VERMICULITE FIRE BRICK INSTALLATION SEQUENCE - WESTFIRE UNIQ 4 / 5 Uniq 4:
1 – Rear Brick 2 – Right Side Brick 3 – Inner Top Baffle Brick 4 – Top Baffle Brick 5 – Left Side Brick 6 – Left Back Base Brick 7 – Right Back Base Brick 8 – Rear Base Brick 9 – Base Grate 10 – Left Front Base Brick 11 – Right Front Base Brick 12 – Log Retainer
Uniq 5:
3 4 1 8 5
6 59 10 12
7 11
2
FIRE BRICK INSTALLATION SEQUENCE - WESTFIRE UNIQ 4 / 5 Installation procedure:
Rear brick 1.
Right side brick 2.
Inner top baffle brick 3 positioned with angled edge at front / top. Position brick so that it rests on rear brick 1 and secondary air pre heat chamber.
FIRE BRICK INSTALLATION SEQUENCE - WESTFIRE UNIQ 4 / 5
Push up Inner top baffle brick 3 slightly so that top baffle brick 4 can rest on rear brick 1. Inner top baffle brick 3 then rests on top baffle brick 4.
Left side brick 5 fitted.
Base bricks 6 & 7 fitted.
Rear base brick 8 & Base grate 9 fitted.
Left & right front base bricks 10 &11 fitted.
FIRE BRICK INSTALLATION SEQUENCE - WESTFIRE UNIQ 4 / 5
Log retainer 12 fitted.