without compromise.
Excel System Overview Excel is a world-class premium performing end-to-end infrastructure solution - designed, manufactured, supported and delivered - without compromise.
Excel System Overview
A world-class
premium performance
end-to-end infrastructure solution.
without compromise.
Introducing Excel Excel is a world-class premium performance end-to-end infrastructure solution - designed, manufactured, supported and delivered - without compromise. Excel is driven by a team of industry experts, ensuring the latest innovation and manufacturing capabilities are implemented to surpass industry standards for quality and performance, technical compliance and ease of installation and use. Our emphasis is on compatibility and standards compliance ‘from cable to rack’, reliability and product availability. With a focus on system performance, independent verification and a 25-year warranty when installed by an accredited Partner, it’s easy to see why Excel is the system of choice across so many organisations and different vertical markets.
Top 3 in the UK and UAE
Excel Brand Values Proven: standards-compliant products, with third party independent verification from test houses such as Force Technology/Delta, ETL and 3P.
Accepted: Excel is a market leader of structured cabling in the UK.
Compatible: an end-to-end system supported by one company with one warranty providing support and peace of mind from racks to copper, fibre & voice cabling systems.
Flexible: from Category 5e through to Category 8 copper cabling and optical systems from conventional multimode OM1 to OM5 and Singlemode OS2, to Passive Optical LAN infrastructure and pre-terminated high density MTP and highly flexible blown fibre systems, as well as Racks and Intelligent Power Distribution Units.
Reliable: worldwide partner programme, 25 year warranty programme, pre and post sales technical support, 21-year plus product development programme, third party verification as standard on all key solutions.
Available: global stock availability via Excel Distribution Partners for immediate delivery.
Excel System Overview
Third Party Verification
ement
e Stat
ianc Compl
cable, ication
mun
Data com any Comp50
No.
Third party verifications are an independent ‘tick in the box’, verifying either a product or a set of products’ compliance with a particular standard. Excel has invested in such test and verification programmes for over 20 years, working closely with laboratories such as Force Technology (Delta) and 3P based in Denmark, and ETL in America.
-8 Excel 2018
ry 6A
Catego
No. 201
9-344
Compl ianc
Data com
e Stat
municat
Company Excel Excel House Junction Six Indus Electric trial Park Avenu Birmingham e B6 7JJ United Kingdom
ion cab le,
ement
Catego
ry 6
No. 201
9-126A
Product trial Park Excel House description Six Indus Unscreened Junction Horizontal cable (U/UT Avenue Electric P) chara B6 7JJ 4 twiste floor wiring cterised cable, d pairs Birmingham om up to 250 100 Ω Flame Kingd MHz MHz retardant, United MHz Data up to 500 PVC jacket 00 cterised com description P) chara Product to 12 Product mun Comp cable (U/UTcable, 100 Ω 100-069 identification A up Unscreenedfloor wiring any icat Exc el ry 7 ion Horizontal pairs Exc free Generic d el tego cabl halogen 4 twiste nts Jun House • ISO/I cabling and ctio e, Ca retardant, e, Ca requireme cabling Cable Electri n Six Flame bl EC cable 11801 U/UTP • IEC ca tego componen ion ory 6A eened Birm c Ave Indust 61156-5:20-1:2017 (Ed. Categ ion ts stand identificatory 6A Unscr rial ry 5e nue • EN ards 1.0) ards Unitedingham Park 50173-1:20 12 (Ed. 2.1) 1.0) / ISO/IEC Product icat ts stand -2:2017 (Ed. Excel Categ • EN 11801-2:20 - Category onen B6 un 89 18 Kin / 50288-6-1:2 m EN 50173 100-1 6 cable ng comp EC 11801 gdo 7JJ 17 (Ed. • TIA-5 requireme -2:2018 m 013 1.0) Pro and cabli(Ed. 1.0) / ISO/I com 68.2-D du nts cabling 17 :2018 Unscr ct de Data Generic EC 11801-1:20 2.1) scr Stand een 18 (Ed. Horizo 12 iption -2:20 ards for ed • ISO/I any 61156-5:2018 / EN 50173 flame • IEC 4 twi ntal floocable (U/ AACR-F) Park Comp • IEC 60332-1-1:2 retardanc -1:20 and PS rial el • IEC Flamested pai r wir UTP) y EN 50173 -11-1:2012 015 (Ed. ANEXT Exc House Indust • 60332 (PS ing cha rs el 1.1) -1-2:2015 retard 50288 cab racter z* Exc parameters n Six • EN 68.2-D:2018 le, 100 (Ed. 1.1) ant, ctio Avenue 7JJ ised 0 MH crosstalk Pro rmance Jun PVC 120 c up to screen • TIA-5 all cable alien Ω duct e perfo B6 jacket Technical 100 ing up to braid Electriingham m 100 ide and smok 1.1) d -06 ty, includ ntific rall ise MHz acidi 5 T923448, report 015 (Ed. Birm Kingdo h ove ation halogen racter DANAK-19/ Gene 60332-1-2:2 ents ability, iption ) cha 100 Ω rs wit until United 19970 flamm 1.1) / IEC ric CS valid 3.1) uirem descr (S/FTP cable, sted pai • ards for 015 (Ed. 2020 13 (Ed. ISO cablin EC Cabli Stand duct cable wiring ed twi le req 1 June /IEC ct ID • g an 60332-1-1:211 (Ed. 2.0) IEC 61034-2:20 ng produ Pro r ed IEC een free / 5317 ng produ • IEC 7 A cab ct ID • 611 11801- d cab This produc 60754-2:20 13 (Ed. 3.1) Screen ntal floo foil scr ogen EC Cabli ory EN ly • IEC t has ) 501 56-5:2 1:2017 ling com • "Terms CS valid Categ Horizoividual ant, hal 61034-1:20 5738 73-1:2 012 and conditbeen tested by EN (Ed s - (Ed. 1.0 • IEC rds and in a mainte 502 • . 1.0 pone FORCE 11 Janua until ions for 4 ind retard 018 (Ed. standa 88TIA Technology ndard 017 the EC nance part schedu ) / ISO nts ry 2020 ation specifiedand QA -568.2 3-1:20 / EN 2.1) 2:2 sta VERIF t takes report Flame and 20188 above ntific produc sites. nts 11801/IEC stand 501 of the tionThe mainte le, which impliesIED programme complies with 0 -D:201 13 Technical , DANAK-19/ ide Sta 73compliance ments 1006. The This C 118 ards 201 r's produc pone the require nance ndard that FORCE for Gener 2:2018 duct A1: 01-2:2 - Ca 8 the require g”, DQP23 manufacture testing statem com ISO/IE T927768-02 ments • Pro ent has l Cablin of the produc Technology ic and Coaxia ies with the s for ment IEC ling 1.0) / 017 tegory been revised -912 l Cablin of the above audit of and compl ic and Coaxia perfor • t is perfor 603 fla (Ed g”, DQP23 100 specified amend d cab (Ed. . IEC 32-1-1 me Technologymme for Gener performs a quality med on ms a quality . 1.0 5e cab -913 an standa 1006. ing Hørsh basis. ret audit of 603 a sample rds and ce 100 ) by FORCE IED progra olm, 4 le req ling 1:2017 . 2.1) the manufThe product 32-1-2 :2015 ardan Technology on a sample includ tested basis. June 2019 VERIF cab takes rman 01acturer's uirem t has been cy the EC that FORCEt is performed ric :2015 (Ed. 118 012 (Ed . 1.0) 2:2018 produc part perfo implies ions for 9 Techn until This producidcondit produc 73tion ents (Ed Gene /IEC (Ed 1.1) 201 le, which oke ) of the and s val 56-5:2 003 EN 501 ISO . 1.1 ica berschedu nance testing T93 "Term 611 d sm . 1.1 • nance / CS ) 023 l rep mainte 56-7:2 IEC NovemThe mainte y, an 15 (Ed in a 17 2, DA ort Lars Lindsk 611 1:2018 12 • sites. NAK-1 IEC acidit 1-2:20 73and QA :20 ) ID Test Mana ov Pedersen en • 501 9/2 log 60332EN . 3.1 88-9-1 ger duct 028 (Ed • 502 y, ha / IEC pro 9 Andersen 2019 n EN This ng abilit . 1.1) Dennis • tment 14 May has bee 2:2013 Cabli 34"Te produc of Depar Hørsholm, product conditions flamm15 (Ed ) EC rms 610 Head t has 2.0 s 0 in a and s for 1-1:20 (Ed. bee 593 EC ) / IEC Dennis z. Thi rms and nance The and mainte conditi n test Cabli Andersen ndard60332011 (Ed. 3.1 "Te mainte 0 MH s. nan ons ed by QA 509 Head of site Sta 120 and ng a ce for site 2 54-2:2 013 QA sen IEC FOR Department pro s. The schedu the up to dards part in andPeder 607 • 1:2 CE ts du EC ov es Lindsk 34limi IEC ct ID mainte le, whi VER Techno tion d stan 610 duc Lars • . 7A cifie duct tak logy nan ch imp IFIED logy Hørsh IEC 5 Techno s pro Manager ce test lies pro ed Cat ve spe pro rer'Test and FORCE dsvej 4 • ort 968 olm Venlighe tha gramm com 9/1 ing rep extend the abo 6. The actu ,9 CS of the t FOR e for plies 2970 Hørsholm July ical NAK-1 with nts of P23100 manuf val Denmark 201 and 1 Aug id un producCE Tec Genericwith the me ”, DQ it of the 00 Techn 4, DA 9 uire 43 25 14 56-7 til ust 535 req t is hnology and .com Tel. +45 611 the req Cabling lity aud 202 perform per T83 ebydelta Coa uireme IEC Lars xial a qua is. ion.mad 0 certificat with s with Coa s ed on forms xial Cab nts of bas ply Tes Lindsk plie and a sam a qua ling”, the abo com t Ma ov com eric perform ple and Gen nag Peders ple lity aud DQP23 ve spe eters logy on a sam FORCE for bas er hno it of Techno 100 en cifie param hnologymme is. Tec formed 6. the Venlighe logy CE sion Tec dsvej manuf The prod stan ersen nt mis CE progra t FOR t is per 2970 Hørsholm4 ans FOR IFIED duc dards actu tha duc s And partme *Tr and rer's t tak Denmark ed by VER implies the pro Tel. +45 Denni of De certificat produc es par test EC gy ch of ion.mad 43 25 14 00 ad the nolo j 4 whi ing ebydelta He tion t for le, .com Tech dsve test CE FOR Venlighe holm schedu nance 8 Hørs ark 201 2970 Denm 00 mainte ber 25 14 m vem 43 No ta.co +45 Denni , 14 Tel. adebydel olm ion.m Head s And ficat Hørsh certi of De ersen partme ersen nt ov Ped Lindsk er s Lar Manag t Tes
Com
n plia
ce S
nt me
tate
Com
plia
nce
Sta
tem ent
FOR CE Tech Venl nolo ighe 2970 dsve gy Hørs j 4 certi holm ficat Tel. +45 Denm ion.m 43 adeb 25 14 ark ydel ta.co 00 m
To download copies of our third party verification certificates please visit www.excel-networking.com.
Excel 25-Year Warranty We offer a 25 year product and application warranty as standard on all installations completed by an accredited Excel Partner.
• Covers all Excel copper, fibre optic and voice cabling systems, Environ racks (25 year warranty) and PDUs (3 year warranty) when installed as part of a complete Excel Solution • Registered sites covered by 25 year application warranty • Permanent Link warranty as standard, channel on application • Issued to latest published standards • Performance/Bandwidth warranty All warranties are processed through the online warranty system located in the Excel Partner area of the website and are typically processed in 5 working days. The Excel 25 year product and application warranty is only available when systems are designed, installed, and tested by Excel Partners with current training certification in place. Warranties are issued only after an audit of test data, and at the discretion of the Excel technical support team at site audit. In all cases 100% of the links which require warranty support must be tested.
Excel Partner Programme The Excel Partner Programme offers three levels of accreditation: Excel Cabling Partner (ECP)
Excel Solutions Partner (ESP)
Excel Distribution Partner (EDP)
A pre-requisite of Excel partner status is training, the understanding of which is verified through an online exam process to demonstrate knowledge of the Excel system and how to design, install and test in accordance with Excel guidelines, best practice and above all standards compliance. There is an online course and a one-day face-to-face course, both run by Excel. The assessment is available online for one calendar month following the course. Once partner status is awarded, both ECPs and ESPs are able to provide the comprehensive 25-year warranty for copper, fibre, voice and rack installations. Read more about the Excel Partner Programme on our website: www.excel-networking.com/excel-partner-programme
No.
2019
-436
without compromise.
Excel System Offering Excel offers one of the market’s most comprehensive cabling solutions, including:
Enbeam Fibre cabling
Evniron Racks & Open Frames
Copper
Residential
l
l
l l l l l l
Category 3 UTP Category 5e U/UTP and F/UTP Category 6 U/UTP and F/UTP Category 6A U/UTP, U/FTP and F/FTP Category 7A S/FTP Category 8 Pre-Terminated Solutions
Fibre l l l l l l l l
Enbeam Internal/External Grade Cable Enbeam Patch Cords and Pigtails – ST, SC, LC Enbeam Connectors and Adaptors Enbeam Patch Panels Enbeam MTP Enbeam Blown Fibre Excelerator Pre-Terminated Solutions Excel Passive Optical LAN (PON) Solution
l l l l
Cables and Patch Leads Patch Panels Enclosures USB, HDMI, SVGA Cables AV Inserts
Voice l l
Internal Grade Cabling External Grade Cabling
Racks & Open Frames l l l l l l l l
Environ® CR (Comms) Racks Environ® ER (Equipment) and SR (Server) Racks Environ® CL (Co-Location) Racks Environ® 2 Post Racks Environ® Wall Mount Racks Environ Locking Solutions Accessories PDUs – Standard, Modular and Intelligent
Excel System Overview
Excel Copper Cabling Systems 8 Cable
Patch Leads
Patch Panels
Multiple colours and cable constructions available in a variety of length cuts.
A wide variety of colours and lengths as standard and high-density patching solutions
Straight and angled panels available as loaded or unloaded frames for complete flexibility.
View Now
View Now
View Now
Jacks and Modules
Faceplates and Shutters
Screened and unscreened jacks available in flat and angled styles to suit all environments.
Large choice of styles and colours, featuring built in labelling fields.
View Now
View Now
Excel Pre-Terminated Copper Solutions Excel’s full range of pre-terminated copper assemblies are available as single or loomed, supplied loose or fitted with cable socking. The cable can be fitted with modules, jacks or plugs on either or both ends. Read more: www.excel-networking.com/pre-terminated-copper-assemblies
Excel Voice Cabling Systems The Excel voice cabling system offers a range of cables for all types of applications and installation conditions, as well as a complete set of line jack units, box connections and RJ45 voice patch panels. We offer, from stock, a choice of multipair cables, manufactured to CW specification and suitable for internal and external applications, or Category 3 options for voice and low speed data applications. The Excel range of voice connectivity products meets all possible requirements from standard LJU’s, high density RJ45 patch panels, through to 20 to 1380 pair box connections
without compromise.
Excel Enbeam Fibre Cabling Systems
OM2
OM1
OM3
OM5
OM4
OS1
OS2
Cable
Patch Leads and Pigtails
Patch Panels
Multiple colours of cable sheath in a variety of lengthcuts, with CST and SWA constructions available.
A wide variety of colours and lengths as standard and high-density patching solutions.
Multiple styles available, including sliding drawer panels for optimum protection of fibre.
View Now
View Now
View Now
PON Solution Delivering fibre to a range of environments across FTTx and POL network infrastructure systems. Regardless of the size of the building, the Excel range of PON products offers numerous options in fibre connectivity and distribution.
View Now
Excel Pre-Terminated Fibre Solutions Excel’sfull range of pre-terminated fibre assemblies are available in all core counts with bespoke breakout lengths to suit application. The fibre end faces are machine polished, with ferrule geometry checked and fitted with protection on both ends. Preterminated fibre is available on a drum or coiled in a bag. Read more: www.excel-networking.com/pre-terminated-fibre-assemblies
Excel System Overview
Excel Environ Racking Solution
CL
CR
ER
OR
SR
WR
PDU's
Floor Racks
Open Racks
Wall Racks
- Choice, flexibility, strength and performance by design - Suitable for a variety of installation environments across a full spectrum of vertical markets - 15U - 47U - ER, CR, SR, CL Series
- Flexible and adaptable by design - Suitable for highdensity patching applications where strong cable management is critical. - 42U - 52U - OR Series
- Ergonomic and versatile by design - Suitable for smallerscale that don’t require large quantities of equipment - 6U - 21U - WR Series
View Now
View Now
View Now
Excel Power Distribution Solutions Excel Intelligent PDU (iPDU) Range The Excel Intelligent Power Distribution Unit (iPDU) Family offers a high specification portfolio of power distribution units that are designed to suit any environment, where monitoring or managing of information is required. The iPDUs are a highly flexible solution, with all versions having a built-in environmental centre covering a series of functions for optimum monitoring and measuring, even down to individual socket monitoring and switching.
Excel Standard PDU Range The Excel Standard PDUs are available in a variety of sizes and international socket types. A range of input connectivity plugs are available to support different installation environments, including IEC 60309 “Commando Style”, UK BS1363, Schuko, French NFC, C13, C19, C14, C20 and more. Excel Desktop PDU Range Excel Desktop PDUs offer a convenient solution to the work place. Available with either UK or Schuko power sockets and options to accept data outlets and USB power, the PDUs are easily fitted to the desktop with the supplied clamps, eliminating the need to scramble under the desk to connect a computer, laptop and other power supplies.
Excel Modular PDU Range The Excel range of modular PDUs introduce flexibility and design options to suit your power requirements. A range of socket modules are available which snap into the housing quickly, easily and securely without the need for tooling.
without compromise.
CPR Compliance Excel offer CPR-compliant cabling across their copper and fibre portfolios, with product available to suit each Member country’s requirements. Visit www.excel-networking.com to learn more about CPR and the BS6701:A1. There is a short video and a downloadable infographic which help to clarify details about the industry regulation and what you should do in order to comply. Understand what a Euroclass means:
Understanding CPR and BS6701:A1 at a glance…
Class Cca, S1b, d2, a2
Droplets rating
Application to cables
Visit www.excel-networking. com/understanding-cpr to learn more and download our CPR Infographic.
A
Acidity rating
Fire performance class
Smoke rating
Be aware of the difference in performances of each Euroclass: A closer look at CPR Euroclasses
B1 B2
C
D
E
Fca
Undetermined reaction
B2ca
Low reaction
Eca
Basic reaction
B1ca
Very low reaction
Dca
Improved reaction
Aca
No reaction
Cca
Reduced reaction
F
If you have any questions about CPR, contact our specialist team at cpr@excel-networking.com. For sales enquiries, please contact our team at sales@excel-networking.com or call 0121 326 7557.
Plastic Free Packaging
ZERO Plastic Packaging
As a business we are acutely aware of the damage that plastic has on the environment and we are determined to lead the way in our industry to remove as much ‘single use plastic’ from the supply chain. It hasn’t been an easy change but one that we’ve persevered with to develop alternative ‘plastic free’ packaging for much of our copper and fibre product lines, as well as reducing card board box sizes where we can. This latest drive to remove single-use plastic bags from a range of Excel products is the latest example of our efforts to improve our sustainability – but it is by no means the end of the road. Our responsible packaging solutions are being introduced from 2019 and will become the standard as stocks of the current packaging designs are depleted. Why should you #PassOnPlastic?
Reduced Waste Volume
100% Recyclable Waste
Quicker to Install
Easier for Engineer On-Site
Lower Installation Costs
By switching to “natural” brown packaging options, we will be reducing our annual single-use plastic bag usage by more than 16 million bags*. This is the equivalent of over 40 tonnes of single-use plastic being removed from the supply chain and replaced with 100% recyclable packaging.
https://www.excel-networking.com/plastic-free
*based upon our 2018 sales figures
Excel System Overview
Excel Marketing Excel offer a number of digital product catalogues and brochures, which provide further information about the different products and services that we offer, all available to download from www.excel-networking.com
Catalogues Click to view PON Product Guide
Fibre Product Guide
Copper Product Guide
Short Form Product Guide
Environ Product Guide
Trunking Product Guide
D-Line Product Guide
Brochures Click to view Warranty Brochure
Pre-Terminated Copper Brochure
Corporate Brochure
Partner Brochure
Enbeam Fibre Cleaning Guide
Pre-Terminated Fibre Brochure
Engraved Labelling Solutions Brochure
PON Solution Brochure
CPR Pocket Guide Data Centres Brochure ExpressNet Solution Brochure
Configured Racks & On-Site Assembly
without compromise.
Excel Encyclopaedia The Excel Encyclopaedia has been designed to provide our partners, consultants and end users with a thorough understanding of structured cabling and, more importantly, a complete insight into the Excel Structured Cabling Solution. Written by key members of our technical and marketing teams, the Excel Encyclopaedia offers a wealth of core content to ensure that you have got one trusted source of information. https://www.excel-networking.com/excel-encyclopaedia
Case Studies and Reference Sites Excel has customers across numerous vertical markets worldwide. The portfolio of Case Studies aims to highlight specific details about various Excel installations in different environments, whilst the complete list of Reference Sites offers transparency across all Excel projects and installations around the world. For further information about taking part in a case study, please contact marketing@excel-networking.com. https://www.excel-networking.com/case-studies https://www.excel-networking.com/reference-sites
Case Study
Granada Univ ersity Customer
Granada University
Location Requireme Equipmen t
nts
Granada, Spain First class, future proof network infrastructu Category 6 re A UTP LSOH cable, Category jacks, Environ 6A low profile ER racks and accessories. MTP fibre cables, cassettes keystone and
Case Study
London Luto n Airport Oper ations Ltd (LLAO L)
We wanted to provide a first class of our residents facility, whichCustomer their own would offer London Luton In order to ‘technology each do this we Airport Operations needed a reliablecity’ typeLocation of environmen infrastructu Ltd (LLAOL) London Luton re system. t. and trusted network Airport Requireme Customer’ Provide a resilient, nts The Excel system s View highly secure that we have platform to companies cabling infrastructu in place allows run a new located within Equipmen security search each re as the MultiGigabi of the 30 the facility Excel Category t area within t RedUGRNov to integrate 6A F/FTP, Excel the airport. with our a. They can the latest technologie Intelligent Fibre, Environ also make PDUs Racks and s, reliably and the best use interruption Excel The security of consistently s to service of our passengers without any or quality operation levels experienced and staff Customer and as part Antonio Ruiz . of our redevelopmis critical to our the right infrastructu News UK Moya, CTO, ent we needed Location Granada University Customer’ of the technology re solution and to find partner to (CSIRC-UGR) s View available make the most London infrastructu Requireme re for technologyto us today, as well as providing nts The University future. We that will be the Fully networked of feel that we available new office city of Granada, Granada (UGR) is a public have more with Excel build than achieved to us in the l and DWM. Spain, and university located With approximate Excel Category founded in our objectives in the 1531 by Emperor Neil Thompson, l Excel Category 6A U/FTP Screened in Spain. Apart ly 85,000 end users, Charles V. Operations Cable it is the fourth from the city 6A Screened Director London l Excel U/FTP Northern Africa. largest university Equipmen of Granada, Keystone Jacks Luton t UGR also has Screened Solid Airport London Luton l Excel U/FTP campuses Harness Cable Airport is Every year in Screened Patch Links and carried over 2,000 one of the l Excel GOP Leads European students UK’s largest 10.5 million Erasmus Programme Boxes and airports 2014 final passengers Copex Assemblies enrol in UGR l Excel Power , making planning in 2014. In destinations through the Distribution consent was July developme . The university’s it one of the most popular l Units Excel granted nt that will Voice Pair over 10,000 Centre for European for a £110m Cable increase the capacity from internationa Modern Languages l students each annual passenger the best Spanish 12 million l Screened receives London Luton to 18 million year. In 2014, university by System Design UGR was voted by 2020 and to become internationa l Breadth Why Excel? The University living in London, a leading l students. of 3rd Party airport serving enable also Verification Luton and l Breadth range of cultural provides the University those the surroundin of the product The plans, Community activities such l Cradle range, and g regions. include an conferences with a wide to grave programme design options expanded , cinema, courses, as musical concerts, building and l Ability and modernize these activities of support improved seminars, exhibitions poetry, various to meet the surface access d terminal forecast to is to provide fast track installationservices etc. The aim the first organisation increase the a link between all of which of all “We the airport’s programme university are national had a huge in the world annual contributio economy challenge to use an Ethernet life and the other by £1billion companies to bring the n to network designed elements of the city, under one to £2.3billion News UK group roof, installed. . Requireme society and culture. forThe of 160Gbps The Requirem Customer’ The Excel solutionwithin a year of the nt connectivity The University s View first cable ent to meet every . delivered on is also being One element deadline all The University levels and of the refurbishme and get the running within allowed us had invested of the latest 4,500 members nt was to take the required individuals technologie of staff up who are engagingin a new building the timescales.” advantage s for passengers and as well as being the security screening in R & D, teaching purpose of which These types of able to provide Paul Ovall to house and managemen was flight information of business IT – Programme demand high to passengers up to new mobile t services. these works Companies developed Manager generation speed, reliable viabythe screens. date the existing expects and networks, News UK is To quality infrastructu the very best the network enable demands. whilst also part of News re and the Sourcing providing to accommod design of to be Corp – a global mobility for ate the new educates, a Partner upgraded, network users, equipment entertains as well as media business technologie The university future proofed , informs and something needed as The Times, s. focused on that the worked with for emerging inspires its The Sunday the infrastructu creating a number customers. of local Times, The re required News UK includes and distributing Previously by these bandwidthdistribution and installationSourcing a Partner Sun and TLS. located The university such prestigiou content that News Corp hungry clients. partners to around London, in various offices in was already includes Harper source a suitable s media brands is backed up and aware of the the new News DWM Technical by independen allowed all Excel product solution Collins and UK building which of the Solutions had developed t third party range having Dow Jones. striving to Ltd is an innovative would provide together under media titles to be brought verification a working heard about its research, relationship from Delta design and organisation proven track technology and the fact with. building, also one roof. This prestigious install cutting record, its into the networking that backed sometimes technical capability edge sectors. is referred to the ‘Baby Shard’, by a 25 year , audio Since inception as visual and which warranty, due to electrical its exterior over 14 years from the installers grown from construction strength to ago and close proximity glass it strength, supplyingDWM have steadily service to The Shard, to an expanding is located at a high quality London Bridge, high profile aim to deliver providing a customer perfect central and integrate DWM has base. They been working a network location. solutions platform to with LLAOL chosen to provide high for their clients across The Requirem control. work for 12 quality, efficiency knowledge enton this part of the project years and was and expertise. and for Newsincorporate UK needed With the design its proven athe structured migration system having to cabling that could minimum of critical IT downtime support services with requiremen the andtechnical it was ts maintaining of the really 4,500 staff important full airport wouldpartner to that be based operations, LLAOL the the office, including that they picked job. journalists, forin the right photograph ers, web developers, TV studios etc. A Category 6A solution with a fibre back support 10 Gigabit Ethernet bone to with proven, was required, standards compliance strong UK , support and a robust warranty programme .
Case Study
News UK
Videos A well-populated Youtube channel features a library of video materials showcasing the Excel product range, “How To” installation video guides, webinars and reference sites. https://www.youtube.com/excelnetworking
Blog Written by our product marketing specialists, Excel publish a range of blog posts that take a closer look at individual products from a more light-hearted perspective. Each blog post delves into specific key features and benefits of various product sets to highlight the versatility of the Excel product range. https://www.excel-networking.com/blog White Paper
The Future of The Rise of Fibre PON
White Paper
High Power Remo Powering Revis te ited
White Papers A comprehensive range of white papers written by our technical experts are designed to keep our partners up to date with the relevant standards and any technical developments that effect the installation of structured cabling.
It is very difficult to predict unpredictab what will happen le industry. in 2019 in This last year already, however such an has seen so number of much change devices, bringing that was publishedone hint came from technology different challenges. in the December the Opinion Piece is going to Networks, assist in handling One 2018 Edition when some Lan (POL). commentato of Inside These are of Artificial this is Passive becoming rs discussed Intelligence Optical mature in the emergence hospitality space and (AI) being led to the the residential a driver for consideratio dwelling developmen are increasingly and Industry 4.0. Backgroun n of the wider common for highlighted d It ts. Some hotel aspect of the large multisome of the on them due to the topic and findings whitepaper fact they provide chains have standardised ‘Artificial intelligence of the recently to deploy published Back in 2014, quick ROI, Exceland manage Not only were IEC across industries’. they are easy there are no mid-span, published itsasfirst the impact the Thermocoup This looked active devices of highspace IDFs/SERsWhite Paper powerfor at four key les distributed discussing in the the layers they were it is inherently 4PPoE is greatly reduced areas: throughout also installed secure, andon structured test sample, The Paper along the they provide cabling. or eradicated, i. Smart as well as having was produced length of the excellent scalability.measure Homes one remote The next stage following Montfort the ambient University is for POL extensive research from the test temperature to step over rig to and there and the as one of at De results . ii. Smart are now early were the two sets into the Enterprise Manufacturi of information signs thatshared with plausible technology ng TR EN50174-99 this is beingCenelec space, that went -1 T accepted as Abstract with some on to develop starting to– Remote Powering. T iii. Smart Transportati major corporate a T look at POL Ta on organisation as a serious This Technical LAN approach. alternative s Report was Ambient to the traditional This white iv. Smart developed ‘mitigation paper is intended Energy to provide strategies’ 0,6 ± 0,05 guidance m challenges Whilst some when deploying structured ± 0,05 m faced in achievingto0,6highlight cabling, mainly of the arguments remote powering or some of the The two key when testing what theboard, consistency it should notover existingare not as strong over takeaways impact data cables and repeatability cabling would be. be ruled for our industry systemsacross this will lead whitepaper out. A recently and the Construction Products to higher Euroclasses to the number is the forecast from one of published under the worldwide ≥1,2 mRegulation that In the beginning of connected the leading equipment (CPR). in ‘Intelligent vendors of devices installed thatwas ≥1,2 m there some The paper PON Networks’ Enterprise in 2018 to thermalopportunity a lot of concern growing from aims to encourage impact of of saving customers approximate regarding deploying up arethe over 23 billion ly 75 billion “perfect” bundle a looking at understandi the impact such as 70% topower 30-50% of whatof their ongoing high in 2025, ng and ultimately constructive the of the IoT debate, wider remote their Capex costs, Asrisk on data acquisition. which illustratesconfinedrack was proposed powering Opex growth in actions of for opposed variances, costs IEEE 50that reduce global andspace. 802.3bt, andespecially to a limited unventilated This a whopping to ensure On further the potential number the industry investigatio massive amounts connectivity and networking unprecedented theontime the performanc 90% of their continual spaces within up quite well and to test improvemen as a whole of these 7 different t andof cable types, e of the thecabling of data, and is generatingthe latter really hown that Excelistook claims, would focused accelerating along with construction some stack impact standards the rate of andwas testing system. depends finaltodesign. having them . s andcompliance. The first this generation upon the cable categories create a test Our observation in ‘Free Air’ two is recommendations possible rig in accordance stage ofbuilding layout and Insulation s follow months laid out in informationextremes This leads with the We will therefore of corresponde to gain the the diagrams TR EN50174-99 to the question exchangeof environmen below. nce with many t. look at each -1 as described of connectivity individual Alllike thistodata but first we thank external parties, and device that in wasand ; whilst at acknowledg need to consider one of these areas collated we would is used to the in isolation, will almost theCertification e including LAN approach Thermocoup data from (Previouslyand shared collect the the with Cenelec certainly be BASEC, Force another vendor data the bandwidth and that of les two models for a traditional Delta), very low, when along with Initiative backbone testing whoSGS, T1 , T and POL. (ACI), Trading in another wasThe this is going Approved we get into conducting T3 2a location. Standards, Cables to build up the Communitie the model Due to the same and there was in line with The Department s and stringency notLocal the increased a great Governmen of the test from the two For deal of surprise t. when the We will alsocompletely independen identical detail how results. t tests showed data Excel Networking standards in material follow thealmost managemen applicable Toand giveoutline t, production one example ongoing work and testing of the being the Notified Bodies Group.results. undertaken by Cenelec Test Date and Test ID Backgroun Thermocoup d 23/3/2014 le Wires used
White Paper
Testing for Euroc lass Comp - The Marke t Challenges liance 1
2
3
T2d
Conventional
Thermocoup le T2c Thermocoup le T2b
The ‘perfect’ bundle size for the test layers of cable was 37, which in an almost allowed for 100m length perfect round 4 of cable that (in reality it is wrapped end). A controlled is a single around a post power source at each correct levels was then used of power were strictly controlled. to ensure the
https://www.excel-networking.com/white-papers
Testing Three main standards that govern and give the how cables limits that are tested define whether as a particular they can be Euroclass. declared EN50399 methods under the CPR, EN50575 covers the common outlines the test sets out the requiremen test limits ts of 10 covers and the Test Apparatus the FPC and finally, IEC 60332-3Ladder Test, and burner the typical used in the set up for Vertical which is shown below.
002A
The CPR came set-up 8 Cable type into force on the 1st cable Yes Cable manufactur July 2016 diameter ers had 12 following LS0H Cat6 Installation sold within which UTP conditions the EU complied months to ensure Humidity outlined with one of 6.2mm all the products at test inend EN 50575. the Free Air Average Conductor Euroclasses the former Resistance The classes range 40% having no DC Loop Resistance from F to A with performanc having no 0.075Ω e declared reaction to We will start and the latter fire, the standard 15Ω /100m requiremen by looking ts covering at the test also details used, and methods and smoke specifically review the equipment these sections of the standards, tolerances allowed within of some or and asses all of these how a combination could lead shown in italics and numerical to variances in test data. the referenced values are taken directly Text standard. from used for the ts for Euroclass39.38 testing 36.36 higher Euroclasses It is accepted D and System spread as practice for 1+ well as introducing having stricter standards, parameters and indeed to include Production the requiremen limits on flame test tolerances, Control (FPC) standards, t for a Factory however when and tolerances Audit and each 6 the range months subsequent both at the initial in play when compliance of testing test houses, is considered, testing for phase ly. A network Euroclass named Notified alongside notified bodies, of independen the high number out these Bodies, were it seems clear t assessments discrepancie appointed of there is a high , and to issue to carry DOPs (Declaration s between likelihood certification tests on the have seen of same cables. exactly this supplier, notified of Performance) confirming known as during Indeed, we body and our research. declared Euroclass. details of the If we then add to this the accepted design and tolerances production, within cable most relevant those of cable to this diameter and discussion has a challenge jacket thickness, to ensure the industry consistency standards. in application of test test
Temperature Power additional gases andT1 Rise production above Ambient flaming droplets. and density, T2a Watts acid T3 ºC T2b ºC 34.2 Finished products ºC 14.02 ºC 15.89 60 are certified14.45 ºC 22.9 programme through one 15.3 26.2 100 s. of two assessment 14.17 35.16 System 3 which 23.77 and additional 25.35 has 40.67 23.39 requiremen 36.82limited flame spread
Technical Note
TN30: Segre
gation and
Technical Notes A selection of technical notes are published to bring specific elements of structured cabling and the wider industry to your attention. These are short summary documents that highlight key facts or changes that you need to be aware of.
Shared Pathw
ays
Following numerous questions above subject in the recent this Technical months on clarity to segregation Note will hopefully the and shared bring some pathways. There are numerous references BS7671 and BS6701, however in other key standards Author: 50174. Paul Cave they all reference such as back to BS EN Technical Manager The definition contained Date: within BS EN August 2019 50174-2 is Segregatio as follows: n First published use of earthed the Electrical in Amendment 3 of electrically sources, including the 17th edition conductive Wiring Regulation following barriers or of BS7671 power supply s in 2015, the physical separationregulation cabling, and intention of Within Clause to prevent has been around for informationsince the publication the electromag some time. 4 - Requireme technology has gained renewed numerous However, cabling of the 18th netic interference Edition nts for planning references in 2018, the between clarity as it to ‘segregatio installatio wording external noise has been changed. Author: ns of informatio n’. The following Previously Paul Cave 4.3 Pathways are the key , it stated: n technolog ones: y cabling, Technical Manager 521.11.201 of BS EN 5074-2 4.3.1 Requiremen there are ts Date: August 2019 ‘Wiring systems 4.3.1.1 Cable There are no documente in escape routes segregation not be liable impact of d national shall be supported to premature sealants on or Metallic information collapse in that they will a communica international tests the event of any definitive for the ‘The requiremen tions cable. technology statements a fire’ reference cabling and Nor are there within the ts of the regulation 4.3.1.2 Cable to local regulations emergency’ power supply standards, separation 422.2.1 shall text from apart from cabling shall as highlighted also apply BS EN50174-2: be segregated irrespective in the following Separation It now states in accordance of the classificatio Author: of cable bundles with‘The the following: Paul Cave re-instatem the requiremen n of the conditions defined in (Note. the the installation within pathways tsent the fire rating with ofof Clause for evacuation local regulations 521.10.202 words ‘escape (and pathway 6. specification of fire barriers Technical Manager in an systems) shall shall be implemente routes’ have of EN 50174-1:201 fire-stop materials in accordance Where separation 8, Date: removed) d using the and/orbeen 4.11 provides be adequate to support between different ‘Wiring fire-stoppin change during August 2019 systemsdetails any remote g techniques’. specified cabling systems shall be of appropriate Thispowering installation technicalobjectives supported assessment or extensions is required note is intended such that s. this to the installation. Any reference they will not shall be maintained to provide NOTE 1: Wiring systems There are be liable to to segregation useful guidance. by physical supply cabling. two key risks premature hanging also calls upon barriers when usingcollapse in the acrosstoaccess prevent unintended Clause 6 NOTE firestoppin event of or egress routes Segregatio 2: Cables installed 1. Chemical g materials a fire’ This lays out n of metallic may hinder regulation. in or on steel reaction between around IT all the rules evacuation informatio cable being: as well as the the cable sheath containmen and firefighting cables n technolog2. Increased t systems formulas to y cabling pressure and the sealant activities. calculate the NOTE 3: This regulation and poweron are the deemed to meet the distances For information cable sheath of supportrequired precludes, The impact from therequiremen technology where cables on performanc between the for example, ts of this seal dividers: cables and metallic cable are clipped the life of the use two direct e may cable of power supply non-metall not the types, trunking as be apparent system. the cables within ic cable key the sole means to exposed ones during surfaces aNOTE 3) for cables single4:pathway or suspended clips or cable tiestesting of support The main prior to system installed in as the sole Suitably system, function of the under cable spacedor adjacent compartme separation handover means cables of the in parallel regulation steel twisted but therein. tray, and the sheath but it could shall be provided or copper pathway of a twisted the performanc use of nonsystems, become an by the divider nts of a pathway pair cable with alsoclips, issue later e is achieved havesaddles BS6701 system ties are examples 4) for cables an innerorseparator unless additional or another also provides in by twisting is to maintain the geometry installed pathway that some cable fixing, between that all 4 pairs will meet the required separation in non-adjace incorporateMechanica of the pairs the pairs. or restraint further as a bundle clarification nt compartme requiremen The use of s a divider, l systems Any crushing on shall be provided ts of thiswithin the sheath within. Not only are space in modernis present. nts the routes.can crush or pressure theyevacuation pathway system the pairs ‘cure’ and required by the distance of abecome in a specific cables if not buildings tends on the cable evacuation dry out. or another manner. installed correctly. between will change routes. With to change pathway that assume theeverywhere dividers unless the performancSome cables with time a cablingincorporate At the same To ensure and it is increasingl additional system is, or e. that time, sealants s more could become, having there cable fixing, than no impact oneisdivider, y difficult to can contract It goes on or restraint a design an evacuation predict which and pressurise to further is present. life exceedingon 25-year warranty route 15 the Specificatio years, clarify this and cable spaces will cables as the common-se provided n sheets with the following accordingly by Excel Networking should be ‘For new installations nsical approach instruction . provided statement: s to ensure is to with the proposed we suggest and fire barriers the correct the following of buildings the refurbishment or actions are firestoppin This Technical actions: and other structures extension Each carried out Excel is a world-class g product Note has of sealant proposed to prevent along with been produced Conclusion should theexisting premium performing manufacture the aforementi sealantinstallations meet the the detailed by Paul shall manufactu, cables be assessed on Cave, Technical following d, supported installation oned damage. an individual Manager, on requiremen rer thatinstalled and delivered end-to-end infrastructur in the their spaces behalf of Excel ts’ product will bounded basis and A combinatio - without compromise Any damage e solution it is recommen by the external not detrimenta - designed, n of these www.excel-netw caused . ded that assurances building two standards lly impact of the fire-stoppin to cables due should the cable. orking.com to not following are gained g material hooks or metal not be the sole source should make it very the installation from or system of support ties must be that plastic will result Afterclear instruction any corrective for cables. used at regular in fixings all s affected correctly and They must action, all ties at high cables having intervals, as either be placed links affected level anywhere From experience the recommen to be replaced.provided by the manufactu must be tested within on top of the dation , there rer the are afor tray. Alternative therange in line with wide spacing of of suitable which is 1200mm. ly metalExcel ‘J’ Installation Guidelines. Hilti products on the market from the following This Technical Excel is a world-class Hillmoore Note has been list of reputable Rockwool MF1708_08/19 produced by premium performing manufacture manufactu Paul Cave, d, supported rers*: Technical end-to-end H.S. Firetherm Everflex Manager, PFC
Technical Note
TN31: The Use Fixings at High of Plastic Cable Ties and Level
Technical Note
TN32: The Impact of Fire-stoppi ng Materials
•
•
•
•
https://www.excel-networking.com/technical-notes
and delivered
• • •infrastructure solution
- without compromise - designed, www.excel-netw . orking.com * This is not an endorseme nt or guarantee
• • •
on behalf of
Fischer
of individual
product performanc e. This
Excel
• • •
Knauf Firepro
Technical Note Excel is a world-class has been produced premium performing manufacture by Paul Cave, d, supported MF1709_08/19 Technical Manager, and delivered end-to-end infrastructur on behalf of e solution Excel - designed,
- without compromise www.excel-netw . orking.com
Demonstration Suites Excel demonstration suites are available for use by Excel Partners and their customers by prior arrangement with an account manager. Each area contains working examples of the most popular Excel copper and fibre cabling solutions as well as our racking and power management offerings. Facilities are currently open in our Birmingham, City of London, St Neots and Dubai locations. https://www.excel-networking.com/technical-notes
European Headquarters Excel House Junction Six Industrial Park Electric Avenue Birmingham B6 7JJ England T: +44 (0)121 326 7557 E: sales@excel-networking.com
Certificate No. FS 547274
Certificate No. EMS 542863
MF1718_10/19