MICHAEL BARKOVIAK
ARCHITECTURAL PORTFOLIO
CONTENTS
1. RESUME 2. ARMORY REDEVELOPMENT
1-2 3-12
3. BRYAN HALL
13-18
4. NOYES LABORATORY
19-26
5. RUSSELL APARTMENTS
27-32
6. MISSOURI STATE CAPITOL
33-38
7. NORMAL PUBLIC LIBRARY
39-46
8. INTERNATIONAL TOWER & HOTEL
47-56
In my eyes, architecture is all about the experience. We can create experience with the technology and materials we have today. Form and materials can invoke sentiments and instill emotion within people. It is important to investigate the client’s previous experiences in order to design a space to develop the appropriate mood. We have the power as architects to design these spaces with materials, technology, and form in order to create truly inspiring buildings.
MICHAEL W. BARKOVIAK EDUCATION UNIVERSITY of ILLINOIS at URBANA-CHAMPAIGN • Masters of Architecture • M.S.C.E.E Construction Management • Bachelor of Science in Architecture
(Fall 2015) (Fall 2015) (Spring 2013)
US GREEN BUILDING COUNCIL
• LEED Accredited Professional Building Design + Construction
(Winter 2016)
EXPERIENCE TRIVERS ASSOCIATES • • • • •
Architectural Designer Produced and updated Revit project models for sets in all project phases Developed critical details with project architect in all project phases Explored materials to properly fit project cost and aeshetic requirements Worked with various complex project types and sizes Coordinated Construction Administration on two projects for a year
FACILITIES & SERVICES at the UNIVERSITY of ILLINOIS • • • • •
(May 2015- Oct 2017)
Facilities Information Resource Student Utility GPS to map and verify university sites and facilites Input descriptive data into databases and spreadsheets CAD drafting and 3d rendering Editing campus maps and floor plans Conduct fieldwork to verify facility management information
(Jan 2014- Dec 2015)
WORKBENCH LLC
(Summer 2014)
COLLEGE WORKS PAINTING
(Summer 2010)
Intern Architect • Regularly observed site and drafted field observation reports for site visits • Created As-Built drawings in Revit for owner • Worked alongside head architect on multiple projects
• • • •
General Manager Conducted custom estimates for clients Presented proposed work plan Personally interviewed and hired painters Generated over $30,000 in total sales
ARMORY REDEVELOPMENT ADAPTIVE REUSE AT HISTORIC BUILDING
PROJECT: Built in 1937, the Armory has a rich history from housing the 138th Missouri National Guard to a rock concert hall. Trivers endeavor was to continue this history by creating a new entertainment destination for St. Louis and to help revitilize midtown. This is complex site that requires strategic thinking and vision to make this project successful. My role included creating renderings, site diagrams, graphic plans, programming design, historic elevations, field verification and eventually a demolition pricing set. LOCATION: Midtown, St. Louis, MO
SOUTH EAST PHOTO
CWE
SLU SARAH BJC WASH U
CORTEX FOUNDRY GRAND
STADIUM
SSM
Diagrammatic Site Plan
E PLAN
R I VOne ERS of the toughest challenges for this project is access to the site. Much of the viability of the project depends on multiple means of travel
to the site. Above is a diagram that illustrates the possible methods to access the site. The purple lines indicate travel by car, the blue line indicates travel by the Metrolink, and the Orange lines indicate walking distance by 1/2 mile. The dashed circle indicates a half mile radius of a metro station. It is the combination of the dashed circles and walking paths that determine the possibility of arriving to the site in around 10 minutes. Our conclusion is that this site requires multiple means of transportation in order to be viable since no one type can completely supplement Armory’s size.
Aerial Perspective Diagram ALTERNATE 1 - AERIAL VIEW
TRIVERS
FOUNDRY DEVELOPMENT PEDESTRIAN BRIDGE
I-64/40
SPRING AVE.
PHASE 1 ARMORY
500 PROSPECT
PHASE 2 PHASE 3
BERNARD ST. (VACATED)
PARKING AS DESIGNED: 817 Armory: 357 500 Prospect: 37 502 Prospect: 64 Hotel: 360
N
SCOTT AVE.
PHASE 1 SITE PLAN SCALE - 1:100
TRIVERS
0
50
100
HOTEL
GRAND BLVD.
PARKING GARAGE
PROSPECT AVE.
502 PROSPECT
PRIVATE STREET
PARKING REQUIREMENTS: 613 Armory: 283 500 Prospect: 100 502 Prospect: 80 Hotel: 150
PRIVATE STREET
GRAND METROLINK STATION
200
10.12.2016
SECO 02/02/2015
024100.02 1
1.1
2
3
4
5
6
7
G
DN
8
024100.02
UP
024100.05
UP
BUILDING LOBBY 024100.04 (1,170 S.F.)
27'-2"
024100.14
B.1
10
024100.26
024100.14 11
12
024100.02 UP
PLAN LEGEND
SMALL
13
UP
WALLS EXISTING TO REMAIN
UP
024100.02
024100.04
A
29'-0"
C STOR. (3,120 S.F.)
A.1
B
STOR. (1,950 S.F.)
H
P UP
024100.02
D
024100.02
D
8
024100.02
21
120 PARKING SPOTS (52,800 UPS.F.)
024100.02
024100.02
12'-10" 29'-0"
E
I
DN
024100.10
F
STOR. (1,560 S.F.)
G
UP DN
9
9
9
JE
9
9
9
9
9
BUILDING LOBBY (2,400 S.F.)
UP 024100.10
024100.02
UP 024100.02
UP
UP
7
024100.02
BUILDING LOBBY (1,400 S.F.)
KITCHEN (...S.F.)
UP UP
ARCADE (1,320 S.F.) LINEAR BAR & SEATING (1,970 S.F.)
STOR. (2,000 S.F.)
26'-0"
C
29'-0"
024100.13
STOR. (2,410 S.F.)
UP
UP
2
024100.02
(2x) PRIVATE ALLEYS (1,200 S.F.)
DINER (1,950 S.F.)
024100.02
2
B.1
P
024100.02
M (185)
024100.24
024100.04
024100.02
B
DEMO WALLS
HISTORIC BUILDING LOBBY W STOR (2,130 S.F.) (185) (150) 024100.13
UP
024100.05
UP
024100.24
9
DN
3'-10"
024100.02
SMALL
024100.26
UP
024100.04 (6x) BOWLING ALLEYS (3,470 S.F.)
024100.02 KAR. (240)
KAR. UP
M (320)
(240)
W SHOE (320) (180)
360 BAR & SEATING (3,780 S.F.)
VIEW CORRIDOR
024100.02
024100.02
UP
UP 024100.02
UP UP UP
A ALAMO THEATERS (37,050 S.F.)
DN
024100.10
BUILDING LOBBY (1,400 S.F.)
PUNCH BOWL LOBBY (210 S.F.)
UP
024100.02 024100.02 024100.02 DN
024100.02
UP
3
ALAMO LOBBY (1,200 S.F.)
024100.02
024100.21
024100.21 29'-0"
H
LOADING DOCK (1,100 S.F.)
RETAIL/RESTAURANT (5,290 S.F.)
024100.26
UP
BREWERY STORAGE (13,100 S.F.)
I
B
J
N
BASEMENT FLOOR PLAN 32'
Basement Plan
1
1'-0"
BASEMENT PLAN
0'
1/16" = 1'-0"
8'
0
15
16'
32'
30
N
1ST FLOOR PLAN
1
60
1/16" = 1'-0"
SCALE: 1/16" = 1'-0"
TRIVERS
08.19.2016
UP 16'
0' 8' 024100.02
N
SCALE - 1:30
2
4
5 1
6
1.1
7
2
8
3
4
B
9 5
10
11
6
12
7
SMALL
9
10
11
12
PLAN LEGEND
13
SMALL
WALLS EXISTING TO REMAIN DEMO WALLS
1
B.1
UP
OPEN TO BELOW
TENANT SPACE (8,300 S.F.)
024100.02
OPEN TO BELOW 024100.02
UP
UP
ALAMO THEATERS
I
12'-10"
024100.10
G
UP
UP
024100.02
UP DN
024100.02
BUILDING LOBBY (3,920 S.F.)
D
UP 024100.02 024100.02 RESTAURANT/
BUILDING LOBBY 024100.10 (3,920 S.F.)
DN
F
11
12
SMALL
13
024100.21
H
B
SECOND FLOOR PLAN 0
15
30
60
Second Floor Plan 08.19.2016
2ND FLOOR PLAN 1/16" = 1'-0"
0'
8'
16'
SCALE: 1/16" = 1'-0"
32'
N
1
1ST FLOOR PLAN 1/16" = 1'-0"
THIRD FLOOR PLAN SCALE - 1:30
0'
8'
16'
SCALE: 1/16" = 1'-0"
32'
TRIVERS
THIRD FLOOR PLAN
TRIVERS 02/16/16
024100.02
PUNCHBOWL OUTDOOR (1,780 S.F.)
0
15
30
Third Floor Plan 08.19.2016 TRIVERS
60
UP
024100.02 DN
024100.02 LOBBY (1,820 S.F.)
A
024100.10 OUTDOOR LOUNGE (2,320 S.F.)
B
1
DN
024100.10
TENANT SPACE (17,460 S.F.) I
32'
UP
G
N
UP
TENANT SPACE (36,750 S.F.)
J
SCALE - 1:30 N
024100.02
UP
UP 024100.02
RETAIL OUTDOOR (4,100 S.F.)
A
I
OND FLOOR PLAN
10
024100.02
E
A
J
IVERS
9
UP
024100.21 TENANT SPACE (17,460 S.F.)
TR 1'-0"
8
B
J
H
16'
7
B.1
024100.02
A
F
32'
6
OPEN TO BELOW
E
BUILDING LOBBY (1,400 S.F.)
8'
5
A.1
H
024100.02
ALAMO THEATERS
0'
4
C
OPEN TO BELOW
P
SCALE: 1/16" = 1'-0"
3
B
UP
26'-0"
D
16'
2
43,450 S.F.
C
OPEN TO BELOW
R PLAN
1.1
WALLS EXISTING TO REMAIN DEMO WALLS
29'-0"
TENANT SPACE BUILDING (8,300 S.F.) LOBBY (1,680 S.F.)
BUILDING TENANT LOBBYSPACE (11,220 S.F.) (1,680 S.F.)
B
N
024100.02
60
A
A.1
B
30
PLAN LEGEND
13
8
G
B
TENANT SPACE (11,220 S.F.)
DN
15
08.19.2016
A
A
0
024100.21
TRIVERS
3
P
First Floor Plan
TRIVERS
EMENT DEMO PLAN
1
UP
32' FLOOR PLAN FIRST
SCALE: 1/16" = 1'-0"
29'-0"
SCALE - 1:30
ALAMO SUPPORT (8,250 S.F.)
LOADING DOCK (1,000 S.F.)
F
P 16'
A
BUILDING LOBBY 024100.10 (5,560 S.F.)
DN
5
.26
UP
UP
D
A
A.1
B
B.1
E
F
G
C
H
I
J
TENANT SPACE TENANT SPACE
TENANT SPACE
ALAMO THEATERS
PUNCH BOWL
SCALE - 1:30
1
1/16" = 1'-0"
1.1
0
15
2
30
3
2ND FLOOR 30'-0"
RETAIL/ RESTAURANT
1ST FLOOR 15'-0"
BREWERY STORAGE
PARKING
TRANSVERSE SECTION Section 3B-B Transverse Section 1
ROOF 43'-8"
BASEMENT 0"
60
4
5
6
7
8
9
10
11
12
13
TENANT SPACE
ROOF 43'-8"
ALAMO THEATERS
BUILDING LOBBY
BUILDING LOBBY
2ND FLOOR 30'-0"
1ST FLOOR 15'-0"
PARKING BASEMENT 0"
ion 4 1'-0"
LONGITUDINAL SECTION Longitudinal SectionA-A SCALE - 1:30
0
CEPTUAL SECTIONS
SECTION
IVERS
08.19.2016
15
30
60
13
12
11
10
9
8
7
6
5
4
3
2
1.1
1
MAX HEIGHT 99'-6"
ROOF 43'-8" 2ND FLOOR 30'-0"
1ST FLOOR 15'-0" GROUND PLANE 7'-6"
NORTH ELEVATION 1 North Elevation
0'
1/16" = 1'-0"
1
1.1
8'
16'
32'
SCALE: 1/16" = 1'-0"
2
3
4
5
6
7
8
9
10
11
12
13
MAX HEIGHT 99'-6"
ROOF 43'-8" 2ND FLOOR 30'-0"
1ST FLOOR 15'-0" GROUND PLANE 7'-6"
2
SOUTH ELEVATION
South Elevation
TRIVERS
1/16" = 1'-0"
0'
8'
16'
SCALE: 1/16" = 1'-0"
32'
DN
024100.05
UP
4100.14
024100.24
024100.02 1
1.1
2
3
42'-4"
4
024100.04
29'-0"
UP
29'-0"
024100.26
5
6
29'-0"
UP
7
UP
29'-0"
29'-0"
024100.02
024100.04
UP 9
8 024100.02
29'-0"
10
024100.02
29'-0"
11
29'-0"
024100.02
12'-4"
12
29'-0"
30'-0"
13 12'-4"
3'-10"
024100.02
UP
A
024100.10 024100.04 UP
17'-11"
A.1
B
13'-6"
024100.25
DN
024100.02
DN
27'-2"
024100.14
024100.03
024100.24
024100.02 024100.04
024100.02 UP
UP
UP
024100.05
UP
B.1
024100.02
DN
024100.26
UP
UP
UP
024100.02
024100.02
024100.04
024100.02 024100.02
3'-10"
27'-8"
19'-0"
024100.13
UP
C
29'-0"
UP
024100.02
024100.13
024100.02 UP
024100.02
D
024100.21
29'-0"
UP
UP
024100.02
UP E
024100.02
UP
29'-0"
024100.02
024100.26
UP
024100.21
F UP
UP
29'-0"
024100.02
024100.02
024100.02 UP
29'-0"
G
UP
024100.02
UP
024100.02
024100.02
UP
UP
024100.02
UP 024100.02 UP
UP
DN
26'-0"
UP
024100.10
024100.02
024100.02
DN 12'-10"
024100.10
024100.21
Demolition Plan - First Floor 0'
8'
UP
024100.02
UP
024100.02
024100.02
UP
024100.02
DN
024100.02
024100.10
024100.21
J
1/16" = 1'-0"
UP
UP
DN
I
1ST FLOOR PLAN
UP
024100.10
UP
024100.02
1
024100.02
024100.02
H
32'
UP
UP
024100.02
16'
SCALE: 1/16" = 1'-0"
32'
DN
024100.02
AERIAL RENDER*
BRYAN HALL
CONSTRUCTION ADMINISTRATION
PROJECT: This was a project designed by Ayers Saint Gross Architects in Baltimore as a renovation lab project for Washington University St. Louis. Trivers Associates was charged with Construction Administration for the building, plaza, and bridge component of this project. Throughout this project I was tasked with maintaining the revit model by inputing design updates, RFIs, and ASI responses. I helped answer and organize the submittals and conducted field reports to document construction projects. Additionally, I went to Owner, Contractor and Architect meetings to help answer infield questions with my Project Architect. Trivers also took part in a facade restoration of Cupples II, once a connector bridge was demolished. I created an Enlarged elevation and details to ensure the stone the facade was historically accurate from the outside. LOCATION: Washington University, St. Louis, MO
*Co-Authored Drawing ASG
AERIAL RENDER*
BACK OF CURTAIN WALL SHOWN DASHED; RE: GLAZING SHOP DRAWINGS
ALIGN CONC KNEE WALL @ DOOR TO EDGE OF STAIR S1 SLAB
CONC KNEEWALL EDGE OF STAIR S1 SLAB EAST EDGE OF PT SLAB BACK OF CURTAIN WALL ALIGNED TO FACE OF CONC KNEEWALL
KNEE WALL @ STAIR LANDING; ALIGN OUTSIDE FACE WITH KNEE WALL TO SOUTH
EXIST STEEL COLUMN
EXIST CONC COLUMN
CONC KNEEWALL EDGE OF EXISTING BUILDING SLAB
SOUTH EDGE OF PT SLAB
EXIST PLAZA SLAB
A A.0
B
B.7
C
D E
4 ASK-02 - RFI - 226
1 ASK-02 - RFI - 226
1 ASK-02 - RFI - 226
2 ASK-02 - RFI - 226
3 ASK-02 - RFI - 226
ENLARGED PLAN @ NW CORNER 1/2" = 1'-0"
6"
1' - 7"
2"
11.9 12
6"
8"
3 A5.01
EDGE OF S1 STAIR SLAB ALIGN MTL STUD EDGE W/ EXISTING BUILDING SLAB
KNEE WALL LOCATION @ CW
Drawing Title Sketch No. ASK-01 - RFI - 226
BACK OF CURTAIN WALL ALIGNED TO FACE OF CONC KNEEWALL
1
Ayers/Saint/Gross 2016
Date
12/22/2016
Scale
1/2" = 1'-0"
Proj. Name BRYAN HALL RENOVATION TRIVERS
4' - 6" 6' - 11" +/-
6"
10" +/-
2' - 2 1/2"
PRE-FORMED COMPRESSIBLE JT (SLOPE W/ TOPPING SLAB)
FACE OF CAST STONE 7 1/2" CW SYSTEM 11"
8"
2" TOPPING SLAB (ELEV VARIES)
B.O. CW
STAIR LANDING 534' - 8" HOLD EDGE OF TOPPING SLAB 2" BACK FROM PT SLAB EDGE 12" POST TENSION SLAB
6" CONC
12" POST TENSION SLAB (ELEV VARIES)
2' - 2 1/2"
6"x4"x3/8" STEEL ANGLE; SLOPE TO MATCH SLOPE OF PT SLAB; HOLD 1" ABV TOP OF PT SLAB; CUT VERTICAL LEG AS REQUIRED
7 1/2" CW SYSTEM
11"
6"x4"x3/8" STEEL ANGLE; SLOPE TO MATCH SLOPE OF PT SLAB; HOLD 1" ABV TOP OF PT SLAB; CUT VERTICAL LEG AS REQUIRED
2' - 2" TO EDGE OF PT SLAB
DETAIL @ CW 1" = 1'-0" PRE-FORMED COMPRESSIBLE JT (SLOPE W/ TOPPING SLAB)
1' - 0 3/4"
5 ASK-02 - RFI - 226
2
11"
8"
B.O. CW
B.O. CW
STAIR LANDING 534' - 8" 8"
8" CONC
CONC
4" TOPPING SLAB
LEVEL 2 533' - 4"
EXIST PLAZA SLAB
FLUID APPLIED WATERPROOFING MARRY W/ FLASHING MEMBRANE @ PT SLAB 2' - 0"
2' - 2 1/2"
7 1/2" CW SYSTEM 8"
12
FACE OF CAST STONE
HOLD EDGE OF TOPPING SLAB 2" BACK FROM PT SLAB EDGE
CONC KNEEWALL BEYOND
FLUID APPLIED WATERPROOFING, TO MARRY W/ ELEVATED SLAB WATERPROOFING MEMBRANE
1" FROM EXIST BUILDING
1" FROM EXIST BUILDING
6"x4"x3/8" STEEL ANGLE.
3 1/2"
SILICONE SEALANT @ EXISTING 1/2" EJ BETWEEN STRUCTURAL SLAB AND BUILDING
DETAIL @ CW FROM NEAR COL B TO SOUTH EDGE OF PT SLAB 1" = 1'-0"
3
DETAIL @ CW FROM SOUTH EDGE OF PT SLAB TO RAINSCREEN 1" = 1'-0"
EPOXY TERRAZZO
STAIR LANDING 534' - 8" 1"
534'-8" FINISH 534'-7 5/8" T.O.C. 5"x3"x3/8" STEEL ANGLE W/ 3/4" DIA. EXP ANCHORS @ 12" O.C.
LEVEL 2 533' - 4" DETAIL @ CW DOOR 1" = 1'-0" TRIVERS
5 Proj. Name BRYAN HALL RENOVATION
Sketch No. ASK-02 - RFI - 226 Ayers/Saint/Gross 2016
11.9 STONE TO MATCH TOPPING SLAB SLOPE
LEVEL 2 533' - 4"
FLUID APPLIED WATERPROOFING MARRY W/ FLASHING MEMBRANE @ PT SLAB
4
12
DIM OF FACE OF CAST STONE
STAIR LANDING 534' - 8"
LEVEL 2 533' - 4"
1
11.9
ALIGN
2" TOPPING SLAB
STONE TO MATCH PT SLAB SLOPE. 1-1/2" FROM PT SLAB
12
ALIGN
PRE-FORMED COMPRESSIBLE JT (SLOPE W/ TOPPING SLAB)
11.9
1' - 4"
STONE TO MATCH PT SLAB SLOPE. 1-1/2" FROM PT SLAB
ENLARGED DETAIL @ CW DOOR 3" = 1'-0" Date
12/22/2016
Scale
As indicated
Drawing Title
KNEE WALL SECTIONS @ CW
RESTORATION ACTIVITY
G
H
J
REPLACE WOOD BASEBOARD TO MATCH EXISTING RE: 7/A5.14
H
REPLACE PARTITION DISTURBED BY WINDOW INSTALLATION
G
INFILL CAVITY WITH UNFACED FIBERGLASS BATT INSULATION
Enlarged Plan - Main Entry @ Existing Window
1
ENLARGED PLAN - MAIN ENTRY @ EXISTING WINDOW 1" = 1'-0"
Profile Tool
REPOINT GRANITE WITH MORTAR OF COLOR AND STRIKE TO MATCH THAT OF ADJACENT ORIGINAL STONE
E
Field Measurement
Cupples II Infill Elevation - Lower
REPLACE STONE BAND RE: 16/A5.14
REMOVE GRANITE; PROVIDE QUOINS LINTEL AND SILL TO MATCH OPENING AT EAST GABLE, THIS BUILDING DEDUCT ALTERNATE: NO GRANITE DEMOLITION; NO NEW WINDOW. RE-POINT EXISTING GRANITE INFILL AS NOTED ABOVE REMOVE EXISTING FLASHING
A
RE-POINT GRANITE AT GABLE WITH MORTAR OF COLOR AND STRIKE TO MATCH ADJACENT ORIGINAL STONE
B NEW SPANDREL WINDOW; FRAMES TO MATCH EXISTING
Existing Bridge Connector
NEW STONE TO MATCH EXISTING
C
D
F
NEW STONE BAND TO MATCH EXISTING
F
NEW STONE TO MATCH EXISTING RE: 13/A5.14
A
SPANDREL GLASS COLOR T.B.D. THERMALLY BROKEN ALUMINUM FRAME; PROFILE TO MATCH EXISTING WINDOWS
J
1 A5.14
H
G K
H
NEW SPANDREL WINDOWS; FRAMES TO MATCH EXISTING
K
I. TRACERY WINDOW
C
II. GABLE WINDOW
EXISTING WINDOWS TO REMAIN; PROTECT AGAINST DAMAGE DURING FACADE RESTORATION ACTIVITY
G
Cupples II Infill Elevation - Upper4
B
Enlarged Sections @ Windows
ENLARGED SECTIONS @ WINDOW HEADS AND SILLS 1" = 1'-0"
NOYES LABORATORY PARTIAL BUILDING RENOVATION
PROJECT: Noyes Laboratory has served the Department of Chemistry at the University of Illinois since 1902. Our goal was to update numerous classrooms and restrooms and to provide a new central HVAC system to the western wing of the building. Creating an environment conducive to student learning was critical to our design. We achieved this by working closely with numerous university departments. Updated finishes, new windows, lighting controls, comfortable seating layouts, and new A/V systems were among many pieces that create a comfortable space students and teachers. In this project, I produced enlarged plans, window details, perspectives, interior elevations, and maintained the overall revit model through design and construction. LOCATION: University of Illinois, Urbana, IL
*Co-Authored Drawing
WEST BUILDING PHOTO
JUNCTION BOX TO EXIST CABLE TRAY
EQ
6'-0"
12.01
12.01
FUTURE 70" DIGITAL MONITOR BY OWNER, N.I.C.
1G NETWORK JACK
3 North 3/8" = 1'-0" Elevation Room 209
10.11
9.10
3/8" = 1'-0"
4'-0"
Room 209 South Elevation 2
2'-0"
A1
26.09
10.11
ROOM 209 SOUTH ELEVATION
9
A-300
R.O.
A1
TYPE B
1 2G DEVICE BOX AV 2 CABLE PASS THRU AV 3 INPUT PLATE EXISTING OUTLETS TO REMAIN.
ROOM 209 NORTH ELEVATION
TYPE B
26.09
9.09
1'-6"
2'-6"
10.11
3'-0"
26.09
4'-0"
4'-6"
5'-5"
TYPE B
4'-0"
2'-0"
EQ
3'-0"
~ 2'-0"
11'-0"
FUTURE WALL MT BRACKET BY OWNER, N.I.C. ALIGN
QUAD POWER AV 1 CONTROL, ADJACENT TO MONITOR
3'-8"
BLOCKING AS REQUIRED.
1
EQ
6"
B1
B1
5C
A1
2
2'-3"
P1
R.O.
4'-0"
10.11
10.11
10.11 10.11
3
10.11
A-501 11
10 1'-11" 12 P2
9
1'-0 7/8"
A-410
10.11
3
CLASS RM 209
2'-0"
7
R.O. 12.08
A-410 4
10.11
1
CLASS RM
CLASS RM
203
A-410
12.08
2
5
204
12.08
6
8
10.11
10.11
5 A-500
1'-6"
SIM.
3
6"
9.05
2
10.11
3 5/8"
A-501
8'
10.11
10.11 P1
R.O.
2'-8 7/8"
P1
5C
9.05
10.11
10.11
10.11
9.05
5C
2'-6"
1
R.O.
ENLARGED PLAN - CLASSROOMS @ LEVEL 2 1/4" = 1'-0"
Enlarged Plan - Classrooms @ Level 2
0'
2'
4'
SCALE: 1/4" = 1'-0"
8'
7
TYP
TYP
7 A-602
1'-0"
A-602
UP
2 VET-1 VET-2
VET-2 VET-1
2 A-301
VET-1 VET-2
A-602
9'-0"+/-
2 A-301
SIM.
1
VET-2 ETR
1 A-301
22'-2 1/2"+/-
1'-0"
A-301 DN
1'-0"
1'-0"
TYP
7
6
8'
A-602
ENLARGED PLAN - STAIR 4 @ LEVEL 3
0'
Enlarged Plan - Stair 4 @ Level 3
1/4" = 1'-0"
2'
4'
8'
SCALE: 1/4" = 1'-0"
TYP
1
1'-0"
VET-2 ETR
A-602
UP
2
VET-1 VET-2
A-301
A-301
VET-1 VET-2
9'-0"+/-
2 VET-2 VET-1
A-301
23'-0"+/-
1'-0"
DN
NEW LIGHT FIXTURE; RE: RCP
1'-0"
2'-10"
TYP
1
5 8'
2 7/16"
A-602
ENLARGED PLAN - STAIR 4 @ LEVEL 2
Enlarged Plan - Stair 4 @ Level 2
1/4" = 1'-0"
A-301
ETR VET-2
1'-0"
04 - ATTIC LEVEL 142'-4"
1
VET-2 ETR
1
0'
2'
4'
5'-0 3/4"
8'-4 11/16"
1'-0 1/2"
PROVIDE HANDRAIL AND ANCHORS TO MATCH (E)
8'
SCALE: 1/4" = 1'-0"
(E) ELEC. PANEL & CONDUIT TO REMAIN. RE: ELEC.
3'-0"
C383 NEW LIGHT FIXTURE; RE: RCP 7
03 - LEVEL 128'-6"
TYP
1'-0"
A-602
EQ
VET-1 VET-2
(E) PENETRATION TO REM 2
(E) DISPLAY CASE TO REMAIN
A-301
NEW LIGHT FIXTURE; RE: RCP
9'-0"+/-
A-301
1
VET-2 ETR
1 A-301
NEW LIGHT FIXTURE; RE: RCP
EQ
UP
ETR VET-2
2
10'-5 5/16"
23'-0 1/2"+/-
1'-0"
A-301
EQ
DN
(E) ELEC. PANEL & CONDUIT TO REMAIN. RE: ELEC.
218
EQ
1'-0"
1'-0"
7
02 - LEVEL 114'-2"
TYP
A-602
4
8'
0'
ENLARGED PLAN - STAIR 4 @ LEVEL 1 1/4" = 1'-0"
Enlarged Plan - Stair 4 @ Level 1
2'
4'
(E) PENETRATION TO REMAIN
8'
NEW LIGHT FIXTURE; RE: RCP
SCALE: 1/4" = 1'-0"
EQ
10'-5 5/16"
EQ
NEW LIGHT FIXTURE; RE: RCP
1
(E) ELEC. PANEL & CONDUIT TO REMAIN. RE: ELEC.
A-602
EQ
1'-0"
1'-0"
VET-2 ETR
18
EQ
170
110C
1'-0"
01 - LEVEL 100'-0"
UP VET-1 VET-2
VET-2 VET-1
1'-0"
9'-0"
2 A-301
20'-2"
1'-0"
1 A-301
1
00 - ENTRY 95'-1"
TYP
C78
ETR VET-2
1'-0"
1'-0"
A-602
Level B 90'-2"
C78 8'
3
Enlarged Plan - Stair 4 @ Level B
ENLARGED PLAN - STAIR 4 LEVEL B 1/4" = 1'-0"
0'
2'
4'
SCALE: 1/4" = 1'-0"
8'
Enlarged Section - Stair 4 East 1
ENLARGED SECTION - STAIR 4 - EAST 1/4" = 1'-0"
1
TYP
B2 89'-2 9/16" 0'
2'
4'
SCALE: 1/4" = 1'-0"
8'
2'-7 1/4"
22.04
302A
10.04
1'-8"
9.01
22.01
10.02
22.01
10.06
A-500 10.14
10.10
1'-3"
10.13
10.04
10.04 8
10.16 1
10.07 TYP.
WOMEN 302
Restrooms Enlarged Plan - Level 3
RESTROOM DEMO PLAN - LEVEL 3
10.09
26.01
N 2'
4'
8'
SCALE: 3/8" = 1'-0"
26.01
4' 2' 0'
2'-6" PTD. GYP BD.
SCALE: 1/4" = 1'-0"
1
10.01
0'
A-301
10.05
2
10.05
3/8" = 1'-0"
10.01 A-301
10.01
LEVEL 3 - ENLARGED PLAN - WOMEN'S AND MEN'S RESTROOM
1
4
8'
3/8" = 1'-0"
SCALE: 1/4" = 1'-0"
4
302
A-413
9
10.03 1
3
4.01
22.01
10.03 10.16
RE-ROUTE EXISTING DE IONIZED WATER LINE AROUND OPENING OF DOOR AT 2ND FLOOR. RECONNECT TO EXISTING LINE ABOVE AND BELOW RESTROOM 302.
Restroom Demo Plan - Level 3 26.01
P4
5'-1 5/8"
22.02
5'-0"
A-602
3'-2"
3'-4"
10.03 10.06
26.02
10.02
TYP
5
22.03
9.04
22.04 1'-4"
4.01
8'
22.01
10.06
3'-3"
3'-0"
22.01
4'
10.02
2'-11 1/4"
23.01
2'
22.03
3
3'-6 1/4"
9.01
302
10.01
0'
10.04
1
1'-3"
16'-4"
WOMEN
3'-8 1/4"
6'-1 1/2"
22.04
4
2'-6"
9.01
1'-8"
10.05
4 10.01
5'-0"
1'-3"
4.01 1'-7 3/4"
8.04
8 1/2"
3'-4"
7'-4 1/4"
8.04
9.03
9.04
A-602
10.09
A-413
5
3'-8 11/16"
9.01
302A
10.14
TYP
5
5'-1 5/8"
MEN
10.13
10.05
4.01
2'-1 1/4"
3'-8" GRAB BAR
1'-9"
6'-5" +/-
26.01
EQ
EQ
EQ
EQ
EQ
10'-6"
EQ
10'-6"
11'-0"
11'-0"
EQ
1'-0"
VET-2 ETR
3'-6"
7
TYP
10.02
8"
8.02
9.05 10.04
9.01
3
15
22'-2 1/2"+/-
INTERIOR RESTROOM ELEVATION - RM 202
10 3/8" = 1'-0" Int. Restroom Elev. - South
9.05
A-602
TYP
1'-5" 22.02
7
22.02
A-602
7
6"
8.02
1'-0"
22.01
9'-0"+/-
10.04
1'-0"
A-602
TYP
1'-7"
VET-1 VET-2
DN
8'-0"
EQ
11'-0"
2'-0" UP
2'-0"
9.05
10.08
10.14
9.05 26.10
9.05
INTERIOR RESTROOM ELEVATION - RM 202 INTERIOR INTERIOR RESTROOM RESTROOM ELEVATION ELEVATION 302A - RM 302A INTERIOR INTERIOR RESTROOM RESTROOM ELEVATION ELEVATION - RM 302A - RM 302A INTERIOR RESTROOM - RM 202 16- RM 4 3/8" = 1'-0" 4ELEVATION 5 3/8" = 1'-0" 5 3/8" = 1'-0" 3/8" = 1'-0" 3/8" = 1'-0" 3/8" = 1'-0"
Int. Restroom Elev. - East
Int. Restroom Elev. - West
1'-0"
WINDOW NOTES NOTE #
ITEM DESCRIPTION
W1
PROVIDE CUSTOM ALUM BRICK MOLD TO MATCH EXISTG WD PROFILE.
W2
EXIST WD WEIGHT POCKET AND WEIGHTS TO REMAIN. PAINT OR STAIN AND VARNISH EXPOSED INTERIOR SURFACES TO MATCH EXISTG.
W3
PROVIDE NEW ALUM CLAD WD WINDOW WHERE INDICATED ON BLD. PLANS
W4
FILL WEIGHT POCKET CAVITY WITH SPRAY INSULATION.
W5
W9
EXIST MASONRY WALL TO REMAIN.
W1
W6
REINSTALL SALVAGED WINDOW STOOL AND APRON TRIM TO REMAIN, U.N.O. SEE WINDOW SCHEDULE FOR FINISH WORK AT STOOL.
W18
W7
BOTTOM SASH LUG TO BE CONTINUOUS EXTENSION OF STILE.
W4
W8
UPPER SASH LUGS TO BE ATTACHED W/ CLEATS
W10
W9
EXIST WD FRAME TO REMAIN. PAINT OR STAIN AND VARNISH EXPOSED INTERIOR SURFACES TO MATCH EXISTG.
W10
PROVIDE STAINED OAK TRIM TO MATCH WINDOW.
W11
EXIST STONE SILL TO REMAIN
W12
EXIST STEEL LINTEL TO REMAIN.
W13
PROVIDE BACKER ROD & SEALANT
W14
EXIST WD TRIM. PAINT OR STAIN AND VARNISH EXPOSED INTERIOR SURFACES TO MATCH EXISTG.
W15
PATCH & PAINT GYP BD AT JAMB PER FINISH SCHEDULE.
W16
WINDOW SHADE. ALIGN EDGE OF SHADE WITH FLARED EDGE OF WINDOW OPENING. RE: SPEC.
W17
PROVIDE LOW RISE FOAM SEALANT
W18
NEW BLIND STOP
W19
NEW PARTING STOP
W20
NEW INTERIOR STOP
W2
W20 W3
W19
W17 W18 W1 W11 W13
Section Detail - Typ. Jamb
W4
W13
W17
MIN
W5
W14
1/2"
W6
W10 W3
SECTION DETAIL - TYP. HEAD 3 Section Detail - Typ. Head 3" = 1'-0"
W7
SECTIONDetail DETAIL - TYP.-MEETING Section Typ.RAIL Meeting Rail 7 3" = 1'-0"
RE: PLANS
V.I.F. MATCH EXIST. EXISTING TO REMAIN
A1
WINDOW TYPE ENLARGED ELEVATIONS
9 Window Types
RE: WINDOW SCHEDULE FOR QUANTITY
W8
V.I.F.
MATCH EXISTING
MATCH EXIST
V.I.F.
B1
C
W3 V.I.F.
V.I.F.
MATCH EXISTING
W8
MATCH EXISTING
V.I.F.
W8
MATCH EXIST.
W6
W11
SECTION DETAIL - TYP. SILL 8 Section Detail - Typ. Sill 3" = 1'-0"
P
VET-1 VET-2
1'-0"
VET-2 ETR
VET-1 VET-2
DN
1'-0"
VET-2 ETR DN
UP
UP
10'-10"
4'
0'
2'
4'
2'
4' SCALE: 1/4" = 1'-0"
0'
SCALE: 1/4" = 1'-0"
9"
2
A-301
1
A-301
2
A-301
1
A-301
8'
8'
8'
EQ EQ
3
2
FB-2
FB-2
EQ
11.01
EQ
EQ
ENLARGED RCP - LECTURE 217 1/4" = 1'-0"
EQ
1/4" = 1'-0"
FB-2
1'-5"F.O. FIXED SEAT
FB-3
FB-2
FB-3
RETRACTABLE TABLET ARM, TYP.
FB-3
ENLARGED FURNITURE PLAN - LECTURE 217
FB-3
FB-2
EQ EQ EQ
2'
EQ EQ
8'-7 13/16" EQ.
FB-2
FB-3
2'-9 1/8"
12.01
FB-2
FB-3
10'-10"
217
11'-7"
10'-10"
FB-2
FB-2
LECTURE HALL
2'-4 7/8"
A-500
2
FB-2
FB-3
A-602
3
FB-2
3 2'-9 1/8"
A-500
FB-3
FB-3
5" 2'-4 7/8"
FB-3
1
6
217A
3
A-414
ACCESSIBLE SEAT
5
ACCESSIBLE SEAT
ACCESSIBLE SEAT
FB-2
ACCESSIBLE SEAT
3'-11" 19'-0"
217
4
1
10.01
12.04
EQ
ALIGN
TILE
FULL
A-500
26.01
ALIGN
EQ
12.02
LECTURE HALL
4'-0" 5'-0"
0'
26.03
2'-0"
EQ
10'-10"
EQ
217A
STOR.
4'-0" 11'-0"
4'-0"
7'-5" 7'-7"
3
4'-0" EQ
1'-0"
3
2
C284
C280
1
4'-2"
3'-0"
CORRIDOR
10'-8"
4'-0"
C284
CORR.
12.07
CORR.
A-414
12.03
12.07
+/- 5'-0" 2'-0" 6'-0" 3'-4 1/8"
EQ
SCALE: 1/4" = 1'-0"
Enlarged Reflected Ceiling Plan
EQ
EQ 9 FULL TILES EQ
A-602
4'-0"
9.08
2'-1"
3
EQ
3/8" = 1'-0"
8'-0"
South Interior Elevation INTERIOR CLASSROOM ELEVATION - RM 217 SOUTH
12.09
4'-0"
5 9.11
EQ
12.09
1'-6"
9.11
EXIST. WDW.
1'-6"
EXIST. WDW.
EQ
5
EQ
A-500
8'-0"
East Interior Elevation Enlarged Plan
8'-0"
Enlarged Demolition Plan 26.02
EXIST. WDW.
12.02 9.11
12.09
DOOR
5 A-500
Lecture Hall Perspective
Existing Conditions
RUSSELL APARTMENTS MULTIFAMILY HOUSING
PROJECT: This neighborhood project was a complex one. Our objective was to create a new building that would contextually fit within the Soulard neighborhood. This challenge involved much investigation of the surrounding area to ensure a building would fit correctly into this location. My role included this site investigation and to help create a package to present the Soulard Restoration Group to ensure neighborhood support for the project before proceeding. I also helped during various other points during design including details, stair design, plans, and elevations. LOCATION: Soulard, St. Louis, MO
*Co-Authored Drawing
NORTH PERSPECTIVE*
Site Massing
Elevation Massing
Contextual Study
Building Massing
FITNESS
1 BED 119 746 SF
1 BED 123 747 SF
1 BED 121 747 SF
1 BED 127 747 SF
1 BED 125 747 SF
1 BED 129 747 SF
RUSSELL BLVD.
1 BED 113 644 SF 2'-0"
1 BED 114 632 SF
1 BED 119 746 SF
1 BED 121 747 SF
2 BED 111 1,019 SF
1 BED 123 747 SF
1 BED 125 747 SF
1 BED 109 640 SF
1 BED 118 632 SF
1 BED 109 640 SF
OFFICE
1 BED 120 632 SF
1 BED 122 632 SF
1 BED 124 632 SF
1
EFFICIENCY
COURTYARD
UP
1 BED 110 640 SF
OFFICE
1 BED
1 BED 107 640 SF
1BED
COURTYARD 108
1 BED
641 SF
1 BED 14
2 BED 105 1,018 SF
2 BED 106 1,019 SF
85.5'
ALLEY 2 BED 105 1,018 SF
2 BED 106 1,019 SF
1 BED 103 640 SF 1 BED 103 640 SF
2 BED 101 986 SF
16'
32'
N
8'
First Floor Plan* LOOR PLAN SCALE
0' 4'
8'
16'
32'
1 BED 104 641 SF
1 BED 104 641 SF
2 BED 102 983 SF
14 85.5'
241'-10"
1BED 108 641 SF
1
1 BED
1 BED
1 BED 107 640 SF
UP
DESK
1 BED 112 639 SF
1 BED 110 640 SF
1 BED 124 632 SF
UP
241'-10"
2 BED 111 1,019 SF
1 BED 116 632 SF
FIREPLACE
1 BED 129 747 SF
1 BED 112 639 SF
1 BED 113 644 SF 1 BED 114 632 SF
1 BED 127 747 SF
1 BED 122 632 SF
1 BED 120 632 SF
S. 13th ST.
FITNESS
1 BED 118 632 SF
1 BED 116 632 SF
2 BED 101 986 SF
2 BED 102 983 SF
North Elevation*
West Perspective*
MISSOURI STATE CAPITOL STONE RESTORATION & WATERPROOFING
PROJECT: The scope for this building is a combination of significant stone restoration with waterproofing. The design was a joint effort between Trivers and Wiss Janney Elsner, a Chicago base stone restoration expert. Our main responsibilites were to waterproof the terrace and walkway approaches leading to the building. We were also the prime design contract so we also coordinated with the rest of the design to team to ensure a successful project. My role included creating plans, enlarged elevations, stone paver layouts, and waterproofing details. The biggest endeavor was coordinating our drawings with WJE to ensure a seamless, cohesive drawing set to the client. The most significant coordination items included repair codes, details, and keynotes. LOCATION: Jefferson City, MO
WEST BUILDING PHOTO
2'-8"
R 71'-7 3/8" 4'-8"
NORTH TERRACE LOWER STAIR
3'-1 1/4"
? B1
A-236N ?
2'-8"
2'-8"
R 79'-8 7/8"
2'-8"
NORTH APPROACH
EJ
11
EJ
1/4" = 1'-0"
C D
I
1/4" = 1'-0"
NORTH TERRACE
UP
UP
R
EJ
'-7 13
4" 3/ 21 21
J EJ
EJ
16
C1 A-401
EQ
12'-9" V.I.F.
16
EQ
EQ
EJ
C1 A-401
EQ
B5 A-401
B5 A-401
2'-8 1/2"
" 10 EJ
EJ
EJ
STAIR LANDING
G H
23
2'-8 1/2"
'88
3/ 4"
V.I.F.
2'-8 1/2"
=
V.I.F.
F
R
13 '-7
44'-9 3/4"
V.I.F.
UP
E
R
13'-5" +/-
V.I.F.
"
B
C5 C5 16
A
40'-0" +/-
V.I.F.
'-1 0
17
11'-6" +/-
88
V.I.F.
. SIM
1
11
RADIAL CUT PAVERS @ RADIAL CUT PAVERS @ NORTH TERRACE NORTH TERRACE TYP
3'-1 1/4"
H+
=
R 66'-2 3/8"
EJ
2'-8"
2'-8"
2'-8"
R 66'-2 3/8"
R 68'-10 7/8"
4'-8"
H+
H
23
4'-8"
30
R1 1'-9 "
H
17
F R 71'-7 3/8"
G
TYP
NORTH TERRACE UPPER STAIR
23
5'-0 3/8"
R 65'-9 1/8"
4'-8"
R 77'-0 3/8"
4'-8"
R 68'-10 7/8"
R 79'-8 7/8"
R 82'-5 3/8"
F
R 74'-3 7/8"
E
R 74'-3 7/8"
5'-0 3/8"
" 1'-9 R1
2'-11" +/V.I.F.
5'-2 5/8"
4'-10 1/4" 2'-8"
G
1/4" = 1'-0"
21
A-236N ?
A-553
2'-8"
E
A-236N ?
NORTH TERRACE LOWER LANDING EAST
24
C
R 71'-7 3/8"
D
D5 ?
UP
2'-8"
2'-8"
D3 ?
C3 ?
5'-7 1/8"
C
23
2'-8"
5'-2 5/8"
2'-8"
5'-4 7/8"
R 77'-0 3/8" 4'-10 1/4"
B5 B5
19'-6 1/2" +/-
A-236N ?
24
B
R 82'-5 3/8"
R 85'-1 7/8"
5'-4 7/8"
DTL @ RADIAL DTL @ PAVERS RADIAL PAVERS
23'-5 1/2" +/-
D1 ?
5'-7 1/8"
B1
D
1/4" = 1'-0"
C1 ?
5'-9 3/8" NORTH PLAZA MIDDLE LANDING
2'-8"
2'-8"
B
2'-8"
RADIAL CUT STONE PAVER. REF C5/A-011 & A1/A-011 FOR SIZE AND LOCATION.
A
R 85'-1 7/8"
RADIAL CUT STONE PAVER. REF C5/A-011 & A1/A-011 FOR SIZE AND LOCATION.
A
5'-9 3/8"
24
A5 ?
A-236N ?
5'-11 1/2"
C5 ?
A4 ?
24
16 B5 ?
5'-11 1/2"
1/2" JOINT TYP. CENTER JOINT ON RADIAL CUT STONE PAVER BELOW.
A-236N ? UP
A-236N ?
24
1/4" = 1'-0" 1/4" = 1'-0"
1/2" JOINT TYP. CENTER JOINT ON RADIAL CUT STONE PAVER BELOW.
B2 A-403
UP
B4 ?
R
B2 ?
2'-8"
1
24
NORTH TERRACE LOWER LANDING WEST
C5 C5
1
B3 ?
1
11
11
RADIAL CUT PAVERS RADIAL CUT PAVERS @@ NORTH TERRACE NORTH TERRACE
EDGE STONE TYP.
23
25
? A1
A-236N ?
EDGE STONE TYP.
A-236N ?
30
R 65'-9 1/8"
2'-8"
3'-1 1/4"
2'-8"
23
R 65'-9 1/8"
2'-8"
2'-8"
R 65'-9 1/8"
R 66'-2 3/8"
H+H+
R 66'-2 3/8"
2'-8"
H H
R 68'-10 7/8"
R 68'-10 7/8"
2'-8"
28
G G
3'-1 1/4"
4'-8"
2'-8"
4'-8"
2'-8"
4'-8"
R 71'-7 3/8"
R 74'-3 7/8"
R 74'-3 7/8"
R 77'-0 3/8"
4'-10 1/4" 4'-10 1/4"
2'-8"
F F
2'-8"
E E
2'-8"
D D
2'-8"
5'-0 3/8" 5'-0 3/8"
2'-8"
5'-2 5/8" 5'-2 5/8"
R 77'-0 3/8"
5'-4 7/8" 5'-4 7/8"
2'-8"
R 79'-8 7/8"
R 79'-8 7/8"
R 82'-5 3/8"
R 82'-5 3/8"
R 85'-1 7/8"
2'-8"
C C
2'-8"
B B
2'-8"
A A
2'-8"
5'-7 1/8" 5'-7 1/8"
2'-8"
5'-9 3/8" 5'-9 3/8"
R 85'-1 7/8"
5'-11 1/2" 5'-11 1/2"
ENLARGED PLAN - NORTH TERRACE GENERAL NOTES
3/32" = 1'-0"
KEYNOTE
0
8'
16'
24'
A1
D5
4'
1/4" = 1'-0"
8'
37
PLANTER 37PLANTER 21
REPLACEMENT STONE REPLACEMENT STONE
TYP AT SKY21 TYPFACING AT SKY-COURSES
GRADE PER CIVIL GRADE PER CIVIL
REPLACEMENT STONE REPLACEMENT STONE
6'-6"
1'-0"
1'-0"
R1
R1
LOWER W PLATFORM - E ELEV 4'
23 23
R1
22
R1
2'
R1
20 6'-11 "
1'-0"
1'-0"
6'-6"
TYP AT SKYFACING COURSES
R1
STONE PAVERS REF: A-010
0
STONE PAVERS AND STONE STAIRS, REF: PAVERS AND A-010 STAIRS, REF: A-010
23 23
22
23
FIELD VERIFY ANCHOR LOCATION PRIOR TO FIELD VERIFYOF ANCHOR FABRICATION KERFS LOCATION PRIOR TO FABRICATION OF KERFS
FACING COURSES
20 20 22
21
REMOVE AND RESET CAP REMOVE AND STONE PER RESET DETAILCAP A1/A-554 STONE PER DETAIL A1/A-554
CRAMP ANCHOR REF: B4/A-554, CRAMP ANCHOR MATCH EXISTING REF: B4/A-554, SPACING MATCH EXISTING SPACING
1'-0"
2'
0
1'-0"
LOWER E PLATFORM - E ELEV
1/4" = 1'-0"
8'
D1 D1
UPPER STAIR W WALL - E ELEV UPPER STAIR W WALL - E ELEV
B2
2'
0
4'
2'
0
ELEVATION ELEVATION
SIDERAIL PANEL REPLACEMENT (RP2) SIDERAIL PANEL REPLACEMENT (RP2)
1 1/2" = 1'-0"
1/4" = 1'-0"
8'
4'
ENLARGED SECTION ENLARGED SECTION 1 1/2" = 1'-0"
1/4" = 1'-0"
8'
REMOVE AND RESET CAP STONE PER REMOVE ANDA1/A-554 RESET DETAIL CAP STONE PER CRAMP ANCHOR REF: DETAIL A1/A-554 B4/A-554, MATCH CRAMP ANCHOR REF: EXISTING SPACING B4/A-554, MATCH EXISTING SPACING
0
1'
2'
3'
0
1'
2'
3'
3/4" = 1'-0"
FIELD VERIFY ANCHOR 3/4" = 1'-0" LOCATION PRIOR TO FIELD VERIFYOF ANCHOR FABRICATION KERFS LOCATION PRIOR TO FABRICATION OF KERFS
PLANTER
REPLACEMENT STONE REPLACEMENT STONE
PLANTER
1'-0"
R1
6'-1"1
22
R1
7'-4"
20 22
23
R1
22
23
R1
1'-0"
20
EXISTING STAIR TREAD EXISTING STAIR TREAD
TYP AT SKY21 TYPFACING AT SKY-COURSES FACING COURSES
R1
R1
R1
R1
R1
R1
R1
R1
R1
EXISTING STAIR TREAD EXISTING STAIR TREAD
R1
D5 55
4'
1/4" = 1'-0" 30
8'
'-7" 3
PLANTER
30
30
23
D3 D3
UPPER STAIR E WALL - E ELEV UPPER STAIR E WALL16-30E ELEV
16
2'
0
2'
0
4'
1/4" = 1'-0"
8'
23
TYP SKY- 21 FACING JOINTS C1
C1
16
C1
16
C1
R1
R1 C1
1 1/2" = 1'-0"
STRINGER REPLACEMENT (RP2) STRINGER REPLACEMENT (RP2) 0
3"
6"
1'
0
3"
6"
1'
3/4" = 1'-0"
3/4" = 1'-0"
A2 A2
16
30
R1
B1
PLANTER
30 16
23
9'-2"
20
ELEVATION ELEVATION
1/4" = 1'-0"
8'
4'
ENLARGED SECTION ENLARGED SECTION 1 1/2" = 1'-0"
3'-7"
2'
0
TYP SKY- 21 FACING JOINTS
3'-7"
LOWER E PLATFORM - E ELEV
04 03 42 REPLACEMENT STONE 04 03 42 REPLACEMENT STONE
1'-0"
TYP AT SKYFACING COURSES
21
21
R1
7'-4"
1'-0"
23
20
23
1'-0"
23
R1 R1
1'-0"
R1 R1
GRADE PER CIVIL GRADE PER CIVIL
A4 A4
20
R1
R1
LOWER W PLATFORM - E ELEV 2'
0
4'
1/4" = 1'-0"
8'
C1
23 '-4" 5
C1
C1
'-4" 5
9'-2"
R1 R1
4'
8'
0
2'
4'
8'
R1
R1
C1
1/4" = 1'-0"
23
C1(x2) C1 R1
C1
23
C1 PLANTER
C1
C1
C1
C1
GROUT BED
R1
C1
22
R1(x6)
R1
R1
R1
C1 R1
STONE PAVERS REF: A-010
C1
LOWER STAIR - N ELEV 0
R1(x6)
7
1/4" = 1'-0"
C1 C1
9'-2"
20
2'
PLANTER
C1
23
0
R1
PLANTER
R1
C1(x2)
C1 TYP C1 SKY21 FACING JOINTS
R1
16
B1 LOWER STAIR - S ELEV B1 LOWER STAIR - S ELEV
B2
PLANTER
22
30
R1
7
TYP SKY21 FACING JOINTS
20
PLANTER C1
B1
STONE PAVERS AND STAIRS, REF: A-010
R1
R1
7
R1
R1
22
R1 R1
C1
R1
2"
FACING COURSES
C1
6"
9'-2"
22 STONE PAVERS REF: A-010
STONE C1 PAVERS AND STAIRS, REF: A-010
5'-4"
R1
7
21
R1 TYP AT SKY-
5'-4"
1'-0" 1'-0"
20
23
PLANTER
23
16
'-7" 3
30
6'-11 "
22
STONE PAVERS REF: A-010
2'
4'
8'
1/4" = 1'-0"
A1
EXISTING STONE ANCHOR TO REMAIN
BALUSTRADE FLASHING 1" = 1'-0"
W = VARIES, MATCH EXISTING BUILDING WALL
W = VARIES, MATCH EXISTING BUILDING WALL
07 92 00 SEALANT OVER BOND BREAK
07 92 00 SEALANT OVER BOND BREAK
09 63 40 COMPRESSIBLE FILLER
09 63 40 COMPRESSIBLE FILLER
09 63 40 MORTAR
1/4" Ø EPOXY PIN, POSITION TO AVOID EXISTING BASE PIN, PATCH HOLE
W PATCH HOLE
07 14 13 WATERPROOFING
09 63 40 MORTAR
W = VARIES; MATCH EXISTING
EXISTING CONC. SLAB
09 63 40 MORTAR
W/2 OR 1/2" MAX
1 1/2"
09 63 40 STONE PAVER
09 63 40 STONE PAVER
1 1/2" MIN **
D OR E
**
1 1/2" MIN **
H/2
TYP. PAVER JOINT AT BUILDING WALL PLAN
3"
3" = 1'-0"
6"
A4
** WHEN 1 1/2" GROUT BED IS NOT POSSIBLE, ELIMINATE DRAIN BOARD.
TYP. PAVER JOINT OVER GROUT BED 0 1"
3"
3" = 1'-0"
6"
** WHEN 1 1/2" GROUT BED IS NOT POSSIBLE, ELIMINATE DRAIN BOARD.
A3
TYP. PAVER JOINT AT BUILDING WALL 0 1"
VERTICAL CRACK
3/8" Ø BLIND SET EPOXY PIN
D
SECTIONS
JOINT LOCATION VARIES
6"
1 1/2" = 1'-0"
1'
B2
B1
BTM RAIL D'MAN REPAIR (DM) 0
3"
6"
P 1 1/2" = 1'-0"
1'
SIM WEST STAIR NOT IN SCOPE OF WORK
SIM
A1 AD-500
P
A1 AD-500 TD
WEST STAIR NOT IN SCOPE OF WORK
+/
-2
+/ +/- 6'-6"
2'-
22
TD
11
'-1
1"
TD A
STONE D'MAN
T
+/- 15'-1"
RECESS
H
B4 AD-500
+/- 15'-1"
B B4 AD-500
"
TD
TD
TD
TD
TD
TD
TD
P
+/- 9'-4"
TYP. BALUSTER PINNING (CP1, CP2)
OR EQUAL TO 6"
+/- 9'-4"
W IS LESS THAN
3" = 1'-0"
6"
A1 AD-500
P HORIZONTAL CRACK
3"
A
B
C
F TD
A
B
C
F
A1 AD-500TD
TD
TD
TD
C4 AD-500
PAVERS ON GRADE SEE AD-012
C4 AD-500
PAVERS ON GRADE SEE AD-012
A4
A1/AD-102F A1/AD-102F
1/2" MIN. RECESS
STONE D'MAN
** WHEN 1 1/2" GROUT BED IS NOT POSSIBLE, ELIMINATE DRAIN BOARD. 1/4" Ø EPOXY SET PIN
0 1"
3"
EXISTING CONC. SLAB
EXISTING CONC. SLAB
REPLACE EXISTING PIN WITH STAINLESS STEEL PIN TO MATCH
0
07 14 13 WATERPROOFING
1 1/2"
1 1/2" MIN **
EXISTING BASE PIN, IF BALUSTER IS LIFTED FOR REPAIR, REPLACE W/ STAINLESS STEEL PIN TO MATCH
W
W/2 OR 1/2" MAX
1 1/2"
H
2" 2"
09 63 40 STONE PAVER
EXISTING CRACK W/2 OR 1/2" MAX
EXISTING CRACK
R
TD +/ -
+/ -
23
23
'-3
'-3
"
"
C +/- 6'-6"
F A B C F
+/- 6'-1" B1
H
H
H/2
A-208.5T TD +/- 6'-1" B1 A-208.5T TD
3/8" Ø BLIND SET EPOXY PIN
D
JOINT LOCATION VARIES
TD P
W IS LESS THAN OR EQUAL TO 6"
B1
P
TD
64'-9"
2
TD
BTM RAIL D'MAN REPAIR (DM)
1 1/2" = 1'-0" 3" VERTICAL 6" 1' HORZONTAL REPLACE0MISSING AND - MULTIPLE PIECES REPLACE MISSING MOLDING VERTICALPROFILES AND HORZONTAL MOLDING PROFILES - MULTIPLE PIECES MISSING - REF STONE REPAIR SCHEDULES ELEVATIONS FOR LOCATIONS DM OR MISSING - REF AND STONE REPAIR SCHEDULES AND ELEVATIONS FOR LOCATIONS DM OR DMR DMR
2"
2" EMBED
REPAIR AT NEWEL POST
EQ2
LIGHT
EQ2
LIGHT TYP AT TERRACE NEWEL POSTS
LIGHT TYP AT TERRACE NEWEL POSTS
A B
A1 AD-500
TD
ENLARGED DETAIL
5" EQ1
5" EQ1 EQ1
TD
5" EQ1
1/4" Ø EPOXY SET PIN RECESS 1/4"1/2" Ø EPOXY SET PIN RECESS 1/2" AND PATCH AND PATCH
1'
0
3"
6"
1'
1 1/2" = 1'-0"
A1
1 1/2" = 1'-0"
A1
EXIT
EXIT
EXIT
TD
A1/AD-101B
TYPICAL NEWEL POST REPAIR (DM, DMR) (DM, DMR) TYPICAL NEWEL POST REPAIR 6"
EXIT
EQ2 5"
NOTE: REMOVE EXG. EPOXY NOTE: RESIDUE PRIOREXG. TO EPOXY RESIDUE PRIOR TO REMOVE SETTING REPAIR SETTING REPAIR
3"
12'-8"
+/- 16'-7"
SEE ENLARGED DETAIL
B12'-8" C
+/- 16'-7"
SEE ENLARGED DETAIL
EQ2
4 1/2"
EQ2
4 1/2"
EQ2
1/4" Ø BLIND SET EPOXY PIN
C F A
TD
TD
" Ø BLIND POXY PIN
0
TD
5"
1" MIN.
EQ2
TD
1/2"
D DETAIL
A1 AD-500
F
5"
LIGHT
EQ2
5"
2" EMBED
REPAIR AT NEWEL POST
5"
STONE D'MAN (OR RESET EXTG WHERE INDICATED)
64'-9"
TD
'MAN (OR XTG WHERE ED)
TD
NORTHWEST TERRACE DEMOLITION PLAN
EXIT A1/AD-101B
TD TRUE
EXIT
TD
PLAN
0
4'
8'
16'
1/8" = 1'-0"
NORTHWEST TERRACE DEMOLITION PLAN 1/8" = 1'-0"
A1 A1
TYP 0 1"
1'
0
D 4"
4'
W
3"
3" TYP.
H
H/3 (1" MIN)
2'
REMOVE AND RESET EXISTING TOP RAIL REMOVE AND RESET EXISTING BALUSTERS, COORDINATE REPAIRS TO INDIVIDUAL BALUSTERS PER SCHEDULE
REPLACEMENT STONE
REPLACEMENT STONE
STONE D'MAN
IF DOWELS ARE PRESENT, REPLACE W/ S.S. TO MATCH EXISTING
3/8" Ø BLIND SET EPOXY PIN
IF DOWELS ARE PRESENT, REPLACE W/ S.S. TO MATCH EXISTING REPLACEMENT STONE
ENLARGED SECTION
TOP RAIL D'MAN REPAIR (DM) 0
3"
6"
1'
1 1/2" = 1'-0"
D1
BALUSTRADE TOP RAIL REPLACEMENT (RP2) 1'
0
2'
1/2" = 1'-0"
4'
ELEVATION
ENLARGED SECTION
ELEVATION
C1
04 03 42 REPLACEMENT STONE
BALUSTRADE BTM RAIL REPLACEMENT (RP2) 0
1'
2'
4'
1/2" = 1'-0"
B1
REMOVE AND RESET EXISTING TOP RAIL REMOVE AND RESET EXISTING BALUSTERS, COORDINATE REPAIRS TO INDIVIDUAL BALUSTERS PER SCHEDULE
IF DOWELS ARE PRESENT, REPLACE W/ S.S. TO MATCH EXISTING REPLACEMENT STONE
04 03 42 REPLACEMENT STONE ELEVATION
ENLARGED SECTION
BALUSTRADE BTM RAIL REPLACEMENT (RP2) 0
1'
2'
4'
1/2" = 1'-0"
B1
Model Perspective
NORMAL PUBLIC LIBRARY LIBRARY SITE STUDY
PROJECT: The town of Normal approached our studio to conduct an investigation of various potential sites within the city to determine a location of a new library. We worked with Studio GC in Chicago, the Normal Library Board, and the Normal City Council to develop our investigations and to tailor our project to fit their needs. LOCATION: Normal, IL PARTNER: Tyler Ruckman
*Partner Drawing
CITY ANNEX SITE MODEL
Site Synthesis
Within our site analysis, it is evident that Normal, Illinois is emerging as a cutting edge town for the green movement. This can be seen through the various new LEED conscious buildings, Tesla car chargins stations, and even a traffic circle using drain water for the fountain in its center. In fact, the town wanted this green traffic circle to be the center piece of its continual innovation. While we agree with the town’s overall direction, we felt that the center piece of the town’s movement should not be the traffic circle. They invisioned it as a place where people could around as an activity node. Instead, we felt the library could be used in as this activity node, freeing the traffic circle to automotive circulation. We propose also using the library site as the center piece of Normal’s sustainable movement. Site Orientation*
North Elevation
Site Analysis - Bicycle Traffic
Site Analysis - Railway Traffic
Site Analysis - Vehicular Traffic
Vehicular Traffic
Railway
Site Analysis - Surrounding Objects
Bicycle Traffic
Activity Considerations
Water Fountain
6.
5.
4.
3.
1. Lobby 2. Circulation Desk 3. Main Reading Room 4. Multimedia Room 5. Children’s Stacks 6. Children’s Discovery Area 7. Meeting Room 8. Cafe’ 9. Teen Stacks 10. Circulation Room 11. Maintanence Storage 12. Mechanical Room
7.
13.
2. 1.
8. 12.
13. Technology Center 14. Upper Reading Area 15. Fiction Stacks 16. Non-Fiction Stacks 17. Work Rooms 18. Offices 19. Administration 20. Collaboration Spaces
9.
14.
15.
16. 17.
11. 10.
N
Ground Level
20.
Upper Level
19.
18.
Reading Room
East Elevation
Pergola Detail*
Water Flow Diagram*
Plaza Night View
INTERNATIONAL TOWER & HOTEL COMPREHENSIVE INTEGRATED DESIGN
PROJECT: This was an advanced architectural studio with emphasis on Comprehensive Integrative Design for maximum value creation under the realistic, technical, legal, and budgetary limitations. The subject projects are technologically demanding and functionally complex tall building. The studio setting simulates an office practice with the instructor overseeing the project processes of each design team with strict time budget. LOCATION: Chicago, IL PARTNERS: Peter Kao, Min Hoo Kim, Tyler Ruckman
TOWER SITE MODEL*
Circulation around the site includes I-90/94, I-290m Lakeshore Drive. Wacker Drive and Michigan Avenue bring significant traffic through the neighborhood. Vehicular access comes from two levels. North and south of the Chicago River are directly connected on Wabash Avenue through the Irv Kupcinet Bridge. Kinzie and Water Streets provide lower level access.
Circulation
Pedestrians can connect through Michigan Avenue, Wrigley Buillding Plaza, and the river walk, diversifying pedestrian flow from north to south of the river. The riverwalk development can be signifcantly improved with direct access for retail and green space. The location of the site highlights the strategic importance of the Trump International Hotel and Tower. The site is located at the bend of the river with scenic views 360 degrees, including towards Lake Michigan. Trump Tower’s site will serve as a connection between the Chicago River, Michigan Avenue, and the Chicago downtown. Additionally, it will further expand business and commercial activities towards the north side of the chicago river. Design Implications
Vehicular Access
Pedestrian Access
Automated Parking
Hotel/Condo Valet Parking Entry
108
Retail
Mechanical Condo
-
High Condo
-
Hotel
82
Retail
Mechanical Retail
Mid Condo
57
Mechanical
N
Level 1
Fire Sta Public Hotel G Reside Plan* Autom Service
Low Condo 0’ Roof Deck
50
Spa Level 65’
Community Level Mechanical
32
Prep Kitchen
Pre-Function Ballroom Level 45’
Management Office
Conference Level
-
Hotel
30’
Health Club Level 15’
Wabash St.
Hotel Atrium
Parking Entry
Main Entry Level 0’
Spa Conference Ground Riverwalk
Robotic Parking Tower
7 Ballroom Lobby Retail Public Parking
Hotel Kitchen
Riverwalk Level 1 -15’
Service
Public Restaurant
Riverwalk Level 2
Riverwalk Public Parking
-30’
Chicago River
Public Parking Condo Parking Condo Parking Hotel Parking 10’
Programmatic Stacking
20’
30’
40’
50’
60’
70’
Podium Section*
10’ 0”
A
B
C
C
A
D D
5’ 0”
A. Spandrel panel ofofsingle pane Onyxphotovoltaic Solar PV cell cell A Spandrel panel single pane withwith Onyx Solar B Insulating glasswith with low-E coating B. Insulating Glass low-E coating C Extruded aluminum horizontal stack joint C. Extruded aluminum horizontal stack joint D Fireproofing D. Fireproofing
5’ 0”5’ 0”
North Elevation
A
B
B
C
C
D
D
E
E
15’ 0”
A
10’ 0”
10’ 0”
15’ 0”
Tower Curtain Wall System
Podium Curtain Wall System
A. Insulating glass with low-E coating B. Point system A support Insulating low-E coating A Insulating glassglass with with low-E coating B Point support system B Point support system C. Channel C Channel C Channel D. Vertical glass support D Vertical support D Vertical glassglass support E Aluminum Splice E. Aluminum Splice E Aluminum Splice
3330 sf
2500 sf
2200 sf
3130 sf
High Condo Level 3 Bedroom
Deluxe Condo Levels 770 sf
1330 sf
1550 sf
870 sf
870 sf
1550 sf 1020 sf
1550 sf Lower Condo Level 1 Bedroom 2 Bedroom
Standard Condo Levels 3260 sf
2570 sf
2570 sf
PUBLIC HOTEL ESCACONDO SE PUBLIC PUBLIC HOTEL HOTEL ESCAESCACONDO CONDO SERVICE SERVIC PUBLIC HOTEL ESCACONDO SERVICE PUBLIC HOTEL ESCACONDO SERVICE LATOR LATOR LATOR LATOR LATOR
3460 sf
Deluxe Hotel Level Deluxe Suites
Deluxe Hotel Levels
Public
1000 sf
640 sf
640 sf
790sf 880 sf
880 sf
Hotel
Escalator
Wabash Street Ground
Condo
Riverwalk
460 sf
460 sf
460 sf
460 sf
Michigan Avenue Rush Street
Service
Public
880 sf 880 sf
Deluxe Hotel Level Standard Suites
Elevator Riser Diagram Hotel Escalator Condo Service
790 sf
640 sf
840 sf
1000 sf
Standard Hotel Levels
Zone 5
Zone 5
Zone 4
Zone 4
Zone 3
Zone 3
Zone 2
Zone 2
Zone 1
Domestic Water Riser
Water Supply Domestic Cold Water Domestic Hot Water Sprinkler
Zone 1
Fan Diagram
DOMW Diagram
Supply Return Intake Exhaust
Air Riser Diagram
As a structural concept, we decided to use an adapted version of an outrigger system. We proposed using a “Mega� system, thus eliminating numerous columns within the hotel and condo spaces while giving ample resistance to wind forces. Using a flat plate construction allowed us a lower floor to floor height, thus allowing the client to either add more floors or reduce the overall height of the building to save on cost.
Upper Levels
Exterior
Mega-Shearwalls + MegaColumns + Floors Mega-Shearwalls + Mega-Columns + Outriggers/Belt Girders
M
M
Mega-Shearwalls + Mega-Columns
O
Lower Levels
Mega-Shearwalls
Structural Axon*
B
C
Atrium Perspective*
Riverwalk Perspective*
South Elevation
Perspective from Lake Michigan*
MICHAEL BARKOVIAK ARCHITECTURAL PORTFOLIO