Description of the real estate The estate is located in the north part of the city by the exit road towards Gdańsk at the distance of 6 km from the Pomeranian Special Economic Zone. The area is directly located by the national road no. 91. The location provides access to the surrounding communication routes. Vacant land, grassy, partly covered with broadleaved trees and bushes. From the north side the area borders with the Łysomice district.

Purpose of the land On 1st of March, 2007 the Toruń City Council passed a resolution no. 51/07 on local land development plan for the areas located in the vicinity of the following streets: Grudziądzka, Polna and Ugory. From the land covered by the development plan (417 ha) a total of 168 ha is allotted for building purposes, including: • 50 ha for multi-family apartment buildings, • 39 ha for single-family buildings, • 22 ha for services, • 57 ha for services / production.


Technical infrastructure The commune of the City of Toruń, trying to meet the expectations of potential investors, set about to developing service infrastructure of the investment land. The first stage was preparing design plans and specifications, which include road development with lighting, rain drainage system, water infrastructure and sanitary drainage system. Next, on its basis, developing service infrastructure started on the land located in the area of the following streets: Grudziądzka, Polna and Ugory. This project is a chance for increasing the investment attractiveness of this area and preparing it for the needs of a potential investor. The investments, connected with developing service infrastructure on the JAR area, are the Toruń commune’s own tasks and they are realised by the Roads Authority in Toruń and Toruńskie Wodociągi Ltd. The JAR investment areas include the area planned for residential development, as well as a wide program of estate commercial services and public services in the scope of education, healthcare, sport, leisure and culture. Economical activation of areas adjoining the national road no. 91 was also taken into consideration, which delineated a strip of service and production land. A part of this area is under the auspices of Pomeranian Special Economic Zone, where one can operate a business on preferential terms, tailored to the individual needs of the entrepreneur. As a result of realising the abovementioned tasks, Toruń along with the whole region gained areas that are attractive for investment and attractive from the civilisation point of view. Urban regeneration of the JAR areas is an essential element of development of the city and is an effect of a long-term policy of the local government of the City of Toruń, which aims at development and raising the investment attractiveness of Toruń.


The scope of developing road infrastructure for the JAR investment areas Task

Length of section (in meters)

Task 1

2000

loop at Polna Street, Traktorowa Street with two sections on the south side

Task 2

1400

service road along Grudziądzka Street

Task 3

550

sections between Poland and Traktorowa Street

Task 4

630

north section of the service road along Grudziądzka Street

Task 5

350

new section connecting Polna and Grudziądzka Streets

Task 6

950

section of Ugory Street from Polna Street and further in the north direction towards JAR housing estate

Task 7

360

section of Polna Street in the existing outline up to railway tracks

Task 8

670

within the territory of JAR housing estate

Task 9

840

within the territory of JAR housing estate - closing of the loop

Tasks in progress Completed tasks

Description of the section


Action schedule for service infrastructure for the JAR areas No.

Task

Status

Realisation date / planned realisation date

1

Preparation of a local plan

Finished

2007

2

Geodetic divisions

Finished

2007

3

Performing the “Multi-business programme and spatial concept (...) JAR housing estate�

Finished

2008

4

Underground service infrastructure - 1st stage (tasks 1, 6, 8, 9), including: water pipelines and sewage piping; storm sewer system

Finished

2012

5

Underground service infrastructure - 2nd stage (tasks 2, 3, 4, 5, 7), including: water pipelines and sewage piping; storm sewer system

Finished

2012

6

Road infrastructure construction - 1st stage (task 6)

Finished

2012

7

Road infrastructure construction - 1st stage (task 1)

Under construction

2013 -2014

8

Road infrastructure construction - 1st stage (task 8)

To be constructed

2014

9

Road infrastructure construction - 2nd stage (task 2, 3, 4, 5, 7)

To be constructed

2014 - 2015

10

Road infrastructure construction - 1st stage (task 9)

To be constructed

2015


Real estate intended for multi-family apartment buildings No.

Planning unit

Number of floors

Plot no.

Area in ha

1

MW 1

III

207

2,4537

sold

2

MW 2

III

204, 239

2,8583

sold

3*

MW 3

III

198/1, 232/1

3,2453

4*

MW 4

III

202/2

1,8120

5

MW 5

III

171

3,2568

6

MW 6

III

129

2,7190

7

MW 7

III

163

3,1877

8

MW 8

III

187

3,2013

9

MW 9

IV

132

3,5536

10

MW 10

IV

162

4,0164

11

MW 11

IV

173

3,3885

12

MW 12

IV

175

3,2454

13

MW 13

IV

185

2,3925

14*

MW 14

IV

199

1,8952

200/1

1,7619

sold

200/2

1,4170

sold

200/3

3,1370

15

MW 15

IV

* Ownership of the Commune of the City of Toruń and TTBS

Sold


Real estate intended for services / production No. Planning unit

Plot no.

Area in ha

1

U/P72

157/1

3,1448

2

U/P72

157/2

3,4472

3

U/P73

166/1

3,3097

4

U/P73

166/2

2,7302

5

U/P73

166/3

2,5672

6

U/P74

191/1

3,1590

7

U/P74

191/2

2,3332

8

U/P74

191/3

2,3350

9

U/P74

191/4

2,3351

10

U/P74

191/5

2,3350

11

U/P74

191/6

2,3351

12

U/P74

191/7

2,3350

13

U/P74

191/8

2,3318

14

U/P74

191/9

2,8882

15

U/P74

191/10

2,4554

16

U/P74

191/11

2,0777

17

U/P75

215

1,5766

18

U/P76

217

5,9792

19

U/P77

220/1, 220/3

2,6427

20

U/P77

220/4

2,3517

Investment sites under patronage of the Pomeranian Special Economic Zone Ltd.


City Hall of Toruń The Investor Assistance Office 126b Grudziądzka Street, 87-100 Toruń, Poland phone: +48 56 611 84 09, +48 56 611 84 99 fax: +48 56 611 85 16 e-mail: boi@um.torun.pl www.boi.torun.pl


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.