro

0.65

Proyección muro

7.32

1.07

0.05

1.07

0.05

1.07

0.05

1.07

0.05

1.07

0.05

1.07

9

8

10

7

3.30

6

10

9

8

6

5

4

3

2

1

5

4

3

1-1

2-2

3-3

4-4

5-5

2

B-B

Proyección muro

6-6

1

8

8.35

Proyección losa alero

1.54

Proyección losa alero

7

1.30

7

5

maceteros de madera

piedra partida

B-B

4.30

6

8

7

6

pilastra de madera

4.91

1.26

1.15

0.90

1.50

Pav. a eje de bañera

0.30

2.75 06 Cortina

Proyección tirante

Caseta bomba enterrada

0.80

2.00 1.10

4

2.05

1.25

3.48

3.17

1.00

06 Cortina

0.35

0.35

0.65

2.00 0.35

0.95

1.10

0.95

2

1

7.00

0.45

5.00

3.25

1.05 1.95 0.20 1.40 0.20

0.15

1.85

0.80

2.05

Cerco de madera

FUENTE

0.91

E09

1.75

1.10

2.85

3.65

4.30

1.10

4.95

1.00

1-1

0.90

E07

E08

2.70

Cp07

H=2.40m 0.60

2-2

0.45

3-3

2.00

V06

C10 E03

1.60 2.50

4-4

2.85

H=2.85m

E03

2.20

0.45

C-C

0.43

C20

Cp08 E03

E04

C18

Revestimineto de madera

1.26 1.00

0.91

06 Cortina

V04

H=2.40m

C11

2.20

Cara ext. viga

Pilar de madera de pérgola

Canto rodado chato diámetro mínimo 8cm

D-D

C12

4.91

0.72

1.20

1.40

3.65

C18

ver cámara de sanitaria existente

1.26

Cp09

2.59

2.00

M-03

3.50

H=2.40m 1.80

1.00

E01

C08

1.00

1.00

Perfil 12x6cm.

C18

0.30 0.12

0.12 0.30

1.00

C01

C01

G Largo de rampa 15.30m pendiente 20%

1.95

1.05

0.35

0.95

C01

2.60

3.35

1.75

0.95 0.25

0.70

0.40 1.30

0.80

piedra partida

2.40

06 Cortina

C-C

C06 C07

2.59

Cp05

Cp12

Revestimineto de madera

piedra partida

5-5

F

hueco

6-6

0.67

3.00

0.42 0.10 0.80

E

3.00

C14

4.95

H=2.40m

0.15

0.20

1.45

1.55

1.90

1.90 0.62

0.38

3.80

0.75

0.65

0.45

0.35

C09

2.15

D

F G

revestimiento de madera

A-A

C20

17

Cp10

E

Pav. a eje de ducha

V05

E07

6.30

0.95

D

hueco

1.00 0.70 Rectificar medida 2.70

1.20

0.15

0.95

0.80 0.80 2.20

0.80

0.60

0.90

0.55

C05

0.75

baldosones de hormigon

0.45 1.00 H=2.85m C09a

4.05

9

4.40

8 BARANDA

2.35

0.83

BARANDA

0.20

7

12

C-C

losa con piedra sobrepuesta pilastra de madera ducha

16

3.30

2.00

B-B

0.30

5

11

0.80

M-04

H=2.15m

C-C

3.00

15

C19

2.55

Cp06

1.85

2.20

2.40

0.95

0.35

C08

0.35 0.30

0.85

6

C17

1.75

2.05

2.80

A-A

V04

2.70

Tanque Tanque 500l 300l

2.05

06 Cortina

0.80

1.25

6.35

H=2.40m

06 Cortina

10 H=2.60m

H=2.60m

1.45

M-02

H=2.45m

1-1

3.00

1.00

4.45 4.95

13

Cp12

1.60

Cp03

2-2

C

H=2.30m

3.00

3-3

4.65

E01

14

D-D

H=2.30m muro a demoler 2.20

1.05

E06

C26 E02

0.50

0.20

BARANDA

0.50

4

H=2.60m

0.30

1.15 Aprox

4-4

4.65

0.55

5-5

1.00

1.70

3 1.00

0.72

3.00

0.30

3.00

0.65 C18

1.16 C03

C03

1.00

17

7.25

0.45

0.55

C22

G

E-E

06 Cortina

6.25

Agrandar muro hasta buña

6.10

5.85

0.55

1.10

H=2.30m

2.15

15 Puerta a plomo de escalón 16 Cp04

1.25

0.95

6-6

C18

C04

B

0.30

2.40

0.15 1.15

2.20

0.30 0.90

0.63

0.82

E-E

1.40

B-B

1.20

1.55

H=2.60m

11.15

1.00

5.25 11.15

2.20

1.13

1.55

1.15

1.45

0.20 Cp01

5.50

2.30

14

1.45 1.55

Caldera

3

1.05 0.15 2.40 0.95 0.30

1.40 6.25 5.30 5.60

Aplacado de yeso pegado

A-A

4.35 Muro revestido en Madera

1.05

11.95

0.30

A

F

Reguera según detalle

0.43

7.35

0.70 C24

Cap Puertas y rev. H=2.30m

H=2.75m

13

0.45

4.15

1.70

Caseta bomba

12

1.25

5

6.15

11

10.35

V02

2.25

0.70

9 10

2.05

4.80

3.70 0.90

0.55

2.85

8

H=2.45m

H02

B-B

Aplacado1.20 en yeso

5 7

Cielorraso hasta buña

Reguera

4.65

0.85

1.00

Hcr.=2.10m

Hcr.=2.25m

0.60

4

1.25

1.75

H=2.70m

0.50

3.70

1

2.60

1

7.65 E

3.00

H=2.50m

2

3

1.50

6.60

D

0.20 0.20

H=2.50m

1.00

2

6

A-A

06 Cortina

0.50

3.00

2.20 C16

3

0.90

4.35

2.20

1.15

B-B Ver detalle sector escalera

C21

PERGOLA

06 Cortina

1.70

E02

Cp11

H=2.90m Muro revestido en Madera

1.00

C25

0.90

Cp02

H=2.30m

3.20 Muro hasta buña Estucado

3.45

1.80

BARANDA

1.65

0.80

0.45

2.50

H=2.50m

06 Cortina

1.80

C

5.10

1.50

V03

5.20

1-1

2-2

3-3

4-4

5-5

6-6

16.75

0.60

2.75

E08

1.00

5.45

B 1.99

Muro revestido en Madera

0.85

0.90

1-1

0.15

1.40

H=1.40m

0.85

2.20

C

2-2

0.60 0.15

Escalera ancho 60 cm a definir escalones

A

3-3

3.30

C 4-4

3.45

borde estucado

B

5-5

Pav. Piedra laja rústica tamaños variables

borde estucado

6-6

Vidrio

3.45

A

1.50

Borde libre

borde estucado

Borde libre

0.15

0.50

Deck de madera

A-A

10.60

6.95

A-A

9.10

D E 5.00

pendiente 2%

F 3.25

pendiente 2%

G Proyección muro

C-C 1.48

C-C

3.70

Proyección losa alero Proyección muro

1.48

acometidas

1-1

2-2

3-3

4-4

5-5

6-6

Proyección losa alero

REFERENCIAS LOCALES

BAÑO 1

DESTINO

NUMERO DE LOCAL ALTURA

REFERENCIAS PLANTAS

NIVEL LOCALESNIVEL DE PISO TERMINADO N.P.T

BAÑO 1

DESTINO DE ABERTURA DE CARPINTERIA DE MADERA TIPOLOGIA NUMEROABERTURA DE LOCAL ANCHO

C03

ALTURA DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA

(0.80x1.30 O/B) Movilidad 100%

PLANTASANTEPECHO

SECTIONS

NIVEL DINTEL

DETAILS

NIVEL DE PISO TERMINADO TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO

N.P.T

C03

TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA TIPOLOGIA DE ABERTURA DE CARP DE HIERRO ANCHO ABERTURA

H4

reja

(0.80x1.30 O/B) P Movilidad 100% Cortina

DIMENSIONES DE ABERTURA TIPOLOGIA DE CORTINA DE ENROLLAR MOVILIDAD DE ABERTURA ANTEPECHO DINTEL

V09

Pizarra

TIPOLOGÍA DE MAMPARAS Y TIPOLOGIA DE CRISTAL ABERTURA DE CARP DE ALUMINIO CERRAMIENTOS

E03

TIPOLOGÍA ESPEJOS TIPOLOGIADEDE ABERTURA DE CARP DE HIERRO

H4

reja

TIPOLOGIADEDEPLACARD CORTINA DE ENROLLAR TIPOLOGIA

Cp05P

Cortina

Pizarra

M06

TIPOLOGÍA DE MESADAS

V09

Pizarra

E01

E01

TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL

M4 20 E03

TIPOLOGÍA DE MUROS

TIPOLOGÍA DE ESPEJOS

MURO A CONSTRUIR TIPOLOGIA DE PLACARD NUMERO DE DETALLE

Cp05

18°

Madera

18°

E01

M06

Espejo

E01

TIPOLOGÍA DE MESADAS NUMERO DE LAMINA

M4 20 CORTES

TIPOLOGÍA DE MUROS

NIVEL DE PISO TERMINADO MURO A CONSTRUIR

Madera

Revoque

180

9 Frente y fondo Limestone Mesada y bacha Limestone

9

24

Revoque

NIVEL CARA INFERIOR H.A. NIVEL DE PISO TERMINADO CORTE

NUMERO DE LAMINA NIVEL DE CIELORRASO

Tapa bañera Limestone

150

162

NIVEL CARA SUPERIOR H.A.

CORTES

A-A

NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.

Frente y fondo Limestone Mesada y bacha Limestone

132

A-A

CORTE

NUMERO DE LAMINA

1.45

Tapa bañera Limestone

E02

Espejo 132 25

162

20

9

24

9

2.20

24

1.70 1.00

9

9

2.40

2.40

25

0.25

NUMERO DE DETALLE NIVEL DE CIELORRASO NUMERO DE LAMINA

Espejo Frente y fondo Limestone Mesada y bacha Limestone

9

3.15

0.25

3.15

Revoque

1.95 2.85

95

150 95

Frente y fondo Limestone Mesada y bacha Limestone

2.40

Madera Madera

95

180 95

3.15

9

3.15

2.40

24

18°

Madera

2.85

E-E 10

150

135

E-E 75

Espejo M01b

M01b

V04

180

C23

E09

10

E08

10

A-A

220

C23

205

V05

BAÑO 1 50

5

40

60

5

2.40

2.45

50

NFL

50

5

40

60

95

5

305

205

367.CC.D AS.Baños 2013-08-28.dwg

R RE EGVI SI ST IROON E S DIBUJADO

FECHA

REVISADO

FECHA

NOMBRE DE ARCHIVO

367.CC.D AS.Baños 2013-08-28.dwg

REFERENCIAS

REGISTRO

R E F E R E NLOCALES CIAS

FLIA. CAMPOMAR

60

50

95

UBICACION

DESTINO

LOCALES NUMERO

SAN NICOLÁS NUEVO

ALTURA DESTINO

PROPIETARIO

NUMERO D

PLANTAS

FLIA. CAMPOMAR 5

F-F

2.40

FECHA

NOMBRE DE ARCHIVO

305

D-D

2.40

FECHA

REVISADO

790

0.30

0.30

95

DIBUJADO

B-B 17.5

100 130 5

B-B A-A

V06

180

C-C

NFL 2.46

95

305

2.85

0.12

0.35

2.70 NFL

50

BAÑO 1

Cielorraso de madera

0.12

REVISIONES

10

V06

95

60

50

E-E

0.46

3.15

0.31

Rejilla

220

C23

17.5

100

B-B

180

C23

100

100

Rejilla V05

llaves de pasollaves de paso

200

llaves de pasollaves de paso

105

130

B-B A-A

10

E08

180

UBICACION PLANO PROPIETARIO

95

01

E-E

F-F

D-D

C-C

2.40 2.40

2.85

0.07 0.54

piedra partida

ducha a nivel de cielorraso

H4 reja

1:25

V09

TIPOLOGI TIPOLOG CERRAM

P Cortina

E03 V09

TIPOLOG TIPOLOGÍA CERRAMIE

E03 Cp05

TIPOLOGÍ TIPOLO

M06

TIPOLOG

Cp05

TIPOLOG

M4 M06 20

TIPOLOG TIPOLOG

M4 20

TIPOLOGÍ MURO A

NUMERO

tierra

MURO AC NUMERO

Pendiente min.5%

NUMERO D

CORTES NUMERO D

NIVEL

CORTES

NIVEL NIVEL D

Estuco

2.25

2.30

2.20

2.76

TIPOLOG TIPOLOGI

reja

01

ducha a nivel de cielorraso

Desgue canalizado a punto bajo de terreno o a red

2.25

2.10

2.45

2.90

2.70

0.20

0.56

piedra partida

0.15

0.10 0.76

rectificar altura

NIVEL DE

TIPOLOG NIVEL DE ANCHO

DIMENSIO TIPOLOGI MOVILIDA ANCHO A ANTEPE DINTEL DIMENSION MOVILIDAD TIPOLOG ANTEPEC DINTEL TIPOLOG TIPOLOGI

P

H4 Cortina

LAMINA

1.20

2.40

2.60 2.70

2.60

2.60

2.60 2.70

Revestimiento de Lapacho ancho 0.15 cm

/PLANTAS Y VISTAS

23 ESCALA

aro acero inox.

0.00

8.68

BAÑO 1

PLANO

ALTURA

N.P.T

SSHH (0.80x1.30 O/B) L 07 Movilidad 100%

1:25

LAMINA

0.00

NIVEL N.P.T PLANTAS

C03 NIVEL

/PLANTAS Y VISTAS

(0.80x1.30 O/B) C03 Movilidad 100%

ESCALA

790

SSHH L 07

SAN NICOLÁS NUEVO

BAÑO 1

305

4

V04

200

E09

40

150

4

65 105

V04

105

105

Espejo

150

V04

180

A-A

40

E07

Espejo

180

M01a

65

Espejo

E07

135

E07

65

95

17.5

180

0.07

20

M01a

0.15

7.55

95

40

305 75

95

D-D

180

305 90

17.5

3.00

95

0.07

0.55

200

20

C-C

90

305 90

E07 65

3.00

F-F

10

90

105

Pav. Piedra laja rústica tamaños variables

2.50

2.50

180

305

105 Revestimiento Relleno pend.0.5%

Pav. Piedra laja rústica tamaños variables

F-F

Deck de madera

Revestimiento Piedra

105

0.85

E02 40

150

Espejo

Estructura

Madera

10

D-D

Borde estucado

Revestimiento Relleno pend.0.5%

Madera

200

borde estucado

Frontalín de madera

Nivel de agua -0.10m.

10

C-C

0.00

180

20

105

NIVEL NIVEL D

Estuco

Estuco

Murete tapa Limestone

Murete tapa Limestone

Murete tapa Limestone

Murete tapa Limestone

NIVEL

NIVEL C

Estuco

A-A

CORTC NIVEL NUME

A-A

CORTE

NUMER

3.06 NPT int 3.31

Murete Limestone 100

Limestone

18°

95

50

95

60

50

20 20

20

20

40

20

20

25

40

25

120

100

8.04

Murete Limestone 120

Limestone

85

60

15

85

180

15

790 180

15

85

15

60

85

40

60

105

40

105

790

3.15 11°

2.70

2.40

2.40

3.15

2.40

2.40

2.60

8 4

V01

Tomas en cara

DIBUJADO REVISIONES

3.05 NPT 100

15 15

120 120

DESTINO

Limestone Limestone Espejo 10

55 270

100

10

10

55

REGISTRO

LOCALES

interior en de cara mesada Tomas ver ubicación en planta interior de mesada ver ubicación en planta

2.70

REVISADO

NOMBRE R E G DE I S ARCHIVO TRO

REFERENCIAS

10

Espejo

55 55

NUMERO DE LOCAL ALTURA

45

BAÑO 2

1.13

Murete Limestone

Limestone Limestone

24

2.30

2.30

Murete Limestone

DIBUJADO NOMBRE DE ARCHIVO REVISADO

Murete Limestone

9

2.42 2.30

REVISIONES

15 15

Murete Limestone

3.05 NPT

Murete tapa Murete tapa

Murete tapa

25

0.59

2025

0.59

Estuco Estuco

Murete tapa

0.54 NFL

0.47 0.59

V01

Estuco Estuco

188

17 270

17

270

270

PLANTAS NIVEL

FLIA. CAMP SAN NI

TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA UBICACION ANCHO ABERTURA

(0.80x1.30 O/B) Movilidad 100%

188

FLIA. CAMP

NIVEL DE PISO TERMINADO

N.P.T

C03

20

NFL

0.76

21 21

2

Estuco Estuco

9 24

0.56

2 8 4

V01 V01

1.15 0.00 NPT

45

2.40

2.60

24 24

Detalle

PROPIETARIO UBICACION

DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA ANTEPECHO DINTEL

285

SAN NI

PROPIETARIO

TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO

285

TIPOLOGIA DE ABERTURA DE CARP DE HIERRO

H4 reja

TIPOLOGIA DE CORTINA DE ENROLLAR PLANO

P Cortina

V09

TIPOLOGÍA DE ESPEJOS

Cp05

1:25

1:25

LAMINA

TIPOLOGÍA DE MESADAS

M4 20

BAÑO 1 /

BAÑO 1 /P

LAMINA ESCALA

TIPOLOGIA DE PLACARD

M06

4.81

PLANO ESCALA

TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL

E03

TIPOLOGÍA DE MUROS

MURO A CONSTRUIR NUMERO DE DETALLE

40

NUMERO DE LAMINA

18°

0.25

NIVEL DE CIELORRASO

40

3.49 3.15

0.85

A-A

25

E06

5

E04

LOCALES

E05

DESTINO

NUMERO DE LOCAL ALTURA

1.14

PLANTAS NIVEL N.P.T

120

C03

NIVEL DE PISO TERMINADO TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA

(0.80x1.30 O/B) Movilidad 100%

DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA ANTEPECHO DINTEL

45

2.60

2.60

CORTE

NUMERO DE LAMINA

REFERENCIAS

5

BAÑO 5

2.40

2.65

2.60

Nicho

Nicho

0.30

0.35

2.60

NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.

0.90

2.95

85

18°

0.69

CORTES NIVEL DE PISO TERMINADO

3.53

3.10

TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO TIPOLOGIA DE ABERTURA DE CARP DE HIERRO

H4

25

reja

TIPOLOGIA DE CORTINA DE ENROLLAR

P Cortina

V09

borde estucado

TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL

E03

TIPOLOGÍA DE ESPEJOS

Cp05

TIPOLOGIA DE PLACARD

M06

2.45

TIPOLOGÍA DE MESADAS

C-C

NUMERO DE DETALLE NUMERO DE LAMINA

CORTES

75

NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.

55

35

Madera

Madera

10

10

REVISIONES

DIBUJADO

125

10

ns

Zócalo silestone gris

40

Zócalo silestone

40

A-A

43

75 43

95

62.5

Zócalo silestone gris

55

65

50

80

90

270

115 285

173

45

D-D

C-C

62.5

160

60

55

H= cara inferior de mesada

M05

60

25

D-D

C-C

Bacha Deca

26

-09-

SION

IENE

FLIA. CAMPOMAR UBICACION

SSHH L 22

A

ESCALA

285 90

90

h=3cm

B-B

A

2.40

2.40

REVISIONES

B-B 4

Mesada silestone gris

96

DIBUJADO

barral de acero inox

96

96

barral con rosca de acero inox sostiene mampara y entrada de agua en ducha h= dintel puertas 50

4

96

SAN NICOLÁS NUEVO

PROPIETARIO

SSHH L 12

0.60

9.20

Pizarra

0.45

2.85

Madera 2.40

2.85

0.45

1.05

0.45

8.80

0.00 0.30

4.60

2.80

1.85

0.52

0.00

Madera

D-D

C-C

0.35 3.10

Madera

3.30

ESCALA LAMINA

Revestimiento Madera

Material a confirmar

55

UBICACION

PLANO

0.60

Revoque

65

100 285

270

0.55

Madera

367.CC.D AS.Baños 2013-08-28.dwg

FLIA. CAMPOMAR 185

0.20

2.00

2.40

FECHA

REGISTRO

Madera

V03 43

80

80

100

170

0.60

2.40

FECHA

REVISADO NOMBRE DE ARCHIVO

0.00

0.95

Madera

2.45

Ver con Gabriela

1:25

Venecitas blancas 100

0.95

Revoque

BAÑO 2 /PLANTAS Y VISTAS

PLANO

A-A

Zócalo silestone gris

0.15

Revoque

SAN NICOLÁS NUEVO

PROPIETARIO

LAMINA

A-A

1.10

2012

REVI

MANT

V03

Mesada silestone gris

367.CC.D AS.Baños 2013-08-28.dwg

REGISTRO

185

115

55

V02

llave de paso

FECHA

NOMBRE DE ARCHIVO

de s

Pizarra

15

0

30

30

30

270

ce

4

B-B Joystick

2.40

FECHA

REVISADO

96

B-B

3.10

CORTE

NUMERO DE LAMINA

o

45

83

Nicho

7

83

28

Llaves H= cara inferior de mesada A-A

25

85

Mesada silestone gris 12

Losa volada R

NIVEL DE CIELORRASO

A-A

220 45

R

3.31

NIVEL DE PISO TERMINADO

Revoque enduido y pintado

Revoque enduido y pintado

Revoque enduido y pintado

Venecitas blancas

TIPOLOGÍA DE MUROS

MURO A CONSTRUIR

barral de acero inox sostiene mampara y entrada de agua en ducha h= dintel puertas

Revoque enduido y pintado

E06

2.70

M4 20

du

35

en

V02

Espejo

2.25

62.5

Black out

35

Revestimiento

2.90

62.5

5

0.41

Relleno pend.0.5%

Pav. Piedra laja rústica tamaños variables

45 140

D-D

0.61

95

Extractor

0.07 0.35

0.31 0.12

0.43

0.48

aprox 2"x4"

Canalón

0.20

0.13

0.00

0.33

0.48

0.00

0.18

Nivel de agua -0.10m.

BAÑO 5 /PLANTAS Y VISTAS 1:25


MOVIE NUEVO CENTRO SHOPPING CENTER

MOVIE B. Testa Architects. Montevideo, Uruguay. MOVIE is the largest movie theatre chain company in Uruguay. With over 4 different locations in Montevideo, Uruguay B.Testa Architects has been in charge of designing and renovating all of the locations for over 15 years. Constantly coming up with new design concepts for the firm to stay relevant.

REFERENC LOCALES DESTINO NUMERO DE LOCAL ALTURA

LOCAL

L01

PLANTAS NIVEL N.P.T

C03

NIVEL DE PISO TERMINA

TIPOLOGIA DE ABERTUR ANCHO ABERTURA NUMERO DE DETALLE NUMERO DE LAMINA

DIMENSIONES DE ABERT MOVILIDAD DE ABERTU

(0.80x1.30 O/B) Movilidad 100%

ANTEPECHO DINTEL

A= 0.00 D=2.10 A 08

CORTE 5-5 Esc 1.100

TIPOLOGIA DE ABERTUR 4

TIPOLOGÍA DE MAMPAR CERRAMIENTOS CRISTA

V09

TIPOLOGÍA DE ESPEJOS

E03

TIPOLOGIA DE PLACARD

Cp05

M06

TIPOLOGÍA DE MESADA

M4 20

TIPOLOGÍA DE MUROS

TIPOLOGÍA DE TABIQUE

C:\Users\beatriz\Documents\2-Transitorio\359 Costos 2012-07-30\en proceso anteproyecto\propuesta sin proyecciones\Concesion Layout l\el-hobbit.jpg

TB 01

TIPOLOGÍA DE CIELORR

CR 01

B1

C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg

C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg

C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg

TIPOLOGIA BARANDA

C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg

MURO A CONSTRUIR MOVIE MURO EXISTENTE MURO A DEMOLER

MOVIE Nuevo Centro Shopping Center New construction (2013) With the construction of a new Shopping Center in the city, it was a chance for the owner to expand the company. The studio had to design the new complex. For this project, I worked on stages 4 and 5. Some of my tasks were: -Develop drawings for construction, such as floor plans, sections, contraction details, etc. (AutoCAD) -Design a pattern for carpets to use in this complex that was later used for all of the other ones. -Monitor construction work in progress to ensure it was the same as specified on our drawings.

0.00

NIVEL DE PISO TERMIN

NIVEL DE CIELORRASO

0.00

NIVEL CARA SUPERIOR NIVEL CARA INFERIOR

A-A

CORTE

NUMERO DE LAMINA

TERMINACIONES

PAVIMENTO 1 2 3 4 5 6

Madera Moquette

Porcelanato 0.60x0.60m Porcelanato 1.20x0.60m Arena y portland lustrado y endurecido Masa niveladora

ZOCALO

CORTE 4-4 Esc 1.100

1 2

Madera pintada Porcelanato h=20cm

PARAMENTO 1 2 3 4 5 6

Revoque enduido pintado Interior Yeso enduido pintado Interior Yeso sellado sin terminación Bloque pintado Silestone Revoque gruso para revestimiento

CIELORRASO 1 2 3 4

Revoque pintado Revoque enduido y pintado Placa de yeso, enduido y pintado Placa de yeso, pintada sin terminación

5.75+ si el mall suprime no se construye

CIELORASO MALL

5.50+

0.40

CORTE 5-5 Esc 1.50

C:\Users\beatriz\Documents\2-Transitorio\359 Costos 2012-07-30\en proceso anteproyecto\propuesta sin proyecciones\Concesion Layout l\el-hobbit.jpg

C:\Users\beatriz\Documents\2-Transitorio\359 Costos 2012-07-30\en proceso anteproyecto\propuesta sin proyecciones\Concesion Layout l\el-hobbit.jpg

3.30+

Arq. Beatriz Testa

REVISIONES REVISIÓN

C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg

C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg

C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg

C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg

C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg

C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg

C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg

C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg

UBICACIÓN

Shopping Nuevo

PROPIETARIO

0.00+

OBRA

MOVIE NUEVO ARCHIVO

CORTE 4-4 Esc 1.50

CORTE 3-3 Esc 1.50

PLANO

359 MNC Fachadas Int

CORTES

PLANO

ESC

A

ARCHIVO

MOVIE PORTONES SHOPPING CENTER

2.40

1.73

2.00 0.15

5.60

D

D

0.80

1.00

2.40

3.85

5.95

3.10

5.21

D

2.53

3.15

5.90

5.60

2.05

3.15

D

0.71

4-4

3-3

4.50

1.00

2.02

0.13 0.23

CORTE 1-1

D

4-4

3-3

5-5

Cielo raso placa yeso doble trabada

0.60

D

0.71

Cielo raso acustico 0.61x1.22m

7.37

1.95

0.37

0.67

0.30

0.10

2.15

1.43

1.43

1.43

1.43

5.95

1.82

0.29

1.04

0.10

0.37

1.41

0.10

0.37

2.15

0.10

1.78

2.37

0.37

3.15

0.37

0.32

0.10

2.02

5.19

5.21

5.60

3.70

1.50 1.95

5.90

1.42

2.40

2.45

7.26

5.60

D

1.95

1.43

5.12

0.54 0.10 0.23

9.30

CORTE 2-2

D

19.50

4-4

3-3

5-5

Cielo raso placa yeso doble trabada Cielo raso acustico 0.61x1.22m

0.67

5.95

0.29

1.04

0.37

0.10

0.10

2.15

1.43

1.43

1.43

1.43

1.43

1.75

0.25

9.30

D

D

2.02

CORTE 6-6

3.10

0.37

2.37

0.37

1.78

0.10

0.37

2.15

0.10

1.41

3.15

0.37

5.19

5.21

5.60

3.70

1.50

5.90

2.40

0.71

D

Techo bovedillas

D

0.10

7-7

2-2

6-6

1-1

1-1

6-6

2-2

7-7

9.02

9.02 4.20

4.20

0.45

0.40 1.86

0.90

2.75

0.30

2.02

0.60

D

0.45

0.70 4.16

1.26

2.25

2.25

3.15

2.15

2.80

CORTE 5-5

2.87

5.20

Eje de Proyección

4.57

5.60

3.50

0.70

D

1.00

5-5

MOVIE Montevideo Shopping Center Lobby Domination (2017) The company was searching for a more contemporary look for all their complexes and decided to star with this one. For this project, I was involved through stages 240 to 4. Stage 0-2 -Prepare, develop and edit graphic material, such as drawings, photo-montages,etc., for meetings with clients in early stages, using Illustrator, InDesign, Photoshop. Stage 3 - Prepare drawings and documents for construction permits. Polishing the first stages drawings to ensure they meet regulations standards. Stage 4- Prepare technical drawings for construction use in AutoCAD, such as floor plans, sections, details, etc. 4D Projection Room (2018) The first of its kind in Uruguay. The studio was in charge of the design and construction. I worked on stages 0-4, performing the following tasks. Stage 0-2 -Prepare, develop and edit graphic material, for meetings with clients in early stages, using Illustrator, InDesign, Photoshop. Stage 3 - Prepare drawings and documents for construction permits. Polishing the first stages drawings to ensure they meet regulations standards. Stage 4- Prepare technical drawings for construction use in AutoCAD, such as floor plans, sections, details, etc. MOVIE Portones Shopping Center 4D Projection Room (2017) -Develop drawings for construction, such as floor plans, sections, contraction details, etc. (AutoCAD) MOVIE Punta Carretas Shopping Center Lobby Renovation (2018) -Develop drawings for construction, such as floor plans, sections, contraction details, etc.

Cortes


MOVIE MONTEVIDEO SHOPPING CENTER 4D PROJECTION ROOM

UBICACIÓN

Av. LUIS A. HERRERA 1290

PROPIETARIO

JELSI S.A.

OBRA

SALA 4D ARCHIVO

Tamaño A3

373-MS 4D-Xref 2018 07 20.dwg

PLANO

SECTOR

PLANTA ESCALA

PLANO

ABRIL 2018

UBICACIÓN

1:50

LAMINA

MS.Al-1

Av. LUIS A. HERRERA 1290

PROPIETARIO

JELSI S.A.

OBRA

SALA 4D ARCHIVO PLANO

SECTOR

PLANTA ESCALA

PLANO

ABRIL 2018

UBICACIÓN

Tamaño A3

373-MS 4D-Xref 2018 07 20.dwg

LAMINA

MS.E-1

1:100

Av. LUIS A. HERRERA 1290

PROPIETARIO

25

JELSI S.A.

OBRA

SALA 4D UBICACIÓN PLANO

ESCALA

ABRIL 2018

ARCHIVO

1:100

SALA 4D

SALA 4D ARCHIVO

A

PLANO

MS.Al-2 Tamaño A3

SECTOR

ESCALA

PLANO

ABRIL 2018

1:100

A

LAMINA

MS.Al-2

SECTOR

PLANTA ESCALA

ABRIL 2018

373-MS 4D-Xref 2018 07 20.dwg

Tamaño A3

373-MS 4D-Xref 2018 07 20.dwg

PLANO

LAMINA

CORTES

JELSI S.A.

OBRA

SECTOR

CORTES JELSI S.A.

PLANO OBRA

Av. LUIS A. HERRERA 1290

PROPIETARIO

Av. LUIS A. HERRERA 1290

PROPIETARIO

PLANO

UBICACIÓN

Tamaño A3

373-MS 4D-Xref 2018 07 20.dwg

180

LOBBY DOMINATION

ARCHIVO

1:100

LAMINA

MS.E-2


PLANTA BAJA 1:250

SOCIAL HOUSING / OLD TOWN, MONTEVIDEO, URUGUAY

FOURTH YEAR STUDIO S2 - DESIGN STUDIO SCHEPS

Unidades plante tanto jóvenes c mayores. Banda las circulaciones toda la fachada living-comedor y

The site for this studio project is located on the limit of the old town urban trace, and the begging of new city. The point where both traces merge generates an empty space. Our aim, with my project partner, was to work on this void, placing our housing project there, not as an element, but also creating guidelines for a master plan, designing the public space inside the project and extending it to the city

Unidades plante familiares de 3 planta baja se o espacios comun planta alta se e espacios más ín

El terreno está comprendido entre el limite que delimita la traza de la ciudad vieja, y el límite delimitado por la ciudad nueva, generando un punto particular en la ciudad, donde estas dos directrices generan un vacio en el terreno. El proyecto de vivienda colectiva no es pensado para ser colocado en el lugar como un objeto aislado sino que tiene un carácter de master plan , incorporando el espacio publico dentro de los edificios, y diseñando todo el espacio público como uno solo continuo, y al servicio del barrio y de los usuarios del complejo de viviendas.

El terreno está comprendido entre el limite que delimita la traza de la ciudad vieja, y el límite delimitado por la ciudad nueva, generando un punto particular en la ciudad, donde estas dos directrices generan un vacio en el terreno. El proyecto de vivienda colectiva no es pensado para ser colocado en el lugar como un objeto aislado sino que tiene un carácter de master plan , incorporando el espacio publico dentro de los edificios, y diseñando todo el espacio público como uno solo continuo, y al servicio del barrio y de los usuarios del complejo de viviendas. NIVEL 1 1:500

NIVEL 2 -3 1:500

Unidades plante familiares más a mediante una ci separa la zona i de la zona socia ubican en los ex aprovechando s

Puerto de Montevideo

Puerto de Montevideo Plazoleta de las Bóvedas

Rambla Franklin D. Roosvelt

MONTEVIDEO

Plazoleta de las Bóvedas

NEW WAYS OF LIVING The project goal is to allow different types of users to coexist peacefully on the same site, creating bonds between them. To achieve this we implemented the following strategies.

Rambla Franklin D. Roosvelt

Plaza Pública (Actualmente sede de la Terminal Ciudadela)

El terreno está comprendido entre el limite que delimita la traza de la ciudad vieja, y el límite delimitado por la ciudad nueva, generando un punto particular en la ciudad, donde estas dos directrices generan un vacio en el terreno. El proyecto de vivienda colectiva no es pensado para ser colocado en el lugar como un objeto aislado sino que tiene un carácter de master plan , Plaza Pública sedede de los edificios, y diseñando todo el espacio público como uno solo continuo, y al servicio del barrio y de los usuarios del complejo de viviendas. incorporando el espacio (Actualmente publico dentro

Parque Portuario

ZONING

THE PLATFORM

Zona ampliada

Parque Portuario

THE TOWERS

El edificio se recuesta sobre la calle Cerro Largo y Florida, liberandoElunproyecto gran espacio al servicio del público lineal de la rambla. Trabaja buscapúblico continuar el espacio barrio. Por la calle Cerro Largo físico se encuentran los mismo, integrandolo en su planta inferior, y como remate y visual del accesos peatonales y vehiculares al complejo. mediante un quiebre en la manzana mas pequeña, permite la continuidad de la Las calles Ciudadela y otra generada por ely proyecto, plaza, sin fragmentarla, así leerla locomo una gran plaza continua, en donde atraviesaan transversalmente ñeste el proyecto sehaciéndolo acomodaaarmonicamente permeable y accesible a las personas externas al complejo.

Plazuela

El proyecto busca mediante las conexiones entre los bloques habitacionales y los programas complementarios, y mediante las relaciones entre los distintos tipos de usuarios, una nueva forma de habitar, generando una gradación desde los espacios mas privados e intimos, hasta la plaza pública, con matices entre ellos.

1

2

3

ZONA 2

ZONA 3

Es el remate del espacio publico lineal que existe sobre la rambla, invadiendo el nivel inferior del edificio y conteniendo "burbujas" de programas complementarios.

Parking del edificio, espacialmente continuo a la zona 2, generando grandes espacios libres y dándole flexibilidad de uso.

ZONA 1 Pulmón verde que funciona como filtro entre el puerto y el tránsito de la rambla con el proyecto, éste delimita la plaza pública.

7 Local comercial tipo isla

10 Plaza seca

2 Biblioteca

5 Sala de exposiciones

8 Paseo petonal

11 Lavadero de autos

3 Cafetería

6 Estacionam. bicis

9 Parque verde

12 Rampa

16 Lucernario sobre biblioteca

19 Sector común estudiantes

Plazuela

PLANTA DE UBICACION 1:2000

ZONA 3 Parking del edificio, espacialmente continuo a la zona 2, generando grandes espacios libres y dándole Plaza Pública flexibilidad de uso. (Actualmente sede de la Terminal Ciudadela)

PLATAFORMA

TORRES

La plataforma funciona como nexo entre el nivel

Las torres emplazadas sobre la plataforma buscan una separación generosa entre ellas sin impedir el cambio de densidad propuesto. Las plantas bajas estan ocupadas por programas complementarios de las viviendas, por viviendas para estudiantes, o por viviendas tradicionales, acomodandose a los huecos de la plataforma para separar las viviendas del espacio común.

donde se encuentra el parking y los NIVEL rambla, 4 1:500

programas complementarios, con el nivel de

Cada torre e de program

THE MASTER PLAN Zona ampliada

El edificio se recuesta sobre la calle Cerro Largo y Florida, liberando un gran espacio público al servicio del barrio. Por la calle Cerro Largo se encuentran los accesos peatonales y vehiculares al complejo. Otro de los objetivos del proyectoPlazuela es alterar la densidad existente del barrio, y aumentarla pero sin perder la calidad del habitar. Para lograr esto las torres intentan buscar una Las calles Ciudadela y otra generada por el proyecto, lo relacion de altura y separación entre ellas que permita alcanzar un significativo numero de viviendas pero sin perder espacios comunes de buena calidad ni intimidad en cada unidad. atraviesaan transversalmente haciéndolo a ñeste permeable y accesible a las personas externas al complejo.

D

PLANTA DE UBICACION 1:2000

NUEVOS MODOS DE HABITAR

El proyecto busca mediante las conexiones entre los bloques habitacionales y los programas complementarios, y mediante las relaciones entre los distintos tipos de usuarios, una nueva forma de habitar, generando una gradación desde los espacios mas privados e intimos, hasta la plaza pública, con matices entre ellos.

21 Gym

ZONA 2

ZONA 3

Es el remate del espacio publico lineal que existe sobre la rambla, invadiendo el nivel inferior del edificio y conteniendo "burbujas" de programas complementarios.

Parking del edificio, espacialmente continuo a la zona 2, generando grandes espacios libres y dándole flexibilidad de uso. CORTE 1-1

1:500

ZONA 1 Pulmón verde que funciona como filtro entre el puerto y el tránsito de la rambla con el proyecto, éste delimita la plaza pública.

PLATAFORMA

TORRES

La plataforma funciona como nexo entre el nivel rambla, donde se encuentra el parking y los programas complementarios, con el nivel de vivienda. Se conecta espacialmente y visualmente mediante huecos que permiten el ingreso de luz solar al nivel inferior. La plataforma permite también, una gradación de espacio publico, generando lugares comúnes sobre ella para uso de los usuarios de las viviendas.

Las torres emplazadas sobre la plataforma buscan una separación generosa entre ellas sin impedir el cambio de densidad propuesto. Las plantas bajas estan ocupadas por programas complementarios de las viviendas, por viviendas para estudiantes, o por viviendas tradicionales, acomodandose a los huecos de la plataforma para separar las viviendas del espacio común.

SECTION

FACHADA RAMBLA CORTE 1:5001-1 1:500

1 Parking

4 Expansión cafetería

7 Local comercial tipo isla

10 Plaza seca

2 Biblioteca

5 Sala de exposiciones

8 Paseo petonal

11 Lavadero de autos

3 Cafetería

6 Estacionam. bicis

9 Parque verde

12 Rampa

1

NUEVAS DENSIDADES

Otro de los objetivos del proyecto es alterar la densidad existente del barrio, y aumentarla pero sin perder la calidad del habitar. Para lograr esto las torres intentan buscar una NUEVOS MOD relacion de altura y separación entre ellas que permita alcanzar un significativo numero de viviendas pero sin perder espacios comunes de buena calidad ni intimidad en cada unidad. El proyecto bus conexiones ent habitacionales y complementari relaciones entr tipos de usuari SE forma de habita TI gradación desd privados e intim pública, con ma

15

10

16

NIVEL 5 1:500

NUEVAS DENSIDADES

17 Lucernario sala de exposiciones 20 Seguridad 18 Zona deportiva

Las torres emplazadas sobre la plataforma buscan una separación generosa entre ellas sin impedir el cambio de densidad propuesto. Las plantas bajas estan ocupadas por programas ZONA 2 complementarios de las viviendas, por viviendas Es el remate del espacio para publico estudiantes, o por viviendas tradicionales, acomodandose lineal que existe sobre la rambla, a los huecos de la plataforma para separar invadiendo el nivel inferior del las viviendas del espacio común.

edificio y conteniendo "burbujas" complementarios, y mediante las vivienda. Se conecta espacialmente y de programas complementarios. relaciones entre los distintos visualmente mediante huecos que permiten el ingreso de luz solar al nivel inferior. La plataforma tipos de usuarios, una nueva ZONA 1 permite también, una gradación de espacio forma de habitar, generando una PulmónParque verde Portuario que funciona como filtro entre publico, generando lugares comúnes sobre ella gradación desde los espacios mas el puerto y el tránsito de la rambla con el para uso de los usuarios de las viviendas. e intimos, hasta la plaza proyecto, éste delimita la plaza pública. El proyecto busca continuar el espacio público lineal de la rambla. Trabaja NUEVASprivados DENSIDADES pública, con matices entre ellos. remate y visual del mismo, integrandolo en subuscar plantauna inferior, y Otro de los objetivos del proyecto es alterar la densidad existente del barrio, y aumentarla pero sin perdercomo la calidad del físico habitar. Para lograr esto las torres intentan quiebrecomunes en la manzana pequeña, permite continuidad relacion de altura y separación entre ellas que permita alcanzar un significativo numero de viviendas pero mediante sin perder un espacios de buenamas calidad ni intimidad en la cada unidad. de la plaza, sin fragmentarla, y así leerla como una gran plaza continua, en donde el proyecto se acomoda armonicamente

1-1

4 Expansión cafetería

Zona ampliada

El edificio se recuesta sobre la calle Cerro Largo y Florida, liberando un gran espacio público al servicio del barrio. Por la calle Cerro Largo se encuentran los accesos peatonales y vehiculares al complejo. Rambla Franklin D. Roosvelt Las calles Ciudadela y otra generada por el proyecto, lo atraviesaan transversalmente haciéndolo a ñeste permeable y accesible a las personas externas al complejo.

TORRES

La plataforma funciona como nexo entre el nivel MARTINA LEON rambla, donde se encuentra el parking y los programas complementarios, con el nivel de vivienda. Se conecta espacialmenteNUEVOS y MODOS DE HABITAR visualmente mediante huecos que permiten el El proyecto busca mediante las ingreso de luz solar al nivel inferior. La plataforma entre los bloques permite también, una gradación deconexiones espacio publico, generando lugares comúnes sobre ella habitacionales y los programas para uso de los usuarios de las viviendas.

ZONING - First on the site we defined 3 different zones. 1 - A green area that operates as a filter between the project and the urban traffic. It is a public space for all the city. 2 - The limit between the public space and the housing project. It is a semipublic space that contains additional program bubbles for the users. 3 - An extension of zone 2 that also provides parking area, but it is 26flexible in terms of use. 1 Parking

FACUNDO LABORDE

PLATAFORMA

Puerto de Montevideo

PLANTA DE UBICACION 1:2000

Plazoleta de las Bóvedas

NUEVOS MODOS DE HABITAR

THE SITE

la Terminal Ciudadela)

El proyecto busca continuar el espacio público lineal de la rambla. Trabaja como remate físico y visual del mismo, integrandolo en su planta inferior, y mediante un quiebre en la manzana mas pequeña, permite la continuidad de la plaza, sin fragmentarla, y así leerla como una gran plaza continua, en donde el proyecto se acomoda armonicamente

9

19 8

CORTE 1-1 1:500

16 Lucernario sobre biblioteca 2-2

19 Sector común estudiantes

1-1

14 17 Lucernario sala de exposiciones 20 Seguridad 21 Gym

18 Zona deportiva

1 Parking

4 Expansión cafetería

7 Local comercial tipo isla

10 Plaza seca

2 Biblioteca

5 Sala de exposiciones

8 Paseo petonal

11 Lavadero 9 de autos

3 Cafetería

6 Estacionam. bicis

9 Parque verde

12 Rampa

9

8

15 2-2

10

6 3

10

16

19 5

2

14

7

1 Acceso a plataforma

4 Plataforma principal

7 Espacio común estudiantes 10 Lavadero común estudiantes

2 Acceso por rampa

5 Food Market

3 Acceso vehicular 12

6 Vivienda encargado

8 Expansión espacio común 10 9 Cocina común estudiantes

11

Escalera hacia biblioteca/ segundo nivel estudiantes

12 SUM

13 Expansión SUM

16 Lucernario sobre biblioteca

19 Sector común estudiantes

1-1

12

8

SECTION

14 Rampa hacia niv. rambla 17 Lucernario sala de exposiciones 20 Seguridad 15 Paseo peatonal

6

CORTE 2-2 1:250

21 Gym

18 Zona deportiva

1 Parking

2 Biblioteca 3 Cafetería

3 9

15

20 4

9

8 5

2

7

2-2

10

16

4

19 4

8 1

14

13

21

12

11

10

12

6

17

THE PLATFORM - We covered zone 2 with a platform, meant only for the residents use. It is a leisure space. It is visually and physically connected with zone 2 by ramps and big openings that provide sunlight to the lower level. 1 DORMITORIO 45.2 m2 THE TOWERS - We positioned the towers with generous space in between them, but still achieving the aimed population density. On the lower levels, we placed student housing and DÚPLEX - 2 DORMITORIOS 45.2 m2 complementary programs. We ensured to place the apartments on the platform level, next to the opening to ensure they had privacy. 20

BAJA 1:250

3

2-2

NIVEL RAMBLA 1:250

2

1 5

1

11

9

3

2

2-2

11

Vistas desde arriba de la plataforma y desde abajo de la misma 7

10

8

1-1

4

PLANTA BAJA 1:250

EL 2 -3 1:500

Unidades planteadas para parejas tanto jóvenes como para adultos mayores. Banda de servicios hacia las circulaciones centrales liberando 1 la fachada para el toda living-comedor y el dormitorio.

1 11

1 DORMITORIO

3 DORMITORIOS

4

45.2 m2

21

5 Unidades planteadas para parejas tanto jóvenes como para adultos mayores. Banda de servicios hacia las circulaciones centrales liberando toda la fachada para el living-comedor y el dormitorio.

PLANTA BAJA 1:250

Unidades planteadas para grupos familiares de 3 o 4 personas. La planta baja se ordena mediante los espacios comunes, mientras en planta alta se encuentran los espacios más íntimos.

Vistas desde arriba de la plataforma y desde abajo de la misma

NIVEL RAMBLA 1:250

7

20

1-1

2

9

18

6

DÚPLEX - 2 DORMITORIOS

45.2 m2

45.2 m2 3

Unidades planteadas para grupos familiares de 3 o 4 personas. La planta baja se ordena mediante los espacios comunes, mientras en planta alta se encuentran los espacios más íntimos.

Unidades planteadas para grupos familiares más amplios. Se accede mediante una circulación que separa la zona intima de la vivienda de la zona social. Las unidades se ubican en los extremos de las torres aprovechando sus tres fachadas .

SIMPLE

Unidades planteadas para parejas tanto jóvenes como para adultos mayores. Banda de servicios hacia

Vistas desde arriba de la plataforma y desde abajo de la misma

NIVEL RAMBLA 1:250

1 DORMITORIO

45.2 m2

3 DORMITORIOS

45.2 m2

2

1

1-1

21

3

4

GROUND LEVEL PLANTA BAJA 1:250

ZONA DE ESTUDIANTES TIPOLOGIAS ALTERNATIVAS

12


27


NIVEL 4 1:500

NIVEL 5 1:500

Cada torre esta conformada por todas las distintas tipologias, haciendo q en cada una de ellas convivan los diferentes usuarios. Existen espacios de programas complementarios especificos para un tipio de usuario y otros en donde todos los habitantes se encuentran

DÚPLEX

FACHADA RAMBLA 1:500

SECTION

1 DORMITORIO

+19.13 m

+13.92 m

LEVEL 1 SECTOR ESTUDIANTES TIPOLOGÍAS ALTERNATIVAS

DUPLEX

1 BEDROOM

CORTE 2-2 1:250

+ 8.70 m

CORTE 2-2 1:100

LEVEL 2-3

STUDENT HOUSING

LEVEL 4

28

SECTION

LEVEL 5

STUDENT HOUSING - Located on the lowers levels of the towers and with a direct link to the entrance, the flow of people and zone 2. We propose 3 different type of layouts, that contain space for sleeping, studying and a bathroom. There are common areas for other activities.

CONVENTIONAL UNITS - This more conventional units are though for small and bigger, families. For single people, for young and couples and even for the elderly. All units have an efficient layout that allows for privacy and comfortable common areas. All of them have a green balcony, providing connection to the exterior.

SINGLE

1 BEDROOM

DOUBLE

2 BEDROOM

QUADRUPLE

3 BEDROOM


FACADE SYSTEM

29


ESAC / BARRIO SUR, MONTEVIDEO, URUGUAY

FOURTH YEAR STUDIO S1 - DESIGN STUDIO SCHEPS

ESAC is a building that provides cultural and sports infrastructure for the neighborhood and the city. The site given to us for this project is on the limit of Barrio Sur and la rambla of Montevideo. BARRIO SUR

PUBLIC PLATFORM

THE SITE

BARRIO SUR - is a consolidated neighborhood in Montevideo. It is one of the most traditional and reflects the cultural history of the city. It limits with the Rambla, a promenade that links the whole coast of the city. Making it a very accesible site. PUBLIC PLATFORM - The first strategy my partner and I decide to apply is to create a public platform that through ramps connects the neighborhood with the Rambla.

ESAC ESAC BARRIO BARRIO SUR SUR

PLATAFORMA PLATAFORMA PUBLICA PUBLICA

VOLUMETRIA VOLUMETRIA

El proyecto El proyecto se emplaza se emplaza en un terreno en un terreno singular, singular, una zona unafiltro zonadonde filtro donde Mediante Mediante una plataforma una plataforma publicapublica en base enabase rampas a rampas se conectan se conectan los los El edificio El edificio posee posee una volumetría una volumetría particular. particular. Esta esEsta generada es generada encontramos encontramos el dinamismo el dinamismo de la rambla de la rambla como espacio como espacio integrador integrador de de accesos, accesos, funciona funciona como un como áreaundeárea circulación de circulación que seque agrega se agrega a la a la mediante mediante la adición la adición de dosde volumenes dos volumenes principales. principales. toda latoda ciudad la ciudad junto aljunto Barrio al Barrio Sur, unSur, barrio un con barrio raíces con raíces muy muy ciudad,ciudad, un nuevo un nuevo recorrido recorrido para elpara barrio el en barrio medio en medio de un espacio de un espacioEl auditorio El auditorio cerradocerrado junto con junto uncon foyer unvidriado foyer vidriado que genera que genera un un arraigadas. arraigadas. publicopublico disfrutable disfrutable para todo paraeltodo que el pase quepor pase allí.por allí. volumen volumen con una con gran unapendiente gran pendiente inferiorinferior mas unmas volumen un volumen cultural, cultural, educativo educativo y gastronómico y gastronómico de tresde niveles tres niveles y que contiene y que contiene De esta Deforma, esta forma, el ESAC el ESAC nace como nace un como vinculo un vinculo de conexión de conexión fluida fluida En estaEnsituación esta situación posteriormente posteriormente se prevé se una prevé zonificación una zonificación de la de la una cubierta una cubierta inclinada. inclinada. entre estas entre diferencias, estas diferencias, un espacio un espacio integrador integrador utilizado utilizado tanto por tanto lospor losplataforma plataforma en áreas en de áreas estar, de abiertas estar, abiertas o cerradas, o cerradas, de de habitantes habitantes del barrio del como barrio por como toda porlatoda ciudad la ciudad pararealizar pararealizar diversas diversascirculación,áreas circulación,áreas verdesverdes y hastay un hasta parque un parque de esculturas.A de esculturas.A su vezsu vez A esta A gran estapieza gran total piezasetotal le sustrae se le sustrae dos partes dos partes creando creando así unaasí una actividades actividades se planifica se planifica el equipamiento el equipamiento necesario necesario para estas para áreas, estas áreas, como como terrazaterraza y una salida y una a salida la cubierta, a la cubierta, ademas ademas de dosde grandes dos grandes bancosbancos de hormigón, de hormigón, u otros.u otros. entradas entradas de luz de luz CIRCULACIONES CIRCULACIONES : :

BARRIO BARRIO

ESAC

ESAC

THE VOLUME

CIRCULACION CIRCULACION PRINCIPAL PRINCIPAL GREEN PLANTED ROOF

DEPORTEDEPORTE AREA DE AREA APOYO DE APOYO AREA TOTAL AREA TERRENO TOTAL TERRENO

DebidoDebido a una comparación a una comparación de alturas de alturas entre elentre EsacelyEsac los edificios y los edificios circundantes circundantes la cubierta la cubierta es pensada es pensada como una como quinta una quinta fachada. fachada. De este Demodo este se modo creaseuna crea cubierta una cubierta inclinada inclinada verde, verde, una cubierta una cubierta de cesped de cesped a la cual a la elcual visitante el visitante puede puede llegar mediante llegar mediante un acceso, un acceso, una escalera una escalera ubicada ubicada en el segundo en el segundo nivel. nivel. Asi el visitante Asi el visitante puede puede aprovechar aprovechar un granunespacio gran espacio delimitado delimitado donde donde poder estar podertranquilo estar tranquilo y disfutar y disfutar de las de vistas las que vistas regala que regala el paisaje el paisaje circundante circundante TERRAZAS TERRAZAS El edificio El edificio contiene contiene dos terrazas, dos terrazas, una privada una privada y publica y publica con con accesos accesos a la cubierta a la cubierta verde. verde. El acceso El acceso a la cubierta a la cubierta posee posee una serie unade serie gradas de gradas de estar dealestar aire al aire libre y libre es precedido y es precedido por un por espacio un espacio abiertoabierto con piso con depiso vidrio de vidrio donde donde se disfruta se disfruta de las de distintas las distintas visuales visuales exteriores exteriores del lugar delylugar al y al mismomismo tiempotiempo se convive se convive con el con interior. el interior. En esteEnespacio este espacio tambien tambien puede puede generarse generarse una expansion una expansion exteriorexterior del comedor. del comedor.

RAMBLA RAMBLA

OCIO Y CULTURA OCIO Y CULTURA

CUBIERTA CUBIERTA VERDE VERDE

A su vez, A su elvez, áreaeladministrativa área administrativa posee posee una terraza, una terraza, un espacio un espacio de de estar aestar cieloaabierto cielo abierto el cualel puede cual puede utilizarse utilizarse como expansion como expansion de de las oficinas las oficinas privadas. privadas.

FACHADA FACHADA

Recorre Recorre todo eltodo edificio el edificio tanto vertical tanto vertical Las fachadas Las fachadas se estructuran se estructuran mediante mediante un muro uncortina muro cortina que genera que genera una una como horizontalmente como horizontalmente y se convierte y se convierte granplao granplao vidriado vidriado logrando logrando aprovechar aprovechar las vistas las del vistas paisaje del paisaje exterior. exterior. asi en asi un espacio en un espacio integrador integrador de todode todo Ademas, Ademas, una piel, una malla piel, microperforada malla microperforada de color deblanco color blanco se coloca se coloca en en el edificio. el edificio. Al recorrerla Al recorrerla el usuario el usuario se se todo eltodo perimetro el perimetro del edificio del edificio cubriendo cubriendo todas las todas fachadas. las fachadas. Esta Esta convierte convierte en espectador en espectador de las de las colocada colocada mediante mediante perfilesperfiles metalicos metalicos separada separada 1 metro1 del metro vidrio del vidrio diversas diversas actividades actividades que suceden que suceden enerando enerando un espacio un espacio para supara facilsu mantenimiento.La facil mantenimiento.La piel metalica piel metalica simultaneamente. simultaneamente. Ademas Ademas proveeprovee una una funciona funciona como filtro comodefiltro la luz deexterior la luz exterior y le concede y le concede al edificio al edificio una una conexion conexion visual de visual todos de los todos niveles los nivelesimagenimagen exteriorexterior homogénea homogénea sin obstaculizar sin obstaculizar las espectaculares las espectaculares vistas vistas con el con hall de el hall acceso. de acceso. exteriores. exteriores. CIRCULACION CIRCULACION DE SERVICIO DE SERVICIO Esta formada Esta formada por unapor escalera una escalera de de incendio, incendio, un ascensor un ascensor y un y un montacargas montacargas que permite que permite abastecer abastecer distintos distintos servicios servicios de forma de directa forma directa como por como ejemplo por ejemplo subir directamente subir directamente a la cocina a la cocina del área delgastronómica área gastronómica o o subir escenografía subir escenografía al auditorio. al auditorio.

ORGANIZACIÓN ORGANIZACIÓN PROGRAMÁTICA PROGRAMÁTICA El complejo El complejo y variado y variado programa programa es organizado es organizado zen 3 sectores. zen 3 sectores.

THE VOLUME - the final volume is created by the addition of two volumes. One the one hand 30the auditorium which slope creates an important access from the Rambla. On the other hand is the other volumes that in 3 level contains, educational, gastronomic and cultural activities. On the underground level we located the sport activities. GREEN PLANTED ROOF - This decision is made taking into consideration, not only sustainability aspects but also the fact that the surrounding buildings are of much greater height. It is created as a landscape, providing an interesting view. Two different terraces provide access for the users to enjoy it. El primero, El primero, subterráneo subterráneo es el sector es el sector deportivo, deportivo, el cualel secual encuentra se encuentra

separado separado de manera de manera de asegurar de asegurar que sus que actividades sus actividades no interfieran no interfieranCUBIERTA VOLUMETRIA VOLUMETRIA CUBIERTA VERDE VERDE con el con resto. el Aresto. pesarA de pesar estar deconectado estar conectado directamente directamente con el con edificio el edificio SERVICIOS SERVICIOS CIRCULACION CIRCULACION - MIRADOR - MIRADOR mediante mediante circulaciones circulaciones verticales, verticales, como escaleras como escaleras ascensores o ascensores Debido pas e conectan se conectan los los El edificio El edificio poseeposee una volumetría una volumetría particular. particular. Esta Esta esogenerada es generada Debido a unaacomparación una comparación de alturas de alturas entreentre el Esac el Esac y los yedificios los edificios cuenta también también con rampas rampas de acceso de acceso directo directo desde desde el Barrio el Barrio Sur y Sur ycircundantes Cada nivel Cadadel nivel edificio del edificio posee posee sus espacios sus espacios de servicio de servicio agrupados agrupados que e agrega se agrega a la a lacuenta Una circulacion Una circulacion que seque repite se en repite todos en todos mediante mediante la adición la adición decon dos de volumenes dos volumenes principales. principales. circundantes la cubierta la cubierta es pensada es pensada como como una quinta una quinta fachada. fachada. la auditorio rambla mediante mediante lajunto plataforma la plataforma publica publica segundo segundo espacio, en en en “cajas” cerradas cerradas con una con altura una menor altura menor a la deacada la deespacio. cada espacio. dio unde espacio un espacio laElrambla los niveles los niveles contra contra la fachada la fachada que daque a daena “cajas” auditorio El cerrado cerrado junto con un con foyer un foyer vidriado vidriado que genera queespacio, genera un un planta planta baja, sobre baja, sobre plataforma la plataforma esinferior un espacio es un espacio donde donde conviven conviven Cajas opacas Cajas opacas blancas blancas se repiten se repiten en todos en los todos niveles los niveles y creany crean la rambla la rambla seinclinada convierte se convierte en ende lugar estar de estar volumen volumen con una conla gran una gran pendiente pendiente inferior mas un mas volumen un volumen De este De modo este modo se crea se una creacubierta una cubierta inclinada verde, verde, unalugar cubierta una cubierta actividades actividades dinámicas, dinámicas, culturales, culturales, gastronómicas, gastronómicas, un espacio espacio en en de cesped singulares singulares que sirven que sirven a espacios a espacios principales principales y los provee y los provee de de y mirador ypuede mirador del paisaje del mediante paisaje exterior. cultural, cultural, educativo educativo y gastronómico y gastronómico de tres deniveles tres niveles y que yun contiene que contiene de cesped a la cual a la el cual visitante el visitante puede llegar llegar mediante un exterior. acceso, un acceso, zonas zonas constante movimiento, movimiento, un plano un que plano recibe que recibe a todosa los todos usuarios los usuarios que queuna escalera baños,baños, depósitos, depósitos, zonas zonas de mantenimiento, de mantenimiento, almacenaje almacenaje o cocinas. o cocinas. onificación ación de la de la constante una cubierta una cubierta inclinada. inclinada. una escalera ubicada ubicada en el en segundo el segundo nivel.nivel. ingresan ingresan por los por tres los accesos. tres accesos. A su vez, A su se vez, accede se accede a estas a áreas estas mediante áreas mediante una circulación una circulación s, de diferenciada diferenciada del resto, del la resto, cualla posee cual posee un ancho un ancho menor menor a las a las uras.A sculturas.A su vez su vez A esta A gran esta gran piezapieza total se total le se sustrae le sustrae dos partes dos partes creando creando así una así una Asi elAsi visitante el visitante puede puede aprovechar aprovechar unCIRCULACIONES gran un gran espacio espacio delimitado delimitado CIRCULACIONES PUNTUALES PUNTUALES tercer Elysector, tercer sector, la parte parte superior del edificio del edificio contiene contiene losgrandes programas los programasdonde circulaciones circulaciones principales. principales. Esta seEsta encuentra se encuentra entre dichas entre dichas cajas cajas as, s áreas, comocomo Elterraza terraza unaysalida una salida a la lasuperior cubierta, a la cubierta, ademas ademas de dos degrandes dos donde poderpoder estar estar tranquilo tranquilo y disfutar y disfutar de lasdevistas las vistas que regala que regala que requieren quede requieren de mas íntimos mas íntimos como la como mediateca, la mediateca, talleres, talleres,el paisaje de servicios de servicios y los espacios y los espacios “servidos” “servidos” para supara fácilsu acceso fácil acceso y y entradas entradas luz deespacios luzde espacios el paisaje circundante circundante Escaleras Escaleras Helicoidales, Helicoidales, unen partes unen partes comedor, comedor, área administrativa área administrativa y auditorio. y auditorio. comunicación comunicación entre ellos. entre ellos. especificas especificas del edificio del edificio una escalera una escalera conecta conecta la parteladeportiva parte deportiva con la con la DebidoDebido a la particular a la particular forma del forma edificio del edificio cada uno cada deuno estos de estos TERRAZAS TERRAZAS planta planta baja cultural baja cultural y la otra y la une otra la une la espacios espacios es de carácter es de carácter singular singular y se comunican y se comunican mediante mediante mediateca mediateca con el con segundo el segundo nivel. nivel. huecoshuecos o espacios o espacios de conexión de conexión visual visual El edificio El edificio contiene contiene dos terrazas, dos terrazas, una privada una privada y publica y publica con con accesos accesos a la cubierta a la cubierta verde. verde.

RINCIPAL IPAL

El acceso El acceso a la cubierta a la cubierta poseeposee una serie una serie de gradas de gradas de estar de estar al aireal aire libre ylibre es precedido y es precedido por un por espacio un espacio abierto abierto con piso con de piso vidrio de vidrio donde donde se disfruta se disfruta de lasdedistintas las distintas visuales visuales exteriores exteriores del lugar del lugar y al y al mismo mismo tiempo tiempo se convive se convive con elcon interior. el interior. En este En espacio este espacio tambien tambien puede puede generarse generarse una expansion una expansion exterior exterior del comedor. del comedor. A su vez, A su el vez, área el área administrativa administrativa poseeposee una terraza, una terraza, un espacio un espacio de de estar estar a cielo a cielo abierto abierto el cual el puede cual puede utilizarse utilizarse comocomo expansion expansion de de las oficinas las oficinas privadas. privadas.

FACHADA FACHADA

ificio tanto tanto vertical verticalLas fachadas Las fachadas se estructuran se estructuran mediante mediante un muro un muro cortina cortina que genera que genera una una yente se convierte y se conviertegranplao granplao vidriado vidriado logrando logrando aprovechar aprovechar las vistas las vistas del paisaje del paisaje exterior. exterior. rador integrador de todo de todoAdemas, Ademas, una piel, una malla piel, malla microperforada microperforada de color de color blanco blanco se coloca se coloca en en rerla el usuario el usuario se setodo el todo perimetro el perimetro del edificio del edificio cubriendo cubriendo todastodas las fachadas. las fachadas. Esta Esta ctador r de lasde las colocada colocada mediante mediante perfiles perfiles metalicos metalicos separada separada 1 metro 1 metro del vidrio del vidrio es e suceden que suceden enerando enerando un espacio un espacio para para su facil su mantenimiento.La facil mantenimiento.La piel metalica piel metalica mas Ademas provee provee una una funciona funciona comocomo filtro de filtro la de luzlaexterior luz exterior y le concede y le concede al edificio al edificio una una stodos los niveles los niveles imagen imagen exterior exterior homogénea homogénea sin obstaculizar sin obstaculizar las espectaculares las espectaculares vistasvistas eso. exteriores. exteriores.

E RVICIO SERVICIO

una scalera escalera de de nsor un y un permite te abastecer abastecer rma de forma directa directa subir directamente directamente stronómica a gastronómica o o uditorio. al auditorio.

MIRADOR DOR

GROUND LEVEL

SERVICIOS SERVICIOS

CadaCada nivel nivel del edificio del edificio poseeposee sus espacios sus espacios de servicio de servicio agrupados agrupados repite e se repite en todos en todos en “cajas” cerradas cerradas con una conaltura una altura menor menor a la de a la cada de cada espacio. espacio. hada a fachada que da que a da en a “cajas” CajasCajas opacas opacas blancas blancas se repiten se repiten en todos en todos los niveles los niveles y crean y crean en erte lugar en lugar de estar de estar zonaszonas singulares singulares que sirven que sirven a espacios a espacios principales principales y los yprovee los provee de de aje terior. exterior. baños, baños, depósitos, depósitos, zonaszonas de mantenimiento, de mantenimiento, almacenaje almacenaje o cocinas. o cocinas. A su vez, A su se vez, accede se accede a estas a estas áreasáreas mediante mediante una circulación una circulación diferenciada diferenciada del resto, del resto, la cual la posee cual posee un ancho un ancho menor menor a las a las S NTUALES PUNTUALES circulaciones circulaciones principales. principales. Esta Esta se encuentra se encuentra entreentre dichas dichas cajascajas de servicios de servicios y los yespacios los espacios “servidos” “servidos” para para su fácil su acceso fácil acceso y y dales, unen unen partes partes comunicación comunicación entreentre ellos.ellos. ificio una escalera una escalera eportiva iva con lacon la alotra y laune otralaune la ndo segundo nivel.nivel.

SECTION

SECTION LEVEL -1

LEVEL 1

LEVEL 2

LEVEL 3

SECTION


31


COLLECTIVE HOUSING / BARRIO SUR, MONTEVIDEO, URUGUAY

THIRD YEAR STUDIO S2 - DESIGN STUDIO SCHEPS

For this studio we were asked to design a collective housing building on an already consolidated part of our city. Taking advantage of all the city services that were already provided. Our approach to this task was not to design a finished building. We took inspiration from Yona Friedman’s Spatial City. Our aim was to provide a support structure, and a set of rules, into which the future user could build or take down according to necessities. Therefore we proposed a basic module that can work independently or associated with others. The basic module is divides in 3 parts. SERVANT SPACES FREE SPACE DIVISION / STORAGE

32

FREE SPACE - These would be the living space, the space that guest can see, a free space the user can define as wished and for whatever purpose. DIVISION/STORAGE - The storage/ division wall. It divides the services from the free space providing an area for storage, etc. SERVANT SPACES- Here we find basic services such as kitchen, bathroom, and vertical circulation elements. EXAMPLE OF MODULE ASSOCIATIONS

SUPPORT STRUCTURE

SECTION


-------------------------------

NGUYEN GOMENSORO FERNANDA RIOS MARIANA DUTINÉ

A. LUCIA BARREIRO ARTINA LEON ----------------------------

NGUYEN GOMENSORO FERNANDA RIOS MARIANA DUTINÉ

CARLOS GUTIERREZ RUIZ

A

A

CARLOS GUTIERREZ RUIZ

33

CARLOS GUTIERREZ RUIZ

A

CARLOS GUTIERREZ RUIZ

A

A

A

CARLOS GUTIERREZ RUIZ

CARLOS GUTIERREZ RUIZ

NIVEL 1.1

A

NIVEL 1.0

A

A

A

NIVEL 0.1

NIVEL 0.0

A

A


PUBLIC LIBRARY / OLD TOWN, MONTEVIDEO, URUGUAY

THIRD YEAR STUDIO S1 - DESIGN STUDIO SCHEPS

For this exercise we were asked to design a public library on a very particular site. We understood this site as a merging point between to realities. The industrial city and the colonial city. The old town edge is right where the industrial NIVEL 1 - 1:250 port of the city begins. For our design we took inspiration from the containers that are constantly arriving and leaving the port. Introducing a public open building which structure works like a container. It reflects NIVEL 0 - 1:250 the original foundational vocation of the city as a port city.

NIVEL 1 - 1:25 PLANTA TECHO 1:250

LEVEL -1 NIVEL -1 - 1:250

NIVEL 1 - 1:250

CORTE A-A 1:250

CORTE C-C 1:250

GROUND LEVEL NIVEL 0 - 1:250

NIVEL -1 - 1:250

Given the fact that the project is located on a public space we imagined our project as the continuity of it , generating a continuous surface. After we covered it with a box, the container, which was the one that held the library’s archive, and administrative offices. By doing this we achieved a project that was a lot more than covered meeting B-B 1:250 34a library. It was a public, safe,CORTE place, that could also work as a library.

NIVEL 0 - 1:25

NIVEL 0 - 1:250

FACHADA PIEDRAS 1:250

FACHADA PLAZA 1:250

CORTE A-A 1:2 CORTE C-C 1:250

CORTE A-A 1:250

LEVEL 1 01 EXISTING WALL / PUBLIC FLOW

NIVEL 1 - 1:25

VERTICAL CONNECTION

CORTE A-A 1:250

SECTION 02 THE CONTAINER

HORIZONTAL CONNECTION SERVANTS SPACES CORTE B-B 1:250

FACADE

CORTE B-B 1:2 FACHADA PLAZA 1:250

FACHADA PIEDRAS 1:250

SECTION

CORTE B-B 1:250

PARTE DEL ARCHIVO ESTARA EN EL NIVEL INFERIOR CONTENIDO EN KIOSKOS IMITANDO PUESTOS CALLEJEROS QUE PODRAN SE ABRIR O CERRAR DEPENDIENDO DEL HORARIO.

03 THE PROGRAM PRIVATE AREAS

PUBLIC AREA

CORTINAS DE ENROLLAR METALICAS PERMITIRAN EL CIERRE DEL EDIFICIO EL CUAL SERA SOLO POR MOTIVOS DE SEGURIDAD PERMITIENDO QUE MIENTRAS EL EDIFICIO ESTE ACTIVO FUNCIONO COMO UN ESPACIO TOTALMENTE PUBLICO Y ACCESIBLE

UNA PIEL METALICA CERRARA EL NIVEL SUPERIOR AL EXTERIOR, SIEMPRE RECORDANDO EL CARACTER INDUSTRIAL DE LA ZONA VIGAS VIERENDEL VAN DE MEDIANERA A MEDIANERA ESTRUCTURANDO Y MODULANDO TANTO EL ESPACIO SUPERIOR COMO EL INFERIOR

TENSORES DE ACERO DELIMITARAN ESPACIOS DE CRCULACION Y DE CONEXION CON EL INFERIOR EN EL NIVEL SUPERIOR CREANDO UN ESPACIO VISUALMENTE CONECTADO Y DANDOLE UN CARACTER INDUSTRIAL

NIVEL 0 - 1:25 EL CERRAMIENTO DEL TECHO SUPERIOR CONSISTIRA DE PANELES OPACOS O TRANSPARENTES DEPENDIENDO DE LA ACIVIDAD QUE SUCEDA DEBAJO

LOS SERVICIOS QUE SEAN NECESARIOS PARA EL NIVEL 0 DEL EDIFICIO SERAN ALBERGADOS EN CONTENEDORES, QUE PUEDEN SER FIJOS, COMO LOS SSHH O PODRAN SER DESMONTABLES, FUNCIONANDO COMO KIOSKOS DENTRO DE ESTE ESPACIO PUBLICO.

CORTE

LAS VIGAS VIERENDEL Y LA ESTRUCTURA METALICA DEL TECHO PERMITIRAN COLGAR DE ESTA LA ESCENOGRAFIA NECESARIA PARA EL ESPACIO INFERIOR. ESTO INCLUIRA DESDE LUMINARIAS HASTA PERMITARA EXPOSICIONES COLGANTES

SEMI-PUBLIC AREA

CORTE A-A 1:2


35


HOUSE / NEIGHBORHOOD The exercise aimed for students to design a house for a family in a given site. Taking into consideration daily activities and the relationships between the members. Also taking into account the inside and outside space that make a house and the neighborhood it is implanted on. The solution I proposed was a 2 story house. The public activities are concentrated on the ground level, while the private activities of the family take place on the second floor. To further differentiate both aspects of the house, the most public part materiality is heavy concrete while the top private part is a steel structure that inserts itself as a separate element. At the same time, on the ground level, the guest area is divided from the service block and the stairs. On the top floor, the same service block creates a clear division between the master, and the guest’s rooms. It is very simple yet efficient layout that makes this a very comfortable and livable house for a family. It establishes a flowing connection between the inside and the outside This project was one of the only to get a 12, the top mark on our grading system, out of a hundred other projects in my class.

SECOND YEAR STUDIO - DESIGN STUDIO SCHEPS NIVEL 0

NIVEL 0

NIVEL 0

NIVEL 0

GROUND LEVEL NIVEL 0

NIVEL 1

NIVEL 1

NIVEL 1

LEVEL 1 NIVEL 1

36

NIVEL 1 CORTE A-A

CORTE A-A

CORTE A-A

SECTION

CORTE A-A

CORTE A-A

CORTE B-B

CORTE B-B

SECTION CORTE B-B

CORTE B-B

CORTE B-B

SECTION CORTE C-C


37


MARTINA LEON ARCHITECT

AUG 2020


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.