DEPARTMENT OF NATIONAL DEFENSE OFFICE OF CIVIL DEFENSE OCD REGION Caraga WORK AND FINANCIAL PLAN FOR JULY 2011 – DECEMBER 2012 PROGRAMs, PROJECTS AND ACTIVITIES (OUTCOME, OUTPUTS AND MAJOR ACTIVITIES)

PERFORMANCE INDICATORS OR UNIT OF MEASURE

TARGET: JUL-DEC 2011

BUDGET: JUL-DEC 2011

TARGET: JAN-DEC 2012

BUDGET: JANDEC 2012

OUTCOME 1: ENHANCED KNOWLEDGE OF DISASTER RISKS AND VULNERABILITIES OUTPUT 1.1 Database on risk profiles developed

P45,000.00

P105,000.00

MAJOR ACTIVITIES 1.

Inventory of Critical Structures • • •

Revisiting of PD 1096, Rule 1040, PD 1185 and other related laws

# of meetings/consultations held

3

# of participants

20

Test implementation of innovative survey tools in selected establishments

# of activities done

1

# of establishments tested

20

Forum on the Application of the Building Back Better Principle in Restoring and Improving Facilities and Structures

# of activities held

1

# of participants (building owners, architects, engineers)

50

OUTPUT 1.2 Existing resources inventory validated and updated 1.

Consultation with NGAs, LGUs, and private organizations in updating existing and available resources

P45,000.00

1

P15,000.00

20 P40,000.00 P50,000.00

P15,000.00 # of meetings held

1

P15,000.00

OUTCOME 2: STRENGTHENED CIVIL PROTECTION AND COMMUNITY RESILIENCE TO DISASTER OUTPUT 2.1 Participatory Capacity and Vulnerability Assessment conducted

P50,000.00

MAJOR ACTIVITIES 1.

Consultation with key stakeholders in identifying , assessing and prioritizing hazards & risks

# of meetings held

1

# of LGUs consulted

2

P50,000.00

P450,000.00


PROGRAMs, PROJECTS AND ACTIVITIES (OUTCOME, OUTPUTS AND MAJOR ACTIVITIES) 2. 3. 4.

PERFORMANCE INDICATORS OR UNIT OF MEASURE

TARGET: JUL-DEC 2011

BUDGET: JUL-DEC 2011

TARGET: JAN-DEC 2012

Capacity building of enumerators on risk assessment process

# of trainings conducted

1

# of individuals trained

30

Conduct of risk assessment

# of assessments done

2

# of communities assessed

65

# of reports shared/disseminated

2

# of LGUs provided with profiled reports

67

Sharing and dissemination of results

OUTPUT 2.2 Pool of trainers in DRRM organized and trained

P250,000.00

BUDGET: JANDEC 2012

P200,000.00 P150,000.00 P100,000.00 P450,000.00

MAJOR ACTIVITIES 1.

2.

Training of Trainers in DRM

Training on Risk Communication and Handling of the Media for OCD staff (Mindanao Cluster) and RDRRMCTWG

# of trainings conducted

1

# of provinces with trained trainers

5

# of participants

25

P250,000.00

# trainings conducted

1

# of OCD staff participated

50

# of RDRRMC-TWG participated

35

OUTPUT 2.3 DRR program understood and appreciated by local communities

P215,000.00

P450,000.00

P560,000.00

MAJOR ACTIVITIES 1.

Information, Education, Communications and Media Campaign • • •

Reproduction of localized IEC materials

# of localized IEC materials reproduced

2,000

# of IEC materials disseminated / distributed

2,000

P30,000.00

5,000

P75,000.00

5,000

Observance of NDCM, Earth Day, Environment Month and other DRR/CCA related events

# of events observed

2

P150,000.00

4

P250,000.00

# of activities initiated / participated

2

Conduct of disaster drills and simulation exercises

# of BEEP drills conducted

5

P30,000.00

15

P75,000.00

# of bomb threat drills conducted

1

5,000.00

2

10,000.00

4


PROGRAMs, PROJECTS AND ACTIVITIES (OUTCOME, OUTPUTS AND MAJOR ACTIVITIES)

PERFORMANCE INDICATORS OR UNIT OF MEASURE

TARGET: JUL-DEC 2011

BUDGET: JUL-DEC 2011

# of flood simulation exercises conducted

TARGET: JAN-DEC 2012

30

OUTPUT 2.4 Protocols on early warning system established in communities with high susceptibility to flood

P5,000.00

BUDGET: JANDEC 2012

150,000.00 P205,000.00

MAJOR ACTIVITIES 1.

Regional Conference and Sharing Sessions on Local Flood Early Warning Systems

# of conferences held

1

# of participants

50

2.

Ocular inspection of flood prone areas and identification of Need Early Warning Devices (NEWDs)

# of inspections conducted

1

3.

Installation of flood early warning devices

# of rain gauges installed

10

P80,000.00

# of water level gauge installed

10

50,000.00

# of flood signage installed

10

75,000.00

# of planning workshops conducted

1

P250,000.00

# of participants

50

4.

Formulation of FEWS Plan and Protocols

OUTPUT 2.5 Coordination mechanism of partner agencies and organizations strengthened

(c/o GIZ) P5,000.00

P58,000.00

P116,000.00

MAJOR ACTIVITIES 1.

2.

Regular meetings of RDRRMC and TWG

Public-Private Partnership

# of full council meetings held

2

P40,000.00

4

P80,000.00

# of TWG meetings held

4

12,000.00

8

24,000.00

# of EXECOM meetings held

2

6,000.00

4

12,000.00

# of minutes provided to member agencies

8

# of meetings held

1

# of MOUs/MOAs signed

1

16 P5,000.00

6

P30,000.00

6

OUTCOME 3: ENHANCED COORDINATION, SUPERVISION, AND MONITORING OF DISASTER RESPONSE, RECOVERY AND REHABILITATION INITIATIVES OUTPUT 3.1 Disaster assessment and impact report templates standardized

P76,000.00

P312,000.00


PROGRAMs, PROJECTS AND ACTIVITIES (OUTCOME, OUTPUTS AND MAJOR ACTIVITIES)

PERFORMANCE INDICATORS OR UNIT OF MEASURE

TARGET: JUL-DEC 2011

BUDGET: JUL-DEC 2011

TARGET: JAN-DEC 2012

BUDGET: JANDEC 2012

MAJOR ACTIVITIES 1.

Workshop on Rapid Damage Assessment and Needs Analysis

# of workshops conducted

1

P200,000.00

# of participants

30

2.

Maintenance of a 24/7 monitoring of disaster events

# of monitoring activities held

daily

P36,000.00

daily

P72,000.00

3.

Provision of support to mobilization of various response mechanisms

# of response services supported

ANA

20,000.00

ANA

20,000.00

4.

Coordination for the preparation of rehabilitation plans

# of coordinative activities initiated

ANA

20,000.00

ANA

20,000.00

OUTCOME 4: CONDUCIVE POLICY ENVIRONMENT ON DISASTER RISK REDUCTION AND MANAGEMENT OUTPUT 4.1 Regional and Local DRRM Plans formulated, approved and adopted

P565,000.00

P450,000.00

MAJOR ACTIVITIES 1.

Regional and Local DRRMCs Summit on RA 10121, NDRRM Framework and Plan (Roll-out)

# of activities held

2.

Workshop on the Formulation of Regional DRRM Plan

# of workshops conducted

1

P175,000.00

3.

Local DRRM Strategic Action Planning Workshops

# of workshops conducted

4

P140,000.00

# of plans formulated, approved and adopted

4

# of participants

1

P250,000.00

200

12

P450,000.00

12

OUTCOME 5: STRENGTHENED AND EFFECTIVE OCD AS AN ORGANIZATION OUTPUT 5.1 Regional manpower requirement increased MAJOR ACTIVITIES 1.

Hiring of qualified, competent and skilled personnel

# of personnel hired

10

OUTPUT 5.2 Employees interpersonal relationship developed and strengthened 1.

Team Building Workshops and Exercises

# of activities held

•

# of activities held

Developing Personal Discipline to Discover Your

1

c/o CO

P10,000.00

P20,000.00

P10,000.00

P20,000.00


PROGRAMs, PROJECTS AND ACTIVITIES (OUTCOME, OUTPUTS AND MAJOR ACTIVITIES)

• • 2.

PERFORMANCE INDICATORS OR UNIT OF MEASURE

TARGET: JUL-DEC 2011

BUDGET: JUL-DEC 2011

TARGET: JAN-DEC 2012

Destiny

# of participants

Excellence – Living the Life You’ve Always Wanted

# of activities held

1

# of participants

10

# of activities

1

# of participants

10

Building a Strengths-Based Organization

BUDGET: JANDEC 2012

10

Upgrading of Regional Equipments

Pls. see Table of Equipment (separate page) TOTAL BUDGETARY REQUIREMENT

c/o CO

P1,289,000.00

Pls. see Table of Equipment (separate page)

P10,000.00 P10,000.00 c/o CO

P2,668,000.00