6000 Homes Project in KURDISTAN



2 Stories House (140m2 + 70m2) 6000 Homes Project in KURDISTAN Habitania Social Foundation - Teydi - Global Housing Company Ltd.


6000 Homes Project in KURDISTAN Habitania Social Foundation - Teydi - Global Housing Company Ltd.

2 Stories House (140m2 + 70m2)


2 Stories Twin House (86m2 + 40m2) 6000 Homes Project in KURDISTAN Habitania Social Foundation - Teydi - Global Housing Company Ltd.


6000 Homes Project in KURDISTAN Habitania Social Foundation - Teydi - Global Housing Company Ltd.

2 Stories Twin House (86m2 + 40m2)


Terraced House (89m2) 6000 Homes Project in KURDISTAN Habitania Social Foundation - Teydi - Global Housing Company Ltd.


6000 Homes Project in KURDISTAN Habitania Social Foundation - Teydi - Global Housing Company Ltd.

Terraced House (89m2)


6000 Homes Project in KURDISTAN Habitania Social Foundation - Teydi - Global Housing Company Ltd.


6000 Homes Project in KURDISTAN Habitania Social Foundation - Teydi - Global Housing Company Ltd.


6000 Homes Project in KURDISTAN Habitania Social Foundation - Teydi - Global Housing Company Ltd.


6000 Homes Project in KURDISTAN Habitania Social Foundation - Teydi - Global Housing Company Ltd.


6000 Homes Project in KURDISTAN Habitania Social Foundation - Teydi - Global Housing Company Ltd.


6000 Homes Project in KURDISTAN Habitania Social Foundation - Teydi - Global Housing Company Ltd.


6000 Homes Project in KURDISTAN Habitania Social Foundation - Teydi - Global Housing Company Ltd.


6000 Homes Project in KURDISTAN Habitania Social Foundation - Teydi - Global Housing Company Ltd.


We follow the UN recommendations • Flexible structure • Light Housing Construction • Distribute the load around the perimeter of the walls ... and accommodate the National Standard laws

6000 Homes Project in KURDISTAN Habitania Social Foundation - Teydi - Global Housing Company Ltd.

Increases earthquake r e s i s t a n c e


Improves the thermal insulation and internal comfort

C omparative table for wall thermal transmittance Concrete block wall of 15cm. Solid brick wall of 15cm. ConfortWall of 12.5cm

0.420 w/m2K 0.150 w/m2K 0.024 w/m2K

6000 Homes Project in KURDISTAN Habitania Social Foundation - Teydi - Global Housing Company Ltd.

Characteristics of interior and exterior plates


sustainable

Building without use of the water No waste on building site

1. Lets adapt housing to the cultural specificities of each region. a. No limit on the distribution of housing. b. The finishes can accommodate the traditional houses in the vicinity. c. In one story homes structure is dimensioned to build a second plant in the future. 2. The cost of housing is cheaper. a. We reduce construction costs by allowing it to invest in quality and sustainability b. Projects in which a significant amount of housing is required are set to additional savings. 3. Does not require skilled labour for construction. a. No need for skilled labour which allows even the “self�. 4. Improved insulation and this increases the comfort for people and decreases the energy cost of housing. a. We increase the external wall insulation to reach a thermal transmittance of 0.22 W/m2, improving the standard 4-fold (0.82 w/m2 CTE). 5. Decrease the duration of the work. a. You can make housing in a quarter of the time than a conventional promotion with the obvious advantages that this feature brings to reduce workplace accidents, and forward delivery dates.

6. No water is needed for construction. a. . We saved 90% of the water needed to execute the work to accomplish the same with dry construction techniques. 7. It reduces energy consumption. a. By increasing the insulation to reduce energy consumption and CO2 consumption by over 40%. 8. Improves performance in relation to earthquakes. a. The structure shared by load bearing walls around the perimeter of the walls b. The construction carried out by mechanical joints gives greater security and flexibility to the buildings. c. Buildings are less heavy. 9. With regard to fire protection. a. We increased fire protection to the exterior and interior walls using specific materials to prevent fire. 10. Does not generate waste to work. a. . All materials come to the preparations for construction work without having to manipulate them on the spot and minimizing waste and wastage 11. Good performance in relation to noise pollution. a. It reduces noise pollution during construction b. Important values are achieved with sound insulation in exterior and interior walls.

6000 Homes Project in KURDISTAN Habitania Social Foundation - Teydi - Global Housing Company Ltd.

Elements of construction

The dry construction and automated prefabrication requires less skilled workers, while the labor items are also divided and all this affects the lowering of the final cost of the work


project for 6000 homes in Kurdistan

roads and sidewalks green space comercial space equipments parking area

town-plannig cell

22360,88 7079,2 2472 500 4125 1875 375

1000 inhabitants/cell x y

m2 m2 m2 m2 m2 mlineal parking bay

% of total 24,0 7,6 2,7 0,5 4,4

369,4 m 252,2 m

39,2

93162,68 m2

area

200

homes Density

equipments parking area comercial space1% 4% 3%

30 total Cells

10733,91191 inhabitants/km2

Public space private space

% of public space 61,2 19,4 6,8 1,4 11,3

36537,08 m2 56625,6 m2

100

Total space

green space 8%

39,2185798 % 60,7814202 %

Public/private space Public space 39%

private space 60%

roads and sidewalks 24%

private space 61%

equipments 1%

parking area 11%

Public space

comercial space 7%

Private Sapce terraced house 2 stories house 2 houses 2 stories

m2 built ground floor plot area (m2) units Total plot area total built area 89 178,6 16 2857,6 1424 m2 140 572 4 2288 280 m2 86,1 286 180 51480 15498 m2

TOTAL

200

House types

56625,6

17202 m2

terraced house 8% 2 stories house 2%

2 houses 2 stories 90%

%built 49,83202688 12,23776224 30,1048951 30,37848606

green space 19% roads and sidewalks 62%

6000 Homes Project in KURDISTAN Habitania Social Foundation - Teydi - Global Housing Company Ltd.

Public space


export@habitaniasocial.org www.habitaniasocial.org

teydi@teydi.es www.teydi.es

export@globalhousingcompany.com www.globalhousingcompany.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.