

SummerWorks2024

MajorWork
• ConversionoftheSchoolHousetooffices
• DTrefurbishmentinC104&C105
• ConversionofA204toasciencelab
• Extensionof6thFormKitchen
• Extensionof6thFormOffices
• Newlightingatthefrontoftheschool
B

ConversionoftheSchoolHouse



ConversionoftheSchoolHouse-FinanceOffice1



ConversionoftheSchoolHouse-FinanceOffice


B

ConversionoftheSchoolHouse



ConversionoftheSchoolHouse-Computing Hub



ConversionoftheSchoolHouse-DevelopmentTrust



ConversionoftheSchoolHouse-breakoutroom



DTrefurbishment-before



DTrefurbishment-after



A204conversion



Extensionof6thformkitchen-before



Extensionof6thformkitchen-after



Extensionof6thformoffices-before



Extensionof6thformoffices-after



Lightingatthefrontoftheschool-beforeand after



OtherProjects
• Redecorationofmusicrooms
• Baxallsdiggingupthesideroad
• Deliveryandpreparationof315chromebooks
• PicketfencingatsideofCBlock
• Newpartitioninthesmallhall
• ChangesinB004toincorporatenewcomputers

315Chromebooks!



PicketfencingoutsideCBlock



ThereturnofBaxalls-justthesideroad


Newpartitioninsmallhall


SystemsTeamhasbeenbusytoo!
• Completenew phonesystem installedand configuredwith newhandsets, mobileappand web-based access.


Theoldphone systemwasfully decommissioned andtheoldhandsets wereboxedupand soldtoraisesome funds.




A new fibre optic link was run to the school house to facilitate the data connections required for the new office spaces.
In the school house a new data cabinet was installed, new data points and power sockets in each office, WiFi Access Points, sounders for the bells and new CCTV cameras.




315Chromebooksweredelivered,unboxed,sortedintoform groups,paperworkgeneratedandallcarrieduptoA201andA212!
8newcolour printerswere delivered, installedand configuredand theoldones recycled




Completenewwireless networkwith72new WirelessAccessPoints installedupgradingusto theWiFi6Estandard.All oftheoldAPshavebeen decomissioned


NewPrometheanscreeninstalledinC104oncethebuilding workwascompleted


VariousCCTVcameras reinstatedwithan additionaloneonthe schoolhouse


Completedrebuildoftheequipmentonthegallerywithnew


Re-configurationofB004withtherelocationofthescreen, newpoweranddata,newworktopandPCsrelocated



Plus…lotsandlotsofshiftingequipmentaroundforthe variousofficerelocations!

Thankyoutotheallyearroundstafffor yourhardworkoverthesummer!
Thebusiesteverandyouhaveallgone aboveandbeyond!
SpecialthankstoRidgeCrest!