5 minute read

Appendix 3 Social Housing Development Programme

Schemes completed April 2018 – March 2019 Scheme No of units Client Group

Housing Association Policy Theme

Garvaghy Avenue, Portglenone Phase 2 (T)*** 61 Market Road, Ballymena 10 General Needs Apex Housing Rural

36 General Needs Choice Urban

106 & 108 Larne Road. Carrickfergus 19 General Needs Clanmil Urban 43-83 Larne Road (Former Harryville 48 General Needs Clanmil Urban Church), Ballymena 19-21 Royal Court, Gracehill 20 General Needs Fold Urban Showgrounds Social Club, Ballymena 20 General Needs Fold Urban Carrickfergus ESP** 1 General Needs North Belfast Urban Carnlough ESPs** 2 General Needs Rural Rural Glynn ESP** 1 General Needs Rural Rural Cullybackey ESPs** 2 General Needs Rural Rural Ballycarry ESP** 1 General Needs Rural Rural Quarry Hill, Ahoghill OTS* 5 General Needs Triangle Rural Ballymena ESPs** 8 General Needs Triangle Urban Adair Manor, Ballymena OTS* 33 General Needs Triangle Urban

Total 206

* OTS – Off The Shelf ** ESP - Existing Satisfactory Purchase *** (T) Transfer Scheme built on NIHE land

Schemes on-site at March 2019 Scheme No of units Client Group Housing Association Policy Theme

129-131 Broughshane Street, Ballymena 15 General Needs Choice Urban

15-18 Essex Street, Carrickfergus 11 General Needs Choice Urban 18 Waveney Road, Ballymena 15 General Needs Choice Urban 20-24 Main Street, Ahoghill 16 General Needs Choice Rural 8-10 Main Street, Kells 7 General Needs Choice Rural Kilpatrick House, 38-54 High Street, 40 General Needs Choice Urban Ballymena Sallagh Park, Larne, (T)*** 2 General Needs Choice Urban St Mary's PS, Larne Road, Ballymena 74 General Needs Choice Urban 30 Joymount, Carrickfergus 40 General Needs Clanmil Urban Carrickfergus ESPs** 3 General Needs North Belfast Urban Tullygarley Road, Ballymena OTS* 8 General Needs North Belfast Urban Castle Street, Ballymena 19 General Needs Radius Urban Hugomont Mews, Ballymena OTS* 14 General Needs Radius Urban Carnlough ESP** 1 General Needs Rural Rural Cargan ESP** 1 General Needs Rural Rural Galgorm Road, Ballymena 26 General Needs Triangle Urban Broadway Avenue, Ballymena 27 General Needs Triangle Urban

Scheme No of units Client Group Housing Association Policy Theme

Trostan Avenue, Ballymena PSNI Site, Broughshane Ballymena ESPs** Westbourne Gardens, Ballymena OTS* 21 Supported Triangle Urban 8 General Needs Triangle Rural 2 General Needs Triangle Urban 8 General Needs Triangle Urban

Adair Manor, Ballymena OTS* 4 General Needs Triangle Urban Carnwood, Carniny Road, Ballymena 5 General Needs Triangle Urban OTS*

Total 367

* OTS – Off The Shelf ** ESP - Existing Satisfactory Purchase *** (T) Transfer Scheme built on NIHE land

Schemes programmed 2019/22 Scheme No of units Client Group Year Housing association Policy theme

15 Grove Road, Ballymena 6 General Needs 2019/20 Choice Urban 16-18 Dunluce Street, Larne 6 General Needs 2019/20 Choice Urban 5-17 George Street, 21 General Needs 2019/20 Choice Urban Ballymena Clonavon Road, Ballymena 26 General Needs 2019/20 Choice Urban Cullybackey Link Road, 14 General Needs 2019/20 Choice Rural Ahoghill Lands to the Rear of 37 21 General Needs 2019/20 Choice Urban Victoria Street, Carrickfergus St Patrick's Barracks 140 General Needs 2019/20 Radius Urban (Strategic DfC-owned site), Ballymena Ahoghill ESPs* 3 General Needs 2019/20 Rural Rural Carnlough ESPs* 3 General Needs 2019/20 Rural Rural 105-107 Broughshane Street, 15 General Needs 2019/20 Triangle Urban Ballymena Doury Road, Ballymena (T)** 11 General Needs 2019/20 Triangle Urban 84 Curran Road, Larne 16 General Needs 2020/21 Connswater Urban 102-104 Main Street, 20 General Needs 2020/21 Triangle Rural Broughshane Queen’s Road, Carrickfergus 10 General Needs 2021/22 North Belfast Urban

Total 312

* ESP - Existing Satisfactory Purchase ** (T) Transfer Scheme built on NIHE land

Appendix 4 Maintenance Programme, Grants and Adaptations information

Schemes completed April 2018 – March 2019 Work Category Scheme

External Cyclical Maintenance Antiville/Sallagh, Larne Ferris Park/Old Glenarm Road, Larne Ballymena North and Rural Cullybackey/Kells, Ballymena Rectory Estate, Ballymena Sunnylands, Carrickfergus Revenue Replacement (Kitchen) Crosshill View/Doury Road, Ballymena Castlemara, Carrickfergus Revenue Replacement (BKR) Larne Heating Installation Larne Phase 1 Larne Phase 2

Double Glazing

Condiere/Riverside, Ballymena Adair, Ballymena Carrickfergus Dean Park/Salia Avenue, Carrickfergus Larne Ballymena Greenisland, Carrickfergus Incremental Improvement (Roofs) Barra Drive/Inchcolm Avenue, Ballymena Chichester Park, Ballymena

Total

Note: Some schemes may start and complete in year.

Units

43 147 132 169 38 44 85 77 62 91 92 1 8 1 3 59 57 74 63 30 1,276

Scheme activity and expected completions up to 31 March 2020 Work Category Scheme Units

External Cyclical Maintenance Craigyhill, Larne Ferris Park/Old Glenarm Road, Larne Cullybackey/Kells, Ballymena Ballykeel 1 North and Rural, Ballymena Ballykeel 2, Ballymena Harryville Phase 1, Ballymena Rectory Estate, Ballymena Glenfield/Davys Street, Carrickfergus Whitehead, Carrickfergus Lower Woodburn/Sunnylands, Carrickfergus Castlemara/Drumhoy, Carrickfergus

Door Replacement

Mid-East Antrim and South Antrim Revenue Replacement (Kitchen) Herbison Park/Tobar Court, Ballymena Castlemara, Carrickfergus Revenue Replacement (BKR) Larne Dunclug/Fisherwick, Ballymena Skelton Close, Carrickfergus

Heating Installation

Double Glazing Larne Heating Carnlough/Glenarm Adair, Ballymena Drumtara, Ballymena Moyard Gardens/Prospect Park Carrickfergus

Bathrooms

Linn Road, Larne Incremental Improvement (Roofs) Barra Drive and Inchcolm Avenue, Ballymena Door Entry Scheme Capital Scheme (MEI) Ballymena Ballymena General

Total

Note: Some schemes may start and complete in year.

Definition of Work Categories

184 43 150 184 216 48 41 200 154 96 241 45 44 2 5 40 39 57 30 77 70 60 196 109 25 14 12

2,382

Bathrooms

Replacement of bathroom suite

BKR

Bathroom Kitchen Rewiring. Door Entry Provision of a Door Entry System (usually communal) Door Replacement Replacement of External Front or Back Door (based on condition) External Cyclical Work to the external fabric of a dwelling and its immediate surrounding Maintenance area. Heating Installation Replacement of solid fuel or electric heating. Incremental Improvement Tackles the elements of work listed under Multi Element Improvements on a phased bases to reflect the availability of funds

Definition of Work Categories

Revenue Repair/Replacement Capital Scheme

Double Glazing

Repair or replacement of obsolete internal elements, e.g. sanitary ware and kitchen units. Improvement works.

Replacement of single glazed with double glazed units

Grants Performance 2018/19 Grant Type Approved Approval Value £k Completed

Mandatory Grants

Disabled Facilities Grant Repairs Grant

Discretionary Grants

Renovation Grant Home Repair Assistance Grant

Total

There may be a discrepancy in calculation due to rounding 53 29

<10 <10 434 55

18 21

527

57 29

<10 <10

Adaptations to Housing Executive stock in 2018/19 Type of Adaptation Adaptations Actual spend Projected Spend 2018/19 2018/19 2019/20 £m £m

Adaptations for Persons with a Disability (APD’s) Starts* Adaptations for Persons with a Disability (APD’s) Completions* Lifts** Showers** Minor APD repairs*** 10

<10

36 93 313 0.35

0.15 0.18 0.13

Total 0.81

Source: NIHE *Some Adaptations for Persons with a Disability (APD’s) may start and complete in year **Lifts & showers are also included in Planned Maintenance in Finance Table in Local Context ***Minor ADP repairs are also included in Response Maintenance in Finance Table in Local Context There may be a discrepancy in calculation due to rounding. 0.40

0.17 0.21 0.14 0.91

This article is from: