MARTINA LEON ARCHITECT
AUG 2020
INDEX 1.CV................................................2-5 2.Portfolio......................................8-37
Martina Leon ARCHITECT Phone
+44 7901 149120
Flat 1, 2 Elystan Street London, SW3 3NS, United Kingdom martinaleont@gmail.com
Date of birth
Nationality
Italian
Links
09/02/1993 Linkedin: www.linkedin.com/in/martina-leon-64058ab7 Portfolio: https://issuu.com/martinaleon/docs/martinaleon_architect_cv_portfolio
Address
01 PROFILE
Accomplished architect and conceptual designer with 7 years of experience in the development of Revit models, technical drawings and construction documention, as well as visual presentations for clients. My passion for architecture and design was what led me to join a Design Studio faculty in my University as a T.A. for more than 2 years, furthering my knowledge on the subject.
02 EMPLOYMENT HISTORY November 2020 — Present Tasked based contract.
Mar 2020 — Sep 2020
2
Architectural Assistant Part II at Floyd Slaski Architects
London, United Kingdom
Floyd Slaski is a firm that specializes in the health care sector and residential architecture. My current role involves: -Developing detailed drawings for an extension of the Q Block of Northwick Park Hospital, which is currently on Stage 5. -Developing 3D Models and 2D drawings for a temporary shelter extension in Lewisham hospital, currently in Stage 2. Taking part in the conceptual design, developing images and presenting them to clients. Both projects are carried out in Revit and Autocad.
Architectural Assistant Part II at Pattern Design
London, United Kingdom
Pattern is a generalist architecture practise with offices in London, Edinburgh and Lima. Focusing mainly on Sports and Stadium Projects, some of their recent projects include two stadia for the 2022 FIFA World Cup Qatar, and eight sports venues for the Pan American Games, Lima 2019. Pattern is one of the few architectural practices in the UK to be BIM Level 2 accredited. I worked as part of the Planning Team for the new Everton FC Stadium in Liverpool, UK. I was involved in Stage 3 and Stage 4. During Stage 3 our team was responsible for redesigning the interior layout of a pre-existing project to ensure it met not only all the programme requirements but also the fire, security and acoustic strategies requirements. My main tasks were: • Studying the programme, clients requirements, Engineer's reports and redesigning different sectors of the internal layout, making sure they were compliant with all requirements and regulations, reviewing documents such as: . BS 8300-2 (Design of an accessible and inclusive built environment. Buildings - code of practice) . BS 6465-2 (Sanitary_Part 2 COP for Space Requirements for Sanitary Appliances) . BS-9999 (Fire Safety in the Design, Management and Use of Buildings) .The Green Guide . UEFA - Stadium Infrastructure Regulations . EPL - Stadium guide • Preparing plans and sketches for the Planning Addendum submission. • Preparing sketches for consultants, clients or other internal teams to review. • All tasks were carried out in Revit 2020. On Stage 4 my team was responsible for the general layout plans and for technically developing all the interior architectural elements of the building such as walls, doors, windows, internal glazing, etc. My main task on this stage was developing technical specifications for all of the building’s steel and timber doors, roller shutters, smoke curtains, opening lintels and glazed doors (1180 doors in total), developing in Revit all that was related to doors as well as schedules. • Ensuring they were correctly positioned and had the correct dimensions, taking into consideration fire, security, British Standards and accessibility strategies. • Completing and adding all parameters of all doors in the Revit model (Structural openings, fire, security and acoustic rating, AACS information, material, finishes, vision panels, grills, etc.) • Editing Revit families, elements, parameters, etc.adapting them to the design intention. • Assisting to internal coordination meeting as well as meetings with consultants. • Meeting with suppliers to ensure we could find a product that met all of our requirements. • Preparing sketches for Stage 4 submissions. • Developing Revit schedules including all parameters and characteristics for costing. (Internal Doors Schedule, Internal Glazed Doors Schedule, Roller Shutters and Smoke Curtains Schedule, Riser Doors Schedule, Opening Lintel Schedule, Ironmongery Schedule). • Developing the specification on NBS Software for all the systems I was responsible for.
1/4
Mar 2013 — Apr 2019
Junior Architect at B.Testa Architects
Montevideo, Uruguay
B.Testa Architects is an architecture practice in Montevideo, Uruguay. The practice is committed on designing and building high quality projects for a variety of programs such as Entertainment, Housing, Industry, as well as working for the largest movie theater company in Uruguay, developing projects not only in Uruguay but also in Spain, Costa Rica, Colombia, etc. During my time in the firm I evolved from simply being an assistant to being in charge of all the graphic production of the studio. Having the responsibility of producing, editing and developing drawings, CAD 3D models, BIM Models, and other documents for meetings with current and future clients. Additionally, I did all the technical drawings for construction use. During my last 2 years I also assisted directing at the construction sites, having the opportunity not only to assist in the building of high end private residence buildings but also the first CBD laboratory in Uruguay. My main tasks for this purpose included executing quality controls to ensure everything complied to clients expectations, while also making arrangements to fix any problems I encountered. Finally I was assigned to direct by myself smaller projects such as the renovation of apartments. Being a small firm I was involved in all stages of the projects. Some of my tasks were:
• Prepare, develop and edit drawings, 3D models, and documents for to the design and construction of the projects. (Autocad, 3ds Max Design, Photoshop, Illustrator, InDesign) • Prepare graphic material for meeting with clients. • Develop BIM models. (Revit) • Elaborate graphic and informational documents necessary for construction permits. • Monitor construction work in progress to ensure it met clients specifications. • Compare between offers or proposals, and suppliers technical evaluation. Working while attending school for architecture was a deeply enlighting experience, enabling me to approach not only the academic aspect of the profession but also a learning how to apply it to make a profitable business. This way, I learned how to deal with different types of clients and apply all my academical Knowledge into today's dynamic business world.
Mar 2016 — Aug 2018
Teacher Assistant at Facultad de Arquitectura, Diseño Y Urbanismo - Universidad de la República
Montevideo, Uruguay
On my fourth year at the University, as a reward for my outstanding performance as a student, I was invited by my professors to join the Faculty of Scheps Design Studio. I worked for two years for the team in charge of the Second year Studio. The first semester course aim was for students to design a vertical public building, providing a liveable infrastructure for the city. The goal was for students to reflect on the needs of a contemporary meeting space and explore what kind of programs should the building be able to hold, all while understanding the context and how the building amplifies to the city. The second semester was focused on contemporary ways of inhabiting the city. Students were asked to design a collective housing building, reflecting on the importance and sustainable aspect of increasing population density on the areas of the city that already provide a great number of services, considering new liveable layouts that are more appropriate for a present lifestyle. Later, when I was working on my degree thesis I joined the Fourth year Studio team. "Foros" was a course that was led by my thesis tutor and approached the same topic I was working on in my thesis, the Infrastructural building, "More with less". This experience allowed me to reflect and research to more extent on the topic while also collaborating with my tutor's, Luis Oreggioni Ph.D. thesis, which was on the same subject. Some of my tasks were: • Work with the lead teacher to prepare the course schedule and material. • Prepare lectures presentations. • Assist students, answering question regarding the project design, graphic design, presentation method. • Provide resources and material to support their work, encouraging them to do research • Substitute the lead teacher on needed occasions. • Participate on the grading of the final products of the students. This ose one of the most enriching experiences at the University. It allowed me to be constantly reflecting on the profession and on the importance of high quality and efficient design that is able to elevate the context it is implanted on. I developed a critical attitude and creative initiative. Being able to learn not only through my own work and my tutors, but also through my students.
2/4
3
03 EDUCATION Apr 2019 — Dec 2019
Facultad de Arquitectura, Diseño Y Urbanismo Universidad de la República
AMERICA/ ASIA/ EUROPE
Academic Architecture World Trip The Academic Architecture Trip is a consolidated instance in the training of Uruguayan architecture students since 1944. It is in permanent construction and articulates a self-organized student collective (Travel Group) and the Faculty of Architecture, Design and Urbanism. A tour around the world allows visiting and knowing through personal experience, buildings and key cities for architecture. These vivid experiences are complemented with lectures from various renowned architects around the world, and visits to several architectural firms. Such as, SANAA, MVRDV, Foster and Partners among others. Mar 2012 — Dec 2018
Facultad de Arquitectura, Diseño Y Urbanismo Universidad de la República
Montevideo, Uruguay
Undergraduate Major in Architecture By achieving this 6 year degree I gained a general and balanced training of the discipline, and can practice the profession of Architect, being enable for it. I also developed an autonomous initiative for programming, planning, project, direction, production, management, advice, maintenance and equipment related to architecture. Understood in its broadest sense, in all its dimensions and scales of action, including territorial, as well as integrating teams to address the same or other activities of greater complexity or requiring levels of interdisciplinarity. My degree thesis RESET_TROUVILLE was among the best of my class getting a 12, which is the highest mark in the grading scale. It was also used as a supporting example for my tutor's, Luis Oreggioni PhD. thesis: "More with less: Ideas for a new generation of Public Equipment in the peripheral areas of metropolitan Montevideo, generators of urbanity and based on programmatic despecialization as a tool of project." developed at the Universidad de San Pablo FAU USP, that won the second price at the 2019 Arquisur, in the research category. https://teses.usp.br/teses/disponiveis/16/16138/tde-10052019-120315/pt-br.php
4
For it, my thesis partner and I decided to explore simultaneously 2 different topics. On the one hand, the Infrastructural building, understood as a three dimensional organization capable of housing a variety of human activities, not tied to any particular programmatic package. On the other hand, understanding the urban landscape as a platform for architecture. Link: https://issuu.com/martinaleon/docs/tfc_scheps_reset_trouville_leon_ram
04 SKILLS
Autodesk AutoCAD
Google Sketchup
Autodesk 3ds Max
Dynamo
Autodesk Revit
NBS
Adobe InDesign
Microsoft Excel
Adobe Illustrator
Microsoft PowerPoint
Adobe Photoshop
Microsoft Office Word
05 LANGUAGES
Spanish
English
Dec 2011 — Present
Certificate of Proficiency in English (CPE) -Cambridge University.
3/4
06 COURSES May 2016 — May 2016
Conference by Architect Angelo Bucci atUniversidad Nacional de Córdoba - Facultad de Arquitectura Urbanismo y Diseño, Argentina
Mar 2015 — Aug 2015
Revit – BIM Project at IBEC
Oct 2014 — Oct 2014
Obras Maestras de la Arquitectura Uruguaya atFacultad de Arquitectura, Diseño Y Urbanismo Universidad de la República
Oct 2014 — Oct 2014
IX BIAU - Ibero-American Biennial of Architecture and Urbanism at Rosario, Argentina
Mar 2013 — Aug 2013
3DS Max Design 2013 ci 1, 2, and 3 at Autodesk Certificate
Oct 2013 — Oct 2013
Arquitectos del Siglo XX at Facultad de Arquitectura, Diseño Y Urbanismo - Universidad de la República
Mar 2012 — Aug 2012
AutoCAD Level 1 (2D), Level 2 (3D) at Autodesk Certificate
08 REFERENCES
Gabrielle Tester
Adriana Lorenzo
Pattern Design Architects
Pattern Design Architects
gabrielle@pattern-architects.com +44 (0) 7403362284
adriana@pattern-architects.com +44 (0) 7707096385
Beatriz Testa
Luis Lagomarsino
B.Testa Architects
LLI CONSULT
beatesta@btarq.com +598 98944794
llagomarsino@lliconsult.com +598 94441304
Matias Caraballal
Luis Oreggioni
MAPA Architects
Oreggioni y Arquitectura
matias@mapaarq.com +598 95 172411
lucho@y.org.uy +598 99199390
5
4/4
PORTFOLIO
MARTINA LEON INDEX 1.CV................................................2-5 2.Portfolio....................................8-37
Everton FC Stadium (2020) at Pattern Design Architects. Liverpool, United Kingdom. Located on the waterfront of Liverpool’s Mersey River, a UNESCO World Heritage site, the new Bramley-Moore Dock stadium will provide modern facilities, iconic design and a 52,000 capacity. The project will replace Goodison Park Stadium. Pattern were invited by the club to join the Design Team, led by New York-based MEIS Architects, as Technical Architect. All images courtesy of MEIS Architects. As a RIBA chartered practice, one of Pattern’s key roles is to present the design intent and win planning for this ambitious and challenging project. Pattern is also responsible for specialist sports planning and technical architectural consultancy to ensure the smooth delivery that is so critical to the client’s goals Stage 3 - Redesigning the interior layout of a pre-existing project to ensure it met not only all SANDON - TIDE theHALF programme requirements but also the fire, DOCK security, acoustic strategies requirements, british standars, UEFA guidance andOWNERSHIP EPL guidance. BOUNDARY
(FOR LOCAL AUTHORITY USE)
NEW ISOLATION
STRUCTURE Stage 4- Developing technical specifications for EXISTING NORTHERN all of the building’s steel and timber doors, rollDOCK WALL PLANNING ADENDUM SKETCHES WIND MITIGATION er shutters, smoke curtains, opening lintels and (IN OPERATION ONLY PER WIND MITIGATION MANAGEMENT STRATEGY) - REFER TO DETAIL BMD01-PAT-ZZ-ZZ-DR-A-215430 glazed doors (1180 doors in total), developing in Revit all that was related to doors as well as schedules. 8• Ensuring they were correctly positioned and had the correct dimensions, takingEDGE into considOF TERRACE ABOVE 7.5m eration fire,7.5msecurity, British Standards and accessibility strategies. • Completing and adding all parameters of all doors in the Revit model (Structural openings, fire, security and acoustic rating, AACS information, material, finishes, vision panels, grills, etc.) 6.8m • Editing Revit families, elements, parameters, etc.adapting them to the design intention. • Assisting to internal coordination meeting as well as meetings with consultants. STERN DOCK• Meeting with suppliers to ensure we could find LL a product that met all of our requirements. • Preparing sketches for Stage 4 submissions. OW LIGHT STORAGE 5.6m • Developing Revit schedules including all parameters and characteristics for costing. (InPLAN LAYOUTS ternal Doors Schedule, Internal Glazed Doors SLIDING GATE 6.9m Schedule, Roller Shutters and Smoke Curtains Schedule, Riser Doors Schedule, Opening Lintel Schedule, Ironmongery Schedule). • Developing the specification on NBS Software for all the systems I was responsible for.
UNITED UTILITIES WASTEWATER TREATMENT WORKS
4B
General Notes
1. DO NOT SCALE FROM THIS DRAWING 2. ALL DIMENSIONS ARE IN MILLIMETRE UNLESS STATED OTHERWISE. 3. ALL DIMENSIONS TO BE VERIFIED ON THE ENGINEER. THIS DRAWING SHOULD BE READ IN CO RELEVANT ARCHITECTURAL, STRUCTU ELECTRICAL DRAWINGS AND ALL RELE SPECIFICATIONS. 4. ANY DISCREPANCIES FROM THE INF HERE ARE TO BE REPORTED TO THE C CONSTRUCTION.
SANDON HALF - TIDE DOCK
OWNERSHIP BOUNDARY NEW ISOLATION STRUCTURE
LEGEND:
EXISTING NORTHERN DOCK WALL
SITE BOUNDARY
ACCESSIBLE PARKING ELECTRICAL VEHICLE PARKING
VEHICULAR SECURITY BOOTH & BARRIER
PROGRAM TYPE: BACK OF HOUSE GENERAL ADMISSION
EDGE OF TERRACE ABOVE
HOSPITALITY
7.1m
7.3m
7.3m
KITCHEN
7.2m
MEDIA
PLANT & RISERS
HYDRAULIC ENGINE HOUSE
MEDICAL PLANT & RISERS
BACK OF HOUSE
PLAYER AREA
GENERAL ADMISSION
MEDICAL
6.8m
FOR SOFTSCAPE, HARDSCAPE AND LANDSCAPE REFER TO LANDSCAPE DRAWINGS
6.6m
RETAIL SECURITY FACILITIES
6.6m SECURITY
6.6m EASTERN DOCK WALL
7.3m
5.6m
REGENT ROAD WALL
OUTLINE OF DOCK WALL (UNDER STADIUM)
SECURITY
WESTERN DOCK WALL
OPENINGS FOR ACCESS ON REGENT ROAD WALL
KITCHEN
7.3m
7.3m
SLIDING GATE
6.9m
FENCE AT BOUNDARY LINE
NORTH WIND MITIGATION BANNERS - REFER TO DETAILS BMD01-PAT-ZZ-EX-DR-A-904131
7.5m
GROW LIGHT STORAGE
OWNERSHIP BOUNDARY
FOR SOFTSCAPE, HARDSCAPE AND LANDSCAPE REFER TO LANDSCAPE DRAWINGS
WIND MITIGATION (IN OPERATION ONLY PER WIND MITIGATION MANAGEMENT STRATEGY) - REFER TO DETAIL BMD01-PAT-ZZ-ZZ-DR-A-215430
7.5m
7.5m
4A
FOR SOFTSCAPE, HARDSCAPE AND LANDSCAPE REFER TO LANDSCAPE DRAWINGS
DISTRIBUTED NETWORK OPERATOR COMPOUND
FOR SOFTSCAPE, HARDSCAPE AND LANDSCAPE REFER TO LANDSCAPE DRAWINGS
A 5054/BLACKSTONE STREET FAN ZONE PLAZA
RIVER MERSEY WALL
PLAYER AREA MEDIA
SLIDING GATE
RETAIL
7.3m
HOSPITALITY
No
7.3m
SLIDING GATE
EET STR FUL TON
PLANT & RISERS
6.9m
PARKING
PLAYER AREA
Description
SAFETY, HEALTH AND ENVIRONMENT INFORM Brief details on the identified hazard symbol refe hazards / risks are listed above.
FOR SOFTSCAPE, HARDSCAPE AND LANDSCAPE REFER TO LANDSCAPE DRAWINGS
REG ENT
5.6m
GENERAL ADMISSION 7.3m
OPENINGS FOR ACCESS ON REGENT ROAD WALL
STEPS TO THE WESTERN TERRACE
RO AD
6.9m
OUTSIDE BROADCAST COMPOUND
RIVER MERSEY
HOSPITALITY
BACK OF HOUSE
WATER CHANNEL
S2 FOR INFORMATION S2 FOR INFORMATION Description
Client
OPENINGS FOR ACCESS ON REGENT ROAD WALL
6.6m
P02 P01 Rev
7.3m
6.8m
6.6m
7.2m
7.3m
1
GENERAL ADMISSION
EDGE OF TERRACE ABOVE
7.3m
Main Contractor
SECURITY
6.6m 7.3m
7.3m
WIND MITIGATION (IN OPERATION ONLY PER WIND MITIGATION MANAGEMENT STRATEGY) - REFER TO DETAIL BMD01-PAT-ZZ-ZZ-DR-A-215430
Design Consultant
7.0m
7.3m
Structural / MEP / Infrastructure
FOR SOFTSCAPE, HARDSCAPE AND LANDSCAPE REFER TO LANDSCAPE DRAWINGS
SOUTHERN DOCK WALL
SOUTH WIND MITIGATION BANNERS - REFER TO DETAILS BMD01-PAT-ZZ-EX-DR-A-904130
EXISTING ISOLATION STRUCTURE
FOR SOFTSCAPE, HARDSCAPE AND LANDSCAPE REFER TO LANDSCAPE DRAWINGS
Project Title
THE PEOPLE'S PROJECT Drawing Title
PLANNING ADDENDUM STADIUM PROPOSED PLANS PROPOSED FLOOR PLA
KITCHEN NELSON DOCK
Checked
Drawn
GT
AL
Purpose of Issue
FOR INFORMATION Model File Ref:
PROPOSED FLOOR PLAN - LEVEL 00
BMD01-PAT-ZZ-ZZ-M3-A-10Plann Drawing No
1 : 500
BMD01-PAT- 4A-00-D Scale A0 (841x1189)
1 : 500
PLAYER AREA
WATER CHANNEL SLIDING GATE
HOSPITALITY
STEPS TO THE WESTERN TERRACE
Plan
STADIUM FACILITIES
7.3m
MEDIA
6.9m
Project Manager
OUTLINE OF DOCK WALL (UNDER STADIUM)
STADIUM FACILITIES
Status
S2
REVIT FAMILIES AND PARAMETERS DEVELOPMENT.
NBS SPECIFICATIONS
FFL 13.200 m LEVEL 01
1
NW9 CB
E10
E9
Ceiling
Menu TV
1
1 : 50
E10
FIRE/SECURITY/ACOUSTIC/SECURITY SCOPE PLANS.
1
3055
L00 - L01 ROLLER SHUTTER SECTION
E9
5,183 m²
11.800 m LEVEL 02
CONCOURSE
29 m²
FFL 6.800 m
FLOOD PLANE
50
2915
CONCESSION - PIES
FFL 7.300 m LEVEL 00
PLANE
00-L01 CONCESSION ELEVATION OPTION 1
2650
2040
2475
0
Services Lowest level of services 3300 3200 Top of steel Top of block
TV
TV
2340
TV
2475
TV
2250
TV
2250
Horizontal Beam size to be defined by SE
Fire rated ceiling
2475
140
Services
Lowest level of services
COORDINATION SKETCHES. 3300 3200 Top of steel Top of block
Stud Wall
9
BMD01-PAT- ZZ-02-SK-A-020008 L02-SOUTH VOMITORY Services Lowest level of services
Drawn: ML Date: 08/18/20 Scale: 1 : 100
135
3300 3200 Top of steel Top of block
2475
TV
TV
TV
@ A3
TV
2250
N
0
PLANE
0
L00-L01 CONCESSION ELEVATION OPTION 2
2 500 1 : 50
1 : 50
BMD01-PAT-ZZ-ZZ-SK-A- 3100 L00 - L01 CONCESSIONS ROLLER SHUTTERS Suitability: S3 Revision: P01 Date: 13/08/2020 Scale:
DOORS/SMOKE CURTAIN/ROLLER SHUTTERS/OPENING LINTELS SCHEDULES
N
0
2 500
1 : 50
@ A1
ICC LABS (2018-2019) B. Testa Architects. Montevideo, Uruguay.
10
ICC Lab was the first CBD processing Lab built in Uruguay. The building is located on Parque de las Ciencias, Canelones, Uruguay. ICC needed a place to process, test and develop their products, while also housing their offices. It is a two-story project. On the ground floor, all the storage and lab-related facilities are located while on the first floor you can find the director’s office, the team working space, 2 meeting rooms and a small scale lab. A total of 1500m2 constructed. I was involved with the project over the stages 0 to 5. Stage 0-2 -Prepare, develop and edit graphic material for meetings with clients in early stages, using Illustrator, InDesign, Photoshop. Stage 3 - Prepare drawings and documents for construction permits. Polishing the first stages drawings to ensure they meet regulations standards. Stage 4- Prepare technical drawings for construction use in AutoCAD, such as floor plans, sections, details, etc. Develop BIM projects in Revit for system coordination purposes. At the las stages, I also participated in designing the color scheme for the facade and different designs for pavements on the interior. Stage 5- During the finishing stages of the construction monitor the work in progress to ensure it met client expectations.
FLOOR PLANS
SECTIONS 1
TERMINACIONES
2
1 2 3 4
1 - PAVIMENTO 2 - ZOCALO
3- PARAMENTO
4- CIELORRASO
PAVIMENTO
Green block Piedra partida
2.80
Vinílico Epoxi Hormigón estampado 2.80
Porcelanato Piso ingenieril Alisado de arena y portland
1.15
2 3 4 5 6 7 8 9
2.60
3
Piso técnico
1-1
TEQ
CE 01
1 2 3 4 5 6
R3
2 1/7
EGRESO MATERIALES
1/2/4 1
2 1
1.60
4 1
H=3.00m
H=3.00m
M1
650 650
1000 2125
M2a
0.80
650 650
R1
2.00
9 5
2.88
0.60
900 1980
0.90
C4
0.90
0.90
0.90
0.90
C3
1.68
1.68
1.68
1.68 0.90
0.90
0.90
1.05 1.35
C3
R1
E H
G
F
R1
R1
R1
0.50
C3
+400
NPT
H=3.14m
F
E
D
C4
1.68
1.15
A2
M1
900 1980
3.00
Cierre de yeso desde 3.10 a 4.00
1.68
1.44
0.65
900 1980
R1
M1
Cierre de yeso desde 3.10 a 4.00
2/4 1
R1
R1
900 1980
CIRCULACION VISITAS 9 5
R1
2 3
0.91
M1
900 1980
900 1980
900 1980
900 1980
M1
900 1980
900 1980
900 1980
500 1980
M1
500 1980
H=3.14m
1 2
H=3.00m 0.65
1.68
WINTERIZACION 1.00
H
1 2 2 3
H=3.00m
G
1.00
0.98
FORMULACION
TOMAS EN PLANOS DELTA Revisión 6 NO APARECEN EN ELÉCTRICA R 2018 06 07
1.68
M1
0.98
0.67 2368 2612
M1
2.80
2.00
0.48
2/4 1
0.98
0.67 M1
R1
R1
C
3.00
2.00
2.50 3.50
0.80 1.00
0.80
R1
B
2.50 0.40
0.67
A-A
M1
M1
2 3
S1
H=3.00m
7 5 5 1
2.60
4.15
C3
H=3.00m
1000 2125
0.67
M7
2.60
1.23
R1
M1
1000 2125
M1
C3
SE NECESITA TOMA PARA ROTAVAPOR
Roll up
A
2.60
2.50
0.98
M1
1000 2125
PT41
GUARDRAIL 500 1680
900 1680
1000 2125
900 1680
900 1680
M1
900 1680
1000 2125
900 1680
900 1680
900 1680
9.20
M1
M1
M1
M1
2.50
0.98
1.50
1000 2125
500 1680
M1
1000 2125
1000 2125
900 1680
1000 2125
M1
0.60
900 1680
900 1680
900 1680
M1
1000 2125
2.00
0.70
R3
M1
R3
R3
2232 900
1.80
0.95
M1 M1
900 1680
PT42
0.80
D
B
PT43
0.67
PT46
CRISTALIZACION Y FRACCIONAMIENTO
1 2
M2
A
1000 2125
2 3
ACCESO PRINCIPAL
M1
C04
R1
2 3
H=2.50m
0.98
1000 2125
2 3
C1b
2.95
C
M1
C4
R1
CE 02
900 1680
M1
M1
PT16
1000 2125 M1
1.44
1000 2125
500 1680
PT21
1000 2125
C4
R1
Dintel h=3.00m
1000 2125
M1
1000 2125
700 2125
1 2
H=2.50m PT26
1 1 2/4 1
AL-202
CF
8 1 2/4 1
PT52
1 2
1 2
ALMACENAMIENTO H=3.00m
1440 480
H=3.00m
C3 M1
GUARDRAIL
8 5
900 1980
2 3
A2
H=3.00m
C3
CORTES
No
2 3
PT38
Laboratorio CBD
LAMINA
2/4 1
ROTAVAPOR
0.60
M2
AREA DE CARGA
0.70
M1
M1
900+400 2125 M1
PT18
800 2125
M1
700 2125
A1
1000 2125
PRE PACKING 2
H=2.50m
R1
1 2
0.80
C5
M1
2125
OBRA
2 3
1000 2125
700 2125
0.98
PLOMFIN S.A.
20.91
H= variable
1 2
ESCLUSA C3b 1000
374.ICC.Cortes y Fachadas R13.dwg
EXTERNO.
DECARBOXILACION
M1
PT36
C3 M1
H=3.00m
1/4 1
7
0.67
CUTTING HOLE ON SITE
M1
1 2
M1
H=2.50m
M1
PT35
C4
CIRCULACION
PT48
M1
PT1
R1
A1
M1
0.84 700 2125
PT50
1 2 2 3
1 2 2 3
PT3
VESTUARIO PT2
M2
4 1
8 1
700 2125
M1
H=2.50m
M1
2 3
A2
2 3
M1
M1
A1
1 2
R1
M2
1 1
PT44
C4
PT23
H=2.50m
PT24
PT25
MIRROR
VESTUARIO
PT27
R2
5 1
C02
H=2.50m
M1
DEPOSITO R1
0.38
6
MONTACARGAS
C5
M1
H=3.00m
Ing.L.Lagomarsino & Asoc.
0.94
PROPIETARIO
1 2 2 3
1 2
1 2
C4
2 3
1 2 2 3
M1
C5
PT33
CIRCULACION GRADO D
ROTAVAPOR
2 3
2 3
ESCLUSA
M1
1 2
H=2.50m
700 2125
1 1
R2
M7
2.00
M7
0.22
H=3.00m
0.90
M1
2 2 2 3
20.88
M1
C3b
PT32
LAVADERO
0.80
CUTTING HOLE ON SITE
PT34
H=3.00m
2 3
B1
1000 2125
M1
1 2
PT20
DEPOSITO DE EQUIPOS C3
1 2 2 3
H=3.00m
2 3
M1
900+400 2125
H=2.50m
LAVADERO
PT4
R2
0.85
D2
C3
0.60
H=3.00m
C3
M1
LAVADERO
H=2.50m 1 2
A3
M1
700 2125
3.90
0.84
3 1
H=2.50m
5 1
2 3 A1
6 -
0.71
0.50
M1
D2
900+400 2125
M1
PT5
M4b
2 3
LIMPIEZA PT29
C3
1 2
C12
SSHH
H=2.50m 0.20
INTERMEDIOS
1 2
ESC. PERSONAS
H=2.50m
PT22
3.64
M1
PT30
CUTTING HOLE ON SITE
H=2.50m
M4a
C02
M6
6 1
Cierre de yeso 4D hasta entrepiso
PT37
0.95
ESC. MATERIALES 1 2
H=2.50m
M6
ACCESO PERSONAL H=2.50m
800 2125
CIRCULACION CNC
CIRCULACION
R1
5
A-A
900+400 2125 M1 M1
B1
600 1090
800 2125
B2
Cierre de yeso desde 3.10 a 4.00
M1
PT45
PT6
A1
2 3
4.90
TBO
A1
700 2125
2 2
H=2.50m
M1
700 2125
M1
700 2125
dintel h:2.20m en yeso
H=2.50m C4
M1
PT17
1 2
90 cataC
B-B PT49
0.8x0.2/0.25xh1.2
2.70 Proyección PA Cierre de yeso desde 3.10 a 4.00
M1
2 3 PT31
H=2.50m 1 2 2 3
VESTUARIO
2.50
M3
D2
900+400 2125
ESC. MIXTA 2 3
1850 1090
1 2
M1
VESTUARIO
2.60
1000 2125
PT19
MIRROR
H=2.50m
C12
C4
H=2.50m
A1
M4a
H=2.50m
1 2 2 3
900+400 2125
700 2125
R2
2 3
2/4 1
M1
Yeso enduido y pintado Yeso placa doble con aislación enduido y pintado Prefabricado / NO COTIZAR
H=3.00m
M2a
2 1
H=2.50m
M1
D2
SUPERVISOR
PT7
3 1
0.80x0.30/0.35xh2.35
1 2 2 3
PT14
H=2.50m
R2
PT15
H=2.50m
VESTUARIO
1 2
3.60
C02
HALL
1 1 5 1
2 3
A1
M1
A1
6 -
2 1
D2
PT13
ESC. MATERIALES ESC. MATERIALES
1 2
H=2.50m
PT28
SSHH
3
4
700 2125
M1 M1
1 2
2 3
0.84
R1
PT11
700 2125
PT9
H=2.50m
SECAMANOS,SE MUEVE TOMA CANALIZACIÓN POR DUCTO VER PLANO SD-09 CORTE B-B
M6
3.70
1.40
R3
700 2125 700 2125
0.84
700 2125
1.47
M2
A2
R1
700 2125
PT8
1.70
M2
C01
D2
A1
PT12
A1 M1
2.40
4 1
H=2.10m
Cierre de yeso desde 3.10 a 4.00
VESTUARIO
VESTUARIO
A2
dintel h:3.00 en yeso
H=ALTURA GALPON 1/2/4 -
TEO
M2a
TMO
2
h Equipo: 3.70m
R3
1.80
CARGA Y DESCARGA BASKETS
4 1
CANALIZACIÓN POR DUCTO
PT10
R3
PT51
1 1
3.30
M2a
M2a
R3
A1
M2a 0.5x0.15xh0.6
H=3.00m
R1
dintel h:2.20m en yeso Cierre de yeso 4D hasta entrepiso
2/4 1 H=3.00m
MANTENIMIENTO
B-B
0.8x0.3/0.35xh2.35
4.40
2 -
2 7
M2
TAO
C03
4 1
EXTRACCION
4.00
2 1
R3
C04a
Roll up
0.95 Canaleta M5
H=3.00m
2 6 1/2/4 -
H=ALTURA GALPON
1 2 3
R3
TABIQUE A CONSTRUIR EN SEGUNDA ETAPA
DEPOSITO
Cierre de yeso desde 3.10 a 4.00
M3
0.80
2.50
CIELORRASO
M2a R3
Chapa / NO COTIZAR
Paneles Pref. de laboratorio / NO COTIZAR Porcelantao 30x60 Enduido y pintado con pintura epoxi Enduido y pintado con pintura al agua Incalex Enduido y pintado con pintura superlavable
2.50
5.29
2.80
5.10
2.80
1.40
Roll up
1.80
4 1
1.52
1.68
R3
Dintel h=3.00m
C04
21.17
PARAMENTO
2.50
TEQ
2.20
2 1
3.00
TAA
Dintel h=3.00m
2.80
2.50
2.60
CE 01
INGRESO MATERIALES 1
Sanitario Porcelanato Madera prepintada 15cm "L" de Aluminio (ver detalle) "L" de Acero Inoxidable (ver detalle)
2.50
2-2
TAA
PVC flexible Sanitario prefabricado / NO COTIZAR
3.00
ZOCALO 1 2 3 4 5 6 7
Ing.L.Lagomarsino & Asoc.
3 3
1-1
2-2
374.ICC.Plantas R13.dwg
3
PROPIETARIO
PLOMFIN S.A.
4
5
OBRA
Ing.L.Lagomarsino & Asoc.
Laboratorio CBD
6 LAMINA
374.ICC.Cortes y Fachadas R13.dwg
PLANTA BAJA
7 No
PROPIETARIO
PLOMFIN S.A. OBRA
AL-001
Laboratorio CBD
LAMINA
CORTES
No
AL-201
DETAILS TIPO
CANTIDAD
BAÑOS 12 / 32
UBICACION
1
BAÑOS PB
MONOCOMANDO DE MESADA GENEBRE TAU
GRIFERA
SIFONES CROMADOS
DUCHA DE EMBUTIR MONOCOMANDO GENEBRE GE2 + GENEBRE ROCIADOR CON BRAZO DUCHA REGULABLE
TERMINACIONES
1
1 2 3 4
2
REVESTIMIENTO
PISO : PORCELANATO 120x60 cm PORTOBELLO PIETRA DI FIRENZE
PARAMENTO : PORCELANATO 30x60 cm KLIPEN ICE MATE BLANCO
ARTEFACTOS
FERRUM BARI CON MOCHILA Y TAPA
PLATO DE DUCHA FERRUM 80x80 DE ACERO ESMALTADO BLANCO
BACHAS
PILETA DE EMBUTIR FERRUM CONGRESO
2 - ZOCALO
DESAGUES
COORDINDO CON JUNTAS PAVIMENTO
3- PARAMENTO
ACCESORIOS
SECAMANOS / DISPENSADOR DE JABON / DISPENSADOR PAPEL HIGIENICO / PERCHAS
1 - PAVIMENTO
4- CIELORRASO
LLAVES DE PASO COORDINAR CON D. de O.
PAVIMENTO
Green block Piedra partida Porcelanato Piso ingenieril Alisado de arena y portland A-A
B-B
D-D
C-C
F-F
Piso técnico
E-E
2 3 4 5 6 7 8 9
Vinílico Epoxi Hormigón estampado
ZOCALO PVC flexible Sanitario prefabricado / NO COTIZAR
390 155
20
84
60
41
llaves de paso 45
a
1-1
a
30
85
85
30
40
a
72.5
10
Altura 2.50 Tabique revestido ambas caras
Tabique revestido ambas caras
2-2
40
2-2
Altura 2.50
40 3
SSHH
40
Yeso enduido y pintado Yeso placa doble con aislación enduido y pintado 85
87.5
Melamínico Canto ABS
Prefabricado / NO COTIZAR
55
SSHH
20
R1
15
40
1 2 3
R1
155
72.5
4 -
360 20
M2
1-1
Chapa / NO COTIZAR
Paneles Pref. de laboratorio / NO COTIZAR Porcelantao 30x60 Enduido y pintado con pintura epoxi Enduido y pintado con pintura al agua Incalex Enduido y pintado con pintura superlavable
CIELORRASO
2 1
84
71
M1
a
llaves de paso
PARAMENTO
1 2 3 4 5 6
TBO
60
Sanitario Porcelanato Madera prepintada 15cm "L" de Aluminio (ver detalle) "L" de Acero Inoxidable (ver detalle)
40
1-1
2-2
1 2 3 4 5 6 7
11
40
10
OFICINA
M5
1
Dispensador PH
H=Promedio 3.80m
155
15
155
215
M2
175
374.ICC.Sec 2 - Bañ PB R13b.dwg
M7
M7
A-A
B-B
C-C
D-D
F-F
Ing.L.Lagomarsino & Asoc.
B-B
H=Promedio 3.80m 2 1
E-E
CARGA Y DESCARGA BASKETS B-B
4 -
R1
M7
PROPIETARIO TUPS 0.6x0.15xh0.8
4 2
M7
R1
OBRA
R1
M7 R1
PLOMFIN S.A.
CPD
2 1
M7
M7
M7
LAMINA
Laboratorio CBD
Sectores y detalles
M7
M7
H=2.60m
No
7 5
7 5 5 2
M7
M7a
11
M7
5 2
VISITANTES H=Promedio 3.80m
C11a
TB1
M7
M7a
R1 M7a
1 3
M7a
4 2
M7
M7
MONTACARGAS
LABORATORIO
H=2.60m
0.6x0.15xh0.8
M7 M8a
SD-04
M7
DEPOSITO
1/4 -
M7a
2 1
1 1 3/6 2
H=2.60m
C06
M8a
M7a
COMEDOR
2
3.2x0.6xh2.1
TISANERÍA
H=2.60m
C07 C05
R2
M8a
H=2.60m
TA1
8 -
H=3.00m
7 5
- -
dintel h:2.20m en yeso
5 2 C05
M7
7 5
7 5
BAÑO
5 2
7 5 6 2
M7a
5 2
BAÑO
7 5
M7a
CANTIDAD
BAÑOS 12 / 32
UBICACION
1
BAÑOS PB
TG
M7
M8a
H=2.60m
TIPO
Previsión pileta
M8
C06
TAA1
5 2
H=2.60m
0.8x0.3/0.35xh2.35
M7a
C07
1 1
M8
HALL
R1
3
H=2.60m
M9
M8
6 2 M8a
7 5
M8
R1
5 2
M7
M8a
GERENCIA
A-A
TDO
TCO
4
C08 157
dintel h:2.20m en yeso
M7
105
7 5 5 2
M8a
C10
M8a
0.8x0.3/ 0.35xh2.35
30
0.8x0.3/ 0.35xh2.35
H=2.80m
30
R1
30
A-A
C08
210
210 10
30
80
14
EQUIPOS SALA DE REUNIONES
10
E01
RECEPCION
5
H=2.80m 71
H=Promedio 4.40m M8a R1
H=2.80m
5 7 5 5 2
40
10
87.5
37.5
40
85 255
30
30
30
F
E
10
255
374.ICC.Plantas R13.dwg
1-1
152
7.10
7.10
7.10
7.35
PROPIETARIO
105
2-2 7.27
84
Ing.L.Lagomarsino & Asoc.
F
E
D
D
R1
R1
C
B
A
B
A
72.5 255
C
R1
45
PLOMFIN S.A. 210 10
30
210 10
E02
4
30
Laboratorio CBD
30
Ing.L.Lagomarsino & Asoc.
14
OBRA
71
3
LAMINA
5 No
374.ICC.Sec 2 - Bañ PB R13b.dwg
NIVEL 1
PROPIETARIO
LOCAL
AL-002
10
65
10
65
30 255
65
DENOMINACION 10
PLOMFIN S.A. 85
10
39
84
37.5
15
70
30
40
72
40
BASES PARA EQUIPOS EXTERIORES 255
267
OBRA
LAMINA
No
Laboratorio CBD
SECTORES
SD-06
BIM PROJECT
A-A
L05
Bases a d
TFC - RESET_TROUVILLE, MONTEVIDEO, URUGUAY
TROUVILLE, ARTICULATION: 3 LEVELS.
Y02
Y03
04
Y04
Y05
Y06
Y07
Y08
Y09
Y10
01 Y12
Y11
Y00
Y01
Y13
02
Y14
Y02
Y03
Y15
Y16
Y04
Y17
Y05
Y18
Y06
Y19
Y07
Y20
Y08
C02
Y01
Y21
Y09
Y22
Y10
Y23
Y11
Y12
Y24
Y13
X09
0.20 0.10
0.40 0.10
X08
X08
M14
0.30
+3.60
2.15
02
M14
0.40
X07
2
M14
+3.60
MAQUINASX07
MAQUINAS
+3.60
+3.60
+3.60
01
X06
X06
01
01
X05
X05
C03 29.70
X04
X04
X03
X03
M14
M14
+7.00
- 4.00
X02
2.15
M15
0.15 0.42
X02
C03
24.90
34.50
C03
2.08
0.30
+3.60
+3.60 GALERIA EXTERIOR
0.10 0.40
X01
0.10 0.40
X01
0.30
01
49.93
0.30
2.25
0.10 0.20
2.25
0.25
04
2.40
0.25
2.15
0.15 1.25 0.20
2.75
0.800.20 1.00
3.00
0.80 1.00 0.20
3.00
0.80 1.00 0.20
50.10
3.00
0.80 1.00 0.20
3.00
0.80 1.00 0.20
3.00
0.80 1.00 0.20
3.00
0.80 1.00 0.20
0.15
3.00
0.80 1.00 0.20
3.00
0.80 1.00 0.20
3.00
0.80 0.20
2.30
0.25
2.15
0.25
2.25
0.20 0.10
2.25
0.20 0.10
02
C01
0.10 0.20
C02
03
02 01
C02
X00
X00
THE “RAMBLA“
Cementerio del Buceo
03
04
Y00
03
Y01
Y02
Y03
Y04
04
Y05
Y06
Y07
Y08
Y09
Y10
Y11
Y12
Y13
Y14
Y15
Y16
Y17
Y18
Y19
C01
Plaza de la Armada Nacional
C02
Espacio libre Rambla República de Mexico
Espacio libre Rambla Chile
Y20
Y21
Y22
Y23
Y24
X09
Espacio libre Rambla Armenia
X08 +0.00
1 1 -
A=416m² h=3.00m
2.73
2.70
L37 TERTULIA
02
+0.00
02
0.05
X07
M14
4.50
Parque Rodoó
+0.00
0.05
0.05
Yacht Club Uruguayo
Dique Mauá
M14
01
M14
X06
0.05
01
Espacio libre Primo Levi “Kibón”
X05
Punta Trouville
25.00
C03 15.95
C03 +0.00
+0.00
- 4.00
- 4.00
X04
Frente Costero Montevideano comprende el borde de la ciudad y el territorio montevideano sobre el Río de la Plata en toda su extensión. Constituye un territorio de frontera, con fuerte vocación de espacio público recreativo, a la vez que de gran fortaleza paisajística. Se profundizarán y potenciarán las actuaciones dirigidas a promover el uso y acceso público y democrático del litoral del Río de la Plata con el objetivo de potenciar los valores geográficos y naturales del departamento, y de reafirmar la relación que la población mantiene con la costa y el agua, factor de clara identidad de los montevideanos. […] […] Bahía: En virtud de los proyectos de desarrollo y ampliación del Puerto de Montevideo y del fortalecimiento de su significación nacional y regional y con el objetivo de reconquistar para el uso público y valorizar el espacio de la Bahía de Montevideo, se reformulará el vínculo entre la ciudad y el frente costero. Se procurará recalificar las áreas urbanas contiguas y próximas a la bahía y se acordarán visiones estratégicas y actuaciones en común entre el Gobierno Departamental y las entidades públicas localizadas en el entorno de la bahía.
Club de Golf del Uruguay
X03
4.50
SECTOR DE ESTUDIO
2.78
2.73
0.05
X02
LA RAMBLA COMO OPORTUNIDAD
0.05
Teatro de verano Ramon Collazo
03
Y00
X09
LA RAMBLA COMO OPORTUNIDAD
Plaza Republica Argentina
04
C01
03
C02
THE ROOF
0.05
My degree thesis RESET_TROUVILLE was among the best of my class getting a 12, which is the highest mark in the grading scale. It was also used as a supporting example for my tutor’s, Luis Oreggioni PhD. thesis: “More with less: Ideas for a new generation of Public Equipment in the peripheral areas of metropolitan Montevideo, generators of urbanity and based on programmatic despecialization as a tool of project.” developed at the Universidad de San Pablo FAU USP. For the final degree thesis. Students have to select a subject of interest to explore. The research and plot line that the students create, concludes in an architectural project that integrates all variables and scales, incorporating and visualizing industrialization-production and assembly processes as well as all the subsystems that allow a building to function. For it, my thesis partner and I decided to explore simultaneously 2 different topics. On the one hand, the Infrastructural building, understood as a three dimensional organization capable of housing a variety of human activities, not tied to any particular programmatic package. On the other hand, understanding the urban landscape as a platform for architecture. THE URBAN LANDSCAPE - Our site of action was “La Rambla“ of Montevideo. It is a promenade, an urban public space that extends throughout the entire coastal perimeter of the city. Although it has always been one of the most iconic and used areas of the city for recreation, it lacks to support specific activities that 12infrastructure could be taking place. That is why we concluded it was an opportunity to work here, the perfect place for a diffuse infrastructural building to reinforce the essence of the Rambla.
DEGREE THESIS - DESIGN STUDIO SCHEPS
+/-0.00 - 2.00 +/-0.00
X01
Parque de la rambla Mahatma Gandhi Espacio libre Rambla República de Mexico
Espacio libre Rambla Chile
X00
Plaza de la Armada Nacional
Espacio libre Rambla Armenia
02
0.05
01
0.05
03
2.82
0.05
2.40
0.05 0.25
04
55.40
7.20
C01
Cementerio del Buceo
C02
Parque de la rambla Presidente Wilson
0.05
42.62
0.05
Yacht Club Uruguayo Dique Mauá
Digesto departamental. Directrices Departamentales de Ordenamiento Territorial y Desarrollo Sostenible. Capítulo VII Territorios Estratégicos. Artículo D.213 .
Parque Rodoó
Plaza Republica Argentina
Espacio libre Primo Levi “Kibón”
Teatro de verano Ramon Collazo
Punta Trouville
Frente Costero Montevideano comprende el borde de la ciudad y el territorio montevideano sobre el Río de la Plata en toda su extensión. Constituye un territorio de frontera, con fuerte vocación de espacio público recreativo, a la vez que de gran fortaleza paisajística. Se profundizarán y potenciarán las actuaciones dirigidas a promover el uso y acceso público y democrático del litoral del Río de la Plata con el objetivo de potenciar los valores geográficos y naturales del departamento, y de reafirmar la relación que la población mantiene con la costa y el agua, factor de clara identidad de los montevideanos. […] […] Bahía: En virtud de los proyectos de desarrollo y ampliación del Puerto de Montevideo y del fortalecimiento de su significación nacional y regional y con el objetivo de reconquistar para el uso público y valorizar el espacio de la Bahía de Montevideo, se reformulará el vínculo entre la ciudad y el frente costero. Se procurará recalificar las áreas urbanas contiguas y próximas a la bahía y se acordarán visiones estratégicas y actuaciones en común entre el Gobierno Departamental y las entidades públicas localizadas en el entorno de la bahía.
Club de Golf del Uruguay
SECTOR DE ESTUDIO
Parque de la rambla Presidente Wilson
Parque de la rambla Mahatma Gandhi
THE “BOTTOM“
Digesto departamental. Directrices Departamentales de Ordenamiento Territorial y Desarrollo Sostenible. Capítulo VII Territorios Estratégicos. Artículo D.213 .
TROUVILLE SQUARE - It is the area of the Rambla that we chose to take action. In the 30s 2 public Olympic swimming pools were built on this site. Later in the beginning of the 2000s for various reasons the pools stopped being used and were filled with land, leaving the site as a green empty space. Our building proposes re-activating the site bringing back the memory of the old pools, therefore resetting the site. Following these strategies: 27
6.05
A=15m² h=3.70m
A=20m² h=3.00m
3 3 2 -
A=55m² h=3.00m
Y06
3 3 2 -
Y07
L06 VESTUARIO
A=55m² h=3.00m
3 3 2 -
M04 - 4.00
Y08
M04
M04
- 4.00
L07 ADMINISTRACION A=60m² h=3.00m
Y09
Y10
2 1 4 1
L08 SALA EXPO
Y11
A=250m² h=3.00m
Y12
Y13
06
Y14
Y15
2 1 4 1
Y16
L09 SUBESTACION
A=49m² h=3.70m
M07
Y17
Y18
Y19
C01
05
L05 VESTUARIO
M04
M04
C02
Y05
M04
Y20
Y21
Y22
Y23
07
- 4.00 10.00
M05
M05
- 4.00
- 4.00
- 4.00
M13
- 4.00
GRADAS MOVILES
0.25
PROYECCIÓN LOSA
A=168m² h=3.00m
5.12
2 1 4 1
L31 BOLETERIA
A=15m² h=3.00m
3 1 3 2
4.95
L30 HALL
3 1 2
L13 CIRCULACION
- 4.00
A=34m² h=3.00mM132
3 1 2 2
3 1 2 2
L18 DEPOSITO
3 1 2 2
A=12m² h=3.00m
A=17m² h=3.00m
0.15
L32 COCINA
- 4.00
3 3 2 -
4.85
4.85
L16 DEPOSITO
- 4.00
0.15
M11 25.00 45.25
A=18m² h=3.00m
M10
A=12m² h=3.00m
A=15m² h=3.00m
- 4.00
- 4.00
3 3 2 -
C03
- 4.00
02
L19 SSHH
A=18m² h=3.00m
3 3 2 -
L20 DEPOSITO
A=12m² h=3.00m
A=7.5m² h=3.00m
0.15
L34 DEPOSITO
3 1 2 2
3 1 3 2
2.25
0.15
M11
02
L33 BARRA
25.00
0.15
L17 CAMARIN
- 4.00
M04
4.85
0.15
M06
L35 SSHH
3 3 2 -
L36 SSHH
3 3 2 -
7.50
M13
L21 SSHH
A=19m² h=3.00m
3 3 2 -
A=10m² h=3.00m
0.25 A=36m² h=3.00m
2 4 4 -
M13
L22 CIRCULACION
M02
2.65
0.10
X02
L23 CIRCULACION
2 1 3 1
L27 SALA MULTIUSO
2 1 3 1
A=100m² h=3.00m
L24 SALA TABLEROS
- 4.00
A=50m² h=3.70m
1 2 2
L25 SALA BOMBEO
A=23m² h=3.70m
0.25
5.21
M06
M04
X03
0.15
A=10m² h=3.00m
?
4.87
0.15
M11
M12
3 1 2 2
- 4.00
M10
C03
07
M08
- 4.00
M05
M05
A=107m² h=3.00m
3 4 4 -
3 1 2 2
- 4.00
A=18m² h=3.00m
4.85
L11 CIRCULACION
06
Y24
PROYECCIÓN LOSA
1 2 2
0.25
L04 SSHH
M04
M05 A=19m² h=3.00m
L15 CAMARIN
X04
Y04
3 3 2 -
M13
M09
0.20
2.15
A=22m² h=3.00m
L14 CAMARIN
X05
A=20m² h=3.00m
- 4.00
3 4 4 -
M01
M10
X06
L03 SSHH
9.60 0.20
L10 CIRCULACION
0.15 1.35 0.15
X07
1 2 2
M03 - 4.00
M06
Y03
L02 SALA BOMBEO
M06
Y02
M02
- 4.00
M06
Y01
M06
1 2 2
M06
0.25
L01 MAQUINAS
M06
04
Y00
M01
05
A=74m² h=3.70m
X08
2.35
?
04
X09
7.20
?
27
7.15
26
26
1 2 2
- 4.00
L26 SALA MULTIUSO A=106m² h=3.00m
2 1 3 1
A=106m² h=3.00m
L28 SALA MULTIUSO A=106m² h=3.00m
L29 SALA MULTIUSO
2 1 3 1
A=90m² h=3.00m
2 1 3 1
X01
M01 - 4.00 - 4.00
- 4.00
- 4.00
- 4.00
- 4.00
01
01
120
m.
25
m.
120
m.
25
m.
120
X01
X02
X03
X04
X05
X06
X07
X08
0.40
01
0.40
3.60
0.70 0.15
0.20 1.75
0.15
2.40
0.15
3.61
0.15
3.60
0.15
2.50
0.15
2.75
2.40
0.15
05
4.30
0.15
0.15
4.30
2.75
0.15
0.15
10.00
M01
M10 2.50
06
24.70
50.00 5.20
07
C01
9.80 0.15 1.10
M01
M10
0.30
M10
04
0.40
02
C02
03
m.
0.30
X00
X00
25
M10
M10
50.00
15.00
20.00
2.40
4.40
6.75
3.25
0.40
0.40
X09
m. X00
IDENTIFY
UNEARTH
5.00
X01
5.00
X02
5.00
X03
5.00
X04
25.00 5.00
X05
5.00
X06
5.00
X07
5.00
X08
5.00
X09
25.00
BROADEN
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
1.NOSTALGIA 1.NOSTALGIA 1.NOSTALGIA 2.EXCAVAR 2.EXCAVAR 3.DEMOLER 3.DEMOLER 4.RECONSTRUIR4.RECONSTRUIR EL BORDE EL BORDE 5.TECHO COMO EQUIPAMIENTO 5.TECHO COMO 5.TECHO EQUIPAMIENTO 6.TECHO COMO FACHADA 6.TECHO COMO 6.TECHO FACHADACOMO FACHADA 2.EXCAVAR 3.DEMOLER 4.RECONSTRUIR EL BORDE COMO EQUIPAMIENTO Se reconoce el área Seque reconoce ocupaban el área las piscinas ocupaban antes las de que ser piscinas enterradas, antes las de como ser enterradas, lugarantes de de como lugar desentierra de como el volumen Selugar desentierra el volumen las que piscinas, ocupaban reconociendo las que piscinas, el antiguo reconociendo muro deel antiguo Consideramos muro deel antiguo para Consideramos nuestro para demoler nuestro al proyecto antiguo muro deproyecto alcontención antiguodemoler muro creando dealcontención uno muro creando uno El nuevo contención nuevo muro conde losEl contención servicios que conde alos élcontención se servicios adosanque se avuelven él servicios se adosan a enterrar se avuelven Teniendo a enterrar cuenta Teniendo preexistencia en cuenta delados preexistencia piscinas diferentes, delados piscinas se decide diferentes, este se decide dividir Teniendo este en cuenta Teniendo que en predio cuenta que queen esfrente un tieneque edificios en gran tieneque altura edificios de gran se de gran altura se Seque reconoce el área ocupaban piscinas serSeenterradas, deque ocupaban Se desentierra el volumen ocupaban las piscinas, reconociendo muro deproyecto Consideramos parademoler nuestro antiguo de contención creando uno muro de El nuevo muro con los que él se adosan se en vuelven a la enterrar Teniendo en cuenta preexistencia dedividir dos piscinas diferentes, se decide dividir estees un Teniendo en predio cuenta que es frente unde predio ense frente tienealtura edificios oportunidad de proyecto. oportunidad de proyecto. contención que lascontención delimitaba.que Este lasvolumen delimitaba. vacio Este se volumen vacio en el se corazon convierte del vacio en el se corazon nuevo del enaeluncorazon offset de nuevo un manera offset de de 10m, enterrar en ese lugar enterrar equipamientos en esede lugar queequipamientos luego queequipamientos luego manera de reconstruir de manera el borde. de reconstruir Eldevacio de el borde. las El vacio piscinas de las sigue antiguas siendo piscinas centro sigue siendo vacio elen centro dos partes. vacio Reconociendose dos partes. dos Reconociendose espacios diferentes. dos espacios Una plaza diferentes. exterior Una y unplaza exterior considera y unplaza la cubierta considera como la cubierta quinta fachada. como una quinta toma fachada. lacomo decisión detoma llenarla la decisión de agua, llenarla de agua, oportunidad de proyecto. contención que lasconvierte delimitaba. Este volumen convierte del10m,a de nuevo a de un manera offset dede 10m, de manera enterrar en ese lugar quedeluego manera de antiguas reconstruir el borde. El vacio deellas antiguas piscinas sigue siendo el en centro vacio en dos partes. Reconociendose dos espacios diferentes. Una exterior y un una considera laSe cubierta unaSequinta fachada. Sede toma la decisión de llenarla de agua, Un poligono de deUn 25 poligono x 120 mts, deeldecual 25 poligono xhoy 120solo mts, queda eldecual enxhoy la120 memoria solo enhoy la memoria de colectiva proyecto. de la colectiva proyecto. sirvan al vacio central. sirvanSealabre vaciouna central. rampa que abre conecta una rampa el proyecto conecta con el plaza proyecto existente. con la el plaza existente. del proyecto. del proyecto. vacio techado. Este vacio techo techado. no es una Este simple techo cubierta no es una plana, simple sino cubierta plana, unsimple volumen sino que de es 3mplana, un volumen retomanda de es 3m laun nostalgia retomanda dedelas3m laantiguas nostalgia piscinas. de laslaantiguas Anostalgia su vez piscinas. el de agua A su vezcomo el agua reserva funciona reserva Un de 25 mts,queda elcolectiva cual sololaqueda en la memoria de la proyecto. sirvanSeal vacio central. Seque abre una la rampa que conecta proyecto con la plaza existente. del proyecto. vacio techado. Este techo noque es es una cubierta sino que volumen retomanda las funciona antiguas piscinas. A su vezcomo el agua funciona como reserva ciudad. ciudad. de alto que contiene, de alto no solo que programa contiene, no si no solo el equipamiento programa si no necesario el programa equipamiento parasielnodesarrollo necesario para de el desarrollo incendio ypara actuade incendio regulador y actua térmico. como regulador ciudad. de alto que contiene, no solo el equipamiento necesario elcomo desarrollo de incendio y actuatérmico. como regulador térmico. de variadas actividades de variadas debajoactividades de él.de variadas debajoactividades de él. debajo de él.
RECONSTRUCT
ROOF/EQUIPMENT
ROOF/ MEMORY
ARTICULATION IN 3 LEVELS - THE ROOF Serves as a stage house, holds the equipments that make the building function, generates landscape and allows for views of the landscape. THE RAMBLA - Intermediate level, enables to access or view the activities inside of the building. THE BOTTOM - Located at the level where the old pools where, the area these occupied is left empty to activate as wished, while the perimeter is where the services are located.
4.RECONSTRUIR EL BORDE EL BORDE COMO5.TECHO EQUIPAMIENTO COMO EQUIPAMIENTO FACHADACOMO FACHADA 4.RECONSTRUIR4.RECONSTRUIR EL BORDE 5.TECHO COMO 5.TECHO EQUIPAMIENTO 6.TECHO COMO 6.TECHO FACHADACOMO6.TECHO rproyecto alcontención antiguodemoler muro dealcontención antiguo creando de contención uno creando uno muro de El nuevo muro Elcontención nuevo muro conde contención servicios con élservicios se adosan que seavuelven él se adosan a enterrar se vuelven aTeniendo enterrar en cuenta Teniendo preexistencia en cuenta dela dos preexistencia piscinas diferentes, dedividir dos piscinas se decide diferentes, dividir este se decide dividir Teniendo estees en Teniendo que en es en un cuenta predio en es un frente predio tieneque edificios en se frente de gran tiene altura edificios se de gran altura se de creando uno muro El nuevo contención conde los servicios que alos él se adosanque se alos vuelven a enterrar Teniendo en cuenta la preexistencia delados piscinas diferentes, se decide este Teniendo en cuenta que un cuenta predio que frente tieneque edificios de gran altura de errar manera en esedelugar enterrar en ese lugar que equipamientos luego quede luego de manera de reconstruir devacio manera el de El vacio eldeborde. las antiguas El vacio piscinas deellascentro antiguas sigue siendo piscinas el en centro sigue siendo vacio el centro en dos partes. vacio Reconociendose enespacios dos partes. dos Reconociendose espacios diferentes. dos espacios Una diferentes. exterior Una y unplaza exterior considera y un una la cubierta considera como una la Se cubierta quinta como unaSequinta toma fachada. la decisión Sede toma llenarla la decisión de agua, de llenarla de agua, equipamientos queequipamientos luego manera de reconstruir el borde. El deborde. las reconstruir antiguas piscinas sigue siendo vacio dos partes. Reconociendose dos diferentes. Una plaza exterior y unplaza considera la cubierta como quinta fachada. toma fachada. la decisión de llenarla de agua, ue breconecta una proyecto que conecta con laelplaza proyecto existente. con la plaza existente. del proyecto. del proyecto. vacio techado. Este vacio techo techado. no es una Este simple techo no cubierta es una simple sino cubierta que plana, un volumen sino que dees 3m volumen retomanda delas 3mlaantiguas nostalgia retomanda de laslaantiguas las antiguas A su vezpiscinas. el agua funciona A su vez como el agua reserva funciona como reserva ecto con rampa la elplaza existente. del proyecto. vacio techado. Este techo no es una simple cubierta plana, sino que esplana, un volumen dees 3m retomanda launnostalgia de piscinas. Anostalgia su vezpiscinas. eldeagua funciona como reserva de alto que programa contiene, de alto no solo queel contiene, programa no si no solo elprograma equipamiento si el nonecesario el equipamiento para el desarrollo eldedesarrollo incendio y actua de como incendio regulador y actuatérmico. como regulador térmico. de alto que contiene, no solo si no equipamiento necesario para desarrollo denecesario incendio ypara actua como regulador térmico. de variadas de variadas debajoactividades de él. debajo de él. de variadas actividades debajoactividades de él.
Y00
Y01
Y02
Y03
Y04
X00
Y05
X01
Y06
X02
Y07
X03
Y08
X04
Y09
X05
Y10
X06
Y11
X07
Y12
X08
Y13
Y14
Y15
Y16
Y17
Y18
Y19
Y20
Y21
Y22
Y23
Y24
X09
60.00 55.00
X00
X01
5.00
X02
5.00
X03
5.00
5.00
X04
25.00 5.00
X05
5.00
X06
X07
4.95
X08
5.05
+7.40
X09
5.00
+6.80 +6.80 25.00 5.00
5.00
5.00
5.00
5.00
5.00
4.95
5.05
+3.00 +3.60 NPT +6.80 +1.00 Rambla ±0.00 +3.00 +1.00 Rambla +3.60 NPT ±0.00
5.00
+3.00 +1.00 Rambla ±0.00 -4.00 NPT -4.45 -5.45 -4.00 NPT -4.45 -5.45
Y00
Y01
Y02
Y03
Y04
Y05
Y06
Y07
Y08
Y09
Y10
Y11
Y12
Y13
Y14
Y15
Y16
Y17
Y18
Y19
Y20
Y21
Y22
Y23
50.00 5.00
5.00
5.00
5.00
5.00
5.00
Y24
10.00 5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
+6.80
+3.60 NPT +3.00 +1.00 Rambla ±0.00
-4.00 NPT -4.45 -5.45
Y14
Y15
Y16
13
83
INTERIOR SPACE - A CAPABLE SPACE THE ROOF AS A STAGE HOUSE - In the same way that in a theater’s stage house, the roof works like a box of tools. It supports and enables any activities that could happen underneath it. Just like in a stage house it contains a grid. Allowing staff to access any point. Motorized bars installed every 5m allowing the mounting of any equipment or scenography needed. The variations of what can happen underneath is endless. THE RAMBLA LEVEL - This level is connected to the promenade and its the upper level of access. It enables to observe what is taking place at the bottom serving as a viewing platform. It is completely surrounded by a curtain wall glass system to allow for natural light and also a fluid connection of the interior and the exterior. If the event happening in the interior requires it, there are roller blackout blinds that can be pulled down, turning the interior into a black box. The acoustic ceiling can be dismounted and replaced when needed. THE BOTTOM LEVEL - It is constituted by the central, 7m high void, and the surrounding services. The pavement is portable and can be replaced according to the users needs. The void is surrounded on the lower levels by acoustic panels that are reflective on one side and absorbent on the other, the pivotal system enables to choose which is a better fit for the event . The grandstands are retractable.
14
THE ROOF AS A STAGE BOX
THE “BOTTOM” LEVEL
THE “RAMBLA” LEVEL
CONSTRUCTION DESIGN
SECTION
DETALLE 01 Escala 1.10
SECTION
CONSTRUCTION DETAILS
DETALLE 01 Escala 1.10
DETALLE 01 Escala 1.10
DETALLE 02 Escala 1.10
DETALLE 01 Escala 1.10
DETALLE 03 Escala 1.10
PLANILLA DE MUROS Escala 1.20
DETALLE 02 Escala 1.10
15 Vista axonométrica Unidad de detalle
DETALLE 02 Escala 1.10
PLANILLA DE MUROS Escala 1.20
DETALLE 03 Escala 1.10
DETALLE 02 Escala 1.10
STRUCTURE
118
AXONOMÉTRICA GENERAL ESTRUCTURA
PLUMBING
138
AXONOMÉTRICA GENERAL ACONDICIONAMIENTO SANITARIO
HVAC
180
AXONOMÉTRICA GENERAL ACONDICIONAMIENTO TÉRMICO
181
Vista axonométrica Unidad de detalle
190
AXONOMÉTRICA GENERAL COORDINACIÓN DE SUBSISTEMAS
SYSTEM COORDINATION
191
BRITO BUILDING (2016-2019) B. Testa Architects. Montevideo, Uruguay. Brito Building is a private 3 story building constructed for a single-family, where 3 generations live together but each with their own private level. On the ground level is where the apartment of the owner and head of the family is located. On the first floor her son and wife apartment. And on the top-level her granddaughter and grandson apartments. The challenging part of this particular design and construction was to take into consideration and reflect on the plans the 3 different lifestyles and needs required by each generation. I was involved with the project over the stages A total of 1400m2 constructed with a budget of 6 million USD. 0 to 5. Stage 0-2 -Prepare, develop and edit graphic material for meetings with clients in early stages, such as photo-montages, drawings,etc., using Illustrator, InDesign, Photoshop. Stage 3 - Prepare drawings and documents for construction permits. Polishing the first stages drawings to ensure they meet regulations standards. Stage 4- Prepare technical drawings for construction use in AutoCAD, such as floor plans, sections, details, etc. Develop BIM projects in Revit for system coordination purposes. Stage 5- During the finishing stages of the con16struction monitor the work in progress to ensure it met client expectations.
STAGES 0-2
STAGES 4
REFERENCIAS LOCALES
DESTINO
NUMERO DE LOCAL
FLOOR PLANS
ALTURA
DETAILS
PLANTAS NIVEL
1
NIVEL DE PISO TERMINADO
N.P.T
2 2-2 0.85
0.20 0.05
3 2
2.00
3 1-4 1
2.30
2.30 3.20
(0.80x1.30 O/B) Movilidad 100%
0.70
1-4 1
H=2.60m
H=2.60m
0.40
0.75
DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA
H=2.60m
0.10
C03
0.15
1.22
0.15
0.30
0.30
1.60
0.75
C03
0.75
C03
Cp25
2.57
2.20 2.62
0.85
ANTEPECHO
0.75
2.40
2.00
5.30
0.85
1-4 1
2.32
2.64
2.56
8
0.05 0.20
3 2
3.20
7
TIPOLOGIA DE ABERTURA DE CARPINTERIA ANCHO ABERTURA
Piedra partida
- -
1.60
0.15
1-1
10 -
0.70
Ducto extraccion mecánica
H=2.45m
1
C03
0.85 x 0.60 0.85 x 0.60 0.85 x 0.60 (corrediza) (corrediza) (corrediza) Movilidad 50 % Movilidad 50 % Movilidad 50 %
Extracción mecánica 6 Renovac/hora 16.95
0.95
DINTEL
1.75
6 2 2
6 2
TIPOLOGIA DE ABERTURA DE CARP DE ALU 4.35
5.00
B-B
7.34
B-B
H=2.60m
3.12
3.50
6.00
4
6.12
2.32
5
3.30
0.62
6 -
H=2.60m
0.75
2 2 1.00
1
1.40 16
15
14
13
12
11
10
8
1.00
1.02
3
7
1.45 x 0.60 (corrediza) Movilidad 50 %
9.75
2
TIPOLOGIA DE PLACARD
M06
TIPOLOGÍA DE MESADAS
2.65
3.20
4.35
Rampa Vehicular pendiente 20%
Cp05
Portón Gargage Calado 4.25 x 2.45 (Basculante) Movilidad 100% Contraventilación 3.47m2
H01 C17
5
TIPOLOGÍA DE ESPEJOS
A-A
Límite de retiro Lateral
6
5
3.65
2.65
2.50
Son 16 escalones de 0.18 x 0.28
0.06
1.00 0.28
1.45
4
2 3 1 1
9
TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL
E03
2
9
4.75
4
3.20
V09
0.65
1
H=2.60m
3.60
1.05
3
1.45 x 0.60 (corrediza) Movilidad 50 %
1.45
0.35
REJILLA 20x20 DUCTO 0,04
BARANDA h=1.00m
H=2.70m
2.65
H13
6.90
1.00
3.05
2.74
3 2
C19
H=2.60m
2.90
4
H02
4
A-A
5
6.000 litros Reserva de incendio
Límite de predio
0.65
Son 7 escalones de 0.18 x 0.28 7 6
2.30
1.95 0.30
6 2 2
3
1.50
0.50
2.60
19.75
2.69
2 2
H02
TIPOLOGIA DE CORTINA DE ENROLLAR
P Cortina
6 -
H=2.70m
0.20
Límite de retiro Lateral
3.80
3.65
6 10 2
1
5.00
M4 20
H03
25.60
F
E
TIPOLOGÍA DE MUROS
REFERENC
G
D
G
F
E
D
B
C
A
B
A
2-2
1-1
C
Límite de retiro Frontal (8.50m)
3
PLANTA SUBSUELO ESC 1:100
LOC
MURO A CONSTRUIR
4 5
NUMERO DE DETALLE NUMERO DE LAMINA
CORTES 1 2 2-2
1-1
R E F E R E NNIC
BARANDA h=1.00m
1.60 x1.40 (Corrediza) Movilidad 50 %
NIVEL DE CIELORRASO
1 3 Cp14
- 5
Ducto 0.30x0.45
1.60 x1.40 (Corrediza) Movilidad 50 %
H=2.50m
NIVEL CARA SUPERIOR H.A.
Cp13
3.20 x 2.30 (Corrediza) Movilidad 50 %
H=2.50m
1 -
C02
H=2.30m
4 3
- 5 C02
C02
1 1
C15H=2.40m
4 3
1.15 x 2.30 (Batiente) Movilidad 100 %
1 3
H=2.40m H=2.40m
C02
Cp03
9 - -
A-A
C02
B-B
0.85 x 1.20 (Oscilobatiente) Movilidad 100 %
Cp12
Cp02
(0.80x1.30 O/B) Movilidad 100%
1 3
C15
1 -
NIVEL CARA INFERIOR H.A.
9 -
1 1
H=2.40m
0.50 x 1.20 (Oscilobatiente) Movilidad 100 %
0.50 x 1.20 (Oscilobatiente) Movilidad 100 %
H=2.40m
C01
H=2.60m
Cp01
0.50 x 1.20 (Oscilobatiente) Movilidad 100 %
7 3
C01
C01
Cp20
B-B
H=2.50m
1 -
0.50 x 1.20 (Oscilobatiente) Movilidad 100 % H cenefa=2.30m
H cenefa=2.30m
C01
C03
H=2.50m 1 1 3 3
2
N.P
LOC
1 1
9 C01
Terraza Estrucutra liviana Indep.
BARANDA h=1.00m 1.60 x1.40 (Corrediza) Movilidad 50 %
1 3
1 3
- 5
1
C18
01
1 1
4 1
H cenefa=2.30m
1 3
9 -
2.40 x 2.30 (Corrediza) Movilidad 50 %
2.00 x 2.30 (VF) Movilidad 0 %
1.40 x 2.30 (VF) Movilidad 0 %
4 1
BARANDA h=1.00m
H=2.50m
1.40 x 2.30 (VF) Movilidad 0 %
PLA
NIVEL DE PISO TERMINADO
Terraza Estrucutra liviana Indep.
CORTE
NUMERO DE LAMINA
PLA
H=2.30m
1.40 x 1.70 (Oscilobatiente) Movilidad 100 %
1 2
H cenefa=2.30m H=2.40m
3 -
1.80 x 2.30 (Corrediza) Movilidad 50 %
4 1 1 3
2.05 x 2.30 (VF) Movilidad 0 %
3 3
1 3
H=2.30m
9 2
1 3
1 2
C02
C05c
1 3
2.05 x 2.30 (VF) Movilidad 0 %
NI
1 1 C02
1.00 x 2.30 (Oscilobatiente) Movilidad 100 %
H=2.60m
H cenefa=2.30m
1 1
1 1
H=2.40m
H=2.40m
5 3
N.P
4 1 1 3
2.60 x 1.20 (Corrediza) Movilidad 50 %
H=2.60m C05a
1 1 3 3
H=2.60m
C05c
H=2.60m
H=2.60m
1 2 1-4 3
C09 Cp04
17
Ducto 0.34x0.33
C07b
C07b
1 1
13
12
11
10
REJILLA 20x20 DUCTO 0,04
BARANDA h=1.00m
1 1
1 3 H=2.60m
C05
C05
H cenefa=2.30m C10a
H cenefa=2.30m
1.10 x 1.20 (Corrediza) Movilidad 50 %
H=2.60m
1-4 3
H=2.60m
A-A
E03
H=2.60m
1 1
Cp05
3 3
H cenefa=2.30m C04
C02
1 2 1 2 1 3
2
1 3
1 3
C03a
H cenefa=2.30m
C04
H=2.60m
1 1
C02
6 5 4 3
1 1
1 1
5
V09
(0.80x1.30 O/B) Movilidad 100%
9 8
Son 17 escalones de 0.18 x 0.28
H=2.60m
H=2.60m
7
1
C10a
3.00x 2.30 (Corrediza) Movilidad 50 %
H=2.60m
0.70 x 1.10 (VF) Movilidad 0 %
2 3
BARANDA h=1.00m
Límite de retiro Lateral
14
1C03a 1
- -
4
15
Cp05
3 3
9 -
A-A
16
P
Cortina C03
Límite de retiro Lateral
C10
3.00x 2.30 (Corrediza) Movilidad 50 %
4
H cenefa=2.30m
3
Límite de predio
C07a
3 3
F
E
G
D
Cortina
3
PLANTA BAJA ESC 1:100
4
M06 P
1.40 x 2.30 (VF) Movilidad 0 %
- - 5
F
E
D
C
B
A
C
1.40 x 2.30 (VF) Movilidad 0 %
- -
2-2
B
1.40 x 2.30 (Oscilobatiente) Movilidad 100 % 8 -
1-1
A
1.40 x 2.30 (Oscilobatiente) Movilidad 100 %
1.40 x 2.30 (VF) Movilidad 0 %
G
0.60 x 1.50 (Oscilobatiente) Movilidad 100 %
H cenefa=2.30m
1.40 x 2.30 (VF) Movilidad 0 %
Límite de retiro Frontal (8.50m)
M4
V09 20
4 5
E03
Cp05 1
REVISIONES
4.20x 2.30 (Corrediza) Movilidad 50 %
BARANDA h=1.00m
2-2
1-1
BARANDA h=1.00m
7 -
1.60
2.95 x 2.30 (Corrediza) Movilidad 100 %
4 1 1 3
1.00 x 2.30 (Oscilobatiente) Movilidad 100 %
M06
REVISIÓN 1.55
1.10
- 4
2.95 x 2.30 (Corrediza) Movilidad 100 %
01
4.20
0.30
2
M4 COR 20
00 - LICITACION
1.10 x 2.30 (VF +Oscilobatiente) Movilidad 65 %
7 2.95
5 1
3.65
- 5
2.95
3.35
5 1 4 1
1.10
2.80
0.40
16
15
14
13
12
11
H cenefa=2.30m
C16
10
EDIFICIO BRITO
0.30
02
1.40
0.60
0.75
BARANDA h=1.00m 3.45 x 1.60 (VF+Oscilobatiente) Movilidad 45 %
05
1.10
C06
2.55
0.95
H 14
H=2.40m
C18
05
BARANDA h=1.00m
C18
0.70
0.60
F
4 5
Corte A-A Esc 1/50
A-A
Corte Integral
- -
3.65 x 2.30 (Corrediza) Movilidad 50 %
BARANDA h=1.00m
1.40 x 1.60 (Oscilobatiente) Movilidad 100 %
PLANO
7 -
- -
E
D
C
B
A
2-2
1-1
C
3.65
7 -
01
H06
1.40 x 1.60 (Oscilobatiente) Movilidad 100 %
3
370.AB.AS.De.Corte Integral - Licitaci
4 1 1 3
1.35
A3
ARCHIVO
1.10 x 2.30 (VF +Oscilobatiente) Movilidad 65 %
F
0.60
C18
H=2.60m
E
1 3
0.75
C18
1 3
1.55
0.95
BARANDA h=1.00m 3.45 x 1.60 (VF+Oscilobatiente) Movilidad 45 %
1 1
H07
1.20
D
6 3
3.45
G
1.40
BARANDA h=1.00m
0.45
1.85
1.40
1.10
1 3 5 1
1.70
1 2
A-A
9 3
5 1
1.00
H=2.60m Cp09
H=2.60m
1.10 x 2.30 (VF +Oscilobatiente) Movilidad 65 %
3 -
C05
5
H=2.60m
2
1
2.50
H=2.40m
1 3
H=2.60m
C03
C11
0.45
6 5 4 3
Son 18 escalones de 0.18 x 0.28
2 3
H=2.60m
6 3
02
8 7
Cp11
7 3
H=2.30m
1.05
1.85
Extractor
C18
H cenefa=2.30m
1.40
9
C08
1 -
C03
COR
A-A
OBRA
0.77
REJILLA 20x20 DUCTO 0,04
1 3
C12
H=2.60m 1 2
0.60
17
5 1
1.00
Cp10
H=2.30m
Cp11b
18
1.42
H=2.60m
ANA BRITO
1.10 x 2.30 (VF +Oscilobatiente) Movilidad 65 %
H=2.60m
H=2.60m
H07
1.10 0.80 1.10 0.80
Cp08
C05b
1 3
Cp11a
Rivera 7031
PROPIETARIO
C13
0.40
C07c
Cp23
4
1.85 x 1.20 (Corrediza) Movilidad 50 %
1.10 x 2.30 (VF +Oscilobatiente) Movilidad 65 %
0.50 0.75
Cp07
1.65
1 3
1.85 x 1.20 (Corrediza) Movilidad 50 %
UBICACIÓN
1 3
H=2.60m
0.50 x 1.40 (VF) Movilidad 0 % 1.65x 2.30 (VF) Movilidad 0 %
H cenefa=2.30m
1.65
5 1 1 3
B-B 1.10 x 2.30 (VF +Oscilobatiente) Movilidad 65 %
4 1
1.60 0.40
1.10 x 2.30 (VF +Oscilobatiente) Movilidad 65 %
0.30
H cenefa=2.30m
0.35
H cenefa=2.30m
C13
1.90 x 2.30 (VF) Movilidad 0 %
0.40
C11a
A-A
B
H=2.60m
0.50
0.50 x 1.40 (VF) Movilidad 0 %
1.65 x 2.30 (VF) Movilidad 0 % H cenefa=2.30m
0.50
1 2 6 3
2.80 x 1.20 (Corrediza) Movilidad 50 %
A
2.20 1.10 0.35 1.10
0.50 1.60
5.60 1.90
1.70
3
PLANTA NIVEL 1 ESC 1:100
3 9 3
0.77
0.25
BARANDA h=1.00m
H cenefa=2.30m
C13
BARANDA h=1.00m
2.00
1.70 x 1.20 Guillotina Movilidad 50 %
01
C07
H=2.60m
H=2.60m
0.60
C18
4 1 1 3
Cp06
2.00 x 2.30 (Corrediza) Movilidad 100 %
C20
H06
Cp21
H cenefa=2.30m
0.50 x 1.40 (VF) Movilidad 0 %
VACIO SOBRE PATIO
1.10 x 2.30 (VF +Oscilobatiente) Movilidad 65 %
0.30
BARANDA h=1.00m
BARANDA h=1.00m
BARANDA h=1.00m
5.00
- 5
0.50
BARANDA h=1.00m
7 -
- 4
1.00 x 2.30 (Oscilobatiente) Movilidad 100 %
H06
01
Cp22
2 B-B 7 -
H=2.60m
2.00 x 2.30 (Corrediza) Movilidad 100 %
H cenefa=2.30m
2.30
2.00
1 3
2.30 x 2.30 (Corrediza) Movilidad 100 %
1
17 ESCALA
PLANO
LAMINA
AS
1:50 1:10
1 2 2-2
1-1
C18
BARANDA h=1.00m
H08
BARANDA h=1.00m 7 -
7 -
- 4
7 - -
- 4
REVISIONES
C21a
1
7 -
REVISIÓN
- 4
2
H06
BARANDA h=1.00m
C18
4.40 x 2.30 (Corrediza) Movilidad 50 %
01
BARANDA h=1.00m
BARANDA h=1.00m
4.40 x 2.30 (Corrediza) Movilidad 50 %
4 1
4 1
1 3
1 3
3.00 x 2.30 (Oscilobatiente) Movilidad 100 %
3.00 x 2.30 (Corrediza) Movilidad 100%
B-B
00 - LICITACION
B-B H=2.70m
H=2.70m
Barra
VACIO SOBRE PATIO 7 H06 C18
01
6 3
C14
C06
4 1
Cp17
C06 REJILLA 20x20 DUCTO 0,04
4 1
H=2.30m
Cp16
C21b
8 3
1 3
Cp24
1 3
C06
1 3
4 1 Cp18
C06
C06a
H=2.60m
H=2.60m
H=2.30m 7 3
05
Cortina
Motorizada
C06
04
Cortina
0.60 x 1.60 (Oscilobatiente) Movilidad 100 %
1 3
Motorizada
2.20 x 2.30 (Corrediza) Movilidad 50 %
2.20 x 2.30 (Corrediza) Movilidad 50 %
1.00 x 1.40 (Oscilobatiente) Movilidad 100 %
Cp19
H08
C18
D
REVISIÓN
PROPIETARIO
Cortina
OBRA
1.00 x 1.60 (Oscilobatiente) Movilidad 100 %
03
BARANDA h=1.00m
B
2.20 x 2.30 (Corrediza) Movilidad 50 %
06
Motorizada
0.80 x 2.30 (VF) Movilidad 0 %
1.00 x 1.40 (Oscilobatiente) Movilidad 100 %
03
C
A
B
C18
2-2
A
H08
1-1
C
BARANDA h=1.00m
Motorizada
H=2.60m
C06
4 1
BARANDA h=1.00m
Límite de retiro Frontal (8.50m)
H=2.30m
1 3
Cortina
5 0.60 x 1.60 (Oscilobatiente) Movilidad 100 %
4 1
04
Cortina
Motorizada
04
1 3
Motorizada
3 8 3
4 1
05
Cortina
1 3
H=2.30m
1 -
04
Cortina
Motorizada
F
2.20 x 2.30 (Corrediza) Movilidad 50 %
REVISIONES UBICACIÓN 00 - LICITACION
BARANDA h=1.00m
1 3
H=2.30m
2 3
H=2.60m
H=2.30m
A-A
H=2.30m
4
E
Límite de retiro Lateral
A-A
0.75 x 1.40 (Oscilobatiente) Movilidad 100 %
H=2.30m
H08
C18
03
F
H=2.30m
C06
3 -
4 1
C13a
1 3
H=2.30m
7 3
4 1 1 3
Cp25
H=2.30m
C14
E
1 -H=2.30m
0.75 x1.40 (Oscilobatiente) Movilidad 100 %
1.25 x 1.20 (Oscilobatiente) Movilidad 100 %
H=2.70m1 -
01
H=2.30m
1 3
G
01
01
4 1 Cp15
4 1
Límite de retiro Lateral
C18
H=2.70m
1 -
6 3
C06a
D
1.25 x 1.20 (Corrediza) Movilidad 100%
01
G
C18
- 4
H06
C21 H06
3
3
PLANTA NIVEL 2 ESC 1:100
4
UBICACIÓN ARCHIVO
370.AB.
5
PROPIETARIO PLANO
BIM PROJECT
OBRA
REFERENCIAS CANTIDAD
BAÑO 34
1
GRIFERA
UBICACION
BIDET BIMANDO: Robinet niquel mate-tirol
PISO Y PARAMENTO : Mármol Limestone moca creme 60X60cm
ARTEFACTOS
INODORO: Ferrum Marina Blanco
BACHAS
PILETAS DE EMBUTIR L375
DESAGUES
REGUERA:Rejilla plate 12cm p/revestir Tece drainline: (2)120cm (2) 90cm
NIVEL N.P.T
C03
TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO
COORDINAR CON D. de O.
F-F
E-E
Ver ubicacion con D.O. Secatoalla
PLANO
DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA ANTEPECHO DINTEL
TIPOLOGIA DE CORTINA DE ENROLLAR
P Cortina
515
NIVEL DE PISO TERMINADO TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA
(0.80x1.30 O/B) Movilidad 100%
BAÑERA: Riva
TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL
V09
TIPOLOGÍA DE ESPEJOS
E03
DESAGÜES COORDINDO CON JUNTAS PAVIMENTO
TIPOLOGIA DE PLACARD
Cp05
TIPOLOGÍA DE MESADAS
M06
D-D
Ver Listado dim: 50x120
M4 20
ARCHIVO
TIPOLOGÍA DE MUROS
370.AB.
MURO A CONSTRUIR MURO EXISTENTE
140
12
220
143
e
e
a
PLANO
TIPOLOGIA BARANDA
9
9
c
Extractor
NIVEL DE PISO TERMINADO
40
NIVEL DE CIELORRASO
G-G
70
65
130
130
60
Cortes
30
9
b
40
G-G
NUMERO DE DETALLE NUMERO DE LAMINA
32.5
34
b
MURO A DEMOLER
a
Extractor
NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.
Coordinar regueras con D.O.
A-A
CORTE
NUMERO DE LAMINA
c
40
32.5
34
Corte A-A Esc 1/50
50
A-A
64
70
18
70
75
75
PLANO
A-A
41.5 135
Coordinar con D.O.
164
d
290
35
30 150
90
B-B
70
40
150
30
320
B-B
82
d
55
310 48
80
15
55
M16 f
f
f
20 30
40
55
65
f
llaves de paso 72.5
27
165
72.5
143
PLANTA
F-F
C-C
E-E
D-D
480
55 a e
REVISIONES
a
e
130
16 12 2016 01 06 2017 28 01 2018 17 04 2018 08 08 2018 28 08 2018
Revisión 01 Revisión 02 Revisión 03 Revisión 04 Revisión 05 Revisión 06
190
45
320
UBICACIÓN PROPIETARIO
ANA BRITO
OBRA
ING. ANA BRITO
NOTA: LOS INICIOS DE CERÁMICAS Y DRENAJES SE COORDINARÁN CON D.O.
A2 594x420
ARCHIVO
10
370.AB.AS.Baños 08 2018 - N1 baño veronica.dwg
PLANO
150
12
143
220
SECTOR
BAÑOS / SERVICIOS ESCALA
PLANO
525
PLANTAS Y VISTAS
LAMINA
AS.421
1:25
REFERENCIAS CANTIDAD
1
LOCALES
UBICACION
Unidad 101
DESTINO NUMERO DE LOCAL ALTURA
PLANTAS NIVEL N.P.T
C03 (0.80x1.30 O/B) Movilidad 100%
NIVEL DE PISO TERMINADO TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA ANTEPECHO DINTEL TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO
P Cortina
V09 E03 Cp05
50
33
M06
M4 20
TIPOLOGIA DE CORTINA DE ENROLLAR TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL TIPOLOGÍA DE ESPEJOS
TIPOLOGIA DE PLACARD TIPOLOGÍA DE MESADAS
TIPOLOGÍA DE MUROS
MURO A CONSTRUIR MURO EXISTENTE MURO A DEMOLER NUMERO DE DETALLE NUMERO DE LAMINA TIPOLOGIA BARANDA
a
Cortes
a
NIVEL DE PISO TERMINADO NIVEL DE CIELORRASO NIVEL CARA SUPERIOR H.A.
Bañera exenta
NIVEL CARA INFERIOR H.A.
A-A
CORTE
NUMERO DE LAMINA
55 150
12
220
65
143
90
35
34
60
34
320
25
10
525
30
145
100
50
100
50
100
50
100
4
Bañera exenta 15
71
75
a
a
a
a
a
a
10
llaves de paso 143
72.5
165 310 480
72.5
27
10
60 10
BAÑO 34
62
TIPO
C
DESTINO NUMERO DE LOCAL ALTURA
PLANTAS
SIFONES Genebre cromado recto
BAÑERA CON PEDESTAL: Robinet Charleston c/duchador niquel mate
BIDET: Ferrum Marina Blanco 3P
LLAVES DE PASO: Robinet niquel mate
ACCESORIOS SECATOALLA
LOCALES
DETALLE ZOCALO DUCHA ESC. 1:10
Unidad 101
BIMANDO PARA MESADA: Robinet niquel mate-tirol
DUCHA BIMANDO: Robinet niquel mate-tirol / Robinet Niagara techo - Sin transf. REVESTIMIENTO
C-C
TIPO
Corte A-A Esc 1/50
55 65
65
90
35
130
320
REVISIONES 16 12 2016 01 06 2017 28 01 2018 17 04 2018 08 08 2018 28 08 2018
Revisión 01 Revisión 02 Revisión 03 Revisión 04 Revisión 05 Revisión 06 UBICACIÓN PROPIETARIO
ANA BRITO
OBRA
ING. ANA BRITO
NOTA: LOS INICIOS DE CERÁMICAS Y DRENAJES SE COORDINARÁN CON D.O.
A2 594x420
ARCHIVO
370.AB.AS.Baños 08 2018 - N1 baño veronica.dwg
PLANO
SECTOR
BAÑOS / SERVICIOS ESCALA
PLANO
PLANTAS Y VISTAS
1:25
LAMINA
AS.421a
C
TE SURF
FIFTH YEAR STUDIO S2 - DESIGN STUDIO DANZA
THE EXERCISE - For this studio we were connected with some of the top surfers in our country who came to class and talked to us about the beaches, surf and different activities they were involved in. The goal was for each team to design something that addressed the beaches, their uses and current issues. Taking all of the above into consideration my partner and I decided to create some kind of infrastructure for the beaches, considering surfers and their need, but also all of the other beach users. We wanted to create an ephemeral structure that allowed the natural process of sand, water and wind to happen through it. THE SITE - This structure can be installed in any beach, anywhere. The place of action we considered was from the access of the beach to the shore line.
THE MODULE - It is a steel structure that can be assembled on site and dismantled as wished. We designed vertical closings. These can be opaque or semi opaque and are also assembled on site, the same as the flooring. There are 2 different type of modules. The “activators” and the program “containers”.
18 Martina Leon/ Nicolas Ramos
MODONEUTRO TZPEA2017
SOPORTAR CIRCULACIONES VERTICALES, HORIZONTALES Y SERVICIOS HIGIENICOS.
NEUTRAL MODE
FIFTH YEAR STUDIO S1 - DESIGN STUDIO DANZA 8
8
The rules for this project were to create a building that was able to house a variety of non defined programs. A diffuse, homogeneous, generic space. The project should be able to considerate future needs and provide solutions and strategies for future problems. Therefore the design provides wide open spaces that allow users the freedom the define them.
12
12
17
17
15
5
15
5
20
5
8
8
6
20
8
8
THE EXTERIOR - The building is covered by a uniform skin, which results on an homogeneous image, taking the concept of diffuse even further. What happens in the interior becomes a mystery to the exterior observer.
8
8
6
5
6
6
SERVICIOS
12
12
17
17
15
5
20
15
5
20
5
5
IMPLANTACION ESTEEL TERRNO SE ENCUENTRA UBICADO EN EL BARRIO PARQUE ARIEDAD DETIENE FRENTE A LA CALLE JUAN DO JACKSON, RODO. FACHADA JU AN CIO, HOMOGEOESTE Y FRENTES A DR LUIS PIERA, FACHADA SUR. D JLA FORMA DE AC KS TEARA IMPLANTAR EL EDIFICIO FUE UNA DIRECTA CONSECUENCIA ON DE AUNCONSTRUIR NO EL VOLUMEN A CAPAZ CONSTRUIBLE POR NORMATIVA. IER VOLUMEN QUE ACOMODANDOSE AL LIZA EL CRANDO RESULTADO FUEIS PUN LU IERTO GRADO Y A LA TERRENO DR ALTURA DE LAS CONSTRUCCIONES LINDERAS STOS DEFINIR PROPORCIONABA VARIEDAD DE ESPACIOS, CRUGIAS Y ORIENTAN E N CONVENICIONES, HACIENDOLO CAPAZ DE CONTENER UNA GRAN VARIEDAD LAR. DE PROGRAMAS CON NECECIDADES DIFERENTES 8
6
12
17
15
5
20
8
8
5
8
8
Martina Leon Testa Martina Leon Testa IMPLANTACION EL TERRNO SE ENCUENTRA UBICADO EN EL BARRIO PARQUE RODO. TIENE FRENTE A LA CALLE JUAN D JACKSON, FACHADA OESTE Y FRENTE A DR LUIS PIERA, FACHADA SUR. LA FORMA DE IMPLANTAR EL EDIFICIO FUE UNA DIRECTA CONSECUENCIA DE CONSTRUIR EL VOLUMEN CAPAZ CONSTRUIBLE POR NORMATIVA. EL RESULTADO FUE UN VOLUMEN QUE ACOMODANDOSE AL TERRENO Y A LA ALTURA DE LAS CONSTRUCCIONES LINDERAS PROPORCIONABA VARIEDAD DE ESPACIOS, CRUGIAS Y ORIENTAMartina Leon Martina LeonTesta Testa CIONES, HACIENDOLO CAPAZ DE CONTENER UNA GRAN VARIEDAD DE PROGRAMAS CON NECECIDADES DIFERENTES SE REALIZARON DOS OPERACIONES SOBRE EL VOLUMEN CAPAZ PARA SEGARANTIZAR REALIZARONLA DOS OPERACIONES SOBRE EL VOLUMEN CAPAZ PARA GARANTIZAR LA CORRECTA ILUMINACION Y VENTILACION DE LOS ESPACIOS. CORRECTA ILUMINACION Y VENTILACION DE LOS ESPACIOS. 8
MODONEUTRO TZPEA2017
12
THE VOLUME - The volume is a result of the max MODONEUTRO capacity of site occupation allowed by the reguMODONEUTRO TZPEA2017 TZPEA2017 lations in Montevideo, Uruguay. After, 2 subtractions were made to allow for SE REALIZARON DOS EL CAPAZ SE REALIZARON DOSOPERACIONES OPERACIONES SOBRE ELVOLUMEN VOLUMEN CAPAZPARA PARAGARANTIZAR GARANTIZARLA LA proper natural lightSOBRE and ventilation. CORRECTA ILUMINACION Y VENTILACION DE LOS ESPACIOS.
MODONEUTRO TZPEA2017
12
5
15
5
15
THE INTERIOR - The volume is horizontally sectioned, creating DIFFUSE - REPETECION DE PLANTAS LIBRES open layouts with different heights, EL VOLUMEN ESaSECCIONADO therefore allowing wide range of HORIZONTAL CREANDOSince PLANTAS LIBRES programs. the services areDE ALTURASLIB AS Y DIMENSIONES AMPLIAS. concentrated on one corner the AL ESTAR LO CONCENTRADOS freedom of the user CONTRA is total. LA MEDIANERA, L
ORGANIZACION ES COMPLETA, DEJANDO LA DIVISION EN MANOS DE LA IMAGINACION Y USUARIO.
12
12
5
5
15
15
8
Martina Leon Testa
MODONEUTRO TZPEA2017
12
5 15
FORMA FINAL PARA SALVAR EL DESNIVEL DE 2mSE ENTRE LAUNA CALLE DEFINE BANDA DE JACKSON Y LA CALLE PIERA SE PROPONE UNADERAMPA SERVICIOS 4m DEQUE ANCHO QUE UNE AMBOS NIVELES, SE DESPEGASEELPEGA EDIFICIO A LA DEL MEDIANERA MAS TERRENO Y SE GENERA UN PASAJE QUE UNE AMBOS ALTA (CON ORIENTACION SUR). ACCESOS. ESTA BANDA ES CAPAZ DE SOPORTAR CIRCULACIONES VERTICALES, HORIZONTALES Y SERVICIOS HIGIENICOS.
SE DEFINE UNA BANDA DE SERVICIOS DE 4m DE ANCHO QUE SE PEGA A LA MEDIANERA MAS ALTA (CON ORIENTACION SUR). ESTA BANDA ES CAPAZ DE SOPORTAR CIRCULACIONES VERTICALES, HORIZONTALES Y SERVICIOS HIGIENICOS.
CORRECTA ILUMINACION Y VENTILACION DE LOS ESPACIOS.
SE REALIZARON DOS OPERACIONES SOBRE EL VOLUMEN CAPAZ PARA GARANTIZAR LA CORRECTA ILUMINACION Y VENTILACION DE LOS ESPACIOS.
FORMA FORMAFINAL FINAL SE PARA SEDEFINE DEFINEUNA UNABANDA BANDADE DE PARASALVAR SALVAREL ELDESNIVEL DESNIVELDE DE2m 2mENTRE ENTRELA LACALLE CALLE SERVICIOS SERVICIOSDE DE4m 4mDE DEANCHO ANCHOQUE QUE JACKSON JACKSONYYLA LACALLE CALLEPIERA PIERASE SEPROPONE PROPONEUNA UNARAMPA RAMPAQUE QUE SE PEGA A LA MEDIANERA MAS UNE AMBOS NIVELES, SE DESPEGA EL EDIFICIO DEL SE PEGA A LA MEDIANERA MAS UNE AMBOS NIVELES, SE DESPEGA EL EDIFICIO DEL ALTA AMBOS FORMA FINAL ALTA(CON (CONORIENTACION ORIENTACIONSUR). SUR). TERRENO TERRENOYYSE SEGENERA GENERAUN UNPASAJE PASAJEQUE QUEUNE UNE AMBOS SEES DEFINE UNA BANDA PARA SALVAR EL DESNIVEL DE 2m ENTRE LA CALLE ESTA DE DE ACCESOS. ESTABANDA BANDA ESCAPAZ CAPAZ SERVICIOS DE 4mDE DE ANCHO QUEACCESOS. JACKSON Y LA CALLE PIERA SE PROPONE UNA RAMPA QUE SOPORTAR SOPORTARCIRCULACIONES CIRCULACIONES SE PEGA A LA MEDIANERA MAS UNE AMBOS NIVELES, SE DESPEGA EL EDIFICIO DEL VERTICALES, HORIZONTALES ALTA (CON ORIENTACIONYY SUR). TERRENO Y SE GENERA UN PASAJE QUE UNE AMBOS VERTICALES, HORIZONTALES ESTA BANDA ES CAPAZ DE ACCESOS. SERVICIOS SERVICIOSHIGIENICOS. HIGIENICOS.
To the south I defined a 4m wide block able to contain all type of services such as toilets, kitchens and vertical and horizontal connections, leaving the rest of the space free.
SERVICIOS
FORMA FINAL PARA SALVAR EL DESNIVEL DE 2m ENTRE LA CALLE JACKSON Y LA CALLE PIERA SE PROPONE UNA RAMPA QUE UNE AMBOS NIVELES, SE DESPEGA EL EDIFICIO DEL TERRENO Y SE GENERA UN PASAJE QUE UNE AMBOS ACCESOS.
ACCESO SERVICIOS
ACCESO
SOPORTAR CIRCULACIONES VERTICALES, HORIZONTALES Y SERVICIOS HIGIENICOS.
ACCESO
ACCESO ACCESO
Access from both streetst are connected by a ramp that unifies DIFFUSE the ground level creating anDIFFUSE- -REPETECION REPETECIONDE DEPLANTAS PLANTASLIBRES LIBRES VOLUMEN SECCIONADO other open spaceELELthat isESESconnected to the city VOLUMEN SECCIONADOHORIZONTALMENTE HORIZONTALMENTE CREANDO PLANTAS LIBRES DE ALTURASLIBRES GENEROSCREANDO PLANTAS LIBRES DE ALTURASLIBRES GENEROSPAC#3 GRADINTE IMAGEN GENERAL AS YYDIMENSIONES AMPLIAS. AL could become a public space. AS DIMENSIONES AMPLIAS. ALESTAR ESTARLOS LOSSERVICIOS SERVICIOS PARA DEFINIRand EL SISTEMA DE GRADIENTE DEL EDIFICIO SE DIO PRIORIDAD A LA CONCENTRADOS CONTRA LA MEDIANERA, LA LIBERTAD DE DIFFUSE - REPETECION DE PLANTAS LIBRES EL VOLUMEN ES SECCIONADO HORIZONTALMENTE CREANDO PLANTAS LIBRES DE ALTURASLIBRES GENEROSAS Y DIMENSIONES AMPLIAS. AL ESTAR LOS SERVICIOS CONCENTRADOS CONTRA LA MEDIANERA, LA LIBERTAD DE ORGANIZACION ES COMPLETA, DEJANDO LA OCUPACION Y DIVISION EN MANOS DE LA IMAGINACION Y NECESIDAD DEL USUARIO.
A DEFINIR POR USUARIO
2
HACIA EL INTERIOR DE LA PIEL LOS USUARIOS PODRAN ELEGIR DIFERENTES OPCIONES DE COMO RELACIONARSE CON EL EXTERIOR, DEPENDIENDO DEL PROGRAMA, NECESIDADES DE EXPANSION O PRIVACIDAD 1-CORTINA + ABERTURA CORREDIZA DE VIDRIO + PASARELA EJEMPLO EN PLANTA DE LAS TÉCNICA+ PIEL 2- CORTINA + ABERTURA CORREDIZA DE VIDRIO + AIRE + PIEL DIFERENTES OPCIONES LLA ESTRUCTURA MODULADA (MOVIMIENTO BATIENTE) + TERRAZA DEL EDIFICIO PERMITE DEFINIR 3- CORTINA +ABERTURA CORREDIZA DE VIDRIO + PATIO LOS PATIOS INTERNOS. INTERIOR + PASARELA TÉCNICA + PIEL.
LA MEDIANERA, LA LIBERTAD DE IMAGEN DEL CONJUNTO. HACIEND DE LA ACTIVIDAD CONCENTRADOS EN EL INTERIOR UNCONTRA MISTERIO ORGANIZACION PARA EL OBSERVADOR. ORGANIZACIONES ESCOMPLETA, COMPLETA,DEJANDO DEJANDOLA LAOCUPACION OCUPACIONYY DIVISION EN DE PARA ESO SE RECUBRIO TODO EL VOLUMEN CON UNA PIEL UNIFORME DE CHAPA DIVISION ENMANOS MANOS DELA LAIMAGINACION IMAGINACIONYYNECESIDAD NECESIDADDEL DEL 23.00 Leon USUARIO. Martina MICROPERFORADA NO MOVIL.DURANTE EL DIA LEDA UN EFECTO HOMOGENEO AL USUARIO. Nivel 6 EDIFICIO Y DURANTE LA NOCHE LAS LUCES QUE SE REVELAN A TRAVES DE ESA CORTINA DE CHAPA DAN INDICIOS DE LO QUE PUEDE SUCEDER DENTRO. ACENTUANDO LA CONDICION DIFUSA DEL PROYECTO. SE ACENTUAA LA CONDICION DIFUSA DEL PROYECTO,NO SOLO CREANDO ESPACIOS APTOS PARA VARIADAS ACTIVIDADES, SI NO DANDO UNA IMAGEN DE QUE TODO O NADA PUEDE ESTAR PASANDO DENTRO.
MODONEUTRO TZPEA2017 EN LA SSITUACIONES DE TERRAZA LAPIEL SE CONVIERTE EN BARANDA, RESPETANDO EL ASPECTO UNIFORME DEL EDIFICIO
1
0.95
REFERENCIAS DETALLE 2 1-PANEL CHAPA MICROPERFORADA
2
19
2-ESTRUCTURA PORTANTANTE DE LA CHAPA EN HORIZONTAL (DISTANCIA MAXIMA 1.40m) 3-PASARELA TECNICA DE ORSOGRIL (60cm de ancho) 4-ABERTURA DE ALUMINIO CORREDIZA 5- PAVIMENTO 6- PERFIL DE SECCION RECTANGULAR (25 x 55mm) 7-PERFIL L 8-MEMBRANA ASFALTICA 9-STEEL DECK 13-PERFIL I 305 X 165 10- HORMIGON 14-15-AISLACION 11- PERFIL C 130X13 16- ROLLER 12-PERFIL I 127 X 76 17 CIELORRASO DE YESO
THE STRUCTURE
1
23.00 Nivel 6
19.50 Nivel 5
DIFFUSE - REPETECION DE PLANTAS LIBRES EL VOLUMEN ES SECCIONADO HORIZONTALMENTE CREANDO PLANTAS LIBRES DE ALTURASLIBRES GENEROSAS Y DIMENSIONES AMPLIAS. AL ESTAR LOS SERVICIOS CONCENTRADOS CONTRA LA MEDIANERA, LA LIBERTAD DE ORGANIZACION ES COMPLETA, DEJANDO LA OCUPACION Y DIVISION EN MANOS DE LA IMAGINACION Y NECESIDAD DEL USUARIO.
1.40m
SERVICIOS
SERVICIOS SERVICIOS
DIFFUSE - REPETECION DE PLANTAS LIBRES EL VOLUMEN ES SECCIONADO HORIZONTALMENTE CREANDO PLANTAS LIBRES DE ALTURASLIBRES GENEROSAS Y DIMENSIONES AMPLIAS. AL ESTAR LOS SERVICIOS CONCENTRADOS CONTRA LA MEDIANERA, LA LIBERTAD DE ORGANIZACION ES COMPLETA, DEJANDO LA OCUPACION Y DIVISION EN MANOS DE LA IMAGINACION Y NECESIDAD DEL USUARIO.
2
4
2.55
2
EL CUARTO NIVEL PROPORCIONA LA LAS 3 FORMAS DE RELACION CON EL EXTERIOR PLANTEADAS EN EL PROYECTO
5
16.00 Nivel 4
0.50
19.50 Nivel 5
3
3
D
0.95
6 78 10 13
3.00
11
0.50
14
15 16 17
12.50 Nivel 3
DETALLE A 16.00 ESC1:20
0.95
2.55
EL TERCER NIVEL NO CONSTA CON ESPACIO DE TERRAZA, PERO SI SE OFRECE LA POSIBILIDAD DE CREAR PATIOS INTERIORES, SOLO CERRADOS POR LA PIELMETALICA, SE TRANFORMA UN ESPACIO EXTERIOR CONTROLADO
12
9
Nivel 4
B
2
0.95
3.00
2.55
DETALLE D ESC 1:20
EL SEGUNDO NIVEL PROPORCIONA MAYOR AMPLITUD EN ESPACIO EXTERIOR, NO ESTANDO SOLO LIMITADO A PATIOS INTERIORES
B
EXT
DETALLE B ESC1:20 A 12.50 Nivel 3
A
2.55
3.00 Nivel 1
EXT (CARPETA HORMIGON CON PENDIENTE)
INT
DETALLE C ESC1:20
D
5.00
0.00 Jackson
PARA DEFINIR EL SISTEMA DE GRADIENTE DEL EDIFICIO DAR PRIORIDAD AL CONJUNTO Y NO MOSTRAR LAS
-2.10 Piera
SECTION 3.00 Nivel 1
0.50
4.60
9.00 Nivel 2
EL PRIMER NIVEL, Y ELQUE CUENTA CON LA MAYOR AREA INTERIOR, ES EL UNICO QUE PROPORCIONA UN ESPACION DE DOBLE ALTURA. HABILTANDO PROGRAMAS CULTURALES O PUBLICOS QUE REQUIEREN ESPACIOS MENOS COMPRIMIDOS.
0.50
0.95
5.00
0.95
C
9.00 Nivel 2
CORTE PERSPECTIVADO SECTION
ROBLE 55 / ROBLE 66 (20122013) B. Testa Architects. Montevideo, Uruguay. These two buildings were designed and constructed for a gated community for which the studio also took part in the urban planning and the construction of several houses in it. The two identical, high-end, four-story buildings were developed for young families and offer a range of different apartments from 1 bedroom to 3 bedrooms. All of them have a large balcony, a kitchen that can be opened or closed into the living space, en-suite bathrooms, laundry room, etc. I was involved with the project during stages 4-6. Stage 4- Prepare technical drawings for construction use in AutoCAD, such as floor plans, sections, details, etc. Stage 5- During the finishing stages of the construction monitor the work in progress to ensure it met client expectations. Stage 6- Developing user’s guides. These guides were given to the owners of each apartment and contained instructions on how too use and look after different pavements, appliances, etc. What is more, the provided the name of the model and distributor of everything inside. (InDesign).
20
FLOOR PLANS
DETAILS
REFERENCIAS LOCALES DESTINO
C03
NUMERO DE LOCAL ALTURA
PLANTAS NIVEL
NIVEL DE PISO TERMINADO
N.P.T
TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA
A-A
B-B
C-C
SEMIENTERRADO
(0.80x1.30 O/B) P Movilidad Cortina 100%
DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA ANTEPECHO
SEMIENTERRADO
DINTEL TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO
TIPOLOGIA DE CORTINA DE ENROLLAR
Cp05
V09
TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL
E03
TIPOLOGÍA DE ESPEJOS
TIPOLOGIA DE PLACARD
M06
TIPOLOGÍA DE MESADAS
M4 20
TIPOLOGÍA DE MUROS
MURO A CONSTRUIR NUMERO DE DETALLE NUMERO DE LAMINA TIPOLOGIA BARANDA
B1
CORTES
SEMIENTERRADO
NIVEL DE PISO TERMINADO NIVEL DE CIELORRASO NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.
A-A
2.38x4.85
1
2.40x4.85
1
2.40x4.85
2
2.40x4.30
3
2.07x4.50
2.33x4.30
4
5
3.36x4.50
3.36x4.50
6
2.33x4.30
2.07x4.50
7
2.40x4.30
8
2.40x4.85
2.40x4.85
10
9
11
CORTE
NUMERO DE LAMINA
2.38x4.85
12
RAMPA ACCESO VEHICULAR MAX PENDIENTE 5%
1-1
1-1
0.80
A=604m² Lm=17.30 H=2.60m
PAVIMENTO HORMIGON ESTAMPADO
P23 2
2.33x7.55
2.37x7.55
2.48x7.55
2.45x7.00
22
23
24
15
2.28x7.00
2.35x5.50
14
20
21
12
Rejilla 20x15cm
2.55x5.50
2.28x7.00
18
19
13
Ducto 20x15cm.
2.45x7.00
2.48x7.55
16
17
2.37x7.55
14
15
2.33x7.55
13
11 10
A=2.05m² Lm=1.30 H=2.60m
9 8 7
baranda h=0.90mm
3
SEMIENTERRADO 4
SEMIENTERRADO
Tanque de agua inferior
6 5 4 3 2 1
ESCALERA ABIERTA 0.15
Pozo bombeo Primaria
Son 15 escalones de 0.19 x 0.26
Pozo bombeo Secundaria
0.15
Tanque agua inferior
TERMINACIONES
Contadores UTE
1 - PAVIMENTO
1 2
2 - ZOCALO
3 4
3- PARAMENTO
4- CIELORRASO
PAVIMENTO
1 Madera 2 Moquette 3 Porcelanato 60x60 cm. 4 Piedra laja 5 Porcelanato 80x80 cm. 6 Arena y Portland lustrado y enduercido 7 Porcelanato 60X120 cm ZOCALO
1 Mdf pintado 2 AYP Endurecido 3 Porcelanato 60x60 cm H=20cm. 1 Revoque enduido pintado Interior 2 Cerámico 30x60 3 Granito 4 Cerámico 20x20 5 Revoque fino -exterior6 Piedra 7 Ladrillo bolseado pintado
E
D
B
C
A
E
B
A
C
A-A
B-B
C-C
D
PARAMENTO
CIELORRASO
SEMIENTERRADO
SEMIENTERRADO
1 Revoque pintado 2 Placa de yeso enduido y pintado 3 Revoque enduido y pintado 4 Madera machihembrada REVISIONES DIBUJADO
FECHA
REVISADO
FECHA
NOMBRE DE ARCHIVO
361.CR.Al.Plantas 1.50 Bind.dwg
REGISTRO Revisión 1 Revisión 2
1
2012 05 21 2012 10 12
2
+10.95
CASONAS ROBLE
3
PARQUES
UBICACION
DATYLCO S.A.
PROPIETARIO
4
SUBSUELO Albañilería
PLANO
1/50 CR.AL.099.1.pdf
ESCALA LAMINA
A
SECTOR
REFERENCIAS LOCALES
1
DESTINO
C03
NUMERO DE LOCAL ALTURA
PLANTAS NIVEL
2
NIVEL DE PISO TERMINADO
N.P.T
TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA
(0.80x1.30 O/B) P Movilidad Cortina 100%
DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA
3
ANTEPECHO DINTEL TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO
4
TIPOLOGIA DE CORTINA DE ENROLLAR
Cp05
A-A
B-B
C-C
V09
TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL
E03
TIPOLOGÍA DE ESPEJOS
TIPOLOGIA DE PLACARD
M06
TIPOLOGÍA DE MESADAS
M4 TIPOLOGÍA DE MUROS 2012 05 21 20 Revisión 1
baranda h=1.00m
baranda h=1.00m
MURO A CONSTRUIR 361.CR.Al.Plantas 1.50 Bind.dwg NUMERO DE DETALLE
baranda h=1.00m
0.15
2012 05 21
TIPOLOGIA BARANDA
B1
0.15
6.75 x 2.75 m
0.80
1.20
6.75 x 2.75 m
NUMERO DE LAMINA
Revisión 1
DUCTOS D=25x30 cm (4)
DUCTOS D=25x30 cm (4)
1
CORTES NIVEL DE PISO TERMINADO NIVEL DE CIELORRASO
0.80
DATYLCO S.A.
NIVEL CARA SUPERIOR H.A.
A=16.10m² Lm=3.55m H=2.55m
A=13.30m² Lm=3.20m H=2.55m
A=16.10m² Lm=3.55m H=2.55m
H=2.20m
NIVEL CARA INFERIOR H.A.
A=11.90m² Lm=2.90m H=2.55m
A-A
CORTE
NUMERO DE LAMINA
0.80
A=11.90m² Lm=2.90m H=2.55m
1.35
2
A=3.15m² Lm=1.40m H=2.30m
0.80 0.90
1.20
3.33
1-3 2.02 2
baranda h=0.90mmventilada 7 6 5 4 3 2 8 1 9 10 1112 13 14 15
Tapa de inspección
14
6
A=4.50m² Lm=2.10m H=2.30m Rejilla 20x15cm.
12
A=2.50m² Lm=1.15 H=2.30m
A=3.45m² Lm=1.35 H=2.55m
H=2.30m
1-1 Rejilla 20x15cm.
11 10
A=1.50m² Lm=0.80m H=2.20m
A=1.50m² Lm=0.80m H=2.20m
A=10.70m² Lm=2.75m H=2.55m
DUCTO 20x40cm (1) A=4.40m² 15x20cm (2) Lm=1.70m H=2.30m Rejilla 20x15cm.
Pilar en yeso
Caño
13
A=4.50m² Lm=2.10m Rejilla 20x15cm. H=2.30m
Rejilla 20x15cm.
H=2.30m
1.85 x 1.75 m A=3.25m² A=10.70m² Lm=2.75m H=2.55m
DUCTO 20x40cm (1) 15x20cm (2)
H=2.30m
15
A=4.40m² DUCTO Lm=1.70m 20x40cm (1) H=2.30m 15x20cm (2)
Rejilla A=4.05m² 20x15cm. Lm=1.25m H=2.30m
Rejilla 20x15cm.
Rejilla 20x15cm.
ESCALERA ABIERTA Son 15 escalones de 0.19 x 0.26
A=10.70m² Lm=2.75m H=2.55m
A=4.70m² Lm=2.00m H=2.30m
A=6.35m² Lm=2.30m H=2.55m
Llaves de paso agua Son 15 esc. Llaves de paso gas de 18.5x27cm. Boca de Incendio Pase libre=2.35m Escalera Compensada
Llaves de paso agua
A=34.95m² Lm=1.40m H=2.55m
5
H=2.30m
Tapa de inspección
Tapa de inspección
3.37
7 1-3
1.10
0.30 0.30
1.20
0.80
A=4.25m² 3 Rejilla Lm=2.00m H=2.30m 1-2 220x15cm. Llaves de paso gas
Boca de Incendio
A=2.35m² Lm=1.05m H=2.30m
Ducto 0.04m2
H=2.20m 1.75
0.25
0.70
0.75
1.20
0.80
2.10
Tapa de inspección
1.40
1.00
0.80
1.25
2 -
1-2 2
1.98
1.20
3 4 5 6 7 8 9 15 14 13 12 11 10
2 1
A=6.35m² Lm=2.30m H=2.55m
DUCTO 20x40cm (1) 15x20cm (2)
A=31.40m² Lm=4.00m H=2.55m
H=2.30m
Cp14
1.20
0.85 A=2.95m² Lm=1.20m 0.43 0.85 H=2.30m
Tapa de inspección
baranda h=0.90mm
A=4.70m² Lm=2.00m H=2.30m Rejilla 20x15cm.
A=10.70m² Lm=2.75m H=2.55m
Rejilla 20x15cm.
Rejilla 20x15cm.
baranda h=0.90mm
A=1.50m² Lm=0.80m H=2.20m
1.85 x 1.75 m A=3.25m²
Tapa de inspección ventilada
A=4.05m² Lm=1.25m Rejilla H=2.30m 20x15cm.
A=1.50m² Lm=0.80m H=2.20m
0.55
Ducto 0.04m2
H=2.30m
4
1-1
A=25.80m² Lm=3.20m H=2.55m
1.37
0.63
2.53
A=3.15m² Lm=1.40m H=2.30m
A=2.35m² Lm=1.05m H=2.30m
3
1.85 x 1.75 m A=3.25m²
0.80
0.80
1.03
H=2.30m
0.80
A=31.40m² Lm=4.00m H=2.55m
1.85 x 1.75 m A=3.25m²
H=2.30m
9
A=45.15m² Lm=6.40m H=2.40m
8 7 6
A=3.45m² Lm=1.35 H=2.55m
5
A=2.50m² Lm=1.15 H=2.30m
H=2.30m
4 3
A=31.30m² Lm=4.00m H=2.55m
7
A=31.30m² Lm=4.00 H=2.55m
2 1 0.15
A=15.90m² Lm=3.35 H=2.55m
A=11.90m² Lm=2.90 H=2.55m
Pilar en yeso
H=2.20m
Pilar en yeso
A=15.90m² Lm=3.35 H=2.55m
H=2.30m
A=11.90m² Lm=2.90 H=2.55m
TERMINACIONES 1 - PAVIMENTO
1 2
2 - ZOCALO
3 4
3- PARAMENTO
4- CIELORRASO
PAVIMENTO
1 Madera 2 Moquette 3 Porcelanato 60x60 cm. 4 Piedra laja 5 Porcelanato 80x80 cm. 6 Arena y Portland lustrado y enduercido 7 Porcelanato 60X120 cm
8 DUCTOS D=25x30 cm (4)
6.75 x 2.75m
DUCTOS D=25x30 cm (4)
baranda h=1.00m
6.75 x 2.75m
ZOCALO
1 Mdf pintado 2 AYP Endurecido 3 Porcelanato 60x60 cm H=20cm.
baranda h=1.00m
PARAMENTO
1 Revoque enduido pintado Interior 2 Cerámico 30x60 3 Granito 4 Cerámico 20x20 5 Revoque fino -exterior6 Piedra 7 Ladrillo bolseado pintado
baranda h=1.00m
baranda h=1.00m
CIELORRASO
1 Revoque pintado 2 Placa de yeso enduido y pintado 3 Revoque enduido y pintado 4 Madera machihembrada
A
B
C
D
F
E
H
G
F
E
D
B
A
A-A
D
B-B
C
C-C
B
C
REVISIONES
A
F
G
DIBUJADO
H
FECHA
Revisión 2
REVISADO
2013 02 07
FECHA
NOMBRE DE ARCHIVO
361.CR.Al.Plantas 1.50 Bind.dwg
REGISTRO
Revisión 1 2012 05 21 Revisión 2 corrección de cotas sin cambios de albañilería 2013 02 07 Revisión 3 2013 05 03
5 CASONAS ROBLE
6
PARQUES
UBICACION
DATYLCO S.A.
PROPIETARIO
7 PLANTA BAJA Albañilería
PLANO
8
1/50 CR.AL.100.pdf
ESCALA LAMINA
SECTOR
A
REFERENCIAS LOCALES DESTINO
C03
1
NUMERO DE LOCAL ALTURA
PLANTAS NIVEL
NIVEL DE PISO TERMINADO
N.P.T
2
TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA
(0.80x1.30 O/B) P Movilidad Cortina 100%
DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA ANTEPECHO
3
DINTEL TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO
TIPOLOGIA DE CORTINA DE ENROLLAR
Cp05
4
V09
TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL
E03
A-A
B-B
C-C
TIPOLOGÍA DE ESPEJOS
TIPOLOGIA DE PLACARD
M06
TIPOLOGÍA DE MESADAS
M4 20
TIPOLOGÍA DE MUROS
MURO A CONSTRUIR NUMERO DE DETALLE
baranda h=1.00m
baranda h=1.00m
NUMERO DE LAMINA
1
TIPOLOGIA BARANDA
B1
baranda h=1.00m DUCTOS D=25x30 cm (4)
DUCTOS D=25x30 cm (4)
CORTES
1
5.45 x 2.20 m
5.45 x 2.20 m
NIVEL DE PISO TERMINADO NIVEL DE CIELORRASO NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.
A-A
A=11.90m² Lm=2.90m H=2.55m
A=16.10m² Lm=3.55m H=2.55m
A=17.55m² Lm=3.20m H=2.55m
A=17.55m² Lm=3.20m H=2.55m
A=16.10m² Lm=3.55m H=2.55m
2
2 A=31.40m² Lm=4.00m H=2.55m
H=2.30m
Ducto 0.04m2
3 4 5 6 7 8 9 15 14 13 12 11 10
Tapa de inspección
Llaves de paso gas
Rejilla 20x15cm.
H=2.30m
6
Tapa de inspección
A=4.70m² Lm=2.00m H=2.30m
A=6.35m² Lm=2.30m H=2.55m
Rejilla 20x15cm.
A=3.45m² Lm=1.35 H=2.30m
H=2.30m
A=1.50m² Lm=0.80m H=2.20m
A=20.55m² Lm=3.40m H=2.55m
A=3.45m² Lm=1.35 H=2.55m
A=20.55m² Lm=3.40m H=2.55m
5
1.85 x 1.75 m A=3.25m²
H=2.30m
A=2.50m² Lm=1.15 H=2.30m
H=2.30m
A=31.30m² Lm=4.00m H=2.55m
7
1-1 A=1.50m² Lm=0.80m H=2.20m
A=10.70m² Lm=2.75m H=2.55m
DUCTO 20x40cm (1) A=4.40m² Lm=1.70m A=4.50m² 15x20cm (2) H=2.30m Lm=2.10m Rejilla H=2.30m Rejilla 20x15cm. 20x15cm.
H=2.30m
+8.40 NPT
4
A=10.70m² Lm=2.75m H=2.55m
A=12.10m² Lm=1.40m H=2.55m
A=5.00m² Lm=1.60m H=2.30m
M04
A=4.50m² Lm=2.10m Rejilla H=2.30m 20x15cm.
A=2.50m² Lm=1.15 H=2.30m
1.85 x 1.75 m A=3.25m²
Rejilla 20x15cm. A=4.05m² Lm=1.25m H=2.30m
DUCTO 20x40cm (1) 15x20cm (2)
Son 17 esc. Boca de Incendio Llaves de paso agua de 18.5x27cm. Pase libre=2.35m Llaves de paso gas Escalera Compensada
175
3
H=2.30m
7 6 5 4 3 2 8 1 9 10 1112 13 14 15
Rejilla 20x15cm.
58
H=2.30m
M04
A=4.40m² DUCTO Lm=1.70m20x40cm (1) H=2.30m15x20cm (2)
baranda h=0.90mmventilada
A=4.15² Lm=1.60m H=2.30m
Rejilla 20x15cm.
Son 15 esc. Llaves de paso agua de 18.5x27cm. Boca de Incendio Pase libre=2.35m Escalera Compensada
A=5.00m² Lm=1.60m H=2.30m A=10.70m² Lm=2.75m H=2.55m
5
Tapa de inspección
Tapa de inspección
A=4.15m² Lm=1.60m H=2.30m
2 1
A=6.35m² Lm=2.30m H=2.55m
Rejilla 20x15cm. DUCTO 20x40cm (1) 15x20cm (2)
A=12.10m² Lm=1.40m H=2.55m
A=1.50m² Lm=0.80m H=2.20m
Tapa de inspección
baranda h=0.90mm
A=4.70m² Lm=2.00m H=2.30m
A=10.70m² Lm=2.75m H=2.55m
A=1.50m² Lm=0.80m H=2.20m
Ducto 0.04m2
Tapa de inspección ventilada
A=4.05m² Lm=1.25m H=2.30m Rejilla 20x15cm.
4
1-1
A=2.35m² Lm=1.05m H=2.30m
58
H=2.30m
1.85 x 1.75 m A=3.25m²
A=3.15m² Lm=1.40m H=2.30m
Ducto 0.04m2
Ducto 0.04m2
A=31.40m² Lm=4.00m H=2.55m
H=2.30m
H=2.30m
H=2.30m A=3.15m² Lm=1.40m H=2.30m
A=2.35m² Lm=1.05m H=2.30m
3
1.85 x 1.75 m A=3.25m²
CORTE
NUMERO DE LAMINA
A=11.90m² Lm=2.90m H=2.55m
A=31.30m² Lm=4.00 H=2.55m
6
TERMINACIONES
A=15.90m² Lm=3.35 H=2.55m
A=15.90m² Lm=3.35 H=2.55m
A=11.90m² Lm=2.90 H=2.55m
A=11.90m² Lm=2.90 H=2.55m
1 - PAVIMENTO
1 2
2 - ZOCALO
3 4
3- PARAMENTO
4- CIELORRASO
PAVIMENTO
1 Madera 2 Moquette 3 Porcelanato 60x60 cm. 4 Piedra laja 5 Porcelanato 80x80 cm. 6 Arena y Portland lustrado y enduercido 7 Porcelanato 60X120 cm
+8.15
ZOCALO
8
2.75x 2.30m H=2.53m
DUCTOS D=25x30 cm (4)
5.45 x 2.20m
2.75 x 2.30m H=2.53m
DUCTOS D=25x30 cm (4)
1 Mdf pintado 2 AYP Endurecido 3 Porcelanato 60x60 cm H=20cm.
5.45 x 2.20m
PARAMENTO
1 Revoque enduido pintado Interior 2 Cerámico 30x60 3 Granito 4 Cerámico 20x20 5 Revoque fino -exterior6 Piedra 7 Ladrillo bolseado pintado
baranda h=1.00m baranda h=1.00m
baranda h=1.00m
CIELORRASO
1 Revoque pintado 2 Placa de yeso enduido y pintado 3 Revoque enduido y pintado 4 Madera machihembrada REVISIONES DIBUJADO
FECHA
F
E
361.CR.Al.Plantas 1.50 Bind.dwg
G
A
B
C
D
F
E
G
G
F
E
D
C
B
A
B
A
D
FECHA
NOMBRE DE ARCHIVO
A-A
B-B
C-C
C
REVISADO
REGISTRO
Revisión 1 2012 05 21 Revisión 2 corrección de cotas sin cambios de albañilería 2013 02 07 Revisión 3 2013 05 03
5
CASONAS ROBLE
6
PARQUES
UBICACION
DATYLCO S.A.
PROPIETARIO
7
PLANTA N1 y 2 Albañilería
PLANO
8
1/50 CR.AL.101.1.pdf
ESCALA LAMINA
SECTOR
A
REFERENCIAS LOCALES
1
DESTINO
C03
NUMERO DE LOCAL ALTURA
PLANTAS NIVEL
2
NIVEL DE PISO TERMINADO
N.P.T
TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA
(0.80x1.30 O/B) P Movilidad Cortina 100%
DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA
3
ANTEPECHO DINTEL TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO
4
TIPOLOGIA DE CORTINA DE ENROLLAR
Cp05
V09
TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL
A-A
B-B
C-C
E03
TIPOLOGÍA DE ESPEJOS
TIPOLOGIA DE PLACARD
M06
TIPOLOGÍA DE MESADAS
M4 20
baranda h=1.00m
TIPOLOGÍA DE MUROS
MURO A CONSTRUIR
baranda h=1.00m
baranda h=1.00m
NUMERO DE DETALLE NUMERO DE LAMINA TIPOLOGIA BARANDA
B1
1
CORTES
5.45 x 2.20 m
5.45 x 2.20 m
NIVEL DE PISO TERMINADO NIVEL DE CIELORRASO NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.
A-A
A=11.90m² Lm=2.90m H=2.55m
A=13.60m² Lm=3.55m H=2.55m
A=18.00m² Lm=3.25m H=2.55m
A=18.00m² Lm=3.25m H=2.55m
A=13.60m² Lm=3.55m H=2.55m
CORTE
NUMERO DE LAMINA
A=11.90m² Lm=2.90m H=2.55m
2 0.75
A=34.00m² Lm=4.00m H=2.55m
H=2.30m
A=2.70m² Lm=1.05m H=2.30m
A=2.70m² Lm=1.05m H=2.30m
A=2.30m² Lm=1.45m H=2.30m
A=2.30m² Lm=1.45m H=2.30m Ducto 0.04m2
3 4 5 6 7 8 9 15 14 13 12 11 10
Llaves de paso agua Boca de Incendio
1.30
baranda h=0.90mm 7 6 5 4 3 2 8 1 9 10 1112 13 14 15
A=5.45m² Lm=2.05m H=2.30m
Rejilla 20x15cm.
DUCTO Rejilla 20x40cm (1)20x15cm. 15x20cm (2)
A=5.55m² Lm=1.65m H=2.30m
A=4.50m² Lm=2.10m H=2.30m
DUCTO 20x40cm (1) 15x20cm (2)
A=4.95m² Lm=1.60m H=2.30m
Rejilla 20x15cm.
Tapa de inspección
Rejilla 20x15cm. DUCTO 20x40cm (1) 15x20cm (2)
0.65
A=21.15m² Lm=2.85 H=2.55m
A=14.05m² Lm=3.35 H=2.55m
A=11.90m² Lm=2.90 H=2.55m
1-1 A=1.50m² Lm=0.80m H=2.20m
A=9.10m² Lm=1.40m H=2.55m
A=1.50m² Lm=0.80m H=2.20m
A=15.40m² Lm=2.75m H=2.55m
DUCTO 20x40cm (1) 15x20cm (2)
1.85 x 1.75 m
Rejilla 20x15cm.
A=2.90m² Lm=1.15m H=2.30m
H=2.30m
H=2.30m
A=34.60m² Lm=4.00m H=2.55m
7
1.85 x 1.75 m
A=15.40m² Lm=2.75m H=2.55m
Rejilla 20x15cm.
A=4.50m² Lm=2.10m H=2.30m
H=2.30m
Rejilla 20x15cm.
A=2.90m² Lm=1.15m H=2.30m
6
DUCTO 20x40cm (1) 15x20cm (2) A=4.70m² Lm=1.25m H=2.30m
A=6.35m² Lm=2.30m H=2.55m
Son 17 esc. Boca de Incendio Llaves de paso agua de 18.5x27cm. Llaves de paso gas Pase libre=2.35m Escalera Compensada
A=3.65m² Lm=1.65m H=2.30m
A=4.95m² Lm=1.60m H=2.30m
1.05
A=15.40m² Lm=2.75m H=2.55m
5
Tapa de inspección ventilada
Tapa de inspección
Llaves de paso gas
A=6.35m² Lm=2.30m H=2.55m Son 17 esc. de 18.5x27cm. Pase libre=2.35m Escalera Compensada
A=9.10m² Lm=1.40m H=2.55m
A=1.50m² Lm=0.80m H=2.20m
A=5.45m² Lm=2.05m H=2.30m
2 1
A=4.70m² Lm=2.10m Rejilla H=2.30m 20x15cm.
A=15..40m² Lm=2.75m H=2.55m
A=1.50m² Lm=0.80m H=2.20m
0.75
4 1-1
Tapa de inspección
baranda h=0.90mm
DUCTO 20x40cm (1) 15x20cm (2)
1.85 x 1.75 m
1.85 x 1.75 m
H=2.30m
Ducto 0.04m2
Tapa de inspección ventilada
0.30
3
A=34.00m² Lm=4.00m H=2.55m
H=2.30m
H=2.30m
A=21.15m² Lm=2.85 H=2.55m
A=34.60m² Lm=4.00 H=2.55m
A=14.05m² Lm=3.35 H=2.55m
0.45
TERMINACIONES
A=11.90m² Lm=2.90 H=2.55m
1 - PAVIMENTO
1 2
2 - ZOCALO
3 4
3- PARAMENTO
4- CIELORRASO
PAVIMENTO
1 Madera 2 Moquette 3 Porcelanato 60x60 cm. 4 Piedra laja 5 Porcelanato 80x80 cm. 6 Arena y Portland lustrado y enduercido 7 Porcelanato 60X120 cm
8
ZOCALO
1 Mdf pintado 2 AYP Endurecido 3 Porcelanato 60x60 cm H=20cm.
5.45 x 2.20m
5.45 x 2.20m
baranda h=1.00m
baranda h=1.00m
PARAMENTO
1 Revoque enduido pintado Interior 2 Cerámico 30x60 3 Granito 4 Cerámico 20x20 5 Revoque fino -exterior6 Piedra 7 Ladrillo bolseado pintado
baranda h=1.00m
21
CIELORRASO
2.75 x 1.30m
1 Revoque pintado 2 Placa de yeso enduido y pintado 3 Revoque enduido y pintado 4 Madera machihembrada
2.75 x 1.30m
REVISIONES DIBUJADO
FECHA
F
E
FECHA
NOMBRE DE ARCHIVO
361.CR.Al.Plantas 1.50 Bind.dwg
G
A
B
C
D
F
E
G
G
F
E
D
C
B
A
B
A
D
A-A
B-B
C-C
C
REVISADO
REGISTRO
Revisión 1 2012 05 21 Revisión 2 corrección de cotas sin cambios de albañilería 2013 02 07 Revisión 3 ajustes 2013 05 03
5 6
CASONAS ROBLE
PARQUES
UBICACION
7
DATYLCO S.A.
PROPIETARIO
8
PLANTA N3 Albañilería
PLANO
1/50 CR.AL.103.1.pdf
ESCALA LAMINA
SECTOR
A
±0.00 NPT REFERENCIAS LOCALES DESTINO
C03
NUMERO DE LOCAL ALTURA
PLANTAS NIVEL
NIVEL DE PISO TERMINADO
N.P.T
TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA
(0.80x1.30 O/B) P Movilidad Cortina 100%
DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA ANTEPECHO
A-A
B-B
C-C
DINTEL TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO
TIPOLOGIA DE CORTINA DE ENROLLAR
Cp05
V09
TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL
E03
TIPOLOGÍA DE ESPEJOS
TIPOLOGIA DE PLACARD
M06
TIPOLOGÍA DE MESADAS
M4 20
TIPOLOGÍA DE MUROS
MURO A CONSTRUIR NUMERO DE DETALLE NUMERO DE LAMINA TIPOLOGIA BARANDA
B1
Inclinación 20°
Inclinación 20°
Inclinación 20°
CORTES NIVEL DE PISO TERMINADO NIVEL DE CIELORRASO NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.
A-A
CORTE
NUMERO DE LAMINA
-0.24 Ubicación unidades exteriores AA
Ubicación unidades exteriores AA
Ducto 0.04m2
Ducto 0.04m2
baranda h=0.90mm
3 4 5 6 7 2 8 1 9 17 16 15 14 13 12 11 10
1
TANQUE DE AGUA
TANQUE DE AGUA
1-1
1-1
Inclinación 20°
A=6.35m² Lm=2.30m H=2.55m Inclinación 20°
Ubicación unidades exteriores AA
2
0.50
Ubicación unidades exteriores AA
Ubicación unidades exteriores AA
TERMINACIONES 1 - PAVIMENTO
1 2
2 - ZOCALO
3 4
3- PARAMENTO
4- CIELORRASO
PAVIMENTO
1 Madera 2 Moquette 3 Porcelanato 60x60 cm. 4 Piedra laja 5 Porcelanato 80x80 cm. 6 Arena y Portland lustrado y enduercido 7 Porcelanato 60X120 cm ZOCALO
1 Mdf pintado 2 AYP Endurecido 3 Porcelanato 60x60 cm H=20cm.
Inclinación 20°
PARAMENTO
Inclinación 20°
1 Revoque enduido pintado Interior 2 Cerámico 30x60 3 Granito 4 Cerámico 20x20 5 Revoque fino -exterior6 Piedra 7 Ladrillo bolseado pintado
Inclinación 20°
CIELORRASO
1 Revoque pintado 2 Placa de yeso enduido y pintado 3 Revoque enduido y pintado 4 Madera machihembrada REVISIONES DIBUJADO
FECHA
Revisión 1
REVISADO
2013 04 03
FECHA
NOMBRE DE ARCHIVO
C
B
A
B
A
A-A
B-B
C-C
C
361.CR.Al.Plantas 1.50 Bind.dwg
REGISTRO
Revisión 1
2013 04 03
1 CASONAS ROBLE
2
PARQUES
UBICACION
DATYLCO S.A.
PROPIETARIO
PLANTA Azotea Albañilería
PLANO
1/50 CR.AL.800.1.pdf
ESCALA LAMINA
SECTOR
A/B
SECTIONS REFERENCIAS LOCALES DESTINO
NUMERO DE LOCAL ALTURA
Ladrillo bolseado
Ladrillo bolseado
Tanque de agua
bar
PLANTAS NIVEL N.P.T
C03
NIVEL DE PISO TERMINADO TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA
(0.80x1.30 O/B) Movilidad 100%
and
DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA ANTEPECHO
a h=0
DINTEL
.90m
TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO
Teja
TIPOLOGIA DE CORTINA DE ENROLLAR
P Cortina
V09
TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL
E03
Revoque pintado
Revoque
Cielorraso de madera
TIPOLOGÍA DE ESPEJOS
Cp05
Cielorraso de madera Revoque
TIPOLOGIA DE PLACARD
M06
TIPOLOGÍA DE MESADAS
M4 20
TIPOLOGÍA DE MUROS
MURO A CONSTRUIR
baranda h=1.00m
NUMERO DE DETALLE NUMERO DE LAMINA
CORTES
a
h=0
h=0
a and
.90
m
bar
baranda h=1.00m
m .90
bar and
Rev. Piedra
NIVEL DE PISO TERMINADO NIVEL DE CIELORRASO NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.
A-A
CORTE
NUMERO DE LAMINA
Revoque
.90 h=0
a .90
bar and
a
h=0
Rev. Piedra
m
Revoque
baranda h=1.00m
a
h=0
and
.90
m
bar
baranda h=1.00m
h=0 m
.90
bar and
a
Fa *E lta *P st co ro ru or ye ctur di ct a na o ció ej ec n ut fin iv al o co sa n: ni ta ria
baranda h=1.00m
m
and bar
baranda h=1.00m
TERMINACIONES
Rev. Piedra
1 - PAVIMENTO
1 2
2 - ZOCALO
3 4
3- PARAMENTO
4- CIELORRASO
Revoque
1 Madera 2 Moquette 3 Porcelanato 60x60 cm. 4 Piedra laja 5 Porcelanato 80x80 cm. 6 Arena y Portland lustrado y enduercido 7 Porcelanato 60x120
a
h=
0.9
and bar
0m
PAVIMENTO
ZOCALO
baranda h=1.00m
0m
bar
0.9
and
a
h=
baranda h=1.00m
1 Mdf pintado 2 AYP Endurecido 3 Porcelanato 60x60 cm H=18cm. PARAMENTO
Rev. Piedra
1 Revoque enduido pintado Interior 2 Cerámico 30x60 3 Granito 4 Cerámico 20x20 5 Revoque fino - exterior 6 Piedra 7 Ladrillo bolseado pintado
CIELORRASO
Rev. Piedra
1 Revoque pintado 2 Placa de yeso enduido y pintado 3 Revoque enduido y pintado 4 Madera machihembrada REVISIONES DIBUJADO
Revisión 1
REVISADO
NOMBRE DE ARCHIVO
FECHA
2012 05 25
FECHA
361.CR.Al.Cortes 2012-10-12.dwg
REGISTRO
Revisión 1
Rampa vehicular
2012 05 25
PLANO
CORTE 1-1 ESC 1:50
ESCALA LAMINA
PARQUES
DATYLCO S.A.
CORTES Albañilería 1/50 CR.AL.201.1.pdf
REFERENCIAS
REFERENCIAS
LOCALES
LOCALES
DESTINO
DESTINO
NUMERO DE LOCAL
NUMERO DE LOCAL
ALTURA
ALTURA
NIVEL
NIVEL
NIVEL DE PISO TERMINADO
N.P.T
NIVEL DE PISO TERMINADO
N.P.T
C03
TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA
TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA
(0.80x1.30 O/B) Movilidad 100%
DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA
DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA ANTEPECHO
ANTEPECHO
DINTEL
DINTEL
TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO
TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO
TIPOLOGIA DE CORTINA DE ENROLLAR
P Cortina
V09
Cielorraso de madera Ladrillo bolseado
TIPOLOGIA DE PLACARD TIPOLOGÍA DE MESADAS
M4 20
Cielorraso de madera
TIPOLOGÍA DE ESPEJOS
Cp05
Ladrillo bolseado
TIPOLOGIA DE PLACARD
M06
TIPOLOGÍA DE MESADAS
M4 20
TIPOLOGÍA DE MUROS
baranda h=1.00m
TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL
E03
TIPOLOGÍA DE ESPEJOS
Cp05
M06
TIPOLOGIA DE CORTINA DE ENROLLAR
P Cortina
V09
TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL
E03
Ladrillo bolseado
TIPOLOGÍA DE MUROS
baranda h=1.00m
MURO A CONSTRUIR NUMERO DE DETALLE
MURO A CONSTRUIR NUMERO DE DETALLE NUMERO DE LAMINA
NUMERO DE LAMINA
1.20
CORTES
1.74
1.62
1.34
CORTES
Revoque pintado
Revoque pintado
Revoque pintado
Ladrillo bolseado
Ladrillo bolseado
Revoque pintado
NIVEL DE CIELORRASO
Ladrillo bolseado A-A
NIVEL DE CIELORRASO
Ladrillo bolseado
NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.
1.50
Ladrillo bolseado
NIVEL DE PISO TERMINADO
NIVEL DE PISO TERMINADO
Revoque pintado Revoque pintado Ladrillo bolseado
-2.85 NPT
PLANTAS
PLANTAS
C03 (0.80x1.30 O/B) Movilidad 100%
Ladrillo bolseado
A
SECTOR
CASONAS ROBLE UBICACION PROPIETARIO
NIVEL DE CIMENTACIÓN PARA ARCILLA DE BUENA CALIDAD
NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.
A-A
CORTE
CORTE
NUMERO DE LAMINA
NUMERO DE LAMINA
baranda h=1.00m
baranda h=1.00m
Revoque pintado
Revoque pintado
baranda h=1.00m
baranda h=1.00m
4- CIELORRASO
1 Madera 2 Moquette 3 Porcelanato 60x60 cm. 4 Piedra laja 5 Porcelanato 80x80 cm. 6 Arena y Portland lustrado y enduercido 7 Porcelanato 60x120 ZOCALO
baranda h=1.00m
1 Mdf pintado 2 AYP Endurecido 3 Porcelanato 60x60 cm H=18cm.
1 Mdf pintado 2 AYP Endurecido 3 Porcelanato 60x60 cm H=18cm. PARAMENTO
1 Revoque enduido pintado Interior 2 Cerámico 30x60 3 Granito 4 Cerámico 20x20 5 Revoque fino - exterior 6 Piedra 7 Ladrillo bolseado pintado
Revoque pintado Rev. piedra
1 Revoque pintado 2 Placa de yeso enduido y pintado 3 Revoque enduido y pintado 4 Madera machihembrada
Revisión 1
NOMBRE DE ARCHIVO
1 Revoque enduido pintado Interior 2 Cerámico 30x60 3 Granito 4 Cerámico 20x20 5 Revoque fino - exterior 6 Piedra 7 Ladrillo bolseado pintado 1 Revoque pintado 2 Placa de yeso enduido y pintado 3 Revoque enduido y pintado 4 Madera machihembrada
DIBUJADO
FECHA FECHA
CASONAS ROBLE
NOMBRE DE ARCHIVO
FECHA FECHA
2012 05 25
361.CR.Al.Cortes 2012-10-12.dwg
REGISTRO
Revisión 1
2012 05 25
B
SECTOR
2012 05 25
CASONAS ROBLE
PARQUES
PROPIETARIO
CORTE A-A ESC 1:50
PLANO
ESCALA LAMINA
A
SECTOR
PARQUES
UBICACION
DATYLCO S.A.
NIVEL DE CIMENTACIÓN PARAAlbañilería PLANO CORTES ARCILLA DE BUENA CALIDAD ESCALA 1/50 CR.AL.202.1.pdf LAMINA
Revisión 1
REVISADO
2012 05 25
361.CR.Al.Cortes 2012-10-12.dwg
REGISTRO
UBICACION PROPIETARIO
CIELORRASO
REVISIONES
REVISIONES DIBUJADO REVISADO
CORTE C-C ESC 1:50
3- PARAMENTO
PAVIMENTO
Revisión 1 Contrapiso H. allanado con helicópetro Balasto cemento Greda
POZO ASCENSOR ESC. 1:50
2 - ZOCALO
1 Madera 2 Moquette 3 Porcelanato 60x60 cm. 4 Piedra laja 5 Porcelanato 80x80 cm. 6 Arena y Portland lustrado y enduercido 7 Porcelanato 60x120
CIELORRASO
Rev. piedra
Rev. Piedra
nit
sa
1 - PAVIMENTO
1 2 3 4
ZOCALO
PARAMENTO
Revoque pintado
Revoque pintado
ia
al co or
3- PARAMENTO
4- CIELORRASO
Hormigón en 2° etapa
o
lta Fa
ro 2 - ZOCALO
PAVIMENTO
Ladrillo bolseado
tiv
TERMINACIONES
Revoque pintado Ladrillo bolseado
1 - PAVIMENTO
1 2 3 4
cu
ra tu eje uc cto str ye *E ro *P
TERMINACIONES
Revoque pintado Ladrillo bolseado
ar
fin ión
ta ni sa
din ac
na di
cu
or
eje
co lta
Revoque pintado Ladrillo bolseado
baranda h=1.00m
ye
Fa
ra
tu
uc
str
*E
*P
Corte Integral Esc 1/50
baranda h=1.00m
tiv o
ció
n
fin
al
BOMBEO PRIMARIA BOMBEO SECUNDARIA
ESC. 1:50
cto
RevoquePOZO pintado Ladrillo bolseado POZO
ria
co
n:
co n:
baranda h=1.00m
baranda h=1.00m
baranda h=1.00m
DATYLCO S.A.
CORTES Albañilería 1/50 CR.AL.201.2.pdf
USER GUIDE
ROBLE 55 MANUAL
2. LISTADO DE MATERIALES Y TERMINACIONES 2.1 PAVIMENTOS PORCELANÍTICOS PROVEEDOR: BOSCH Tel.: 2708 4545
Tel.: 2200 8721
2.8 GRIFERIA PROVEEDOR: ACERENZA Tel.: 24013333
TERRAZAS
AREA SOCIAL
BAÑOS
Aptos 2 y 3 dormitorios: Belize Sand Natural (45x90) Aptos 1 dormitorio: Portobello Vicenza Café (60x120)
Piso Ingenieril Roble Eslavonia con acabado Brushing de la firma Patagonia, 16mm espesor, 19cm ancho, largos Random con una capa noble de 3mm.
Servicio:
Cuidados y prevención Luego de colocado el piso En las entradas colocar un felpudo o alfombra para retener arenilla o piedrecillas. Secar derrames de agua rápidamente. No usar amoníacos ni cloros para limpiar nuestros pisos, solo use un paño apenas humedecido con agua. No encere nuestros pisos, ya que no es necesario y podría resultar muy resbaladizo. Aspire el piso en forma regular con el accesorio con cepillo, tan seguido como lo hace con las alfombras. Coloque felpas en las patas de las sillas y mesas. No adhiera cintas plásticas ni pegamentos sobre el piso ya que pueden dañar parte del lustre.
Secundarios: Lavatorio: Pared Monocomando Acerenza Eros
COCINAS Portobello Vicenza Café (60x120)
BAÑOS Servicio: Porcelanato Luna Pulido Nano (60X60) Secundarios: Porcelanato Klipen Grace Vision (60x60) Porcelanato Klipen Grace Vision (30x60) Unid. 001, 002 Roble 55 Suite: Porcelanato Marazzi Solid Concrete R10 (60 x 60) Unidades: 001, 002, 004, 005, 101, 102, 105, 106, 201(Roble 55), 202, 205 Porcelanato Grace Vision (60 x 60) Unidades: 003, 103, 104, 203, 204 Porcelanato Loft antracita (45x90) Unidades: 201(Roble66), 301, 302, 303, 304
AREAS COMUNES Hall: Pallier:
Porcelanato Marazzi Soho Brow (60x120) Porcelanato Klipen Grace Vision (30x60 y 60x60) Porcelanato Klipen Mars Grafito Natural (80x80)
AMENITIES
Camino Brunel 2930
2. LISTADO DE MATERIALES Y TERMINACIONES 2.2 PAVIMENTOS MADERA
PROVEEDOR: SAMIC
Belize Sand Natural (45x90)
COCINA Lavatorio Monocomando exterior Split
Percha Focus
Ducha: Monocomando Embutir Acerenza Eros
Portarrollo sin tapa Focus
Roseta de lluvia SOLE 5
Cuidados y prevención Luego de colocado el piso En las entradas colocar un felpudo o alfombra para retener arenilla o piedrecillas. Secar derrames de agua rápidamente. No usar amoníacos ni cloros para limpiar nuestros pisos, solo use un paño apenas humedecido con agua. No encere nuestros pisos, ya que no es necesario y podría resultar muy resbaladizo. Aspire el piso en forma regular con el accesorio con cepillo, tan seguido como lo hace con las alfombras. Coloque felpas en las patas de las sillas y mesas. No adhiera cintas plásticas ni pegamentos sobre el piso ya que pueden dañar parte del lustre.
Suite:
ACCESORIOS
Bidet: Monocomando Acerenza Eros
DORMITORIOS Piso flotante Alemán marca Classen , Categoría AC4, Cod.:32254, 7mm espesor , 194 mm ancho, 1286mm de largo.
Monocomando para cocina de mesada Ero
Toallero Barrla Focus
Lavatorio: Juego Bimando Compass
SIFONES
Bidet: Bimando para bidet Compass
Sifón para lavatorio cromado
Bañera: Bimando Transf. Embutir Compass Roseta de lluvia SOLE 5
CASA CAMPOMAR 2013) B. Testa Architects. Montevideo, Uruguay.
(2012-
Casa Campomar is a house built inside a gated neighborhood, for a married couple. On the inside all rooms flow into each other and onto the nature, blurring the division lines and creating visual connection with each other. A total of 500m2 constructed. I was involved with the project during stages 4. Stage 4- Prepare technical drawings for construction use in AutoCAD, such as floor plans, sections, details, etc.
22
FLOOR PLANS
Revestimeinto piedra
Borde libre
A B
0.15
M-01
0.40 1.20
1.00 0.30
1.05
2.65
1.70
2.90 7.90
2.10 2.90
3.72
0.80
0.95
0.20
0.45
1.30
0.90 2.85
0.40 1.35
Proyección losa alero Proyección losa alero 1.54
Proyección tirante
2.06
Proyección muro
0.65
Proyección muro
7.32
1.07
0.05
1.07
0.05
1.07
0.05
1.07
0.05
1.07
0.05
1.07
9
8
10
7
3.30
6
10
9
8
6
5
4
3
2
1
5
4
3
1-1
2-2
3-3
4-4
5-5
2
B-B
Proyección muro
6-6
1
8
8.35
Proyección losa alero
1.54
Proyección losa alero
7
1.30
7
5
maceteros de madera
piedra partida
B-B
4.30
6
8
7
6
pilastra de madera
4.91
1.26
1.15
0.90
1.50
Pav. a eje de bañera
0.30
2.75 06 Cortina
Proyección tirante
Caseta bomba enterrada
0.80
2.00 1.10
4
2.05
1.25
3.48
3.17
1.00
06 Cortina
0.35
0.35
0.65
2.00 0.35
0.95
1.10
0.95
2
1
7.00
0.45
5.00
3.25
1.05 1.95 0.20 1.40 0.20
0.15
1.85
0.80
2.05
Cerco de madera
FUENTE
0.91
E09
1.75
1.10
2.85
3.65
4.30
1.10
4.95
1.00
1-1
0.90
E07
E08
2.70
Cp07
H=2.40m 0.60
2-2
0.45
3-3
2.00
V06
C10 E03
1.60 2.50
4-4
2.85
H=2.85m
E03
2.20
0.45
C-C
0.43
C20
Cp08 E03
E04
C18
Revestimineto de madera
1.26 1.00
0.91
06 Cortina
V04
H=2.40m
C11
2.20
Cara ext. viga
Pilar de madera de pérgola
Canto rodado chato diámetro mínimo 8cm
D-D
C12
4.91
0.72
1.20
1.40
3.65
C18
ver cámara de sanitaria existente
1.26
Cp09
2.59
2.00
M-03
3.50
H=2.40m 1.80
1.00
E01
C08
1.00
1.00
Perfil 12x6cm.
C18
0.30 0.12
0.12 0.30
1.00
C01
C01
G Largo de rampa 15.30m pendiente 20%
1.95
1.05
0.35
0.95
C01
2.60
3.35
1.75
0.95 0.25
0.70
0.40 1.30
0.80
piedra partida
2.40
06 Cortina
C-C
C06 C07
2.59
Cp05
Cp12
Revestimineto de madera
piedra partida
5-5
F
hueco
6-6
0.67
3.00
0.42 0.10 0.80
E
3.00
C14
4.95
H=2.40m
0.15
0.20
1.45
1.55
1.90
1.90 0.62
0.38
3.80
0.75
0.65
0.45
0.35
C09
2.15
D
F G
revestimiento de madera
A-A
C20
17
Cp10
E
Pav. a eje de ducha
V05
E07
6.30
0.95
D
hueco
1.00 0.70 Rectificar medida 2.70
1.20
0.15
0.95
0.80 0.80 2.20
0.80
0.60
0.90
0.55
C05
0.75
baldosones de hormigon
0.45 1.00 H=2.85m C09a
4.05
9
4.40
8 BARANDA
2.35
0.83
BARANDA
0.20
7
12
C-C
losa con piedra sobrepuesta pilastra de madera ducha
16
3.30
2.00
B-B
0.30
5
11
0.80
M-04
H=2.15m
C-C
3.00
15
C19
2.55
Cp06
1.85
2.20
2.40
0.95
0.35
C08
0.35 0.30
0.85
6
C17
1.75
2.05
2.80
A-A
V04
2.70
Tanque Tanque 500l 300l
2.05
06 Cortina
0.80
1.25
6.35
H=2.40m
06 Cortina
10 H=2.60m
H=2.60m
1.45
M-02
H=2.45m
1-1
3.00
1.00
4.45 4.95
13
Cp12
1.60
Cp03
2-2
C
H=2.30m
3.00
3-3
4.65
E01
14
D-D
H=2.30m muro a demoler 2.20
1.05
E06
C26 E02
0.50
0.20
BARANDA
0.50
4
H=2.60m
0.30
1.15 Aprox
4-4
4.65
0.55
5-5
1.00
1.70
3 1.00
0.72
3.00
0.30
3.00
0.65 C18
1.16 C03
C03
1.00
17
7.25
0.45
0.55
C22
G
E-E
06 Cortina
6.25
Agrandar muro hasta buña
6.10
5.85
0.55
1.10
H=2.30m
2.15
15 Puerta a plomo de escalón 16 Cp04
1.25
0.95
6-6
C18
C04
B
0.30
2.40
0.15 1.15
2.20
0.30 0.90
0.63
0.82
E-E
1.40
B-B
1.20
1.55
H=2.60m
11.15
1.00
5.25 11.15
2.20
1.13
1.55
1.15
1.45
0.20 Cp01
5.50
2.30
14
1.45 1.55
Caldera
3
1.05 0.15 2.40 0.95 0.30
1.40 6.25 5.30 5.60
Aplacado de yeso pegado
A-A
4.35 Muro revestido en Madera
1.05
11.95
0.30
A
F
Reguera según detalle
0.43
7.35
0.70 C24
Cap Puertas y rev. H=2.30m
H=2.75m
13
0.45
4.15
1.70
Caseta bomba
12
1.25
5
6.15
11
10.35
V02
2.25
0.70
9 10
2.05
4.80
3.70 0.90
0.55
2.85
8
H=2.45m
H02
B-B
Aplacado1.20 en yeso
5 7
Cielorraso hasta buña
Reguera
4.65
0.85
1.00
Hcr.=2.10m
Hcr.=2.25m
0.60
4
1.25
1.75
H=2.70m
0.50
3.70
1
2.60
1
7.65 E
3.00
H=2.50m
2
3
1.50
6.60
D
0.20 0.20
H=2.50m
1.00
2
6
A-A
06 Cortina
0.50
3.00
2.20 C16
3
0.90
4.35
2.20
1.15
B-B Ver detalle sector escalera
C21
PERGOLA
06 Cortina
1.70
E02
Cp11
H=2.90m Muro revestido en Madera
1.00
C25
0.90
Cp02
H=2.30m
3.20 Muro hasta buña Estucado
3.45
1.80
BARANDA
1.65
0.80
0.45
2.50
H=2.50m
06 Cortina
1.80
C
5.10
1.50
V03
5.20
1-1
2-2
3-3
4-4
5-5
6-6
16.75
0.60
2.75
E08
1.00
5.45
B 1.99
Muro revestido en Madera
0.85
0.90
1-1
0.15
1.40
H=1.40m
0.85
2.20
C
2-2
0.60 0.15
Escalera ancho 60 cm a definir escalones
A
3-3
3.30
C 4-4
3.45
borde estucado
B
5-5
Pav. Piedra laja rústica tamaños variables
borde estucado
6-6
Vidrio
3.45
A
1.50
Borde libre
borde estucado
Borde libre
0.15
0.50
Deck de madera
A-A
10.60
6.95
A-A
9.10
D E 5.00
pendiente 2%
F 3.25
pendiente 2%
G Proyección muro
C-C 1.48
C-C
3.70
Proyección losa alero Proyección muro
1.48
acometidas
1-1
2-2
3-3
4-4
5-5
6-6
Proyección losa alero
REFERENCIAS LOCALES
BAÑO 1
DESTINO
NUMERO DE LOCAL ALTURA
REFERENCIAS PLANTAS
NIVEL LOCALESNIVEL DE PISO TERMINADO N.P.T
BAÑO 1
DESTINO DE ABERTURA DE CARPINTERIA DE MADERA TIPOLOGIA NUMEROABERTURA DE LOCAL ANCHO
C03
ALTURA DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA
(0.80x1.30 O/B) Movilidad 100%
PLANTASANTEPECHO
SECTIONS
NIVEL DINTEL
DETAILS
NIVEL DE PISO TERMINADO TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO
N.P.T
C03
TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA TIPOLOGIA DE ABERTURA DE CARP DE HIERRO ANCHO ABERTURA
H4
reja
(0.80x1.30 O/B) P Movilidad 100% Cortina
DIMENSIONES DE ABERTURA TIPOLOGIA DE CORTINA DE ENROLLAR MOVILIDAD DE ABERTURA ANTEPECHO DINTEL
V09
Pizarra
TIPOLOGÍA DE MAMPARAS Y TIPOLOGIA DE CRISTAL ABERTURA DE CARP DE ALUMINIO CERRAMIENTOS
E03
TIPOLOGÍA ESPEJOS TIPOLOGIADEDE ABERTURA DE CARP DE HIERRO
H4
reja
TIPOLOGIADEDEPLACARD CORTINA DE ENROLLAR TIPOLOGIA
Cp05P
Cortina
Pizarra
M06
TIPOLOGÍA DE MESADAS
V09
Pizarra
E01
E01
TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL
M4 20 E03
TIPOLOGÍA DE MUROS
TIPOLOGÍA DE ESPEJOS
MURO A CONSTRUIR TIPOLOGIA DE PLACARD NUMERO DE DETALLE
Cp05
18°
Madera
18°
E01
M06
Espejo
E01
TIPOLOGÍA DE MESADAS NUMERO DE LAMINA
M4 20 CORTES
TIPOLOGÍA DE MUROS
NIVEL DE PISO TERMINADO MURO A CONSTRUIR
Madera
Revoque
180
9 Frente y fondo Limestone Mesada y bacha Limestone
9
24
Revoque
NIVEL CARA INFERIOR H.A. NIVEL DE PISO TERMINADO CORTE
NUMERO DE LAMINA NIVEL DE CIELORRASO
Tapa bañera Limestone
150
162
NIVEL CARA SUPERIOR H.A.
CORTES
A-A
NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.
Frente y fondo Limestone Mesada y bacha Limestone
132
A-A
CORTE
NUMERO DE LAMINA
1.45
Tapa bañera Limestone
E02
Espejo 132 25
162
20
9
24
9
2.20
24
1.70 1.00
9
9
2.40
2.40
25
0.25
NUMERO DE DETALLE NIVEL DE CIELORRASO NUMERO DE LAMINA
Espejo Frente y fondo Limestone Mesada y bacha Limestone
9
3.15
0.25
3.15
Revoque
1.95 2.85
95
150 95
Frente y fondo Limestone Mesada y bacha Limestone
2.40
Madera Madera
95
180 95
3.15
9
3.15
2.40
24
18°
Madera
2.85
E-E 10
150
135
E-E 75
Espejo M01b
M01b
V04
180
C23
E09
10
E08
10
A-A
220
C23
205
V05
BAÑO 1 50
5
40
60
5
2.40
2.45
50
NFL
50
5
40
60
95
5
305
205
367.CC.D AS.Baños 2013-08-28.dwg
R RE EGVI SI ST IROON E S DIBUJADO
FECHA
REVISADO
FECHA
NOMBRE DE ARCHIVO
367.CC.D AS.Baños 2013-08-28.dwg
REFERENCIAS
REGISTRO
R E F E R E NLOCALES CIAS
FLIA. CAMPOMAR
60
50
95
UBICACION
DESTINO
LOCALES NUMERO
SAN NICOLÁS NUEVO
ALTURA DESTINO
PROPIETARIO
NUMERO D
PLANTAS
FLIA. CAMPOMAR 5
F-F
2.40
FECHA
NOMBRE DE ARCHIVO
305
D-D
2.40
FECHA
REVISADO
790
0.30
0.30
95
DIBUJADO
B-B 17.5
100 130 5
B-B A-A
V06
180
C-C
NFL 2.46
95
305
2.85
0.12
0.35
2.70 NFL
50
BAÑO 1
Cielorraso de madera
0.12
REVISIONES
10
V06
95
60
50
E-E
0.46
3.15
0.31
Rejilla
220
C23
17.5
100
B-B
180
C23
100
100
Rejilla V05
llaves de pasollaves de paso
200
llaves de pasollaves de paso
105
130
B-B A-A
10
E08
180
UBICACION PLANO PROPIETARIO
95
01
E-E
F-F
D-D
C-C
2.40 2.40
2.85
0.07 0.54
piedra partida
ducha a nivel de cielorraso
H4 reja
1:25
V09
TIPOLOGI TIPOLOG CERRAM
P Cortina
E03 V09
TIPOLOG TIPOLOGÍA CERRAMIE
E03 Cp05
TIPOLOGÍ TIPOLO
M06
TIPOLOG
Cp05
TIPOLOG
M4 M06 20
TIPOLOG TIPOLOG
M4 20
TIPOLOGÍ MURO A
NUMERO
tierra
MURO AC NUMERO
Pendiente min.5%
NUMERO D
CORTES NUMERO D
NIVEL
CORTES
NIVEL NIVEL D
Estuco
2.25
2.30
2.20
2.76
TIPOLOG TIPOLOGI
reja
01
ducha a nivel de cielorraso
Desgue canalizado a punto bajo de terreno o a red
2.25
2.10
2.45
2.90
2.70
0.20
0.56
piedra partida
0.15
0.10 0.76
rectificar altura
NIVEL DE
TIPOLOG NIVEL DE ANCHO
DIMENSIO TIPOLOGI MOVILIDA ANCHO A ANTEPE DINTEL DIMENSION MOVILIDAD TIPOLOG ANTEPEC DINTEL TIPOLOG TIPOLOGI
P
H4 Cortina
LAMINA
1.20
2.40
2.60 2.70
2.60
2.60
2.60 2.70
Revestimiento de Lapacho ancho 0.15 cm
/PLANTAS Y VISTAS
23 ESCALA
aro acero inox.
0.00
8.68
BAÑO 1
PLANO
ALTURA
N.P.T
SSHH (0.80x1.30 O/B) L 07 Movilidad 100%
1:25
LAMINA
0.00
NIVEL N.P.T PLANTAS
C03 NIVEL
/PLANTAS Y VISTAS
(0.80x1.30 O/B) C03 Movilidad 100%
ESCALA
790
SSHH L 07
SAN NICOLÁS NUEVO
BAÑO 1
305
4
V04
200
E09
40
150
4
65 105
V04
105
105
Espejo
150
V04
180
A-A
40
E07
Espejo
180
M01a
65
Espejo
E07
135
E07
65
95
17.5
180
0.07
20
M01a
0.15
7.55
95
40
305 75
95
D-D
180
305 90
17.5
3.00
95
0.07
0.55
200
20
C-C
90
305 90
E07 65
3.00
F-F
10
90
105
Pav. Piedra laja rústica tamaños variables
2.50
2.50
180
305
105 Revestimiento Relleno pend.0.5%
Pav. Piedra laja rústica tamaños variables
F-F
Deck de madera
Revestimiento Piedra
105
0.85
E02 40
150
Espejo
Estructura
Madera
10
D-D
Borde estucado
Revestimiento Relleno pend.0.5%
Madera
200
borde estucado
Frontalín de madera
Nivel de agua -0.10m.
10
C-C
0.00
180
20
105
NIVEL NIVEL D
Estuco
Estuco
Murete tapa Limestone
Murete tapa Limestone
Murete tapa Limestone
Murete tapa Limestone
NIVEL
NIVEL C
Estuco
A-A
CORTC NIVEL NUME
A-A
CORTE
NUMER
3.06 NPT int 3.31
Murete Limestone 100
Limestone
18°
95
50
95
60
50
20 20
20
20
40
20
20
25
40
25
120
100
8.04
Murete Limestone 120
Limestone
85
60
15
85
180
15
790 180
15
85
15
60
85
40
60
105
40
105
790
3.15 11°
2.70
2.40
2.40
3.15
2.40
2.40
2.60
8 4
V01
Tomas en cara
DIBUJADO REVISIONES
3.05 NPT 100
15 15
120 120
DESTINO
Limestone Limestone Espejo 10
55 270
100
10
10
55
REGISTRO
LOCALES
interior en de cara mesada Tomas ver ubicación en planta interior de mesada ver ubicación en planta
2.70
REVISADO
NOMBRE R E G DE I S ARCHIVO TRO
REFERENCIAS
10
Espejo
55 55
NUMERO DE LOCAL ALTURA
45
BAÑO 2
1.13
Murete Limestone
Limestone Limestone
24
2.30
2.30
Murete Limestone
DIBUJADO NOMBRE DE ARCHIVO REVISADO
Murete Limestone
9
2.42 2.30
REVISIONES
15 15
Murete Limestone
3.05 NPT
Murete tapa Murete tapa
Murete tapa
25
0.59
2025
0.59
Estuco Estuco
Murete tapa
0.54 NFL
0.47 0.59
V01
Estuco Estuco
188
17 270
17
270
270
PLANTAS NIVEL
FLIA. CAMP SAN NI
TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA UBICACION ANCHO ABERTURA
(0.80x1.30 O/B) Movilidad 100%
188
FLIA. CAMP
NIVEL DE PISO TERMINADO
N.P.T
C03
20
NFL
0.76
21 21
2
Estuco Estuco
9 24
0.56
2 8 4
V01 V01
1.15 0.00 NPT
45
2.40
2.60
24 24
Detalle
PROPIETARIO UBICACION
DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA ANTEPECHO DINTEL
285
SAN NI
PROPIETARIO
TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO
285
TIPOLOGIA DE ABERTURA DE CARP DE HIERRO
H4 reja
TIPOLOGIA DE CORTINA DE ENROLLAR PLANO
P Cortina
V09
TIPOLOGÍA DE ESPEJOS
Cp05
1:25
1:25
LAMINA
TIPOLOGÍA DE MESADAS
M4 20
BAÑO 1 /
BAÑO 1 /P
LAMINA ESCALA
TIPOLOGIA DE PLACARD
M06
4.81
PLANO ESCALA
TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL
E03
TIPOLOGÍA DE MUROS
MURO A CONSTRUIR NUMERO DE DETALLE
40
NUMERO DE LAMINA
18°
0.25
NIVEL DE CIELORRASO
40
3.49 3.15
0.85
A-A
25
E06
5
E04
LOCALES
E05
DESTINO
NUMERO DE LOCAL ALTURA
1.14
PLANTAS NIVEL N.P.T
120
C03
NIVEL DE PISO TERMINADO TIPOLOGIA DE ABERTURA DE CARPINTERIA DE MADERA ANCHO ABERTURA
(0.80x1.30 O/B) Movilidad 100%
DIMENSIONES DE ABERTURA MOVILIDAD DE ABERTURA ANTEPECHO DINTEL
45
2.60
2.60
CORTE
NUMERO DE LAMINA
REFERENCIAS
5
BAÑO 5
2.40
2.65
2.60
Nicho
Nicho
0.30
0.35
2.60
NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.
0.90
2.95
85
18°
0.69
CORTES NIVEL DE PISO TERMINADO
3.53
3.10
TIPOLOGIA DE ABERTURA DE CARP DE ALUMINIO TIPOLOGIA DE ABERTURA DE CARP DE HIERRO
H4
25
reja
TIPOLOGIA DE CORTINA DE ENROLLAR
P Cortina
V09
borde estucado
TIPOLOGÍA DE MAMPARAS Y CERRAMIENTOS CRISTAL
E03
TIPOLOGÍA DE ESPEJOS
Cp05
TIPOLOGIA DE PLACARD
M06
2.45
TIPOLOGÍA DE MESADAS
C-C
NUMERO DE DETALLE NUMERO DE LAMINA
CORTES
75
NIVEL CARA SUPERIOR H.A. NIVEL CARA INFERIOR H.A.
55
35
Madera
Madera
10
10
REVISIONES
DIBUJADO
125
10
ns
Zócalo silestone gris
40
Zócalo silestone
40
A-A
43
75 43
95
62.5
Zócalo silestone gris
55
65
50
80
90
270
115 285
173
45
D-D
C-C
62.5
160
60
55
H= cara inferior de mesada
M05
60
25
D-D
C-C
Bacha Deca
26
-09-
SION
IENE
FLIA. CAMPOMAR UBICACION
SSHH L 22
A
ESCALA
285 90
90
h=3cm
B-B
A
2.40
2.40
REVISIONES
B-B 4
Mesada silestone gris
96
DIBUJADO
barral de acero inox
96
96
barral con rosca de acero inox sostiene mampara y entrada de agua en ducha h= dintel puertas 50
4
96
SAN NICOLÁS NUEVO
PROPIETARIO
SSHH L 12
0.60
9.20
Pizarra
0.45
2.85
Madera 2.40
2.85
0.45
1.05
0.45
8.80
0.00 0.30
4.60
2.80
1.85
0.52
0.00
Madera
D-D
C-C
0.35 3.10
Madera
3.30
ESCALA LAMINA
Revestimiento Madera
Material a confirmar
55
UBICACION
PLANO
0.60
Revoque
65
100 285
270
0.55
Madera
367.CC.D AS.Baños 2013-08-28.dwg
FLIA. CAMPOMAR 185
0.20
2.00
2.40
FECHA
REGISTRO
Madera
V03 43
80
80
100
170
0.60
2.40
FECHA
REVISADO NOMBRE DE ARCHIVO
0.00
0.95
Madera
2.45
Ver con Gabriela
1:25
Venecitas blancas 100
0.95
Revoque
BAÑO 2 /PLANTAS Y VISTAS
PLANO
A-A
Zócalo silestone gris
0.15
Revoque
SAN NICOLÁS NUEVO
PROPIETARIO
LAMINA
A-A
1.10
2012
REVI
MANT
V03
Mesada silestone gris
367.CC.D AS.Baños 2013-08-28.dwg
REGISTRO
185
115
55
V02
llave de paso
FECHA
NOMBRE DE ARCHIVO
de s
Pizarra
15
0
30
30
30
270
ce
4
B-B Joystick
2.40
FECHA
REVISADO
96
B-B
3.10
CORTE
NUMERO DE LAMINA
o
45
83
Nicho
7
83
28
Llaves H= cara inferior de mesada A-A
25
85
Mesada silestone gris 12
Losa volada R
NIVEL DE CIELORRASO
A-A
220 45
R
3.31
NIVEL DE PISO TERMINADO
Revoque enduido y pintado
Revoque enduido y pintado
Revoque enduido y pintado
Venecitas blancas
TIPOLOGÍA DE MUROS
MURO A CONSTRUIR
barral de acero inox sostiene mampara y entrada de agua en ducha h= dintel puertas
Revoque enduido y pintado
E06
2.70
M4 20
du
35
en
V02
Espejo
2.25
62.5
Black out
35
Revestimiento
2.90
62.5
5
0.41
Relleno pend.0.5%
Pav. Piedra laja rústica tamaños variables
45 140
D-D
0.61
95
Extractor
0.07 0.35
0.31 0.12
0.43
0.48
aprox 2"x4"
Canalón
0.20
0.13
0.00
0.33
0.48
0.00
0.18
Nivel de agua -0.10m.
BAÑO 5 /PLANTAS Y VISTAS 1:25
MOVIE NUEVO CENTRO SHOPPING CENTER
MOVIE B. Testa Architects. Montevideo, Uruguay. MOVIE is the largest movie theatre chain company in Uruguay. With over 4 different locations in Montevideo, Uruguay B.Testa Architects has been in charge of designing and renovating all of the locations for over 15 years. Constantly coming up with new design concepts for the firm to stay relevant.
REFERENC LOCALES DESTINO NUMERO DE LOCAL ALTURA
LOCAL
L01
PLANTAS NIVEL N.P.T
C03
NIVEL DE PISO TERMINA
TIPOLOGIA DE ABERTUR ANCHO ABERTURA NUMERO DE DETALLE NUMERO DE LAMINA
DIMENSIONES DE ABERT MOVILIDAD DE ABERTU
(0.80x1.30 O/B) Movilidad 100%
ANTEPECHO DINTEL
A= 0.00 D=2.10 A 08
CORTE 5-5 Esc 1.100
TIPOLOGIA DE ABERTUR 4
TIPOLOGÍA DE MAMPAR CERRAMIENTOS CRISTA
V09
TIPOLOGÍA DE ESPEJOS
E03
TIPOLOGIA DE PLACARD
Cp05
M06
TIPOLOGÍA DE MESADA
M4 20
TIPOLOGÍA DE MUROS
TIPOLOGÍA DE TABIQUE
C:\Users\beatriz\Documents\2-Transitorio\359 Costos 2012-07-30\en proceso anteproyecto\propuesta sin proyecciones\Concesion Layout l\el-hobbit.jpg
TB 01
TIPOLOGÍA DE CIELORR
CR 01
B1
C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg
C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg
C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg
TIPOLOGIA BARANDA
C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg
MURO A CONSTRUIR MOVIE MURO EXISTENTE MURO A DEMOLER
MOVIE Nuevo Centro Shopping Center New construction (2013) With the construction of a new Shopping Center in the city, it was a chance for the owner to expand the company. The studio had to design the new complex. For this project, I worked on stages 4 and 5. Some of my tasks were: -Develop drawings for construction, such as floor plans, sections, contraction details, etc. (AutoCAD) -Design a pattern for carpets to use in this complex that was later used for all of the other ones. -Monitor construction work in progress to ensure it was the same as specified on our drawings.
0.00
NIVEL DE PISO TERMIN
NIVEL DE CIELORRASO
0.00
NIVEL CARA SUPERIOR NIVEL CARA INFERIOR
A-A
CORTE
NUMERO DE LAMINA
TERMINACIONES
PAVIMENTO 1 2 3 4 5 6
Madera Moquette
Porcelanato 0.60x0.60m Porcelanato 1.20x0.60m Arena y portland lustrado y endurecido Masa niveladora
ZOCALO
CORTE 4-4 Esc 1.100
1 2
Madera pintada Porcelanato h=20cm
PARAMENTO 1 2 3 4 5 6
Revoque enduido pintado Interior Yeso enduido pintado Interior Yeso sellado sin terminación Bloque pintado Silestone Revoque gruso para revestimiento
CIELORRASO 1 2 3 4
Revoque pintado Revoque enduido y pintado Placa de yeso, enduido y pintado Placa de yeso, pintada sin terminación
5.75+ si el mall suprime no se construye
CIELORASO MALL
5.50+
0.40
CORTE 5-5 Esc 1.50
C:\Users\beatriz\Documents\2-Transitorio\359 Costos 2012-07-30\en proceso anteproyecto\propuesta sin proyecciones\Concesion Layout l\el-hobbit.jpg
C:\Users\beatriz\Documents\2-Transitorio\359 Costos 2012-07-30\en proceso anteproyecto\propuesta sin proyecciones\Concesion Layout l\el-hobbit.jpg
3.30+
Arq. Beatriz Testa
REVISIONES REVISIÓN
C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg
C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg
C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg
C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg
C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg
C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg
C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg
C:\Users\beatriz\Pictures\1Pictures\1 cines\1AFICHES-NUEVOS.jpg
UBICACIÓN
Shopping Nuevo
PROPIETARIO
0.00+
OBRA
MOVIE NUEVO ARCHIVO
CORTE 4-4 Esc 1.50
CORTE 3-3 Esc 1.50
PLANO
359 MNC Fachadas Int
CORTES
PLANO
ESC
A
ARCHIVO
MOVIE PORTONES SHOPPING CENTER
2.40
1.73
2.00 0.15
5.60
D
D
0.80
1.00
2.40
3.85
5.95
3.10
5.21
D
2.53
3.15
5.90
5.60
2.05
3.15
D
0.71
4-4
3-3
4.50
1.00
2.02
0.13 0.23
CORTE 1-1
D
4-4
3-3
5-5
Cielo raso placa yeso doble trabada
0.60
D
0.71
Cielo raso acustico 0.61x1.22m
7.37
1.95
0.37
0.67
0.30
0.10
2.15
1.43
1.43
1.43
1.43
5.95
1.82
0.29
1.04
0.10
0.37
1.41
0.10
0.37
2.15
0.10
1.78
2.37
0.37
3.15
0.37
0.32
0.10
2.02
5.19
5.21
5.60
3.70
1.50 1.95
5.90
1.42
2.40
2.45
7.26
5.60
D
1.95
1.43
5.12
0.54 0.10 0.23
9.30
CORTE 2-2
D
19.50
4-4
3-3
5-5
Cielo raso placa yeso doble trabada Cielo raso acustico 0.61x1.22m
0.67
5.95
0.29
1.04
0.37
0.10
0.10
2.15
1.43
1.43
1.43
1.43
1.43
1.75
0.25
9.30
D
D
2.02
CORTE 6-6
3.10
0.37
2.37
0.37
1.78
0.10
0.37
2.15
0.10
1.41
3.15
0.37
5.19
5.21
5.60
3.70
1.50
5.90
2.40
0.71
D
Techo bovedillas
D
0.10
7-7
2-2
6-6
1-1
1-1
6-6
2-2
7-7
9.02
9.02 4.20
4.20
0.45
0.40 1.86
0.90
2.75
0.30
2.02
0.60
D
0.45
0.70 4.16
1.26
2.25
2.25
3.15
2.15
2.80
CORTE 5-5
2.87
5.20
Eje de Proyección
4.57
5.60
3.50
0.70
D
1.00
5-5
MOVIE Montevideo Shopping Center Lobby Domination (2017) The company was searching for a more contemporary look for all their complexes and decided to star with this one. For this project, I was involved through stages 240 to 4. Stage 0-2 -Prepare, develop and edit graphic material, such as drawings, photo-montages,etc., for meetings with clients in early stages, using Illustrator, InDesign, Photoshop. Stage 3 - Prepare drawings and documents for construction permits. Polishing the first stages drawings to ensure they meet regulations standards. Stage 4- Prepare technical drawings for construction use in AutoCAD, such as floor plans, sections, details, etc. 4D Projection Room (2018) The first of its kind in Uruguay. The studio was in charge of the design and construction. I worked on stages 0-4, performing the following tasks. Stage 0-2 -Prepare, develop and edit graphic material, for meetings with clients in early stages, using Illustrator, InDesign, Photoshop. Stage 3 - Prepare drawings and documents for construction permits. Polishing the first stages drawings to ensure they meet regulations standards. Stage 4- Prepare technical drawings for construction use in AutoCAD, such as floor plans, sections, details, etc. MOVIE Portones Shopping Center 4D Projection Room (2017) -Develop drawings for construction, such as floor plans, sections, contraction details, etc. (AutoCAD) MOVIE Punta Carretas Shopping Center Lobby Renovation (2018) -Develop drawings for construction, such as floor plans, sections, contraction details, etc.
Cortes
MOVIE MONTEVIDEO SHOPPING CENTER 4D PROJECTION ROOM
UBICACIÓN
Av. LUIS A. HERRERA 1290
PROPIETARIO
JELSI S.A.
OBRA
SALA 4D ARCHIVO
Tamaño A3
373-MS 4D-Xref 2018 07 20.dwg
PLANO
SECTOR
PLANTA ESCALA
PLANO
ABRIL 2018
UBICACIÓN
1:50
LAMINA
MS.Al-1
Av. LUIS A. HERRERA 1290
PROPIETARIO
JELSI S.A.
OBRA
SALA 4D ARCHIVO PLANO
SECTOR
PLANTA ESCALA
PLANO
ABRIL 2018
UBICACIÓN
Tamaño A3
373-MS 4D-Xref 2018 07 20.dwg
LAMINA
MS.E-1
1:100
Av. LUIS A. HERRERA 1290
PROPIETARIO
25
JELSI S.A.
OBRA
SALA 4D UBICACIÓN PLANO
ESCALA
ABRIL 2018
ARCHIVO
1:100
SALA 4D
SALA 4D ARCHIVO
A
PLANO
MS.Al-2 Tamaño A3
SECTOR
ESCALA
PLANO
ABRIL 2018
1:100
A
LAMINA
MS.Al-2
SECTOR
PLANTA ESCALA
ABRIL 2018
373-MS 4D-Xref 2018 07 20.dwg
Tamaño A3
373-MS 4D-Xref 2018 07 20.dwg
PLANO
LAMINA
CORTES
JELSI S.A.
OBRA
SECTOR
CORTES JELSI S.A.
PLANO OBRA
Av. LUIS A. HERRERA 1290
PROPIETARIO
Av. LUIS A. HERRERA 1290
PROPIETARIO
PLANO
UBICACIÓN
Tamaño A3
373-MS 4D-Xref 2018 07 20.dwg
180
LOBBY DOMINATION
ARCHIVO
1:100
LAMINA
MS.E-2
PLANTA BAJA 1:250
SOCIAL HOUSING / OLD TOWN, MONTEVIDEO, URUGUAY
FOURTH YEAR STUDIO S2 - DESIGN STUDIO SCHEPS
Unidades plante tanto jóvenes c mayores. Banda las circulaciones toda la fachada living-comedor y
The site for this studio project is located on the limit of the old town urban trace, and the begging of new city. The point where both traces merge generates an empty space. Our aim, with my project partner, was to work on this void, placing our housing project there, not as an element, but also creating guidelines for a master plan, designing the public space inside the project and extending it to the city
Unidades plante familiares de 3 planta baja se o espacios comun planta alta se e espacios más ín
El terreno está comprendido entre el limite que delimita la traza de la ciudad vieja, y el límite delimitado por la ciudad nueva, generando un punto particular en la ciudad, donde estas dos directrices generan un vacio en el terreno. El proyecto de vivienda colectiva no es pensado para ser colocado en el lugar como un objeto aislado sino que tiene un carácter de master plan , incorporando el espacio publico dentro de los edificios, y diseñando todo el espacio público como uno solo continuo, y al servicio del barrio y de los usuarios del complejo de viviendas.
El terreno está comprendido entre el limite que delimita la traza de la ciudad vieja, y el límite delimitado por la ciudad nueva, generando un punto particular en la ciudad, donde estas dos directrices generan un vacio en el terreno. El proyecto de vivienda colectiva no es pensado para ser colocado en el lugar como un objeto aislado sino que tiene un carácter de master plan , incorporando el espacio publico dentro de los edificios, y diseñando todo el espacio público como uno solo continuo, y al servicio del barrio y de los usuarios del complejo de viviendas. NIVEL 1 1:500
NIVEL 2 -3 1:500
Unidades plante familiares más a mediante una ci separa la zona i de la zona socia ubican en los ex aprovechando s
Puerto de Montevideo
Puerto de Montevideo Plazoleta de las Bóvedas
Rambla Franklin D. Roosvelt
MONTEVIDEO
Plazoleta de las Bóvedas
NEW WAYS OF LIVING The project goal is to allow different types of users to coexist peacefully on the same site, creating bonds between them. To achieve this we implemented the following strategies.
Rambla Franklin D. Roosvelt
Plaza Pública (Actualmente sede de la Terminal Ciudadela)
El terreno está comprendido entre el limite que delimita la traza de la ciudad vieja, y el límite delimitado por la ciudad nueva, generando un punto particular en la ciudad, donde estas dos directrices generan un vacio en el terreno. El proyecto de vivienda colectiva no es pensado para ser colocado en el lugar como un objeto aislado sino que tiene un carácter de master plan , Plaza Pública sedede de los edificios, y diseñando todo el espacio público como uno solo continuo, y al servicio del barrio y de los usuarios del complejo de viviendas. incorporando el espacio (Actualmente publico dentro
Parque Portuario
ZONING
THE PLATFORM
Zona ampliada
Parque Portuario
THE TOWERS
El edificio se recuesta sobre la calle Cerro Largo y Florida, liberandoElunproyecto gran espacio al servicio del público lineal de la rambla. Trabaja buscapúblico continuar el espacio barrio. Por la calle Cerro Largo físico se encuentran los mismo, integrandolo en su planta inferior, y como remate y visual del accesos peatonales y vehiculares al complejo. mediante un quiebre en la manzana mas pequeña, permite la continuidad de la Las calles Ciudadela y otra generada por ely proyecto, plaza, sin fragmentarla, así leerla locomo una gran plaza continua, en donde atraviesaan transversalmente ñeste el proyecto sehaciéndolo acomodaaarmonicamente permeable y accesible a las personas externas al complejo.
Plazuela
El proyecto busca mediante las conexiones entre los bloques habitacionales y los programas complementarios, y mediante las relaciones entre los distintos tipos de usuarios, una nueva forma de habitar, generando una gradación desde los espacios mas privados e intimos, hasta la plaza pública, con matices entre ellos.
1
2
3
ZONA 2
ZONA 3
Es el remate del espacio publico lineal que existe sobre la rambla, invadiendo el nivel inferior del edificio y conteniendo "burbujas" de programas complementarios.
Parking del edificio, espacialmente continuo a la zona 2, generando grandes espacios libres y dándole flexibilidad de uso.
ZONA 1 Pulmón verde que funciona como filtro entre el puerto y el tránsito de la rambla con el proyecto, éste delimita la plaza pública.
7 Local comercial tipo isla
10 Plaza seca
2 Biblioteca
5 Sala de exposiciones
8 Paseo petonal
11 Lavadero de autos
3 Cafetería
6 Estacionam. bicis
9 Parque verde
12 Rampa
16 Lucernario sobre biblioteca
19 Sector común estudiantes
Plazuela
PLANTA DE UBICACION 1:2000
ZONA 3 Parking del edificio, espacialmente continuo a la zona 2, generando grandes espacios libres y dándole Plaza Pública flexibilidad de uso. (Actualmente sede de la Terminal Ciudadela)
PLATAFORMA
TORRES
La plataforma funciona como nexo entre el nivel
Las torres emplazadas sobre la plataforma buscan una separación generosa entre ellas sin impedir el cambio de densidad propuesto. Las plantas bajas estan ocupadas por programas complementarios de las viviendas, por viviendas para estudiantes, o por viviendas tradicionales, acomodandose a los huecos de la plataforma para separar las viviendas del espacio común.
donde se encuentra el parking y los NIVEL rambla, 4 1:500
programas complementarios, con el nivel de
Cada torre e de program
THE MASTER PLAN Zona ampliada
El edificio se recuesta sobre la calle Cerro Largo y Florida, liberando un gran espacio público al servicio del barrio. Por la calle Cerro Largo se encuentran los accesos peatonales y vehiculares al complejo. Otro de los objetivos del proyectoPlazuela es alterar la densidad existente del barrio, y aumentarla pero sin perder la calidad del habitar. Para lograr esto las torres intentan buscar una Las calles Ciudadela y otra generada por el proyecto, lo relacion de altura y separación entre ellas que permita alcanzar un significativo numero de viviendas pero sin perder espacios comunes de buena calidad ni intimidad en cada unidad. atraviesaan transversalmente haciéndolo a ñeste permeable y accesible a las personas externas al complejo.
D
PLANTA DE UBICACION 1:2000
NUEVOS MODOS DE HABITAR
El proyecto busca mediante las conexiones entre los bloques habitacionales y los programas complementarios, y mediante las relaciones entre los distintos tipos de usuarios, una nueva forma de habitar, generando una gradación desde los espacios mas privados e intimos, hasta la plaza pública, con matices entre ellos.
21 Gym
ZONA 2
ZONA 3
Es el remate del espacio publico lineal que existe sobre la rambla, invadiendo el nivel inferior del edificio y conteniendo "burbujas" de programas complementarios.
Parking del edificio, espacialmente continuo a la zona 2, generando grandes espacios libres y dándole flexibilidad de uso. CORTE 1-1
1:500
ZONA 1 Pulmón verde que funciona como filtro entre el puerto y el tránsito de la rambla con el proyecto, éste delimita la plaza pública.
PLATAFORMA
TORRES
La plataforma funciona como nexo entre el nivel rambla, donde se encuentra el parking y los programas complementarios, con el nivel de vivienda. Se conecta espacialmente y visualmente mediante huecos que permiten el ingreso de luz solar al nivel inferior. La plataforma permite también, una gradación de espacio publico, generando lugares comúnes sobre ella para uso de los usuarios de las viviendas.
Las torres emplazadas sobre la plataforma buscan una separación generosa entre ellas sin impedir el cambio de densidad propuesto. Las plantas bajas estan ocupadas por programas complementarios de las viviendas, por viviendas para estudiantes, o por viviendas tradicionales, acomodandose a los huecos de la plataforma para separar las viviendas del espacio común.
SECTION
FACHADA RAMBLA CORTE 1:5001-1 1:500
1 Parking
4 Expansión cafetería
7 Local comercial tipo isla
10 Plaza seca
2 Biblioteca
5 Sala de exposiciones
8 Paseo petonal
11 Lavadero de autos
3 Cafetería
6 Estacionam. bicis
9 Parque verde
12 Rampa
1
NUEVAS DENSIDADES
Otro de los objetivos del proyecto es alterar la densidad existente del barrio, y aumentarla pero sin perder la calidad del habitar. Para lograr esto las torres intentan buscar una NUEVOS MOD relacion de altura y separación entre ellas que permita alcanzar un significativo numero de viviendas pero sin perder espacios comunes de buena calidad ni intimidad en cada unidad. El proyecto bus conexiones ent habitacionales y complementari relaciones entr tipos de usuari SE forma de habita TI gradación desd privados e intim pública, con ma
15
10
16
NIVEL 5 1:500
NUEVAS DENSIDADES
17 Lucernario sala de exposiciones 20 Seguridad 18 Zona deportiva
Las torres emplazadas sobre la plataforma buscan una separación generosa entre ellas sin impedir el cambio de densidad propuesto. Las plantas bajas estan ocupadas por programas ZONA 2 complementarios de las viviendas, por viviendas Es el remate del espacio para publico estudiantes, o por viviendas tradicionales, acomodandose lineal que existe sobre la rambla, a los huecos de la plataforma para separar invadiendo el nivel inferior del las viviendas del espacio común.
edificio y conteniendo "burbujas" complementarios, y mediante las vivienda. Se conecta espacialmente y de programas complementarios. relaciones entre los distintos visualmente mediante huecos que permiten el ingreso de luz solar al nivel inferior. La plataforma tipos de usuarios, una nueva ZONA 1 permite también, una gradación de espacio forma de habitar, generando una PulmónParque verde Portuario que funciona como filtro entre publico, generando lugares comúnes sobre ella gradación desde los espacios mas el puerto y el tránsito de la rambla con el para uso de los usuarios de las viviendas. e intimos, hasta la plaza proyecto, éste delimita la plaza pública. El proyecto busca continuar el espacio público lineal de la rambla. Trabaja NUEVASprivados DENSIDADES pública, con matices entre ellos. remate y visual del mismo, integrandolo en subuscar plantauna inferior, y Otro de los objetivos del proyecto es alterar la densidad existente del barrio, y aumentarla pero sin perdercomo la calidad del físico habitar. Para lograr esto las torres intentan quiebrecomunes en la manzana pequeña, permite continuidad relacion de altura y separación entre ellas que permita alcanzar un significativo numero de viviendas pero mediante sin perder un espacios de buenamas calidad ni intimidad en la cada unidad. de la plaza, sin fragmentarla, y así leerla como una gran plaza continua, en donde el proyecto se acomoda armonicamente
1-1
4 Expansión cafetería
Zona ampliada
El edificio se recuesta sobre la calle Cerro Largo y Florida, liberando un gran espacio público al servicio del barrio. Por la calle Cerro Largo se encuentran los accesos peatonales y vehiculares al complejo. Rambla Franklin D. Roosvelt Las calles Ciudadela y otra generada por el proyecto, lo atraviesaan transversalmente haciéndolo a ñeste permeable y accesible a las personas externas al complejo.
TORRES
La plataforma funciona como nexo entre el nivel MARTINA LEON rambla, donde se encuentra el parking y los programas complementarios, con el nivel de vivienda. Se conecta espacialmenteNUEVOS y MODOS DE HABITAR visualmente mediante huecos que permiten el El proyecto busca mediante las ingreso de luz solar al nivel inferior. La plataforma entre los bloques permite también, una gradación deconexiones espacio publico, generando lugares comúnes sobre ella habitacionales y los programas para uso de los usuarios de las viviendas.
ZONING - First on the site we defined 3 different zones. 1 - A green area that operates as a filter between the project and the urban traffic. It is a public space for all the city. 2 - The limit between the public space and the housing project. It is a semipublic space that contains additional program bubbles for the users. 3 - An extension of zone 2 that also provides parking area, but it is 26flexible in terms of use. 1 Parking
FACUNDO LABORDE
PLATAFORMA
Puerto de Montevideo
PLANTA DE UBICACION 1:2000
Plazoleta de las Bóvedas
NUEVOS MODOS DE HABITAR
THE SITE
la Terminal Ciudadela)
El proyecto busca continuar el espacio público lineal de la rambla. Trabaja como remate físico y visual del mismo, integrandolo en su planta inferior, y mediante un quiebre en la manzana mas pequeña, permite la continuidad de la plaza, sin fragmentarla, y así leerla como una gran plaza continua, en donde el proyecto se acomoda armonicamente
9
19 8
CORTE 1-1 1:500
16 Lucernario sobre biblioteca 2-2
19 Sector común estudiantes
1-1
14 17 Lucernario sala de exposiciones 20 Seguridad 21 Gym
18 Zona deportiva
1 Parking
4 Expansión cafetería
7 Local comercial tipo isla
10 Plaza seca
2 Biblioteca
5 Sala de exposiciones
8 Paseo petonal
11 Lavadero 9 de autos
3 Cafetería
6 Estacionam. bicis
9 Parque verde
12 Rampa
9
8
15 2-2
10
6 3
10
16
19 5
2
14
7
1 Acceso a plataforma
4 Plataforma principal
7 Espacio común estudiantes 10 Lavadero común estudiantes
2 Acceso por rampa
5 Food Market
3 Acceso vehicular 12
6 Vivienda encargado
8 Expansión espacio común 10 9 Cocina común estudiantes
11
Escalera hacia biblioteca/ segundo nivel estudiantes
12 SUM
13 Expansión SUM
16 Lucernario sobre biblioteca
19 Sector común estudiantes
1-1
12
8
SECTION
14 Rampa hacia niv. rambla 17 Lucernario sala de exposiciones 20 Seguridad 15 Paseo peatonal
6
CORTE 2-2 1:250
21 Gym
18 Zona deportiva
1 Parking
2 Biblioteca 3 Cafetería
3 9
15
20 4
9
8 5
2
7
2-2
10
16
4
19 4
8 1
14
13
21
12
11
10
12
6
17
THE PLATFORM - We covered zone 2 with a platform, meant only for the residents use. It is a leisure space. It is visually and physically connected with zone 2 by ramps and big openings that provide sunlight to the lower level. 1 DORMITORIO 45.2 m2 THE TOWERS - We positioned the towers with generous space in between them, but still achieving the aimed population density. On the lower levels, we placed student housing and DÚPLEX - 2 DORMITORIOS 45.2 m2 complementary programs. We ensured to place the apartments on the platform level, next to the opening to ensure they had privacy. 20
BAJA 1:250
3
2-2
NIVEL RAMBLA 1:250
2
1 5
1
11
9
3
2
2-2
11
Vistas desde arriba de la plataforma y desde abajo de la misma 7
10
8
1-1
4
PLANTA BAJA 1:250
EL 2 -3 1:500
Unidades planteadas para parejas tanto jóvenes como para adultos mayores. Banda de servicios hacia las circulaciones centrales liberando 1 la fachada para el toda living-comedor y el dormitorio.
1 11
1 DORMITORIO
3 DORMITORIOS
4
45.2 m2
21
5 Unidades planteadas para parejas tanto jóvenes como para adultos mayores. Banda de servicios hacia las circulaciones centrales liberando toda la fachada para el living-comedor y el dormitorio.
PLANTA BAJA 1:250
Unidades planteadas para grupos familiares de 3 o 4 personas. La planta baja se ordena mediante los espacios comunes, mientras en planta alta se encuentran los espacios más íntimos.
Vistas desde arriba de la plataforma y desde abajo de la misma
NIVEL RAMBLA 1:250
7
20
1-1
2
9
18
6
DÚPLEX - 2 DORMITORIOS
45.2 m2
45.2 m2 3
Unidades planteadas para grupos familiares de 3 o 4 personas. La planta baja se ordena mediante los espacios comunes, mientras en planta alta se encuentran los espacios más íntimos.
Unidades planteadas para grupos familiares más amplios. Se accede mediante una circulación que separa la zona intima de la vivienda de la zona social. Las unidades se ubican en los extremos de las torres aprovechando sus tres fachadas .
SIMPLE
Unidades planteadas para parejas tanto jóvenes como para adultos mayores. Banda de servicios hacia
Vistas desde arriba de la plataforma y desde abajo de la misma
NIVEL RAMBLA 1:250
1 DORMITORIO
45.2 m2
3 DORMITORIOS
45.2 m2
2
1
1-1
21
3
4
GROUND LEVEL PLANTA BAJA 1:250
ZONA DE ESTUDIANTES TIPOLOGIAS ALTERNATIVAS
12
27
NIVEL 4 1:500
NIVEL 5 1:500
Cada torre esta conformada por todas las distintas tipologias, haciendo q en cada una de ellas convivan los diferentes usuarios. Existen espacios de programas complementarios especificos para un tipio de usuario y otros en donde todos los habitantes se encuentran
DÚPLEX
FACHADA RAMBLA 1:500
SECTION
1 DORMITORIO
+19.13 m
+13.92 m
LEVEL 1 SECTOR ESTUDIANTES TIPOLOGÍAS ALTERNATIVAS
DUPLEX
1 BEDROOM
CORTE 2-2 1:250
+ 8.70 m
CORTE 2-2 1:100
LEVEL 2-3
STUDENT HOUSING
LEVEL 4
28
SECTION
LEVEL 5
STUDENT HOUSING - Located on the lowers levels of the towers and with a direct link to the entrance, the flow of people and zone 2. We propose 3 different type of layouts, that contain space for sleeping, studying and a bathroom. There are common areas for other activities.
CONVENTIONAL UNITS - This more conventional units are though for small and bigger, families. For single people, for young and couples and even for the elderly. All units have an efficient layout that allows for privacy and comfortable common areas. All of them have a green balcony, providing connection to the exterior.
SINGLE
1 BEDROOM
DOUBLE
2 BEDROOM
QUADRUPLE
3 BEDROOM
FACADE SYSTEM
29
ESAC / BARRIO SUR, MONTEVIDEO, URUGUAY
FOURTH YEAR STUDIO S1 - DESIGN STUDIO SCHEPS
ESAC is a building that provides cultural and sports infrastructure for the neighborhood and the city. The site given to us for this project is on the limit of Barrio Sur and la rambla of Montevideo. BARRIO SUR
PUBLIC PLATFORM
THE SITE
BARRIO SUR - is a consolidated neighborhood in Montevideo. It is one of the most traditional and reflects the cultural history of the city. It limits with the Rambla, a promenade that links the whole coast of the city. Making it a very accesible site. PUBLIC PLATFORM - The first strategy my partner and I decide to apply is to create a public platform that through ramps connects the neighborhood with the Rambla.
ESAC ESAC BARRIO BARRIO SUR SUR
PLATAFORMA PLATAFORMA PUBLICA PUBLICA
VOLUMETRIA VOLUMETRIA
El proyecto El proyecto se emplaza se emplaza en un terreno en un terreno singular, singular, una zona unafiltro zonadonde filtro donde Mediante Mediante una plataforma una plataforma publicapublica en base enabase rampas a rampas se conectan se conectan los los El edificio El edificio posee posee una volumetría una volumetría particular. particular. Esta esEsta generada es generada encontramos encontramos el dinamismo el dinamismo de la rambla de la rambla como espacio como espacio integrador integrador de de accesos, accesos, funciona funciona como un como áreaundeárea circulación de circulación que seque agrega se agrega a la a la mediante mediante la adición la adición de dosde volumenes dos volumenes principales. principales. toda latoda ciudad la ciudad junto aljunto Barrio al Barrio Sur, unSur, barrio un con barrio raíces con raíces muy muy ciudad,ciudad, un nuevo un nuevo recorrido recorrido para elpara barrio el en barrio medio en medio de un espacio de un espacioEl auditorio El auditorio cerradocerrado junto con junto uncon foyer unvidriado foyer vidriado que genera que genera un un arraigadas. arraigadas. publicopublico disfrutable disfrutable para todo paraeltodo que el pase quepor pase allí.por allí. volumen volumen con una con gran unapendiente gran pendiente inferiorinferior mas unmas volumen un volumen cultural, cultural, educativo educativo y gastronómico y gastronómico de tresde niveles tres niveles y que contiene y que contiene De esta Deforma, esta forma, el ESAC el ESAC nace como nace un como vinculo un vinculo de conexión de conexión fluida fluida En estaEnsituación esta situación posteriormente posteriormente se prevé se una prevé zonificación una zonificación de la de la una cubierta una cubierta inclinada. inclinada. entre estas entre diferencias, estas diferencias, un espacio un espacio integrador integrador utilizado utilizado tanto por tanto lospor losplataforma plataforma en áreas en de áreas estar, de abiertas estar, abiertas o cerradas, o cerradas, de de habitantes habitantes del barrio del como barrio por como toda porlatoda ciudad la ciudad pararealizar pararealizar diversas diversascirculación,áreas circulación,áreas verdesverdes y hastay un hasta parque un parque de esculturas.A de esculturas.A su vezsu vez A esta A gran estapieza gran total piezasetotal le sustrae se le sustrae dos partes dos partes creando creando así unaasí una actividades actividades se planifica se planifica el equipamiento el equipamiento necesario necesario para estas para áreas, estas áreas, como como terrazaterraza y una salida y una a salida la cubierta, a la cubierta, ademas ademas de dosde grandes dos grandes bancosbancos de hormigón, de hormigón, u otros.u otros. entradas entradas de luz de luz CIRCULACIONES CIRCULACIONES : :
BARRIO BARRIO
ESAC
ESAC
THE VOLUME
CIRCULACION CIRCULACION PRINCIPAL PRINCIPAL GREEN PLANTED ROOF
DEPORTEDEPORTE AREA DE AREA APOYO DE APOYO AREA TOTAL AREA TERRENO TOTAL TERRENO
DebidoDebido a una comparación a una comparación de alturas de alturas entre elentre EsacelyEsac los edificios y los edificios circundantes circundantes la cubierta la cubierta es pensada es pensada como una como quinta una quinta fachada. fachada. De este Demodo este se modo creaseuna crea cubierta una cubierta inclinada inclinada verde, verde, una cubierta una cubierta de cesped de cesped a la cual a la elcual visitante el visitante puede puede llegar mediante llegar mediante un acceso, un acceso, una escalera una escalera ubicada ubicada en el segundo en el segundo nivel. nivel. Asi el visitante Asi el visitante puede puede aprovechar aprovechar un granunespacio gran espacio delimitado delimitado donde donde poder estar podertranquilo estar tranquilo y disfutar y disfutar de las de vistas las que vistas regala que regala el paisaje el paisaje circundante circundante TERRAZAS TERRAZAS El edificio El edificio contiene contiene dos terrazas, dos terrazas, una privada una privada y publica y publica con con accesos accesos a la cubierta a la cubierta verde. verde. El acceso El acceso a la cubierta a la cubierta posee posee una serie unade serie gradas de gradas de estar dealestar aire al aire libre y libre es precedido y es precedido por un por espacio un espacio abiertoabierto con piso con depiso vidrio de vidrio donde donde se disfruta se disfruta de las de distintas las distintas visuales visuales exteriores exteriores del lugar delylugar al y al mismomismo tiempotiempo se convive se convive con el con interior. el interior. En esteEnespacio este espacio tambien tambien puede puede generarse generarse una expansion una expansion exteriorexterior del comedor. del comedor.
RAMBLA RAMBLA
OCIO Y CULTURA OCIO Y CULTURA
CUBIERTA CUBIERTA VERDE VERDE
A su vez, A su elvez, áreaeladministrativa área administrativa posee posee una terraza, una terraza, un espacio un espacio de de estar aestar cieloaabierto cielo abierto el cualel puede cual puede utilizarse utilizarse como expansion como expansion de de las oficinas las oficinas privadas. privadas.
FACHADA FACHADA
Recorre Recorre todo eltodo edificio el edificio tanto vertical tanto vertical Las fachadas Las fachadas se estructuran se estructuran mediante mediante un muro uncortina muro cortina que genera que genera una una como horizontalmente como horizontalmente y se convierte y se convierte granplao granplao vidriado vidriado logrando logrando aprovechar aprovechar las vistas las del vistas paisaje del paisaje exterior. exterior. asi en asi un espacio en un espacio integrador integrador de todode todo Ademas, Ademas, una piel, una malla piel, microperforada malla microperforada de color deblanco color blanco se coloca se coloca en en el edificio. el edificio. Al recorrerla Al recorrerla el usuario el usuario se se todo eltodo perimetro el perimetro del edificio del edificio cubriendo cubriendo todas las todas fachadas. las fachadas. Esta Esta convierte convierte en espectador en espectador de las de las colocada colocada mediante mediante perfilesperfiles metalicos metalicos separada separada 1 metro1 del metro vidrio del vidrio diversas diversas actividades actividades que suceden que suceden enerando enerando un espacio un espacio para supara facilsu mantenimiento.La facil mantenimiento.La piel metalica piel metalica simultaneamente. simultaneamente. Ademas Ademas proveeprovee una una funciona funciona como filtro comodefiltro la luz deexterior la luz exterior y le concede y le concede al edificio al edificio una una conexion conexion visual de visual todos de los todos niveles los nivelesimagenimagen exteriorexterior homogénea homogénea sin obstaculizar sin obstaculizar las espectaculares las espectaculares vistas vistas con el con hall de el hall acceso. de acceso. exteriores. exteriores. CIRCULACION CIRCULACION DE SERVICIO DE SERVICIO Esta formada Esta formada por unapor escalera una escalera de de incendio, incendio, un ascensor un ascensor y un y un montacargas montacargas que permite que permite abastecer abastecer distintos distintos servicios servicios de forma de directa forma directa como por como ejemplo por ejemplo subir directamente subir directamente a la cocina a la cocina del área delgastronómica área gastronómica o o subir escenografía subir escenografía al auditorio. al auditorio.
ORGANIZACIÓN ORGANIZACIÓN PROGRAMÁTICA PROGRAMÁTICA El complejo El complejo y variado y variado programa programa es organizado es organizado zen 3 sectores. zen 3 sectores.
THE VOLUME - the final volume is created by the addition of two volumes. One the one hand 30the auditorium which slope creates an important access from the Rambla. On the other hand is the other volumes that in 3 level contains, educational, gastronomic and cultural activities. On the underground level we located the sport activities. GREEN PLANTED ROOF - This decision is made taking into consideration, not only sustainability aspects but also the fact that the surrounding buildings are of much greater height. It is created as a landscape, providing an interesting view. Two different terraces provide access for the users to enjoy it. El primero, El primero, subterráneo subterráneo es el sector es el sector deportivo, deportivo, el cualel secual encuentra se encuentra
separado separado de manera de manera de asegurar de asegurar que sus que actividades sus actividades no interfieran no interfieranCUBIERTA VOLUMETRIA VOLUMETRIA CUBIERTA VERDE VERDE con el con resto. el Aresto. pesarA de pesar estar deconectado estar conectado directamente directamente con el con edificio el edificio SERVICIOS SERVICIOS CIRCULACION CIRCULACION - MIRADOR - MIRADOR mediante mediante circulaciones circulaciones verticales, verticales, como escaleras como escaleras ascensores o ascensores Debido pas e conectan se conectan los los El edificio El edificio poseeposee una volumetría una volumetría particular. particular. Esta Esta esogenerada es generada Debido a unaacomparación una comparación de alturas de alturas entreentre el Esac el Esac y los yedificios los edificios cuenta también también con rampas rampas de acceso de acceso directo directo desde desde el Barrio el Barrio Sur y Sur ycircundantes Cada nivel Cadadel nivel edificio del edificio posee posee sus espacios sus espacios de servicio de servicio agrupados agrupados que e agrega se agrega a la a lacuenta Una circulacion Una circulacion que seque repite se en repite todos en todos mediante mediante la adición la adición decon dos de volumenes dos volumenes principales. principales. circundantes la cubierta la cubierta es pensada es pensada como como una quinta una quinta fachada. fachada. la auditorio rambla mediante mediante lajunto plataforma la plataforma publica publica segundo segundo espacio, en en en “cajas” cerradas cerradas con una con altura una menor altura menor a la deacada la deespacio. cada espacio. dio unde espacio un espacio laElrambla los niveles los niveles contra contra la fachada la fachada que daque a daena “cajas” auditorio El cerrado cerrado junto con un con foyer un foyer vidriado vidriado que genera queespacio, genera un un planta planta baja, sobre baja, sobre plataforma la plataforma esinferior un espacio es un espacio donde donde conviven conviven Cajas opacas Cajas opacas blancas blancas se repiten se repiten en todos en los todos niveles los niveles y creany crean la rambla la rambla seinclinada convierte se convierte en ende lugar estar de estar volumen volumen con una conla gran una gran pendiente pendiente inferior mas un mas volumen un volumen De este De modo este modo se crea se una creacubierta una cubierta inclinada verde, verde, unalugar cubierta una cubierta actividades actividades dinámicas, dinámicas, culturales, culturales, gastronómicas, gastronómicas, un espacio espacio en en de cesped singulares singulares que sirven que sirven a espacios a espacios principales principales y los provee y los provee de de y mirador ypuede mirador del paisaje del mediante paisaje exterior. cultural, cultural, educativo educativo y gastronómico y gastronómico de tres deniveles tres niveles y que yun contiene que contiene de cesped a la cual a la el cual visitante el visitante puede llegar llegar mediante un exterior. acceso, un acceso, zonas zonas constante movimiento, movimiento, un plano un que plano recibe que recibe a todosa los todos usuarios los usuarios que queuna escalera baños,baños, depósitos, depósitos, zonas zonas de mantenimiento, de mantenimiento, almacenaje almacenaje o cocinas. o cocinas. onificación ación de la de la constante una cubierta una cubierta inclinada. inclinada. una escalera ubicada ubicada en el en segundo el segundo nivel.nivel. ingresan ingresan por los por tres los accesos. tres accesos. A su vez, A su se vez, accede se accede a estas a áreas estas mediante áreas mediante una circulación una circulación s, de diferenciada diferenciada del resto, del la resto, cualla posee cual posee un ancho un ancho menor menor a las a las uras.A sculturas.A su vez su vez A esta A gran esta gran piezapieza total se total le se sustrae le sustrae dos partes dos partes creando creando así una así una Asi elAsi visitante el visitante puede puede aprovechar aprovechar unCIRCULACIONES gran un gran espacio espacio delimitado delimitado CIRCULACIONES PUNTUALES PUNTUALES tercer Elysector, tercer sector, la parte parte superior del edificio del edificio contiene contiene losgrandes programas los programasdonde circulaciones circulaciones principales. principales. Esta seEsta encuentra se encuentra entre dichas entre dichas cajas cajas as, s áreas, comocomo Elterraza terraza unaysalida una salida a la lasuperior cubierta, a la cubierta, ademas ademas de dos degrandes dos donde poderpoder estar estar tranquilo tranquilo y disfutar y disfutar de lasdevistas las vistas que regala que regala que requieren quede requieren de mas íntimos mas íntimos como la como mediateca, la mediateca, talleres, talleres,el paisaje de servicios de servicios y los espacios y los espacios “servidos” “servidos” para supara fácilsu acceso fácil acceso y y entradas entradas luz deespacios luzde espacios el paisaje circundante circundante Escaleras Escaleras Helicoidales, Helicoidales, unen partes unen partes comedor, comedor, área administrativa área administrativa y auditorio. y auditorio. comunicación comunicación entre ellos. entre ellos. especificas especificas del edificio del edificio una escalera una escalera conecta conecta la parteladeportiva parte deportiva con la con la DebidoDebido a la particular a la particular forma del forma edificio del edificio cada uno cada deuno estos de estos TERRAZAS TERRAZAS planta planta baja cultural baja cultural y la otra y la une otra la une la espacios espacios es de carácter es de carácter singular singular y se comunican y se comunican mediante mediante mediateca mediateca con el con segundo el segundo nivel. nivel. huecoshuecos o espacios o espacios de conexión de conexión visual visual El edificio El edificio contiene contiene dos terrazas, dos terrazas, una privada una privada y publica y publica con con accesos accesos a la cubierta a la cubierta verde. verde.
RINCIPAL IPAL
El acceso El acceso a la cubierta a la cubierta poseeposee una serie una serie de gradas de gradas de estar de estar al aireal aire libre ylibre es precedido y es precedido por un por espacio un espacio abierto abierto con piso con de piso vidrio de vidrio donde donde se disfruta se disfruta de lasdedistintas las distintas visuales visuales exteriores exteriores del lugar del lugar y al y al mismo mismo tiempo tiempo se convive se convive con elcon interior. el interior. En este En espacio este espacio tambien tambien puede puede generarse generarse una expansion una expansion exterior exterior del comedor. del comedor. A su vez, A su el vez, área el área administrativa administrativa poseeposee una terraza, una terraza, un espacio un espacio de de estar estar a cielo a cielo abierto abierto el cual el puede cual puede utilizarse utilizarse comocomo expansion expansion de de las oficinas las oficinas privadas. privadas.
FACHADA FACHADA
ificio tanto tanto vertical verticalLas fachadas Las fachadas se estructuran se estructuran mediante mediante un muro un muro cortina cortina que genera que genera una una yente se convierte y se conviertegranplao granplao vidriado vidriado logrando logrando aprovechar aprovechar las vistas las vistas del paisaje del paisaje exterior. exterior. rador integrador de todo de todoAdemas, Ademas, una piel, una malla piel, malla microperforada microperforada de color de color blanco blanco se coloca se coloca en en rerla el usuario el usuario se setodo el todo perimetro el perimetro del edificio del edificio cubriendo cubriendo todastodas las fachadas. las fachadas. Esta Esta ctador r de lasde las colocada colocada mediante mediante perfiles perfiles metalicos metalicos separada separada 1 metro 1 metro del vidrio del vidrio es e suceden que suceden enerando enerando un espacio un espacio para para su facil su mantenimiento.La facil mantenimiento.La piel metalica piel metalica mas Ademas provee provee una una funciona funciona comocomo filtro de filtro la de luzlaexterior luz exterior y le concede y le concede al edificio al edificio una una stodos los niveles los niveles imagen imagen exterior exterior homogénea homogénea sin obstaculizar sin obstaculizar las espectaculares las espectaculares vistasvistas eso. exteriores. exteriores.
E RVICIO SERVICIO
una scalera escalera de de nsor un y un permite te abastecer abastecer rma de forma directa directa subir directamente directamente stronómica a gastronómica o o uditorio. al auditorio.
MIRADOR DOR
GROUND LEVEL
SERVICIOS SERVICIOS
CadaCada nivel nivel del edificio del edificio poseeposee sus espacios sus espacios de servicio de servicio agrupados agrupados repite e se repite en todos en todos en “cajas” cerradas cerradas con una conaltura una altura menor menor a la de a la cada de cada espacio. espacio. hada a fachada que da que a da en a “cajas” CajasCajas opacas opacas blancas blancas se repiten se repiten en todos en todos los niveles los niveles y crean y crean en erte lugar en lugar de estar de estar zonaszonas singulares singulares que sirven que sirven a espacios a espacios principales principales y los yprovee los provee de de aje terior. exterior. baños, baños, depósitos, depósitos, zonaszonas de mantenimiento, de mantenimiento, almacenaje almacenaje o cocinas. o cocinas. A su vez, A su se vez, accede se accede a estas a estas áreasáreas mediante mediante una circulación una circulación diferenciada diferenciada del resto, del resto, la cual la posee cual posee un ancho un ancho menor menor a las a las S NTUALES PUNTUALES circulaciones circulaciones principales. principales. Esta Esta se encuentra se encuentra entreentre dichas dichas cajascajas de servicios de servicios y los yespacios los espacios “servidos” “servidos” para para su fácil su acceso fácil acceso y y dales, unen unen partes partes comunicación comunicación entreentre ellos.ellos. ificio una escalera una escalera eportiva iva con lacon la alotra y laune otralaune la ndo segundo nivel.nivel.
SECTION
SECTION LEVEL -1
LEVEL 1
LEVEL 2
LEVEL 3
SECTION
31
COLLECTIVE HOUSING / BARRIO SUR, MONTEVIDEO, URUGUAY
THIRD YEAR STUDIO S2 - DESIGN STUDIO SCHEPS
For this studio we were asked to design a collective housing building on an already consolidated part of our city. Taking advantage of all the city services that were already provided. Our approach to this task was not to design a finished building. We took inspiration from Yona Friedman’s Spatial City. Our aim was to provide a support structure, and a set of rules, into which the future user could build or take down according to necessities. Therefore we proposed a basic module that can work independently or associated with others. The basic module is divides in 3 parts. SERVANT SPACES FREE SPACE DIVISION / STORAGE
32
FREE SPACE - These would be the living space, the space that guest can see, a free space the user can define as wished and for whatever purpose. DIVISION/STORAGE - The storage/ division wall. It divides the services from the free space providing an area for storage, etc. SERVANT SPACES- Here we find basic services such as kitchen, bathroom, and vertical circulation elements. EXAMPLE OF MODULE ASSOCIATIONS
SUPPORT STRUCTURE
SECTION
-------------------------------
NGUYEN GOMENSORO FERNANDA RIOS MARIANA DUTINÉ
A. LUCIA BARREIRO ARTINA LEON ----------------------------
NGUYEN GOMENSORO FERNANDA RIOS MARIANA DUTINÉ
CARLOS GUTIERREZ RUIZ
A
A
CARLOS GUTIERREZ RUIZ
33
CARLOS GUTIERREZ RUIZ
A
CARLOS GUTIERREZ RUIZ
A
A
A
CARLOS GUTIERREZ RUIZ
CARLOS GUTIERREZ RUIZ
NIVEL 1.1
A
NIVEL 1.0
A
A
A
NIVEL 0.1
NIVEL 0.0
A
A
PUBLIC LIBRARY / OLD TOWN, MONTEVIDEO, URUGUAY
THIRD YEAR STUDIO S1 - DESIGN STUDIO SCHEPS
For this exercise we were asked to design a public library on a very particular site. We understood this site as a merging point between to realities. The industrial city and the colonial city. The old town edge is right where the industrial NIVEL 1 - 1:250 port of the city begins. For our design we took inspiration from the containers that are constantly arriving and leaving the port. Introducing a public open building which structure works like a container. It reflects NIVEL 0 - 1:250 the original foundational vocation of the city as a port city.
NIVEL 1 - 1:25 PLANTA TECHO 1:250
LEVEL -1 NIVEL -1 - 1:250
NIVEL 1 - 1:250
CORTE A-A 1:250
CORTE C-C 1:250
GROUND LEVEL NIVEL 0 - 1:250
NIVEL -1 - 1:250
Given the fact that the project is located on a public space we imagined our project as the continuity of it , generating a continuous surface. After we covered it with a box, the container, which was the one that held the library’s archive, and administrative offices. By doing this we achieved a project that was a lot more than covered meeting B-B 1:250 34a library. It was a public, safe,CORTE place, that could also work as a library.
NIVEL 0 - 1:25
NIVEL 0 - 1:250
FACHADA PIEDRAS 1:250
FACHADA PLAZA 1:250
CORTE A-A 1:2 CORTE C-C 1:250
CORTE A-A 1:250
LEVEL 1 01 EXISTING WALL / PUBLIC FLOW
NIVEL 1 - 1:25
VERTICAL CONNECTION
CORTE A-A 1:250
SECTION 02 THE CONTAINER
HORIZONTAL CONNECTION SERVANTS SPACES CORTE B-B 1:250
FACADE
CORTE B-B 1:2 FACHADA PLAZA 1:250
FACHADA PIEDRAS 1:250
SECTION
CORTE B-B 1:250
PARTE DEL ARCHIVO ESTARA EN EL NIVEL INFERIOR CONTENIDO EN KIOSKOS IMITANDO PUESTOS CALLEJEROS QUE PODRAN SE ABRIR O CERRAR DEPENDIENDO DEL HORARIO.
03 THE PROGRAM PRIVATE AREAS
PUBLIC AREA
CORTINAS DE ENROLLAR METALICAS PERMITIRAN EL CIERRE DEL EDIFICIO EL CUAL SERA SOLO POR MOTIVOS DE SEGURIDAD PERMITIENDO QUE MIENTRAS EL EDIFICIO ESTE ACTIVO FUNCIONO COMO UN ESPACIO TOTALMENTE PUBLICO Y ACCESIBLE
UNA PIEL METALICA CERRARA EL NIVEL SUPERIOR AL EXTERIOR, SIEMPRE RECORDANDO EL CARACTER INDUSTRIAL DE LA ZONA VIGAS VIERENDEL VAN DE MEDIANERA A MEDIANERA ESTRUCTURANDO Y MODULANDO TANTO EL ESPACIO SUPERIOR COMO EL INFERIOR
TENSORES DE ACERO DELIMITARAN ESPACIOS DE CRCULACION Y DE CONEXION CON EL INFERIOR EN EL NIVEL SUPERIOR CREANDO UN ESPACIO VISUALMENTE CONECTADO Y DANDOLE UN CARACTER INDUSTRIAL
NIVEL 0 - 1:25 EL CERRAMIENTO DEL TECHO SUPERIOR CONSISTIRA DE PANELES OPACOS O TRANSPARENTES DEPENDIENDO DE LA ACIVIDAD QUE SUCEDA DEBAJO
LOS SERVICIOS QUE SEAN NECESARIOS PARA EL NIVEL 0 DEL EDIFICIO SERAN ALBERGADOS EN CONTENEDORES, QUE PUEDEN SER FIJOS, COMO LOS SSHH O PODRAN SER DESMONTABLES, FUNCIONANDO COMO KIOSKOS DENTRO DE ESTE ESPACIO PUBLICO.
CORTE
LAS VIGAS VIERENDEL Y LA ESTRUCTURA METALICA DEL TECHO PERMITIRAN COLGAR DE ESTA LA ESCENOGRAFIA NECESARIA PARA EL ESPACIO INFERIOR. ESTO INCLUIRA DESDE LUMINARIAS HASTA PERMITARA EXPOSICIONES COLGANTES
SEMI-PUBLIC AREA
CORTE A-A 1:2
35
HOUSE / NEIGHBORHOOD The exercise aimed for students to design a house for a family in a given site. Taking into consideration daily activities and the relationships between the members. Also taking into account the inside and outside space that make a house and the neighborhood it is implanted on. The solution I proposed was a 2 story house. The public activities are concentrated on the ground level, while the private activities of the family take place on the second floor. To further differentiate both aspects of the house, the most public part materiality is heavy concrete while the top private part is a steel structure that inserts itself as a separate element. At the same time, on the ground level, the guest area is divided from the service block and the stairs. On the top floor, the same service block creates a clear division between the master, and the guest’s rooms. It is very simple yet efficient layout that makes this a very comfortable and livable house for a family. It establishes a flowing connection between the inside and the outside This project was one of the only to get a 12, the top mark on our grading system, out of a hundred other projects in my class.
SECOND YEAR STUDIO - DESIGN STUDIO SCHEPS NIVEL 0
NIVEL 0
NIVEL 0
NIVEL 0
GROUND LEVEL NIVEL 0
NIVEL 1
NIVEL 1
NIVEL 1
LEVEL 1 NIVEL 1
36
NIVEL 1 CORTE A-A
CORTE A-A
CORTE A-A
SECTION
CORTE A-A
CORTE A-A
CORTE B-B
CORTE B-B
SECTION CORTE B-B
CORTE B-B
CORTE B-B
SECTION CORTE C-C
37
MARTINA LEON ARCHITECT
AUG 2020