Michael Walch GSAPP Tech Work

Page 1

AC SP

BR ON X

t ar

Building Systems 2 - Fall 2009

E

f.09

Bs2

Building Systems 2 Anton Martinez

Critic: Anton Martinez with Elias Matar Team: Yuval Borochov, Debbie Lin, Jessica Helfand-Talley Project: Design of an Industrial Loft Building Our design efforts focused on providing a lattice for crawling plants to grow over the facade of the building, giving access to light and air filtered through green plants to the majority of spaces in the building. Artists working within the building are supported by a variety of production and display spaces for individual and collaborative work. Integral to this are the public gallery spaces and access within the building which allow artists to promote their work to a wide audience, while the public can learn production techniques. The plants are supported on a lattice over tension cables, supported by steel struts which connect it back to the building structure at the floor levels. An aluminum cover conceals the cable connections and a sprinkler system to water the plants. The cables keep the external structure light weight, and their flexibility allows for variety within a simple diamond-shape formal vocabulary across the facade.


BR ON X

AC SP

t ar

t ar

BR ON X

E ey

v all ho d-T

De ich M

5 roc an p Bo Helf h ou val ica Lin alc Gr YuJess bbie ael W

b a De ich M

LIN. RETURN DIFFUSER SEE MECH. PLANS

STL. BEAM DECK ABOVE

24” X 24” ACCESS PANEL LIN. RADIANT PANEL SFC-MTD TRACK LIGHTING HVAC SUPPLY DUCT RECESSED DOWN LIGHTING INTERNAL LOUVERS IN REMOVABLE FRAME

LINEAR RADIANT HEAT PANEL

OPERABLE AWNING WINDOW

SPRINKLER HEAD

GYP. BD. SOFFIT

ALUMINUM MULLION

FRAMELESS GLASS DOOR

LINEAR SUPPLY DIFFUSER SEE MECH. PLANS

Typical Floor Plans of Studios 3/4” = 1’-0”

3/4” = 1’-0”

3/-

3/8” = 1’-0”

VAV BOX BRANCH DUCT

ALUMINUM FRAMED GLAZING

MAIN SUPPLY DUCT

GLASS DOOR

RETURN PLENUM

5/-

GYP. BOARD CLG. WITH STL. FRAMING EACH SIDE 3 5/8” METAL STUD @ 16” O.C. CONT. TO UNDERSIDE OF DECK ABOVE

4/-

3/8” = 1’-0”

Ground Floor Plan

A1 Floor Plans

3/4” = 1’-0”

Studio space enlarged plans and sections

A

Sin


X BR ON

tS

ar

R25.00

Gr

Yu ssi bie l W Je eb ae D ich M

R25.00

R5.00

R25.00 R25.00 R25.00

3

Elevation Detail at Aluminum Cable Cover Type A NTS

ey v all ho d-T

BR ON

2”

2’-2”

1’-0”

1’-4”

5”

E

Elevation Detail at Aluminum Cable Cover Type B NTS

s ie l Je ebb ae D ich M

5

ANCHOR TO STRUCTURE BEYOND

Y

Plan at Exposed S.S. Connec on to Structure

DETAIL B AT S.S. CABLE CONNECTION

Elevation Detail at Aluminum Cable Cover Type CCOVER CONNECTION, CUSTOM EXPOSED S.S. CABLE AND CABLE

DETAIL A AT S.S. CONNECTION TO COVER PLATE NTS

7

R25.00

5 roc an p Bo Helf h ou uval sica Lin Walc

5’-0” OR 20’-0” TYPICAL, SEE ELEVATIONS

HALF SCALE

0.25” DIAMETER STEEL CABLE, STRING THROUGH ROLLER CONNECTION

CUSTOM EXPOSED S.S. CONNECTION TO STRUCTURE BEYOND

WELD STEEL PLATE TO CUSTOM S.S. CONNECTION FOR CONNECTION TO STRUCTURE BEYOND

WELD STEEL PLATE TO END OF CUSTOM EXPOSED S.S. CONNECTION 1" TYP

3

WELD STEEL PLATE TO CUSTOM S.S. CONNECTION FOR CONNECTION TO STRUCTURE BEYOND CUSTOM NEOPRENE ROLLER, TYPICAL

DETAIL B AT S.S. CABLE CONNECTION

Gr

DETAIL A AT S.S. CONNECTION TO COVER PLATE

C PA

CABLE CLAMP CONNECTION, TYPICAL (SEE ELEVATIONS FOR CONNECTION POINTS)

tS

0.25” DIAMETER STEEL CABLE, STRING THROUGH ROLLER CONNECTION

ar

X

R25.00

CURTAINWALL AND MULLION SYSTEM, TYPICAL STEEL STRUCTURE AND CATWALK BEYOND

CUSTOM EXPOSED S.S. CONNECTION TO STRUCTURE BEYOND

86.05°

CABLE CLAMP CONNECTION, TYPICAL (SEE ELEVATIONS FOR CONNECTION POINTS) 0.25” DIAMETER STEEL CABLE, STRING THROUGH ROLLER CONNECTION

al Axonometric at Stainless Steel Connec on to Structure (SEE SYSTEMS DRAWINGS PART TWO) 4 Par 1" TYP NTS ROLLER

ROLLER

CABLE

CABLE

CUSTOM NEOPRENE ROLLER, TYPICAL

CRIMPED PIN CUSTOM ALUMINUM CABLE COVER, BOLT TO S.S. CONNECTION CUSTOM EXPOSED S.S. CABLE COVER CONNECTION, ANCHOR TO STRUCTURE BEYOND

6

Section Detail at Cable Pass-through Type C

4

NTS

Section Detail at Cable Pass-Through Type B

2

NTS

Axonmetric Detail at Typical Cable Pass-Through NTS

NEOPRENE SHIM WELD STEEL PLATE TO END OF CUSTOM EXPOSED S.S. CONNECTION

+32'-0" 3RD F.F.

0.25” DIAMETER STEEL CABLE, STRING THROUGH ROLLER CONNECTION

2" TYP.

CUSTOM EXPOSED S.S. CONNECTION TO STRUCTURE BEYOND

CUSTOM EXPOSED S.S. CONNECTION TO STRUCTURE BEYOND

CUSTOM EXPOSED S.S. CONNECTION TO STRUCTURE BEYOND

ROLLER

ROLLER

ROLLER

ROLLER

ROLLER

CABLE

CABLE

CABLE

CABLE

CABLE

7

CRIMPED PIN

OCCURS AT CONDITION TYPE C

2

CUSTOM EXPOSED S.S. CONNECTION TO STRUCTURE BEYOND

6.87°

CUSTOM EXPOSED S.S. CONNECTION TO STRUCTURE BEYOND

6.87°

CURTAINWALL AND MULLION SYSTEM, TYPICAL STEEL STRUCTURE AND CONCRETE POUR STOP, TYPICAL, BEYOND

0.75" TYP.

SPRINKLER SYSTEM BEHIND COVER PLATE

OCCURS AT CONDITION TYPE B

OCCURS AT CONDITION TYPE A, OR WHERE APPLICABLE

Sec on Detail at Exposed S.S. Connec on to Structure

1

3”=1’-0”

Exterior cladding rendering and details

OCCURS AT CONDITION TYPE A, OR WHERE APPLICABLE

OCCURS AT CONDITION TYPE A, OR WHERE APPLICABLE

Plan Details at Typical Cable Pass-Through Conditions NTS

Cable connection and aluminum cover diagrams and details 6

A1

Floor P


Building Systems 1 - Spring 2009

Critic: Robert Condon Team: John Becker, Yuval Borochov, Debbie Lin Project: Analysis of Ingalls Hockey Rink by Eero Saarinen The Ingalls Hockey Rink at Yale University is an elegant but complicated structure of concrete arches and steel tension cables, enclosing the hockey rink in a single, column-free space. We analyzed and diagrammed the dead and live load paths through the structure to the ground, through overall sections, connection details, and isometric projections.

UP

UP

DN

TELEPHONE

HOCKEY RINK

JANITORIAL

UP

UP

SEATING

DN

DN

DN

DN

W1

W2

W2

EXIT

GROUND FLOOR PLAN

ROOF PLAN

1/16” = 1’-0”

B

1/16” = 1’-0”

Floor Plans

UP

SEATING

DN

W2

DN

DN

EXIT

VISITORS

INTRAMURAL

FRESHMEN LOCKERS

VARSITY LOCKERS STOR.

OFFICE SHARPENING SKATES CHECK ROOM

UP

TELEPHONE BLDG. MAINT.

MEN’S WASHROOM

WOMEN’S TOILET

SEATING

HOCKEY RINK

OFFICIALS JANITORIAL SURGERY

DN

Analysis: John Becker,Yuval Borochov, Debbie Lin, Michael Walch

SEATING

MAIN ENTRY

DN

A

DN

Yale University, New Haven , CT

DN

TICKET BOOTH

MEN’S TOILET

WOMEN’S TOILET

SEATING

UP

MEN’S WASHROOM

SEATING

SEATING

A

WOMEN’S TOILET

MAIN ENTRY

EXIT

DN

DN

W2

ro Saarinen & Associates, 1958

CONSTRUCTION

DN

SEATING

TICKET BOOTH

B

Building Systems 1 Robert Condon

DN

DN

DN

DN

Bs1

CONSTRUCTION

1/16” = 1’-0”

EXIT

W2

s.09

INGALLS RINK Eero Saarinen & Associates, 1958

B

ROOF PLAN

MEN’S TOILET

A REFRIGERATION MACHINE ROOM UNIMPROVED

WOMEN’S TOILET

JANITORIAL

UP

DESIGN SKETCHES SERVICE

DN

UNIMPROVED

A


CANTILEVER ARCH

CANTILEVER ARCH

UPLIFT ON CANTILEVER ROOF

UPLIFT ON MAIN ROOF

WIND LOAD SCENARIO 1

FREE-BODY/DEFLECTED SHAPE DIAGRAMS OF MAIN ARCH

WIND LOAD SCENARIO 2

FREE-BODY/DEFLECTED SHAPE DIAGRAMS OF RIM ARCHES

Isometric of Roof Loads O

N

M

P

L

K J

M

H

MAIN ARCH THRUST

C

D

Diagrams of Vertical and Horizontal Arch/Cantilever Structures

G

B

F

D

P

E

C

O

RIM/PLAN ARCH THRUST

K

F

B

N

P

H

A

M

O

J

G

A

N

L

L K J

M

O

P

L

H

K J

G

H

A

PLAN DIAGRAM OF LOAD TRANSFER FROM CABLES

F

B

C

D

NO SCALE

G

B

F

C D

E

A

N

SECTION A-A

SECTION B-B

SECTION C-C

LOAD PATHS THROUGH CABLES

Building Sections NO SCALE

SECTION D-D

SECTION E-E

SECTION F-F

SECTION G-G

SECTION H-H

SECTION J-J

SECTION K-K

SECTION L-L

SECTION M-M

SECTION N-N

SECTION O-O

SECTION P-P

Arch Details


Enclosures and Environments 2 - Fall 2008

Critic: Fiona Cousins Team: Yuval Borochov, Naomi Ocko, Rajiv Fernandez Project: Acoustically Isolated Box The challenge was to fabricate a box, no bigger than 24”x24”x24”, with maximum sound damping for minimal material weight. We made an 18” diameter cylinder of 2” thick rigid insulating foam, sealed with tape and lined with a layer of mattress foam. Our box had the best dampening-to-weight ratio of our class. Rigid foam shell

f.08

En2

Encl & Env2 Fiona Cousins

Sealing with tape

Lining with softer foam


Enclosures and Environments 1 - Spring 2008 Critics: Mayine Wu and Bill Suk Team: Yuval Borochov, Naomi Ocko, Rajiv Fernandez

Project: Detail Drawings and Mock-up of Metal Panel Facade System Our team designed, detailed, and mocked-up a diamondshaped metal panel facade system for a hotel. The system incorporates a rain screen with an insulated back-up wall, installed on a concrete structure. We detailed the entire envelope, including solid enclosure and diamond-shaped windows that would fit into our system.

s.08

En1 Encl & Env 1 Bill Suk

Mock-up of the entire system including the back-up wall and slab


Above-right: Enlarged elevation and plan of one hotel room. Above-left: Enlarged plan at one of the diagonal windows.

Left: Enlarged section. Right: Section details at parapet, window head and sill.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.