Portfolio Civil Engineer - Melly Nur Fatimah

Page 1


Bachelor of Civil Engineering - GPA 3,40/4,00 Thesis : Control of Project Costs and Time Using Earned Value Analysis Method on High-Rise Building


Technical Inspector - SLF Consultant (September 2021 – Now) • Checked the completeness of building administration documents for SLF management. • Inspected the building as a basis for SLF study preparation. • Compared the inspection results with the applicable building technical standards in the SLF study preparation document. • Coordination and presented the result of the SLF study in the SLF session with relevant agencies related.

• • •

: • Building Technical Young Expert (SKA Tenaga Ahli Teknik Bangunan Gedung), • Health and Safety Construction Young Expert (SKA Ahli Muda K3 Konstruksi)

: • 5D BIM Cubicost Introduction Training (March 2022) • Basic Supply Chain Management Oil & Gas Case (Nov 2021) • SAP2000 Advance Level (Dec 2020)

• Tekla Course Advance Level (August 2020) • • •

.




Project Control One stage of the project management process is project control. Project control is an effort made by project manager to determine standards according to plans, compare implementation with planning, and analyze possible project deviations. The goal is that the project can immediately take the necessary actions to anticipate deviations.

Control of Project Costs and Time Using Earned Value Analysis Method on High-Rise Building Earned Value Analysis (EVA) is a method that allows the project manager to measure the amount of work actually performed on a project beyond the basic review of cost and schedule reports. EVA provides a method that permits the project to be measured by progress achieved.

BCWS (Budgeted Cost of Work Scheduled)

Budget that has been prepared against the schedule as a reference for job scheduling.

BCWP (Budgeted Cost of Work Performed)

Value that obtained from the completion of work packages over a certain period of time.

ACWP (Actual Cost of Work Performed)

Accumulated costs that have been incurred by the project to complete work packages over a certain period of time

Cost Variance CV = BCWP - ACWP

Schedule Variance SV = BCWP - BCWS

Parameters

Value

Conclusion

Cost Variance (CV)

+

Project cost under-budget

-

Project cost over-budget

Schedule Variance (SV)

+

Schedule acceleration occurs

-

Schedule delay occurs

Cost Performance Index CPI = BCWP/ACWP

1. Project control uses three Earned value indicators, namely BCWS, BCWP, and ACWP so that the results obtained are more accurate. 2. Able to assess project performance based on project time and cost. 3. Able to predict estimate to complete (ETC) and estimate at completion (EAC). 4. Able to provide more accurate project condition status.

Schedule Performance Index SPI = BCWP/BCWS

Parameter

Value

Conclusion

Cost Performance Index (CPI)

>1

Project cost under-budget

<1

Project cost over-budget

Schedule Performance Index (SPI)

>1

Schedule acceleration occurs

<1

Schedule delay occurs


Estimate to Complete (ETC) Estimated cost for remaining work 𝐸𝑇𝐶 =

(𝐵𝐴𝐶 − 𝐵𝐶𝑊𝑃) 𝐶𝑃𝐼

Estimate at Completion (EAC) Estimated cost to complete the project 𝐸𝐴𝐶 = 𝐸𝑇𝐶 + 𝐴𝐶𝑊𝑃 Description : BAC = Budget At Completion

Estimate to Complete (ETC) Estimated time to complete the project

The results of this study can be concluded that project scheduling has accelerated in the first week to the 15th

𝑂𝐷 − (𝐴𝑇𝐸 𝑥 𝑆𝑃𝐼) 𝑇𝐸 = 𝐴𝑇𝐸 + 𝑆𝑃𝐼

week. but in the 16th to 26th week the project was delayed. The delay occurred because there are many design

Description : OD = Original Date ATE = Actual Time Expended

materials. In terms of costs, there are cost overruns that have occurred since the beginning of the project .

reviews when the project already running, slow work approval, bad labor productivity, and delays in ordering Due to the occurred problems, adopted strategy to control the variance were: Improving communication with other parties, accelerating work on the critical path, increasing labor productivity, Diverting available resources from hampered jobs to other jobs, and evaluate the calculation of the cost of each job.


BOQ is a breakdown of the volume of all work items in a construction job. Which consists of preparatory work, structural work, architectural work, MEP work, utility work, landscape, and so on. Volume in BOQ is calculated from

shop

drawings.

This

volume will then be used to

calculate the budget plan/RAB

This project designed the entrance gate at the Brooklyn Town House in Cilacap, Central Java. The gate is 5 m high parallel-shaped walls with granite wall finishing. Equipped with a guard post in the middle of the gate.


is planning costs required in a construction project or development from the beginning until the project is completed.

AHSP (Analysis of the unit price of work) is the calculation of the cost of labor, materials, and equipment to obtain the unit price of a certain type of work item.


Structural modelling

Analysis Result

Above is structural modeling that I made using SAP2000 software to calculate the strength of structure. This building is an office building consisting of 2 floors with an area of 1000 m2

is a program used to analyze and

located in Cilacap, Central Java.

design structures, especially high-

Material Quality :

rise buildings and bridges.

Rebar U30 for D < 13 U40 for D > 13 Concrete K250 Dimensioning Structure


The resulting analysis is the

ratio

longitudinal

area.

If

element

of

reinforcing

the is

the

structural red,

the

structural elements must

be

checked

redesigned.

Earthquake Response Spectrum

and The resulting M22 diagram on the second floor slab

The resulting M22 diagram on the roof floor slab

The resulting M11 diagram on the second floor slab

The resulting M11 diagram on the roof floor slab


Autodesk Revit is one of BIM software for architectural, structural, and MEP design in 3D that is fully integrated. Streamline

documentation

work, with instant revisions to

plans,

elevations,

schedules, and sections as

projects change

First Floor

Second Floor


Section A - A

Considering the complexity of BIM technology, this project will continue until scheduling with Microsoft Project and Autodesk Naviswork Software and cost estimation with Cubicost Software. Section B - B