Portfolio Massimo Munari

Page 1

assimomunariacademicwork


2 | Curriculum Vitae

Massimo Munari 2008/2014

Curriculum Vitae DATE OF BIRTH E-MAIL CELLULAR

EDUCATION 2008 Final exam of the upper secondary cycle of studies (5 years) High school specialized in scientific subjects GG Trissino, Valdagno (VI) 100/100 2011 BSc Architecture (3 years) University IUAV of Venice 110/110 2013 MSc Architecture (2 years) University IUAV of Venice 110/110 cum laude Sep 2012 Erasmus exchange program Jun 2013 Universitat politecnica de Cataunya, ETSAB, Barcelona July 2014 Professional certification exam University IUAV of Venice 80/100 Oct 2014 IELTS General Training Exam British Council, Brescia

W OTHER EDUCATIONAL EXPERIENCES Aug - Sep 2010 Internship | Zordan Rausse Architetti Associati, Vicenza (2 month) Architectural design, CAD Drafter a group of sustainable terraced houses a photovoltaic field, installed in an agricultural area July - Sep 2013 Internship | Rahola Vidal Arquitectes, Barcelona (4 month) Architectural design, CAD Drafter, 3D Rendering, Model maker a private cellar in the catalan countryside|model a swimming pool for a private house|design and renders renovaton of a hotel in Ibiza|model renovation of a hotel in Majorca|renders a luxury farm holidays in Ibiza|renders

02.09.1989 | Valdagno massimomunari89@gmail.com 3401925987

S PUBLICATIONS 2009 Mart Stam’s architectures 1924-1933: drawings, models, interpretations Università IUAV di Venezia, Munster University, curator Armando Dal Fabbro Editing of part of the drawings for the book and exhibition 2014 Making city without citizens - RPBW in Trento Architecture in Spain: graft or interior? GIZMO | online magazine on architecture, Marco Biraghi DOPPIOZERO | online magazine on culture Editing of two articles

S COMPETITIONS March 2013 Design in wood | Student competition Universitat Politecnica de Catalunya ETSAB a wooden pedestrian footbridge First prize Sep 2013 A new centre for Sarrià | International competition Town council of Barcelona Collaboration | A library and civic centre in Barcelona July 2014 My Museum 1+1 | International online contest Inexhibit | website of cultural criticism An image and a phrase for the favourite museum Seventh position among than one hundred participants Sep 2014 City and urban regeneration, RIUSO 03: sustainable urban regeneration | National contest National Council of Architects, National Association of Builders, Legambiente The best sustainable project in urban regeneration Oct 2014 Lisbon Open Room | International competition Archmedium A polyvalent pavilion near the centre of the city in progress


Curriculum Vitae | 3

W WORKSHOPS July 2009 A sacred space University IUAV of Venice Tutor Markuu Komonen July 2010 Ideas for a museum of chinese art University IUAV of Venice Tutor EMBT Benedetta Tagliabue Sep 2011 Building scenarios to design the future University IUAV of Venice Tutor Paola Viganò July 2011 New italian pavilion at Giardini della Biennale University IUAV of Venice Tutor Mauro Galantino

LANGUAGE SKILLS Italian English Spanish Catalan

mother tongue C1 | fluent (IELTS 7.0) C1 | fluent B2 | upper-intermediate

PERSONAL SKILLS Photo manipulation Photography CAD drafter Editorial design 3D rendering Model making Handrawing Team working Independent working

COMPUTER SKILLS Photoshop Indesign Illustrator Autocad 2D-3D Sketchup Archicad Revit 3DS Max Artlantis Word, Excel, Power Point

PERSONAL INTERESTS architecture, museums, art, drawing, reading, travelling, history, music, cinema, theather,cycling, climbing, nature, mountain


4 | Master thesis

Master Science Thesis 2013/2014

22@griCULTURAL WHERE WHAT WITH TUTORS

Poblenou, Barcelona market, art school Daniela Peli Ricardo Flores, Eva Prats Flores & Prats Arquitectes Paolo Ceccon | CZ Associati

The project is situated in Poblenou, part of the first suburban belt of the city. The area has experienced many changes over the last three centuries, having developed from an area almost exclusively industrial to a mix of residences, services and few surviving industries. The project investigated a big void of this part of the city that hadn’t been filled since the first urbanization of the area and disclosed the different layers, which were the result of three hundred years of history and which were still recognisable, contrasting the perpendicular grid of Plan Cerdà and the irregular grid of the existing road network. Following the principle of an operating use of history, we interpreted and reinvented these signs. The strategy developed in two directions: we safeguarded the void, giving it meaning and mending the disjoint urban fabric; besides we preserved the existing structures, the urban order (or, better, DISorder) and the buildings (in the area there are two disused factories of the nineteenth century). Once we had detected the lack of services of the district, we consequently decided to build a market and an art school while a quite wide part of the lot was assigned to urban gardens, in order to boost and develop the sense of community. We also thought about a progressive process of construction of the entire complex, that was related to the growth of the social awareness among the inhabitants of the neighborhood.


Auditorium Square

hool

Art Sc

arket

rary M

o Temp

Old Factor

y

t

New Marke

New Resid

dens

Urban Gar

ences

Orchard


6 | Master thesis


Master Thesis | 7

THE MARKET The market is specialized on food products, fruits and vegetables in particular, and it is placed in an existing factory. The ground floor of the existing structure is renovated and transformed in a covered market with bars / restaurants, shops and stands while a pedestrian street, that occupies the middle nave, distributes people to the spaces. The existing building also houses craft workshops of food and items sold directly below, offices and a multipurpose space. The market consists also of an entirely new covered part of three floors: the first one, placed under the ground level, is used as an underground car park; the second one, the ground floor, is occupied by stands, arranged in such a way as to suggest the idea of an overcrowded maze, the archetypal image of the market; a mezzanine holds a small exhibition space; the last floor, the roof level, houses the open-air theater, the new meeting place for the community.


8 | Master thesis RE USE OF THE EXCAVATED MATERIAL

the

the

the

co

roo

f sla

bs

nc

ba

GREEN ROOFS The green roofs, with high insulation, prevent the transmission of heat to the spaces below

ret

sem

es

en

tru

t

ctu

re

RAINWATER HARVESTING SYST The inclined planes of the cover c rainwater in cable ducts and from in small wells at ground level. From water flows in irrigation canals for gardens.


TEM convey the these then m here the r the urban

Master thesis | 9 RE USE OF THE EXSTING BUILDING The nineteenth-century factory in this area is an integral part of the project. The external image remains the same but the interiors are converted into new functions: market and craft workshops.

AN ARTIFICIAL LANDSCAPE The sloping roofs, the opportunity to travel the same and the choice of the green roof transform the building into an artificial landscape raised above the ground. In this case the flap provides the right angle in order to create a large slide.

SINUOUS PATHS The sinuous paths lead the user to discover different situations: introduce him to the new commercial space, the factory complex or through cultivated gardens.

SOLAR ENERGY The energy produced through the huge photovoltaic system on the roof makes the market almost energy self-sufficient.

NEW SPACES FOR THE COLLECTIVITY The residents of the neighborhood can use the small exhibition space and the huge open air theather above the market

URBAN GARDENS Much of the ground available is used for urban gardens. The plots can be cultivated both by the residents of the neighborhood and by the owners of the stalls in the market, so they can sell what they have produced there, fostering a type of responsible consumption.


10 | MACBA extension

Architectural Design Studio 2012

MACBA Extension existing building

vertical connections

facilities

Exhibition Offices

existing building

vertical connections

Exhibition Offices

existing building

vertical connections

Barcelona museum J. Arias, M. Gallego

vertical connections

The MACBA is the contemporary art museum of Barcelona, ​​designed by the architect Richard Meier. In front of the headquarters of the museum we can find a nineteenth-century church, without any architectural value which is nowadays desecrated. The objective of this project is the rehabilitation and the adaptation of this empty building as a new exhibition space for the MACBA. As for the functional program, the new museum areas, equipped with an independent entrance, is held in the high and narrow space of the old church (with the construction of new floors at different heights), while the new administrative offices are placed in a new structure, that wraps the existing facade. The store of the new exhibition spaces, connected to the MACBA warehouse through an underground corridor, is dug under the walls of the existing church, supported by a new steel structure. The formal idea that characterizes the entire project is the concept of wrapping the old structure with a thin layer of white perforated aluminum panels, which reproduces the curved shapes of the object a reaction poetique, designed by Meier for his museum.

facilities

Exhibition Entry

WHERE WHAT WITH TUTORS

vertical connections


Entry

Store

existing building

Exhibition

Offices

MACBA

MACBA extension | 11


12 | MACBA extension


MACBA extension | 13 DETAIL SECTION OF THE BUILDING 1- Exhibition space | Roof bituminous roofing membrane|thermal insulation 10cm | PVC membrane|lightweight concrete screed, slope 2% | composite floor slab made of a steel floor deck with in-situ concrete cast 10 cm | steel structure HEA 200|suspended ceiling of plasterboard 2- Offices | Roof white zinc and titanium plates for the coating | wooden slats on metal structure|bitominous membrane | thermal insulation, two layers 20cm | PVC membrane | composite floor slab made of a steel floor deck with in-situ concrete cast 10 cm | steel structure | suspended ceiling of plasterboard 3- Facade perforated aluminum panels painted white on steel structure | space between the two facades for maintenance|precast curtain wall: doble-glazed window on aluminium frame, HPL panels with aluminium finish 5cm, thermal insulation 10cm 4- Existing wall existing structure of stone blocks 5- Offices | Floor white linoleum finish|lightweight concrete screed | soundproofing membrane | composite floor slab made of a steel floor deck with in-situ concrete cast 10 cm | steel structure UNP and IPE | suspended ceiling of plasterboard 6- Exhibition space | Floor white linoleum finish | floating floor made of HPL panels 5cm on a reinforced concrete slab | steel structure UNP and IPE 7- Outdoor sidewalk | Floor granite tiles 3cm on a layer of compacted sand 5cm | soil 8- Support structure Structure made of HEM 800 beams and reinforced concrete pillars to support the existing walls of the church.


14 | Social housing

Architectural Design Studio 2012

Social HousingVenice WHERE WHAT WITH TUTORS

Venice social housing C. Zanuso, F. Zandegiacomo M. Galantino, M. Milan

A new residential neighborhood, aimed at saturating one of the last urban voids of Venice: this is the topic of this workshop. The new buildings rise in an area between the big church of Santi Giovanni e Paolo and the ensemble of the city hospital, which was once occupied by the gardens of a nowadays disused elderly residence. The project includes about seventy new flats for young couples and a residence for students, as well as a new public square, the new central core of the entire complex. While it maintains a distinctly modern image and a rigorous and unified urban structure, the new intervention tries to harmoniously insert itself in the existing urban fabric, through the creation of new public spaces that evoke traditional elements of the city: il campo, la calle. The complex is divided into two main rows of block of flats, mutually orthogonal, plus two small other blocks, partly independent. The ground floor of the rows is occupied by shops and a kindergarten while the three upper floors hold exclusively flats. All the residences have the entrance that overlooks a ballatoio, that could be compared to a raised public road. The student residence is an independent unit structured with a central community space and vertical connections while the flats are arranged on the sides.


Social housing | 15

Ballatoio

Residences

Shops

Residences

Campo

Kindergarten

Student Residence

ground floor and second floor (smaller plan)


16 | Social housing


Social housing | 17

the public space | trials


18 | Social housing DETAIL SECTION OF THE BUILDING 1- Roof drainage gravel 5 cm | anti-root membrane | double bituminous membrane | lightweight concrete screed with welded steel mesh 5 cm | thermal insulation of polystyrene 10 cm | steam barrier | lightweight concrete screed, slope 2% | concrete slab 23 cm 2- Opaque facade concrete panel 300 x 50 mm | aluminium structure for attaching of the cladding panels | concrete wall 3- Glazed facade double-glazing 3+3/18/3+3 on aluminium frame | sliding panels of double glazing 6+6 and with a coloured PVB membrane in the middle 4- Typical floor concrete floor 3 cm, polished finish | lightweight concrete screed with welded steel mesh 5 cm | extruded polystyrene panel for the installation of the underfloor heating 5 cm | steam barrier | concrete slab 23 cm | thermal insulation of polystyrene | suspended ceiling of plasterboard 5- Terrace floating floor of stone 20 + 60 | double bituminous membrane | lightweight concrete screed, slope 2% | concrete slab 23 cm | railing made of steel slats 1500 x 50 x 5 mm on a steel tubular fixed on a steel plate 6- Ground floor concrete floor 3 cm, polished finish | lightweight concrete screed with welded steel mesh 5 cm | extruded polystyrene panel for the installation of the underfloor heating 5 cm | steam barrier | concrete slab 23 cm | bituminous membrane | ground 7- Ground level terrace floating floor of stone 20 + 60 | double bituminous membrane | lightweight concrete screed, slope 2% | concrete slab 23 cm | bituminous membrane | ground | railing made of concrete with aluminium plate on the top


Social housing | 19


20 | Garibaldi towers

Architectural Design Studio 2011

WHERE WHAT WITH TUTOR CUTTING

NEW BLOCKS

EXSTING STRUCTURE

Garibaldi Towers Milan residential towers C. Zanuso, F. Zandegiacomo Angelo Villa

The project focuses on the renovation of two buildings that have finished their life cycle. The towers are situated near the Porta Garibaldi railway station in Milan, above an artificial platform raised from the street level; built at the end of the eighties, the towers once housed the offices of the National Railways A project of architectural and energetic improvement for the towers already exists and it consists in a functional adaptation of the interior spaces, a structural reinforcement and a total renovation of the external image of the building. As consequence of the refurbishment, we even propose to change the original function of the building, from offices to residences, integrating original architectural-distributive solutions with new structural and technological solutions. The leading idea of the project for the internal distribution consists in the effort to eliminate the usual repetition of the same floor for all the extension of the tower, as it happens in almost all the tall buildings. We propose different combinations of various typologies of apartments for every level of the building and common areas developed in more than one floor, lit by natural rather than artificial light. The towers are divided into macro-groups of 4 floors of flats and one floor for the community spaces (restaurant, kindergarten, study rooms and library, senior centre, gym), each of them equipped with a winter garden and a terrace.


Garibaldi towers | 21

RESIDENTIAL BLOCKS

FACILITIES FLOORS

STRUCTURE


22 | Garibaldi towers

Solar chimneys and panels on the roof large glazed elements, situated on the top of the building, able to heat quickly and thus generate a difference of pressure that can create movements of air. The solar chimneys are connected directly to the flats, to promote the natural air circulation

EXPLOTATION OF THE PREVAILING WINDS we arrange the windows in such a way to promote a natural cooling of the distributive spaces of the residential blocks.

SOLAR GREENHOUSES small, enclosed spaces with large glazed windows, placed on the facilities plans, arranged in such a way to be warm in winter and cool in summer (also through the positive impact of the plants).


Garibaldi towers | 23

FACADE DETAIL | AXONOMETRIC VIEW 1- Aluminium vertical framework 2- plasterboard sheet 10 mm 3- extruded polystyrene 50 mm 4- plasterboard sheet 12 mm 5- high density polystyrene 12kg|mc, 100 mm 6- plasterboard sheet 15 mm 7- aluminium structure for attaching of the cladding panels

8- cladding of aluminium panels 4 mm 9- C aluminium profile 10- steel mounting bracket for the cladding structure 11- dimming system of roller blind 12- double-glazing 3+3/12/3+3 on aluminium frame 13- reflective double-glazing on steel structure,

movable part 14- reflective double-glazing on steel structure, unmovable part 15- parquet floor 16- composite floor made of reinforced concrete and corrugated sheet metal, 120 mm


24 | Recommendation letter


Recommendation letter | 25


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.