MEXICO CONCRETE HOUSE

Page 1


Mexico concrete house Type: Commission Client: rigo Fernandez Collaborators: rigo Fernandez Location: Mexico Status: under construction Square footage: 4,492

Concept The idea is to transition a studio into a 3 bedroom house. The concept is to have large floor to ceiling windows for natural light Entry and to have open space on the second floor with master bed master, bath and walking closet. The patio space is great for Accommodating large parties and family gatherings.




EXISTING STRUCTURE


ADDITION OF TWO BEDROOMS AND STAIRS


ADD ROOF PLUS CANTILER OVER HANG FOR SECOND FLOOR


MASTER BEDROOM ADDITION


ADD ROOF TO MASTER BED ROOM AND ADD RAIL TO PATIO SPACE


SKY LIGHT AND LARGE WINDOWS FOR OPTIMOM LIGHT ENTRY WITH PATIO SHADING DEVICE


LARGE OPENINGS FOR OPTIMIUM VIEWS


25 1

0

3

3

3

1

1

2

1

0

1

3

-

4

5

---

1

-

A108

---

1

2

3

1

3

5

2

0

1

1

UP

1

1

1

3

1

1

1

1 3

2

2

1

2

3 6

3

1

1 A109

1

Level 1 1 : 96

CD PLAN LV1

RIGO

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

CD PLAN LV1 Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A101 Scale 1 : 96


1 5

3

1

2

3

2

13 7

-

1

---

A108

6

6

5

3

5

3

1

2

DN 3

1

1

2

1

2

1

3

2

1

4

1

1

1

3

2 3 13 2

1 A109

1

Level 2 1 : 96

RIGO

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

CD PLAN LV2

No.

Description

Date

CD PLAN LV2 Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A102 Scale 1 : 96


Bedroom

Walk in closet

Bedroom

Living

Stairs Passage

Bathroom

Closet

Kitchen

Dinning

Exterior circulation


MASTER BEDROOM

STAIRS

PATIO

MASTER BATH WALKING CLOSET

LANDING SPACE INTERIOR CIRCULATION


8

2

1

0

2.21

0.04

0.25

Level 2 4

0.35

3

3.00

0

11

3

3.46

8

Level 5 8

FLOOR LEVEL 0

0.32

Level 1 0

3

0.60

0.88

2.16

0.36 1.30

1.30

1.30 0.30

West 1 1 : 96

RIGO FERNANDEZ

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

CD WEST ELEVATION Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A107 Scale 1 : 96


8 4 6 1.41

1.41

1.41 0.37

1.80 2

Level 6 11 Level 4 11

0.37

6

4.36

Level 5 8

8

0.10

5.19 0.50 0.10

0.14 0.28

0.70

1

0.31

1.10

4.01

1

11

3.64

1.73

4

2.10

0.76

4

Level 1 FLOOR LEVEL 0 0

1

3.81

0.30

Level 2 4

0.80

1.47

0.70

1.36

1

East 1 : 96

0.360.81 0.81 0.81 0.81 0.81 0.810.36

RIGO FERNANDEZ

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

CD EAST ELEVATION Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A104 Scale 1 : 96


13

16.60 5

2

1

1

A109

0.41 0.49

Level 6 11 Level 4 11

2.93

0.30

0.31

2.10

0.80

0.30

8

0.28

0.10

1.29

Level 5 8

1.29 0.10

2

0.80

3.65

2

2.39

2.53

4

0.59

0.16

0.80

3

0.68

2.06

3

1.22

0.50

6

0

Level 2 4

2.74

0.91

0.91

Level 1 FLOOR LEVEL 0 0

2 1 2.20

0.98

0.36

3

1

25

North 1 : 96

RIGO FERNANDEZ

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

CD NORTH ELEVATION Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A106 Scale 1 : 96


17 2 14 12

1 8

A109 1.56 4.11

0.69 1.10

0.85 1.00

0.98

0.90

Level 6 11 Level 4 11

0.30

0.78 0.78

1

0.98

0.10

1.44

0.31 0.31

0.30

6

4

5

4.80

4.58

4.33

4.19

3.94

3.70

0.80 0.58

Level 2 4

2.10

4

Level 1 FLOOR LEVEL 0 0

0.50

00

1.00

3

3

0.35 0.04

3.55

0.30

0.35 0.35

0.31

1

2

10

2.54

3.50

5 4

Level 5 8

0.30

1.44

0.30

1.23

0.97 0.97

0.56 0.80

0.53

1.38

0.43

3.18

1.46

0.92

1.32

3.18

1.80

3.26 0.14

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

SOUTH ELEVATION Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A129 Scale 1 : 96

11/13/2019 5:20:02 PM

0.85

South 1 1 : 96


5.07

2.60

3.11

2.94

2.58

0.70

1 A109

0.30

Level 6 11 Level 4 11

Level 5 8

0.30

0.89

0.81 0.81

3.64

0.30

0.28

0.100.31

3.81

Level 2 4

1 A111

Level 1 FLOOR LEVEL 0 0

10.00

3.00

3.68

1.04

1.04

4.00

RIGO FERNANDEZ 1

Section 1 1 : 96

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

SECTION1 Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A108 Scale 1 : 96


7.60 1.80

5.70

Level 6 11 Level 4 11

Level 2 4

0.12

1.75

0.94

2.75

2.29

11.44

5.49

Level 5 8

4.36

1

Level 1 FLOOR LEVEL 0 0

2.77

Section 2 1 : 96

RIGO FERNANDEZ

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

SECTION2 Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A109 Scale 1 : 96


Level 4 11

Level 4 11

Level 5 8

Level 5 8 1.61

0.68

1.83

1.80

Level 2 4

Level 2 4 4

Section 5 - Callout 1 1 : 48

MASTER BATHROOM DETAILS 1 A109

3

Section 4 - Callout 1 1 : 48

RIGO FERNANDEZ

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

MASTER BATH DETAILS Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A110 Scale 1 : 48


0.91

0.91

1.83

2.94

0.50

Level 2 4

0.00

Level 1 0 FLOOR LEVEL 0 0.91

Level 1 0 FLOOR LEVEL 0 1

Section 1 - Callout 1 1 : 48

2.20 0.36 0.32

2

Section 1 Copy 1 - Callout 1 1 : 48

FIRST FOOR KITCHEN DETAILS

FRIST FLOOR BATHROOM DETAILS

RIGO FERNANDEZ

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

KIT & BATH 1 FLOOR DETAILS Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A111 Scale 1 : 48


1

{3D} Copy 1

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

EXPLODED Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A129 Scale


1

{3D}

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

AXO Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A130 Scale


1

{3D} Copy 2

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

3DSECTION Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A131 Scale


1

Site 1 : 100

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

Unnamed Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

SITE Scale 1 : 100


RIGO FERNANDEZ

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

REN EX VIEW1 Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A113 Scale


RIGO FERNANDEZ

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

REN EX VIEW 3 Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A114 Scale


RIGO FERNANDEZ

Owner

No.

Description

Date

REN EX VIEW 4 Project number Date

Project Number Issue Date


RIGO FERNANDEZ

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

REN EX VIEW 5 Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A116 Scale


RIGO FERNANDEZ

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

REN EXT VIEW 7 Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A119 Scale


Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

REN EX VIEW 6 Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A117 Scale


RIGO FERNANDEZ

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

REN EX VIEW 8 Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A123 Scale




RIGO FERNANDEZ

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

REN INT STAIR CASE Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A121 Scale


RIGO FERNANDEZ

Owner

No.

Description

Date

REN INT STAIR CASE 2 Project number Date

Project Number Issue Date


RIGO FERNANDEZ

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

REN INT VIEW BED ROOM Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A124 Scale


RIGO FERNANDEZ

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

REN IN VIEW KIT Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A126 Scale


RIGO FERNANDEZ

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

REN INT VIEW KIT Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A125 Scale


RIGO FERNANDEZ

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

REN INT MASTER BED Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A120 Scale


RIGO FERNANDEZ

Owner instagram.com/dyzine1studios

CONCRETE HOUSE

No.

Description

Date

REN VIEW MASTER BATH Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A128 Scale


mickel l. johnson mickellj3@gmail.com dyzine1studios@gmail.com 832.537.6304


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.