MÍRIAM SOLER PORTFOLIO
To see the document properly you need to activate the following display options: View / Page Display / Two page view View / Page Display / Show cover page in Two page view
INTERIOR DESIGNER AND ARCHITECT
As a co-owner of a small design studio during the last 10 years, I have been involved in all the phases of a project, analyzing the client’s needs, preparing working drawings and specifications, collaborating with other practitioners and finally, supervising the execution. My aim of learning together with my professional trajectory and solid academic background, helped me to work as a teacher. This experience gave me the possibility to establish a bridge between the real cases and the theory, becoming a very exciting chapter in my life. Moved to Copenhagen recently, I think this might be an amazing chance to learn and to improve my skills.
i n f o @ m i r i a m s o l e r. c o m Copenhagen, 2000 ¡ Danmark
CONTENT
SELECTED PROFESSIONAL PROJECTS HOUSING HOSPITALITY RETAIL EPHEMERAL
TYPE OF PROJECTS INTERIOR DESIGN ARCHITECTURAL URBAN
SELECTED PROFESSIONAL PROJECTS
HOUSING · HOSPITALITY · RETAIL · EPHEMERAL ARCHITECTURE
HOUSING
JD HOUSE Batet, 2010
HOUSING
A G A PA R T M E N T Olot, 2010
HOSPITALITY
V E R T I S O L R E S TA U R A N T Les Preses, 2011
RETAIL
Runner up in Girona Architecture Awards · Edition 2008 · Award by the Architects Association of Catalonia (COAC)
FRUITS AND FOOD Olot, 2007
RETAIL
DR2 Olot, 2008
EPHEMERAL ARCH.
Runner up in Girona Architecture Awards · Edition 2016 · Award by the Architects Association of Catalonia (COAC)
EASDO’S MAIN HALL Olot, 2015
EPHEMERAL ARCH.
L LU È R N I A · L I G H T F E S T I VA L Olot, 2015
EPHEMERAL ARCH.
A C E L O B E R T · O U T S I D E F E S T I VA L Tortosa, 2016
TYPE OF PROJECTS
INTERIOR DESIGN · ARCHITECTURAL · URBAN
INTERIOR DESIGN LAYOUTS AND MOOD BOARDS
Given and fixed the space, the interior shows multiple options. Mood boards as an effective way to consider different proposals.
B LU E H O U S E Colera, 2017
OP1
OP3
OP2
OP4
INTERIOR DESIGN MODELLING, TEXTURING, LIGHTING,RENDERING...
A good way to capture sensations, emotions, environments
and
atmospheres
that
characterize each project. Through
materiality,
light
and
visual
approach it’s easy to emphasize all values of architecture, achieving a direct interaction between the proposal and the observer
M A Q Q A PA R T M E N T Torelló, 2018
ARCHITECTURE DESIGNING, DETAILING AND PLANNING
PPLLAANNTTAA GCYOMB EERNTTAO R EN NTORN PLANTA
COBERTA
ENTORN
1/600 1/600
PLAN TA
AULES
1 /6 00
ENT O RN
FLEXIBILITAT
PLAN TA
BA R
1 /6 00
ENTO RN
PERMEABLE
PLAN TA
GYM
EN TO RN
1 /6 00
GENER
FEBRER
FEBRER
MARÇ
ABRIL
MAIG
JUNY
GENER
FEBRER
MARÇ
MARÇ
MARÇ
MAIG
JUNY
FJEUBLRI E OR L
AM GA OR SÇ T
SETEMBRE
ABRIL
MAIG
JUNY
G JE U NN EY R
FEBRER
MARÇ
MARÇ AGOST
SETEMBRE
MB AR IG OCTU E
JU NOVEM BN RY E
DESEMBRE
FJEUBLRI EORL
AM GA OR SÇ T
SETEMBRE
ABRIL SETEMBRE
MAIG
JUNY
G JE U NN EY R NOVEMBRE
FEBRER DESEMBRE
MARÇ
AM GA OR SÇ T
SETEMBRE
MAIG OCTUBRE
JUNY NOVEMBRE
JULIOL DESEMBRE FEBRER
AGOST MARÇ
SETEMBRE
S E T EAMBBRRI E L
MAIG
JUNY
JU NOVEM BN RY E
DESEMBRE
AGOST
SETEMBRE
DESEMBRE
MARÇ OCTUBRE MAIG
NOVEMBRE JUNY
DESEMBRE
D E SJEUMLBI R OE L
AGOST
SETEMBRE
SETEMBRE
NOVEMBRE
DESEMBRE
JUNY
AGOST
SETEMBRE
OCTUBRE
NOVEMBRE
DESEMBRE
SETEMBRE
NOVEMBRE
DESEMBRE
DESEMBRE
DESEMBRE
A L Ç A T
S U D
OES T
A L Ç A T
N O RD
ES T
AL ÇAT
SU D
E ST
AA LÇ AA T TN N OO RR D DO O E S T T LÇ E S
S E C C I Ó
T R A N S V E R S A L
4
S E C C I Ó
T R A N S V E R S A L
5
S E C C I Ó
T R A N S V E R S A L
6
s5
s6
s1 s2 s3 s4
1 / 3 0 0
1 2
1 3 1 4
1 5 1 6
8 1 0
1 7 5 4
6
7
18 3
9
1
2
1 1
3
2 1
5
6
P LAN T A
A ULES
4
8 9
7
1 / 2 0 0 1 0
7
1 1
2
3
1
10
8
4 9
5 6
1 3
PLANTA
BAR
1/200
12
1
bany accessible
2
bany dones
3
bany homes
11,04 m²
4
hall distribuidor
28,52 m²
5
magatzem mèdic
6
magatzem tallers
9,2 m²
7
vestuari personal
9,08 m²
8
circulacions 1
16,19 m²
9
circulacions 2
20,41 m²
10
circulacions 3
20,61 m²
11
circulacions 4
12
consulta 1
21,34 m²
13 1 14 2
consulta 2 bany accessible sala d'espera bany dones
22,31 5,26 37,39 10,03 25,49 11,04
17 5 18 6
taller 3 magatzem mèdic biblioteca tallers magatzem
15 3 16 4
taller homes 1 bany taller 2 hall distribuidor
7
vestuari personal
8 1 1 9 2 2 10 3 3 11 4 4 12 5 5 13 6 6 14 7 7 15 8 8 16 9 9 17 10 10 18 11
circulacions 1 bany accessible hall distribuidor circulacions 2 bany dones consergeria 3 circulacions bany homes magatzem 4 circulacions hall distribuidor cuina consulta 1 magatzem mèdic banys bar2 consulta magatzem tallers circulacions sala d'espera1 vestuari personal circulacions 2 taller 1 circulacions 1 zona treball bar taller 2 circulacions 2 zona usuaris de taller 3 circulacions 3 peu zona d'usuaris biblioteca circulacions 4 asseguts
12
consulta 1
13 1 1 14 2 2 15 3 3 16 4 4 17 5 5 18 6 6
consulta 2 hall distribuidor distribuidor hall sala d'espera vestuari homes consergeria taller 1 vestuari dones magatzem taller 2 vestuari accessible cuina taller 3 circulacions banys bar 1 biblioteca circulacions 1 2 circulacions
7 7 8 8 1 9 9 2 10 10 3 11 4 12 5 13 1 6 2 7 3 8 4 9 5 10 6
7 8 1 9 2 10 3 11 4 12 5 13 6
sota escala 2 circulacions magatzem zona treball bar hall distribuidor box 1usuaris de peu zona consergeria peu box 2d'usuaris zona magatzem asseguts sala màquines cuina zona polivalent 1 banys bar zonadistribuidor polivalent 2 hall circulacions 1 vestuari homes circulacions 2 vestuari dones zona treball bar vestuari accessible zona usuaris de peu circulacions 1 zona d'usuaris asseguts circulacions 2
sota escala magatzem hall distribuidor box 1 vestuari homes box 2 vestuari dones sala màquines vestuari accessible zona polivalent 1 circulacions 1 zona polivalent 2 circulacions 2
5,26 m² 10,03 m²
4,74 m²
46,4 m² m² m² m² m²
m² m² 24,89 m² 28,52 m² 46,05 m² 4,74 m² 119,84 m² 9,2 m²
9,08 m² 16,19 5,26 39,03 20,41 10,03 12,85 20,61 11,04 11,23 46,4 28,52 11,84 21,34 4,74 15,48 22,31 9,2 20,73 37,39 9,08 28,52 25,49 16,19 10,67 24,89 20,41 7,19 46,05 20,61 48,87 119,84 46,4
m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m²
21,34 m² 22,31 28,1 39,03 37,39 23,47 12,85 25,49 20,37 11,23 24,89 6,96 11,84 46,05 18,21 15,48 119,84 19,32 20,73
m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m²
41,85 m² m² 28,52 18,93 m² m² 10,67 39,03 m² 17,99 m² 7,19 m² 12,85 m² 17,77 m² m² 48,87 11,23 m² 17,89 m² 11,84 m² 161,62 m² 15,48 m² ² 127,58 28,1 m m² 20,73 m² 23,47 m² 28,52 m² 20,37 m² 10,67 m² 6,96 m² 7,19 m² 18,21 m² 48,87 m² 19,32 m²
41,85 m² 18,93 m² 28,1 m² 17,99 m² 23,47 m² 17,77 m² 20,37 m² 17,89 m² 6,96 m² 161,62 m² 18,21 m² 127,58 m² 19,32 m²
7
sota escala
8
magatzem
41,85 m² 18,93 m²
9
box 1
17,99 m²
10
box 2
17,77 m²
11
sala màquines
12
zona polivalent 1
161,62 m²
13
zona polivalent 2
127,58 m²
17,89 m² propostes distribució P AULES
SECCIÓ
CONSTRUCTIVA
TRANSVERSAL
1
1/60
PLANTA GYM
PLANTA GYM
I N S T A L · L A C I Ó
C O N T R A
I N C E N D I S
J U S T I F I C A C I Ó
S U A
I N S T A L · L A C I Ó
E L E C T R I C I T A T
URBAN TERRITORY AND ANALYSIS
MASTER THESIS · ARCHITECTURE University of Girona, 2015
TFT=
Proposal to solve an historic conflict between the presence of tourism and nature. The project is based first, on a geographic, urban, and social deep evaluation of the Costa Brava region, a zone with a high density of summer houses for tourists, which are fully decoupled between them and/or any urban centre. Secondly, a specific solution is proposed to “dignify” the zone by transforming isolated residential areas in to new green neighbourhoods through
the
construction
of
linking
elements and establishing shared services.
(Original title: 68.644 cases per la finestra: pla de dignificació de les urbanitzacions de la Costa Brava; estratègia arquitectònica, política i urbanística) TFT=
nº de places d’allotjament*
https://dugi-doc.udg.edu/handle/10256/11750
nº d’habitants residents (cens hivern)
nº de places d’allotjament* nº d’habitants residents (cens hivern)
TT A AX XA A
D DE E
FF U UN NC C II Ó Ó
TT U UR R ÍÍ S S TT II C CA A
% d’ocupació % d’ocupació = =
km² urbanitzacions km² urbanitzacions presents presents al terme al ter
OCUP ACI Ó
D EL
km² terme km² terme municipal munici TERRI TORI
D I S T À N C I A
OCU P ACIÓ
DEL
U
T E
1 r
NIVE L L
E STRU C TU RADOR
2 n
N I V E LL
E S
TRUCTURADOR
3r
NIVE LL
E ST R UCT UR A D O R
THANK YOU