STATEMENT In today’s world, architecture needs not only to look good, but do good. The adept architect is a problem solver and innovator, but also an arrst. Architecture should always reect the needs and desires of the people, its cultural and physical context, and the statement it wants to transmit. It is not about designing a building, but a place - a place that relies on human experiences to create and foster life, emooons, and character. This is the result of establishing a unique architectural language based on innovaaon, a concise conceptual meaning behind every design, and a gracious aatude towards the needs of not just the people, but the environment as well.
Martin Uquillas email euquil20@student.scad.edu phone 912-373-5471
CONTENTS
2 32 48
URBAN ACUPUNCTURE
GRADUATE STUDIO 1 FALL 2014
M.R.D FACILITY
STUDIO 6 SPRING 2014
WORK EXPERIENCE
SUMMER INTERN AT HOK
14 44
RIVERFRONT COMPLEX
STUDIO 4 FALL 2013
INDIVIDUAL WORK
FURNITURE DESIGN
urban acupuncture
2
URBAN ACUPUNCTURE
Studio VII LOCATION: Los Angeles, California PROGRAM: Master Plan and Train staaon ARCH_301 PROFESSOR_RENO Fall_2014
In collaboraaon with Adel Asvat
urban acupuncture
4
PROPOSED PLAN
urban acupuncture
6
urban acupuncture
8
urban acupuncture
10
urban acupuncture
12
riverfront complex
14
RIVERFRONT COMPLEX
Studio IV LOCATION: Washington D.C., Virginia PROGRAM: Mixed-use SIZE: 70,000 sq. . ARCH_401 PROFESSOR_Bacha Fall_2013
riverfront complex
16
riverfront complex
18
riverfront complex
20
riverfront complex
22
riverfront complex
24
riverfront complex
26
riverfront complex
28
riverfront complex
30
m.r.d facility
32
m.r.d facility
34
m.r.d facility
36
m.r.d facility
38
m.r.d facility
40
1 2 A
3 4 5 6 Mailroo Mailroom oom 11
7
UP
8
B Storage 09
UP Computer Serv Server er er erv 10
C
Office Equipment 06
UP Hoteling 08
D
Hoteling 07
Reception 01
Concierge 02
UP HR Office Off f ice ff 05 Conf. C onf.. Room Roo oom m 03 0 3
Library brar brary 04
3'
E
DW 4'
FIRST FLOOR PLAN 0’
7.5’
15’
5'
30’
F 6'
7' G 8'
9 H 10
SECTION A-A
0’
7.5’
15’
30’
42 1 2 A
3 4 5
Meeting Mee eeting Room 12
6 8
DN R&D R&D 1A
B
Storage S torage 1D
m.r.d facility
7
Clean Room m 500 sqft f ft
R&D 1B
R&D 1C
Meeting Room 13
Storage R&D 1D
DN
A
DN
Hotelin ng Hoteling 15 Hoteling H otelin ng 16
C
Electrical E lectrica call
B Mechanical 17
D C
Confere Conference f nce Room fere Roo oom oo m 20
open to below w DN Mechanical 19
3'
E
open to below w 4'
SECOND FLOOR PLAN 0’
7.5’
15’
Confere Conference f nce Room fere Room 21
5'
30’
F
6'
7' G 8'
9 H 10
SECTION B-B
0’
7.5’
15’
30’
furniture
44
furniture
46
work experience furniture
48 38
WORK EXPERIENCE
HOK
LOCATION: Houston, Texas SUMMER INTERN JULY 2015 - AUGUST 2015
1/2"
HSS 1-1/4"X1-1/4"X3/16" HSS 1-1/4"X1-1/4"X3/16" 2 1/4"
2 1/4" CUSTOM WOOD DOOR, CUSTOM WOOD DOOR, FINISH AS SCHEDULED FINISH AS SCHEDULED
FILL CAVITY WITH ACOUSTICAL FILL CAVITY INSULATION WITH ACOUSTICA CENTER HUNG PIVOT
CENTER HUNG PIVOT
3 1/8" WOOD BLOCKING
WOOD BLOCKING
GWB CLG.
GWB CLG. 2 1/2"
3/4"
3/4"
3 1/8"
1/2"
During my experience as a summer intern at HOK I had the opportunity to work on a variety of different tasks focusing on the technical aspects of the projects. I participated in the HOK Houston office renovation located at the Phoenix Tower and on the ACE Mentoring Program. My first responsibility involved working and developing a set of interior architecture details for the office renovation. The ACE Mentoring Program was the next project in which I was engaged with. This program targeted high school students whom aspire on pursuing the career of architecture. For this reason, HOK developed a series of activities for them to explore the practice of the career. I had to develop and design an example project in order for them to have guidance and direction. I was able to understand how important and vital mentoring is in the profession of architecture.
3 1/8"
2 1/2"
3 1/8"
REVEAL, REVEAL, MATCH FINISH OF PANELMATCH FINISH OF PANEL
3/4" MDF WALL PANELS, 3/4" MDF WALL PANELS, FINISH AS SCHEDULED FINISH AS SCHEDULED
PARTITION AS SCHEDULED PARTITION AS SCHEDULED
PARTITION AS SCHED
PARTITION AS SCHED
1/4"
1/4"
2 1/2"
2 1/2"
3/4" MDF WITH FINISH AS3/4" MDF WITH FINISH AS SCHED SCHED MET "Z" CLIP PANEL MET "Z" CLIP PANEL ATTACHMENT SYSTEM ATTACHMENT SYSTEM WOOD BLOCKING AS REQUIRED WOOD BLOCKING AS REQUIRED
1/4" FIN FLOOR AS SCHED
43:49 PM
43:49 PM
Courtesy of HOK1
WOOD WALL WOOD PANEL WALL SECTION PANEL SECTION 3" = 1'-0"
1
3" = 1'-0"
1/4" 2 1/2"
4"
4"
1/4"
REVEAL IN WOOD BASE, REVEAL IN WOOD BASE, MATCH FINISH OF PANELMATCH FINISH OF PANEL
FIN FLOOR AS SCHED
1/4" 2 1/2"
PAINTED AS SCHEDULEDPAINTED AS SCHEDULED
2
CONCEALED CONCEALED DOOR PLAN DOOR AT CONF. PLAN ROOM AT CONF. ROOM 3" = 1'-0"
2
3" = 1'-0"
2 1/2"
+1 4 t Consu
2 1/2"
50
Cons Cons
All repro
In Asso
Consu
PARTITION AS SCHEDULED
CENTERWOOD HUNG PIVOT BLOCKING
WOOD BLOCKING
HSS 1-1/4"X1-1/4"X3/16"
FILL CAVITY WITH ACOUSTICAL INSULATION
3/4" MDF WALL PANELS, FINISH AS SCHEDULED
3 1/8"
3 1/8"
WOOD BLOCKING 3 1/8"
CENTER HUNG PIVOT
1/4"
1/4"
HSS 1-1/4"X1-1/4"X3/16"
PARTITION AS SCHEDULED
CUSTOM WOOD DOOR, FINISH AS SCHEDULED
3/4" MDF WALL PANELS, FINISH AS SCHEDULED
CUSTOM WOOD DOOR, FINISH AS SCHEDULED
work experience
HSS 1-1/4"X1-1/4"X3/16"
CENTER HUNG PIVOT
Consul Consu Consu
PARTITION AS SCHEDULED
2 1/2"
HSS 1-1/4"X1-1/4"X3/16"
Key P
Key Pla
1/4"
CENTER HUNG PIVOT SS 1-1/4"X1-1/4"X3/16"
CONCEALED DOOR PLAN AT CLOSET 3/4" MDF WALL PANELS,
4
4
3" = 1'-0" FINISH AS SCHEDULED
CUSTOM WOOD DOOR, FINISH AS SCHEDULED
Profes
CONCEALED DOOR PLAN AT CLOSET
LL CAVITY WITH ACOUSTICAL INSULATION
3" = 1'-0"
ENTER HUNG PIVOT
4
CONCEALED DOOR PLAN AT CLOSET
Profess
3" = 1'-0"
No.
RUNNER TRACK No.
GWB CLG.
3/4" MDF WALL PANELS, FINISH AS SCHEDULED
WOOD BLOCKING
11' - 00" 3/4"
CUSTOM WOOD DOOR, RUNNER TRACK FINISH AS SCHEDULED RUNNER TRACK
IVES STOP HSS 1-1/4"X1-1/4"X3/16" FILL CAVITY WITH ACOUSTICAL INSULATION
PARTITION AS SCHEDULED
GWB CLG. GWB CLG.
4" MDF WALL PANELS, NISH AS SCHEDULED
11' - 00"
11' - 00"
3/4"
3/4"
3 1/8"
PARTITION AS SCHEDULED
IVES IVESSTOP STOP
CONCEALED DOOR HEAD AT PIVOT HSS 1-1/4"X1-1/4"X3/16"
WOOD BLOCKING WOOD BLOCKING
5 CUSTOM WOOD DOOR,
CUSTOM WOOD3" DOOR, = 1'-0" FINISH AS SCHEDULED
FINISH AS SCHEDULED
ARTITION AS SCHEDULED
HSS 1-1/4"X1-1/4"X3/16"
No.
FILL CAVITY WITH
FILL CAVITY WITH ACOUSTICAL INSULATION ACOUSTICAL INSULATION
CONCEALED DOOR HEAD AT PIVOT
3 1/8"
3 1/8"
3/4" MDF WALL PANELS, FINISH ASAS SCHEDULED PARTITION SCHEDULED
5
5 3" = 1'-0" CONCEALED DOOR HEAD AT PIVOT
No.
3" = 1'-0"
PARTITION AS SCHEDULED RUNNER TRACK
CENTER HUNG HEAD PIVOT
1/4"
3/4" MDF WALL PANELS, FINISH AS SCHEDULED
3/4" MDF WALL PANELS, FINISH AS SCHEDULED
WOOD BLOCKING CUSTOM WOOD DOOR, FINISH AS SCHEDULED
9' - 00"
1/4"
FILL CAVITY WITH ACOUSTICAL INSULATION
3" =WOOD 1'-0" DOOR, CUSTOM FINISH AS SCHEDULED
WOOD BLOCKING
F. ROOM
CUSTOM WOOD DOOR, FINISH AS SCHEDULED
9' - 00"
FILL CAVITY WITH ACOUSTICAL INSULATION
HSS 1-1/4"X1-1/4"X3/16"
3
CUSTOM WOOD DOOR, FINISH AS SCHEDULED 3" = 1'-0"
HSS 1-1/4"X1-1/4"X3/16" FILL CAVITY WITH ACOUSTICAL INSULATION
WOOD BLOCKING CUSTOM WOOD DOOR, FINISH AS SCHEDULED
6
FILL CAVITY WITH ACOUSTICAL INSULATION
GWB CLG. HSS 1-1/4"X1-1/4"X3/16"
CONCEALED DOOR HEAD AT LATCH
6
CONCEALED DOOR HEAD AT PIVOT 3" = 1'-0"
GWB CLG.
Drawn
Projec
Sheet
RUNNER TRACK WOOD BLOCKING
9' - 00"
WOOD BLOCKING HSS 1-1/4"X1-1/4"X3/16" CONCEALED DOOR HEAD AT PIVOT
1/4"
3
CUSTOM WOOD DOOR, FINISH AS SCHEDULED RUNNER TRACK
HSS 1-1/4"X1-1/4"X3/16" CENTER HUNG HEAD PIVOT
CENTER HUNG HEAD PIVOT
NF. ROOM
WOOD BLOCKING
FILL CAVITY WITH
Do
Drawn
Project
ACOUSTICAL INSULATION GWB CLG.
HSS 1-1/4"X1-1/4"X3/16"
Sheet T
Origina
FILL CAVITY WITH CONCEALED DOOR HEAD AT LATCH ACOUSTICAL INSULATION
Doo Sheet
3" = 1'-0"
Original
CONCEALED DOOR HEAD AT PIVOT
3 Courtesy of HOK 3" = 1'-0"
6
CONCEALED DOOR HEAD AT LATCH 3" = 1'-0"
Sheet N
STRUCTURE PLAN 1
A
2
B 3
RETAIL STORE C
4
RETAIL STORE D
LOBBY
RETAIL STORE
E
F
RESTAURANT
G
H
KITCHEN 5
RETAIL STORE
BIK E ON LY
RETAIL STORE
6
RETAIL STORE
7
UP
SERVICE DO WN
8
RETAIL STORE
UP
DO WN
UP
0'-0"
PARKING PLAN
5'-0"
15'-0"
30'-0"
1/32”=1’-00”
1/32”=1’-00”
AMENITIES PLAN
EXAMPLE PROJECT
GROUND PLAN
Courtesy of HOK