marta elefterijadis|studio air
SITE MAP chosen site: Clifton Hill railway bridge
Source: http://www.jeavons.net.au/ser vices.html
0 metres
50
100
N source: google maps 2015
marta elefterijadis|studio air
SITE MODEL chosen site: Clifton Hill railway bridge
5 KEY REASONS FOR SITE CHOICE:
• Accessible to a wide range of people due to proximity to main road, housing estates and train stations. • Already a widely used skate park on the other side of creek – wide exposure – and may bring more from different target audiences. • Adversely, the specific areas on site to be used have been underutilised unlike the skate park. • Opportunity to hang and anchor design from many points of both the bridge and the staircases/supporting structure. • Opportunity to incorporate the built and natural environments present on site.
marta elefterijadis|studio air
marta elefterijadis|studio air
Examples of various iterations of Green Void (left) and reverse engineering of Gridshell (right).