
1 minute read
Assessment of Infrastructure
7 RESERVE ASSESSMENT
Assessment of Infrastructure
The Reserve’s assets were inspected and recorded (see Figure 9). A preliminary assessment of asset condition is described in Table 2, complementing the MidCoast Council’s previously completed Conditions Report.9 The majority of the assets are in a good or very good condition reflecting the work of user groups and Council. Because of the number of assets involved, the approach was to segment the Reserve’s grounds into spatial activity clusters.
Table 2 – Condition of Land and Buildings
SECTION ASSET Cond. SECTION ASSET Cond.
Royce Dorney Arena Broadcasting box Lighting Fencing Seating - ring Arena surface Cattle yards Horse stalls Pony Club Store Bar
Stage Stage Pavilion Sports Centre
Swimming Admin / Entry Fence Pool Toddlers pool Amenities Pavilions Mervyn Richards Pavilion Gooch Pavilion L.B. Shultz Shed
Amenities Amenities Block
Playing fields Stephen Locke Shed Playing surface Cricket pitch Cricket practice net Drainage Lighting Tennis Clubhouse Courts Pagoda Lighting Other Main Entry Skatepark Camping/infrastructure Dump site Cattle stalls Boundary fencing Helipad
Very Good Good (satisfactory) Poor Very Poor (unserviceable)
9 Council’s Conditions Report was undertaken by GHD (April 2017).