Abstract The Area Location Story of the project Grid The Masterplan Street system Blocks Green spaces Public spaces Medium Scale Analysis Functions Flows Plots and blocks Inside Europaallee Building shape Buildings Conclusions Biblio- Sito-graphy Image sources


4

abstract

Abstract The masterplan of Europaallee is situated in Zurich in the south-west part of the main railway station. The term “allee” in German means “boulevard” as the typical French ones, with trees, but this case the idea is a bit different because it’s not for cars but only for bicycles and pedestrians. This project is very important because of its significant intention: to enrich a crucial and central area, which is

owned

by

SBB

(Schwetzerische

Bundesbahnen,

manager of Swiss railways) close to the central Railway

for this area: there is in fact the presence of other projects

Station of Zurich, creating a new neighborhood inside

starting from the ‘70s. The first project was called “HB-

the consolidated city with the logic of “functional mix”

Südwest” and then it was changed with “Eurogate” and

among residential areas, open spaces, public spaces,

now it’s called “Europaallee” that is the name of the new

work spaces and commercial areas: through this functions

boulevard which is faced by the new buildings of the

melting pot the main idea is to enhance the identity of the

masterplan.

city of Zurich and the space itself.

In this area SBB, the owner, decided to make a specific

The project is studied in order to give a particular attention

tool for this space, and the proposal of Kees Christiansee

to some important features:

(member and partner of KCAM Architects&Planner in

1.

Zurich) was chosen and developed. The area is very big

High quality in social, economical and ecological

according to other Swiss’ projects; it count a large amount

terms; Design and the composition of the spaces and of

of buildings – almost 10 – and some of them are projected

the buildings with a clear identification of space in terms

and designed by famous architects: this situation of

of identity and functions;

“differentiation” can be considered one of the more

3.

relevant and difficult challenges for masterplan’s success.

2.

Interaction with the surrounding and the other

parts of the city both in terms of connections-infrastructures (there are lots of public transports passing through this area) and functions. This project, that started in 2004, was not the first presented


abstract

night view reconstruction of Europaallee and surroundings

5


6

the area

Planners Planning years Realization years Country Promoter Planning tool

KCAPArchitects&Planners 2003-2004 2009 -present Zurich Sbb Zurich, Municipality of Zurich Masterplan

Total surface

100.000 sqm

Total gross floor area

350.000 sqm - housing

almost 1.200 new residence

- offices

almost 5.000 new jobs

- public spaces - retail - leisure - services

almost 2.500 new students

data sheet

Location The masterplan for the area of Europaallee, that is the name of the main street passing through the new buildaerial view of part of the already built elements

up space, is located in a very accessible and central position, in fact, it is very close to the city center and to the railway station. These spaces, in the last decades, are facing crucial challenges and re-thinking for new development, as it’s happened to Europaallee, where masterplan’s intention was to create a new hub where different functions can coexist in a unique space: the areas surrounded by the railway stations are mostly interested by traffic flows and it can contribute to give more importance to the new development space1 . The accessibility to this area is given also by public transportation which pass close to Europaallee (especially in Lagerstrasse) that let people moving around the area without using the car. The surrounding of the masterplan area are the quartier

The Area

Langstrasse and Kreis 4 that are characterized by a strong presence of nightspots and discotheques but it’s a space where is possible to find retails and restaurants with residences for students, artists and young people; the big park was reorganized and partially open to public uses (because it is military owned) and it is utilized by citizens and visitors.

1

For more information, it’s possible to visit the site: http://www.

kcap.eu/en/projects/v/europaallee/details


the area

official plan of Europaallee

two ipotetical views of the future settlement

7


8

the area

Kreis 1

Kre Altstetten

Langstr

Wollishofe

the localization of Europaallee inside of Zurich


the area

Flughafen Zurich

Kreis 11

0

Oerlikon

eis 5 Oberstrass

rasse

en

City Centre

Zurichsee

0

1

2 Km

9


10

the area

aerial view of the actual situation

Story of the project Europaallee area is owned by SBB, the partner of Swiss Railway, and during the years there were some attempts to requalify the area of railway warehouses, trying to take them off from the city and creating a new attractive pole. The main problem of this area was to acquire the area from SBB1. The name of the projects was changing during the decades and the debate of the dimension of the project was often disagree; the causes of this “long term� project (the first proposal for the area was presented in 1969) are caused by different factors: problem connected with the big dimension of the area (one of the biggest area that Zurich have ever tried to develop), and problems linked with constrictions given by regulatory framework (citizens, referenda and initiatives) that are very important, especially in Switzerland, for developing new construction site. Staring from 1969, lots of attempts were done during the years, up to 2003 when actors found an agreement for the masterplan of Europaallee.

Eurogate, I HB Sudwest, I

1970

Eurogate, II

HB Sudwest, II

1980

Europaallee

1990

2000

1

2010

2020

For more information about this point, visit the website:

http://www.tagesanzeiger.ch/zuerich/stadt/Die-Lagerstrasse-soll-zumBoulevard-werden/story/22187422


the area

EVOLUTION OF THE PROJECTS

M ilit ar str

THE STRUCTURE OF THE GRID OF EUROPAALLEE

La ge rst ra ss e as se

Ka se rm en

1970

Railway Station

ss ra st

e

the regular existing grid

La ge rst M ra ilit sse ar str as se

Railway Station

1900

regular grid

M ilit ar st

Railway Station

1991

Ka se rm en

La ge rst ra ss e ra ss e

s ra st

se

irregural grid

tra ss e

str as se

Ka se rm en

2009-2020

La ge r

e ss ra st

ris ita

M il

the resultant grid of Europaallee

11


12 The Masteplan

the masterplan

part of the official plan of Europaallee, showing the two enclosing boulevards

Street system The street system is mainly car-free and organized with parking lot external to the new development; the only street that is maintained vehicle accessible is Lagerstrasse which will become a more pedestrian-bicycle friendly street, maintaining the same traffic that is already present1. In this way, the new organization of the streets can be considered a “linkage” among new spaces and old spaces, pedestrian/bicycle routes and car routes, relationships between public and private spaces. _bus line line 31 line 32 _tram line line 14 new line 1 (from 2025)

Gustav-Gull Platz Europa Square

Europaallee tree lines and the two main plazas

300 meters

1

For more information about this specific project, it’s possible to

consult the website: http://www.20min.ch/schweiz/zuerich/story/19635921


13

the masterplan

Blocks The

ANALYSIS OF THE NEW GRID

blocks

inside

Europaallee

masterplan

are

characterized by the same over-dimension referring to the surrounding but they’re different in terms of typology and shape. se as str ar ilit M

La geLa rsgt e rars sstra es se Ka se rm en

e ss ra st

soft elements

M

a ilit

e ss ra rst

La ge rs t ra ss e

e ss ra st

building C

linear elements _blocks

ANALYSIS OF THE AREA building E

new buildings dimension compared to the existing ones

Green spaces Looking at the masterplan is possible to recognize that there is a lacking of green spaces: it doesn’t mean that public spaces are not present in this area but green element is visible only along Europaallee streets and in

plots

some parts of the squares.

Public spaces The system of public spaces is connected between the different streets inside the area, in particular Europaallee can be considered as a linkage between two relevant public spaces: Gustav Gull Platz and Europa Square, that is located in the old plaza of the railway station.

blocks

Ka se rm en

building A


14 Medium Scale Analysis

medium scale analysis

The Europaallee project is enclosed on two sides by the railway, on one side by the Sihl River and on the last one by the surrounding buildings. Its diagonal orientation interrupts the classic orthogonal grid in order to allow and facilitate the passages from the

skeme of the diagonal boulevard cutting the block of Europaallee

east side to the west side of the plot and vice versa: in fact its central location assures a very strong identity and opportunities to the complex, while its strictly proximity with the station and the riverside allows a continuous flow of people.

Limmat River School district Expressway

Europaallee Station

Sihl River Europaallee and the surrounding infrastructural systems

0

100

200

400 Meter


15

medium scale analysis

Functions This part of the city is moreover residential and commercial: a lot of buildings are dwellings with commercial activities in the first floor. There are neither single nor multi-family buildings, or even culture facilities. An important element in this area however is the presence of education services, both in south and north of the plot. Setting up a school within a Europaallee block, there’ll be the possibility of generating a diffused education district

City of Zürich

that will attract a significant number of students and people that will give a new life to this “in-between” area. Another remarkable element is the reinforcement within the plot of hospitality and commercial services in order to attract more tourists and investors and to offer to the workers a greater number of services.

Europaallee district

scheme of functions around Europaallee

Meter

Single Family Multi-Family Mixed use with Dwelling Industrial Commercial Hotel - Hospitality Cultur School - Sport Facility Transport Building Other


16

medium scale analysis

Flows The Europaallee central position in the city promotes its visibility to a lot of people. The flows around the site are achievable just on one side because, on the other one, there are the railroad tracks; by the way, the closeness with the train station facilitates the presence of people as workers, tourists or citizens. With the new pedestrian area that will serve new facilities inside the complex, as a school and an economic district, the flows inside and around this part of the city will change drastically.

P

Railway Station 3-6-10-14

0

100

200

31-33-34-433E-N2

400Meter 3-14 31-33-34- N2

scheme of the pedestrian accessibilities of the area

3-10-14 31-33-34

primary streets secondary streets pedestrian streets directions bus-tram stops P

parking lot

existing public transport lines around Europaallee

30

634

2

93

12

28

129

1

statio

33

statio

n

n

55 38

32

85

0

Vehicles

13

15

1

9

15

4001 - 8000

People

1001 - 2000

8001 - 14000

2001 - 4000

14001 - 21000

4001 - 7000

21001 - 35000

7000 - 10000 10000 - 15000 0

100

200

400Meter


medium scale analysis

17 1. 2. Zurich typical blocks

newer and older plots compared

Plots and blocks This grid defines some different spaces that are covered by plots and open spaces; Europaallee plots can be considered similar to the old one below but in the new development parcels are not defined and the plot is occupied by a unique big block. The block in Europaallee is opened in order to have a semi-public space in their internal space: this space is projected as a part of the building and sometimes the aim is to create a close space. The grid defines also some open spaces where in Europaallee are at the end of the main street; moreover open spaces and passages for pedestrian are given by building permeability and porosity, which is important defining the north south connection between blocks. 3. Europaallee blocks

Meter

streets plot buildings parcelization

keeping the same shape of the plot, the parcelization inside Europaallee (second line) is different from the more classical one of the surrounding blocks (first line)


18

inside europaallee

aerial view of the site and outline of all the designed single buildings

building F building D

building H building B building E

building C

building A

on going projects last projects to be implemented

building D

finished buildings pedestrian-bicycle street 2020

Inside EuropaAllee

building G

pedestrian-bicycle street (Lagerstrasse)

2018

stages. The foreseen output is an avenue surrounded by

building B

a development plan ending in 2020, subdivided in eight

building F

The actual project for Europaallee started in 2009 is part of

2017

environments and capable of creating a define identity, in close cooperation with the city of Zurich.

building H

modern architectures that are embedded in the existing

The main destination for the Europaallee are business activities and headquarters for Swiss banks - where

value as a new landmark and meeting point inside the 2014

city, with different shops, bars and restaurants.

site from east to west, ending each side with open plazas, while vertical passages are allowed by small corridors

2012

inside and around buildings and a main one on the east side, designed as a meeting point for people interested in topics like travel and sports.

timeline for the realization of each building

building A

2013

ecosystem of Europaallee: two main streets cross the entire

building C

The “pedestrian movements� are fundamental in the

building A

thanks to the central train station. By no means least the

building E

2015

its centrality and the accessibility to the city and outside

building G

already 6,000 workers are present, - choosing this place for


inside europaallee

main horizontal and vertical passages

open, closed spaces and the relation with the railway

line of trees along the streets and green elements

19


20

inside europaallee

Building shape We can interprete the architectural and design strategy in four steps:

aerial view of the built-up area above, the disposition of the different blocks

- Cut

H

- Opening

G

E

F

C D A

- Alignment - Final result Looking at the analysis is possible to notice how the buildings are able to be one and only, but at the same time to work together perfectly. The blocks are built looking at the necessity to provide squares and an open public space to the people; in this way the users will be able to move easily and fluently through the area, being transported by the unique floor and the harmonious correlation between elements.

CUT

H

G

E

OPENING

ALIGNMENT

FINAL RESULT


inside europaallee

CUT

OPENING

ALIGNMENT

21 FINAL RESULT

F

D

C

A

the surface covered by blocks and the green elements around them


22 Buildings

buildings

According to a last review (December 20141) three construction site is for buildings along the line of the three

new

built-up, the last to be built are the more close to the railway.

old

The buildings designed for Europaallee are all categorizable

city

city

buildings are completed (building A, C and E) and the

in two typologies (escluding Sihlpost):

Sihlpost generates a barrier between old and new city

open blocks

blocks or slabs with towers above

Both of them generally provide internal open spaces or

1

green, most of them freely accesible.

europaallee.ch/de/europaallee/projekt/aktuelle-baustellen.html

view of Sihlpost from the west side

view of Sihlpost from Lagerstrasse in 2009, with the area of Europaallee still unbuilt

Newer updates can be seen in this website: http://www.


buildings

Sihlpost

An historic building recently renewed, it

rises as a landmark in this place, being the divider between the old Zurich and the new Europaallee settlement, generating open and closed spaces in-between historical ambience and functionality.

bottom view of Sihlpost from the east side

Sihlpost

23


24 Buildings A

buildings

open block with internal open space

The first part of the Europaallee project is the only one together with block C completed until now. Led by the architect Max Dudler, it appears as a single block with an inner mall occupying the ground floor, while the upper ones

each building composing the block is linked with the other by internal corridors

are offices of the client. The space around is used by the bordering school, giving a strong identity and potentiality to the structure.

the internal paths of the block generate passages and open spaces

FLOOR USAGE office leisure

view from the internal open space of block A

A


25

buildings

B

slab with single tower above

It will be developed by Stücheli architects and, together with block A, they will be the entrance to Europaallee. It has a sculptural and elegant look, with the upper floors dedicated for offices, while a slight reversion of the surface near the basement creates a sort of “portico” for the public

passages and the tower

uses, together with shops and restaurants. The building is also pre-certified with a sustainable label.

the building works as a noise barrier from the railway

B

FLOOR USAGE office leisure

the shape of the building create a sort of portico that encolse the pedestrian passage between the building itself and the line of trees

render of block B


26 Buildings

buildings

single buildings linked together

the corridors between one building and the other generate passages linking the internal open public space with the surrounding boulevards

view of the building designed by Gigon/Guyer

C

each building composing the block is linked with the other by internal corridors

C

view of the building designed by Gigon/Guyer

open block with internal open space

A joint action of three groups of architects (Annette Gigon/Mike Guyer, David Chipperfield and Max Dudler as general supervisor) for the realization of four buildings around a central space. It results as a single squared structure keeping the different buildings separated by surface style and structure, but connected all together at the first floor by a single common art gallery. Even though a Swiss bank is the owner of the structure, the ring generates a central free open space, linked with the space outside by Swiss-style narrow corridors crossing the buildings.

FLOOR USAGE office gallery leisure


buildings

the two towers emerging from the block are surrounded by green roofs, while the internal private space is both green and paved

27

render of building D seen from the railway line

D

the building works as a noise barrier from the railway

D office

FLOOR USAGE

leisure

block with two towers above and internal private

space By the Dutch team Wiel Arets Architects, an interesting project by and architectural and urban planning point of view. Located along the borders of the railway, it’s composed by a main structure accessible by the public with shops and restaurants, ending with two staircases leading to as many towers for offices. This too has a precertified sustainable label.

passages with staircases inside the building


28 Buildings E

articulated slab with two towers above

Project won by Caruso St John Architects together with the

buildings

the two emerging towers at the extreme sides of the slab

E

Swiss-based Bosshard Vaquer Architects, as the previous is located along the railway network. It is a mixed uses building that keeps a classical structure at the basements for public uses and it develops two towers only for housing rent.

render of building E and boulevards

passages surrounding the slab ending with Gustav-Gull Platz

FLOOR USAGE loft

leisure


buildings

29

block with the two towers and the separate one

F

passages and the boulevards surrounding the block generate an open space between the separate tower, Gustav-Gull Platz and the block itself

F

block with two towers above, internal private

space and external tower By Boltshauser architects, it’s a system of three towers, which together blocks E, G and H generate the future “tail” of Europaallee. The towers are mainly designated for lofts and apartments to rent, and their disposition generates a square in between.

the building works as a noise barrier from the railway

render of building F seen from the railway line

FLOOR USAGE

loft

leisure


30 Buildings G

buildings

H G

block with two towers above and internal private

space By the architecture team ARGE Graber Pulver architects, as the previous projects is composed by a single building

the towers above the block

developing two distinct towers, both for residential purposes. The highest tower creates a volumetric entanglement and a vertical cut being in the crossing position between Europaallee and Lagerstrasse.

passages, open and closed spaces, all of them generated by the main tower on the east side

render of building F seen from the railway line

FLOOR USAGE loft

leisure


31

buildings

old city

H

block with two towers above, internal private

space and external tower A joint team of E2A architects and Basler & Hofmann engineers and planners AG, this project differs from the other by its strong integration with the existing neighborhood,

promoting

environmentally

friendly

mobility and urban sustainability. Designed for mixed uses as residential, offices, shops and restaurants, the building is block H (and especially its external tower) will be the west border of Europaallee, separating the new settlement by the old city

placed at the ending (or beginning) of Europaallee, in the crossroad with Longstrasse. It has the goal to be one of the first buildings in Europe with zero CO2 emissions.

the space inside the block is for private uses

render of building H, surrounded by Europaallee and Lagerstrasse

FLOOR USAGE loft office

leisure


32

sketch of the future Europaallee

conclusions

Conclusions

Studying the case of Europaalle in line with urban design

more close and intimate; on the other hand, green spaces

practices, it’s possible to read the project according

can be seen as “place for staying” as the open spaces but

to different themes: urban fabric, building typology

in this area the relationships with nature is lacking.

and public realm; understanding the masterplan of

To conclude, Europaallee is an example of typical

Europaallee and the expectation that this masterplan had

new idea of city linked with the reusing of spaces and

it’s possible to underline that, although a set of different

enhancing the territory; this contemporary intention is

projects during the last 30 years, this masterplan is going to

visible for first looking at the dimension of the building

be developed in the same way as it is designed.

but also thinking to the idea of flexibility, considered as

Although this masterplan is not completed, some crucial

an opportunity to foster identity of the city of Zurich, on

aspects are emerging and they’re dealing especially with

the other hand this adaptability can become a sort of

public and open spaces sphere. Buildings that will face the

“code” for new development building around the world.

railway are very close to the trail and the street along the

The space, although this “ideal criticalities” is a space

same line are not designed: in this way the streets of the

where practices of living, working, studying and others are

orthogonal grid are dead-end street, facing the railway.

gathered together giving a mixed spaces with a variety of

The risk in this case is that streets can become un-friendly

people in that space that is proper of a livable city.

for people passing in Europaallee district. Moreover in this project there is a lack of green spaces that are given just by the streets of Europaallee and, in the future, by Lagerstrasse. This lack can be considered as a choice in order to make the internal spaces of the building


conclusions

view from the plaza inside block C

render of a view from Gustav-Gull Plaz

33


34

sources

BOOKS A. Bonte and J. C. Burkle, “Zusammen Bauen : Dudler, Gigon/Guyer, Chipperfield : Europaallee 21 Zurich = Building together“, Berlin: Jovis, 2013

WEBSITES http://it.detail-online.com/architettura/temi/un-sistema-coerente-europaallee-21-a-zurigo-021710.html http://www.arquitecturabeta.com/2012/01/29/europaallee-kcap/ http://www.europaallee.ch/de/europaallee/projekt/aktuelle-baustellen.html http://www.kcap.eu/en/projects/v/europaallee/3191 http://www.progettarearchitettura.it/nuova-vita-intorno-alla-stazione-di-zurigo/ http://www.archdaily.com/375191/europaallee-zurich-max-dudler-architekt/ http://www.metalocus.es/content/en/blog/europaallee-house-max-dudler-iii http://www.metalocus.es/content/en/blog/wiel-arets-architects-will-design-europaallee-site-d-z%C3%BCrich http://www.carusostjohn.com/projects/stadtraum-hauptbahnhof/ http://www.20min.ch/schweiz/zuerich/story/19635921 http://www.tagesanzeiger.ch/zuerich/stadt/Die-Lagerstrasse-soll-zum-Boulevard-werden/story/22187422 http://www.tagesanzeiger.ch/zuerich/region/Fuer-den-letzten-Baustein-der-Europaallee-werden-vier-Gleiseabgebrochen/story/16396787 http://www.tagesanzeiger.ch/kultur/Unsere-Gebaeude-sollen-Ruhe-ausstrahlen/ story/29816429#clicked0.9005495270248502 http://www.german-architects.com/de/pages/studio-visit-kcap


sources

BiblioSitography

https://www.stadt-zuerich.ch/ted/de/index/geoz/geoportal/historische-karten.html http://www.europaallee.ch/de/europaallee/projekt.html https://www.openstreetmap.org/#map=16/47.3783/8.5288 http://www.urbanrail.net/eu/ch/zh/zuerich.htm http://www.swissinfo.ch/eng/ubs-pulls-out-of-zurich-development-project/2013356 http://memim.com/eurogate-zurich.html http://www.informagiovani-italia.com/come_muoversi_zurigo.htm https://www.google.it/maps/@47.3786588,8.5288087,14z http://www.stuecheli.ch/projekte/detail/europaallee-baufeld-b/ http://www.boltshauser.info/works/work-detail.php?y=2014&aID=120 http://divisare.com/projects/197276-Boltshauser-Architekten-Z-rich-Europaallee-Baufeld-F http://graberpulver.ch/projects/europaallee-baufeld-g/ http://masswerk.com/wettbewerbe.php?WEBYEP_DI=19 http://divisare.com/projects/141601-E2A-Eckert-Eckert-Architekten-Europaallee-plot-H

35


36

sources

Image Sources http://maps.google.it http://it.detail-online.com http://www.kcap.eu/en/ http://www.europaallee.ch/de/ http://issuu.com/gigerpartner/docs/issuu_ver_ea_magazin_baufeld_e/1 http://issuu.com/gigerpartner/docs/ver_ea_magazin_haus_g/1 http://www.archdaily.com/375191/europaallee-zurich-max-dudler-architekt/5197f702b3fc4b96d7000092_europaalleezurich-max-dudler-architekt_02_luftbild_europaallee-stefan_m-ller-jpg/ https://www.zuerich.com/it/visitare/attrazioni-turistiche/langstrasse http://de.wikipedia.org/wiki/Aussersihl http://dusp.mit.edu/sites/dusp.mit.edu/files/attachments/project/projections_10_b.pdf



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.