USC MArch +3 Portfolio

Page 1

Mel Lewis Portfolio 310-428-8001 melvinle@usc.edu linkedin


Contents Thesis Experimental Open Source CLT Comprehensive Buidling Drawing Set

3 15 19 44

Global Nervous System: The Library Sonata for Two Farm to Table Farm to Table


Global Nervous System: The Library Mel Lewis Arch 793B Critical Drawings, No Pens

3

Back USC School of Architecture

Lisa Little

793B | Spring 2021


Global Nervous System: The Library Mel Lewis Arch 793B Critical Drawings, No Pens

4

Back USC School of Architecture

Lisa Little

793B | Spring 2021


Global Nervous System: The Library Mel Lewis Arch 793B Critical Drawings, No Pens

5

Back USC School of Architecture

Lisa Little

793B | Spring 2021


Global Nervous System: The Library Mel Lewis Arch 793B Critical Drawings, No Pens

6

Back USC School of Architecture

Lisa Little

793B | Spring 2021


Global Nervous System: The Library Mel Lewis Arch 793B Critical Drawings, No Pens

OPENING Libraries play a vital role in community identity. They are open and free to everyone. With Community needs changing as well as innovations in technology, it is time to re imagine the library. THESIS STATEMENT The library of the future will transition from ocular-centric inwardoriented spaces of storage to multi-sensory places facilitating curiosity, production, and collaboration. Augmented Reality will provide a navigation of physical space catering to individual needs in flexible program, promoting equity, social connection, and community resilience TECHNOLOGY BACKGROUND In the past, our means of acquiring information derived primarily from print & 2D visuals, demanding our focused attention serving as a distraction in interacting with each other. With the massive network of today through Augmented Reality we can now interact and navigate the built environment as never before.

7

Technology Proposal The librarian now serves as a navigator for the individual to knowledge networks and people relationships. Multi-sensory interfaces, permit the use of eye movement, hand gestures, speech, and/or touch to communicate with computers. And it is the combination of this data availability, and how we can access it, that invites the possibilities of evolving into a new environment removed from static print of equalizing for children, elderly & people with disabilities. Physical Renovation To provide greater customer mobility, natural ventilation, and natural lighting a portion of the thick walls, roof and columns will be removed and replaced with a new metal column structure hidden within the interior. In turn, this will reveal the characteristic central rotunda, structural frame and dome visible from all interior levels while encouraging community through transparency, seismic support, and building resiliency. Stacks will be consolidated in the lower levels of the Bradley Wing and dispersed via a robotic delivery system (5-minute turnaround) at one-ninth the space of conventional shelving permitting the library to incorporate new essential programs. This blended space, an integration of physical and virtual environments, provide a higher accessibility of information and ease of communication posing no barrier to personal interactions and self development. Back

USC School of Architecture

Lisa Little

793B | Spring 2021


8

Fl

ow e

rS

tr ee

t

Global Nervous System: The Library Mel Lewis Arch 793B Critical Drawings, No Pens

5th

Str

eet

Los Angeles Central Library USC School of Architecture

Lisa Little

Back 793B | Spring 2021


Global Nervous System: The Library Mel Lewis Arch 793B Critical Drawings, No Pens

9

Original Building - Betram Goodhue, 1926

“Rotunda”

Back USC School of Architecture

Lisa Little

793B | Spring 2021


Global Nervous System: The Library Mel Lewis Arch 793B Critical Drawings, No Pens

10

Bradly Wing Addition - Hardy Holzman Pfeiffer Associates, 1993

Atrium

Back USC School of Architecture

Lisa Little

793B | Spring 2021


Global Nervous System: The Library Mel Lewis Arch 793B Critical Drawings, No Pens

11

Renovation

Bookbot

Lower Levels - Bradley Wing USC School of Architecture

Lisa Little

Back 793B | Spring 2021


Global Nervous System: The Library Mel Lewis Arch 793B Critical Drawings, No Pens

12

Main Entrance

Existing

Renovation

Level 1 West Entrance USC School of Architecture

Lisa Little

Back 793B | Spring 2021


Global Nervous System: The Library Mel Lewis Arch 793B Critical Drawings, No Pens

13

Existing

Renovation

Level 2 Goodhue USC School of Architecture

Lisa Little

Back 793B | Spring 2021


Global Nervous System: The Library Mel Lewis Arch 793B Critical Drawings, No Pens

14

Back USC School of Architecture

Lisa Little

793B | Spring 2021


Sonata for Two Mel Lewis Arch 705 Redefining Performance

15

Sonata for Two Mel Lewis USC Arch 705 Redefining Performance Fall 2020 Professor Erin Cuevas

Youtube Video Link

Back USC School of Architecture

Erin Cuevas

705 | Fall 2020


Sonata for Two Mel Lewis Arch 705 Redefining Performance

16

Back USC School of Architecture

Erin Cuevas

705 | Fall 2020


Sonata for Two Mel Lewis Arch 705 Redefining Performance

17

Back USC School of Architecture

Erin Cuevas

705 | Fall 2020


Sonata for Two Mel Lewis Arch 705 Redefining Performance

18

Back USC School of Architecture

Erin Cuevas

705 | Fall 2020


19

Farm-to-Table Coworking Space A design to create a producer driven, vital and inclusive space that revitalizes the LA River Community

Final Presentation Sixue He, Mel Lewis ARCH 605B Professor Jose Sanchez

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


Open Source CLT Mel Lewis, Snow He ARCH 605B - Jose Sanchez

20

Perspective South Elevation from Parking

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


21

Farm-to-Table Coworking Space

Youtube Video Link

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


Open Source CLT Mel Lewis, Snow He ARCH 605B - Jose Sanchez

22

Site Overview LA River Los Angeles, CA

Los A

ngele

s Riv

er

Site

Downtown Los Angeles

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


OpenPresentation Source CLT Final Mel Lewis, Snow He Snow He, Mel Lewis ARCH 605B - Jose Sanchez

23

Site Downtown Los Angeles

N. S

prin

g St

.

r

LA

ve i R

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


Final Presentation Open Source CLT Mel Lewis, Snow He, Mel Snow Lewis He ARCH 605B - Jose Sanchez

24

Site Arroyo Seco

N. S

prin

g St

.

r

LA

ve Ri

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


Open Source CLT Mel Lewis, Snow He ARCH 605B - Jose Sanchez

25

Site Demographic breakdown

City Proposal for 2035

Low Income Households

Active Street Proposal

Create a safe active transportation corridor along the Los Angeles River for people of all ages that enhances recreation, livability, and regional connectivity. Los Angeles Count Metropolitan Transportation Authority 2019

Percentage of Low Income Household (<$25 K) 41%-55% 54%-100% Industrial District

Active Streets Retail Streets Active Industrial Streets Industrial District

Zero Car Households

Plannel Bicycle Networks

Percentage of Zero Car Households 11%-25% 25%-50% Industrial District

Bicycle Lane Separated Bikeway Industrial District

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


Open Source CLT Mel Lewis, Snow He ARCH 605B - Jose Sanchez

26

Program Proposal Farm-to-Table Interior Hydroponic Farm

Exterior Green Balcony

Exterior Green Roof

Interior growing with nutrients and no soil.

Exterior growing that also provides shading.

Exterior growing that also provides shading and natural daylighting to the interior.

Interior Aeroponic Farm

Exterior Cowork Balcony

Exterior Pergola

Interior growing without the need of a planting medium.

Permit maximum amount of daylight without direct solar radiation for occupants

Exterior growing at prime solar radiation locations

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


Open Source CLT Mel Lewis, Snow He ARCH 605B - Jose Sanchez

27

Program Assembly

Cowork

Auditorium

Hydroponic & Aeroponic Farming

Lobby

Restaurant

Shipping/Delivery

Volume

Program placement

Primary Program Components

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


Open Source CLT Mel Lewis, Snow He ARCH 605B - Jose Sanchez

28

Passive Strategies Massing for natural daylighting

Massing volume

Subtraction to promote interior natural daylighting

Volume result

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


Open Source CLT Mel Lewis, Snow He ARCH 605B - Jose Sanchez

29

Engineered Wood Construction Type

2021 IBC New Tall Wood Construction Type Type IV-C Surfaces may be exposed - exceptions: shafts, concealed spaces, outside face of exterior walls 8 Allowable stories above grade for B, R-1, R-2 85 feet above grade for B, R-1, R-2

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


Open Source CLT Mel Lewis, Snow He ARCH 605B - Jose Sanchez

30

Engineered Wood Hybrid Construction Appoach

Glulam (Glue laminated timber)

CLT (Cross laminated timber)

SCL (Structural composite lumber)

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


Open Source CLT Mel Lewis, Snow He ARCH 605B - Jose Sanchez

31

Solar Design Approach Daily Shading Orientation

9:00 AM March 30, 2020 Los Angeles,CA

12:00 PM March 30, 2020 Los Angeles,CA

3:00 PM March 30, 2020 Los Angeles,CA

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


Open Source CLT Mel Lewis, Snow He ARCH 605B - Jose Sanchez

32

Solar Design Approach Solar Analysis of Shading System

Annual Solar Radiation (kWh/m2) - 1722

-0

Green Roof Green Roof

Green Roof

Green Roof

Green Roof

Green Roof

Isometric Southeast no facade

USC School of Architecture

Isometric Southeast with facade

Jose Sanchez

Back ARCH 605B | Spring 2020


Open Source CLT Mel Lewis, Snow He ARCH 605B - Jose Sanchez

33

Louver Design

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


Open Source CLT Mel Lewis, Snow He ARCH 605B - Jose Sanchez

34

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


Open Source CLT Mel Lewis, Snow He ARCH 605B - Jose Sanchez

35

Solar Design Approach Shading System To mitigate the direct solar radiation of Southern California a double facade system with wooden louvers supported by a steel truss is implemented. Vertical louvers to the east, west and north, and horizontal louvers to the south.

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


Open Source CLT Mel Lewis, Snow He ARCH 605B - Jose Sanchez

36

Beam Connection Detail Sherpa Wood Connector Connectors consist of two aluminum plates. Dovetail connection joined via friction lock. Permits safe load absorption in, opposite and across the direction of insertion.

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


Open Source CLT Mel Lewis, Snow He ARCH 605B - Jose Sanchez

37

Column Connection Detail Sherpa Power Plate Aluminum power base with a centerpoint and angular screw connection. Screw placed on the interior for weatherproofing.

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


Open Source CLT Mel Lewis, Snow He ARCH 605B - Jose Sanchez

38

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


Open Source CLT Mel Lewis, Snow He ARCH 605B - Jose Sanchez

39

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


Open Source CLT Mel Lewis, Snow He ARCH 605B - Jose Sanchez

40

South Elevation

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


Final Presentation Snow He, Mel Lewis ARCH 605B - Jose Sanchez

41

East Elevation

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


Open Source CLT Mel Lewis, Snow He ARCH 605B - Jose Sanchez

42

Perspective West Entrance

Back USC School of Architecture

Jose Sanchez

ARCH 605B | Spring 2020


Comprehensive Building Drawing Set Mel Lewis, Snow He ARCH 526 - Karen Kensek, John Southern

43 He Lewis Architecture

Wall & Floor Detail

Stucco

500 S Figueroa St. LA, CA 90071

Air Rigid foam insulation board Douglas Fir Douglas Fir

Farm-to-Table Coworking Space

Douglas Fir Douglas Fir Douglas Fir Air Gypsum Wall Board

Gypsum Wall Board

Steel, mill finish

Gypsum Wall Board

Douglas Fir

Drawn by

Douglas Fir

Client's name:

Author Karen Kensek

Douglas Fir Douglas Fir

Address:

141 Naud St. LA, CA 90012

Douglas Fir Steel, mill finish Gypsum Wall Board

Seal and Signature

No.

1

Exterior 5-Ply CLT Panel 90-minute fire rating

3

Description

Date

5-Ply CLT FLoor Panel 90-minute fire rating

Gypsum Wall Board

Steel, mill finish

Douglas Fir

A2.1

Douglas Fir Douglas Fir

3D System Families

Steel, mill finish Gypsum Wall Board

Grass Soil Air Barrier Plastic Wood

Architecture 526, Fall 2020

Polyethylene Exterior finish, roofing

Project number

2

Interior 3-Ply CLT Panel 45-minute fire rating

4

EPDM Green Roof

Date Checked by

Scale

USC School of Architecture

Karen Kensek, John Southern

3 9/28/20 Checker

10/2/2020 7:18:18 AM

half-size set

Back ARCH 526 | Fall 2020


Comprehensive Building Drawing Set Mel Lewis, Snow He ARCH 526 - Karen Kensek, John Southern

44 He Lewis Architecture

Project Data and Analysis Project Description: A 6-story coworking building designed to create a producer driven, vital and inclusive space that revitalizes the LA River Community. Construction type:

Type IV-C

Zoning Code information: A-1 theater with fixed seating. ZI-2129 State Enterprise Zone: East Los Angeles ZI-1117 MTA Right-of-Wat ROW Project Area ZI-2432 Cornfield Arroyo Seco Specific Plan Zoning designation: PIN numbers:

500 S Figueroa St. LA, CA 90071

136-5A219 25 136-5A219 23

Parcel No. (APN)

5409002029 5409002900

Map Sheet

136-5A219

FAR:

2.0

General Plan Use

Hybrid Industrial

Use:

Theater Restaurant Business

Occupancy Groups:

A-1, B, & I

Farm-to-Table Coworking Space

Fire district & Height limitations: Floor area ratio (FAR):

2.0 (3.0 Max)

Allowable lot coverage:

(50%)

Author

Drawn by

Karen Kensek

Gross lot area: (2 lots) ZIMAS-official 9177.5 sq/ft (Sanchez model for 605B)22887.55 sq/ft Net building area:

(utilizing 3 ft setback) 20903.02 sq/ft

Paved surfaces: Landscaped areas:

12260 sq/ft 723 sq/ft -Jose likes concrete

A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13

141 Naud St. LA, CA 90012

Seal and Signature

Sheet List Sheet Number

Address:

Sheet Name Title Sheet Plot Plan Level 1- Ground Floor Plan Level 3 - Typical Floor Plan Roof Restaurant & Cowork System Coordination Elevations Section Cowork South Door, Floor & Wall Schedule Large Wall Section One Details Chunk Detail Drawing ADA Cut Sheet

No.

Description

Date

Area Schedule (Gross Building) Level

Name

Level 1 Level 1 Area Level 1 Upper Level 1 Upper Area Hydroponics Level 1 Upper Area Coffee Shop Level 2 Level 2 Area Restaurant Level 2 Area Cowork Level 3 Typical Level 3 Typical Area Cowork Level 3 Typical Area Restaurant Level 4 Level 4 Area Cowork Level 4 Area Roof Garden Level 5 Level 5 Area Cowork Level 6 - Roof Cowork Level 6 - Roof Area Roof Garden Cowork

Area

9711 SF 1294 SF 956 SF

A1

1636 SF 2085 SF

Title Sheet

6003 SF 1976 SF 3937 SF 1131 SF 3835 SF 3116 SF

Architecture 526, Fall 2020

Project number Date Checked by

1

Isometric SE Scale

USC School of Architecture

Karen Kensek, John Southern

3 9/28/20 Checker

11/29/2020 4:49:14 PM

half-size set

Back ARCH 526 | Fall 2020


Comprehensive Building Drawing Set Mel Lewis, Snow He ARCH 526 - Karen Kensek, John Southern

45 He Lewis Architecture

Plot 1 PIN NUMBER Lot/Parcel Area Thomas Brothers Grid Assessor Parcel No. (APN) Tract Map Reference Lot Map Sheet General Plan Use

136-5A219 25 6,950.3 (sq ft) PAGE 634 - GRID J1 5409002029 Subdivision of the Wilhardt Tract M R 6-289 25 136-5A219 LIGHT MANUFACTURING 500 S Figueroa St. LA, CA 90071

Plot 2

Project Widening XXX6

h Nort

St. g n i r Sp 309.53

Storm Drain Repair J804 1'-0" 3/8" /

e rty Lin Prope ck Setba

0 5/8

"

3' - 8 5/8"

309.52

1

vel of Tra

Farm-to-Table Coworking Space

Author

Drawn by

Area and Vicinity Map

Karen Kensek

1'-0" / 1'-0"

Lot 25 Line

Los Angeles River

Address:

231' - 1 5/8" Property

Path sible Acces

2

Setback

Off Drop

136-5A219 23 2,227.2 (sq ft) PAGE 634 - GRID J1 5409002900 Subdivision of the Wilhardt Tract M R 6-289 25 136-5A219 PUBLIC FACILITIES

"

308.64

19' -

"

9" / 1'-0"

3' - 0

2 7/8 144' " /8 1 2 125' -

PIN NUMBER Lot/Parcel Area Thomas Brothers Grid Assessor Parcel No. (APN) Tract Map Reference Lot Map Sheet General Plan Use

3' - 0"

309.73

233

k bac e Set in ty L per " Pro ' - 7 1/2 3' -

309.56

0"

1/8" /

" '-0 /1 1/ 4"

0"

p Dro

Off

k bac ine Set ty L /2 " per 11 1 9 Pro 1 '-

36' -

Seal and Signature

No.

Description

Site

1'-0"

309.60

8" 7 5/ /4" -71 56'

l rave of T h t a le P ssib cc e

A2

A

dS Nau

Date

311.58

[No Slope] 309.77

3' -

309.85

141 Naud St. LA, CA 90012

t.

Plot Plan

Site

Architecture 526, Fall 2020

1

Project North

Plot Plan 1" = 30'-0"

N

half-size set

True North Project number Date Checked by

Scale

USC School of Architecture

Karen Kensek, John Southern

3 9/28/20 Checker

1" = 30'-0"

11/29/2020 4:49:19 PM

N

Back

ARCH 526 | Fall 2020


Comprehensive Building Drawing Set Mel Lewis, Snow He ARCH 526 - Karen Kensek, John Southern

46 He Lewis Architecture

A

B

D

C

G

F

E

H

I

500 S Figueroa St. LA, CA 90071

K

J

167' - 2 1/4" 16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

Farm-to-Table Coworking Space

14' - 3"

1

C2

2

2' - 9"

5

Conf. Room #1 315 SF

14' - 3 3/8"

W2

310.52

4' - 5 1/4"

Cowork Lobby 1054 SF

4

C1

4' - 9"

3' - 0"

C1

8

C2

18

16

Seal and Signature 13

21 W2

Janitor 19 SF

5 W2 A13

W2 W2

141 Naud St. LA, CA 90012

3

Rise: 6 ½” Run: 11”

3' - 0"

C1

Address:

3 A13 23

10

4' - 5 1/4"

C1

5' - 5 1/8"

4' - 8 5/8" 4' - 9"

2

Karen Kensek

5' - 5 5/8"

W2

W2

Rise: 6" Run: 11”

6' - 8"

310.52

3' - 7 3/8"

G1

3' - 11 5/8"

Author

Drawn by

24 14' - 3"

2' - 9"

14' - 3"

12' - 9 3/4"

No.

Description

Date

4 7' - 5 1/4"

1' - 2"

3' - 6"

14' - 6 1/8"

C1

20

" -9 4' 1/ 4" -3

9

3/ 4

"

6 310.52

C1

15

1

C1 W2 C2

33

W2

7

Women's Restroom 157 SF

W2

D52 D52

32 D52

31

1' - 8 1/2" 3' - 4"1' - 2 3/4"

W2

Auditorium 3838 SF

Level 1- Ground Floor Plan

C2

D52

8

A3

7

16' - 5"

5' - 0 1/8"

25' - 1 3/4"

3' - 11 3/4"

5' - 0 3/4"

34

W2

1' - 2" 4' - 2 1/2"

35

6

W2

2' - 6" 3' - 4 3/8" 3' - 3 5/8"

17' - 5 1/4"

5' - 0" 5' - 7"

5' - 7"

G6

W2

Storage 118 SF

5' - 0"

6' - 3"

W2

W2

W2

4' - 1 3/4"

G7

C2

4'

" 5/ 8"

1/ 4

0

4' - 11 1/2" 5' - 8"

3

14' - 3"

4' - 10"

W2

14

44' - 0"

22

4' -

7

5' -

2

2 A13

9"

-1

9

4' -

5' - 0 1/8"

10' - 0 1/2"

ADA Restroom 38 SF

4 A13

5

14' - 3"

4

Hydroponics 2040 SF

C1

11

Janitor Restroom 45 SF

5'

6' - 2 1/2"

5' - 8 3/8"

6' - 3"

Lobby 876 SF

10

ADA Restroom 54 SF

310.52

4' - 9 3/4"

3

310.52

Rise: 6 ¾” Run: 11”

4' - 10 1/8"

Rise: 6 ¾” Run: 11”

3 15' - 5 1/4"

4' - 0" 1' - 4 1/8"

1' - 6" 4' - 0"

4' - 3 3/8"

310.52

1

12

Lockers 40 SF

14' - 3"

5' - 2 3/8"

G6

6' - 4 3/4"

5' - 5 1/2"

5' - 1 7/8"

5' - 0 1/8"

5' - 2 3/8"

99' - 9"

5' - 2 3/8"

14' - 3"

W2

4' - 10 5/8"

16' - 6 1/8"

C2

8

Men's Restroom 167 SF 26

27

29

28

Architecture 526, Fall 2020

Project North

True North

0'

6'

12'

24'

Project number Date Checked by

Scale

USC School of Architecture

Karen Kensek, John Southern

3 9/28/20 Checker

1/8" = 1'-0"

11/29/2020 4:49:25 PM

N

N

half-size set

Back

ARCH 526 | Fall 2020


Comprehensive Building Drawing Set Mel Lewis, Snow He ARCH 526 - Karen Kensek, John Southern

47 He Lewis Architecture

B

A

E

D

C

G

F

H

J

I

500 S Figueroa St. LA, CA 90071

K

167' - 2 1/4"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

Farm-to-Table Coworking Space

14' - 3"

1

341.52

G14 4' - 11"

5' - 0 3/8"

Karen Kensek

4' - 11"

36

Address:

C1

3' - 0 1/8"

W2

3' - 0"

Rise: 6 ¾” Run: 11”

C1

Rise: 6 ¾” Run: 11”

57

52

G13

341.52

47

58' - 8 7/8"

59

W2 G3

Restroom 120 SF

W2 W2

38

55

57

ADA Restroom 37 SF

5

51

W2

C1

34 Restaurant Upper Level 1149 SF

50

G5

W2

16' - 1 1/4"

3' - 0"

1' - 4 1/8" 2' - 11 1/2" 2' - 11 1/2"

4' - 3"

6 A13

6

Rise: 6" Run: 11” 22' - 5 7/8"

13' - 5 5/8"

C1

8' - 5 5/8"

49

341.52

C1

14' - 3"

G5

4' - 1"

C1

W2

335.30

35

D52

341.52

ADA Restroom 46 SF

53

A4

6' - 3 1/4"

341.52

5' - 0"

341.52

3' - 1 5/8"

G5

G3

4 99' - 9"

39

Date

14' - 3"

56

Description

W2 14' - 3"

58

Restroom 123 SF

2' - 10 1/4"

No.

ADA Restroom 53 SF 3' - 1 3/4"

W2

G13

37

4' - 1"

341.52

Rise: 6 ¾” Run: 11”

Seal and Signature

54 W2

5' - 9 1/8"

141 Naud St. LA, CA 90012

3 335.02 14' - 3"

Rise: 6" Run: 11”

Cowork 2535 SF

G14

Author

Drawn by

3' - 6 1/2"

14' - 3"

6' - 2"

2 3' - 6"

7

Level 3 - Typical Floor Plan

12' - 8 3/4"

W2

14' - 3"

G4

8' - 0"

341.52 335.30

G5

8 9' - 2"

12' - 8 3/4"

9' - 0"

Architecture 526, Fall 2020

Project North

True North

0'

6'

12'

24'

Project number Date Checked by

Scale

USC School of Architecture

Karen Kensek, John Southern

3 9/28/20 Checker

1/8" = 1'-0"

11/29/2020 4:49:28 PM

N

N

half-size set

Back

ARCH 526 | Fall 2020


Comprehensive Building Drawing Set Mel Lewis, Snow He ARCH 526 - Karen Kensek, John Southern

48 He Lewis Architecture

A

B

C

D

E

G

F

H

500 S Figueroa St. LA, CA 90071

K

J

I 66' - 10 1/2"

66' - 10 1/2"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

16' - 8 5/8"

Farm-to-Table Coworking Space

1

Drainage Point

3' - 5"

Drainage Point

2

Access Point

Author

Drawn by

3' - 6"

Karen Kensek

381.52

2% MIN SLOPE REQ.

381.522% MIN SLOPE REQ.

14' - 3"

2% MIN SLOPE REQ.

Address: 2% MIN SLOPE REQ.

Drainage Point

3

Drainage Point

381.52

381.52

Drainage Point

Seal and Signature

Rise: 6 ¾” Run: 11” 2% MIN SLOPE REQ.

50

Green NotRoof Enclosed

Drainage Point

No.

0' - 11 0' -5/8" 3" 4' - 11 3/4" 0' - 5"

2% MIN SLOPE REQ.

381.68

Description

Date

4

57' - 0"

2% MIN SLOPE REQ.

Mechanical Space

14' - 3"

2% MIN SLOPE REQ.

141 Naud St. LA, CA 90012

2% MIN SLOPE REQ.

3' - 5"

3' - 9"

2% MIN SLOPE REQ. 14' - 3"

2% MIN SLOPE REQ. 34' - 0 1/4"

3' - 5 1/2"

Drainage Points

2% MIN SLOPE REQ.

Drainage Point

Drainage Point

5

Drainage Point Drainage Point

2% MIN SLOPE REQ. 2% MIN SLOPE REQ.

4' - 2 3/8"

14' - 3"

Mechanical Space

2% MIN SLOPE REQ.

4' - 0"

11' - 6 1/4"

3' - 0 1/8"

Drainage Points

2% MIN SLOPE REQ.

381.52

19' - 6 1/4"

Drainage Point

4' - 6 1/2"

355.68 3' - 8 5/8"

381.52

6

25% OR GREATER REQ.

2% MIN SLOPE REQ.

63

2% MIN SLOPE REQ.

40

Green NotRoof Enclosed

4' - 1 7/8"0' - 2"

Drainage Point

Drainage Point

A5

5' - 0"

354.52 25% OR GREATER REQ.

Roof Restaurant & Cowork

7

4' - 0 3/8"

354.52

0' - 2' 6"- 9 5/8"

Access point

355.68 2% MIN SLOPE REQ.

4' - 7 1/4"

Drainage Point

Drainage Point

8 Architecture 526, Fall 2020

Project North

True North

Project number

0'

8'

16'

32'

Date Checked by

Scale

USC School of Architecture

Karen Kensek, John Southern

3 9/28/20 Checker

1/8" = 1'-0"

11/29/2020 4:49:31 PM

N

N

half-size set

Back

ARCH 526 | Fall 2020


Comprehensive Building Drawing Set Mel Lewis, Snow He ARCH 526 - Karen Kensek, John Southern

49 He Lewis Architecture

500 S Figueroa St. LA, CA 90071

Double Swing Door

Double Door 60"x80" 2

Double Door 60"x80"

Single Flush 30"x84"

Single Flush 30"x80"

Single Flush 36"x80"

Single Flush 36"x84"

Single Flush 36"x80"

Bathroom Door

Farm-to-Table Coworking Space

3D Doors

1

Door Schedule

Family and Type

Count

Width

Fire Rating

Door-Curtain-Wall-Double-Glass: Door-Curtain-Wall-Double-Glass Door-Curtain-Wall-Double-Glass: 6 45 Minutes Door-Curtain-Wall-Double-Glass Door-Curtain-Wall-Single-Glass: Door-Curtain-Wall-Single-Glass Door-Curtain-Wall-Single-Glass: 8 45 Minutes Door-Curtain-Wall-Single-Glass Door-Double-Flush_Panel: 68" x 80" Door-Double-Flush_Panel: 68" x 80" 3 5' - 8" 30 Minutes Door-Double-Flush_Panel: 68" x 80" 2 Door-Double-Flush_Panel: 68" x 80" 2 2 5' - 4" 30 Minutes Door_Swing-Double-SaftiFirst-BUFP-Steel_45_Min_Interior: 45 Minute Fire Protective Door_Swing-Double-SaftiFirst-BUFP-Steel_45_Min_Int 1 6' - 0" 45 Minutes erior: 45 Minute Fire Protective Single-Flush: 30" x 80" Single-Flush: 30" x 80" 2 2' - 6" 30 Minutes Single-Flush: 30" x 84" Single-Flush: 30" x 84" 10 2' - 6" 30 Minutes Single-Flush: 36" x 80" Single-Flush: 36" x 80" 2 3' - 0" 30 Minutes Single-Flush: 36" x 84" Single-Flush: 36" x 84" 15 3' - 0" 20 Minutes Single-FlushClosed: 36" x 84" Single-FlushClosed: 36" x 84" 5 3' - 0" 20 Minutes Toilet Stall: 30" x 64" Toilet Stall: 30" x 64" 18 2' - 6" -

Plumbing Fixture Schedule Family and Type

Mop Sink 5

Sink Vanity

Commercial Toilet

Urinal Wall

3D Bathroom Fixtures

0'

-8

3' - 2 3/16"

-8

1' - 7 1/2"

1' - 0"

0'

0'

1

Address:

141 Naud St. LA, CA 90012

1 2 11 16 28 2 8 4 16

Seal and Signature

No.

Description

Date

N

Graphic Scale 3/32" = 1' 16'

8'

32'

Count

Glulam-Western Species Carved: 8.75x12 Glulam-Western Species: 8.75x12 Glulam-Western Species: 8.75x19.5 W-Wide Flange: W40X149

6" 3/1 11

0'

4 90 116 6

Graphic Scale 1/16" = 1' 0' Outdoor ADU Horizontal Supply Diffuser

3D Structural Columns Beams

3

Karen Kensek

North Arrow

Family and Type

" 3/4

Count

Faucet-Delta-Haywood-Two_Handle_Widespr ead_Lav (1): 35999LF PW Mop Sink: 34"W Sink Vanity-Square: 20" x 18" Sink-Round-2D: Sink-Round-2D Toilet-Commercial-Wall-3D: 15" Seat Height Toilet-Commercial-Wall-3D: 19" Seat Height trash - in counter: 4 trash Urinal-Wall-3D: Urinal-Wall-3D USC Faucet_3D: USC Faucet_3D

Mirror

Structural Framing Schedule " 3/4

Sixue He & Mel Lewis

Drawn by Client's name:

6

8'

16'

32'

A2.2

Oval Duct

2D Annotation (not 3D presentable) 4 1/4" = 1'-0"

HVAC Equipment 3D

3D Loadable Families

Structural Column Schedule

0'

-7

" 1/2

0'

-5

1/8 "

Glulam Beam

2

USC School of Architecture

1'

0"

0'

-8

3/4 "

1'

2"

1'

-2

"

Sherpa Power Plate

1'

-2

"

1'

-2

"

0'

-9

" 1/2

0'

Timber

-9

1/2 "

1'

-2

"

0'

-1

0"

W-Wide Flange

Glulam-Western Species-Column: 5.125x7.5 Glulam-Western Species-Column: 8.75x12 MRL-Glulam Column-with Power Plate: 14x14 MRL-Glulam Column-with Power Plate: 14x14 2 Timber-Column: 10x10 W-Wide Flange-Column: W14X68

Count

Structural Material

21

Glulam-Vertical

9 28

Glulam-Vertical Glulam-Vertical

91

Glulam-Vertical

9 11

Glulam-Vertical

Architecture 526, Fall 2020

half-size set Project number Date Checked by

ADA Parking & Wheelchair Circle 1/2" = 1'-0"

3D Structural Columns

Karen Kensek, John Southern

Scale

3 9/28/20 Checker

As indicated

10/2/2020 7:18:25 AM

Family and Type

Back

ARCH 526 | Fall 2020


Comprehensive Building Drawing Set Mel Lewis, Snow He ARCH 526 - Karen Kensek, John Southern

50 He Lewis Architecture

Door

Elevator

Stair

3' - 0"

3' - 0"

Inner handrail

500 S Figueroa St. LA, CA 90071

4' - 5"

3' - 1 5/8"

4' - 10"

5' - 8"

4' - 3"

1' - 0"

Landing

5' - 0 1/4"

Outer handrail

Farm-to-Table Coworking Space

Landing

3' - 6"

Down

Author

Drawn by

4

Level 1 - Callout Door 1/4" = 1'-0"

2

Level 1 - Callout Elevator 1/4" = 1'-0"

3

Karen Kensek

Level 1 - Callout Stairs 1/4" = 1'-0" Address:

141 Naud St. LA, CA 90012

Seal and Signature

No.

Corridor

Restroom

Description

Date

Paths of Travel and parking St. g n i r h Sp Nort

'ø5

0"

Accessible Path of Travel Drop Off

310.34

6' - 5 3/4"

0' - 9 5/8"

1' - 6 1/8"

3' - 10 3/8"

4' - 6 7/8"

6' - 7 1/4"

3' - 0"

1' - 10"

A13

2' - 2 3/4"

ADA Cut Sheet

309.85

J

Drop Off

Accessible Path of Travel

St. d u ADA Parking Na 6

Level 3 Typical - Callout Corridor 1/4" = 1'-0"

5

Level 1 - Callout Bathroom 1/4" = 1'-0"

1

ADA Paths of Travel 1" = 100'-0" Architecture 526, Fall 2020

Project number Date Checked by

Scale

USC School of Architecture

Karen Kensek, John Southern

3 9/28/20 Checker

As indicated

11/29/2020 4:50:10 PM

half-size set

Back

ARCH 526 | Fall 2020


Models Mel Lewis 1st Year Models

51

Back USC School of Architecture

1st Year | 2018


Models Mel Lewis 1st Year Models

52

Back USC School of Architecture

1st Year | 2018


Models Mel Lewis 1st Year Models

53

Back USC School of Architecture

1st Year | 2018


Mel Lewis Portfolio 310-428-8001 melvinle@usc.edu linkedin


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.