VERMICULITE FIREBRICK INSTALLATION SEQUENCE - UNIQ 26,27,28 Ÿ1 - Top Left Turbulence Brick
1
2
Ÿ2 - Top Right Turbulence Brick 8
Ÿ3 - Rear Brick Ÿ4 - Left Side Brick Ÿ5 - Right Side Brick Ÿ6 - Left Small Side Brick
6
4
3
5
Ÿ7 - Right Small Side Brick Ÿ8 - Baffle Brick Ÿ9 - Left Base Brick Ÿ10 - Right Base Brick
9
Ÿ11 - Base Grate Ÿ12 - Metal Spacer
1 - Insert both base bricks (9 and 10) on their respective sides. Then place the Metal spacer (12) inbetween bricks at front with curved edge facing the rear of the chamber.
11 12
10
7