| MOHAMMAD MAZHARUL HAQUE | | WORK SAMPLE |
linkedin.com/in/mazhararven
01
Installation on an Emotion
Studio | Virginia Tech| Fall 2017
INSTALLATION | 450 sq ft
Design, development, drawings, presentation US Capitol | Washington D.C. | USA
This is installation design project aims to create interaction. The giant couch like sea-saw structure is set on a formal settings bringing a informal environment.
concept interaction among the users & with the context
sea-saw seating experience design development
elevation
01
02
Cosmo House
ACTIVITY ANALYSIS
Thesis | Virginia Tech| Spring 2018
HOUSING | 50000 sq ft land Design, development, drawings, presentation Newark | New Jersey | USA
IMMIGRATION FACTS
DURATION OF STAY
WORLD MOST COSMOPOLITAN CITIES BRUSSELS LONDON
AMSTERDAM FRANKFURT
TORONTO PARIS
NEW YORK
DUBAI
CHICAGO MUMBAI
SAN FRANCISCO TOKYO
LOS ANGELES SHANGHAI
MIAMI
SINGAPORE
SYDNEY
SAO PAULO MELBOURNE
AUCKLAND
NEWARK, NJ
JOHANNESBURG
1
12 mi walk n
PROGRAM ANALYSIS
30 min commute
HOUSE ISOLATED
CULTURAL ISLAND
DIVERSIFIED
BEDROOM
4
BATHROOM LIVING DINNING KITCHEN PARKING BALCONY TERRACE BROAD ST. STATION
LAUNDRY GARDEN ENTRY LOBBY PARTY AREA PLAY AREA SWIMMING POOL FITNESS CENTER WORKSPACE CHILDCARE LIBRARY
SITE / MIXED-USE COMMERCIAL/OFFICE RESIDENTIAL
COMMON ROOM
MIXED-USE
GUEST ROOM
HOTEL FEDERAL BUILDING THEATER/ STADIUM CHURCH/ RELIGIOUS
BUSINESS CENTER
TRANSPORTATION HUB
COOKING CLASS
PARKING GARAGE PARK/ OPEN SPACE NEWARK RIVERFRONT PUBLIC ACCESS AND REDEVELOPMENT PLAN BOUNDARY
NWK. PENN. STATION
RESTAURANT/ COMMON DINNING
MART GARAGE SALE
LANGUAGE CLASS FREEZER ROOM STORAGE MOVIE SCREENING
BUILDING TYPOLOGY MAP
GALLERY
03
APARTMENTS
DORM
HOTEL
HOME STAY
CO-LIVING CO-HOUSING COSMO-HOUSE
SPACE ORGANIZATION DIAGRAM
28
STUDIO 1-BED 2-BED 3-BED
APT. APT. APT. APT.
19
APARTMENTS
14 GAMES SWIMMING POOL THEATER FITNESS CENTER LANGUAGE CLUB PARTY SPACE GALLERY LAUNDRY RETAILS RESTAURANT OFFICE SPACE
COMMUNITY SPACE
COMMERCIAL/ RETAIL
12
29TH FLOO
R (ROOF)
8 5
PARTY SPACE
RESIDENTIAL PARKING COMMERCIAL PARKING LOADING DOCK KIDS PLAY AREA COMMUNITY GARDEN COURTYARD
PARKING OPEN SPACE
BASIC PROGRAM
DETAIL PROGRAM
2 1
RESUFFLED PROGRAM OR FLO 9TH
OF)
(RO
BIG LOUNGE
1
1
2
3
L
A
TI
LIBRARY
N
E
ID
SMALL LOUNGE VERTICAL CIRCULATION
L
IA
S
E
C
R
R
WORKSPACE
E
M
M
O
C
PARTY & MUSIC FUNCTION
4
COURTYARD
3
HEIGHT GAIN & MANHATTAN VIEW
4
OOR H FL
GARDEN GARDEN CAFÉ
PUBLIC ENGAGEMENT
CONCEPT DEVELOPMENT
RESIDENTS’ ENGAGEMENT
MICRO GATHERING & FUTURE EXPANSION
COWORKING SPACE RACQUETBALL
GARDEN 11T
SWIMMING POOL GENTS CORNER POTLUCK/PARTY BADMINTON
SPORTS SCREENING INDOOR GAMES POT LUCK KIDS PLAY AREA INDOOR GAMES GROUP EXERCISE KIDS PLAY AREA INDOOR GAMES GARDEN INDOOR GAMES LIBRARY LAUNDROMAT CHILD CARE LOUNGE LEASING OFFICE MOVIE SHOW
FITNESS
LADIES’ CORNER
2ND
OR
FLO
LEARNING CLASS GROCERY STORE CAFÉ WORKSHOP/STUDIO KIDS PLAY AREA MARKETPLACE ART GALLERY
03
3
2 1 1
LEVEL 13 PLAN 1. LIBRARY
HALLWAY & CONNECTED WITH LIBRARY & WORKSPACE
5
6 4
10 3
8
7
1
2
1. CAFE 2.COMMUNITY GARDEN 3.CO-WORKING SPACE 4.RAQUETBALL 5.FITNESS 6.POOL 7.INDOOR GAMES
LEVEL 11 PLAN
LIVE SPORTS SCREENING 2
6 4
4
1
3
4
5
7 1. KIDS PLAY AREA 2. POT LUCK/ PARTY SPACE 3. TERRACE GARDEN 4. GUEST HOUSE 5. SPORTS LIVE STREAMING
LEVEL 05 PLAN
POTLUK/ PARTY SPACE
3
4
12 5
11 15 6
1
12
14
7 13 12
8
9 11 10 LEVEL 02 PLAN
04
16
1. GARDEN/ MOVIE SHOW 2. MARKET PLACE FOOD/ CRAFT/ YARD SALE 3. WORKSHOP/ STUDIO/ CLAY/ CRAFT/ COOKING 4. CAFE 5. GROCERY 6. LEARNING CLUB 7. TERRACE GARDEN 8. INDOOR GAMES 9. LIBRARY 10. MAINTENANCE 11. LAUNDROMAT 12. CHILD CARE 13. LOUNGE 14. LEASING OFFICE 15. KIDS PLAY AREA 16. STORAGE
YOGA/KARATE/DANCE
ROOF IS THE NEW GROUND
COURTYARD IS THE HEART
ENGAGING NEIGHBOR: OPEN THEATER, COSMO-MARKETPLACE EAST ELEVATION
SCALE 1:1000
05
03
110 W 123 ST
Professional | Shahrish Consulting | 2018
PROPOSED BUILDING PLOT
RESIDENTIAL | 7000 sq ft
Project development, authority & construction drawings Manhattan | New York | USA
106
108
NEW 123RD ST BLOCK ASSOCIATION GARDEN
110
118
WEST 123RD STREET PROPOSED BUILDING VISUALIZATION
NOTE: ALL RENDERINGS / DRAWINGS ARE AN APPROXIMATION AND IS NOT IN ACTUAL SCALE
LOCATION PARAPET CORNICE EXTERIOR FRONT FACADE
MATERIAL SPECIFICATIONS WOOD/ FIBERGLASS OR COMPOSITE PAINTED BLACK
DETAILS FIBERGLASS/WOOD CORNICE CAN REPLICATE MOST FINISHES INCLUDING CAST IRON, TERRA COTTA, LIMESTONE, SANDSTONE, MARBLE, GRANITE, COPPER, STEEL, SHEET METAL AND OTHER POPULAR BUILDING MATERIALS.
CONTINUOUS ALUMINUM FLASHING
3 PLY BUILT UP ROOF MEMBRANE
4'' FIBRE CANT STRIP
4'' FIBRE CANT STRIP
2'' RIGID INSULATION
PRESSURE TREADED WOOD
ALUMINUM COPING OVERLAP ALUMINUM 6'' MIN
2'' RIGID INSULATION PRESSURE TREADED WOOD
3'' CONCRETE SLAB W/ 1/2'' DECKING, SEE STRUCTURAL DWG.
CONTINUOUS ALUMINUM FLASHING
ROOFTOP BULKHEAD LEVEL T.O.C. EL. [+70'-0"] = 96.25'
CONTINUOUS ALUMINUM FLASHING
3 PLY BUILT UP ROOF MEMBRANE
ALUMINUM COPING OVERLAP ALUMINUM 6'' MIN
3'' CONCRETE SLAB W/ 1/2'' DECKING, SEE STRUCTURAL DWG.
CONTINUOUS ALUMINUM FLASHING
ROOFTOP BULKHEAD LEVEL T.O.C. EL. [+70'-0"] = 96.25'
CONCRETE- MASONRY BLOCK
WATERPROOFING MEMBRANE AND VAPOR BARRIER
LOCATION
MATERIAL SPECIFICATIONS
RAIN SCREEN DRAINAGE MAT
DETAILS
6" METAL STUD @ 16" O.C W/R-21 SPRAY INSULATION
5/8" TYP "X" G.W.B.
7/8" FURRING @ 16" O.C
EXTERIOR WINDOWS AND DOORS
THE TILT & TURN WINDOW: MATTE BLACK ALUMINUM SPECIFICATION: MECHANICALLY FASTENED STILES AND RAILS JOINED AT 90° ANGLES AND THE CLASSIC CONFIGURATION OF 5” STILES, 6” HEADER PANEL AND 9” KICK RAIL.
5/8" TYP "X" G.W.B. SEALANT TRACK WITH WEEP HOLES
LOW-MAINTENANCE LAMINATES WITH ATTRACTIVE CORROSION RESISTANT BRASS HARDWARE PERFORM WELL ON THE INTERIOR OR EXTERIOR WINDOW AND DOORS.
CONCRETE- MASONRY BLOCK
BACKER ROD AND SEALANT BOTH SIDES OF WINDOW
ALUMINUM COPING OVERLAP ALUMINUM 6'' MIN
ELEVATOR AND STAIR SHAFT BACKER ROD AND SEALANT BOTH SIDES OF WINDOW
PRESSURE TREADED WOOD
CONTINUOUS ALUMINUM FLASHING
ALUMINUM APRON
SEALANT
SEALANT
FASTENERS 18'' O.C.
FASTENERS 18'' O.C.
FASTENERS 8'' O.C.
LOCATION
MATERIAL SPECIFICATIONS
DETAILS
BRICK VENEER AS PER MANUFACTURER'S DESIGN AVAILABILITY WATERPROOFING MEMBRANE AND VAPOR BARRIER
FASTENERS 8'' O.C.
4" FIBER CANT STRIP
4" FIBER CANT STRIP
3 PLY BUILT UP ROOF MEMBRANE
3 PLY BUILT UP ROOF MEMBRANE
2'-0"X2'-0" PAVERS ON ADJUSTABLE PEDESTALS
2'-0"X2'-0" PAVERS ON ADJUSTABLE PEDESTALS
RAIN SCREEN DRAINAGE MAT 5/8" TYP "X" G.W.B.
EXTERIOR RAILING
LOCATION EXTERIOR FACADE (FRONT)
LOCATION EXTERIOR FACADE (LIMESTONE FINISH)
FRONT ELEVATION (NORTH) 06
BLACK ONYX BY PINNACLE / CAST IRON / WROUGHT IRON
MATERIAL SPECIFICATIONS ROMAN BRICK DEVELOPS A CHARACTER OF ITS OWN BEING EXTREMELY VERSATILE, TIMELESS AND AGE APPROPRIATE COMPLEMENTING OLDER STRUCTURE OF THE BLOCK WITH A MODERN APPEAL MATERIAL SPECIFICATIONS
MATCH SURFACE COLOR OF EXTERIOR FACADE PANELS. USE MOST DURABLE PAINT TO AVOID MAINTENANCE AND CORROSION ON STEEL/CAST/WROUGHT IRON SURFACES
ROOF LEVEL T.O.C. EL. [+60'-0"] = 86.25'
2" RIGID INSULATION COMPRESSIVE STRENGTH OF 60 PSI AND R-10 TOP LAYER TO BE SLOPE TO
CONCRETE- MASONRY BLOCK
DETAILS CHARACTERISTICALLY IT HAS LONGER AND MORE LINEAR DIMENSIONS THAN THOSE OF STANDARD MODERN BRICK. THE FACE BRICK ARE APPROXIMATELY 3-5/8” X 1-5/8” X 11-5/8”.
"JOISTRITE" GALVANIZED STEEL JOISTS SEE STRUCTURAL PLAN FOR SIZING R-30 SPRAY INSULATION
7/8" FURRING @ 16" O.C (2)
CONCRETE BLOCK 2 HOUR RATED (2)
DETAILS SCALE: NTS
LIMESTONE FINISH IS A LIGHTWEIGHT AND EASILY INSTALLED DECORATIVE WALL FINISH THAT PROVIDES THE LOOK AND FEEL OF NATURAL STONE AT A FRACTION OF THE EXPENSE
LAYERS OF 5/8" TYP "X" CEILING
SEE STRUCTURAL DRAWINGS FOR DETAILS 6" METAL STUD @ 16" O.C W/R-21 SPRAY INSULATION
2" RIGID INSULATION COMPRESSIVE STRENGTH OF 60 PSI AND R-10 TOP LAYER TO BE SLOPE TO
3" CONCRETE SLAB W/1/2" METAL DECKING, SEE STRUCTURAL DWG.
SEE STRUCTURAL DRAWINGS FOR DETAILS
3" CONCRETE SLAB W/1/2" METAL DECKING, SEE STRUCTURAL DWG.
WALL DETAIL @ STAIR AND ELEVATOR BULKHEAD
LIMESTONE PRECAST
ROOF
3" CONCRETE SLAB W/1/2" METAL DECKING, SEE STRUCTURAL DWG.
LAYERS OF 5/8" TYP "X" G.W.B.
APARTMENT
ROOF LEVEL T.O.C. EL. [+60'-0"] = 86.25'
19'-10" 10'-3"
10" 10" 10"
9'-0"
DN
DN
19'-11.5 "
AA'
6'-6"
AA'
8'-3"
UP
AA'
BALCONY
3'-6"
8'-0"
18'-0"
8'-2"
9'-6" D4
D4
D4
1A 1A
G
G
G
G
G
E
E
E
E
E
E
2'-0"
10'-0" 10'-0"
59'-8"
3'-0"
10'-0"
D13
2'-6"
10'-0"
70'-0"
16'-8"
18'-8"
8'-9"
8'-9"
13'-8"
60'-0"
3'-4"
10'-0"
D02
22'-6" 39'-8"
5'-0"
15'-9"
10'-0"
7'-8"
2'-0" 14'-9"
BASE PLANE / DATUM EL./ FIRST FLOOR T.O.C. EL. [+0'-0"] = 26.25' 10'-0"
8'-9"
NOTE: EXHAUST FAN IS TO BE ALIGNED WITH THE PERIMETER WALL. 6' OF UNOBSTRUCTED CLEARANCE REQUIRED.
Ø5'-0"
C.M. & S.D.
FAN#2
0"
3'-3"
4'-
18'-0" EGRESS DISTANCE <34'7'' IN COMPLIANCE WITH TABLE 1021.2, CHAPTER 10, EXIT ACCESS TRAVEL DISTANCE, 2014 NYC BUILDING CODE
DINING AREA
19'11.5''
10'-1"
22'-6"
9'-5"
C.M. & S.D.
LIVING ROOM
1A
22'-6"
14'-9"
D03G
IN COMPLIANCE WITH ADA STANDARDS 404 (403.5.1)
C.M. & S.D.
LIVING ROOM C.M. & S.D.
1A
6' WIDE UNOBSTRUCTED AREA#1A CLEARANCE TERRACE AS PER FC 504
CELLAR FLOOR T.O.C. EL. [-8'-8"] = 17.58'
5'-5"
5'-3" G
2
KITCHEN EXHAUST DN
1D = 7.6668 SF
1A = 29.1876 SF G
7'-0"
ELEVATOR
KITCHEN
11'-2"
ELEC. ROOM 5'-3"
3'-4"
39'-8"
5'-0"
18'-9" 22'-6"
3'-3"
9'-5"
5'-0"
7'-1"
2'-2"
KITCHEN
8'-5"
8'-5"
6'-10"
13'-8"
D02
6'-2" 5'-0" 7'-8"
2'-8" 3'-6" 5'-10"
3'-10"
59'-8"
12'-7"
2'-0"
6'-2"
2'-4"
WASHER DRYER
11'-2"
DW
1C = 10.8037 SF
Ø5'-0"
DW
GAS METER ROOM
SECOND FLOOR T.O.C. EL. [+10'-0"] = 36.25'
FLOOR DRAIN
D02
11'-9"
D02
FLOOR DRAIN
AREA#1B TERRACE
BB'
7'-0"
2
1B = 0.1340 SF
D02
H
SPRINKLER ROOM
FAN#1 2'-2"
THIRD FLOOR T.O.C. EL. [+20'-0"] = 46.25'
RD
15'-9"
6'-0"
1E = 1.8546 SF
AA'6'-4"
2A = 9.6217
3'-0"
8'-9"
32'-7" 1B EGRESS DISTANCE <24'-3'' IN COMPLIANCE WITH TABLE 1021.2, CHAPTER 10, EXIT ACCESS TRAVEL DISTANCE, 2014 NYC BUILDING CODE
D02
8'-9" 28'-4"
1F = 0.8518 SF
TOILET EXHAUST DN
3'-5"
7'-0"
1H = 0.9994 SF 1G = 9.2381 SF
D02
11'-8"
16'-8"
8'-9" 11'-2"
8'-5"
4
7'-1"
D02
7'-0"
10'-10"
BATH 02
BB'
3'-6"
ELEVATOR
3'-0"
4'-10"
BICYCLE ROOM
BB'
3'-6" 6'-10"
1I = 14.8307 SF
3'-0"
DN
DOWN
D03
DOWN
FLOOR DRAIN
ELEC HWH MECH.
FOURTH FLOOR T.O.C. EL. [+30'-0"] = 56.25'
CONDENSER OUTDOOR UNIT #2
SEE EQUIPMENT SCHEDULE FOR 19'11.5'' EQUIPMENT DETAILS
6' WIDE UNOBSTRUCTED AREA#1A CLEARANCE AS PER FC 11'-10"TERRACE 504
2
1A
UP
FLOOR DRAIN
D03G
AA'
6'-4"
3'-5"
C.M. & S.D.
2'-0"
1B
2B = 10.2078
UP
LIVING ROOM
D03
BB'
ELEVATOR
6'-10"
2'-0"
3'-3"
16'-1"
D13
3'-11" 0" 4'-
16'-1"
1A = 29.1876 SF
D03
D03
WASHER DRYER
EGRESS DISTANCE <55'1'' IN COMPLIANCE WITH TABLE 1021.2, CHAPTER 10, EXIT ACCESS TRAVEL DISTANCE, 2014 NYC BUILDING CODE
1J = 1.0555 SF
BB'
AA'
TERRACE
59'-8"
8'-10"
UP
59'-8"
59'-8"
10" D02
EGRESS DISTANCE <25'-8''. IN COMPLIANCE WITH TITLE 27 / SUBCHAPTER 6 NYC BUILDING CODE
5'-5"
3'-4" 7'-6"
E
FLOOR DRAIN
BB'
2'-6"
D13
E
CONDENSER OUTDOOR UNIT #1 SEE EQUIPMENT SCHEDULE FOR EQUIPMENT DETAILS
3'-0"
E
6'-4"
BATH 01
8'-9"
E
CL
6'-0"
5
1A
D13
E
5'-1"
2'-6"
E
2'-2"
2'-6"
IN COMPLIANCE WITH ADA STANDARDS 404 (403.5.1)
AREA#2
EGRESS DISTANCE <34'7'' IN COMPLIANCE WITH TABLE 1021.2, CHAPTER DISTANCE, 2014 NYC BUILDING CODE
2'-8"
E
KITCHEN EXHAUST DN
Ø5'-0" 10, EXIT ACCESS TRAVEL
6'-2"
2C = 6.3319
2
FIFTH FLOOR T.O.C. EL. [+40'-0"] = 66.25'
7'-0"
19'11.5''
FAN#2
18'-0"
DINING AREA CL
5'-10"
G
EGRESS DISTANCE <40'2'' IN COMPLIANCE WITH TABLE 1021.2, CHAPTER 10, EXIT ACCESS TRAVEL DISTANCE, 2014 NYC BUILDING CODE
3 1A
4
59'-8"
G
C.M. & S.D.
5'-5"
5'-3"
G
LIVING ROOM
3'-10"
G
BED ELEVATOR 2 ROOM 02
EGRESS DISTANCE <40'3'' IN COMPLIANCE WITH TABLE 1021.2, CHAPTER 10, EXIT ACCESS TRAVEL DISTANCE, 2014 NYC
KITCHEN
NOTE: EXHAUST FAN IS TO BE ALIGNED WITH THE PERIMETER WALL. 6' OF UNOBSTRUCTED CLEARANCE REQUIRED.
RD
G
RD
7'-0" C.M. & S.D.
D13
G
1A
2'-6"
D13
2'-6"
G
FAN#1 2'-2"
BB'
D13
5
C.M. & S.D.
3'-11"
3'-3"
5'-3" 3'-6"
3'-6"
1B = 0.1340 SF
D03G
6'-4"
D4
AREA#1B TERRACE
8'-5"
BED 3'-0" ROOM 01
2'-0"
1D = 7.6668 SF
IN COMPLIANCE WITH ADA STANDARDS 404 (403.5.1)
KITCHEN
ELEC. ROOM
DRYER
7'-1"
DW
1C = 10.8037 SF
Ø5'-0"
CL
10'-1"
BATH 7'-1"
8'-5"
8'-5"
6'-10" UP
5'-0"
6'-1"
4
DW
3'-0"
2'-4" 9'-3"WASHER
BUILDING CODE C.M. & S.D.
6'-1"
3'-9"
9'-6" 3'-5"
C.M. & S.D.
1B
D02
3'-0"
6'-0" 2'-0"
D02
4'-9"
11'-9"
D02
3'-0"
CL
BALCONY
FLOOR DRAIN
SIXTH FLOOR T.O.C. EL. [+50'-0"] = 76.25'
TOILET EXHAUST DN
AA'
11'-2"
2
Ø5'-0"
D02
GAS METER ROOM
FLOOR DRAIN
2'-0"
1E = 1.8546 SF
11'-10"
DOWN
UP
2A = 9.6217
1A
1K = 1.8783 SF
7'-1" D4
2
D02
D13
5'-7"
2'-6"
H
SPRINKLER ROOM
6'-8"
CL
BATH 02
BB'
8'-4"
D02
10'-10"
D02
4'-10"
1F = 0.8518 SF
2'-0"
D13
ELEVATOR
BED ROOM 027'-0"
3
9'-3"
1B EGRESS DISTANCE <24'-3'' IN COMPLIANCE WITH TABLE 1021.2, CHAPTER 10, EXIT ACCESS TRAVEL DISTANCE, 2014 NYC BUILDING CODE
BB'
Ø5'-0"
1G = 9.2381 SF
C.M. & S.D.
28'-4"
BICYCLE ROOM
C.M. & S.D.
3'-3"
1H = 0.9994 SF
7'-0"
D02
3'-0"
16'-9" 32'-7"
8'-9"
14'-5" 11'-8"
DISTANCE, 2014 NYC BUILDING CODE
2'-6"
8'-5"
10"10" 10"
5'-5"
6'-6" 59'-8"
13'-5"
3'-0"
C.M. & S.D.
ACESSORY USE ONLY NO LIVING, SLEEPING OR COOKING PERMITTED
1A
6'-4"
19'-11.5 "
ELEC HWH MECH.
3'-6"
6'-10"
1B
DN
4
IN COMPLIANCE WITH TABLE 1021.2, CHAPTER 10, EXIT ACCESS TRAVEL DISTANCE, 2014 NYC BUILDING CODE
BED ROOM 01
CONDENSER OUTDOOR UNIT #2 SEE EQUIPMENT SCHEDULE FOR EQUIPMENT DETAILS
D03
EGRESS DISTANCE <23'8'' IN COMPLIANCE WITH TABLE 1021.2, CHAPTER
RECREATIONAL SPACE
8'-2"
UP
D4
2'-0"
FLOOR DRAIN
2B = 10.2078
D02
ELEVATOR
5
DN AA'
3'-6" EGRESS DISTANCE <17'7''
1I = 14.8307 SF
6'-10" 10, EXIT ACCESS TRAVEL
6'-1"
4
2'-0"
59'-8"
8'-10"
8'-3"
ROOF LEVEL T.O.C. EL. [+60'-0"] = 86.25'
TERRACE
3'-5"
BATH 01
D03
FLOOR DRAIN
18'-0"
EGRESS DISTANCE <55'1'' IN COMPLIANCE WITH TABLE 1021.2, CHAPTER 10, EXIT ACCESS TRAVEL DISTANCE, 2014 NYC BUILDING CODE
DOWN
2C = 6.3319
2
3'-4" 7'-6"
D03
D03
BB'
CL
6'-0"
PARAPET LEVEL T.O.C. EL. [+63'-8"] = 89.92'
D13
10'-3" 5
6'-4"
DN
1J = 1.0555 SF
BB'
5'-1"
2'-6"
RD
UP UP
D02
EGRESS DISTANCE <25'-8''. IN COMPLIANCE WITH TITLE 27 / SUBCHAPTER 6 NYC BUILDING CODE
6'-2"
D13
10"
WASHER DRYER
BATH 7'-1"
Ø5'-0"
CL
4
2'-6"
D13
2'-6"
8'-0"
D02
3'-0"
2'-0"
3'-3"
4'-9"
19'-10"
AA'
FLOOR DRAIN
CL
IN COMPLIANCE WITH ADA STANDARDS 404 (403.5.1)
9'-0"
3'-0"
3'-6"
3'-6"
BB'
3'-9"
D02
18'-0"
6'-1"
1K = 1.8783 SF
UP
2'-6" ELEC HWH MECH. 5'-7"
D02
D13
2'-6"
3'-0"
CONDENSER OUTDOOR UNIT #1 SEE EQUIPMENT SCHEDULE FOR EQUIPMENT DETAILS
1A
2'-0"
Ø5'-0"
6'-8"
CL
EGRESS DISTANCE <40'2'' IN COMPLIANCE WITH TABLE 1021.2, CHAPTER 10, EXIT ACCESS TRAVEL DISTANCE, 2014 NYC BUILDING CODE
3
5'-0"
CL
ROOFTOP BULKHEAD LEVEL T.O.C. EL. [+70'-0"] = 96.25'
AREA#2
59'-8"
2'-0"
D13
5'-7"
EGRESS DISTANCE <40'3'' IN COMPLIANCE WITH TABLE 1021.2, CHAPTER 10, EXIT ACCESS TRAVEL DISTANCE, 2014 NYC BUILDING CODE
1B 1A
BED ROOM 02
59'-8"
8'-4"
C.M. & S.D.
ACESSORY USE ONLY NO LIVING, SLEEPING OR COOKING PERMITTED
2'-6" ELEC HWH MECH. 5'-7"
BED ROOM 01
19'11.5''
C.M. & S.D.
16'-8"
3
9'-3"
RECREATIONAL SPACE
C.M. & S.D.
18'-9"
16'-9"
14'-5"
1B
12'-7"
BED ROOM 02
BED ROOM 01 EGRESS DISTANCE <23'8'' IN COMPLIANCE WITH TABLE 1021.2, CHAPTER 10, EXIT ACCESS TRAVEL DISTANCE, 2014 NYC BUILDING CODE
16'-8"
C.M. & S.D.
C.M. & S.D.
RD
8'-5"
9'-3"
18'-8"
EGRESS DISTANCE <17'7'' IN COMPLIANCE WITH TABLE 1021.2, CHAPTER 10, EXIT ACCESS TRAVEL DISTANCE, 2014 NYC BUILDING CODE
13'-5"
18'-0"
1B
RD
E D03G
AA'
CELLAR PLAN SCALE: NTS
AA'
FIRST FLOOR PLAN
AA'
SECOND FLOOR PLAN
ROOF FLOOR PLAN
SECTION AA' SCALE: 3/16" = 1'-0"
07
03
Rehabilitation of Norosunda River & Improvement of Surrounding Area in Kishoreganj Sadar
Professional | Ehsan Khan Architect | 2012-2016
Urban Design++PUBLIC Public Infrastructure | 2.5 mile long riverside | Bridges, Park, Amphitheater, Watch tower | Project Architect URBAN DESIGN INFRASTRUCTURE Project development, presentation, construction drawings, co-ordination, site visits
Project outline at initial Stage
This project also known as ‘Norosunda Project’ is basically an river excavation and infrastructure development project. The client is Local Government and Engineering Department (LGED). This is government financed public project for the people of Kishoreganj Town. The length of the project is 32km where there is a 4km portion run inside the Kishoreganj Town. In that portion there is an intensive program of designing some bridges over river, riverside sidewalk, a public space consists of park, amphitheater & watch tower. Initially the project has 6 bridges in program which was later increased to 9 bridges in total. The budget of the project also increased from $8 million to $13 million. The projects starts in 2012 and with a lots of meetings among the architects, engineers, cabinet minister, local government representatives like district commissioner and mayor, the project has evolved in many aspects. The riverside was previously possessed by illegal settlements, there were local political impacts over those illegal settlements that the project has to adjust with all this real issues which needed to be carefully handled to execute the project well. Project Summery: -32km river excavation -6km river embankment -6km sidewalk -9 nos. bridges -1 no. park -1 no. amphitheater -1 no. watch tower -8 nos. riverside decks Budget: -$13 million
Norosunda river, Kishoreganj, Bangladesh 24°25' N, 90°46' E
08
BRIDGES
Sketches | Design Development
Bridges: 1. 35.00m Pagla Mosque bridge 2. 40.00m Akhra Bazar bridge 3. 33.00m Machh Bazar bridge 4. 33.00m Batrish Mela Bazar bridge 5. 40.00m Sholakia bridge 6. 45.00m Monipurighat bridge 7. 18.80m Ekrampur Bazar bridge (sidewalk extension) 8. 31.6m Gourango Bazar bridge (sidewalk extension) 9. 19.70m+16.00m Gurudoyal College double bridge (sidewalk extension with interim deck)
35.00m Pagla Mosque bridge
40.00m Akhra Bazar bridge
Cross Section
Elevation
Pagla Mosque Bridge
Cross Section
Elevation
Akhra Bazar Bridge
09
AMPHITHEATER + PARK
Amphitheater | Site photo
SEATING
+28.05m.
SEATING
DN
3 SEATING
SEATING
• •SEATING •
SEATING
N
Plan at Level-09
5
2 1
4 8
7
6
RAILING - 01
DN
9
DN UP
+11.85m .
RAILING - 02
10 N
Plan at Level-04
Watch Tower
Site plan
2.00m.
11 5.00m.
2.00m.
RAILING - 01
RAILING - 01
1.80m.
12 DN UP RAILING - 02
13.00m.
+0.00m.
RAILING - 02
UP 1.85m.
5.00m.
Plan at Level-02
+12.00m.
Plan at Level-01
3.45m.
13
N
N
10
1.80m.
+4.65m .
3.45m.
1. Amphitheater Gallery 2. Amphitheater Stage 3. Viewing Deck 01 4. Viewing Deck 02 5. Watch Tower 6. Pond 7. Playing Field 8. Forest 9. Public Toilet 10.26Sandbox 11. Playing Trail 12. Children Play Area 13. Park Entry
2.10m.
N
2.00m.
13.00m.
04
Faridganj Diabetes Center
Images | Construction Phase
Professional | ARVEN | 2014-2015
HEALTHCARE HEALTH CARE | 27,000 sq ft | 50 Beds | Principal Architect
Concept & design development, presentation, authority approval drawings, construction drawings, co-ordination
wing 01 lobby
waiting
wing 02
N
entry to the site
Photo | Under Construction
center lobby to serve both wings wings for wards & cabins
waiting for public 4
2
17
4
3
3
3
3
Diagram | Design Scheme Lobby
Ward
Lobby
Ward
Lobby
Ward
4
Vertical Circulation
5
1
6
Lobby
Terrace Garden
11
12
14
13
15
Public Lobby Public Waiting
Outdoor Waiting
Section diagram shows how the building programs are organized to ensure better experience of spaces. 08
8
8
8
8
7
7
1. Outdoor Lobby 2. Pharmacy 3. Doctorâ&#x20AC;&#x2122;s Chamber 4. Toilet 5. Storage 6. Lobby & waiting 7. Emergency 8. Test Lab
N
Longitudinal Section
Floor plan | Level 01 Scale NTS
South Elevation
03 11
05
Barista Lavazza
Professional | Ehsan Khan Architects | 2013
INTERIOR DESIGN INTERIOR DESIGN | 500 sq ft | Premium coffee shop | Project Architect
Concept & design development, presentation, construction & furniture drawings, co-ordination, site supervision
The Barista Lavazza Chain of Cafés, an Italian Café Chain began its operations in Bangladesh in the year 2007. Barista’s entrance added a new element to the Bangladeshi coffee scene, which had just began to understand and appreciate the richness of brewed coffee. Barista delivers a truly Italian coffee experience in a warm, friendly and relaxed environment and it opens its premium coffee lounge in the country’s busiest international airport for the travelers.
Airport, Dhaka, Bangladesh 23°25'49.67” N, 90°24'20.32” E 32
Sketches | Design development
Barista Lavazza at airport project was initiated with mind to introduce a premium coffee shop for the airlines travelers in a highly expensive rent area of international airport of Dhaka. It has only 500sft area of lease and the operation was lunched to serve as many customers in a quality customer. The project was started with 12 seating capacity to end up with 36 seating capacity. In design, we tried to design a premium lounge which should distinguish the customers inside from the general departure lounge and at the same time create a transparency while inviting other customers to experience inside. Vertical oak wood screen was at the front and also a oak wood screened ceiling was inside to create a sense of volume for the customers. we tried to introduce different sets of seating arrangements from cozy sofa & tub chair seating to rapid bar tool type seating. People can have the option to seat in a group or seat individually. It has richness in using furniture material from red oak wood to local manufactured leather. The lounge has also a playfulness of lighting. In the program, it has an open kitchen where options for making coffee and sandwiches were kept. Customizable cabinet for kitchen and seating for the lounge were designed and manufactured for this specific project. The whole project was completed in a constrain time span of 3 months from design development to getting approval to the site construction and completion.
N
Furniture layout plan
Diagram | Design Scheme
Kitchen (150 sft)
Lounge Area (350 sft, 36 seating)
Café Entry Total area : 500 sft 12
Elevation
FT-01
FS-03
FS-04
FS-02
Photo | After completion
13
Parametric Wall
Coursework | Virginia Tech| Spring 2018
REVIT
Parametric design idea, scripting and modeling, presentation
14