Portfolio

Page 1

MELIS AYDIN

Portfolio architecture+design Selected Works


“You know, it is life that is right and the architect who is wrong.�

Le Courbusier



PALMİYE 360

Projet Title Function Project Type Project Location Senior Architect Design Team Project Manager Interior Design Material Design 3D Visualization Contruction Manager Contructor Project Date Construction Date Land Area (m2) Construction Area (m2)

Palmiye 360 Residential and Retail Architectural, Design and Interior Kadikoy, Istanbul Melis Aydin Melis Aydin, Ertugrul Aydin Melis Aydin Melis Aydin Melis Aydin Omer Faruk Cakir Ertugrul Aydin Yapı 360 2014 2014-2016 660,2 m2 2.650 m2



Palmiye 360 is a project, part of an urban renewal policy in Istanbul, consisting of demolishing a 4 storied, 50 year old, unstable, residential building and designing a new one. In the old building there were 14 residential flats and 2 retail stores and 16 landlords in total. In the new building there are 20 residential flats (8 for the constructor) and 2 retail stores. It makes 17 different clients for the design team. While designing the project, the first problem was to answer the problems of 16 land lords and the constructor. Every landlord has different land shares, different needs, cultures, economic backgrounds and families. And even the landlords having same land shares had very different needs from each other. And also the constructor didn’t want to have all his 8 flats the same. So, in the end we came up with a solution of 10 different types of residential flats, all differentiated to answer a different need of a different landlord.


While thinking about the design of the building enterence, we try to focus on the privacy and publicity needs of a residential. So we tried to make a design as open as it could be as long as it keeps the safety of the privacy.


GOLA

Projet Title Function Project Type Project Location Senior Architect Design Team Project Manager Interior Design Material Design 3D Visualization Contruction Manager Contructor Project Date Construction Date Land Area (m2) Construction Area (m2)

Gola Residential and Retail Architectural, Design and Interior Camlihemsin, Rize Melis Aydin Melis Aydin, Omer Faruk Cakir Melis Aydin Melis Aydin Melis Aydin Omer Faruk Cakir Ertugrul Aydin YapÄą 360 2013 2016-2017 600 m2 100 m2


A lonely house in the middle of Samistal Meadow’s untouched topography. A working hub combining Black Sea’s traditional architecture with today’s needs. Gola means meadow in Laz language, the language of the old folk of Black Sea Region. The project is located in the rural region of a little town called Çamlıhemşin, near Black Sea. In the area, modern development is much slower than the city and traditional building technologies are still the only form of architecture. The client is a free-lance designer who was living in a big city. He decided to leave the modern life and move his studio and home in this rural area. The project combines the space formations of the region and the needs of a designer. It combines the modern needs of the clients with the traditional life of the region. Instead of building a house of the modern lifestyle, the project combines the term “living” with the Black Sea’s architectural heritage. The building doesn’t intent to “show” itself but tries to breath with its surrounding.


GOLKOY

Projet Title Function Project Type Project Location Senior Architect Design Team Project Manager Project Date Construction Date

House and Extention at Golkoy Residential Architectural, and Interior Golkoy, Bodrum, Turkey Mert Eyiler Mert Eyiler, Melis Aydin Melis Aydin 2013 2013-2014





HERMES

Projet Title Function Project Type Project Location Senior Architect Design Team Project Manager Interior Design Material Design Contruction Manager Contructor Project Date Construction Date Construction Area (m2)

Hermes Retail Shop Retail Interior Kadikoy, Istanbul Melis Aydin Melis Aydin, Ertugrul Aydin Melis Aydin Melis Aydin Melis Aydin Ertugrul Aydin YapÄą 360 2016 2016 220 m2


Hermes Retail Shop is an interior project, in which we have worked interdisiplinary with architects, interior designers, researchers, marketing consultants, and potential customers at the same time. Hermes is a Eskisehir based company and this is the first the retail shop of the company in Istanbul. The project is located in a high income neighbour which has infected our design and material choices. In the design process we tried to think about the shop as an exhibition space more than just a shop or a showroom. We tried to make the spot attractive both for the passerbys and for the customers who already decided to shop.


YERSIZ

Projet Title Function Project Type Project Location Senior Architect Design Team Project Date

Information Center for Bagcilar Municipilaty Public Architectural, Interior and Design Anywhere and Everywhere Mert Eyiler, Guray Oskay Melis Aydin 2012



PANORAMA

Projet Title Function Project Type Project Location Senior Architect Design Team Project Manager 3D Visualization Contruction Manager Contructor Project Date Construction Date Land Area (m2) Construction Area (m2)

Panorama Apartments Residential and Retail Architectural Buyukcekmece, Istanbul Melis Aydin Melis Aydin, Ertugrul Aydin Melis Aydin Melis Aydin Melis Aydin Mgn Construction 2016 2016-2017 2392 m2 4.406 m2



APARTMENT O

Projet Title Function Project Type Project Location Senior Architect Design Team Project Manager Contruction Manager Contructor Project Date Construction Date Land Area (m2) Construction Area (m2)

Apartment O Residential and Retail Architectural Kadikoy, Istanbul Melis Aydin Melis Aydin, Ertugrul Aydin Melis Aydin Melis Aydin Can Construction 2015 2015-2016 602 m2 1.850 m2


Apartment O is also an urban renewal project in Istanbul, consisting of demolishing a 5 storied, 40 year old, unstable, residential building and designing a new one. In the old building there were 10 residential flats and 4 retail stores and 14 landlords in total. In the new building there are 12 residential flats (2 for the constructor) and 5 retail stores. In this project, we also discussed the main design details with the residents. While some pf the landlords preferred to have a 2 bedroom apartment with wide rooms and living spaces, the others preferred to have an extra 3rd bedroom space. So we designed one side of the building with 2 bedroom apartments and the other side with 3 bedroom ones. Also while designing the retail areas, we tried to listen to the needs of the store owners. As the project area didn’t let us to design enough storage space, we made the stores higher and tried to maintain some storage space at the mezzanines.


TRANS-FORMING

Projet Title Project Type Employer Research Manager Research Team Project Date

Trans-forming Kadikoy Research Kadikoy Municipality Melis Aydin Melis Aydin, Ertugrul Aydin 2014


LAND-LESS

Projet Title Project Type Research Manager Research Team Project Date

Land-less Research Melis Aydin Melis Aydin, Ertugrul Aydin 2017

We made a multidisiplinary workshop under the roof of Studio 360 to investigate the immigration issues occuring today. Instead of a claassical designer approach which includes temprory sheltering or easy life boats etc, we decided to imagine the whole aspects of the situation. What an immigrant need? What can we give an immigrant, the ashes of our society and space? So can we design a living hub for people with no space in a space noone wants? Can we offere a land that noone wants to people with no land, landless?


MIRAGE

Projet Title Function Project Type Project Location Project Coordinator Senior Designer Concept 3D Visualisation Modelling Contructor Project Date Construction Date

Mirage Bodrum Residential Graphic Design and Marketing Bodrum, Turkey Melis Aydin Melis Aydin Melis Aydin Ömer Faruk Çakır Murat Tekin Game Construction 2015 2015-2016



EPOXY

Projet Title Project Type Coordinator Project Date

Material Investigations: Epoxy Research Workshop Melis Aydin 2015


This research project which ended with a workshop, is about investigating epoxy material. Can epoxy be a new material for our design? What is its specs? Can we design with epoxy? For what kind of functions can we use epoxy for? What kind of spaces are appropriate for the use of this material? We tried to answer this questions with different experiments.


HYDROPONIC GARDENING

Projet Title Project Type Design Team Design Manager Material Design Project Date

Hydroponic Gardening for Small Apartments and Balconies Research and Design Melis Aydin, Ertugrul Aydin Melis Aydin Melis Aydin 2015


Nowadays 54% of the world population is living in cities. This rate is higher in countries like Turkey. The cities are getting more crowded everyday and people could have lesser space for their own. Although there is lots of benefits of living in a green environment, in big cities there is never enough space for the green. Having some plants or growing your own vegetables in your small apartment is sometimes just a dream. As the space is always very limited, we decided to design a new form of garden, suitable for small apartments or balconies. We tried to grow plants vertical instead of horizontal and try to apply vertical gardening technologies to little city apartments.

PROJE ADI PROJE AŞAMASI PROJE BAŞLANGIÇ TARİHİ MEVCUT HAFTA

DİKEY BAHÇE ÇİMLENDİRME AR-GESİ 7.06.2016 1. HAFTA (06.06-12.06.2016)

TARİH KONU 7.06.2016 Salı 1. grup çimlendirme

NOTLAR Tohumlar: hıyar, domates, semizotu, dereotu, roka, marul, marul lettuce, haseki, melisa, lavanta. 1. grup tohumlar ıslak pamukların arasına yerleştirilip, daha sonra üstü kapalı kaplara koyularak çimlendirme işlemine başlandı. Bu kaplar yüksek ve direk ışık almaya bir alana kaldırıldı. 8.06.2016 Tohumlar: hıyar, domates, semizotu, dereotu, roka, marul, marul lettuce, haseki, Çarşamba melisa, lavanta. 2. grup tohumlar, önceden limon sıkılmış suda 1 saat bekletilmiş 2. grup kaya yününe (bitki çimlendirmek için özel olan kaya yünü) ekildi. Daha sonra üstü çimlendirme kapalı bir kaba koyularak çimlendirme işlemine başlandı. Bu kap yüksek ve direk ışık almaya bir alana kaldırıldı. 9.06.2016 Perşembe Hidrofonik Akan su hidrofonik sisteminin kurulumuna başlnadı, pimaşlar kesilerek duvara Sistemin monte edilmeye başlandı. Kuruluşu 10.06.2016 Cuma

FOTOĞRAFLAR

Hidrofonik Akan su hidrofonik sisteminin kurulması için pimaşların yerleştirilmesine devam Sistemin edildi. Su pompası yerleştirilerek sistemin çalışıp çalışmadığı kontrol edildi. Kuruluşu

Hidrofonik Sistemin Kuruluşu

Durgun su hidrofonik sisteminin kurulması için önceden alınmış olan plastik kap ışık almaması için sprey boyayla boyandı, kapağına saksıların girebileceği 6 adet delik açıldı ve içine hava pompası yerleştirildi. Suyun içerisine besin olarak 3er ml jungle juice, 5 ml bioroot plus köklendirici eklendi.

Durgun Su Önceden alınmış olan 4 adet hıyar, 1 adet domates ve 1 adet biber fidesi Hidroponik saksılarından çıkarıldı, kökleri topraktan arındırılması için güzelce yıkandı ve Sistemi temizlendi. Daha sonra ise durgun su hidroponik sisteminin içerisine yerleştirildi. Ekim

2. grup Kaya yününde çimlendirilen tohumlar 2. gününde kontrol edildi. Kaba su eklendi. çimlendirme Semizotu, roka ve hıyarın çimlenmiş olduğu görüldü. 11.06.2016 Cumartesi

Kaya yününde çimlendirilen tohumlar 3. gününde kontrol edildi. Kaba su eklendi. 2. grup Semizotu, roka ve hıyarın büyümeye devam ettiği, buna ek olarak 2 adet marulun çimlendirme ve dereotunun da çimlenmeye başladığı görüldü.

Pamukta çimlendirilen tohumlar 4. gününde kontrol edildi. Kaplara su eklendi. Rokanın çok hızlı çimlendiği ve büyüdüğü,semizotu, marullar ve hıyarın da 1. grup çimlenmeye başladığı görüldü. Çimlenen bitkiler limonlu suda 1 saat kadar çimlendirme bekletilmiş kaya yününe, henüz çimlenmeyenler ise yine limonlu suda 1 saat bekletilmiş cam yününe alındı. Durgun Su Hidroponik Durgun su hidrofonik sistemi 2. gününde kontrol edildi. Hıyarların güneşten hafifçe Sistemi sarardığı, domates ve biberde ise bir değişiklik olmadığı gözlemlendi. Ekim Kaya yününde çimlendirilen tohumlar 4. gününde kontrol edildi. Kaba su eklendi. 12.06.2016 Semizotu, roka, hıyar, 2 adet marul ve dereotunun büyümeye devam ettiği, buna ek Pazar 2. grup olarak 2 adet domatesin de çimlenmeye başladığı görüldü. Hıyar, 2 adet marul, çimlendirme semizotu ve roka kap için fazla büyümüş olduğu için ayrı bir kaba geçirilip balkona çıkarıldı. Cam yünü ve kaya yününe geçirilen tohumlar 5. gününde kontrol edildi. Kaplara su eklendi. Rokanın çok hızlı gelişmeye devam ettiği gözlemlendi. Bu nedenle rokalar 1. grup çimlendirme ayrı bir kaba alınarak balkona çıkarıldı. Diğer tohumlar eski kaplarında bırakıldı ve direk ışık almayan bir alanda muhafaza edilmeye devam edildi.

PROJE ADI PROJE AŞAMASI PROJE BAŞLANGIÇ TARİHİ MEVCUT HAFTA TARİH KONU 13.06.2016 Pazartesi

DİKEY BAHÇE ÇİMLENDİRME AR-GESİ 7.06.2016 2. HAFTA (13.06-20.06.2016)

NOTLAR

14.06.2016 Salı Dikey Akan Hidrofonik Dikey Akan su hidrofonik sisteminin kurulması için pimaşların delindi. Sistemin Kuruluşu 1. Durgun Su Hidroponik Sistemi 2. grup çimlendirme - dışarıya alınanlar 1. grup çimlendirme - dışarıya alınanlar

Durgun su hidrofonik sistemi nde hıyarlar gelişmeye devam ediyor. Biberler de gelişiyor. Fakat domates fidesi iyi bir gelişim sergilemiyor. Acaba kökleri hıyara göre daha kısa olduğu için mi? Hıyar, 2 adet marul, semizotu ve roka gelişimini düzgün bir şekilde sürdürmekte. Su eklendi. Kısa zaman sonra hidrofonik sisteme dahil etmeye hazır olacaklar.

Dışarıya alınan rokaların gelişimleri düzgün bir şekilde devam ediyor.

2. grup Yeterince büyüyen domatesler ayrı bir kaba alınarak dışarıya çıkarıldı. Gelişimlerine çimlendirme dışarıda devam ediyorlar. - domates 2. grup Yeterince büyüyen semizotları ayrı bir kaba alınarak dışarıya çıkarıldı. Gelişimlerine çimlendirme dışarıda devam ediyorlar. - semizotu 1. grupta yer alan ve henüz yeterince çimlenmeyen cam yününde olan tüm 1. ve 2. grup tohumlar kaya yününe geçirildi. 1. ve 2. grup çimlenmede yavaş gelişenler tek bir çimlendirme kaba geçirilerek iç mekanda direk ışık almayan, sıcak ve nemli bir yerde muhafaza - yavaş edilmeye devam edilmeye başlandı. Bu tohumlar: domates, hıyar, marul, gelişenler maydonoz, dereotu, haseki, melisa ve lavanta. 2. grup 15.06.2016 Hıyar, 2 adet marul, semizotu ve roka gelişimini düzgün bir şekilde sürdürmekte. Çarşamba çimlendirme Hıyar, yeterince geliştiği için kaptan çıkarılarak durgun su hidrofonik sisteminin bir - dışarıya parçası haline getirildi. Su eklendi. alınanlar 1. grup çimlendirme Dışarıya alınan rokaların gelişimleri devam ediyor. Cam yününde bırakılan rokanın - dışarıya gelişimde gerileme ve dallarında güçsüzleşme gözlemlendi. Su eklendi. alınanlar 2. grup çimlendirme Dışarıya alınan domateslerin gelişimleri devam ediyor. Su eklendi. - domates

FOTOĞRAFLAR


BATH

Projet Title Function Project Type Project Location Senior Architect Project Manager Project Date

Historical Turkish Bath at Eyup Public Architectural, Restoration Eyup, Istanbul Melis Aydin Melis Aydin 2012



AEY

Projet Title Function Project Type Project Location Senior Architect Project Manager Project Date

AEY Elemetery School Restoration Project Public Architectural, Restoration Beyoglu, Istanbul Melis Aydin Melis Aydin 2011



IU

Projet Title Function Project Type Project Location Senior Architect Project Manager Project Date

Istanbul University Law School Restoration Project Public Architectural, Restoration Beyazit, Istanbul Melis Aydin Melis Aydin 2010




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.