1 minute read

HIGHLIGHTED PROJECTS

Brazil

TRINIDAD & TOBAGO

Advertisement

BASE ONE Location: Pecém Concessionaire: Enegix Energy Capex: US$ 5.4 B

Base One calls for a green hydrogen production plant to be built at the port of Pecém in the northeastern state of Ceará. The facility would produce green hydrogen from 3.4GW of baseload renewable energy. Operator Enegix expects the facility to be fully operational in 2025.

Chile

NEWGEN Owners: Yara, NGC

Norwegian fertilizer company Yara International is co developing the NewGen hydrogen project in Trinidad and Tobago in partnership with the National Gas Company of Trinidad and Tobago (NGC).

The complex, which aims to produce ammonia, is expected to comprise 170MW to 185MW of electrolysis capacity. Construction work is expected to be completed in 2024. Yara already co‑owns two ammonia plants, known as Tringen I and II, in Trinidad and Tobago.

QUINTERO BAY Location: Valparaíso Owner: GNL Quintero Capex: US$ 30 M

The project entails the construction and operation of an electrolysis plant for the generation of green hydrogen from water and electricity generated through renewable sources. The project, which will occupy an area of 0.69ha, will be located in Quintero bay, Valparaiso region.

This article is from: